Stouffville Stations Rer Project – Steeles Avenue East Underpass Project Update – Information As of March 2019

Total Page:16

File Type:pdf, Size:1020Kb

Stouffville Stations Rer Project – Steeles Avenue East Underpass Project Update – Information As of March 2019 TRANSFORMING TRANSIT IN YOUR AREA STOUFFVILLE STATIONS RER PROJECT – STEELES AVENUE EAST UNDERPASS PROJECT UPDATE – INFORMATION AS OF MARCH 2019 Metrolinx, an agency of the Province of Ontario, is working to transform the way the region moves by building a seamless, convenient and integrated transit network across the Greater Toronto and Hamilton Area (GTHA). Over the next 10 years, Metrolinx is transforming the existing GO rail system to deliver a whole new rapid transit experience to your community. With more frequent train service you’ll have more options to get you where you need to go. PROJECT BENEFITS Once the Project is complete in 2021, you’ll have: • A new grade separated pedestrian bridge and underpass at the Steeles Avenue East intersection between Kennedy Road and Midland Avenue. Vehicles will be able to pass under the railway, without having to stop or wait for trains. • The new pedestrian bridge across Steeles Avenue East will connect to both platforms at Milliken GO Station. • A new second track and platform at Milliken GO. • A renovated existing platform at Milliken GO. • Two new pedestrian tunnels with elevators. • Canopies and integrated shelters on the platforms to protect GO customers from the elements. • A canopy-covered walkway to Steeles Avenue. CONSTRUCTION UPDATE Work is well underway to make major improvements to the existing Stouffville line, which includes infrastructure upgrades to the Agincourt GO, Milliken GO, and Unionville GO Stations and to construct a new underpass at the railway crossing Steeles Avenue East. EllisDon Transit Infrastructure (the Contractor) is undertaking the construction of the Stouffville Regional Express Rail Project on behalf of Infrastructure Ontario and Metrolinx. This notice is to provide you with an update of planned work happening along Steeles Avenue East and what you can expect in the next few months. Early Draft Rendering 91 1 9 49 e KENNEDY ROAD THELMA AVENUE 3 TURFF AVENUE 3 OLD KENNEDY ROAD STEELES AVENUE EAST STEELES AVENUE EAST 43 D R A V E L U O B RED LEA AVENUE R A 33 ST R LVE SI 19 17 KENNEDY ROAD KENNEDY MIDLAND AVENUE AVENUE MIDLAND 1 IMPACTED BUSINESSES NO ACCESS FROM STEELES AVE E WEEKEND FULL CLOSURE - STEELES AVENUE EAST (BETWEEN REDLEA AVENUE AND SILVER STAR BOULEVARD) Our Contractor will implement a full closure of Steeles Avenue to conduct construction on the Stouffville line railway. The date of the full closure will be determined in the coming months and businesses will receive a notice in advance. Here’s what you can expect: • The full closure will occur from Friday at 8 p.m. until Monday at 6 a.m. (Dates to be confirmed) • During the closure, we will need to close Steeles Avenue East between Redlea Avenue and Silver Star Boulevard to construct a temporary diversion railway track through Steeles Avenue. • For this weekend, vehicles and pedestrians will not be able to access businesses between Redlea Avenue and Silver Star from Steeles Avenue East. • Business access will be available through alternate routes (See map above). • You will notice more heavy equipment and cranes in the construction area. THELMA AVENUE TURFF AVENUE OLD KENNEDY ROAD VENUE EAST - NOR LES A TH DIVE STEE RSION STEELES AVENUE EAST AREA UNDER STEELES AVENUE EAST CONSTRUCTION D R A V E L U O B R TA REDLEA AVENUE S ER LV SI DRIVEWAY CLOSED TEMPORARILY DRIVEWAY CLOSED PERMANENTLY STEELES AVENUE EAST TEMPORARYWORK AREA ROAD DIVERSION (BETWEEN REDLEA AVENUE AND OLD KENNEDY ROAD) Our Contractor will construct a temporary road diversion north of Steeles Avenue East between Redlea Avenue and Old Kennedy Road. This work will allow crews to build the new railway overpass bridge and pedestrian bridge at Steeles Avenue while maintaining traffic flow. Here’s what you can expect: • The temporary roadway will be in place for approximately one year. (Start date to be confirmed) • Business access will be available from Redlea Avenue and Silver Star Boulevard. (See map above). • Pedestrians will travel along the temporary roadway via new, temporary pedestrian sidewalks. • Drivers are asked to watch for traffic control personnel, obey posted speed limits at all times, and look out for signs directing drivers along the detour route. Early Draft Renderings CONTACT US VISIT US Should you have any questions concerning Stouffville Community Office the project or this upcoming work, please 4142 Sheppard Avenue East, Scarborough contact: Prince Hall at 416-202-1516 [Steps away from Agincourt GO Station] or email [email protected]. Hours of Operation: Tuesdays & Wednesdays (11 a.m. to 3:30 p.m.) STAY INFORMED To join the Steeles Underpass email newsletter, please: Email [email protected] | Follow us on Twitter @metrolinx | Visit us at Metrolinx.com/stouffville. Disponible en français. .
