From: Currie, Leslie (MTO) [mailto:Leslie.Currie@.ca] Sent: December-14-18 12:18 PM To: Katie Bright Cc: Leanna Burgess; Halim Abdihalim; Rupesh Udash; Simon Strauss Subject: RE: Two projects - request for feedback re: potentially interested Indigenous communities

Hi Kaitie; Based on my experience your contact lists look similar to what I would develop at MTO As always, the final decision is up to , and should follow the advice of Metrolinx Legal Services Feel free to contact me if you have any further questions Leslie Currie Indigenous Liaison Phone: 416-235-5229 Cell: 647-274-8489 From: Katie Bright [mailto:Katie Bright@metrolinx com] Sent: December 14, 2018 10:38 AM To: Currie, Leslie (MTO) Cc: Leanna Burgess ; Halim Abdihalim ; Rupesh Udash ; Simon Strauss Subject: Two projects - request for feedback re: potentially interested Indigenous communities Hi Leslie, There are two projects that Metrolinx would appreciate your feedback on re: potentially interested Indigenous communities Below are project descriptions and the lists developed to date: Expansion of Milton GO Station, Redevelopment of Meadowvale GO Station, and Construction of the New Station Operations West Facility Metrolinx is currently completing environmental due diligence studies, including a Stage 1-2 archaeological assessment, for the Expansion of Milton GO Station, Redevelopment of Meadowvale GO Station, and Construction of the New Station Operations West Facility Attached is a study area figure – the study area falls within the Town of Milton and the City of , in the regional municipalities of Halton and Peel in Ontario Here is the list we are working with at the moment: · Mississaugas of the New Credit First Nation · Huron-Wendat Nation · Six Nations · Haudenosaunee Confederacy Chiefs Council Scarborough Junction Grade Separation Project This project is located in the City of and includes: · New tracks: one heading north on Stouffville and one heading east on Lakeshore East · Rail/rail grade separation of the new Stouffville connection under the Lakeshore East tracks at Scarborough Junction · Re-located Scarborough GO Station building to accommodate new tracks · Stouffville rail corridor: § Depressed rail corridor along Stouffville from Corvette Avenue to Danforth Road § Depressed rail grade separation at Danforth Road § Grade separation of the pedestrian crossing at Corvette Avenue · Lakeshore East rail corridor: New alignment of Lakeshore East tracks to the north New rail carrying structure over Midland Avenue Study area:

Here is the list we are working with at the moment: · Williams Treaties First Nations: Alderville First Nation Beausoleil First Nation Chippewas of Georgina Island Chippewas of Mnjikaning First Nation (Rama) Curve Lake First Nation Hiawatha First Nation Mississaugas of Scugog Island First Nation · Mississaugas of the New Credit First Nation · Huron-Wendat Nation · Kawartha Nishnawbe First Nation · Métis Nation of Ontario FYI, the list above matches the list we previously discussed for some other projects close to this project I understand that IAO is anticipated to release updated advice re: consulting with Métis communities and organizations – that will be considered once received Any feedback you can provide would be greatly appreciated Thanks and regards, - Katie Katie Bright, MCIP, RPP Manager (A), Environmental Programs and Assessment Metrolinx 10 Bay Street | Toronto | Ontario | M5J 2R8 T: 416 202 4967 C: 647 927 5065

This e-mail is intended only for the person or entity to which it is addressed If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments

This e-mail is intended only for the person or entity to which it is addressed If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments From: Desautels, Solange (MECP) To: Simon Strauss Cc: Rupesh Udash; James Hartley; Batista, Cindy (MECP) Subject: RE: Scarborough Junction Grade Separation Date: Thursday, January 10, 2019 4:57:16 PM Attachments: image001.png

Hi. Thanks for your message. Yes that information would be good. Do u also want confirmation of Aboriginal communities that is something that needs to be done first and do u have a list of communities yet.

Solange Desautels | Supervisor Central and East Unit|Environmental Assessment Services Section | Environmental Assessment and Permissions Branch | Ministry of the Environment, Conservation and Parks | 135 St Clair Ave W |1st Floor |Toronto ON M4V 1P5| T: 416-314-7241 |

From: Simon Strauss [mailto:[email protected]] Sent: January 10, 2019 3:18 PM To: Desautels, Solange (MECP) Cc: Rupesh Udash; James Hartley Subject: Scarborough Junction Grade Separation

Good afternoon Solange,

Happy new year, I hope you had a wonderful break.

I called a couple of days ago, and wanted to follow up: we are in the pre-TPAP phase of a new project, the Scarborough Junction Grade Separation, and I wanted to reach out to the MECP as we start preparing for the TPAP. In terms of initial steps, I would like to confirm what information you would need in order to assign a Project Officer. I’m assuming at a minimum:

· Project description · Study area map · Proposed TPAP schedule

Thanks very much, a feel free to give a call if that would be easier.

Regards,

Simon Strauss Project Manager, Environmental Programs & Assessment Metrolinx 10 Bay St., 14th Floor | Toronto | Ontario | M5J 2W3 T: 416.202.3919 C: 647.283.0895

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: ESA Aurora (MNRF) To: Giesbrecht, Debra Subject: RE: Information Request - Scarborough Junction, Metrolinx Date: Monday, January 21, 2019 10:23:39 AM Attachments: image001.png

Ms. Giesbrecht;

We find your background information to be extensive and complete. MNRF has nothing further to add.

Thank you for your time

JEFF J. ANDERSEN

MANAGEMENT BIOLOGIST || ONTARIO MINISTRY OF NATURAL RESOURCES & FORESTRY || AURORA DISTRICT

50 Bloomington Road, Aurora ON L4G 0L8 | [email protected] | 905.713.7341

From: Giesbrecht, Debra Sent: January 15, 2019 11:48 AM To: ESA Aurora (MNRF) Cc: [email protected]; [email protected] Subject: Information Request - Scarborough Junction, Metrolinx

Attention : ESA Aurora,

I have attached an information request letter for Scarborough Junction Grade Separation (a Metrolinx project). I conducted a background review following guidance outlined in the Southern Region Natural Heritage Information Request Guide. I am requesting any additional information, which may not be in the NHIC database.

Thanks in advance for your consideration of this request.

Sincerely,

Debbie Giesbrecht

Debbie Giesbrecht M.Sc. Senior Ecologist

Direct: 905 381-3214 Mobile: 289 775-6249 Fax: 905 385-3534 [email protected]

Stantec 200-835 Paramount Drive Stoney Creek ON L8J 0B4

The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately.

From: Kevin DeMille To: Walter, Laura Subject: RE: Information Request - Scarborough Junction Grade Separation Project – Cultural Heritage Assessment Report Date: Monday, March 4, 2019 9:44:17 AM Attachments: image004.png

Good morning Laura,

Thank you for your information request for the Cultural Heritage Assessment Report on the Scarborough Junction Grade Separation Project in the City of Toronto. Your request to verify the presence of conservation easements or OHT owned properties within or adjacent to the area displayed in the map you provided has been processed. I’ve reviewed the site against our database of OHT easements and properties. We can confirm that the OHT does not have any conservation easements or Trust-owned properties within or adjacent to the area that you provided in the map.

I also recommend you check the Trust’s register (available online) http://www.heritagetrust.on.ca/en/index.php/pages/tools/ontario-heritage-act-register or contact the local municipality to verify no local heritage properties are present within the identified study area.

The Heritage Planner, [email protected] at the Ministry of Tourism, Culture, and Sport can assist you with any questions you may have about any other provincially owned heritage properties within or adjacent to the study area.

Kind regards,

Kevin De Mille

Kevin De Mille| Heritage Planner Telephone: 416.314.5972 Email: [email protected]

heritagetrust.on.ca | doorsopenontario.on.ca

From: Walter, Laura [mailto:[email protected]] Sent: February-28-19 3:43 PM To: Kevin DeMille Cc: [email protected]; [email protected] Subject: Information Request - Scarborough Junction Grade Separation Project – Cultural Heritage Assessment Report

Good afternoon Kevin,

As part of the Environmental Assessment (EA) for the Scarborough Junction Grade Separation Project, Stantec is conducting a Cultural Heritage Assessment Report (CHAR) on behalf of Metrolinx. As a provincial crown agency, Metrolinx is subject to the 2010 Standards & Guidelines for Conservation of Provincial Heritage Properties (S&G) issued under the Ontario Heritage Act (OHA) as well as the Metrolinx Interim Cultural Heritage Management Process (2013).

Metrolinx is expanding its services as part of the GO Expansion program which will increase services both in terms of train frequency and availability. Given this proposed level of service, the current configuration at the Scarborough Junction in eastern Toronto (where the and merge) does not provide sufficient train capacity. To eliminate potential conflicts with opposing and express trains, grade separation between the Stouffville Line and Lakeshore East Line trains is being proposed.

The Scarborough Junction Grade Separation Project will include the following key components: New tracks: one heading north on Stouffville Line and one heading east on Lakeshore East Line. Rail/rail grade separation of the new Stouffville connection under the Lakeshore East tracks at Scarborough Junction. Re-located Scarborough GO Station building to accommodate new tracks. Stouffville Line: Depressed rail corridor along Stouffville line from Corvette Avenue to Danforth Road. Depressed rail grade separation at Danforth Road. Grade separation of the pedestrian crossing at Corvette Avenue. New rail bridge or bridge extension over St. Clair Avenue Lakeshore East Line: New alignment of Lakeshore East tracks to the north. New rail carrying structure over Midland Avenue.

The project impacts will be assessed following the Transit Project Assessment Process (TPAP), as prescribed in Ontario Regulation 231/08 under the Environmental Assessment Act. As part of the TPAP, an Environmental Project Report will be prepared for public review.

As part of the CHAR we are inquiring about any potential of Ontario Heritage Trust (OHT) conservation easements or OHT owned properties within or adjacent to the Cultural Heritage Assessment Area. The Cultural Heritage Assessment Area is located within the City of Toronto. The Cultural Heritage Assessment Area extends 50 metres around the Scarborough Junction Project Footprint and is bounded to the west by Kennedy Road, to the north by Eglinton Avenue East, to the east by McCowan Road, and to the south by Park Street.

Specifically, the Cultural Heritage Assessment Area spans across the following historical lots and concessions of the former Township of Scarborough, within the former County of York, now the City of Toronto. · Lots 26 to 30, Concession B

· Lots 26 to 30, Concession C

Could you please advise if there are any properties with an OHT conservation easement or any OHT owned properties within or adjacent to the Scarborough Junction Cultural Heritage Assessment Area?

For the ease of review, mapping has been prepared depicting the Cultural Heritage Assessment Area (see attached). This map appears in draft form and may contain confidential information not yet released to the public. We ask that you maintain confidentiality while responding to this inquiry.

If you have any questions, please feel free to contact me.

Thanks, Laura

Laura Walter MA Cultural Heritage Specialist

Direct: 519 780-8164 Cell: 226-962-6017 [email protected]

Stantec 1-70 Southgate Drive Guelph ON N1G 4P5

The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately.

From: Corey Wells [mailto:[email protected]] Sent: March-07-19 1:15 PM To: Rupesh Udash Cc: James Francis; James Hartley; [email protected]; [email protected]; Merlin Yuen; Renee Afoom-Boateng; Sandeep Malhotra; Simon Strauss Subject: Re: Request for Information - MX Scarborough Junction Grade Separation Project

Afternoon Rupesh,

Would you happen to have a project map that you could circulate? Preferably one that shows the delineation of the local/regional study area?

Many thanks in advance.

-Corey

_

Corey Wells, MSc Project Manager, Project Management Services Project Management Office | Corporate Services

T: 416-661-6600 ext. 5233 C: 437-772-3054 E: [email protected] A: 101 Exchange Ave., Vaughan Toronto and Region Conservation Authority (TRCA) | trca.ca

From: Rupesh Udash To: Renee Afoom-Boateng Cc: "[email protected]" , "[email protected]" , "[email protected]" , Simon Strauss , Sandeep Malhotra , James Hartley , James Francis , Merlin Yuen Date: 03/06/2019 09:46 AM Subject: Request for Information - MX Scarborough Junction Grade Separation Project

[attachment "SJGS TRCA Data Request_06_03_2019.pdf" deleted by Corey Wells/TRCA] Good morning Shalin,

Please find attached our request for information for the Scarborough Junction G/S project. The data request is with regards to the following: 1. Hydraulic Model: Massey Creek HEC-RAS 2. Hydrologic Model: Massey Creek Visual Otthymo 3. Floodplain mapping for Massey Creek

We are submitting this data request to collect information in support of the Transit Project Assessment Process for the project. Information obtained through this request will be used to document existing conditions and inform the effects assessment for the Project.

With regards to TRCA query (March 05) for the The Meadoway project, please note that there is a set of grade separation projects along the Stouffville Corridor that are also advancing, though like the Scarborough Junction G/S project these appear to be outside of the Meadoway Regional Study Area.

Please let me know if you have any questions.

Best regards,

Rupesh Udash Project Coordinator, Environmental Programs & Assessment Metrolinx 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416-202-4902 C: 647-938-9981

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

From: Hatcher, Laura (MTCS) [mailto:[email protected]] Sent: March-12-19 5:42 PM To: Simon Strauss; James Hartley; James Francis Cc: Registrar (MTCS); Barboza, Karla (MTCS); Zirger, Rosi (MTCS) Subject: RE: Scarborough Junction Grade Separation - Project introduction and request for information

MTCS File 0010365 – Scarborough Junction Grade Separation

Hi Simon,

As you may know, the Ministry of Tourism, Culture and Sport (MTCS) developed screening checklists to assist property owners, developers, consultants and others to identify known and potential cultural heritage resources:

· Criteria for Evaluating Archaeological Potential · Criteria for Evaluating Marine Archaeological Potential · Criteria for Evaluating Potential for Built Heritage Resources and Cultural Heritage Landscapes

I have used the document above (Built Heritage and Cultural Heritage Landscapes) in order to respond to your question: Question 3a. i. Is the property (or project area) identified, designated or otherwise protected under the Ontario Heritage Act as being of cultural heritage value e.g. a property that is designated by order of the Minister of Tourism, Culture and Sport as being of cultural heritage value or interest of provincial significance [s.34.5]? MTCS Response: To date, no properties have been designated by the Minister.

Question 3a.v. Is the property (or project area) identified, designated or otherwise protected under the Ontario Heritage Act as being of cultural heritage value included in the Ministry of Tourism, Culture and Sport’s list of provincial heritage properties? MTCS Response: At this time, there are no provincial heritage properties within the study area. Please note that if the subject lands or parts of the subject lands are owned or controlled by an Ontario Ministry or Prescribed Public Body (PPB) on behalf of the Crown (the list of PPBs is available as O. Reg. 157/10), a Ministry or PPB may have responsibilities under the Standards and Guidelines for Conservation of Provincial Heritage Properties.

I hope this helps. Let me know if you have any questions.

Sincerely,

Laura

Laura Hatcher, MCIP, RPP Heritage Planner Heritage Planning Unit | Programs and Services Branch | Ministry of Tourism, Culture and Sport 401 Bay Street Suite 1700 Toronto ON M7A 0A7 Tel. 416.314.3108 | email: [email protected]

From: Simon Strauss Sent: March-06-19 2:24 PM To: Barboza, Karla (MTCS) Cc: Hatcher, Laura (MTCS) ; James Hartley ; James Francis ; Registrar (MTCS) Subject: Scarborough Junction Grade Separation - Project introduction and request for information

Good afternoon Karla,

Please find attached a letter introducing the Scarborough Junction Grade Separation Project, and a request for information regarding heritage interests within the identified study area.

I look forward to your assistance with this, and please reach out if you have any questions or require any further information.

Best regards,

Simon Strauss Project Manager, Environmental Programs & Assessment Metrolinx 10 Bay St., 14th Floor | Toronto | Ontario | M5J 2W3 T: 416.202.3919 C: 647.283.0895

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. -----Original Message----- From: Batista, Cindy (MECP) [mailto:[email protected]] Sent: March-10-19 10:40 PM To: Simon Strauss; Malcolmson, Heather (MECP) Cc: James Hartley; James Francis; Desautels, Solange (MECP); Batista, Cindy (MECP) Subject: RE: Scarborough Junction Grade Separation - Project introduction and confirmation of Indigenous communities

Hello Simon,

Thanks for your email. Ministry staff will confirm the Indigenous community list and get back to you in approximately one week.

Thank again,

Cindy ______From: Simon Strauss [[email protected]] Sent: Wednesday, March 06, 2019 1:29 PM To: Malcolmson, Heather (MECP) Cc: Batista, Cindy (MECP); James Hartley; James Francis; Desautels, Solange (MECP) Subject: Scarborough Junction Grade Separation - Project introduction and confirmation of Indigenous communities

Good afternoon Heather,

Please find attached a letter introducing the Scarborough Junction Grade Separation Project (the Project). As per O.Reg. 231/08 s.7 (4), we are contacting you regarding a list of bodies that would be able to assist in identifying Indigenous communities that may be interested in the Project. The attached letter outlines the steps we have undertaken to identify these communities, and provides the list of communities that have been identified as potentially interested.

I look forward to your assistance with this, and please reach out if you have any questions or require any further information.

Best regards,

Simon Strauss Project Manager, Environmental Programs & Assessment Metrolinx 10 Bay St., 14th Floor | Toronto | Ontario | M5J 2W3 T: 416.202.3919 C: 647.283.0895

[cid:[email protected]] This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Corey Wells To: Rupesh Udash Cc: James Francis; James Hartley; [email protected]; [email protected]; Merlin Yuen; Renee Afoom- Boateng; Sandeep Malhotra; Simon Strauss Subject: RE: Request for Information - MX Scarborough Junction Grade Separation Project Date: Friday, March 8, 2019 1:48:18 PM Attachments: ATT00001.png ATT00002.png

Afternoon Rupesh,

It looks like our two "regional study areas" intersect, however I do not envision any direct impacts between projects. The Meadoway does cross the Stoufville Line between Kennedy and Midland, and we are particularly interested in the pedestrian bridge that crosses this embankment, however these are separate from your EA and will be explored through different channels.

Thanks again.

-Corey

_

Corey Wells, MSc Project Manager, Project Management Services Project Management Office | Corporate Services

T: 416-661-6600 ext. 5233 C: 437-772-3054 E: [email protected] A: 101 Exchange Ave., Vaughan

Toronto and Region Conservation Authority (TRCA) | trca.ca

From: Rupesh Udash To: Corey Wells Cc: James Francis , James Hartley , "[email protected]" , "[email protected]" , Merlin Yuen , Renee Afoom- Boateng , Sandeep Malhotra , Simon Strauss Date: 03/07/2019 02:20 PM Subject: RE: Request for Information - MX Scarborough Junction Grade Separation Project

[attachment "165011004_SJ_Study_Area_Map_20181207_dft.pdf" deleted by Corey Wells/TRCA] Hi Corey,

Please see attached for the Study Area Map. The figure depicts the project foot print and the preliminary study area for the EA. Is this sufficient for your need?

Thank you,

Rupesh Udash Project Coordinator, Environmental Programs & Assessment Metrolinx 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416-202-4902 C: 647-938-9981

From: Corey Wells [mailto:[email protected]] Sent: March-07-19 1:15 PM To: Rupesh Udash Cc: James Francis; James Hartley; [email protected]; [email protected]; Merlin Yuen; Renee Afoom-Boateng; Sandeep Malhotra; Simon Strauss Subject: Re: Request for Information - MX Scarborough Junction Grade Separation Project

Afternoon Rupesh,

Would you happen to have a project map that you could circulate? Preferably one that shows the delineation of the local/regional study area?

Many thanks in advance.

-Corey

_

Corey Wells, MSc Project Manager, Project Management Services Project Management Office | Corporate Services

T: 416-661-6600 ext. 5233 C: 437-772-3054 E: [email protected] A: 101 Exchange Ave., Vaughan

Toronto and Region Conservation Authority (TRCA) | trca.ca

From: Rupesh Udash To: Renee Afoom-Boateng Cc: "[email protected]" , "[email protected]" , "[email protected]" , Simon Strauss , Sandeep Malhotra , James Hartley , James Francis , Merlin Yuen Date: 03/06/2019 09:46 AM Subject: Request for Information - MX Scarborough Junction Grade Separation Project

[attachment "SJGS TRCA Data Request_06_03_2019.pdf" deleted by Corey Wells/TRCA] Good morning Shalin,

Please find attached our request for information for the Scarborough Junction G/S project. The data request is with regards to the following: 1. Hydraulic Model: Massey Creek HEC-RAS 2. Hydrologic Model: Massey Creek Visual Otthymo 3. Floodplain mapping for Massey Creek

We are submitting this data request to collect information in support of the Transit Project Assessment Process for the project. Information obtained through this request will be used to document existing conditions and inform the effects assessment for the Project.

With regards to TRCA query (March 05) for the The Meadoway project, please note that there is a set of grade separation projects along the Stouffville Corridor that are also advancing, though like the Scarborough Junction G/S project these appear to be outside of the Meadoway Regional Study Area.

Please let me know if you have any questions.

Best regards,

Rupesh Udash Project Coordinator, Environmental Programs & Assessment Metrolinx 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416-202-4902 C: 647-938-9981

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Simon Strauss To: Batista, Cindy (MECP) Cc: James Hartley; James Francis; Desautels, Solange (MECP) Subject: RE: Scarborough Junction Grade Separation - Project introduction and confirmation of Indigenous communities Date: Wednesday, March 13, 2019 12:47:36 PM Attachments: image001.png

Hi Cindy,

Thanks very much for your response, we appreciate the Ministry’s input on this. I can confirm that the project is still tracking for Summer 2020 for Minister’s Notice. Currently, the 90% EPR review by agencies is planned for late October 2019 (note that this is indicated in the second paragraph on page 2 of the letter).

Best regards,

Simon Strauss T: 416.202.3919 C: 647.283.0895

From: Batista, Cindy (MECP) [mailto:[email protected]] Sent: March-13-19 8:45 AM To: Simon Strauss Cc: James Hartley; James Francis; Desautels, Solange (MECP); Batista, Cindy (MECP) Subject: RE: Scarborough Junction Grade Separation - Project introduction and confirmation of Indigenous communities

Good Morning Simon,

Ministry staff have reviewed the attached incoming letter and can confirm that Metrolinx has included in their list of potentially interested Indigenous communities all of the communities that MECP would identify as potentially affected by or interested in this proposed transit project.

Currently we have this project tracking for a proposed Minister’s Notice date of Summer 2020. Can you kindly confirm that this is still accurate? A tentative date for when the ministry can expect a draft EPR would be helpful to provide, if possible.

Thanks,

Cindy Batista | Special Project Officer | Transit Coordinator Environmental Assessment Services | Environmental Assessment & Permissions Branch Ministry of the Environment, Conservation & Parks 135 St. Clair Avenue West, 1st Floor, Toronto, ON M4V 1P5 (416-314-7225 | Ê416-314-8452 | *[email protected]

If you have any accommodation needs or require communication supports or alternate formats, please let me know.

Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Simon Strauss Sent: March-06-19 1:30 PM To: Malcolmson, Heather (MECP) Cc: Batista, Cindy (MECP) ; James Hartley ; James Francis ; Desautels, Solange (MECP) Subject: Scarborough Junction Grade Separation - Project introduction and confirmation of Indigenous communities

Good afternoon Heather,

Please find attached a letter introducing the Scarborough Junction Grade Separation Project (the Project). As per O.Reg. 231/08 s.7 (4), we are contacting you regarding a list of bodies that would be able to assist in identifying Indigenous communities that may be interested in the Project. The attached letter outlines the steps we have undertaken to identify these communities, and provides the list of communities that have been identified as potentially interested.

I look forward to your assistance with this, and please reach out if you have any questions or require any further information.

Best regards,

Simon Strauss Project Manager, Environmental Programs & Assessment Metrolinx 10 Bay St., 14th Floor | Toronto | Ontario | M5J 2W3 T: 416.202.3919 C: 647.283.0895

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Rupesh Udash To: Renee Afoom-Boateng Cc: [email protected]; James Francis; [email protected]; [email protected]; Merlin Yuen; Sandeep Malhotra; Sharon Lingertat; Simon Strauss Subject: RE: Request for Information - MX Scarborough Junction Grade Separation Project Attachments: image001.png

Good Morning Renee,

I am just following up on the request below. Can you please let me know by when TRCA would be able to provide the information. Will you be sending the data sharing agreement in advance of sending the modelling data?

Thank you,

Rupesh Udash Project Coordinator, Environmental Programs & Assessment Metrolinx 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416-202-4902 C: 647-938-9981

From: Rupesh Udash Sent: March-19-19 9:42 AM To: 'Renee Afoom-Boateng' Cc: [email protected]; James Francis; [email protected]; [email protected]; Merlin Yuen; Sandeep Malhotra; Sharon Lingertat; Simon Strauss Subject: RE: Request for Information - MX Scarborough Junction Grade Separation Project

Good Morning Renee,

Can you please provide a contact from TRCA’s legal department when you send out the data sharing agreement. It is just in case we need any clarifications regarding the data sharing agreement.

Thank you,

Rupesh Udash Project Coordinator, Environmental Programs & Assessment Metrolinx 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416-202-4902 C: 647-938-9981

From: Renee Afoom-Boateng [mailto:[email protected]] Sent: March-18-19 10:43 AM To: Rupesh Udash Cc: [email protected]; James Francis; [email protected]; [email protected]; Merlin Yuen; Sandeep Malhotra; Sharon Lingertat; Simon Strauss Subject: RE: Request for Information - MX Scarborough Junction Grade Separation Project

Hi Rupesh

This is to let you know that I have received your request for TRCA hydraulic data and will be sending it to you as soon as it is ready.

I will forward to you a data agreement for your signature as well.

Renee

Renee Afoom-Boateng, MES, MCIP, RPP Senior Planner Infrastructure Planning and PermitsI Development and Engineering Services Division

T: 416-661-6600 ext. 5714 C: 647-290-4679 E: [email protected] A: 101 Exchange Avenue, Vaughan, ON L4K 5R6

Toronto and Region Conservation Authority (TRCA) I trca.ca

From: Rupesh Udash To: Sharon Lingertat Cc: "[email protected]" , "[email protected]" , "[email protected]" , Simon Strauss , Sandeep Malhotra , James Francis , Merlin Yuen , "Renee Afoom-Boateng" Date: 03/15/2019 09:45 AM Subject: RE: Request for Information - MX Scarborough Junction Grade Separation Project

Good Morning Sharon,

I received an out of office message from Renee’s inbox. I am reaching out to you in her absence regarding the status of the attached data request submitted to TRCA on March 06th. Can you please let us know when TRCA will be able to provide us with the information. Please let me know if there are any additional information you require to process the request.

Thank you,

Rupesh Udash Project Coordinator, Environmental Programs & Assessment Metrolinx 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416-202-4902 C: 647-938-9981

From: Rupesh Udash Sent: March-15-19 9:30 AM To: 'Renee Afoom-Boateng' Cc: '[email protected]'; '[email protected]'; '[email protected]'; Simon Strauss; Sandeep Malhotra; James Hartley; James Francis; Merlin Yuen Subject: RE: Request for Information - MX Scarborough Junction Grade Separation Project

Good Morning Renee,

I am just following up on the status of the data request for the hydraulic/hydrologic models. Please let me know if you need anything else to process this request.

Thank you,

Rupesh Udash Project Coordinator, Environmental Programs & Assessment Metrolinx 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416-202-4902 C: 647-938-9981

From: Rupesh Udash Sent: March-06-19 10:34 AM To: 'Renee Afoom-Boateng' Cc: '[email protected]'; '[email protected]'; '[email protected]'; Simon Strauss; Sandeep Malhotra; James Hartley; James Francis; Merlin Yuen Subject: RE: Request for Information - MX Scarborough Junction Grade Separation Project

Hi Renee,

My apologies. I meant to address you in the email below.

Regards,

Rupesh Udash T:416-202-4902 C:647-938-9981

From: Rupesh Udash Sent: March-06-19 9:46 AM To: Renee Afoom-Boateng Cc: '[email protected]'; '[email protected]'; '[email protected]'; Simon Strauss; Sandeep Malhotra; James Hartley; James Francis; Merlin Yuen Subject: Request for Information - MX Scarborough Junction Grade Separation Project

Good morning Shalin,

Please find attached our request for information for the Scarborough Junction G/S project. The data request is with regards to the following:

1. Hydraulic Model: Massey Creek HEC-RAS 2. Hydrologic Model: Massey Creek Visual Otthymo 3. Floodplain mapping for Massey Creek

We are submitting this data request to collect information in support of the Transit Project Assessment Process for the project. Information obtained through this request will be used to document existing conditions and inform the effects assessment for the Project.