Recommended publications
  • Regional Express Rail Update
    Clause 5 in Report No. 10 of Committee of the Whole was adopted by the Council of The Regional Municipality of York at its meeting held on June 23, 2016 with the following additional recommendation: 3. Receipt of the memorandum from Daniel Kostopoulos, Commissioner of Transportation Services, dated June 22, 2016. 5 Regional Express Rail Update Committee of the Whole recommends adoption of the following recommendations contained in the report dated June 1, 2016 from the Commissioner of Transportation Services: 1. Metrolinx be requested to mitigate the impacts of Regional Express Rail service by addressing the gap between their Initial Business Case for Regional Express Rail and York Region’s needs for grade separations, additional GO stations and parking charges. 2. The Regional Clerk circulate this report to Metrolinx, Ontario Ministry of Transportation and Clerks of the local municipalities. Report dated June 1, 2016 from the Commissioner of Transportation Services now follows: 1. Recommendations It is recommended that: 1. Metrolinx be requested to mitigate the impacts of Regional Express Rail service by addressing the gap between their Initial Business Case for Regional Express Rail and York Region’s needs for grade separations, additional GO stations and parking charges. 2. The Regional Clerk circulate this report to Metrolinx, Ontario Ministry of Transportation and Clerks of the local municipalities. Committee of the Whole 1 June 9, 2016 Regional Express Rail Update 2. Purpose This report provides an update to Council on the Provincial Regional Express Rail (RER) Service Plan and associated staff activities as York Region’s response to the RER Service Plan to be implemented by the Province over the next 10 years.
    [Show full text]
  • Sep+10+Rail+Ex.Pdf
    Clause 4 in Report No. 13 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on September 24, 2015. 4 York Region’s Initial Response to Regional Express Rail Service Concept Committee of the Whole recommends: 1. Receipt of the presentation by Leslie Woo and James Purkis, Metrolinx. 2. Receipt of the deputation by Bryan Allen, resident of the Town of Newmarket, regarding train anti-whistling at rail crossings. 3. Receipt of the communication from Stephen D’Agostino, Thomson Rogers, on behalf of Colebay Investments Inc., Highcove Investments Inc., Firwood Holdings Inc., Major McCowan Developments Limited, Summerlane Realty Corp. and Brentwood Estates Inc., dated September 10, 2015. 4. Adoption of the following recommendations contained in the report dated August 31, 2015 from the Commissioner of Transportation Services: 1. Recommendations It is recommended that: 1. Council endorse the recommendations contained in the body of this report as the Region’s next steps to respond to the Province of Ontario’s plan to expand service on existing GO rail corridors under the concept plan referred to as Regional Express Rail. 2. The Regional Clerk forward this report to the Ontario Minister of Transportation, President and Chief Executive Officer of Metrolinx and Clerks of the local municipalities. Committee of the Whole 1 Transportation Services September 10, 2015 York Region’s Initial Response to Regional Express Rail Service Concept 2. Purpose The purpose of this report is to update Council on the Provincial GO Regional Express Rail (RER) Service Plan, respond to comments Council raised and to seek Council’s endorsement of the staff recommendations contained in this report as York Region’s initial response to the RER Service Plan as the Province moves forward with implementation of this project over the next 10 years.