With regards to TRCA query (March 05) for the The Meadoway project, please note that there is a set of grade separation projects along the Stouffville Corridor that are also advancing, though like the Scarborough Junction G/S project these appear to be outside of the Meadoway Regional Study Area.

Please let me know if you have any questions.

Best regards,

Rupesh Udash Project Coordinator, Environmental Programs & Assessment Metrolinx 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416-202-4902 C: 647-938-9981

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

[attachment "SJGS TRCA Data Request_06_03_2019.pdf" deleted by Renee Afoom- Boateng/TRCA] From: Rupesh Udash To: Mahdi Esmaeili Cc: Renee Afoom-Boateng; Cherilyn Silvestri; Simon Strauss Subject: RE: Request for Information - MX Scarborough Junction Grade Separation Project Date: Tuesday, April 16, 2019 9:05:35 AM Attachments: image002.png image003.png

Good Morning Mahdi,

Sorry for the dealy in getting back to you on this. Upon review of the data sharing agreement , we have made the following change. The revised DSA with the edits is attached. Please confirm that this is acceptable to TRCA. I will send out a Metrolinx signed version once you confirm.

Thank you,

Rupesh Udash T:416-202-4902 C:647-938-9981

From: Rupesh Udash Sent: March-26-19 2:41 PM To: 'Mahdi Esmaeili' Cc: Renee Afoom-Boateng; Cherilyn Silvestri; Simon Strauss Subject: RE: Request for Information - MX Scarborough Junction Grade Separation Project

Good Afternoon Mahdi,

Thank you for providing the data sharing agreement. We will review at our end get back to you.

Best Regards,

Rupesh Udash T:416-202-4902 C:647-938-9981

From: Mahdi Esmaeili [mailto:[email protected]] Sent: March-26-19 2:30 PM To: Rupesh Udash Cc: Renee Afoom-Boateng; Cherilyn Silvestri Subject: Fw: Request for Information - MX Scarborough Junction Grade Separation Project

Hi Rupesh,

Hope you are doing well. Attached please find the data sharing agreement. Please sign and send it back to me. I will provide you with the requested data as soon as they are ready. If you have any questions let me know please. Thank you.

Mahdi Esmaeili, EIT, CAN-CISEC, Technologist, Water Resources. Engineering Services | Restoration & Infrastructure Division

T: 416 661.6600 ext. 5554 E: [email protected] A: 101 Exchange Avenue, Vaughan, Ontario L4K 5R6

Toronto and Region Conservation Authority (TRCA) | trca.ca

----- Forwarded by Mahdi Esmaeili/TRCA on 03/26/2019 02:24 PM -----

From: Renee Afoom-Boateng/TRCA To: Mahdi Esmaeili/TRCA@MTRCA Cc: Cherilyn Silvestri/TRCA@MTRCA Date: 03/18/2019 10:48 AM Subject: Fw: Request for Information - MX Scarborough Junction Grade Separation Project

Hi Mahdi

Please see below request. Please send me the data agreement so I can forward it to the proponent when it is ready.

Renee

Renee Afoom-Boateng, MES, MCIP, RPP Senior Planner Infrastructure Planning and PermitsI Development and Engineering Services Division T: 416-661-6600 ext. 5714 C: 647-290-4679 E: rafoom-boateng@trca on.ca A: 101 Exchange Avenue, Vaughan, ON L4K 5R6

Toronto and Region Conservation Authority (TRCA) I trca.ca ----- Forwarded by Renee Afoom-Boateng/TRCA on 03/18/2019 10:47 AM -----

From: Rupesh Udash To: Sharon Lingertat Cc: "[email protected]" , "[email protected]" , "[email protected]" , Simon Strauss , Sandeep Malhotra , James Francis , Merlin Yuen , "Renee Afoom-Boateng" Date: 03/15/2019 09:45 AM Subject: RE: Request for Information - MX Scarborough Junction Grade Separation Project

Good Morning Sharon,

I received an out of office message from Renee s inbox I am reaching out to you in her absence regarding the status of the attached data request submitted to TRCA on March 06th Can you please let us know when TRCA will be able to provide us with the information Please let me know if there are any additional information you require to process the request

Thank you,

Rupesh Udash Project Coordinator, Environmental Programs & Assessment Metrolinx 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416-202-4902 C: 647-938-9981

From: Rupesh Udash Sent: March-15-19 9:30 AM To: 'Renee Afoom-Boateng' Cc: 'cwells@trca on.ca'; '[email protected]'; '[email protected]'; Simon Strauss; Sandeep Malhotra; James Hartley; James Francis; Merlin Yuen Subject: RE: Request for Information - MX Scarborough Junction Grade Separation Project

Good Morning Renee,

I am just following up on the status of the data request for the hydraulic/hydrologic models Please let me know if you need anything else to process this request

Thank you,

Rupesh Udash Project Coordinator, Environmental Programs & Assessment Metrolinx 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416-202-4902 C: 647-938-9981

From: Rupesh Udash Sent: March-06-19 10:34 AM To: 'Renee Afoom-Boateng' Cc: 'cwells@trca on.ca'; '[email protected]'; '[email protected]'; Simon Strauss; Sandeep Malhotra; James Hartley; James Francis; Merlin Yuen Subject: RE: Request for Information - MX Scarborough Junction Grade Separation Project

Hi Renee,

My apologies I meant to address you in the email below

Regards,

Rupesh Udash T:416-202-4902 C:647-938-9981

From: Rupesh Udash Sent: March-06-19 9:46 AM To: Renee Afoom-Boateng Cc: 'cwells@trca on.ca'; '[email protected]'; '[email protected]'; Simon Strauss; Sandeep Malhotra; James Hartley; James Francis; Merlin Yuen Subject: Request for Information - MX Scarborough Junction Grade Separation Project

Good morning Shalin,

Please find attached our request for information for the Scarborough Junction G/S project The data request is with regards to the following:

1 Hydraulic Model: Massey Creek HEC-RAS 2 Hydrologic Model: Massey Creek Visual Otthymo 3 Floodplain mapping for Massey Creek

We are submitting this data request to collect information in support of the Transit Project Assessment Process for the project Information obtained through this request will be used to document existing conditions and inform the effects assessment for the Project

With regards to TRCA query (March 05) for the The Meadoway project, please note that there is a set of grade separation projects along the Stouffville Corridor that are also advancing, though like the Scarborough Junction G/S project these appear to be outside of the Meadoway Regional Study Area

Please let me know if you have any questions

Best regards,

Rupesh Udash Project Coordinator, Environmental Programs & Assessment Metrolinx 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416-202-4902 C: 647-938-9981

This e-mail is intended only for the person or entity to which it is addressed If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments

This e-mail is intended only for the person or entity to which it is addressed If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments From: Lee, Dae Young (HC/SC) [mailto:[email protected]] On Behalf Of IA-ON / IE-ON (HC/SC) Sent: Wednesday, February 05, 2020 11:24 AM To: GO Expansion TPAP; Mirjana Osojnicki; Meghan Bratt Cc: IA-ON / IE-ON (HC/SC); Lee, Dae Young (HC/SC) Subject: RE: Metrolinx Public Meetings Notice – February 2020

Dear Metrolinx TPAP project managers,

Thank you for your letter dated January 30, 2020 providing Health Canada with the Notice of Public Meetings for GO infrastructure expansions planned under the Transit Project Assessment Process (TPAP) in accordance with Ontario Regulation 231/08. Health Canada's role in Impact Assessment (IA) / Environmental Assessment (EA) is founded in statutory obligations under the Impact Assessment Act, which provides the legal basis for the federal IA process. Health Canada is a federal department with knowledge and expertise that can be called upon by responsible authorities, review panels, Indigenous groups and/or other jurisdictions leading IA/EAs to determine whether there are potential health risks associated with proposed projects and how to prevent, reduce or mitigate them. Upon receipt of a request from one of the above noted groups, Health Canada may participate in this IA/EA process.

However, should you have any specific questions related to human health or Health Canada guidance documents on IA, please contact us.

Kind regards,

From: GO Expansion TPAP Sent: 2020-01-30 2:34 PM To: GO Expansion TPAP Subject: Metrolinx Public Meetings Notice – February 2020

​​​ Metrolinx, an agency of the , is bringing more transit and more connections to more places within the Greater Golden Horseshoe and surrounding communities. Every community transit project, big or small, plays a vital role in the regional transportation system. We want to share our plans and get your feedback. Starting in February 2020, we will be hosting public meetings to share project updates and seek input on four of Metrolinx’s projects to build new rail infrastructure:

New Track and Facilities Transit Project Assessment Process (TPAP) Scarborough Junction Grade Separations TPAP Stouffville Grade Separations TPAP Network-Wide Structures Project We are also seeking input on updates to several of Metrolinx’s network-wide technical studies including:

Noise & Vibration Air Quality Vegetation Management Program Heritage & Archaeology Natural Environment These projects are being planned under the Transit Project Assessment Process (TPAP) in accordance with Ontario Regulation 231/08, Transit Projects and Metrolinx Undertakings. Please find attached a copy of the Public Meeting Notice containing the dates, times and locations for the meetings, as well as a location map and additional information. In the meantime, if you would like to receive additional information related to these projects, please visit www.metrolinxengage.com or for project-specific inquiries, contact us directly:

Scarborough Junction Grade Separations New Track and Facilities TPAP: TPAP, Stouffville Grade Separations TPAP, Mirjana Osojnicki Network-Wide Structures Project: Manager, Environmental ​Programs and Meghan Bratt Assessment Manager, Environmental Programs and Metrolinx Assessment 10 Bay Street, Toronto, ON M5J 2R98 Metrolinx [email protected] 10 Bay Street, Toronto, ON M5J 2R98 [email protected]

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Batista, Cindy (MECP) Sent: Friday, January 31, 2020 9:38 AM To: Mirjana Osojnicki; Meghan Bratt Cc: Batista, Cindy (MECP); Desautels, Solange (MECP) Subject: FW: Metrolinx Public Meetings Notice – February 2020 Attachments: GO Expansion Newspaper Ad_Final_English.pdf

Good Morning Mirjana and Meghan,

Thank you for sharing this information with the ministry. It would be helpful to know when the ministry may expect to see the draft technical supporting documents and the draft EPRs for the upcoming transit projects listed below. According to our records, Mx was aiming to submit technical reports this month and draft EPRs in February. Can you kindly provide the ministry with the new target dates?

Thank you,

Cindy

From: GO Expansion TPAP Sent: January 30, 2020 3:02 PM To: GO Expansion TPAP Subject: Metrolinx Public Meetings Notice – February 2020

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender.

Metrolinx, an agency of the Government of Ontario, is bringing more transit and more connections to more places within the Greater Golden Horseshoe and surrounding communities. Every community transit project, big or small, plays a vital role in the regional transportation system. We want to share our plans and get your feedback. Starting in February 2020, we will be hosting public meetings to share project updates and seek input on four of Metrolinx’s projects to build new rail infrastructure:

 New Track and Facilities Transit Project Assessment Process (TPAP)  Scarborough Junction Grade Separations TPAP  Stouffville Grade Separations TPAP  Network-Wide Structures Project

We are also seeking input on updates to several of Metrolinx’s network-wide technical studies including:

 Noise & Vibration  Air Quality  Vegetation Management Program

1  Heritage & Archaeology  Natural Environment

These projects are being planned under the Transit Project Assessment Process (TPAP) in accordance with Ontario Regulation 231/08, Transit Projects and Metrolinx Undertakings. Please find attached a copy of the Public Meeting Notice containing the dates, times and locations for the meetings, as well as a location map and additional information. In the meantime, if you would like to receive additional information related to these projects, please visit www.metrolinxengage.com or for project-specific inquiries, contact us directly:

Scarborough Junction Grade Separations TPAP, New Track and Facilities TPAP: Stouffville Grade Separations TPAP,

Network-Wide Structures Project: Mirjana Osojnicki Meghan Bratt Manager, Environmental Programs and Assessment Manager, Environmental Programs and Assessment Metrolinx Metrolinx 10 Bay Street, Toronto, ON M5J 2R98 10 Bay Street, Toronto, ON M5J 2R98 [email protected] [email protected]

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

2 From: Meghan Bratt Sent: Friday, February 14, 2020 11:36 AM To: Batista, Cindy (MECP); Mirjana Osojnicki Cc: Desautels, Solange (MECP); James Hartley Subject: RE: Metrolinx Public Meetings Notice – February 2020

Good morning Cindy,

Thank you for your inquiry. Mirjana and I do apologize for the delayed response. We are gearing up to host public meetings from February 18 to February 29 and our materials will be available on the project website imminently (www.metrolinxengage.com).

I would like to propose a meeting at the beginning of March for MX to provide MECP with updates on the GO Expansion Program, including the anticipated timing of the technical reports and draft EPRs to MECP.

Does your team have availability the week of March 2nd? We will happily come to your office and circulate material (agenda and potentially a presentation) in advance of the meeting.

Thanks and have a great long weekend. Meghan

Meghan Bratt, RPP Manager (A), Environmental Programs and Assessment

From: Batista, Cindy (MECP) [mailto:[email protected]] Sent: January-31-20 9:38 AM To: Mirjana Osojnicki; Meghan Bratt Cc: Batista, Cindy (MECP); Desautels, Solange (MECP) Subject: FW: Metrolinx Public Meetings Notice – February 2020

Good Morning Mirjana and Meghan,

Thank you for sharing this information with the ministry. It would be helpful to know when the ministry may expect to see the draft technical supporting documents and the draft EPRs for the upcoming transit projects listed below. According to our records, Mx was aiming to submit technical reports this month and draft EPRs in February. Can you kindly provide the ministry with the new target dates?

Thank you,

Cindy

From: GO Expansion TPAP Sent: January 30, 2020 3:02 PM To: GO Expansion TPAP Subject: Metrolinx Public Meetings Notice – February 2020

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender.

1 Metrolinx, an agency of the Government of Ontario, is bringing more transit and more connections to more places within the Greater Golden Horseshoe and surrounding communities. Every community transit project, big or small, plays a vital role in the regional transportation system. We want to share our plans and get your feedback. Starting in February 2020, we will be hosting public meetings to share project updates and seek input on four of Metrolinx’s projects to build new rail infrastructure:

 New Track and Facilities Transit Project Assessment Process (TPAP)  Scarborough Junction Grade Separations TPAP  Stouffville Grade Separations TPAP  Network-Wide Structures Project

We are also seeking input on updates to several of Metrolinx’s network-wide technical studies including:

 Noise & Vibration  Air Quality  Vegetation Management Program  Heritage & Archaeology  Natural Environment

These projects are being planned under the Transit Project Assessment Process (TPAP) in accordance with Ontario Regulation 231/08, Transit Projects and Metrolinx Undertakings. Please find attached a copy of the Public Meeting Notice containing the dates, times and locations for the meetings, as well as a location map and additional information. In the meantime, if you would like to receive additional information related to these projects, please visit www.metrolinxengage.com or for project-specific inquiries, contact us directly:

Scarborough Junction Grade Separations TPAP, New Track and Facilities TPAP: Stouffville Grade Separations TPAP,

Network-Wide Structures Project: Mirjana Osojnicki Meghan Bratt Manager, Environmental Programs and Assessment Manager, Environmental Programs and Assessment Metrolinx Metrolinx 10 Bay Street, Toronto, ON M5J 2R98 10 Bay Street, Toronto, ON M5J 2R98 [email protected] [email protected]

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

2 From: Elizabeth Ignatius Sent: Wednesday, February 19, 2020 7:34 AM To: Leah Chishimba Simwanza; Mirjana Osojnicki; Anna Krol Subject: Metrolinx GO Projects Public Meetings-TRCA Response Letter Attachments: Mx GO -TRCA Public Meetings Response Letter .pdf

Hello Leah, Mirjana, and Anna,

Please find attached TRCA’s response letter from Beth Williston to the Public Meetings Notice for the Metrolinx GO New Track & Facilities, Stouffville Grade Separation, and Scarborough Junction Grade Separation Projects.

Elizabeth Ignatius Planner Infrastructure Planning and Permits | Development and Engineering Services

T: 416.661.6600 ext. 5631 E: [email protected] A: 101 Exchange Ave. Vaughan, ON L4K 5R6

Toronto and Region Conservation Authority (TRCA) | trca.ca

1

February 14, 2020 CFN 61773, 61876, 62898

BY E-MAIL ONLY ([email protected], [email protected], [email protected])

Metrolinx 10 Bay Street Toronto Ontario M5J 2W3

Re: Notice of Public Meetings – GO Expansion Program Update Transit Process Assessment Process (TPAP) New Track and Facilities TPAP, Stouffville Grade Separations TPAP, Scarborough Junction Grade Separations TPAP , Highland Creek, Rouge River Watersheds; City of Toronto and Town of Markham; Regional Municipality of Toronto, Scarborough, and Markham

Toronto and Region Conservation Authority (TRCA) staff received notice of the upcoming Public Meetings scheduled for February 18, 19, 24, 25, 26, 27, and 29, 2020.

Staff has screened the locations of the proposed projects and has determined interest in the aforementioned projects. While staff will not be attending the meetings, please forward one copy of any handouts or display materials from these meetings for our files.

At this time, TRCA is deciding the designated planners for the above noted projects and will notify you once they have been assigned. Should you have any questions or require any additional information please contact me at extension 5217.

Regards,

W. Beth Williston, H. BA, MCIP, RPP Associate Director Infrastructure Planning and Permits Development and Engineering Services

/ei

T: 416.661.6600 | F: 416.661.6898 | [email protected] | 101 Exchange Avenue, Vaughan, ON L4K 5R6 | www.trca.ca

From: GO Expansion TPAP To: [email protected] Cc: [email protected]; George Papafotis; Laura Kutisker-Jacobson; Matthew Phillips; Antonio DiFebo; Janis Robins; Gabriela Avila Banegas; Joseph Costigan; Meghan Bratt; Frith, Lindsay; Uton Samuels Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Thursday, April 30, 2020 5:49:59 PM Attachments: Scarborough Junction Draft EPR and Tech Reports Cover Letter_Federal Rai....pdf Scarborough Junction_Draft EPR_Review Comments Spreadsheet.xlsx

Dear Mr. Hoang Tran,

Metrolinx is circulating the Draft Environmental Project Report (EPR) for the Scarborough Junction Transit Project Assessment Process (TPAP) Project for review Based on the project scope and the services / interests of CN along the Kingston Subdivision, Metrolinx believes that you may have an interest in the project scope for the Scarborough Junction TPAP. As CN is listed on the Government Review Team (GRT) list and have been engaged previously with the Notice of Public Information Centre – Metrolinx continues to offer opportunities to CN to participate in the TPAP, including commenting on the draft EPR if you choose to.

Metrolinx is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently circulating the Draft Environmental Project Report (EPR) for the Scarborough Junction Project to Indigenous Groups, Federal and Provincial Review Agencies, Municipalities and Conservation Authorities. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form if you would like to provide comments on the Draft EPR document iii. The Draft EPR can be accessed via the Browser link below iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

From: GO Expansion TPAP To: [email protected]; Christopher Jones Cc: Jonathan Wilder; George Papafotis; Laura Kutisker-Jacobson; Matthew Phillips; Antonio DiFebo; Janis Robins; Frith, Lindsay; Uton Samuels Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Thursday, April 30, 2020 5:45:31 PM Attachments: Scarborough Junction Draft EPR and Tech Reports Cover Letter_Federal Rail Lines.pdf Scarborough Junction_Draft EPR_Review Comments Spreadsheet.xlsx

Dear Mr. Paul Kerry and Mr. Chris Jones,

Metrolinx is circulating the Draft Environmental Project Report (EPR) for the Scarborough Junction Transit Project Assessment Process (TPAP) Project for review. Based on the project scope and CP services, Metrolinx does not believe that CP will be impacted by the Scarborough Junction TPAP. Recognizing that CP is listed on the Government Review Team (GRT) list and has been engaged previously with the Notice of Public Information Centre – Metrolinx continues to offer opportunities to CP to participate in the TPAP, including commenting on the draft EPR if you choose to.

Metrolinx is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently circulating the Draft Environmental Project Report (EPR) for the Scarborough Junction Project to Indigenous Groups, Federal and Provincial Review Agencies, Municipalities and Conservation Authorities. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form if you would like to provide comments on the Draft EPR document iii. The Draft EPR can be accessed via the Browser link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

From: GO Expansion TPAP To: [email protected]; George Papafotis; Laura Kutisker-Jacobson; Matthew Phillips; Antonio DiFebo; Janis Robins; Meghan Bratt; Violetta Savage; Frith, Lindsay; Uton Samuels Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Thursday, April 30, 2020 5:53:47 PM Attachments: Scarborough Junction Draft EPR and Tech Reports Cover Letter_Federal Rai....pdf Scarborough Junction_Draft EPR_Review Comments Spreadsheet.xlsx

Dear Ms. Debra Rasinger,

Metrolinx is circulating the Draft Environmental Project Report (EPR) for the Scarborough Junction Transit Project Assessment Process (TPAP) Project for review. Based on the project scope and the services / interests of VIA along the Kingston Subdivision, Metrolinx believes that you may have an interest in the project scope for the Scarborough Junction TPAP. As VIA is listed on the Government Review Team (GRT) list and have been engaged previously with the Notice of Public Information Centre – Metrolinx continues to offer opportunities to VIA to participate in the TPAP, including commenting on the draft EPR if you choose to.

Metrolinx is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently circulating the Draft Environmental Project Report (EPR) for the Scarborough Junction Project to Indigenous Groups, Federal and Provincial Review Agencies, Municipalities and Conservation Authorities. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form if you would like to provide comments on the Draft EPR document iii. The Draft EPR can be accessed via the Browser link below iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

From: GO Expansion TPAP Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Thursday, April 30, 2020 6:27:24 PM Attachments: Scarborough Junction Draft EPR and Tech Reports Cover Letter for GRT.pdf Scarborough Junction_Draft EPR_Review Comments Spreadsheet.xlsx

Metrolinx is seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project.

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form to provide your comments on the Draft EPR document iii. The Draft EPR can be accessed via the Brower link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: EnviroOnt [mailto:[email protected]] Sent: April-30-20 5:00 PM To: GO Expansion TPAP Subject: Metrolinx OnCorr Program: New Track & Facilities TPAP – Draft EPR For Review

Hello,

Thank you for your correspondence.Please note does not require receipt of all individual or Class EA related notifications. We are requesting project proponents to self-assess if their project:

1. Will interact with a federal property and/or waterway by reviewing the Directory of Federal Real Property, available at at www.tbs-sct.gc.ca/dfrp-rbif/; and 2. Will require approval and/or authorization under any Acts administered by Transport Canada* available at http://www.tc.gc.ca/eng/acts-regulations/menu.htm.

Projects that will occur on federal property prior to exercising a power, performing a function or duty in relation to that project, will be subject to a determination of the likelihood of significant adverse environmental effects, per Section 82 of the Impact Assessment Act, 2019.

If the aforementioned does not apply, the Environmental Assessment program should not be included in any further correspondence and future notifications will not receive a response. If there is a role under the program, correspondence should be forwarded electronically to: [email protected] with a brief description of Transport Canada’s expected role.

*Below is a summary of the most common Acts that have applied to projects in an Environmental Assessment context:

· Canadian Navigable Waters Act (CNWA) – the Act applies primarily to works constructed or placed in, on, over, under, through, or across navigable waters set out under the Act. The Navigation Protection Program administers the CNWA through the review and authorization of works affecting navigable waters. Information about the Program, CNWA and approval process is available at: http://www.tc.gc.ca/eng/programs-621.html. Enquiries can be directed to [email protected] or by calling (519) 383-1863.

· Railway Safety Act (RSA) – the Act provides the regulatory framework for railway safety, security, and some of the environmental impacts of railway operations in Canada. The Rail Safety Program develops and enforces regulations, rules, standards and procedures governing safe railway operations. Additional information about the Program is available at: https://www.tc.gc.ca/eng/railsafety/menu.htm. Enquiries can be directed to [email protected] or by calling (613) 998-2985.

· Transportation of Dangerous Goods Act (TDGA) – the transportation of dangerous goods by air, marine, rail and road is regulated under the TDGA. Transport Canada, based on risks, develops safety standards and regulations, provides oversight and gives expert advice on dangerous goods to promote public safety. Additional information about the transportation of dangerous goods is available at: https://www.tc.gc.ca/eng/tdg/safety-menu.htm. Enquiries can be directed to [email protected] or by calling (416) 973-1868.

· Aeronautics Act – Transport Canada has sole jurisdiction over aeronautics, which includes aerodromes and all related buildings or services used for aviation purposes. Aviation safety in Canada is regulated under this Act and the Canadian Aviation Regulations (CARs). Elevated Structures, such as wind turbines and communication towers, would be examples of projects that must be assessed for lighting and marking requirements in accordance with the CARs. Transport Canada also has an interest in projects that have the potential to cause interference between wildlife and aviation activities. One example would be waste facilities, which may attract birds into commercial and recreational flight paths. The Land Use In The Vicinity of Aerodromes publication recommends guidelines for and uses in the vicinity of aerodromes, available at: https://www.tc.gc.ca/eng/civilaviation/publications/tp1247-menu- 1418.htm. Enquires can be directed to at tc.aviationservicesont- [email protected] or by calling 1 (800) 305-2059 / (416) 952-0230.

Please advise if additional information is needed.

Thank you,

Environmental Assessment Program, Ontario Region Transport Canada / Government of Canada / 4900 Yonge St., Toronto, ON M2N 6A5 [email protected] / Facsimile : (416) 952-0514 / TTY: 1-888-675-6863

Programme d'évaluation environnementale, Région de l'Ontario Transports Canada / Gouvernement du Canada / 4900, rue Yonge, Toronto, ON, M2N 6A5 [email protected] / télécopieur: (416) 952-0514

From: GO Expansion TPAP [mailto:[email protected]] Sent: Monday, April 27, 2020 8:00 PM To: EnviroOnt Cc: Zeit, David ; Mirjana Osojnicki ; Halim Abdihalim ; [email protected]; Coulter, Kevin C. Subject: Metrolinx OnCorr Program: New Track & Facilities TPAP – Draft EPR For Review

Metrolinx is seeking your comments on the Draft Environmental Project Report (EPR) for the New Track & Facilities Project.

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long- term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The New Tracks & Facilities Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently seeking your comments on the Draft Environmental Project Report (EPR) for the New Track & Facilities Project. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form to provide your comments on the Draft EPR document iii. The Draft EPR can be accessed via the following link: https://gfnet.sharefile.com/d-s13a4b7aae7f4555b​

iv. Supporting Draft EPR Appendices can be accessed via the following links: Appendix A1: NTF TPAP Conceptual Corridor Plans Appendix A2: NTF TPAP Conceptual Facility Site Plans Appendix B: NTF TPAP Final Draft Natural Environment Impact Assessment Report Appendix C: NTF TPAP Final Draft Hydrogeology Impact Assessment Report Appendix D: NTF TPAP Final Draft Land Use & Socio-Economic Impact Assessment Report Appendix E: NTF TPAP Final Draft Visual Impact Assessment Report Appendix F: NTF TPAP Final Draft Cultural Heritage Assessment Report Appendix G: NTF TPAP Final Draft Stage 1 Archaeological Assessment Appendix H: NTF TPAP Final Draft Beach Layover Stormwater Management Assessment Report Appendix H: NTF TPAP Final Draft Unionville Storage Yard Stormwater Management Assessment Report Appendix H: NTF TPAP Final Draft Don Valley Layover Stormwater Management Assessment Report Appendix I: NTF TPAP Final Draft Don Valley Layover Traffic Impact Assessment Report Appendix J: NTF TPAP Final Draft Utilities Impact Assessment Report Appendix N: NTF TPAP Final Draft EMI/EMF Impact Assessment Report

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29th, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

Mirjana Osojnicki, BES Manager, Environmental Programs and Assessment, Pre-Construction Services Metrolinx |10 Bay Street | Toronto | Ontario | M5J 2R8 T: 416.202.0295 | M: 416.418.1369

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Chown, Jennifer (OPP) Sent: Friday, May 1, 2020 2:52 PM To: GO Expansion TPAP Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR -OPP review

Good afternoon,

The Ontario Provincial Police (OPP), Highway Safety Division (Toronto) Detachment Commander has reviewed the study area and determined that OPP has “no concerns” with respect to the above- mentioned EPR, as no 400 series highways would be directly affected.

Kind regards and have a great weekend,

Jennifer Chown, MSc(Eng) | Facilities Environmental Coordinator Ontario Provincial Police, Facilities Section 777 Memorial Avenue, Orillia, ON L3V 7V3 Cell: (705) 330-2746 Office: (705) 329-6806

If you have any accommodation needs or require communication supports or alternate formats, please let me know.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: Cameron, Anne (MECP) Cc: Meghan Bratt Subject: RE: Scarborough Junction Attachments: image001.png image002.png

Hello Anne,

Thank you for your comment about the Section 3.2 of the draft EPR that references hydrogeology/geotechnical report for the Scarborough Junction project. MX typically does not append hydrogeology/geotechnical reports to the EPRs, instead we provide a summary of the findings.

The field work for this project is ongoing, and the timeline to complete this work has been affected by Covid-19. Once we have the report, MX will summarize the findings and share the proposed text to be included in the EPR with MECP.

We will be in touch to firm up the timeline for the submission as the study progresses.

Kind regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Wednesday, May 06, 2020 8:38 AM To: Uton Samuels Cc: Meghan Bratt Subject: Scarborough Junction

Good morning Uton,

I am emailing today regarding the hydrogeology/geotechnical report for the Scarborough Junction project. I noticed in Section 3.2 it references that the report has not been completed. Can you let me know when the report will be completed and sent to the ministry for review?

Thanks,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 416-314-1181 I * [email protected] Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Uton Samuels Sent: May 1, 2020 10:40 AM To: Cameron, Anne (MECP) ; Meghan Bratt Subject: RE: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Good Morning,

Thank you for the confirmation. Yes, please feel free to reach out to us if you have any issues.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Friday, May 01, 2020 10:37 AM To: Meghan Bratt Cc: Uton Samuels Subject: RE: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

Good morning,

I can confirm that I was able to download the files from EATS for the Scarborough Junction project. I have forwarded the links to our reviewers and if they have any trouble downloading the files I will let you know.

All the best,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 416-314-1181 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Meghan Bratt Sent: April 30, 2020 5:01 PM To: Batista, Cindy (MECP) ; Moszynski, Dorothy (MECP) ; Cameron, Anne (MECP) Cc: Barboza, Karla (MHSTCI) ; Zirger, Rosi (MHSTCI) ; Hamilton, James (MHSTCI) ; Uton Samuels ; Julia Kun Subject: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Cindy, Anne and Dorothy,

Metrolinx has issued the draft EPR for the Scarborough Junction project (email 1 of 2, email 2 of 2 is underway as I type) and wave 1 of the technical reports (Stage 1 Archaeology Assessment, Cultural Heritage and Natural Environment Reporting) for the Stouffville Grade Separations via the Ontario Public Sector Enterprise Transfer Attachment Service (EATS).

Karla, Rosi and James – I have copied you on the email, as Uton and Julia included you on the EATS Distribution for both projects.

Given this is our team’s first time using EATS – I wanted to share this email to ensure you are in receipt of the files.

Thanks and have a great day. Meghan

Meghan Bratt, RPP Manager (A), Environmental Programs and Assessment Metrolinx |10 Bay Street |Toronto | Ontario | M5J 2W3 T: 416-202-7368 (preferred line) | C: 416-564-9618

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: [email protected] Cc: [email protected]; Meghan Bratt; Rupesh Udash; Katelyn Brown; Blasko, Alex; Frith, Lindsay; [email protected] Subject: Scarborough Junction Grade Separation Project: Environmental Project Report - Draft - Metrolinx Date: Friday, May 8, 2020 9:54:22 AM Attachments: image001.png Importance: High

Hello Renee,

The Scarborough Junction draft EPR and associated appendices (made up of technical reports and record of consultation) is available and has been circulated to the Government Review Team, and Indigenous Communities.

MX is circulating the documents for to review, in advance of issuing the Notice of Commencement on June 26, 2020. Please refer to the ftp site link below to access the EPR files.

Browser link: https://projsftp.stantec.com FTP Client Hostname: projsftp.stantec.com Port: 22 (can be used within an FTP client to view and transfer files and folder; e.g., FileZilla) Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

We look forward to receiving your comments. If you have any issues accessing the files or have any questions, please feel free to contact myself.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Cameron, Anne (MECP) To: Uton Samuels Cc: Meghan Bratt; Desautels, Solange (MECP); Batista, Cindy (MECP) Subject: Indigenous Communities TPAP Letter for Scarborough Junction project Date: Tuesday, May 12, 2020 3:39:34 PM Attachments: Indigenous Communities TPAP Letter for Scarborough Junction.pdf

Good Afternoon Uton,

Please see a letter regarding the Transit Project Assessment Process and Consulting with Indigenous Communities for the Scarborough Junction Grade Separation TPAP project.

Please let me know if you have any questions or concerns.

Thanks,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 416-314-1181 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

Ministry of the Environment, Ministère de l’Environnement, Conservation and Parks de la Protection de la nature et des Parcs

Environmental Assessment Direction des évaluations Branch environnementales

1st Floor Rez-de-chaussée 135 St. Clair Avenue W 135, avenue St. Clair Ouest Toronto ON M4V 1P5 Toronto ON M4V 1P5 Tel.: 416 314-8001 Tél. : 416 314-8001 Fax.: 416 314-8452 Téléc. : 416 314-8452

May 12, 2020

Uton Samuels Project Manager, Environmental Programs and Assessment Metrolinx 10 Bay Street, Toronto ON M5J 2W3

Re: Transit Project Assessment Process and Consulting with Indigenous Communities

Dear Uton Samuels:

On March 13, 2019 the Ministry of the Environment, Conservation and Parks (ministry) confirmed the list of communities that must be consulted on the basis that they have or may have constitutionally protected Aboriginal or treaty rights that could be adversely affected by the Metrolinx Scarborough Junction Grade Separation TPAP (project).

Based on the information provided by Metrolinx and the Crown's preliminary assessment of Aboriginal community rights and potential project impacts, the ministry provided you with a list of the communities to be consulted as follows:

• Alderville First Nation • Beausoleil First Nation • Chippewas of Georgina Island First Nation • Chippewas of Rama First Nation • Curve Lake First Nation • Hiawatha First Nation

• Mississaugas of Scugog Island First Nation • Mississaugas of the Credit First Nation • Huron-Wendat Nation • Kawartha Nishnawbe First Nation • Métis Nation of Ontario

As you are aware, the Government of Ontario (the "Crown") has a constitutional duty to consult Aboriginal communities when Crown project approvals could lead to an adverse impact on established or asserted Aboriginal or treaty rights. The Crown may use existing regulatory processes as a vehicle for fulfilling its constitutional duty, including an assessment process under the Ontario Regulation 231/08, Transit Projects and Metrolinx Undertakings.

The Crown has a duty to consult communities when it knows about established or credibly asserted Aboriginal or treaty rights and contemplates decisions or actions that could adversely affect them. As an agency of the Crown, Metrolinx’ actions can trigger the Crown’s duty to consult and Metrolinx is responsible for carrying out the consultation for the Crown.

Consultation Activities

Steps that you may need to take in relation to Aboriginal consultation for your project are outlined in the ministry’s Guide: Ontario’s Transit Project Assessment Process and Code of Practice for Consultation in Ontario’s Environmental Assessment Process which can be found at the following links: https://www.ontario.ca/page/guide-environmental-assessment- requirements-transit-projects and https://www.ontario.ca/document/consultation-ontarios- environmental-assessment-process.

The ministry relies on consultation conducted by proponents when it assesses the Crown’s obligations and directs proponents during the regulatory process. The proponent’s responsibilities for procedural aspects of consultation include: • Providing First Nation and/or Métis communities with information about the proposed project/activity including anticipated impacts, and information on timelines; • Following up with First Nation and/or Métis communities to ensure they received project/activity information and that they are aware of the opportunity to express comments and concerns about the project. If you are unable to make the appropriate contacts (e.g. are unable to contact the Chief) please contact the appropriate Project Officer for further direction; • Gathering information about how the project could adversely impact the relevant Aboriginal and/or Treaty rights (for example, hunting, fishing) or sites of cultural significance (for example, burial grounds, archaeological sites); • Considering the comments and concerns provided by First Nation and/or Métis communities and providing responses;

• Where appropriate, discussing potential mitigation strategies with First Nation and/or Métis communities; • Bearing the reasonable costs associated with these consultation opportunities; and, • Maintaining a Consultation Record and providing copies to the ministry.

Notice of Commencement

The ministry understands that you are following the transit project assessment process under Ontario Regulation 231/08 for the project. Please be advised that when you initiate the assessment process, a Notice of Commencement should be sent to Kathleen O’Neill, Director of Environmental Assessment Branch (EAB) and the ministry’s Regional Director for the region in which the project is located, as well as to the Indigenous communities identified above. Please also send a copy of the notice to the Project Officer.

Should you or any members of your project team have any questions regarding the material above, please contact me at 416-314-1181 or [email protected].

Sincerely,

Anne Cameron Project Officer Environmental Assessment Branch

c: Solange Desautels, Supervisor, Environmental Assessment Branch Meghan Bratt, Manager, Environmental Programs and Assessment, Metrolinx From: Uton Samuels To: Minkin, Dan (MHSTCI) Cc: Mirjana Osojnicki; Cameron, Anne (MECP); Desautels, Solange (MECP); Barboza, Karla (MHSTCI); Zirger, Rosi (MHSTCI); Hamilton, James (MHSTCI); Meghan Bratt; Rupesh Udash Subject: MX Revised Draft CHR - RE: 0010365 Scarborough Junction Grade Separation TPAP Draft CH Report MHSTCI Comments Date: Thursday, July 23, 2020 3:52:18 PM Attachments: image001.png 165011004_SJ_Cultural-Heritage_20200721_fin-dft.pdf 2020-07-17_ScarboroughJunctionTPAP-CHReport_MHSTCIcommentresponses.pdf

Good Afternoon Dan,

I’m pleased to provide the MHSTCI with the revised Scarborough Junction Grade Separation Project Cultural Heritage Report: Existing Conditions and Preliminary Impact Assessment for your review. I have also attached the comment log that was issued to MHSTCI on July 17, 2020 for your reference.

Please provide your review and comments by August 14, 2020.

We appreciate the Ministry’s continued support in working on this project. If you have any questions or comments, please do not hesitate to contact me.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Minkin, Dan (MHSTCI) [mailto:[email protected]] Sent: Friday, May 22, 2020 3:23 PM To: Meghan Bratt Cc: Uton Samuels; Mirjana Osojnicki; Cameron, Anne (MECP); Desautels, Solange (MECP); Barboza, Karla (MHSTCI); Zirger, Rosi (MHSTCI); Hamilton, James (MHSTCI) Subject: 0010365 Scarborough Junction Grade Separation TPAP Draft CH Report MHSTCI Comments

Dear Meagan Bratt,

Thank you for providing the draft Cultural Heritage Assessment for the Scarborough Junction Grade Separation Project (dated April 17, 2020, prepared by Stantec) to the Ministry of Heritage, Sport, Tourism and Culture Industries (MHSTCI). MHSTCI understands that this project is following the Transit Project Assessment Process (TPAP) as defined in Ontario Regulation 231/08 under the Environmental Assessment Act. O. Reg. 231/08 identifies the MHSTCI’s interest in cultural heritage resources. Cultural heritage resources include archaeological resources, built heritage resources and cultural heritage landscapes.

As you know, MHSTCI has provided guidance on how to incorporate consideration of cultural heritage in the TPAP’s pre-planning activities, and expanded by outlining the technical studies and level of detail required to address the cultural heritage component for transit projects. MHSTCI notes the above-mentioned cultural heritage study does not follow MHSTCI’s guidance and level of detail required to address the cultural heritage component.

We have attached our detailed comments which aim to assist Metrolinx and its consultant in fulfilling the requirements under TPAP:

· Terminology – In keeping with MHSTCI guidance on TPAP studies, the title of this document should be Cultural Heritage Report: Existing Conditions and Preliminary Impact Assessment. Built heritage resources and cultural heritage landscapes should be referred to as such. “Consultation” should not be used to describe basic information gathering.

· Organization and purpose – The report needs to be more concise and provide the level of detail about known and potential built heritage resources and cultural heritage landscapes shown in the ministry’s TPAP guidance. We have provided a recommended table of contents in the attached table. Maps and figures could be included within the sections (as opposed to Appendices) to improve readability.

· Methodology for screening, identification and evaluation – Overall the methodology section should be edited to be informative and concise. The identification of known and potential built heritage resources or cultural heritage landscapes in the study area is to be based on research, the MHSTCI screening Criteria for Evaluating Potential for Built Heritage Resources and Cultural Heritage Landscapes, historical summary of the development of the area and professional judgement. The report is inconsistent as to whether identification and evaluation is following MHSTCI’s TPAP guidance, as required, or Metrolinx’s Interim Cultural Heritage Management Process.

· Impact Assessment discussion – The report needs to Identify preliminary potential project- specific impact (e.g. project components and project activities) on each identified property and propose mitigation measures to avoid or mitigate potential negative impacts.

As per our discussions on May 11, we will be providing comments on the draft EPR for this project (dated April 24, 2020, prepared by Stantec) by June 19, 2020.

Thank you for the opportunity to review the draft report. We would be pleased to discuss any of our comments further and/or provide additional information. Let us know if you would like to schedule a conference call.

All the best,

Dan Minkin Heritage Planner Ministry of Heritage, Sport, Tourism and Culture Industries Heritage, Tourism and Culture Division | Programs and Services Branch | Heritage Planning Unit 401 Bay Street, Suite 1700 Toronto, Ontario M7A 0A7 Tel. 416.314.7147 | Fax. 416.314.7175

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Tuesday, June 02, 2020 7:54 AM To: Meghan Bratt Cc: Uton Samuels; Batista, Cindy (MECP); Desautels, Solange (MECP) Subject: RE: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

Good morning Meghan,

Please find attached the Ministry of the Environment, Conservation and Park’s comments on Metrolinx’s draft EPR for the Scarborough Junction Grade Separation project.

Attached are comments from myself, Air Quality, Noise and Vibration, Surface water, Groundwater and Species at Risk specialists.

Thank you for the opportunity to review and comment on the draft EPR. I look forward to receiving your comments back.

All the best,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 416-314-1181 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Meghan Bratt Sent: April 30, 2020 5:01 PM To: Batista, Cindy (MECP) ; Moszynski, Dorothy (MECP) ; Cameron, Anne (MECP) Cc: Barboza, Karla (MHSTCI) ; Zirger, Rosi (MHSTCI) ; Hamilton, James (MHSTCI) ; Uton Samuels ; Julia Kun Subject: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Cindy, Anne and Dorothy,

Metrolinx has issued the draft EPR for the Scarborough Junction project (email 1 of 2, email 2 of 2 is underway as I type) and wave 1 of the technical reports (Stage 1 Archaeology Assessment, Cultural Heritage and Natural Environment Reporting) for the Stouffville Grade Separations via the Ontario Public Sector Enterprise Transfer Attachment Service (EATS).

Karla, Rosi and James – I have copied you on the email, as Uton and Julia included you on the EATS Distribution for both projects.

Given this is our team’s first time using EATS – I wanted to share this email to ensure you are in receipt of the files.

Thanks and have a great day. Meghan

Meghan Bratt, RPP Manager (A), Environmental Programs and Assessment Metrolinx |10 Bay Street |Toronto | Ontario | M5J 2W3 T: 416-202-7368 (preferred line) | C: 416-564-9618

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: [email protected] Cc: [email protected]; Rupesh Udash; Katelyn Brown; Blasko, Alex; Frith, Lindsay; [email protected] Subject: HONI RE: Scarborough Junction Grade Separation Project: Environmental Project Report - Draft - Metrolinx Date: Thursday, June 4, 2020 2:50:40 PM Attachments: image001.png

Hello Renee,

I hope this e-mail finds you well. This is a follow-up to the attached April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than Friday, June 5th

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Recognizing that you received the reports late, if a little bit more time is needed, please contact me directly to discuss.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Uton Samuels Sent: Friday, May 08, 2020 9:54 AM To: '[email protected]' Cc: '[email protected]'; Meghan Bratt; Rupesh Udash; Katelyn Brown; Alex Blasko ([email protected]); Frith, Lindsay; '[email protected]' Subject: Scarborough Junction Grade Separation Project: Environmental Project Report - Draft - Metrolinx Importance: High

Hello Renee,

The Scarborough Junction draft EPR and associated appendices (made up of technical reports and record of consultation) is available and has been circulated to the Government Review Team, and Indigenous Communities.

MX is circulating the documents for Hydro One to review, in advance of issuing the Notice of Commencement on June 26, 2020. Please refer to the ftp site link below to access the EPR files. Browser link: https://projsftp.stantec.com FTP Client Hostname: projsftp.stantec.com Port: 22 (can be used within an FTP client to view and transfer files and folder; e.g., FileZilla) Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

We look forward to receiving your comments. If you have any issues accessing the files or have any questions, please feel free to contact myself.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: [email protected] Cc: George Papafotis; Laura Kutisker-Jacobson; Matthew Phillips; Antonio DiFebo; Janis Robins; Frith, Lindsay; Rupesh Udash; Katelyn Brown Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, June 5, 2020 9:26:31 AM Attachments: image001.png Importance: High

Hello Debra,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 5:54 PM To: [email protected]; George Papafotis; Laura Kutisker-Jacobson; Matthew Phillips; Antonio DiFebo; Janis Robins; Meghan Bratt; Violetta Savage; Lindsay Frith; Uton Samuels Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Dear Ms. Debra Rasinger,

Metrolinx is circulating the Draft Environmental Project Report (EPR) for the Scarborough Junction Transit Project Assessment Process (TPAP) Project for review. Based on the project scope and the services / interests of VIA along the Kingston Subdivision, Metrolinx believes that you may have an interest in the project scope for the Scarborough Junction TPAP. As VIA is listed on the Government Review Team (GRT) list and have been engaged previously with the Notice of Public Information Centre – Metrolinx continues to offer opportunities to VIA to participate in the TPAP, including commenting on the draft EPR if you choose to.

Metrolinx is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently circulating the Draft Environmental Project Report (EPR) for the Scarborough Junction Project to Indigenous Groups, Federal and Provincial Review Agencies, Municipalities and Conservation Authorities. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form if you would like to provide comments on the Draft EPR document iii. The Draft EPR can be accessed via the Browser link below iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

From: Uton Samuels To: [email protected] Cc: [email protected]; George Papafotis; Laura Kutisker-Jacobson; Matthew Phillips; Antonio DiFebo; Janis Robins; Gabriela Avila Banegas; Joseph Costigan; Frith, Lindsay; Rupesh Udash; Katelyn Brown Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, June 5, 2020 9:29:29 AM Attachments: image001.png

Hello Mr. Hoang Tran,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 5:50 PM To: [email protected] Cc: [email protected]; George Papafotis; Laura Kutisker-Jacobson; Matthew Phillips; Antonio DiFebo; Janis Robins; Gabriela Avila Banegas; Joseph Costigan; Meghan Bratt; Lindsay Frith; Uton Samuels Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Dear Mr. Hoang Tran,

Metrolinx is circulating the Draft Environmental Project Report (EPR) for the Scarborough Junction Transit Project Assessment Process (TPAP) Project for review Based on the project scope and the services / interests of CN along the Kingston Subdivision, Metrolinx believes that you may have an interest in the project scope for the Scarborough Junction TPAP. As CN is listed on the Government Review Team (GRT) list and have been engaged previously with the Notice of Public Information Centre – Metrolinx continues to offer opportunities to CN to participate in the TPAP, including commenting on the draft EPR if you choose to.

Metrolinx is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently circulating the Draft Environmental Project Report (EPR) for the Scarborough Junction Project to Indigenous Groups, Federal and Provincial Review Agencies, Municipalities and Conservation Authorities. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form if you would like to provide comments on the Draft EPR document iii. The Draft EPR can be accessed via the Browser link below iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

From: Hoang Tran Sent: Friday, June 5, 2020 10:04 AM To: Uton Samuels Cc: [email protected]; George Papafotis ; Laura Kutisker- Jacobson ; Matthew Phillips ; Antonio DiFebo ; Janis Robins ; Gabriela Avila Banegas ; Joseph Costigan ; Frith, Lindsay ; Rupesh Udash ; Katelyn Brown Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Dear Mr. Samuels,

We will be late in providing you with our response. The report has been sent to our to our Environment group for review and we hope to provide comments as soon as possible.

Thank you,

Hoang.

Hoang Tran, MBA | Director | Passenger Operations O. 514-399-6673 C. 514-236-5725 | [email protected]

From: Uton Samuels Sent: Friday, June 05, 2020 9:29 AM To: Hoang Tran Cc: Martita Mullen ; George Papafotis ; Laura Kutisker-Jacobson ; Matthew Phillips ; Antonio DiFebo ; Janis Robins ; Gabriela Avila Banegas ; Joseph Costigan ; Lindsay Frith ; Rupesh Udash ; Katelyn Brown Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Hello Mr. Hoang Tran,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 5:50 PM To: [email protected] Cc: [email protected]; George Papafotis; Laura Kutisker-Jacobson; Matthew Phillips; Antonio DiFebo; Janis Robins; Gabriela Avila Banegas; Joseph Costigan; Meghan Bratt; Lindsay Frith; Uton Samuels Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Dear Mr. Hoang Tran,

Metrolinx is circulating the Draft Environmental Project Report (EPR) for the Scarborough Junction Transit Project Assessment Process (TPAP) Project for review Based on the project scope and the services / interests of CN along the Kingston Subdivision, Metrolinx believes that you may have an interest in the project scope for the Scarborough Junction TPAP. As CN is listed on the Government Review Team (GRT) list and have been engaged previously with the Notice of Public Information Centre – Metrolinx continues to offer opportunities to CN to participate in the TPAP, including commenting on the draft EPR if you choose to.

Metrolinx is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently circulating the Draft Environmental Project Report (EPR) for the Scarborough Junction Project to Indigenous Groups, Federal and Provincial Review Agencies, Municipalities and Conservation Authorities. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form if you would like to provide comments on the Draft EPR document iii. The Draft EPR can be accessed via the Browser link below iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: [email protected]; Christopher Jones Cc: Jonathan Wilder; George Papafotis; Laura Kutisker-Jacobson; Matthew Phillips; Antonio DiFebo; Janis Robins; Frith, Lindsay; Rupesh Udash; Katelyn Brown Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, June 5, 2020 9:33:18 AM Attachments: image001.png Importance: High

Dear Mr. Paul Kerry and Mr. Chris Jones,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 5:46 PM To: [email protected]; Christopher Jones Cc: Jonathan Wilder; George Papafotis; Laura Kutisker-Jacobson; Matthew Phillips; Antonio DiFebo; Janis Robins; Lindsay Frith; Uton Samuels Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Dear Mr. Paul Kerry and Mr. Chris Jones,

Metrolinx is circulating the Draft Environmental Project Report (EPR) for the Scarborough Junction Transit Project Assessment Process (TPAP) Project for review. Based on the project scope and CP services, Metrolinx does not believe that CP will be impacted by the Scarborough Junction TPAP. Recognizing that CP is listed on the Government Review Team (GRT) list and has been engaged previously with the Notice of Public Information Centre – Metrolinx continues to offer opportunities to CP to participate in the TPAP, including commenting on the draft EPR if you choose to.

Metrolinx is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently circulating the Draft Environmental Project Report (EPR) for the Scarborough Junction Project to Indigenous Groups, Federal and Provincial Review Agencies, Municipalities and Conservation Authorities. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form if you would like to provide comments on the Draft EPR document iii. The Draft EPR can be accessed via the Browser link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: [email protected]; [email protected]; [email protected]; [email protected] Cc: Rupesh Udash; Katelyn Brown; Frith, Lindsay Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, June 5, 2020 1:50:59 PM Attachments: image001.png Importance: High

Hello Everyone,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 6:27 PM Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Metrolinx is seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project.

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form to provide your comments on the Draft EPR document iii. The Draft EPR can be accessed via the Brower link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: [email protected]; [email protected]; [email protected]; [email protected] Cc: Rupesh Udash; Katelyn Brown; Frith, Lindsay Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, June 5, 2020 1:55:38 PM Attachments: image001.png Importance: High

Hello Everyone,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than today, Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 6:27 PM Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Metrolinx is seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project.

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form to provide your comments on the Draft EPR document iii. The Draft EPR can be accessed via the Brower link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: [email protected]; [email protected] Cc: Rupesh Udash; Katelyn Brown; Frith, Lindsay Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, June 5, 2020 2:15:20 PM Attachments: image001.png

Hello Shawn Batise and Lise Chabot,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than today, Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 6:27 PM Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Metrolinx is seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project.

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures. Metrolinx is currently seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form to provide your comments on the Draft EPR document iii. The Draft EPR can be accessed via the Brower link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: [email protected] Cc: Rupesh Udash; Katelyn Brown; Frith, Lindsay Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, June 5, 2020 2:33:57 PM Attachments: image001.png Importance: High

Dear Beth Hanna,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than today, Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 6:27 PM Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Metrolinx is seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project.

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form to provide your comments on the Draft EPR document iii. The Draft EPR can be accessed via the Brower link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: Collens, Michael (MMA) Cc: Thompson, Jeff (MMA); Chisholm, Stewart (MMA); Frith, Lindsay; [email protected]; Rupesh Udash; Meghan Bratt Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, September 4, 2020 1:29:58 PM Attachments: image001.png Metrolinx GO Expansion Program Scarborough Junction TPAP Draft EPR For Review_Ont Grow Sec_MX Response.pdf

Hello Michael,

Thank you for providing Metrolinx with your email response with regards to Draft EPR for Scarborough Junction TPAP. We appreciated your comments and wanted to send this email acknowledging receipt of your comments.

In response to your comments below, Metrolinx has prepared a comments log that details how we have responded to your comments and how we have incorporated your comments into the EPR.

If you have any further questions, please feel free to contact myself.

Thank you and have a great long weekend.

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Collens, Michael (MMA) [mailto:[email protected]] Sent: Friday, June 05, 2020 4:16 PM To: Uton Samuels Cc: Thompson, Jeff (MMA); Chisholm, Stewart (MMA); Katelyn Brown; Frith, Lindsay Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Hi Uton,

Thank you for the opportunity to provide comments. Our comments are general to policy framework.

The report and appendices need to be updated from Growth Plan for the Greater Golden Horseshoe, 2017 to A Place to Grow: Growth Plan for the Greater Golden Horseshoe.

The MTSA definition would have to be updated accordingly to reflect an area with an approximate radius of 500m to 800m of a station area. But the policy references to those in Section 3 of A Place to Grow still stand.

The reports acknowledge that the lines (Stouffville and Lakeshore) are priority transit corridors as defined in A Place to Grow under Schedule 5, but they should also note that Scarborough GO Station is subject to additional policy requirements and will be planned to achieve a minimum density target of 150 residents and jobs per hectare.

Also, if you could, please add me and Eleni Taye ([email protected]) to your notification list, and remove Jeff Thompson, as we are the new contact points in the Ontario Growth Secretariat.

Thanks again,

Michael Collens Senior Associate (A), Growth Planning, Data & Analysis Growth Management Program Policy, Planning, Analysis & Delivery Ontario Growth Secretariat Ministry of Municipal Affairs and Housing

777 Bay Street, Suite 2304 Toronto ON M7A 2J3 Tel: 416-325-7269 Fax: 416-325-7403

From: Sent: June 5, 2020 2:36 PM To: Thompson, Jeff (MMA) ; Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Dear Jeff Thompson and Stewart Chisholm,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than today, Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 6:27 PM Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Metrolinx is seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project.

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form to provide your comments on the Draft EPR document iii. The Draft EPR can be accessed via the Brower link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: Watt, Heather (MMAH); Harris, Maya (MMAH) Cc: Rupesh Udash; Frith, Lindsay; Meghan Bratt Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, September 4, 2020 11:18:36 AM Attachments: image001.png

Hello Heather,

Thank you very much for responding to Metrolinx. This email is just to acknowledge that we received your email that stated that MMAH has no comments to provide for our Draft EPR and associated Draft Technical Reports. We appreciate your feedback and look forward to working with you and your team in the future.

If you have any questions, please feel free to contact myself.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Watt, Heather (MMAH) [mailto:[email protected]] Sent: Friday, June 05, 2020 4:24 PM To: Uton Samuels; Harris, Maya (MMAH) Cc: Rupesh Udash; Katelyn Brown; Frith, Lindsay Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Hi Uton,

This is to confirm that the MMAH Municipal Services Office, Central Region, has no comments to provide on the reports.