    [Show full text]
  • The One Toronto Transit Plan the One Toronto Transit Plan
    THE ONE TORONTO TRANSIT PLAN THE ONE TORONTO TRANSIT PLAN As Mayor, John Tory will make Toronto more liveable, affordable and functional. Public transit is at the heart of what it takes to improve Toronto in each of these areas. John Tory’s One Toronto Transit Plan is a collection of initiatives and public transit investments that will get our city moving in seven years, and provide relief to the Yonge-University-Spadina subway line. THE ONE TORONTO PLAN WILL: • Start construction of the Scarborough subway extension immediately. • Engage the City with the Government of Ontario’s and Metrolinx’s plans for Regional Express Rail (RER) – all-day, two-way surface subway service on existing GO track lines with new higher-speed vehicles . • Start with the SmartTrack line as the first RER project, providing 53 km of relief. The SmartTrack line will run from the Airport Corporate Centre in the west, down to Union Station and back up to Markham in the east, with 22 new station stops and four interchanges with the TTC rapid transit network. • Finance the City’s one third of the capital cost of the SmartTrack line without raising property taxes, using tax increment financing. • Provide new express bus services for a segment of travelers that can be moved much quicker if fewer stops are made en route. Examples, which have been discussed, include, Don Mills Road, Dufferin Street and Front Street/Liberty Village. THE ONE TORONTO TRANSIT PLAN BENEFITS ASSOCIATED WITH TORY’S ONE TORONTO TRANSIT RELIEF PLAN INCLUDE: • Bringing relief sooner, to more Torontonians, rather than just the downtown- concentrated proposals of other candidates.
    [Show full text]
  • Cultural Heritage Screen Report
    Lincolnville Go Station Improvements: Cultural Heritage Screening Report Prepared for: Metrolinx 20 Bay Street, Suite 1800 Toronto ON M5J 2W3 ~ METROLINX Prepared by: Stantec Consulting Ltd. 300W-675 Cochrane Drive Markham ON L3R 0B8 () Stantec File No. 1135200010 October 12, 2017 LINCOLNVILLE GO STATION IMPROVEMENTS: CULTURAL HERITAGE SCREENING REPORT Project Personnel EA Project Manager: Alex Blasko, B.Sc. (Hon.) Heritage Consultant: Heidy Schopf, MES, CAHP Task Manager: Meaghan Rivard, MA, CAHP Report Writer: Heidy Schopf, MES, CAHP Laura Walter, MA GIS Specialist: Sean Earles Office Assistants: Carol Naylor Quality Review: Meaghan Rivard, MA, CAHP Independent Review: Tracie Carmichael, BA, B. Ed. () Stantec Sign-off Sheet This document was prepared by Stantec Consulting Ltd. (“Stantec”) for the account of Metrolinx (the “Client”). The material in it reflects Stantec’s professional judgment in light of the scope, schedule and other limitations stated in the document and in the contract between Stantec and the Client. The opinions in the document are based on conditions and information existing at the time the document was published and do not take into account any subsequent changes. The report has been prepared based, in part, on information provided by others as cited in the Reference section. Stantec has not verified the accuracy and / or completeness of third party information. Prepared by (signature) Heidy Schopf, MES, CAHP Cultural Heritage Specialist Reviewed by (signature) Signed by Tracie Carmichael on behalf of: Meaghan Rivard,
    [Show full text]
  • Smarttrack Ridership Analysis: Project Final Report
    SMARTTRACK Research Report RIDERSHIP ANALYSIS Project Final Report Eric J. Miller, James Vaughan, Monika Nasterska June 2016 SMARTTRACK RIDERSHIP ANALYSIS PROJECT FINAL REPORT Prepared for the City Manager, City of Toronto by: Eric J. Miller, Ph.D. Professor, Department of Civil Engineering Director, Transportation Research Institute Research Director, Travel Modelling Group University of Toronto James Vaughan & Monika Nasterska Travel Modelling Group, University of Toronto Transportation Research Institute June, 2016 i Executive Summary Project Objectives On December 11, 2014, City Council directed the City Manager in consultation with the Province/Metrolinx to develop a work plan to undertake an accelerated review of the SmartTrack and RER plans. Council also directed the City Manager to retain the specialized services of the University of Toronto Transportation Research Institute (UTTRI) to support the planning analysis and required transit ridership modelling as a component of the overall review.1 On February 10, 2015, City Council considered the report EX2.2 SmartTrack Work Plan (2015- 2016), and approved the accelerated work plan for the review of SmartTrack.2 The UTTRI component of this work was to provide transit ridership estimates and other key network performance measures using the City’s new Regional Travel Demand Model (GTAModel Version 4.0) developed at the University of Toronto by UTTRI. As detailed in the final Terms of Reference for the UTTRI work, this work included: • Confirming the integrated RER and SmartTrack Service Concept to be modelled. • Completion and validation of a new travel demand model system to be used by the City of Toronto in this and similar studies of transit ridership and travel demand.