Thanks, Heather ______Heather Watt, MCIP, RPP Ministry of Municipal Affair and Housing Manager, Community Planning & Development, MSO-Central (West) 777 Bay Street, Toronto, ON M7A 2J3 Mobile ONLY: 437-232-9474

From: Uton Samuels Sent: June 5, 2020 2:43 PM To: Harris, Maya (MMAH) ; Watt, Heather (MMAH) Cc: Rupesh Udash ; Katelyn Brown ; Frith, Lindsay Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Importance: High

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Dear Maya Harris and Heather Watt,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than today, Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 6:27 PM Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Metrolinx is seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project.

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form to provide your comments on the Draft EPR document iii. The Draft EPR can be accessed via the Brower link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: [email protected]; [email protected] Cc: Rupesh Udash; Katelyn Brown; Frith, Lindsay Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, June 5, 2020 2:54:27 PM Attachments: image001.png Importance: High

Dear Michael Falconi and Michael Helfinger,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than today, Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 6:27 PM Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Metrolinx is seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project.

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form to provide your comments on the Draft EPR document iii. The Draft EPR can be accessed via the Brower link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: Leslie Rich Cc: Rupesh Udash; Frith, Lindsay; Meghan Bratt Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, September 4, 2020 11:48:22 AM Attachments: image001.png

Hello Leslie,

Thank you for providing us with this response. As stated in your email, we will defer to the Toronto and Region Conservation Authority’s comments for this project. This email is to acknowledge receipt of your response and to thank for working with Metrolinx. We look forward to working with you in the future.

If you have any further questions, please feel free to contact myself.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Leslie Rich [mailto:[email protected]] Sent: Monday, June 08, 2020 8:55 AM To: Uton Samuels Cc: Rupesh Udash; Katelyn Brown; Frith, Lindsay Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Hi Uton,

Given that this is a local project, as compared to a provincial-level project, your information was forwarded to the local conservation authority, Toronto and Region. They would be best suited to provide comments on the proposal.

Kind regards,

Leslie Rich, MES, RPP Policy and Planning Liaison Conservation Ontario 120 Bayview Parkway Newmarket, Ontario Cell 705-716-6174

From: Uton Samuels [mailto:[email protected]] Sent: Friday, June 05, 2020 3:02 PM To: Leslie Rich Cc: Rupesh Udash; Katelyn Brown; Frith, Lindsay Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Importance: High

Dear Leslie Rich,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than today, Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 6:27 PM Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Metrolinx is seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project.

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form to provide your comments on the Draft EPR document iii. The Draft EPR can be accessed via the Brower link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: [email protected] Cc: Rupesh Udash; Katelyn Brown; Frith, Lindsay Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, June 5, 2020 3:12:06 PM Attachments: image001.png Importance: High

Dear Anjala Puvananathan,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than today, Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 6:27 PM Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Metrolinx is seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project.

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form to provide your comments on the Draft EPR document iii. The Draft EPR can be accessed via the Brower link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: [email protected] Cc: Rupesh Udash; Katelyn Brown; Frith, Lindsay Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, June 5, 2020 3:23:32 PM Attachments: image001.png Importance: High

Dear Paul Lacoste,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than today, Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 6:27 PM Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Metrolinx is seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project.

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form to provide your comments on the Draft EPR document iii. The Draft EPR can be accessed via the Brower link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: [email protected]; [email protected] Cc: Rupesh Udash; Katelyn Brown; Frith, Lindsay Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, June 5, 2020 3:39:55 PM Attachments: image001.png Importance: High

Dear Wesley Plant and Sandro Leonardelli,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than today, Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 6:27 PM Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Metrolinx is seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project.

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form to provide your comments on the Draft EPR document iii. The Draft EPR can be accessed via the Brower link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: IA-ON / IE-ON (HC/SC) Cc: Frith, Lindsay; Thevenot, Aurelia (HC/SC); Ma, Kitty (HC/SC); Boudreau, Julie M (HC/SC); Rupesh Udash; Meghan Bratt; GO Expansion TPAP Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, September 4, 2020 11:37:00 AM Attachments: image001.png

Hello Dae,

Thank you for providing Metrolinx with an explanation of how Health Canada’s Environmental Health Program would participate in the TPAP process for Scarborough Junction and other Metrolinx TPAP projects. We are sending this email to acknowledge receipt of this email and we appreciate Health Canada’s input.

If we have any further need to contact Health Canada, we will be sure to contact you.

If you have any further questions regarding this project, please feel free to contact myself.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Lee, Dae Young (HC/SC) [mailto:[email protected]] On Behalf Of IA-ON / IE-ON (HC/SC) Sent: Friday, June 05, 2020 3:51 PM To: Uton Samuels; GO Expansion TPAP Cc: Katelyn Brown; Frith, Lindsay; Thevenot, Aurelia (HC/SC); Ma, Kitty (HC/SC); Boudreau, Julie M (HC/SC); Rupesh Udash Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Dear Uton Samuels and GO Expansion Team,

Thank you for your email dated April 30, 2020 requesting Health Canada’s comments on the Draft Environmental Project Report (EPR) for Metrolinx’s Scarborough Junction Project. In response to the Go Expansion Team’s email seeking input on Metrolinx’s projects on January 30, 2020, Health Canada clarified on Feb. 5, 2020 that the department’s role in Impact Assessment (IA) / Environmental Assessment (EA) is founded in statutory obligations under the Canadian Impact Assessment Act (IAA), and its knowledge and expertise can be called upon by reviewing bodies (e.g., Impact Assessment Agency of Canada, review panels, Indigenous groups and/or other jurisdictions). In the absence of such a request from one of the above noted groups and considering that Health Canada has no regulatory role subject to Ontario Regulation 231/08, Health Canada is unable to carry out a comprehensive review of projects under the Transit Project Assessment Process (TPAP).

However, should you have any specific questions related to the assessment of effects on human health or Health Canada guidance documents on IA, please contact us.

Kind Regards,

Dae Young Lee, Ph.D. Environmental Assessment Specialist Environmental Health Program Regulatory Operations and Enforcement Branch Health Canada | Government of Canada [email protected] / Tel: (416) 954-5021 Cell: (647) 236-8186 Spécialiste en évaluation environnementale Programme de Sante Environmental Direction générale des opérations réglementaires et de l’application de la loi Santé Canada | Gouvernement du Canada [email protected] / Tél: (416) 954-5021 Cell: (647) 236-8186

From: Uton Samuels Sent: 2020-06-05 3:45 PM To: Thevenot, Aurelia (HC/SC) ; Boudreau, Julie M (HC/SC) ; Lee, Dae Young (HC/SC) ; Ma, Kitty (HC/SC) Cc: Rupesh Udash ; Katelyn Brown ; Frith, Lindsay Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Importance: High

Dear Everyone,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than today, Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 6:27 PM Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Metrolinx is seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project.

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form to provide your comments on the Draft EPR document iii. The Draft EPR can be accessed via the Brower link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: [email protected]; [email protected]; [email protected] Cc: Rupesh Udash; Katelyn Brown; Frith, Lindsay Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, June 5, 2020 3:50:34 PM Attachments: image001.png Importance: High

Hello Everyone,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than today, Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 6:27 PM Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Metrolinx is seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project.

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form to provide your comments on the Draft EPR document iii. The Draft EPR can be accessed via the Brower link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Mirjana Osojnicki To: Minkin, Dan (MHSTCI); Meghan Bratt Cc: GO Expansion TPAP; Uton Samuels; Cameron, Anne (MECP); Desautels, Solange (MECP); Hamilton, James (MHSTCI); Barboza, Karla (MHSTCI); Zirger, Rosi (MHSTCI); Laura Romeo; Rupesh Udash Subject: RE: 0010365 Scarborough Junction Grade Separations TPAP Draft EPR MHSTCI Comments Date: Friday, October 2, 2020 8:11:13 AM Attachments: image001.png 2020-09-28_ScarboroughJct-EPR_MHSTCIcomments_MX Response.pdf

Hello Dan,

On behalf of the Scarborough Junction Grade Separation team, I would like to provide you with the comment/response log for the Draft EPR. We are currently updating the EPR to reflect the Ministry’s comments.

We are aiming to provide you the updated EPR on October 9, 2020.

Please feel free to reach out to myself or Uton Samuels with any questions.

Thank you Mirjana

Mirjana Osojnicki, BES Manager, Environmental Programs and Assessment, Pre-Construction Services Metrolinx |10 Bay Street | Toronto | Ontario | M5J 2R8 T: 416.202.0295 | M: 416.418.1369

Safety Never Stops.

From: Minkin, Dan (MHSTCI) [mailto:[email protected]] Sent: June-19-20 12:21 PM To: Meghan Bratt Cc: GO Expansion TPAP; Uton Samuels; Cameron, Anne (MECP); Desautels, Solange (MECP); Hamilton, James (MHSTCI); Barboza, Karla (MHSTCI); Zirger, Rosi (MHSTCI) Subject: 0010365 Scarborough Junction Grade Separations TPAP Draft EPR MHSTCI Comments

Hi Meghan,

Please find attached our comments (cover letter and detailed comment table) on the draft Environmental Project Report for the Scarborough Junction Grade Separation TPAP. We would be happy to discuss these comments further, should you wish. Thank you for the opportunity to review this draft.

All the best,

Dan Minkin Heritage Planner Ministry of Heritage, Sport, Tourism and Culture Industries Heritage, Tourism and Culture Division | Programs and Services Branch | Heritage Planning Unit 401 Bay Street, Suite 1700 Toronto, Ontario M7A 0A7 Tel. 416.314.7147 | Fax. 416.314.7175

From: Meghan Bratt To: Minkin, Dan (MHSTCI) Cc: GO Expansion TPAP; Uton Samuels; Cameron, Anne (MECP); Desautels, Solange (MECP); Hamilton, James (MHSTCI); Barboza, Karla (MHSTCI); Zirger, Rosi (MHSTCI); Julia Kun; Halim Abdihalim; Mirjana Osojnicki; Weller, Jennie (MECP); Moszynski, Dorothy (MECP) Subject: On Corridor - NTF, Scarborough Junction and Stouffville Grade Separations - Comment Response Logs Date: Friday, July 17, 2020 3:09:10 PM Attachments: image003.png 2020-07-17_StouffvilleTPAP-CHReport_MHSTCIcommentresponses.pdf 2020-07-17_ScarboroughJunctionTPAP-CHReport_MHSTCIcommentresponses.pdf NTF TPAP - EPR CH_ASI_GF_MHSTCI-Only.pdf

Good afternoon Dan,

I am pleased to send to the Ministry of Heritage, Sport, Tourism and Cultural Industries (MHSTCI) the comment response logs for the Cultural Heritage Reporting associated with the three (3) On Corridor TPAP projects: · New Track and Facilities · Scarborough Junction · Stouffville Grade Separations

This email is in response to the Cultural Heritage Reporting comments received from the Ministry via email on the following dates: · New Track and Facilities – May 29, 2020 · Scarborough Junction – May 5, 2020 · Stouffville Grade Separations - May 18, 2020

We are happy to follow-up with issuing the revised Cultural Heritage Reporting to support these comment logs. The Scarborough Junction and Stouffville Grade Separations reporting will be available next week, and the NTF updated report will be coming shortly thereafter. Uton, Julia and Halim - the PMs assigned to each project will issue the reports to the Ministry.

Please note that the draft Environmental Project Reports are being updated based on Ministry comments received, and we will provide those comment response logs in due course.

If you have any questions / comments or would like to have a teleconference to discuss – please let us know.

Thanks and have a great weekend. Meghan

Meghan Bratt, RPP Manager (A), Environmental Programs and Assessment Metrolinx |10 Bay Street |Toronto | Ontario | M5J 2W3 T: 416-202-7368 | C: 416-564-9618

Vacation Alert: July 20 to August 3, returning Tuesday, August 4 From: Uton Samuels To: Cameron, Anne (MECP) Cc: Rupesh Udash; Meghan Bratt; Antunes, Marinha (MECP) Subject: RE: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports Date: Thursday, August 13, 2020 9:23:09 AM Attachments: image001.png image002.png

Good Morning Anne,

I will resend it to Marinha. Marinha should receive the document in a moment.

Thanks,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Thursday, August 13, 2020 7:46 AM To: Uton Samuels Cc: Rupesh Udash Subject: Re: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

Good morning Uton,

Thank you for the information you sent yesterday. Could you send the Updated AQ report via EATS to Marinha Antunes at [email protected]

Thanks,

Anne Cameron Project Officer Environmental Assessment Branch 437-246-2066

From: Uton Samuels Sent: Wednesday, August 12, 2020 3:02:24 PM To: Cameron, Anne (MECP) Cc: Rupesh Udash Subject: RE: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Anne,

AQ Report has been uploaded to EATS.

Thanks,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Uton Samuels Sent: Wednesday, August 12, 2020 2:46 PM To: 'Cameron, Anne (MECP)' Cc: Rupesh Udash Subject: RE: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

Hello Anne,

As per your request, on behalf of your Air Quality Specialist, I will be sending the latest draft report that contains all the revisions that were provided to you in the comment log. I will try to send the report to you via EATS as it is a large document. I am also sending you the modeling files, as requested, that is attached to this email. They are located in the .zip files.

I will send you notification when the EATS upload is complete.

If you have any trouble with the files or have any further questions, please let me know.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Uton Samuels Sent: Tuesday, August 11, 2020 1:34 PM To: 'Cameron, Anne (MECP)' Subject: RE: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

Hello Anne,

Thank you for the comments. We will get back to you regarding the comments your specialist provided to you.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Tuesday, August 11, 2020 10:33 AM To: Uton Samuels Subject: Re: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

Good morning Uton,

The Ministry’s Air Quality Specialist has reviewed the information you provided and is satisfied with Metrolinx’s comments, except for comment no. 9 (refers to the modelling files of BaP and NOx). Our reviewer would like to know if she could see the information as the table states that the information will be provided to the Ministry. Also, the table notes a couple of additional text integrated to the AQ Report. Can you tell me when the revised AQ report will be provided to the Ministry?

Ultimately, our Air Quality Specialist does not have any concerns with this project. She would just like to check if the sections updated match the Disposition table and to screen one of the modelling files to confirm the methodology described in the report was employed in the dispersion model.

Our Noise and Vibration reviewer is still reviewing the information.

All the best,

Anne Cameron Project Officer Environmental Assessment Branch 437-246-2066

From: Uton Samuels Sent: Thursday, July 30, 2020 2:59:56 PM To: Cameron, Anne (MECP) Cc: Batista, Cindy (MECP) ; Desautels, Solange (MECP) ; Meghan Bratt ; Rupesh Udash Subject: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Anne,

Thank you once again for providing Metrolinx with the review comments for the Draft EPR and Technical Reports. Attached to this email is Metrolinx’s responses to the Technical Reports reviewed by the MECP. We have provided our responses and have incorporated the comments into the documents, as detailed in the attached pdf.

If you have any questions, please feel free to contact myself and I will assist you with the matter.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Uton Samuels Sent: Tuesday, June 02, 2020 4:14 PM To: 'Cameron, Anne (MECP)'; Meghan Bratt Cc: Batista, Cindy (MECP); Desautels, Solange (MECP) Subject: RE: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

Hello Anne,

Thank you for providing these comments. We will be in touch with you if we have any questions.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Tuesday, June 02, 2020 7:54 AM To: Meghan Bratt Cc: Uton Samuels; Batista, Cindy (MECP); Desautels, Solange (MECP) Subject: RE: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

Good morning Meghan,

Please find attached the Ministry of the Environment, Conservation and Park’s comments on Metrolinx’s draft EPR for the Scarborough Junction Grade Separation project.

Attached are comments from myself, Air Quality, Noise and Vibration, Surface water, Groundwater and Species at Risk specialists.

Thank you for the opportunity to review and comment on the draft EPR. I look forward to receiving your comments back.

All the best,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 416-314-1181 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Meghan Bratt Sent: April 30, 2020 5:01 PM To: Batista, Cindy (MECP) ; Moszynski, Dorothy (MECP) ; Cameron, Anne (MECP) Cc: Barboza, Karla (MHSTCI) ; Zirger, Rosi (MHSTCI) ; Hamilton, James (MHSTCI) ; Uton Samuels ; Julia Kun Subject: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Cindy, Anne and Dorothy,

Metrolinx has issued the draft EPR for the Scarborough Junction project (email 1 of 2, email 2 of 2 is underway as I type) and wave 1 of the technical reports (Stage 1 Archaeology Assessment, Cultural Heritage and Natural Environment Reporting) for the Stouffville Grade Separations via the Ontario Public Sector Enterprise Transfer Attachment Service (EATS).

Karla, Rosi and James – I have copied you on the email, as Uton and Julia included you on the EATS Distribution for both projects.

Given this is our team’s first time using EATS – I wanted to share this email to ensure you are in receipt of the files.

Thanks and have a great day. Meghan

Meghan Bratt, RPP Manager (A), Environmental Programs and Assessment Metrolinx |10 Bay Street |Toronto | Ontario | M5J 2W3 T: 416-202-7368 (preferred line) | C: 416-564-9618

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: TorontoEast To: "[email protected]" Subject: Metrolinx OnCorr Public Consultation #2 Date: Tuesday, August 11, 2020 12:07:50 PM Attachments: image001.png

Good day, MPP Begum,

Please be advised that Metrolinx is hosting a second round of public engagement as part of the environmental assessments on new infrastructure requirements for GO Expansion.

The purpose of this round is to present information and seek feedback on the any newly identified infrastructure (or changes) and the findings of the draft technical and environmental studies undertaken to date.

Following advice from on COVID-19, this round of consultation will be carried out as a Virtual Open House from August 18 to September 1, 2020. Members of the public, government agencies, Indigenous communities and other interested parties will be encouraged to learn more and participate in the process.

Beginning August 18, you and your constituents will be able to access the virtual open house materials by visiting Metrolinxengage.com/goexpansion/oncorridor. As well, we will be using our digital communication channels, to include paid social media, website updates and eBulletin information portals

As always, we will continue to keep you up to date on this project. If you have questions, please let me know and I would be happy to schedule a briefing.

Kind regards,

Prince Hall Community & Stakeholders Relations Specialist Toronto East Metrolinx | 10 Bay Street | Toronto | Ontario | M5J 2W3 [email protected] From: Uton Samuels To: Minkin, Dan (MHSTCI) Cc: Cameron, Anne (MECP); Desautels, Solange (MECP); Hamilton, James (MHSTCI); Barboza, Karla (MHSTCI); Zirger, Rosi (MHSTCI); GO Expansion TPAP; Meghan Bratt; Rupesh Udash Subject: RE: MX Revised Draft CHR - RE: 0010365 Scarborough Junction Grade Separation TPAP Draft CH Report MHSTCI Comments Date: Wednesday, August 26, 2020 4:04:02 PM Attachments: image001.png 2020-08-13_ScarboroughJct-RevCHReport_MHSTCIcomments_responses20200818.pdf

Hello Dan,

Thank you for providing comments regarding the Revised Draft CHR for Scarborough Junction. We have received your comments and have revised the report accordingly to address the comments provided to Metrolinx. For your reference, please see the attached comment response table that details how MHSTCI’s comments have been addressed. Thank you everyone for your time taken to review the report.

If you have questions, please feel free to contact myself.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Minkin, Dan (MHSTCI) [mailto:[email protected]] Sent: Thursday, August 13, 2020 6:28 PM To: Uton Samuels; Meghan Bratt Cc: Cameron, Anne (MECP); Desautels, Solange (MECP); Hamilton, James (MHSTCI); Barboza, Karla (MHSTCI); Zirger, Rosi (MHSTCI); GO Expansion TPAP Subject: RE: MX Revised Draft CHR - RE: 0010365 Scarborough Junction Grade Separation TPAP Draft CH Report MHSTCI Comments

Good evening,

Please find attached our comments (cover letter and comment tracking table) on the revised draft Cultural Heritage Report: Existing Conditions and Preliminary Impact Assessment for the Scarborough Junction Grade Separation TPAP. We would be happy to discuss these comments further, should you wish. Thank you for the opportunity to review this draft.

All the best,

Dan Minkin Heritage Planner Ministry of Heritage, Sport, Tourism and Culture Industries Heritage, Tourism and Culture Division | Programs and Services Branch | Heritage Planning Unit 401 Bay Street, Suite 1700 Toronto, Ontario M7A 0A7 Tel. 416.314.7147 | Fax. 416.314.7175

From: Uton Samuels Sent: July 23, 2020 3:41 PM To: Minkin, Dan (MHSTCI) Cc: Mirjana Osojnicki ; Cameron, Anne (MECP) ; Desautels, Solange (MECP) ; Barboza, Karla (MHSTCI) ; Zirger, Rosi (MHSTCI) ; Hamilton, James (MHSTCI) ; Meghan Bratt ; Rupesh Udash Subject: MX Revised Draft CHR - RE: 0010365 Scarborough Junction Grade Separation TPAP Draft CH Report MHSTCI Comments

Good Afternoon Dan,

I’m pleased to provide the MHSTCI with the revised Scarborough Junction Grade Separation Project Cultural Heritage Report: Existing Conditions and Preliminary Impact Assessment for your review. I have also attached the comment log that was issued to MHSTCI on July 17, 2020 for your reference.

Please provide your review and comments by August 14, 2020.

We appreciate the Ministry’s continued support in working on this project. If you have any questions or comments, please do not hesitate to contact me.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Minkin, Dan (MHSTCI) [mailto:[email protected]] Sent: Friday, May 22, 2020 3:23 PM To: Meghan Bratt Cc: Uton Samuels; Mirjana Osojnicki; Cameron, Anne (MECP); Desautels, Solange (MECP); Barboza, Karla (MHSTCI); Zirger, Rosi (MHSTCI); Hamilton, James (MHSTCI) Subject: 0010365 Scarborough Junction Grade Separation TPAP Draft CH Report MHSTCI Comments

Dear Meagan Bratt,

Thank you for providing the draft Cultural Heritage Assessment for the Scarborough Junction Grade Separation Project (dated April 17, 2020, prepared by Stantec) to the Ministry of Heritage, Sport, Tourism and Culture Industries (MHSTCI). MHSTCI understands that this project is following the Transit Project Assessment Process (TPAP) as defined in Ontario Regulation 231/08 under the Environmental Assessment Act. O. Reg. 231/08 identifies the MHSTCI’s interest in cultural heritage resources. Cultural heritage resources include archaeological resources, built heritage resources and cultural heritage landscapes.

As you know, MHSTCI has provided guidance on how to incorporate consideration of cultural heritage in the TPAP’s pre-planning activities, and expanded by outlining the technical studies and level of detail required to address the cultural heritage component for transit projects. MHSTCI notes the above-mentioned cultural heritage study does not follow MHSTCI’s guidance and level of detail required to address the cultural heritage component.

We have attached our detailed comments which aim to assist Metrolinx and its consultant in fulfilling the requirements under TPAP:

· Terminology – In keeping with MHSTCI guidance on TPAP studies, the title of this document should be Cultural Heritage Report: Existing Conditions and Preliminary Impact Assessment. Built heritage resources and cultural heritage landscapes should be referred to as such. “Consultation” should not be used to describe basic information gathering.

· Organization and purpose – The report needs to be more concise and provide the level of detail about known and potential built heritage resources and cultural heritage landscapes shown in the ministry’s TPAP guidance. We have provided a recommended table of contents in the attached table. Maps and figures could be included within the sections (as opposed to Appendices) to improve readability.

· Methodology for screening, identification and evaluation – Overall the methodology section should be edited to be informative and concise. The identification of known and potential built heritage resources or cultural heritage landscapes in the study area is to be based on research, the MHSTCI screening Criteria for Evaluating Potential for Built Heritage Resources and Cultural Heritage Landscapes, historical summary of the development of the area and professional judgement. The report is inconsistent as to whether identification and evaluation is following MHSTCI’s TPAP guidance, as required, or Metrolinx’s Interim Cultural Heritage Management Process.

· Impact Assessment discussion – The report needs to Identify preliminary potential project- specific impact (e.g. project components and project activities) on each identified property and propose mitigation measures to avoid or mitigate potential negative impacts.

As per our discussions on May 11, we will be providing comments on the draft EPR for this project (dated April 24, 2020, prepared by Stantec) by June 19, 2020.

Thank you for the opportunity to review the draft report. We would be pleased to discuss any of our comments further and/or provide additional information. Let us know if you would like to schedule a conference call.

All the best,

Dan Minkin Heritage Planner Ministry of Heritage, Sport, Tourism and Culture Industries Heritage, Tourism and Culture Division | Programs and Services Branch | Heritage Planning Unit 401 Bay Street, Suite 1700 Toronto, Ontario M7A 0A7 Tel. 416.314.7147 | Fax. 416.314.7175

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Meghan Bratt To: Batista, Cindy (MECP); Weller, Jennie (MECP); Cameron, Anne (MECP); Moszynski, Dorothy (MECP) Cc: Violetta Savage; James Hartley; Mirjana Osojnicki Subject: GO Expansion TPAPs Virtual Open House – August 18 to Sept. 1, 2020 Date: Tuesday, August 18, 2020 8:16:40 AM

Hello Cindy, Dorothy, Anne and Jennie,

We wanted to share with MECP that Metrolinx is hosting a second round of public consultations as part of the TPAPs for New Tracks and Facilities, Scarborough Junction Grade Separation and Stouffville Rail Corridor Grade Separations.

Following advice from Public Health Ontario on COVID-19, this round of consultation will be carried out as a Virtual Open House from August 18 to September 1, 2020. The focus of this round will be on any newly identified infrastructure (or changes) and findings of draft environmental studies undertaken to date.

Please visit www.metrolinxengage.com/goexpansion/oncorridor if you would like to view the public consultation materials.

Thanks,

Mirjana and Meghan

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: GO Expansion TPAP Subject: GO Expansion TPAPs Virtual Open House – August 18 to Sept. 1, 2020 Date: Tuesday, August 18, 2020 11:55:52 AM

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Golden Horseshoe Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion. As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network.

Metrolinx is completing three (3) Transit Project Assessment Processes (TPAPs) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures. Consultation with the public, review agencies and Indigenous communities is a key component of these TPAPs.

Metrolinx is hosting a second round of public consultations as part of the TPAPs for New Tracks and Facilities, Scarborough Junction Grade Separation and Stouffville Rail Corridor Grade Separations.

Following advice from Public Health Ontario on COVID-19, this round of consultation will be carried out as a Virtual Open House from August 18 to September 1, 2020. The focus of this round will be on any newly identified infrastructure (or changes) and findings of draft environmental studies undertaken to date.

Your participation and feedback is an important part of our work and there is space for you to provide comments every step of the way. All comments and questions received from August 18 to September 1 will be part of the final Environmental Project Reports.

Please visit www.metrolinxengage.com/goexpansion/oncorridor for access to project information, presentation materials, and to provide your comments and feedback.

We look forward to hearing what you have to say.

New Track and Facilities TPAP: Scarborough Junction Grade Separation TPAP, Mirjana Osojnicki Stouffville Rail Corridor Grade Separations TPAP: Manager, Environmental Programs and Meghan Bratt Assessment Manager (A), Environmental Programs and Assessment Metrolinx Metrolinx 10 Bay Street, Toronto, ON M5J 10 Bay Street, Toronto, ON M5J 2R98 2R98 [email protected] [email protected]

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: GO Expansion TPAP To: [email protected] Cc: [email protected]; [email protected]; Darren Reynolds; [email protected]; [email protected]; France Moreau; Gabriela Avila Banegas; Joseph Costigan Subject: GO Expansion TPAPs Virtual Open House – August 18 to Sept. 1, 2020 Date: Tuesday, August 18, 2020 3:57:56 PM

Dear Mr. Hoang Tran,

Metrolinx is hosting a second round of public consultations as part of the TPAPs for New Tracks and Facilities, Scarborough Junction Grade Separation and Stouffville Rail Corridor Grade Separations.

Following advice from Public Health Ontario on COVID-19, this round of consultation will be carried out as a Virtual Open House from August 18 to September 1, 2020. The focus of this round will be on any newly identified infrastructure (or changes) and findings of draft environmental studies undertaken to date. The draft environmental studies were shared with CN in April of this year. CN may have an interest in the Scarborough Junction Grade Separation TPAP along the Kingston Subdivision, and the New Track and Facilities TPAP as the project proposes track improvements across the network.

Participation in the virtual open house by CN is not mandatory, but we did want to make you aware of this project update. If you are interested in viewing the materials for the virtual open house please visit www.metrolinxengage.com/goexpansion/oncorridor.

If you have any further questions regarding the TPAPs please contact us via the coordinates below.

Kindest Regards,

The GO Expansion team

New Track and Facilities TPAP: Scarborough Junction Grade Separation TPAP, Mirjana Osojnicki Stouffville Rail Corridor Grade Separations TPAP: Manager, Environmental Programs and Meghan Bratt Assessment Manager (A), Environmental Programs and Assessment Metrolinx Metrolinx 10 Bay Street, Toronto, ON M5J 10 Bay Street, Toronto, ON M5J 2R98 2R98 [email protected] [email protected]

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: Antunes, Marinha (MECP) Cc: Cameron, Anne (MECP); Rupesh Udash; Meghan Bratt Subject: RE: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports Date: Thursday, August 20, 2020 11:43:38 AM Attachments: image001.png image002.png

The file has been uploaded and resubmitted through EATS

Thanks,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Uton Samuels Sent: Thursday, August 20, 2020 11:35 AM To: 'Antunes, Marinha (MECP)' Cc: Cameron, Anne (MECP); Rupesh Udash; Meghan Bratt Subject: RE: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

Good Morning Marinha,

I will re-upload the document through EATS and send to you. I will let you know when it is done.

Thanks,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Antunes, Marinha (MECP) [mailto:[email protected]] Sent: Wednesday, August 19, 2020 2:49 PM To: Uton Samuels Cc: Cameron, Anne (MECP) Subject: RE: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

Good afternoon Mr. Samuels,

My apologies for not downloading the AQ Report previously. I just tried and I missed the deadline.

Can you please resend me the link so I can access the AQ Report?

Thanks for your time. Marinha Antunes | Air Quality Analyst| Central Region Technical Support Section | Ministry of the Environment, Conservation and Parks | 5775 Yonge Street, 9th Floor North York ON M2M 4J1| T: 437.214.4256 F: 416.325.6346 (New Phone Number) E: [email protected]

From: Uton Samuels Sent: Thursday, August 13, 2020 9:23 AM To: Cameron, Anne (MECP) Cc: Rupesh Udash ; Meghan Bratt ; Antunes, Marinha (MECP) Subject: RE: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Good Morning Anne,

I will resend it to Marinha. Marinha should receive the document in a moment.

Thanks,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Thursday, August 13, 2020 7:46 AM To: Uton Samuels Cc: Rupesh Udash Subject: Re: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

Good morning Uton,

Thank you for the information you sent yesterday. Could you send the Updated AQ report via EATS to Marinha Antunes at [email protected]

Thanks,

Anne Cameron Project Officer Environmental Assessment Branch 437-246-2066

From: Uton Samuels Sent: Wednesday, August 12, 2020 3:02:24 PM To: Cameron, Anne (MECP) Cc: Rupesh Udash Subject: RE: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Anne,

AQ Report has been uploaded to EATS.

Thanks,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Uton Samuels Sent: Wednesday, August 12, 2020 2:46 PM To: 'Cameron, Anne (MECP)' Cc: Rupesh Udash Subject: RE: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

Hello Anne,

As per your request, on behalf of your Air Quality Specialist, I will be sending the latest draft report that contains all the revisions that were provided to you in the comment log. I will try to send the report to you via EATS as it is a large document. I am also sending you the modeling files, as requested, that is attached to this email. They are located in the .zip files.

I will send you notification when the EATS upload is complete.

If you have any trouble with the files or have any further questions, please let me know.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Uton Samuels Sent: Tuesday, August 11, 2020 1:34 PM To: 'Cameron, Anne (MECP)' Subject: RE: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

Hello Anne,

Thank you for the comments. We will get back to you regarding the comments your specialist provided to you.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Tuesday, August 11, 2020 10:33 AM To: Uton Samuels Subject: Re: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

Good morning Uton,

The Ministry’s Air Quality Specialist has reviewed the information you provided and is satisfied with Metrolinx’s comments, except for comment no. 9 (refers to the modelling files of BaP and NOx). Our reviewer would like to know if she could see the information as the table states that the information will be provided to the Ministry. Also, the table notes a couple of additional text integrated to the AQ Report. Can you tell me when the revised AQ report will be provided to the Ministry?

Ultimately, our Air Quality Specialist does not have any concerns with this project. She would just like to check if the sections updated match the Disposition table and to screen one of the modelling files to confirm the methodology described in the report was employed in the dispersion model.

Our Noise and Vibration reviewer is still reviewing the information.

All the best,

Anne Cameron Project Officer Environmental Assessment Branch 437-246-2066

From: Uton Samuels Sent: Thursday, July 30, 2020 2:59:56 PM To: Cameron, Anne (MECP) Cc: Batista, Cindy (MECP) ; Desautels, Solange (MECP) ; Meghan Bratt ; Rupesh Udash Subject: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Anne,

Thank you once again for providing Metrolinx with the review comments for the Draft EPR and Technical Reports. Attached to this email is Metrolinx’s responses to the Technical Reports reviewed by the MECP. We have provided our responses and have incorporated the comments into the documents, as detailed in the attached pdf.

If you have any questions, please feel free to contact myself and I will assist you with the matter.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Uton Samuels Sent: Tuesday, June 02, 2020 4:14 PM To: 'Cameron, Anne (MECP)'; Meghan Bratt Cc: Batista, Cindy (MECP); Desautels, Solange (MECP) Subject: RE: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

Hello Anne,

Thank you for providing these comments. We will be in touch with you if we have any questions.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Tuesday, June 02, 2020 7:54 AM To: Meghan Bratt Cc: Uton Samuels; Batista, Cindy (MECP); Desautels, Solange (MECP) Subject: RE: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

Good morning Meghan,

Please find attached the Ministry of the Environment, Conservation and Park’s comments on Metrolinx’s draft EPR for the Scarborough Junction Grade Separation project.

Attached are comments from myself, Air Quality, Noise and Vibration, Surface water, Groundwater and Species at Risk specialists.

Thank you for the opportunity to review and comment on the draft EPR. I look forward to receiving your comments back.

All the best,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 416-314-1181 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Meghan Bratt Sent: April 30, 2020 5:01 PM To: Batista, Cindy (MECP) ; Moszynski, Dorothy (MECP) ; Cameron, Anne (MECP) Cc: Barboza, Karla (MHSTCI) ; Zirger, Rosi (MHSTCI) ; Hamilton, James (MHSTCI) ; Uton Samuels ; Julia Kun Subject: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Cindy, Anne and Dorothy,

Metrolinx has issued the draft EPR for the Scarborough Junction project (email 1 of 2, email 2 of 2 is underway as I type) and wave 1 of the technical reports (Stage 1 Archaeology Assessment, Cultural Heritage and Natural Environment Reporting) for the Stouffville Grade Separations via the Ontario Public Sector Enterprise Transfer Attachment Service (EATS).

Karla, Rosi and James – I have copied you on the email, as Uton and Julia included you on the EATS Distribution for both projects.

Given this is our team’s first time using EATS – I wanted to share this email to ensure you are in receipt of the files.

Thanks and have a great day. Meghan

Meghan Bratt, RPP Manager (A), Environmental Programs and Assessment Metrolinx |10 Bay Street |Toronto | Ontario | M5J 2W3 T: 416-202-7368 (preferred line) | C: 416-564-9618

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: Cameron, Anne (MECP) Cc: Batista, Cindy (MECP); Laura Romeo; Rupesh Udash Subject: RE: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports Date: Tuesday, October 13, 2020 6:27:26 AM Attachments: image001.png image002.png MECP_Scarborough Junction_Draft EPR_AQ-NV_Review Comments Spreadsheet_Fi....pdf SJGS Draft EPR_Technical Report (Noise and Vibration) - MECP-Comment-MX Response13Oct20.xlsx

Hello Anne,

Thank you for your comments and thank you for confirming that there are no further comments with regards to the Air Quality Technical Reports.

With regards to the comments provided below for our Noise and Vibration Technical Report (Construction), Metrolinx has put the Ministry’s comments in a comment log and have provided our additional comments in the log. For your convenience I am attaching the previous comments that were sent to the MECP that the response below were based upon.

Just to provide further clarity, the comments related to the review of this Technical Report, Appendix 7 of the Draft EPR, are related to Construction Noise and Vibration. A separate report to address Operational Noise and Vibration (System wide study) will be available for the MECP’s review by November 2020. The Operational Noise and Vibration Study will further clarify some of the questions from the MECP.

I hope that our comments addresses all the Ministry’s concerns. If you have any additional questions or concerns, please feel free to contact myself.

Thanks,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Tuesday, August 25, 2020 12:39 PM To: Uton Samuels Cc: Batista, Cindy (MECP); Meghan Bratt; Rupesh Udash Subject: RE: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

Good afternoon Uton,

Thank you for providing a response to the ministry’s technical comments on the Scarborough Junction Grade Separation Draft EPR and Technical Reports. Staff has had a chance to review Metrolinx’s responses and can provide the following comments:

Air Quality No further comments at this time. Please see the attached letter in response to the additional documents you provided.

Noise and Vibration Item 1 (Page 8/11): comment not addressed (will be addressed at a future date)

Item 2 (Page 8/11): the Metrolinx Environmental Guide for Noise and Vibration Impact Assessment is not endorsed by the MECP. Therefore, the reported Zone of Influence (ZOI) distance of 383 metres and night-time noise exposure limit of 65 dBA values are not endorsed by the MECP.

Item 3 (Page 8/11): response is ok.

Item 4 (Page 8/11): the use of reference sound levels for road and rail sources obtained from ORNAMENT and STEAM, respectively in the TNM / FRA / FTA models, is incorrect.

Item 5 (Page 8/11): if the existing noise barriers for the subdivisions along the LSE corridor considered in this assessment are acoustically effective, then figures (to scale) should be provided in order to show the locations, extents, heights and lengths of these barriers.

Item 6 (Page 8/11): the Metrolinx Environmental Guide for Noise and Vibration Impact Assessment is not endorsed by the MECP. The sample size for vibration measurements should be five (not three) train pass-bys.

Item 7 (Page 8/11): the Metrolinx Environmental Guide for Noise and Vibration Impact Assessment is not endorsed by the MECP. The best-case scenario concept is not in accordance with the MECP guidelines and procedures. Publication NPC-300 includes a definition for the “predictable worst case” (not best-case) scenario. See Part A of Publication NPC-300.

Item 8 (Page 8/11): the measured day [leq(16h)] and night [Leq(8h)] sound levels (listed in Table 5.1 and Appendix E) are very high. These sound levels are unlikely representative of the actual baseline levels and therefore, should be verified by attended monitoring and / or modelling.

Item 9 (Page 8/11): the measured vibration levels at 47 / 51 metres (Table 5.3) are not consistent with the measured vibration levels at 11/ 15 metres (Table 5.2). The measured vibration levels at 11 / 15 metres should be significantly higher than the ones measured at 47 / 51 metres.

Item 10 (Page 8/11): the predicted day [leq(16h)] and night [Leq(8h)] sound levels (listed in Table 5.4) are very high. Metrolinx is asked to verify the input parameters used in the sound level modelling.

Item 11 (Page 8/11): response is ok.

Item 12 (Page 8/11): response is ok.

Item 13 (Page 9/11): the listed noise exposure limits (in Tables 6.4a, 6.4b, 6.6a & 6.6b and in Figures 6.3.1 & 6.3.8) are questionable, excessive and not endorsed by the MECP, or the City of Toronto. Furthermore, the use of the best-case scenario concept contradicts the MECP noise guidelines (ref. Publication NPC-300). The Metrolinx Environmental Guide for Noise and Vibration Impact Assessment is not endorsed by the MECP.

Item 14 (Page 9/11): response is ok.

Item 15 (Page 9/11): response is ok.

Item 16 (Page 9/11): response is ok.

Item 17 (Page 9/11): the Metrolinx Environmental Guide for Noise and Vibration Impact Assessment (September 2019) is not endorsed by the MECP. The guidelines, procedures and limits included in this document are of Metrolinx only (the MECP is not a signing party of this document).

Item 18 (Page 10/11): the noise and vibration limits by the US Federal Highway Administration (FHWA), the US Federal Transit Administration (FTA), the US Federal Railraod Administration (FRA), Metrolinx and the City of Toronto are not endorsed by the MECP. The completion of MECP’s noise and vibration review of this project is not an MECP’s endorsement of these limits.

Item 19 (Page 10/11): any recommended acoustic barriers considered in the noise analysis should have specific heights, lengths, extents and locations. Similarly, any recommended vibration control measures considered in the vibration analysis should be specified by type, location and extents. Figures (to scale) should be provided to depict the locations of the recommended acoustic barriers and vibration control measures.

Please let me know if you have any questions regarding the Noise and Vibration comments. I can also assist with setting up a virtual meeting if it would be helpful.

All the best,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 437-246-2066 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Uton Samuels Sent: July 30, 2020 3:00 PM To: Cameron, Anne (MECP) Cc: Batista, Cindy (MECP) ; Desautels, Solange (MECP) ; Meghan Bratt ; Rupesh Udash Subject: OnCorridor - Scarborough Junction Grade Separation - MECP Comment Responses - Technical Reports

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Anne,

Thank you once again for providing Metrolinx with the review comments for the Draft EPR and Technical Reports. Attached to this email is Metrolinx’s responses to the Technical Reports reviewed by the MECP. We have provided our responses and have incorporated the comments into the documents, as detailed in the attached pdf.

If you have any questions, please feel free to contact myself and I will assist you with the matter.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Uton Samuels Sent: Tuesday, June 02, 2020 4:14 PM To: 'Cameron, Anne (MECP)'; Meghan Bratt Cc: Batista, Cindy (MECP); Desautels, Solange (MECP) Subject: RE: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

Hello Anne,

Thank you for providing these comments. We will be in touch with you if we have any questions.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Tuesday, June 02, 2020 7:54 AM To: Meghan Bratt Cc: Uton Samuels; Batista, Cindy (MECP); Desautels, Solange (MECP) Subject: RE: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

Good morning Meghan,

Please find attached the Ministry of the Environment, Conservation and Park’s comments on Metrolinx’s draft EPR for the Scarborough Junction Grade Separation project.

Attached are comments from myself, Air Quality, Noise and Vibration, Surface water, Groundwater and Species at Risk specialists.

Thank you for the opportunity to review and comment on the draft EPR. I look forward to receiving your comments back.

All the best,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 416-314-1181 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Meghan Bratt Sent: April 30, 2020 5:01 PM To: Batista, Cindy (MECP) ; Moszynski, Dorothy (MECP) ; Cameron, Anne (MECP) Cc: Barboza, Karla (MHSTCI) ; Zirger, Rosi (MHSTCI) ; Hamilton, James (MHSTCI) ; Uton Samuels ; Julia Kun Subject: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Cindy, Anne and Dorothy,

Metrolinx has issued the draft EPR for the Scarborough Junction project (email 1 of 2, email 2 of 2 is underway as I type) and wave 1 of the technical reports (Stage 1 Archaeology Assessment, Cultural Heritage and Natural Environment Reporting) for the Stouffville Grade Separations via the Ontario Public Sector Enterprise Transfer Attachment Service (EATS).

Karla, Rosi and James – I have copied you on the email, as Uton and Julia included you on the EATS Distribution for both projects.

Given this is our team’s first time using EATS – I wanted to share this email to ensure you are in receipt of the files.

Thanks and have a great day. Meghan

Meghan Bratt, RPP Manager (A), Environmental Programs and Assessment Metrolinx |10 Bay Street |Toronto | Ontario | M5J 2W3 T: 416-202-7368 (preferred line) | C: 416-564-9618

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: Cameron, Anne (MECP) Cc: Batista, Cindy (MECP); Desautels, Solange (MECP); Meghan Bratt; Rupesh Udash RE: Subject: OnCorridor - Scarborough Junction GS - EPR Response Comments Date: Monday, August 31, 2020 5:38:08 PM Attachments: image002.png image003.png MECP_Scarborough Junction_Draft EPR_Review Comments_MX Response 31Aug20.pdf

Hello Anne,

Thank you and the Ministry once again for taking the time to review the Draft EPR that was submitted to you. We have taken the time to review the responses that you provided to Metrolinx. We have also taken the opportunity to address the Ministry’s comments and have addressed them accordingly in the EPR. For your convenience and information, we are providing you with the comment response log, for the EPR comments that was sent to MX, that includes MX responses to each one of MECP’s comments.

Please find attached to this email the comment response log for the updates that were provided in the EPR. If you have any questions or issues with the file, please feel free to contact myself directly and I will be happy to assist.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Tuesday, June 02, 2020 7:54 AM To: Meghan Bratt Cc: Uton Samuels; Batista, Cindy (MECP); Desautels, Solange (MECP) Subject: RE: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

Good morning Meghan,

Please find attached the Ministry of the Environment, Conservation and Park’s comments on Metrolinx’s draft EPR for the Scarborough Junction Grade Separation project.

Attached are comments from myself, Air Quality, Noise and Vibration, Surface water, Groundwater and Species at Risk specialists.

Thank you for the opportunity to review and comment on the draft EPR. I look forward to receiving your comments back.

All the best,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 416-314-1181 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Meghan Bratt Sent: April 30, 2020 5:01 PM To: Batista, Cindy (MECP) ; Moszynski, Dorothy (MECP) ; Cameron, Anne (MECP) Cc: Barboza, Karla (MHSTCI) ; Zirger, Rosi (MHSTCI) ; Hamilton, James (MHSTCI) ; Uton Samuels ; Julia Kun Subject: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Cindy, Anne and Dorothy,

Metrolinx has issued the draft EPR for the Scarborough Junction project (email 1 of 2, email 2 of 2 is underway as I type) and wave 1 of the technical reports (Stage 1 Archaeology Assessment, Cultural Heritage and Natural Environment Reporting) for the Stouffville Grade Separations via the Ontario Public Sector Enterprise Transfer Attachment Service (EATS).

Karla, Rosi and James – I have copied you on the email, as Uton and Julia included you on the EATS Distribution for both projects.

Given this is our team’s first time using EATS – I wanted to share this email to ensure you are in receipt of the files.

Thanks and have a great day. Meghan

Meghan Bratt, RPP Manager (A), Environmental Programs and Assessment Metrolinx |10 Bay Street |Toronto | Ontario | M5J 2W3 T: 416-202-7368 (preferred line) | C: 416-564-9618

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Margie Akins [mailto:[email protected]] Sent: September-01-20 10:16 AM To: Mirjana Osojnicki; Meghan Bratt Cc: Renee Afoom-Boateng; Suzanne Bevan; Sharon Lingertat Subject: RE: GO Expansion TPAPs Virtual Open House – August 18 to Sept. 1, 2020

Ms. Osojnicki and Ms. Bratt,

Please see the attached letter for TRCA’s response to the above-noted Open House.

Regards,

Margie Akins, B.URPl Planner Infrastructure Planning and Permits I Development and Engineering Services Division

T: (416) 661-6600 ext. 5925 E: [email protected] A: 101 Exchange Avenue, Vaughan, ON, L4K 5R6 | trca.ca

I am currently working remotely 7:30 am – 3:30 pm Monday to Friday.

From: GO Expansion TPAP Sent: Tuesday, August 18, 2020 11:55 AM Subject: GO Expansion TPAPs Virtual Open House – August 18 to Sept. 1, 2020

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Golden Horseshoe Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion. As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network.

Metrolinx is completing three (3) Transit Project Assessment Processes (TPAPs) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures. Consultation with the public, review agencies and Indigenous communities is a key component of these TPAPs.

Metrolinx is hosting a second round of public consultations as part of the TPAPs for New Tracks and Facilities, Scarborough Junction Grade Separation and Stouffville Rail Corridor Grade Separations.

Following advice from Public Health Ontario on COVID-19, this round of consultation will be carried out as a Virtual Open House from August 18 to September 1, 2020. The focus of this round will be on any newly identified infrastructure (or changes) and findings of draft environmental studies undertaken to date.

Your participation and feedback is an important part of our work and there is space for you to provide comments every step of the way. All comments and questions received from August 18 to September 1 will be part of the final Environmental Project Reports.

Please visit www.metrolinxengage.com/goexpansion/oncorridor for access to project information, presentation materials, and to provide your comments and feedback.

We look forward to hearing what you have to say.

New Track and Facilities TPAP: Scarborough Junction Grade Separation TPAP, Mirjana Osojnicki Stouffville Rail Corridor Grade Separations TPAP: Manager, Environmental Programs and Meghan Bratt Assessment Manager (A), Environmental Programs and Assessment Metrolinx Metrolinx 10 Bay Street, Toronto, ON M5J 10 Bay Street, Toronto, ON M5J 2R98 2R98 [email protected] [email protected]

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: TorontoEast To: "[email protected]" Subject: Notice of Commencement GO Expansion Program - Transit Project Assessment Process Date: Thursday, September 3, 2020 4:50:31 PM Attachments: Go Expansion Notice of Commencement 8Sept2020.pdf image001.png Importance: High

Good afternoon, MPP Begum

Progress on the GO Expansion Program continues as we take the necessary steps to deliver better, more frequent transit throughout the Greater Golden Horseshoe. On September 1, the second virtual open house closed as part of the ongoing environmental assessment. The virtual open house achieved great engagement from communities and residents across the region.

We encourage residents to visit MetrolinxEngage.com to see the comments and questions that we received, most of which have been answered and will be included in the public record. A more fulsome report will be posted on Metrolinx Engage later this fall and will also be part of the final Environmental Project Report (EPR).

At this time we would like to make you aware that the Notice of Commencement is being issued for the three (3) TPAP projects: New Track & Facilities TPAP; Stouffville Rail Corridor Grade Separations TPAP; and Scarborough Junction Grade Separation TPAP on September 8, 2020. The Notice of Commencement will be printed in the in the following publications:

Toronto Star Burlington Post Oshawa/Whitby This Week Oshawa Express Markham Economist and Sun Le Metroplitain Toronto L’Express

In accordance with Ontario Regulation 231/08 (Transit Projects and Metrolinx Undertakings (made under the Environmental Assessment Act), please find attached the Notice of Commencement (dated September 8, 2020).

A TPAP is a focused impact assessment created specifically for transit projects. The process involves a pre-planning/consultation phase followed by a regulated phase that can be up to 120 days which starts with the Notice of Commencement and ends with the Notice of Completion. The process includes consultation, an assessment of positive and negative impacts, an assessment of measures to mitigate negative impacts and documentation in an Environmental Project Report (EPR). The EPR is made available for a 30-day public and agency review at the Notice of Completion and is followed by a 35-day Ministry of Environment, Conservation and Parks review.

Consultation with the public, review agencies and Indigenous communities is a key component of these TPAPs. As you are aware, two public open houses have already been held during the pre-planning phase including public meetings in February 2020 and a virtual open house in August 2020. As Metrolinx formally commences these TPAPs, we will continue with consultations including a third public virtual open house to be held in the Fall of 2020. More information regarding the TPAPs can be found on our website at Metrolinxengage.com/goexpansion/oncorridor

Regards,

James Burchell Community & Stakeholders Relations Specialist Toronto East Metrolinx | 10 Bay Street | Toronto | Ontario | M5J 2W3 [email protected]

From: Meghan Bratt To: Weller, Jennie (MECP); Sanzo, Adam (MECP); Cameron, Anne (MECP); Moszynski, Dorothy (MECP) Cc: Batista, Cindy (MECP); Desautels, Solange (MECP); Mirjana Osojnicki; Violetta Savage; Halim Abdihalim; Julia Kun; Uton Samuels Subject: On Corridor Notice of Commencement - NTF, Scarborough Junction, Stouffville Grade Separations Date: Friday, September 4, 2020 8:52:36 AM Attachments: image003.png Go Expansion Notice of Commencement 8Sept2020.pdf

Good morning Adam, Jennie, Anne and Dorothy,

I hope everyone is doing well. We are proceeding with issuing the Notice of Commencement for the three (3) TPAPs (New Track and Facilities, Scarborough Junction, and Stouffville Grade Separations) that make up the GO Expansion Program on September 8, 2020. Attached is a copy of the Notice of Commencement that MX is using for the bulk mailer.

We look forward to continuing to work together through the regulated TPAP phase for each project.

Thanks and have a great (and safe) long weekend.

Meghan

Meghan Bratt, RPP Manager (A), Environmental Programs and Assessment Metrolinx |10 Bay Street |Toronto | Ontario | M5J 2W3 T: 416-202-7368 (preferred line) | C: 416-564-9618 From: Uton Samuels To: [email protected] Cc: [email protected]; [email protected]; [email protected]; [email protected]; Rupesh Udash; Katelyn Brown; Blasko, Alex; Frith, Lindsay; Tom Clarke; John Carbone Subject: RE: HONI RE: Scarborough Junction Grade Separation Project: Environmental Project Report - Draft - Metrolinx Date: Friday, September 4, 2020 11:08:33 AM Attachments: image001.png HydroOne_Scarborough Junction Grade Separation_MX Response.pdf

Hello Matey and Hydro One (HONI) Team,

This email is to acknowledge that we have received your comments with regards to our Draft EPR submission and associated Technical Reports for Scarborough Junction. Thank you all for taking your time to review these documents and providing your comments. We appreciate working with our partners, such as HONI, to deliver projects that benefits our communities.

As stated we have received your comments that encourages Metrolinx to work with HONI with regards to how this project will affect Hydro One corridors and to ensure there are no conflicts with overlapping Metrolinx projects. Both of these comments have been noted by Metrolinx.

Please find attached to this email Metrolinx’s response to Hydro One’s submitted comment log.

If you have any further questions, please feel free to contact myself.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: [email protected] [mailto:[email protected]] Sent: Thursday, June 11, 2020 4:47 PM To: Uton Samuels Cc: [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; Rupesh Udash; Katelyn Brown; [email protected]; [email protected] Subject: RE: HONI RE: Scarborough Junction Grade Separation Project: Environmental Project Report - Draft - Metrolinx

Hi Uton, Please find attached Hydro One’s response to the Scarborough Junction Grade Separation Project TPAP.

Please review and we will be happy to discuss. Please ensure that all future communication is sent to this email address.

Thanks Matey

From: Uton Samuels Sent: Thursday, June 04, 2020 2:50 PM To: PETTIGREW Renee Cc: DIMAND Laura ; Rupesh Udash ; Katelyn Brown ; Alex Blasko ([email protected]) ; Frith, Lindsay ; SECONDARY LAND USE Department Subject: HONI RE: Scarborough Junction Grade Separation Project: Environmental Project Report - Draft - Metrolinx

*** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from unknown senders or unexpected email. ***

Hello Renee,

I hope this e-mail finds you well. This is a follow-up to the attached April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than Friday, June 5th

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Recognizing that you received the reports late, if a little bit more time is needed, please contact me directly to discuss.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Uton Samuels Sent: Friday, May 08, 2020 9:54 AM To: '[email protected]' Cc: '[email protected]'; Meghan Bratt; Rupesh Udash; Katelyn Brown; Alex Blasko ([email protected]); Frith, Lindsay; '[email protected]' Subject: Scarborough Junction Grade Separation Project: Environmental Project Report - Draft - Metrolinx Importance: High

Hello Renee,

The Scarborough Junction draft EPR and associated appendices (made up of technical reports and record of consultation) is available and has been circulated to the Government Review Team, and Indigenous Communities.

MX is circulating the documents for Hydro One to review, in advance of issuing the Notice of Commencement on June 26, 2020. Please refer to the ftp site link below to access the EPR files.

Browser link: https://projsftp.stantec.com FTP Client Hostname: projsftp.stantec.com Port: 22 (can be used within an FTP client to view and transfer files and folder; e.g., FileZilla) Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

We look forward to receiving your comments. If you have any issues accessing the files or have any questions, please feel free to contact myself.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This email and any attached files are privileged and may contain confidential information intended only for the person or persons named above. Any other distribution, reproduction, copying, disclosure, or other dissemination is strictly prohibited. If you have received this email in error, please notify the sender immediately by reply email and delete the transmission received by you. This statement applies to the initial email as well as any and all copies (replies and/or forwards) of the initial email

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: Collens, Michael (MMA) Cc: Thompson, Jeff (MMA); Chisholm, Stewart (MMA); Frith, Lindsay; [email protected]; Rupesh Udash; Meghan Bratt Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review Date: Friday, September 4, 2020 1:29:58 PM Attachments: image001.png Metrolinx GO Expansion Program Scarborough Junction TPAP Draft EPR For Review_Ont Grow Sec_MX Response.pdf

Hello Michael,

Thank you for providing Metrolinx with your email response with regards to Draft EPR for Scarborough Junction TPAP. We appreciated your comments and wanted to send this email acknowledging receipt of your comments.

In response to your comments below, Metrolinx has prepared a comments log that details how we have responded to your comments and how we have incorporated your comments into the EPR.

If you have any further questions, please feel free to contact myself.

Thank you and have a great long weekend.

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Collens, Michael (MMA) [mailto:[email protected]] Sent: Friday, June 05, 2020 4:16 PM To: Uton Samuels Cc: Thompson, Jeff (MMA); Chisholm, Stewart (MMA); Katelyn Brown; Frith, Lindsay Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Hi Uton,

Thank you for the opportunity to provide comments. Our comments are general to policy framework.