    [Show full text]
  • SW Agincourt Consultation Summary November 2020
    Southwest Agincourt Transportation Connections Study Public Consultation Report December 2020 Prepared by: Stephanie Gris Senior Public Consultation Coordinator Public Consultation Unit, City of Toronto Contents 1.0 Introduction ........................................................................................................................................... 3 1.1 Study Background ........................................................................................................................... 3 1.2 Potential Transportation Solutions ................................................................................................ 4 2.0 Notification ............................................................................................................................................ 5 3.0 Consultation Activities ......................................................................................................................... 5 3.1 Indigenous Community Consultation ........................................................................................... 5 3.2 Agency and Utility Consultation ..................................................................................................... 6 3.3 Property Owner Consultation ......................................................................................................... 6 3.4 Consultation with the Agincourt Village Community Association ............................................. 6 3.5 Consultation with the Public ..........................................................................................................
    [Show full text]
  • (BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016
    Bolton Residential Expansion Study (BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016 The purpose of this memorandum is to review the professional literature pertaining to the potential develop- ment of a Transit-Oriented Development (TOD) in the Bolton Residential Expansion Study area, in response to the Region of Peel’s recent release of the Discussion Paper. The Discussion Paper includes the establishment of evaluation themes and criteria, which are based on provincial and regional polices, stakeholder and public comments. It should be noted that while the Discussion Paper and the Region’s development of criteria does not specifi- cally advocate for TOD, it is the intent of this memorandum to illustrate that TOD-centric planning will not only adequately address such criteria, but will also complement and enhance the Region’s planning principles, key points and/or themes found in stakeholder and public comments. In the following are research findings related to TOD generally, and specifically, theMetrolinx Mobility Hub Guidelines For The Greater Toronto and Hamilton Area (September 2011) objectives. Additionally, following a review and assessment of the “Response to Comments Submitted on the Bolton Residential Expansion Study ROPA” submission prepared by SGL Planning & Design Inc. (March 15, 2016), this memorandum evaluates some of the key arguments and assumptions made in this submission relative to the TOD research findings. Planning for Transit-Oriented Developments TOD policy and programs can result in catalytic development that creates walkable, livable neighborhoods around transit providing economic, livability and equitable benefits. The body of research on TODs in the United States has shown that TODs are more likely to succeed when project planning takes place in conjunction with transit system expansion.