The report and appendices need to be updated from Growth Plan for the Greater Golden Horseshoe, 2017 to A Place to Grow: Growth Plan for the Greater Golden Horseshoe.

The MTSA definition would have to be updated accordingly to reflect an area with an approximate radius of 500m to 800m of a station area. But the policy references to those in Section 3 of A Place to Grow still stand.

The reports acknowledge that the lines (Stouffville and Lakeshore) are priority transit corridors as defined in A Place to Grow under Schedule 5, but they should also note that Scarborough GO Station is subject to additional policy requirements and will be planned to achieve a minimum density target of 150 residents and jobs per hectare.

Also, if you could, please add me and Eleni Taye ([email protected]) to your notification list, and remove Jeff Thompson, as we are the new contact points in the Ontario Growth Secretariat.

Thanks again,

Michael Collens Senior Associate (A), Growth Planning, Data & Analysis Growth Management Program Policy, Planning, Analysis & Delivery Ontario Growth Secretariat Ministry of Municipal Affairs and Housing

777 Bay Street, Suite 2304 Toronto ON M7A 2J3 Tel: 416-325-7269 Fax: 416-325-7403

From: Sent: June 5, 2020 2:36 PM To: Thompson, Jeff (MMA) ; Subject: RE: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Dear Jeff Thompson and Stewart Chisholm,

I hope this e-mail finds you well. This is a follow-up to the below April 30th e-mail, requesting your review on the Draft Environmental Project Report (EPR) and Draft Technical Reports for the Scarborough Junction Grade Separation Transit Project Assessment Process (TPAP) Project.

We kindly ask that you provide your review and comments no later than today, Friday, June 5th.

If you have no comments to provide on the aforementioned reports, a short acknowledgement response would be greatly appreciated.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: GO Expansion TPAP Sent: Thursday, April 30, 2020 6:27 PM Subject: Metrolinx GO Expansion Program: Scarborough Junction TPAP – Draft EPR For Review

Metrolinx is seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project.

Metrolinx, an agency of the Province of Ontario, is expanding its services as part of the GO Expansion Program which will increase services both in terms of train frequency and availability across its seven rail corridors. The GO Expansion Program is an investment program that will transform GO Rail into a comprehensive regional rapid transit network system that provides the expanded mobility the Greater Toronto and Hamilton Area needs to accommodate growth and maintain a high quality of life and prosperous economy. The long-term goal and vision of the GO Expansion Program is to provide 15-minute, two-way all-day service. With major investment in GO Rail infrastructure, Metrolinx will be quadrupling GO Rail service and nearly doubling GO Rail ridership. By 2055, annual ridership will exceed 200 million, compared to 105 million without GO Expansion.

As part of the GO Expansion program, Metrolinx has identified various infrastructure requirements to achieve the established service level targets across the network. The Scarborough Junction Project is one component of the broader Metrolinx GO Expansion Program. Metrolinx is completing a Transit Project Assessment Process (TPAP) under Ontario Regulation (O. Reg.) 231/08, Transit Project and Metrolinx Undertakings to assess the effects of the proposed transit project, and to provide mitigation measures.

Metrolinx is currently seeking your comments on the Draft Environmental Project Report (EPR) for the Scarborough Junction Project. The following documents have been provided for your information and review:

i. Summary cover letter as attached to this e-mail describing the Project scope and list of Draft EPR documents ii. Comment/Response form as attached to this e-mail – please use this form to provide your comments on the Draft EPR document iii. The Draft EPR can be accessed via the Brower link below. iv. Supporting Draft EPR Appendices can be accessed via the Browser link below, and includes: Appendix A1: Natural Environment Technical Report Appendix A2: Cultural Heritage Assessment Appendix A3: Stage 1 Heritage Assessment Appendix A4: Socio-Economic and Land Use Study Appendix A5: Transportation Impact Assessment Appendix A6: Air Quality Assessments Appendix A7: Noise and Vibration Assessment

Browser link: https://projsftp.stantec.com Login name: METROLINX1139 Password: 7527768 Expiry Date: 6/18/2020

Should you wish to provide comments on the Draft EPR, please submit your feedback in writing by May 29, 2020, to the Project Team at: [email protected]. Comments received will be reviewed and considered as part of finalizing the EPR.

Regards,

The GO Expansion Team

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: GO Expansion TPAP To: [email protected] Cc: Antonio DiFebo; Janis Robins; George Papafotis; [email protected]; Violetta Savage; Meghan Bratt; Mirjana Osojnicki; Halim Abdihalim; Julia Kun; Uton Samuels Subject: GO Expansion TPAPs Notice of Commencement – September 8, 2020 Date: Tuesday, September 8, 2020 12:13:01 PM Attachments: Go Expansion Notice of Commencement 8Sept2020.pdf

Dear Ms. Debra Rasinger,

In accordance with Ontario Regulation 231/08 (Transit Projects and Metrolinx Undertakings (made under the Environmental Assessment Act), please find attached the Notice of Commencement (dated September 8, 2020) for three (3) Transit Project Assessment Process (TPAP) projects: New Track & Facilities TPAP; Stouffville Rail Corridor Grade Separations TPAP; and Scarborough Junction Grade Separation TPAP.

Metrolinx is carrying out these TPAPs to examine the potential environmental impacts associated with the proposed infrastructure as outlined in the attached Notice. The Notice of Commencement is being issued to formally commence the TPAP phase for each project.

The TPAP process involves a pre-planning/consultation phase followed by a regulated phase that can take up to 120 days which starts with the Notice of Commencement and ends with the Notice of Completion. The process includes consultation, an assessment of positive and negative impacts, an assessment of measures to mitigate negative impacts and documentation in an Environmental Project Report (EPR). The EPR is made available for a 30-day public and agency review at the Notice of Completion and is followed by a 35-day Ministry of Environment, Conservation and Parks review.

The draft EPR and environmental studies were shared with VIA in April of this year. VIA may have an interest in the Scarborough Junction Grade Separation TPAP along the Kingston Subdivision, and the New Track and Facilities TPAP along the Don Branch (proposed Don Valley Layover facility).

Consultation with the public, review agencies and Indigenous communities is a key component of these TPAPs. Two public open houses have already been held during the pre-planning phase including public meetings in February 2020 and a virtual open house in August 2020. As Metrolinx formally commences these TPAPs, we will continue with consultations including a third public virtual open house to be held in the Fall of 2020. For more information on the TPAPs you can visit: Metrolinxengage.com/goexpansion/oncorridor

If you have any further questions regarding the TPAPs please contact us via the coordinates below.

Kindest Regards,

The GO Expansion team

New Track and Facilities TPAP: Scarborough Junction Grade Separation TPAP, Stouffville Rail Corridor Grade Separations TPAP: Mirjana Osojnicki Manager, Meghan Bratt Environmental Programs and Manager (A), Environmental Programs and Assessment Assessment Metrolinx Metrolinx 10 Bay Street, Toronto, ON M5J 2R98 10 Bay Street, Toronto, ON M5J [email protected] 2R98 [email protected] This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: GO Expansion TPAP To: [email protected] Cc: [email protected]; [email protected]; Darren Reynolds; [email protected]; [email protected]; France Moreau; Gabriela Avila Banegas; Joseph Costigan; Violetta Savage; Meghan Bratt; Mirjana Osojnicki; Halim Abdihalim; Julia Kun; Uton Samuels Subject: GO Expansion TPAPs Notice of Commencement – September 8, 2020 Date: Tuesday, September 8, 2020 12:13:08 PM Attachments: Go Expansion Notice of Commencement 8Sept2020.pdf

Dear Mr. Hoang Tran,

In accordance with Ontario Regulation 231/08 (Transit Projects and Metrolinx Undertakings (made under the Environmental Assessment Act), please find attached the Notice of Commencement (dated September 8, 2020) for three (3) Transit Project Assessment Process (TPAP) projects: New Track & Facilities TPAP; Stouffville Rail Corridor Grade Separations TPAP; and Scarborough Junction Grade Separation TPAP.

Metrolinx is carrying out these TPAPs to examine the potential environmental impacts associated with the proposed infrastructure as outlined in the attached Notice. The Notice of Commencement is being issued to formally commence the TPAP phase for each project.

The TPAP process involves a pre-planning/consultation phase followed by a regulated phase that can take up to 120 days which starts with the Notice of Commencement and ends with the Notice of Completion. The process includes consultation, an assessment of positive and negative impacts, an assessment of measures to mitigate negative impacts and documentation in an Environmental Project Report (EPR). The EPR is made available for a 30-day public and agency review at the Notice of Completion and is followed by a 35-day Ministry of Environment, Conservation and Parks review.

The draft EPR and environmental studies were shared with CN in April of this year. CN may have an interest in the Scarborough Junction Grade Separation TPAP along the Kingston Subdivision, and the New Track and Facilities TPAP as the project proposes track improvements across the network.

Consultation with the public, review agencies and Indigenous communities is a key component of these TPAPs. Two public open houses have already been held during the pre-planning phase including public meetings in February 2020 and a virtual open house in August 2020. As Metrolinx formally commences these TPAPs, we will continue with consultations including a third public virtual open house to be held in the Fall of 2020. For more information on the TPAPs you can visit: Metrolinxengage.com/goexpansion/oncorridor

If you have any further questions regarding the TPAPs please contact us via the coordinates below. Kindest Regards,

The GO Expansion team

New Track and Facilities TPAP: Scarborough Junction Grade Separation TPAP, Stouffville Rail Corridor Grade Separations TPAP: Mirjana Osojnicki Manager, Meghan Bratt Environmental Programs and Manager (A), Environmental Programs and Assessment Assessment Metrolinx Metrolinx 10 Bay Street, Toronto, ON M5J 2R98 10 Bay Street, Toronto, ON M5J [email protected] 2R98 [email protected]

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: GO Expansion TPAP To: [email protected]; Christopher Jones Cc: Jonathan Wilder; George Papafotis; Violetta Savage; Meghan Bratt; Mirjana Osojnicki; Halim Abdihalim; Julia Kun; Uton Samuels Subject: GO Expansion TPAPs Notice of Commencement – September 8, 2020 Date: Tuesday, September 8, 2020 12:13:08 PM Attachments: Go Expansion Notice of Commencement 8Sept2020.pdf

Dear Mr. Paul Kerry and Mr. Christopher Jones, In accordance with Ontario Regulation 231/08 (Transit Projects and Metrolinx Undertakings (made under the Environmental Assessment Act), please find attached the Notice of Commencement (dated September 8, 2020) for three (3) Transit Project Assessment Process (TPAP) projects: New Track & Facilities TPAP; Stouffville Rail Corridor Grade Separations TPAP; and Scarborough Junction Grade Separation TPAP.

Metrolinx is carrying out these TPAPs to examine the potential environmental impacts associated with the proposed infrastructure as outlined in the attached Notice. The Notice of Commencement is being issued to formally commence the TPAP phase for each project.

The TPAP process involves a pre-planning/consultation phase followed by a regulated phase that can take up to 120 days which starts with the Notice of Commencement and ends with the Notice of Completion. The process includes consultation, an assessment of positive and negative impacts, an assessment of measures to mitigate negative impacts and documentation in an Environmental Project Report (EPR). The EPR is made available for a 30-day public and agency review at the Notice of Completion and is followed by a 35-day Ministry of Environment, Conservation and Parks review.

The draft EPR and environmental studies were shared with CP in April of this year. CP may have an interest in the New Track and Facilities TPAP as the project proposes track improvements across the network.

Consultation with the public, review agencies and Indigenous communities is a key component of these TPAPs. Two public open houses have already been held during the pre-planning phase including public meetings in February 2020 and a virtual open house in August 2020. As Metrolinx formally commences these TPAPs, we will continue with consultations including a third public virtual open house to be held in the Fall of 2020. For more information on the TPAPs you can visit: Metrolinxengage.com/goexpansion/oncorridor

If you have any further questions regarding the TPAPs please contact us via the coordinates below. Kindest Regards,

The GO Expansion team

New Track and Facilities TPAP: Scarborough Junction Grade Separation TPAP, Stouffville Rail Corridor Grade Separations TPAP: Mirjana Osojnicki Manager, Meghan Bratt Environmental Programs and Manager (A), Environmental Programs and Assessment Assessment Metrolinx Metrolinx 10 Bay Street, Toronto, ON M5J 2R98 10 Bay Street, Toronto, ON M5J [email protected] 2R98 [email protected]

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Meghan Bratt To: Cameron, Anne (MECP) Cc: Uton Samuels; Rupesh Udash; Scarborough Junction Subject: RE: Notice of Commencement - New Track & Facilities TPAP; Stouffville Grade Separations TPAP; and Scarborough Junction TPAP Date: Thursday, September 10, 2020 1:36:58 PM Attachments: Ack Notice of Commencement_ScarboroughJunction_10Sept2020.docx

Good afternoon Anne,

Thank you for issuing the letter acknowledging receipt of the Notice of Commencement for Scarborough Junction TPAP. We look forward to continuing to work with you during the regulated time period.

If you have any questions or comments – please reach out to Uton Samuels – who is the Project Manager assigned to this file.

Thanks, Meghan

Meghan Bratt, RPP Manager (A), Environmental Programs and Assessment

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: September-10-20 9:01 AM To: Meghan Bratt Cc: Batista, Cindy (MECP); Desautels, Solange (MECP); Uton Samuels Subject: RE: Notice of Commencement - New Track & Facilities TPAP; Stouffville Grade Separations TPAP; and Scarborough Junction TPAP

Good morning Meghan,

Thank you for sending the Notice of Commencement for the Scarborough Junction Grade Separation project. Please find attached the ministry’s acknowledgement letter.

All the best,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 437-246-2066 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Meghan Bratt Sent: September 8, 2020 1:56 PM To: O'Neill, Kathleen (MECP) Cc: Batista, Cindy (MECP) ; Sanzo, Adam (MECP) ; Moszynski, Dorothy (MECP) ; Cameron, Anne (MECP) ; Desautels, Solange (MECP) ; Mirjana Osojnicki ; James Hartley ; GO Expansion TPAP Subject: Notice of Commencement - New Track & Facilities TPAP; Stouffville Grade Separations TPAP; and Scarborough Junction TPAP

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Good afternoon Kathleen,

In accordance with Ontario Regulation 231/08 (Transit Projects and Metrolinx Undertakings (made under the Environmental Assessment Act), please find attached the Notice of Commencement (dated September 8, 2020) for three (3) Transit Project Assessment Process (TPAP) projects: New Track & Facilities TPAP; Stouffville Rail Corridor Grade Separations TPAP; and Scarborough Junction Grade Separation TPAP.

Metrolinx is carrying out these TPAPs to examine the potential environmental impacts associated with the proposed infrastructure as outlined in the attached Notice. The Notice of Commencement is being issued to formally commence the up to 120-day TPAP phase.

A TPAP is a focused impact assessment created specifically for transit projects. The process involves a pre-planning/consultation phase followed by a regulated up to 120-day phase that starts with the Notice of Commencement and ends with the Notice of Completion. The process includes consultation, an assessment of positive and negative impacts, identification of measures to mitigate negative impacts and documentation in an Environmental Project Report (EPR). The EPR is made available for a 30-day public and agency review at the Notice of Completion and is followed by a 35- day Ministry of Environment, Conservation and Parks review.

Consultation with the public, review agencies and Indigenous communities is a key component of these TPAPs. Two public open houses have already been held during the pre-planning phase including public meetings in February 2020 and a virtual open house in August 2020. As Metrolinx formally commences these TPAPs, we will continue with consultations including a third public virtual open house to be held in the Fall of 2020. To stay informed please visit: Metrolinxengage.com/goexpansion/oncorridor

Regards, Scarborough Junction Grade Separation TPAP, New Track and Facilities TPAP: Stouffville Rail Corridor Grade Separations TPAP: Mirjana Osojnicki Meghan Bratt Manager, Environmental Programs and Assessment Manager (A), Environmental Programs and Metrolinx Assessment 10 Bay Street, Toronto, ON M5J 2R98 Metrolinx [email protected] 10 Bay Street, Toronto, ON M5J 2R98 [email protected]

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: GO Expansion TPAP To: [email protected] Cc: Antonio DiFebo; Janis Robins; George Papafotis; [email protected]; Violetta Savage; Meghan Bratt; Mirjana Osojnicki; Halim Abdihalim; Julia Kun; Uton Samuels Subject: GO Expansion TPAPs Notice of Commencement – September 8, 2020 Date: Tuesday, September 8, 2020 12:12:06 PM Attachments: Go Expansion Notice of Commencement 8Sept2020.pdf

Dear Ms. Debra Rasinger,

In accordance with Ontario Regulation 231/08 (Transit Projects and Metrolinx Undertakings (made under the Environmental Assessment Act), please find attached the Notice of Commencement (dated September 8, 2020) for three (3) Transit Project Assessment Process (TPAP) projects: New Track & Facilities TPAP; Stouffville Rail Corridor Grade Separations TPAP; and Scarborough Junction Grade Separation TPAP.

Metrolinx is carrying out these TPAPs to examine the potential environmental impacts associated with the proposed infrastructure as outlined in the attached Notice. The Notice of Commencement is being issued to formally commence the TPAP phase for each project.

The TPAP process involves a pre-planning/consultation phase followed by a regulated phase that can take up to 120 days which starts with the Notice of Commencement and ends with the Notice of Completion. The process includes consultation, an assessment of positive and negative impacts, an assessment of measures to mitigate negative impacts and documentation in an Environmental Project Report (EPR). The EPR is made available for a 30-day public and agency review at the Notice of Completion and is followed by a 35-day Ministry of Environment, Conservation and Parks review.

The draft EPR and environmental studies were shared with VIA in April of this year. VIA may have an interest in the Scarborough Junction Grade Separation TPAP along the Kingston Subdivision, and the New Track and Facilities TPAP along the Don Branch (proposed Don Valley Layover facility).

Consultation with the public, review agencies and Indigenous communities is a key component of these TPAPs. Two public open houses have already been held during the pre-planning phase including public meetings in February 2020 and a virtual open house in August 2020. As Metrolinx formally commences these TPAPs, we will continue with consultations including a third public virtual open house to be held in the Fall of 2020. For more information on the TPAPs you can visit: Metrolinxengage.com/goexpansion/oncorridor

If you have any further questions regarding the TPAPs please contact us via the coordinates below.

Kindest Regards,

The GO Expansion team

New Track and Facilities TPAP: Scarborough Junction Grade Separation TPAP, Stouffville Rail Corridor Grade Separations TPAP: Mirjana Osojnicki Manager, Meghan Bratt Environmental Programs and Manager (A), Environmental Programs and Assessment Assessment Metrolinx Metrolinx 10 Bay Street, Toronto, ON M5J 2R98 10 Bay Street, Toronto, ON M5J [email protected] 2R98 [email protected] From: GO Expansion TPAP To: GO Expansion TPAP Cc: Mirjana Osojnicki; Meghan Bratt; Stouffville GS; Scarborough Junction Subject: GO Expansion TPAPs Notice of Commencement – September 8, 2020 Date: Tuesday, September 8, 2020 3:29:45 PM Attachments: Go Expansion Notice of Commencement 8Sept2020.pdf

Good Afternoon,

In accordance with Ontario Regulation 231/08 (Transit Projects and Metrolinx Undertakings (made under the Environmental Assessment Act), please find attached the Notice of Commencement (dated September 8, 2020) for three (3) Transit Project Assessment Process (TPAP) projects: New Track & Facilities TPAP; Stouffville Rail Corridor Grade Separations TPAP; and Scarborough Junction Grade Separation TPAP.

Metrolinx is carrying out these TPAPs to examine the potential environmental impacts associated with the proposed infrastructure as outlined in the attached Notice. The Notice of Commencement is being issued to formally commence the TPAP phase for each project.

A TPAP is a focused impact assessment created specifically for transit projects. The process involves a pre-planning/consultation phase followed by a regulated phase that can take up to 120 days which starts with the Notice of Commencement and ends with the Notice of Completion. The process includes consultation, an assessment of positive and negative impacts, an assessment of measures to mitigate negative impacts and documentation in an Environmental Project Report (EPR). The EPR is made available for a 30-day public and agency review at the Notice of Completion and is followed by a 35-day Ministry of Environment, Conservation and Parks review.

Consultation with the public, review agencies and Indigenous communities is a key component of these TPAPs. Two public open houses have already been held during the pre-planning phase including public meetings in February 2020 and a virtual open house in August 2020. As Metrolinx formally commences these TPAPs, we will continue with consultations including a third public virtual open house to be held in the Fall of 2020. To stay informed please visit: Metrolinxengage.com/goexpansion/oncorridor

Regards,

Scarborough Junction Grade Separation New Track and Facilities TPAP: TPAP, Stouffville Rail Corridor Grade Separations TPAP: Mirjana Osojnicki Meghan Bratt Manager, Environmental Programs and Manager (A), Environmental Programs and Assessment Assessment Metrolinx Metrolinx 10 Bay Street, Toronto, ON M5J 2R98 10 Bay Street, Toronto, ON M5J 2R98 [email protected] [email protected]

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: Cameron, Anne (MECP) Cc: Rupesh Udash; Laura Romeo; Indika Karunarathna Subject: RE: OnCorridor - Scarborough Junction GS - EPR Response Comments Date: Tuesday, October 13, 2020 6:37:42 AM Attachments: image001.png image002.png RE OnCorridor - Scarborough Junction GS - EPR Response Comments.msg

Hello Anne,

To answer your previous email, the Operational Noise and Vibration Study should be available for MECP’s review by November 2020. That being said, we will try to get it into the Ministry’s hands as soon as possible.

With regards to your other query below, you are correct. Comments No. 8 to 19 are mainly outstanding as they are in relations to the upcoming Operation Noise and Vibration Study. This study will provide further context to the EPR and will address some of the remaining outstanding issues. Appropriate revisions will be made to the EPR.

I am away this week, but if you have any further questions, please feel free to reach out to my team copied on this email.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Thursday, September 10, 2020 1:43 PM To: Uton Samuels Subject: RE: OnCorridor - Scarborough Junction GS - EPR Response Comments

Hi Uton,

Our noise and vibration technical reviewer has outstanding issues with Metrolinx’s responses to Items No. 8 to 19. The noise and vibration excerpts of the draft EPR do not match with the corresponding sections of the noise and vibration report. Is this due to the fact that we do not have the final Noise and Vibration Report?

Thanks,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 437-246-2066 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Uton Samuels Sent: September 4, 2020 9:05 AM To: Cameron, Anne (MECP) Subject: RE: OnCorridor - Scarborough Junction GS - EPR Response Comments

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Good Morning Anne,

I will try to get you an approximate date today. The schedule has been changing. I will let you know.

Thanks,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Thursday, September 03, 2020 9:27 AM To: Uton Samuels Subject: RE: OnCorridor - Scarborough Junction GS - EPR Response Comments

Good morning Uton,

Thank you for the email. I was looking over the document you attached and noticed that in regards to Header Merza’s comments, Metrolinx’s response states that the Operational Noise and Vibration Report will be submitted. Can you tell me when we can expect this?

Thanks,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 437-246-2066 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Uton Samuels Sent: August 31, 2020 5:38 PM To: Cameron, Anne (MECP) Cc: Batista, Cindy (MECP) ; Desautels, Solange (MECP) ; Meghan Bratt ; Rupesh Udash Subject: RE: OnCorridor - Scarborough Junction GS - EPR Response Comments

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Anne,

Thank you and the Ministry once again for taking the time to review the Draft EPR that was submitted to you. We have taken the time to review the responses that you provided to Metrolinx. We have also taken the opportunity to address the Ministry’s comments and have addressed them accordingly in the EPR. For your convenience and information, we are providing you with the comment response log, for the EPR comments that was sent to MX, that includes MX responses to each one of MECP’s comments.

Please find attached to this email the comment response log for the updates that were provided in the EPR. If you have any questions or issues with the file, please feel free to contact myself directly and I will be happy to assist.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Tuesday, June 02, 2020 7:54 AM To: Meghan Bratt Cc: Uton Samuels; Batista, Cindy (MECP); Desautels, Solange (MECP) Subject: RE: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

Good morning Meghan,

Please find attached the Ministry of the Environment, Conservation and Park’s comments on Metrolinx’s draft EPR for the Scarborough Junction Grade Separation project.

Attached are comments from myself, Air Quality, Noise and Vibration, Surface water, Groundwater and Species at Risk specialists.

Thank you for the opportunity to review and comment on the draft EPR. I look forward to receiving your comments back.

All the best,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 416-314-1181 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Meghan Bratt Sent: April 30, 2020 5:01 PM To: Batista, Cindy (MECP) ; Moszynski, Dorothy (MECP) ; Cameron, Anne (MECP) Cc: Barboza, Karla (MHSTCI) ; Zirger, Rosi (MHSTCI) ; Hamilton, James (MHSTCI) ; Uton Samuels ; Julia Kun Subject: OnCorridor - Stouffville GS and Scarborough Junction - EATS Distribution

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Cindy, Anne and Dorothy,

Metrolinx has issued the draft EPR for the Scarborough Junction project (email 1 of 2, email 2 of 2 is underway as I type) and wave 1 of the technical reports (Stage 1 Archaeology Assessment, Cultural Heritage and Natural Environment Reporting) for the Stouffville Grade Separations via the Ontario Public Sector Enterprise Transfer Attachment Service (EATS).

Karla, Rosi and James – I have copied you on the email, as Uton and Julia included you on the EATS Distribution for both projects.

Given this is our team’s first time using EATS – I wanted to share this email to ensure you are in receipt of the files.

Thanks and have a great day. Meghan

Meghan Bratt, RPP Manager (A), Environmental Programs and Assessment Metrolinx |10 Bay Street |Toronto | Ontario | M5J 2W3 T: 416-202-7368 (preferred line) | C: 416-564-9618

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Laura Romeo To: Barboza, Karla (MHSTCI) Cc: James Hartley; Hamilton, James (MHSTCI); Meghan Bratt; Zirger, Rosi (MHSTCI); Hatcher, Laura (MHSTCI); Minkin, Dan (MHSTCI); Desautels, Solange (MECP); Batista, Cindy (MECP); Moszynski, Dorothy (MECP); Cameron, Anne (MECP); Mirjana Osojnicki Subject: RE: Input Required EPA Teams EOD Mon., Sept. 28: GO Expansion TPAPs Notice of Commencement – September 8, 2020 Attachments: image004.png image003.png 165011004_SJ_epr_NoC_Version_20201014_dft.pdf

Hi Karla,

I hope you are doing well. I just returned from parental leave and will be taking over for Meghan Bratt for the Stouffville Grade Separation EPR and Scarborough Junction EPR.

Please find attached the updated Scarborough Junction Grade Separation EPR. Following this email I will send you the updated Stouffville Grade Separation EPR.

Thanks Laura

Laura Romeo Manager, Environmental Programs & Assessment Metrolinx | 10 Bay Street | Toronto | Ontario | M5J 2W3 C: 416.414.1127

From: Barboza, Karla (MHSTCI) [mailto:[email protected]] Sent: October-14-20 4:06 PM To: Mirjana Osojnicki Cc: James Hartley; Hamilton, James (MHSTCI); Meghan Bratt; Laura Romeo; Zirger, Rosi (MHSTCI); Hatcher, Laura (MHSTCI); Minkin, Dan (MHSTCI); Desautels, Solange (MECP); Batista, Cindy (MECP); Moszynski, Dorothy (MECP); Cameron, Anne (MECP) Subject: RE: Input Required EPA Teams EOD Mon., Sept. 28: GO Expansion TPAPs Notice of Commencement – September 8, 2020

Hi Mirjana,

Just want to follow up on this … maybe I missed something. Has Metrolinx sent the EPRs for Stouffville Grade Separations and Scarborough Junction Grade Separation on Friday, October 9?

And do you have an idea when will you send the revised Cultural Heritage Report and EPRs for the New Track and Facilities? Thanks again, Karla From: Barboza, Karla (MHSTCI) Sent: October-06-20 4:17 PM To: 'Mirjana Osojnicki' Cc: 'James Hartley' ; Hamilton, James (MHSTCI) ; 'Meghan Bratt' ; 'Laura Romeo' ; Zirger, Rosi (MHSTCI) ; Hatcher, Laura (MHSTCI) ; Minkin, Dan (MHSTCI) ; Desautels, Solange (MECP) ; Batista, Cindy (MECP) ; Moszynski, Dorothy (MECP) ; Cameron, Anne (MECP) Subject: FW: Input Required EPA Teams EOD Mon., Sept. 28: GO Expansion TPAPs Notice of Commencement – September 8, 2020

Hi Mirjana,

Thanks for the updates for the 3 projects mentioned below. Once we receive the updated EPRs, we have a 30-day service offer, therefore our comments may be sent by November 10. We would appreciate if you could give an estimated time for the New Track and Facilities project, as we continue to support Metrolinx while balancing our workload.

We look forward to receiving the draft EPR for Stouffville Grade Separations and Scarborough Junction Grade Separation this Friday. We would be happy to attend a call should you feel it’s necessary.

Thanks again, Karla

Karla Barboza MCIP, RPP, CAHP| (A) Team Lead, Heritage Ministry of Heritage, Sport, Tourism and Culture Industries Heritage, Tourism and Culture Division| Programs and Services Branch | Heritage Planning Unit T. 416.314.7120| Email: [email protected]

From: Mirjana Osojnicki Sent: September-30-20 7:32 AM To: Barboza, Karla (MHSTCI) Cc: James Hartley ; Hamilton, James (MHSTCI) ; Meghan Bratt ; Laura Romeo ; Zirger, Rosi (MHSTCI) Subject: FW: Input Required EPA Teams EOD Mon., Sept. 28: GO Expansion TPAPs Notice of Commencement – September 8, 2020

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Karla,

As a follow up to Meghan’s email, I would like to provide you with the following updates for the submission of updated EPRs and comment logs:

Stouffville Grade Separations - October 9. The comment log is provided in the attachment and reflects the updates being made to the EPR.

Scarborough Junction Grade Separation - October 9 (comment log and EPR)

New Track and Facilities – Comment log was provided on September 24. We are currently in the process of updating the Cultural Heritage Report and Stage 1 Archeological Assessment, as well as the EPR based on refinements to the design of the layovers and will provide these reports as soon as they are available.

We appreciate your patience with us and would be happy to schedule a call to discuss schedules and expectations.

Please feel free to contact me with any questions.

Mirjana

Mirjana Osojnicki, BES Manager, Environmental Programs and Assessment, Pre-Construction Services Metrolinx |10 Bay Street | Toronto | Ontario | M5J 2R8 T: 416.202.0295 | M: 416.418.1369

Safety Never Stops.

From: Meghan Bratt Sent: September-25-20 11:59 AM To: 'Barboza, Karla (MHSTCI)' Cc: Hamilton, James (MHSTCI); Mirjana Osojnicki; James Hartley Subject: RE: GO Expansion TPAPs Notice of Commencement – September 8, 2020

Hello Karla,

Sincere apologies for the delay in responding. Given staff availability (vacation schedules) and we want to ensure we are providing the Ministry achievable dates – please give us until September 29 (next Tuesday) to respond for all three (3) TPAP projects. You are correct – at this time – we have not made the draft EPRs for the three (3) TPAPs public on the website to coincide with the Notice of Commencement.

We will provide a status update for both issuing the comment response logs for each project, outstanding reports (NTF), and revised EPRs. Once we issue a response – it may be worthwhile to convene via teleconference to ensure we are clear on the expectations and timelines for both parties.

Thanks for your patience. Have a nice weekend.

Meghan

Meghan Bratt, RPP Manager, Permits, Licenses and Approvals

From: Barboza, Karla (MHSTCI) [mailto:[email protected]] Sent: September-25-20 11:50 AM To: Meghan Bratt Cc: Hamilton, James (MHSTCI) Subject: RE: GO Expansion TPAPs Notice of Commencement – September 8, 2020

Hi Meghan,

I hope this email finds you well. I know we have all been extremely busy but just want to follow up on this. Would you be able to address our questions below so we can continue to support Metrolinx on these projects while balancing our workload?

Thanks again, Karla

From: Barboza, Karla (MHSTCI) Sent: September-17-20 10:23 AM To: Mirjana Osojnicki ; Meghan Bratt Cc: Hamilton, James (MHSTCI) ; Zirger, Rosi (MHSTCI) ; Minkin, Dan (MHSTCI) ; Hatcher, Laura (MHSTCI) ; Desautels, Solange (MECP) ; Batista, Cindy (MECP) ; Moszynski, Dorothy (MECP) ; Cameron, Anne (MECP) Subject: RE: GO Expansion TPAPs Notice of Commencement – September 8, 2020

Hi Mirjana and Meghan,

I hope this email finds you well.

Thanks again for sending the notice of commencement (attached) for the 3 projects: New Track & Facilities, Stouffville Rail Corridor Grade Separations and Scarborough Junction Grade Separation. We are reviewing the materials posted on the Metrolinx website and are wondering if you would be able to clarify a few items:

· Usually the draft EPR and associated technical studies are posted for review during the notice of commencement. See specific comments below.

· The Additional Information tab seems to be the same for all projects. Although we have provided comments on the Info Sheet 2: Heritage Conservation, that information is specific to the property and would not apply, for example, to Scarborough Junction project.

· New Track & Facilities – MHSTCI File 0010956 We went to the website provided and clicked on the ‘key documents – Learn More’ button. Under the ‘Proposed Infrastructure & Studies’, no draft EPR and/or technical studies are included. Under ‘Reports’, there is a public meeting #1 summary report.

We provided comments on the draft EPR and one version of the Cultural Heritage Report. We haven’t seen a revised Cultural Heritage Report, which Metrolinx said it would send us another version for review. Are we missing something? Can you advise on your expectation – including timelines – for our review?

Metrolinx has yet to send the Stage 1 archaeological assessment. Can you advise on the Stage of Stage 1 AA and when we might expect the licensed archaeologist to submit it?

· Stouffville Rail Corridor Grade Separations – MHSTCI File 0004872 We went to the website provided and clicked on the ‘key documents – Learn More’ button. Under the ‘Proposed Infrastructure & Studies’, there is no draft EPR but under Environmental Studies, the Cultural Heritage Report (dated August 26, 2020) has been posted. Under ‘Reports’, there is a public meeting #1 summary report.

We provided comments on the draft EPR and 2 versions of the Cultural Heritage Report. Stage 1 archaeological assessments have been entered on the Ontario Public Register of Archaeological Reports. Can you advise on your expectations – including timeline – for our review?

· Scarborough Junction Grade Separation – MHSTCI File 0010365 We went to the website provide and clicked on the ‘key documents – Learn More’ button. Under the ‘Proposed Infrastructure & Studies’, there is no draft EPR but under Environmental Studies, the Cultural Heritage Report (dated August 18, 2020) has been posted. Under ‘Reports’, there is a public meeting #1 summary report.

We provided comments on the draft EPR and 2 versions of the Cultural Heritage Report. Stage 1 Archaeological Assessment has been entered on the Ontario Public Register of Archaeological Reports. Can you advise on your expectations – including timeline – for our review?

We look forward to continuing to support Metrolinx in its cultural heritage due diligence under the Ontario Heritage Act and Ontario Regulation 231/08. We are happy to arrange a meeting if you would like to discuss.

Thanks in advance, Karla

Karla Barboza MCIP, RPP, CAHP| (A) Team Lead, Heritage Ministry of Heritage, Sport, Tourism and Culture Industries Heritage, Tourism and Culture Division| Programs and Services Branch | Heritage Planning Unit T. 416.314.7120| Email: [email protected]

From: GO Expansion TPAP Sent: September-08-20 1:36 PM To: GO Expansion TPAP Cc: Mirjana Osojnicki ; Meghan Bratt ; Scarborough Junction ; [email protected] Subject: GO Expansion TPAPs Notice of Commencement – September 8, 2020

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender.

Good Morning,

In accordance with Ontario Regulation 231/08 (Transit Projects and Metrolinx Undertakings (made under the Environmental Assessment Act), please find attached the Notice of Commencement (dated September 8, 2020) for three (3) Transit Project Assessment Process (TPAP) projects: New Track & Facilities TPAP; Stouffville Rail Corridor Grade Separations TPAP; and Scarborough Junction Grade Separation TPAP.

Metrolinx is carrying out these TPAPs to examine the potential environmental impacts associated with the proposed infrastructure as outlined in the attached Notice. The Notice of Commencement is being issued to formally commence the TPAP phase for each project.

A TPAP is a focused impact assessment created specifically for transit projects. The process involves a pre-planning/consultation phase followed by a regulated phase that can take up to 120 days which starts with the Notice of Commencement and ends with the Notice of Completion. The process includes consultation, an assessment of positive and negative impacts, an assessment of measures to mitigate negative impacts and documentation in an Environmental Project Report (EPR). The EPR is made available for a 30-day public and agency review at the Notice of Completion and is followed by a 35-day Ministry of Environment, Conservation and Parks review.

Consultation with the public, review agencies and Indigenous communities is a key component of these TPAPs. Two public open houses have already been held during the pre- planning phase including public meetings in February 2020 and a virtual open house in August 2020. As Metrolinx formally commences these TPAPs, we will continue with consultations including a third public virtual open house to be held in the Fall of 2020. To stay informed please visit: Metrolinxengage.com/goexpansion/oncorridor

Regards,

New Track and Facilities TPAP: Scarborough Junction Grade Separation TPAP, Stouffville

Rail Corridor Grade Separations TPAP:

Mirjana Osojnicki Meghan Bratt Manager, Environmental Programs Manager (A), Environmental Programs and Assessment and Assessment Metrolinx Metrolinx 10 Bay Street, Toronto, ON M5J 2R98 10 Bay Street, Toronto, ON M5J 2R98 [email protected][email protected]

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: Merza, Header (MECP); Cameron, Anne (MECP) Cc: Laura Romeo; Toros Topaloglu; Indika Karunarathna Subject: RE: GO Expansion - Tranche 2: Noise & Vibration and Air Quality Reports Date: Tuesday, November 3, 2020 3:06:01 PM Attachments: image001.png image004.png image003.png

Hello Header and Anne,

We apologize for the confusion. As mentioned previously, the Construction N&V you have already reviewed. Some of the comments provided in that review dealt with Operational N&V that would not be addressed in the previously circulated reports. The documents that were recently submitted are the Operational N&V reports that include Scarborough Rail-Rail. Construction N&V was separated from Operational N&V for this project and the projects that were listed in the table.

RWDI meant that the construction related impacts of grade separation are assessed in separate reports. All operations related impacts are assessed in this report.

We can correct the language in the versions moving forward to reflect that Scarborough is a part of this report.

Thanks,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Merza, Header (MECP) [mailto:[email protected]] Sent: Monday, November 02, 2020 4:39 PM To: Cameron, Anne (MECP) Cc: Uton Samuels; Laura Romeo; Toros Topaloglu Subject: RE: GO Expansion - Tranche 2: Noise & Vibration and Air Quality Reports

See below:

Furthermore, Pages 1-64 of 349 (the text section of the N&V Report) does not make any reference to the assessment of the Scarborough Rail-Rail Grade Separation Project.

I have previously reviewed the Consrtiction N&V Report of the Scarborough Rail-Rail Grade Separation Project and made several comments. I did not review or comment of the Operational N&V Report of the Scarborough Rail-Rail Grade Separation Project.

Regards,

Header Merza, P.Eng. Senior Noise Engineer

Provincial Officer #1653

Approval Services Section – Noise Environmental Assessment & Permissions Branch Ministry of the Environment, Conservation & Parks Environmental Assessment & Permissions Division 135 St. Clair Avenue West, 1st Floor Toronto ON M4V 1P5 Tel: (416)327-6575 Fax: (416)314-8452 E-mail: [email protected]

If you have any accommodation needs or require communication supports or alternate formats, please let me know.

Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Cameron, Anne (MECP) Sent: Monday, November 02, 2020 4:24 PM To: Merza, Header (MECP) Subject: Fwd: GO Expansion - Tranche 2: Noise & Vibration and Air Quality Reports

Hi Header,

As a result of our conversation today I contacted Metrolinx. Please see their response below stating that the Scarborough junction project is indeed included in the Lakeshore east assessment.

Please let me know if you notice any other discrepancies.

Thanks,

Anne Cameron Project Officer Environmental Assessment Branch 437-246-2066

From: Uton Samuels < > Sent: Monday, November 2, 2020 4:14:37 PM To: Cameron, Anne (MECP) Cc: Batista, Cindy (MECP) ; Laura Romeo < >; Toros Topaloglu < > Subject: RE: GO Expansion - Tranche 2: Noise & Vibration and Air Quality Reports

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Anne,

That is not correct and the statement is an error. Scarborough Rail-Rail is Scarborough Junction and is included in the report. I believe where there is confusion was that they (RWDI) were saying that it was not included in the report as they did not do a noise assessment for the entire Scarborough Junction footprint (beyond the operational rail corridor). However, they have assessed the rail corridor that is a part of Scarborough Rail-Rail, so all the operational corridor has been assessed. We did clarify this matter with them internally. That is why there is a statement at the beginning of the document that states that Scarborough Junction is included from an operational standpoint.

I believe that is just a statement in the document that was missed and needs to be corrected.

For your reference, I am taking the statement I am referencing from the LSE N&V Report’s Executive Summary. Please see below:

The operation phase reports address the noise and vibration impacts of train operations per planned “maximum” service levels (10% addition to planned levels during peak periods) on the expanded and improved rail network - fully accounting for every relevant element of the infrastructure – including the new grade separations, new/improved bridges, and layover facilities. Hence, the rail noise and vibration implications of the proposed infrastructure are accounted for in the operation phase report of each corridor, to provide a more consistent and efficient assessment process.

This also includes the following projects that are currently undertaking the Transit Project Assessment Process (TPAP) and/or TPAP Addenda as part of the GO Expansion program:

• Scarborough Junction Grade Separation

The potential noise and vibration impacts of any change in road traffic conditions resulting from grade separation and other component projects were not assessed, since these impacts are expected to be insignificant (much less than 5 dB) and generally positive (a noise reduction)

Thank you for pointing out the error to us. If you have any further questions, please feel free to email me or give me a call.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Monday, November 02, 2020 3:54 PM To: Uton Samuels Cc: Batista, Cindy (MECP) Subject: RE: GO Expansion - Tranche 2: Noise & Vibration and Air Quality Reports

Hi Uton,

Thank you for your email below where you state that for the Scarborough Junction Grade Separation TPAP, the Noise and Vibration Reports for both the Stouffville and the Lakeshore East rail lines should be reviewed. I was just speaking with the Noise Reviewer who has begun his review of the Lakeshore East Noise and Vibration Report. He pointed out that on page 9 of the report, the report states that “The Scarborough Rail-Rail Separation Project is not included in the evaluation of operational noise or vibration”. First off, I want to clarify that the “Scarborough Rail- Rail Separation Project” is the same as the Scarborough Junction Grade Separation project? Secondly, is this statement correct as you had mentioned that both rail lines needed to be assessed for the Scarborough Junction Grade Separation project? I would point out that the email sent from Mirjana Osojnicki on Friday included a table that detailed which technical report was linked to which project and the Lakeshore East Noise and Vibration Assessment was linked to the Scarborough Junction Grade Separation TPAP.

Thank you for your help clarifying the points above.

All the best,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 437-246-2066 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Uton Samuels Sent: October 28, 2020 11:12 AM To: Cameron, Anne (MECP) Cc: Merza, Header (MECP) ; Ubovic, Miroslav (MECP) ; Laura Romeo ; Indika Karunarathna Subject: RE: GO Expansion - Tranche 2: Noise & Vibration and Air Quality Reports

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Anne,

Yes, you are correct. The information referred to below is the Operational N&V and AQ reports.

Unfortunately more than one report will need to be looked at as the operational assessment was not looked at from a project specific basis, but rather corridor wide.

With regards to Air Quality, I believe that the Stouffville portion was an update to 2017 Electrification AQ assessment as this portion of the corridor will be electrified, therefore no negative impacts to report. New information for the LSE portion is available that includes the proposed new tracks and facilities, such as Midland Layover, that was assessed.

With regards to N&V there should be updated information for both Stouffville and LSE corridors.

I hope that helps.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) [mailto:[email protected]] Sent: Monday, October 26, 2020 11:55 AM To: Uton Samuels Cc: Merza, Header (MECP); Ubovic, Miroslav (MECP) Subject: FW: GO Expansion - Tranche 2: Noise & Vibration and Air Quality Reports Importance: High

Hi Uton,

As the project coordinator for the Scarborough Junction Grade Separation TPAP, I wanted to touch base with you regarding the reports that Metrolinx has submitted so far.

Please correct me if I am wrong but I believe Metrolinx has submitted the Noise and Vibration Report for the construction stage – which the ministry has provided comments on. The information submitted in the email below from your colleague is the Noise and Vibration Report for the operation stage – but done for the specific rail lines. As the Scarborough Junction Grade Separation project is where 2 rail lines (Stouffville and Lakeshore East) meet, is it possible for you to tell us if one report can be reviewed rather than both?

Thank you for your help with clarifying the documents.

All the best,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 437-246-2066 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Mirjana Osojnicki Sent: October 23, 2020 3:51 PM To: Batista, Cindy (MECP) Cc: Desautels, Solange (MECP) ; Ubovic, Miroslav (MECP) ; Martin, Paul (MECP) ; Sanzo, Adam (MECP) ; Wills, Devon (MECP) ; Antunes, Marinha (MECP) ; Cameron, Anne (MECP) ; Moszynski, Dorothy (MECP) ; James Hartley ; Dan Beare ; Toros Topaloglu ; Violetta Savage Subject: GO Expansion - Tranche 2: Noise & Vibration and Air Quality Reports Importance: High

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Cindy,

Please use the Dropbox link below to download reports for Tranche 2:

• Kitchener Local Air Quality Assessment • USRC Local Air Quality Assessment • USRC Noise and Vibration Assessment • Lakeshore West Noise and Vibration Assessment • Stouffville Noise and Vibration Assessment • Lakeshore East Noise and Vibration Assessment • Lower Richmond Hill Noise and Vibration Assessment

(link: https://www.dropbox.com/sh/bnwtt96onkdt7ht/AACT0PgEie6H2JZAnBXhWvj5a?dl=0)

**Please note the following:

1. The explanation of the Economic Feasibility Assessment for the Noise and Vibration reports states all receptors that benefit from a noise wall by 5 dB or more are taken into account; this is what our TA has modelled. The text insert prepared by MX states the modelling accounted for all receptors that benefit by 3 dB and more. This minor issue will be revised for the final versions. 2. We are seeking approval of the proposed mitigation language. Metrolinx will advise of any changes.

As an update, we will be sending the following reports as part of Tranche 3 next week:

· Barrie Noise and Vibration Assessment · Kitchener Noise and Vibration Assessment · Lakeshore East Noise and Vibration Assessment · Network-Wide Regional Assessment (Version 2.0) · NT&F Construction Air Quality Assessment for Layover Facilities (Version 2.0) · NT&F Construction Noise Assessment for Layover Facilities (Version 2.0)

Please let us know if you have any issues with downloading the reports and we are certainly available to discuss any issues in advance of providing formal comments.

Thank you Mirjana

Mirjana Osojnicki, BES Manager, Environmental Programs and Assessment, Pre-Construction Services Metrolinx |10 Bay Street | Toronto | Ontario | M5J 2R8 T: 416.202.0295 | M: 416.418.1369

Safety Never Stops.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: Cook, Anita Cc: Pam Foster; Rupesh Udash; Laura Romeo; Indika Karunarathna; Tom Clarke; Bolger, Kevin; Mark Burkholder Subject: RE: Metrolinx-Scarborough Junction Date: Tuesday, November 10, 2020 11:48:54 PM Attachments: image001.png image002.png

Hello Anita,

Construction will not be determined immediately as it will be up to the Project Co. However, construction will be between 2022-2028. We can commence discussions with our Property Acquisitions group to discuss land requirements.

Feel free to contact me to discuss further.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cook, Anita [mailto:[email protected]] Sent: Tuesday, November 10, 2020 10:49 PM To: Uton Samuels Cc: Pam Foster; Rupesh Udash; Laura Romeo; Indika Karunarathna; Tom Clarke; Bolger, Kevin Subject: RE: Metrolinx-Scarborough Junction

Hello Uton Thank you for the positive update and image of the proposed bridge. You have kindly outlined your current process but can you tell me when you would expect to commence construction or acquisition of the property, keeping in mind there is still a reference plan requirement to legally identify the site. TLC needs to undertake Board approvals and Regulatory disposition procedures which takes time. Please let me know approximately when you believe Q?, 202?, and then we can set some timelines to finalize key business terms and I may proceed to obtain the requisite authorities.

Thank you Anita

Anita Cook, MBA, CRA, P.App| Executive Manager, Real Estate & Leasing | Toronto Lands Corporation (TLC) A wholly owned subsidiary of the Toronto District School Board 60 St. Clair Ave. East, Suite 201 Toronto, ON M4T 1N5 T: cell : 416-573-2716 | [email protected] |www.torontolandscorp.com

From: Uton Samuels [mailto:[email protected]] Sent: November 10, 2020 10:40 PM To: Cook, Anita Cc: Pam Foster; Rupesh Udash; Laura Romeo; Indika Karunarathna; Tom Clarke Subject: RE: Metrolinx-Scarborough Junction

Hello Anita,

Thanks for following up. I am currently the Project Manager for Scarborough Junction. I can provide you with an update on the current status.

We are currently in the process of undergoing the TPAP for Scarborough Junction. The Notice of Commencement has occurred in September and we are preparing for a Notice of Completion in December. We will be holding our third PIC at the end of November.

For a project updated, we will no longer be planning for a tunnel and will be planning to provide a bridge. This aligns with TDSB recommendations and is MX preferred crossing. The City of Toronto has agreed with the provision of a bridge. We have an updated RCD that has a bridge design that crosses the tracks and provides a ramp that is directly adjacent to the corridor. The ramp on the TDSB property side will lead to a pathway that will connect to Wolfe Avenue.

For your convenience, please find attached to this email a rendering of the bridge. Please note that stairs will also be added to the bridge/ramp.

As an update, as mentioned, I am the Project Manager for the EA portion of the project, Laura Romeo is the Manager, Pam Foster is now our Director for Environmental Programs and Assessments and Tom Clarke is the Project Manager for our Project Delivery Team.

If you have any further questions, please feel free to contact myself.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cook, Anita Sent: October 25, 2020 10:03:41 AM To: Simon Strauss; Pam Foster; Rupesh Udash Cc: Bolger, Kevin Subject: Metrolinx-Scarborough Junction

Hello, It has been quite a while since we last connected on this project. Could you please provide an update on timing. As well, we need to understand the pedestrian crossing and ensure that the tunnel is no longer considered an option. Overall, we need to allow enough time to finalize the terms and conditions and obtain Board authority. Thank you Regards, Anita

Anita Cook, MBA, CRA, P.App| Executive Manager, Real Estate & Leasing | Toronto Lands Corporation (TLC) A wholly owned subsidiary of the Toronto District School Board 60 St. Clair Ave. East, Suite 201 Toronto, ON M4T 1N5 T: cell : 416-573-2716 | [email protected] |www.torontolandscorp.com

From: Cook, Anita Sent: November 29, 2019 3:31 PM To: Simon Strauss; Pam Foster; Rupesh Udash Cc: Sage, Daryl Subject: Metrolinx-Scarborough Junction

Good Afternoon Please find attached comments from TLC with regards to the Scarborough Junction Metrolinx project as discussed at the on-site meeting with all stakeholders. Please be advised that we have also tabled this project at TDSB senior management, especially with regards to the bridge/tunnel at the Corvette location. Should you have any questions, please contact me at your convenience. Regards, Anita

Anita Cook, MBA, CRA| Senior Manager, Real Estate | Toronto Lands Corporation (TLC) A wholly owned subsidiary of the Toronto District School Board 60 St. Clair Ave. East, Suite 201 Toronto, ON M4T 1N5 T: 416-393-0632 | [email protected] |www.torontolandscorp.com

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: Cook, Anita Cc: Pam Foster; Rupesh Udash; Laura Romeo; Indika Karunarathna; Tom Clarke; Bolger, Kevin; Rossetti, Louie; Mark Burkholder; John Carbone; Nicholas Hiley Subject: RE: Metrolinx-Scarborough Junction - TDSB Property Acquisition Date: Wednesday, November 18, 2020 3:22:42 PM Attachments: image001.png image002.png

Hello Anita,

Thanks for confirming the approximate timeline to complete property acquisitions with TDSB the other day.

Our property acquisitions team should be in contact with you and your organization to commence discussions in the future. You will likely be contacted by the following individuals who are cc’d on this email:

· Mark Burkholder, Manager Property Acquisitions · Nicolas Hiley, Senior Property Officer, Property Acquisitions

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cook, Anita [mailto:[email protected]] Sent: Tuesday, November 10, 2020 11:51 PM To: Uton Samuels Cc: Pam Foster; Rupesh Udash; Laura Romeo; Indika Karunarathna; Tom Clarke; Bolger, Kevin; Rossetti, Louie; Mark Burkholder Subject: RE: Metrolinx-Scarborough Junction

Hello Uton, If construction was to commence in 2022 (say mid-year), we should commence our discussions approximately nine (9) months to one year earlier to ensure your project is not held up due to TLC requirements. Thank you Anita

From: Uton Samuels [mailto:[email protected]] Sent: November 10, 2020 11:49 PM To: Cook, Anita Cc: Pam Foster; Rupesh Udash; Laura Romeo; Indika Karunarathna; Tom Clarke; Bolger, Kevin; Mark Burkholder Subject: RE: Metrolinx-Scarborough Junction

Hello Anita,

Construction will not be determined immediately as it will be up to the Project Co. However, construction will be between 2022-2028. We can commence discussions with our Property Acquisitions group to discuss land requirements.

Feel free to contact me to discuss further.

Thank you,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cook, Anita [mailto:[email protected]] Sent: Tuesday, November 10, 2020 10:49 PM To: Uton Samuels Cc: Pam Foster; Rupesh Udash; Laura Romeo; Indika Karunarathna; Tom Clarke; Bolger, Kevin Subject: RE: Metrolinx-Scarborough Junction

Hello Uton Thank you for the positive update and image of the proposed bridge. You have kindly outlined your current process but can you tell me when you would expect to commence construction or acquisition of the property, keeping in mind there is still a reference plan requirement to legally identify the site. TLC needs to undertake Board approvals and Regulatory disposition procedures which takes time. Please let me know approximately when you believe Q?, 202?, and then we can set some timelines to finalize key business terms and I may proceed to obtain the requisite authorities.

Thank you Anita

Anita Cook, MBA, CRA, P.App| Executive Manager, Real Estate & Leasing | Toronto Lands Corporation (TLC) A wholly owned subsidiary of the Toronto District School Board 60 St. Clair Ave. East, Suite 201 Toronto, ON M4T 1N5 T: cell : 416-573-2716 | [email protected] |www.torontolandscorp.com

From: Uton Samuels [mailto:[email protected]] Sent: November 10, 2020 10:40 PM To: Cook, Anita Cc: Pam Foster; Rupesh Udash; Laura Romeo; Indika Karunarathna; Tom Clarke Subject: RE: Metrolinx-Scarborough Junction

Hello Anita,

Thanks for following up. I am currently the Project Manager for Scarborough Junction. I can provide you with an update on the current status.

We are currently in the process of undergoing the TPAP for Scarborough Junction. The Notice of Commencement has occurred in September and we are preparing for a Notice of Completion in December. We will be holding our third PIC at the end of November.

For a project updated, we will no longer be planning for a tunnel and will be planning to provide a bridge. This aligns with TDSB recommendations and is MX preferred crossing. The City of Toronto has agreed with the provision of a bridge. We have an updated RCD that has a bridge design that crosses the tracks and provides a ramp that is directly adjacent to the corridor. The ramp on the TDSB property side will lead to a pathway that will connect to Wolfe Avenue.

For your convenience, please find attached to this email a rendering of the bridge. Please note that stairs will also be added to the bridge/ramp.

As an update, as mentioned, I am the Project Manager for the EA portion of the project, Laura Romeo is the Manager, Pam Foster is now our Director for Environmental Programs and Assessments and Tom Clarke is the Project Manager for our Project Delivery Team.

If you have any further questions, please feel free to contact myself.

Kind Regards,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Laura Romeo Sent: Monday, October 26, 2020 8:39 AM To: Simon Strauss; Uton Samuels Cc: Pam Foster; Rupesh Udash Subject: RE: Metrolinx-Scarborough Junction

Hi Simon,

Thanks for forwarding this. Uton is the PM for Scarborough Junction G/S on my team now.

Uton – Could you please connect with Simon to get the background on the discussions with TDSB on this issue?