    [Show full text]
  • Metrolinx GO Expansion: Time Extension of Dowry Street Temporary Road Closure
    Revised SC10.18 REPORT FOR ACTION Metrolinx GO Expansion: Time Extension of Dowry Street Temporary Road Closure Date: September 24, 2019 To: Scarborough Community Council From: Director, Planning and Capital Program, Transportation Services Wards: Ward 22 Scarborough-Agincourt SUMMARY This staff report is about a matter that Community Council has delegated authority to make a final decision provided that it is not amended so that it varies with City policy or by-laws. Metrolinx's contractor EllisDon is currently undertaking infrastructure improvements at the Agincourt GO Station. A 44.1 metre long section of Dowry Street leading up to the Station is currently closed to facilitate construction work. A time extension of the existing road closure on Dowry Street is required from November 6, 2019 to October 31, 2021 to complete the required works. RECOMMENDATIONS The Director, Planning and Capital Program, Transportation Services recommends that: 1. Scarborough Community Council temporarily close Dowry Street to vehicular traffic between a point 15 metres west of the east end of Dowry Street and a point 44.1 metres further west, from November 6, 2019 to October 31, 2021 inclusive, to facilitate infrastructure improvements at the Agincourt GO Station. FINANCIAL IMPACT There is no financial impact to the City of Toronto associated with this report. EllisDon, the contractor for this Metrolinx project, is required to implement all recommendations as conditions of permit approval. The Chief Financial Officer has reviewed this report and agrees with the financial impact information. Metrolinx GO Expansion: Time Extension of Dowry Street Temporary Road Closure DECISION HISTORY At its meetings on May 22, 23 and 24 2018, City Council adopted an amended Item PW29.1 entitled "Metrolinx Projects: Temporary Delegation for Long-Term Road Closures".
    [Show full text]
  • Tel: 905-795-0639 Friday, Octoberjune 2, 201730, 2020 Volvol 26, 23, No
    www.WeeklyVoice.com FRONT PAGE Friday, August 21, 2020 | A-1 Canada’s Leading South Asian Newspaper - Tel: 905-795-0639 Friday, OctoberJune 2, 201730, 2020 www.WeeklyVoice.com VolVol 26, 23, No. No. 44 22 PM: 40025701 A-2 | Friday, October 30, 2020 www.WeeklyVoice.com www.WeeklyVoice.com FRONT PAGE Friday, August 21, 2020 | A-3 Canada’s Leading South Asian Newspaper - Tel: 905-795-0639 Friday, OctoberJune 2, 201730, 2020 www.WeeklyVoice.com VolVol 26, 23, No. No. 44 22 PM: 40025701 Action On Electronic Logging On Trucks, page 6 Plastic Capture Technology For The Great Lakes, page 8 Osler Getting Funds To Boost Bed Capacity, page 13 Ottawa Will Boost Recovery Incentives Measures Will Be Expensive, But We Need A Macro-Economic Approach Says Freeland At Forum OTTAWA: The Canadian Gov- will only be able to recover fully contact tracers. “And last spring, ernment is doing everything it once we have defeated the virus.” when they were needed, the takes to protect Canadians’ health Prime Minister Justin Trudeau women and men of the Canadian and jobs and to put COVID-19 hailed the speech and tweeted: Armed Forces went in to care for, behind us as quickly as we can, “No one should have to face this and protect, our elders.” Deputy Prime Minister and Fi- pandemic alone - not workers, Freeland was the keynote nance Minister Chrystia Freeland not families, not business owners. speaker on on the last day of said on Wednesday. That’s why we’ve stepped up to the three-day virtual conference, In a speech to the Toronto help.
    [Show full text]
  • Metrolinx Annual Report 2011-2012 Cover Photo: Glass Panel Installation at Union Station As Part of the Revitalization Project, April 2012
    Metrolinx Annual Report 2011-2012 Cover photo: Glass panel installation at Union Station as part of the Revitalization project, April 2012. Table of Contents MESSAGE FROM THE CHAIR 4 MESSAGE FROM THE CEO 5 GOVERNANCE STRUCTURE 6 OUR VISION, MISSION, VALUES 7 TRANSFORMING TRANSPORTATION 8 KEY ACHIEVEMENTS 9 Rapid Transit Implementation 9 Air Rail Link 9 GO Transit Infrastructure 10 Union Station 10 Acquiring Rail Corridors – More Ownership, Greater Control 10 Substainability 10 SERVICE EXPANSION 11 CUSTOMER SATISFACTION 12 PLAN 14 Regional Planning 14 GO Planning 14 Mobility Hubs 15 INNOVATION 16 INVEST 17 SUMMARY OF FINANCIAL RESULTS 18 AUDITED FINANCIAL STATEMENTS 34 2011-2012 • METROLINX ANNUAL REPORT 3 Letter from the Chair The 2011-12 fiscal year was another transformative one for Metrolinx and the organization made significant progress towards reshaping transportation in this region. Metrolinx is committed to the three cornerstones of strategic focus: planning, investing and delivering. Over the past year, the continued work on building our infrastructure projects, planning for the future connectivity of the region and ensuring we’re investing in the communities we serve are directly aligned to these areas. Demonstrating our commitment to building major regional rapid transit projects, we started construction on the Eglinton Crosstown LRT; a project that is one of the most transformative transit projects in Toronto’s history, and one of great focus over the next decade. Our work continued with our partners on rapid transit in York Region and dedicated bus lanes in Mississauga. Our continued commitment to the GO Transit passenger experience was exemplified with more service to new regions, providing more riders with different transit options.