Thanks Laura

Laura Romeo Manager, Environmental Programs & Assessment Metrolinx | 10 Bay Street | Toronto | Ontario | M5J 2W3 C: 416.414.1127

From: Simon Strauss Sent: October-26-20 8:32 AM To: Laura Romeo Cc: Pam Foster; Rupesh Udash Subject: Fw: Metrolinx-Scarborough Junction

Hi Laura,

I believe you’re now on the Scarborough Junction G/S? See note below from Anita, at TDSB. I haven’t been involved in the project for at least a year, but can fill you in the the discussions that were happening when I left, if that would help.

Simon

From: Cook, Anita Sent: October 25, 2020 10:03:41 AM To: Simon Strauss; Pam Foster; Rupesh Udash Cc: Bolger, Kevin Subject: Metrolinx-Scarborough Junction

Hello, It has been quite a while since we last connected on this project. Could you please provide an update on timing. As well, we need to understand the pedestrian crossing and ensure that the tunnel is no longer considered an option. Overall, we need to allow enough time to finalize the terms and conditions and obtain Board authority. Thank you Regards, Anita

Anita Cook, MBA, CRA, P.App| Executive Manager, Real Estate & Leasing | Toronto Lands Corporation (TLC) A wholly owned subsidiary of the Toronto District School Board 60 St. Clair Ave. East, Suite 201 Toronto, ON M4T 1N5 T: cell : 416-573-2716 | [email protected] |www.torontolandscorp.com

From: Cook, Anita Sent: November 29, 2019 3:31 PM To: Simon Strauss; Pam Foster; Rupesh Udash Cc: Sage, Daryl Subject: Metrolinx-Scarborough Junction

Good Afternoon Please find attached comments from TLC with regards to the Scarborough Junction Metrolinx project as discussed at the on-site meeting with all stakeholders. Please be advised that we have also tabled this project at TDSB senior management, especially with regards to the bridge/tunnel at the Corvette location. Should you have any questions, please contact me at your convenience. Regards, Anita

Anita Cook, MBA, CRA| Senior Manager, Real Estate | Toronto Lands Corporation (TLC) A wholly owned subsidiary of the Toronto District School Board 60 St. Clair Ave. East, Suite 201 Toronto, ON M4T 1N5 T: 416-393-0632 | [email protected] |www.torontolandscorp.com

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Cameron, Anne (MECP) To: Laura Romeo Cc: Batista, Cindy (MECP); Mirjana Osojnicki; Uton Samuels; Indika Karunarathna Subject: RE: Draft Notice of Completion - Scarborough Junction Rail-Rail Grade Separation Project Date: Monday, November 16, 2020 2:00:01 PM Attachments: image001.png OnCorr SJ NoCompletion_Revised Nov16 2020.docx

Good afternoon Laura,

Please find attached the ministry’s comments/edits for the Scarborough Junction Notice of Completion.

Feel free to contact me if you have any questions.

All the best,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 437-246-2066 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Laura Romeo Sent: November 12, 2020 1:42 PM To: Cameron, Anne (MECP) Cc: Batista, Cindy (MECP) ; Mirjana Osojnicki ; Uton Samuels ; Indika Karunarathna Subject: Draft Notice of Completion - Scarborough Junction Rail-Rail Grade Separation Project

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Good afternoon Anne,

Please find attached the draft Notice of Completion for the Scarborough Junction Rail-Rail Grade Separation project for your review and comment. The Notice of Completion will first be published in the Toronto Star on Mon. Dec. 21st which will be the official Notice of Completion date. Please do not hesitate to contact me should you have any questions or concerns.

Thanks, Laura

Laura Romeo Manager, Environmental Programs & Assessment Metrolinx | 10 Bay Street | Toronto | Ontario | M5J 2W3 C: 416.414.1127

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Hatcher, Laura (MHSTCI) To: Laura Romeo Cc: Cameron, Anne (MECP); Desautels, Solange (MECP); Hamilton, James (MHSTCI); Barboza, Karla (MHSTCI); Zirger, Rosi (MHSTCI) Subject: RE: Scarborough Junction Grade Separation TPAP - Environmental Project Report and Cultural Heritage Report Date: Thursday, November 26, 2020 4:58:03 PM Attachments: 2020-11-26ScarboroughJct-EPR_MHSTCIcomments.pdf

Hi Laura,

As discussed, please find attached a revised comment table for the Scarborough Junction Grade Separation TPAP, which incorporates, and responds to, Metrolinx’s most recent responses to MHSTCI’s comments. This replaces the comment table sent on November 18.

Sincerely,

Laura

From: Hatcher, Laura (MHSTCI) Sent: Wednesday, November 18, 2020 5:23 PM To: Laura Romeo Cc: Cameron, Anne (MECP) ; Desautels, Solange (MECP) ; Hamilton, James (MHSTCI) ; Barboza, Karla (MHSTCI) ; Zirger, Rosi (MHSTCI) Subject: Scarborough Junction Grade Separation TPAP - Environmental Project Report and Cultural Heritage Report

Good evening Laura,

Thank you for providing the revised Environmental Project Report and the Cultural Heritage Report for the above mentioned project to the Ministry of Heritage, Sport, Tourism and Culture Industries. Please find attached a letter and table with our comments on the reports.

Thank you for the opportunity to review the reports. Please let me know if you have any questions.

Sincerely, Laura

Laura Hatcher, MCIP, RPP Heritage Planner Heritage Planning Unit | Programs and Services Branch | Heritage, Tourism and Culture Division Ministry of Heritage, Sport, Tourism and Culture Industries 401 Bay Street Suite 1700 Toronto ON M7A 0A7 Tel. 437-239-3404 New| email: [email protected] From: Laura Romeo To: Cameron, Anne (MECP) Cc: Uton Samuels Subject: RE: Scarborough Junction Grade Separation - Draft EPR submission Date: Tuesday, December 8, 2020 3:42:26 PM Attachments: image001.png

Hi Anne,

Thank you for the update. We appreciate you providing us these comments as you receive them.

Kind regards, Laura

Laura Romeo Manager, Environmental Programs & Assessment Metrolinx | 10 Bay Street | Toronto | Ontario | M5J 2W3 C: 416.414.1127

From: Cameron, Anne (MECP) Sent: December 8, 2020 3:26 PM To: Laura Romeo Cc: Uton Samuels Subject: RE: Scarborough Junction Grade Separation - Draft EPR submission

Hi,

I can confirm that our Air Quality Specialist is satisfied with the changes made to the updated draft final EPR for Scarborough Junction Grade Separation TPAP and has no further comments.

I will keep you apprised as I hear back from other technical reviewers.

Thanks,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 437-246-2066 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Laura Romeo Sent: November 26, 2020 8:57 PM To: Cameron, Anne (MECP) Cc: Batista, Cindy (MECP) ; Desautels, Solange (MECP) ; Uton Samuels ; Indika Karunarathna ; James Hartley ; GO Expansion TPAP Subject: Scarborough Junction Grade Separation - Draft EPR submission

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hi Anne,

Metrolinx has issued the draft Environmental Project Report (EPR) for the Scarborough Junction Grade Separation project and the associated technical reports via the Ontario Public Sector Enterprise Transfer Attachment Service (EATS). The EPR folder contains a clean version that includes most of the edits from the MECP from the Government Review Team, with the exception of the Operational N&V sections that are to be revised based on our Meeting this past Tuesday and as follows below. As advised by the MECP, an updated version will follow that will include a red-lined version that includes all the additional edits made to the EPR. We will send another red-line version of the draft EPR once the additional language is added for the Operational Noise and Vibration sections of the report and any edits as a result of the MHSTCI comments.

The following EPR have been included with this submission:

Scarborough Junction Grade Separation Project – Environmental Project Report – Final Draft (Contains updated Operational N&V language that was not reviewed prior to Tuesdays meeting with Header and Cindy (MECP) and additional language addressing Ground Water)

The following Technical Report folders contain the revised reports based on the previously comments received during the GRT process. Previously, Metrolinx had provided the following reports, which have been revised.

Appendix A1: Natural Environment Technical Reports Appendix A2: Cultural Heritage Report Appendix A3: Stage 1 AA Appendix A3-1 MHSCTI Acceptance Letter Appendix A3-2 Stage 1 Archaeological Assessment Appendix A4: Socio-Economic and Land Use Studies Appendix A5: Air Quality Assessment Appendix A5-1 Construction Phase Air Quality Impact Assessment Report (addresses all grade separation sites) Appendix A5-2 Regional Air Quality Study, GO Rail Network Electrification Project Appendix A5-3 Draft Local Air Quality Study LSE Appendix A6: Noise and Vibration Assessments Appendix A6-1 Construction Noise and Vibration Assessment Report (addresses all seven grade separation sites) Appendix A6-2 Operations Noise and Vibration Study Lakeshore East Corridor (same reports as received through separate email attachment – Was not previously reviewed) Appendix A6-3 Operations Noise and Vibration Study Stouffville Corridor (same reports as received through separate email attachment – Was not previously reviewed) Appendix A7: Transportation Impact Assessment Appendix A8: Tree Inventory (Was not previously reviewed) Appendix B: Record of Consultation (Was not previously reviewed)

We reached our limit for uploading to EATS and needed to upload the Appendix B: Record of Consultation to the following dropbox link: https://www.dropbox.com/s/64zqr9405cxflhr/Appendix%20B%20Record%20of%20Consultation.zip?dl=0

Please let me know if you have any difficultly accessing the files, as we can also issue through the consultant’s FTP site or another Dropbox link.

Thank you, Laura

Laura Romeo Manager, Environmental Programs & Assessment Metrolinx | 10 Bay Street | Toronto | Ontario | M5J 2W3 C: 416.414.1127

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

______

EXTERNAL SENDER: Do not click any links or open any attachments unless you trust the sender and know the content is safe. EXPÉDITEUR EXTERNE: Ne cliquez sur aucun lien et n’ouvrez aucune pièce jointe à moins qu’ils ne proviennent d’un expéditeur fiable, ou que vous ayez l'assurance que le contenu provient d'une source sûre. ______From: Mirjana Osojnicki To: "Batista, Cindy (MECP)"; "[email protected]"; "Desautels, Solange (MECP)"; Cameron, Anne (MECP) ([email protected]); Moszynski, Dorothy (MECP) ([email protected]) Cc: GO Expansion TPAP; Violetta Savage; Diana Radulescu; Zoe Yip; Leah Chishimba Simwanza; Dan Beare; Lindsay Prihoda; Uton Samuels; Rupesh Udash; Laura Romeo Subject: GO Expansion TPAPs Virtual Open House – November 27 to December 11, 2020 Date: Friday, November 27, 2020 5:37:09 PM Attachments: image002.png GO Expansion Program Public Meeting#3_Bulk Mailer.pdf

Hello Cindy, Dorothy, Anne and Adam,

We wanted to share with MECP that Metrolinx is hosting a third round of public consultations as part of the TPAPs for New Tracks and Facilities, Scarborough Junction Grade Separation and Stouffville Rail Corridor Grade Separations and the TPAP addenda for the Network-Wide Structures Project and the GO Rail Electrification Addendum.

Following advice from Public Health Ontario on COVID-19, this round of consultation will be carried out as a Virtual Open House from November 27 to December 11, 2020. The purpose of this round of consultation is to present and seek feedback on updates to the proposed infrastructure and the findings of the draft environmental and regional studies undertaken to date. This round will also introduce the Union Station Trainshed Heritage Conservation project.

Please visit www.metrolinxengage.com/goexpansionprogram if you would like to view the public consultation materials.

Thanks,

Mirjana

Mirjana Osojnicki, BES Manager, Environmental Programs and Assessment, Pre-Construction Services Metrolinx |10 Bay Street | Toronto | Ontario | M5J 2R8 T: 416.202.0295 | M: 416.418.1369

Safety Never Stops.

From: Laura Romeo To: Cameron, Anne (MECP) Cc: Batista, Cindy (MECP); Desautels, Solange (MECP); Uton Samuels; GO Expansion TPAP; Scarborough Junction Subject: Scarborough Junction Grade Separation - Updated Draft EPR Date: Friday, December 4, 2020 5:03:10 PM Attachments: image003.png

Hello Anne,

Metrolinx has issued the updated draft Environmental Project Report (EPR) for the Scarborough Junction Grade Separation project via the Ontario Public Sector Enterprise Transfer Attachment Service (EATS). The files transferred contains the latest EPR, both clean and red-lined, that includes the additional language added for the Operational Noise and Vibration, Operation Air Quality and the MHSTCI comments on Cultural Heritage and Archaeology.

For updates for MHSTCI, please refer to the comment log. The additional language for Operational Air Quality is located in section 3.7. The additional language for Operational N&V is located in section 3.8, 4.9 and Table 4.9.

Please let me know if you have any difficultly accessing the file, as we can also issue through Dropbox.

Thanks Laura

Laura Romeo Manager, Environmental Programs & Assessment Metrolinx | 10 Bay Street | Toronto | Ontario | M5J 2W3 C: 416.414.1127

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Cameron, Anne (MECP) To: Laura Romeo Cc: Batista, Cindy (MECP); Desautels, Solange (MECP); Uton Samuels; GO Expansion TPAP; Scarborough Junction Subject: RE: Scarborough Junction Grade Separation - Updated Draft EPR Date: Tuesday, December 8, 2020 11:36:06 AM Attachments: image001.png

Hi Laura,

Thank you for providing the updated draft EPR for the Scarborough Junction Grade Separation TPAP. We will make sure the appropriate staff reviews the information.

All the best,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 437-246-2066 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Laura Romeo Sent: December 4, 2020 5:03 PM To: Cameron, Anne (MECP) Cc: Batista, Cindy (MECP) ; Desautels, Solange (MECP) ; Uton Samuels ; GO Expansion TPAP ; [email protected] Subject: Scarborough Junction Grade Separation - Updated Draft EPR

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Anne,

Metrolinx has issued the updated draft Environmental Project Report (EPR) for the Scarborough Junction Grade Separation project via the Ontario Public Sector Enterprise Transfer Attachment Service (EATS). The files transferred contains the latest EPR, both clean and red-lined, that includes the additional language added for the Operational Noise and Vibration, Operation Air Quality and the MHSTCI comments on Cultural Heritage and Archaeology.

For updates for MHSTCI, please refer to the comment log. The additional language for Operational Air Quality is located in section 3.7. The additional language for Operational N&V is located in section 3.8, 4.9 and Table 4.9.

Please let me know if you have any difficultly accessing the file, as we can also issue through Dropbox. Thanks Laura

Laura Romeo Manager, Environmental Programs & Assessment Metrolinx | 10 Bay Street | Toronto | Ontario | M5J 2W3 C: 416.414.1127

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Laura Romeo To: Hatcher, Laura (MHSTCI); Hamilton, James (MHSTCI); Barboza, Karla (MHSTCI); Zirger, Rosi (MHSTCI) Cc: Cameron, Anne (MECP); Desautels, Solange (MECP); Batista, Cindy (MECP); Uton Samuels Scarborough Subject: Junction G/S - Updated EPR and Comment Response Log Date: Monday, December 7, 2020 6:05:39 PM Attachments: image001.png

Hello Laura, James, Karla, Rosi,

Metrolinx has issued the updated draft Environmental Project Report (EPR) for the Scarborough Junction Grade Separation project via the Ontario Public Sector Enterprise Transfer Attachment Service (EATS). Attached contains the latest EPR and the latest comment response sheet for the comments previously received from MHSTCI.

Please let me know if you have any difficultly accessing the file, as we can also issue through Dropbox.

Thank you, Laura

Laura Romeo Manager, Environmental Programs & Assessment Metrolinx | 10 Bay Street | Toronto | Ontario | M5J 2W3 C: 416.414.1127 From: Uton Samuels To: Cameron, Anne (MECP) Cc: Laura Romeo; Indika Karunarathna Subject: RE: Scarborough Junction Grade Separation - EPR - MHSTCI Comments Date: Thursday, December 10, 2020 3:26:57 PM Attachments: image001.png image002.png 165011004_rpt_20201116_mx_scarjunc_soil_gw_inv_dft_reduced.pdf

Hello Anne,

As discussed, please find attached to this email the Hydrogeological/Geotechnical Sampling Report for your reference as requested.

Thanks,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) Sent: Tuesday, December 08, 2020 11:11 AM To: Uton Samuels Subject: RE: Scarborough Junction Grade Separation - EPR - MHSTCI Comments

That’s great, thanks.

I see in the final EPR there is reference to geotechnical and hydrogeological investigations having been completed. I can not find related reports in any of the appendices. Can you please provide them?

Thanks,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 437-246-2066 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Uton Samuels Sent: December 8, 2020 9:12 AM To: Cameron, Anne (MECP) Subject: RE: Scarborough Junction Grade Separation - EPR - MHSTCI Comments

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Anne,

Yes, it is the exact same information. Just sent to your colleagues directly also.

Thanks,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) Sent: Tuesday, December 08, 2020 8:31 AM To: Uton Samuels Subject: RE: Scarborough Junction Grade Separation - EPR - MHSTCI Comments

Hi Uton,

I just want to confirm that this is the same information that you sent me on Friday.

Thanks,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 437-246-2066 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: [email protected] Sent: December 7, 2020 5:59 PM To: Hamilton, James (MHSTCI) ; Barboza, Karla (MHSTCI) ; Zirger, Rosi (MHSTCI) Cc: Desautels, Solange (MECP) ; Cameron, Anne (MECP) Subject: Scarborough Junction Grade Separation - EPR - MHSTCI Comments

You have received 3 secure files from [email protected]. Use the secure links below to download.

Hello Everyone,

Please find attached to this message an EPR Draft, a blacklined EPR Draft and the comment log that addresses MHSTCI's comments. Please note that both versions of the EPR includes the revisions to address MHSTCI's comments.

Please note the email was not sending with [email protected] email address. Please pass along this email and attachment to Laura.

If you have any trouble with the files, please feel free to contact myself.

Thanks,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

Secure File Downloads: Available until: 12 December 2020

Click links to download:

165011004_SJ_epr_blackline_comparison_20201204.pdf 22.50 MB, Fingerprint: 8c338ea195d86846f71604760e0f2c52 (What is this?)

165011004_SJ_epr_NoC_Version_20201201_fnl-dft.pdf 8.71 MB, Fingerprint: 70f5d3f7c5d38e28acd7cbfabf28725f (What is this?)

2020-11-26ScarboroughJct-EPR_MHSTCIcomments.xlsx 22.35 KB, Fingerprint: 38d324c188096d135e5c3ad052ee4d8f (What is this?)

You have received attachment link(s) within this e-mail message sent via Enterprise Attachment Transfer Service. To retrieve the attachment(s), please click on the link(s).

If you have any difficulty accessing the file using the enclosed link, please log into the Application first at the following location http://attachmail.ontario.ca/

Secured by Accellion

______

EXTERNAL SENDER: Do not click any links or open any attachments unless you trust the sender and know the content is safe. EXPÉDITEUR EXTERNE: Ne cliquez sur aucun lien et n’ouvrez aucune pièce jointe à moins qu’ils ne proviennent d’un expéditeur fiable, ou que vous ayez l'assurance que le contenu provient d'une source sûre. ______

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

______

EXTERNAL SENDER: Do not click any links or open any attachments unless you trust the sender and know the content is safe. EXPÉDITEUR EXTERNE: Ne cliquez sur aucun lien et n’ouvrez aucune pièce jointe à moins qu’ils ne proviennent d’un expéditeur fiable, ou que vous ayez l'assurance que le contenu provient d'une source sûre. ______

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Uton Samuels To: Cameron, Anne (MECP) Cc: Laura Romeo; Indika Karunarathna Subject: RE: Scarborough Junction Grade Separation - EPR - MHSTCI Comments Date: Monday, December 14, 2020 11:46:40 AM Attachments: image001.png image002.png image003.png

Hello Anne,

Please see the Dropbox Link below to access the Geotechnical Report to go along with the soil sample report. https://www.dropbox.com/s/4rbmidkdboc94e8/dft_160540004_rpt_scarborough_junction_grade_separation_20201113.pdf?dl=0

Thanks,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) Sent: Monday, December 14, 2020 10:11 AM To: Uton Samuels Cc: Laura Romeo ; Indika Karunarathna Subject: RE: Scarborough Junction Grade Separation - EPR - MHSTCI Comments

Good morning Uton,

Thank you very much for sending me the groundwater information. I will forward it on to our technical reviewers.

All the best,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 437-246-2066 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Uton Samuels Sent: December 10, 2020 3:23 PM To: Cameron, Anne (MECP) Cc: Laura Romeo ; Indika Karunarathna Subject: RE: Scarborough Junction Grade Separation - EPR - MHSTCI Comments

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Anne,

As discussed, please find attached to this email the Hydrogeological/Geotechnical Sampling Report for your reference as requested.

Thanks,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) Sent: Tuesday, December 08, 2020 11:11 AM To: Uton Samuels Subject: RE: Scarborough Junction Grade Separation - EPR - MHSTCI Comments

That’s great, thanks.

I see in the final EPR there is reference to geotechnical and hydrogeological investigations having been completed. I can not find related reports in any of the appendices. Can you please provide them?

Thanks,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 437-246-2066 I * [email protected] Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: Uton Samuels Sent: December 8, 2020 9:12 AM To: Cameron, Anne (MECP) Subject: RE: Scarborough Junction Grade Separation - EPR - MHSTCI Comments

CAUTION -- EXTERNAL E-MAIL - Do not click links or open attachments unless you recognize the sender. Hello Anne,

Yes, it is the exact same information. Just sent to your colleagues directly also.

Thanks,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

From: Cameron, Anne (MECP) Sent: Tuesday, December 08, 2020 8:31 AM To: Uton Samuels Subject: RE: Scarborough Junction Grade Separation - EPR - MHSTCI Comments

Hi Uton,

I just want to confirm that this is the same information that you sent me on Friday.

Thanks,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 437-246-2066 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

From: [email protected] Sent: December 7, 2020 5:59 PM To: Hamilton, James (MHSTCI) ; Barboza, Karla (MHSTCI) ; Zirger, Rosi (MHSTCI) Cc: Desautels, Solange (MECP) ; Cameron, Anne (MECP) Subject: Scarborough Junction Grade Separation - EPR - MHSTCI Comments

You have received 3 secure files from [email protected]. Use the secure links below to download.

Hello Everyone,

Please find attached to this message an EPR Draft, a blacklined EPR Draft and the comment log that addresses MHSTCI's comments. Please note that both versions of the EPR includes the revisions to address MHSTCI's comments.

Please note the email was not sending with [email protected] email address. Please pass along this email and attachment to Laura.

If you have any trouble with the files, please feel free to contact myself.

Thanks,

Uton Samuels Project Manager Environmental Programs and Assessment, Pre-Construction Services 10 Bay Street | Toronto | Ontario | M5J 2W3 T: 416.202.7760 | C: 647.293.8634

Secure File Downloads: Available until: 12 December 2020

Click links to download:

165011004_SJ_epr_blackline_comparison_20201204.pdf 22.50 MB, Fingerprint: 8c338ea195d86846f71604760e0f2c52 (What is this?)

165011004_SJ_epr_NoC_Version_20201201_fnl-dft.pdf 8.71 MB, Fingerprint: 70f5d3f7c5d38e28acd7cbfabf28725f (What is this?)

2020-11-26ScarboroughJct-EPR_MHSTCIcomments.xlsx 22.35 KB, Fingerprint: 38d324c188096d135e5c3ad052ee4d8f (What is this?)

You have received attachment link(s) within this e-mail message sent via Enterprise Attachment Transfer Service. To retrieve the attachment(s), please click on the link(s).

If you have any difficulty accessing the file using the enclosed link, please log into the Application first at the following location http://attachmail.ontario.ca/

Secured by Accellion

______

EXTERNAL SENDER: Do not click any links or open any attachments unless you trust the sender and know the content is safe. EXPÉDITEUR EXTERNE: Ne cliquez sur aucun lien et n’ouvrez aucune pièce jointe à moins qu’ils ne proviennent d’un expéditeur fiable, ou que vous ayez l'assurance que le contenu provient d'une source sûre. ______

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

______

EXTERNAL SENDER: Do not click any links or open any attachments unless you trust the sender and know the content is safe. EXPÉDITEUR EXTERNE: Ne cliquez sur aucun lien et n’ouvrez aucune pièce jointe à moins qu’ils ne proviennent d’un expéditeur fiable, ou que vous ayez l'assurance que le contenu provient d'une source sûre. ______

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.

______

EXTERNAL SENDER: Do not click any links or open any attachments unless you trust the sender and know the content is safe. EXPÉDITEUR EXTERNE: Ne cliquez sur aucun lien et n’ouvrez aucune pièce jointe à moins qu’ils ne proviennent d’un expéditeur fiable, ou que vous ayez l'assurance que le contenu provient d'une source sûre. ______

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments. From: Cameron, Anne (MECP) To: Uton Samuels; Laura Romeo Subject: Scarborough Junction Grade Separation Project - EA and Groundwater comments Date: Tuesday, December 15, 2020 11:35:04 AM

Hi Laura and Uton,

Please see below final comments from MECP’s Technical Support Staff for Groundwater:

In my comments on an earlier version made via e-mail on Mon 05/25/2020 5:50 PM, I stated: I have not found any sections on geology and hydrogeology in a scan of the documents provided. As the construction is in areas in which there is already rail infrastructure, I have no concerns. In completing the project, the proponent will need to comply with ministry legislation and regulations with respect to water, soils and contamination. Some of these are as follows: 1. Permit to Take Water Regulation (an application will be accompanied by a Category 3 Hydrogeological Assessment which is more detailed that the geological assessment which accompanies an EA, 2. Discharge requirements with possibly an ECA, 3. O. Reg. 406/19: ON-SITE AND EXCESS SOIL MANAGEMENT, 4. The movement of contamination from adjacent possibly contaminant impacted areas.

The current report (Stantec, 2020) provides a very high level description of the geology and hydrogeology taken from published studies. The proponent is currently completing hydrogeological and geotechnical studies along the project corridor. This data will be used to complete the applications required for a Category 3 PTTW or Construction Dewatering EASR.

The report also points out that the various construction areas may require a Permit to Take Water (PTTW) or a Construction Dewatering EASR depending upon the amount of water encountered in the excavations. Longer term PTTWs will be required in those areas where the rail line is below the water table. Area of proposed works is an area of existing municipal, road and rail infrastructure. The proponent is aware of the requirements for either a Permit to Take Water or Construction Dewatering EASR depending upon the dewatering requirements of the various proposed construction sites. The proponent has identified the need for longer term PTTWs in areas where the depressed rail corridor is below the water table. The Proponent has identified five medium risk and two high risk Areas of Potential Environmental Concern including the presence of fill of unknown quantity along the rail corridor. The proponent has committed to developing a Groundwater Management and Dewatering Plan (GMDP) to guide the handling, management, and disposal of groundwater encountered during the Works.

The proponent has correctly identified the legislation applicable to dewatering and the movement of waste and excess soil likely to occur along the rail corridor including:

O. Reg. 406/19: On Site and Excess Soil Management

O. Reg. 387/04: Water Taking and Transfer

O. Reg. 245/11: Registrations Under Part II.2 of the Act – General O. Reg. 63/16 – Registrations Under Part II.2 of the Act – Water Taking. The proponent has also correctly identified the requirement for a discharge agreement with the City of Toronto for the discharge of water from its short term and long term dewatering requirements. In conclusion, I have no concerns with Stantec’s (2020) report. More geological and hydrogeological detail will be provided should ministry instruments be required to complete the project.

I have also completed my review of the updated draft EPR. Other than the outstanding consultation points (highlighted in green in the draft EPR), I have no outstanding concerns. As of this email, we are waiting on comments related to Noise & Vibration and Surface Water. Please let me know if you have any questions. Thanks,

Anne Cameron I Project Officer Environmental Assessment Services Section I Environmental Assessment Branch 135 St. Clair Avenue West I 1st Floor I Toronto ON M4V 1P5 (: 437-246-2066 I * [email protected]

Ministry of the Environment, Conservation and Parks

If you have any accommodation needs or require communication supports or alternate formats, please let me know. Si vous avez des besoins en matière d’adaptation, ou si vous nécessitez des aides à la communication ou des médias substituts, veuillez me le faire savoir.

______

EXTERNAL SENDER: Do not click any links or open any attachments unless you trust the sender and know the content is safe. EXPÉDITEUR EXTERNE: Ne cliquez sur aucun lien et n’ouvrez aucune pièce jointe à moins qu’ils ne proviennent d’un expéditeur fiable, ou que vous ayez l'assurance que le contenu provient d'une source sûre. ______

This e-mail is intended only for the person or entity to which it is addressed. If you received this in error, please contact the sender and delete all copies of the e-mail together with any attachments.