    [Show full text]
  • Decision Document City Council
    2010-05-11 Decision Document - City Council http://www.toronto.ca/legdocs/mmis/2010/cc/decisions/2010-05-11-cc4... Decision Document City Council Meeting No. 49 Contact Marilyn Toft, Manager Meeting Date Tuesday, May 11, 2010 Phone 416-392-7032 Wednesday, May 12, 2010 Start Time 9:30 AM E-mail [email protected] Location Council Chamber, City Hall The Decision Document is for preliminary reference purposes only. Please refer to the Council Minutes for the official record of Council's proceedings. Routine Matters - Meeting 49 RM49.1 Presentation Received Ward: All Moment of Silence City Council Decision May 11, 2010 Members of Council observed a moment of silence and remembered the following persons who passed away: Florence Honderich Louis (Lou) Lockyer, and Carlo Varone May 12, 2010 Members of Council observed a moment of silence and remembered the following person who passed away: Fred Foster Background Information (City Council) Condolence Motion for Florence Honderich (http://www.toronto.ca/legdocs/mmis/2010/rm/bgrd/backgroundfile-30358.pdf ) Condolence Motion for Louis (Lou) Lockyer (http://www.toronto.ca/legdocs/mmis/2010/rm/bgrd/backgroundfile-30359.pdf ) Condolence Motion for Carlo Varone (http://www.toronto.ca/legdocs/mmis/2010/rm/bgrd/backgroundfile-30360.pdf ) Condolence Motion for Fred Foster (http://www.toronto.ca/legdocs/mmis/2010/rm/bgrd/backgroundfile-30361.pdf ) 1 of 162 6/18/2010 11:57 PM 2010-05-11 Decision Document - City Council http://www.toronto.ca/legdocs/mmis/2010/cc/decisions/2010-05-11-cc4... RM49.2 ACTION Adopted Ward: All Confirmation of Minutes City Council Decision City Council confirmed the Minutes of Council from the regular meeting held on March 31 and April 1, 2010, and the special meeting held on April 15, 2010, in the form supplied to the Members.
    [Show full text]
  • GO Transit's Deliverable: the 2020 Service Plan
    GO Transit’s deliverable: the 2020 Service Plan GO Transit’s 2020 Service Plan describes GO’s commitment to customers, existing and new, Success… and challenge: Union Station. to provide a dramatically expanded interregional transit option that integrates fully with the About 95% of GO Train customers travel RTP rapid transit network, and addresses the future travel needs in the Greater Golden to or from Union Station. During the peak Horseshoe. Further analysis during the planning and design of individual services will detail the hour, 45,000 customers use GO Transit’s service outline presented here, and define the appropriate technology, rail corridor improve - seven tracks and six platforms – the most ments, bus priority measures, passenger facilities, fleet growth, operational growth, and other intensive use of a train station in North activities needed to build the service. America. GO Transit has invested in more stairways, passenger waiting areas, This 2020 Service Plan summarizes the frequency and extent of service to be offered on and communications systems to handle major corridors, and is consistent with the infrastructure improvements and technologies the growing traffic through this “mobility included in the Metrolinx RTP and GO Transit’s vision and objectives described above. hub.” The adjacent Union Station GO Bus The plan reflects a significantly more proactive approach to service development than the Terminal provides convenient access to incremental, business-case driven approach that has guided GO’s growth for the past 15 express “train-bus” service between Union years. GO Transit will provide an attractive travel option that will compete successfully with Station and GO stations when trains are not automobile use for peak and off-peak trips between Urban Growth Centres identified in scheduled to run.
    [Show full text]