Sheppard East Light Rail Transit (LRT)
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
STAFF REPORT ACTION REQUIRED 8304 Sheppard Avenue East
STAFF REPORT ACTION REQUIRED 8304 Sheppard Avenue East - Official Plan & Rezoning Applications - Preliminary Report Date: February 16, 2010 To: Planning and Growth Management Committee From: Chief Planner and Executive Director Wards: Ward 42 – Scarborough-Rouge River Reference 10 102286 ESC 42 OZ Number: SUMMARY These applications were made on or after January 1, 2007 and is subject to the new provisions of the Planning Act and the City of Toronto Act, 2006. These applications propose a Toronto Transit Commission (TTC) Light Rail Vehicle (LRV) Maintenance and Storage Facility at 8304 Sheppard Avenue East. This facility is intended to serve the Sheppard East, Eglinton Crosstown and Scarborough Malvern Light Rail Transit (LRT) lines which are all part of the Transit City Plan. This report provides preliminary information on the above-noted applications and seeks Planning and Growth Management Committee’s direction on the further processing of the applications and on the community consultation process. These applications seeks to permit a maintenance and storage facility which is a key component of the Transit City Plan. Accordingly, staff is of the view that the application should be deemed a matter of City-wide interest and that all planning reports be routed through and the public Staff report for action – Preliminary Report - 8304 Sheppard Avenue East 1 meeting held before the Planning and Growth Management Committee. The applications should proceed through the normal planning process in terms of community consultation. Staff will attempt to combine the community consultation for these Planning Act applications with the second public open house to be held as part of the required Environmental Assessment process. -
Transit Planning in Toronto: Roles, Priorities and Our Decision Making Framework
INFORMATION ONLY ____________________________________________________________________________ Subject: Transit Planning in Toronto: roles, priorities and our decision making framework Date: July 29, 2015 At the TTC Board meeting on July 29, 2015, Jennifer Keesmaat, Chief Planner, City of Toronto will deliver a presentation titled “Transit Planning in Toronto: roles, priorities and our decision making framework.” Original signed by Vincent Rodo Chief Financial & Administration Officer 1-17 Transit Planning in Toronto: Roles, Priorities and our decision making framework TTC Board Meeting July 29, 2015 Jennifer Keesmaat, Chief Planner and Executive Director City Planning Division PLANNING A GREAT CITY, TOGETHER Overview of Presentation 1. Role of the City Planning Division in Transit Planning 2. Key Transit Planning Projects • SmartTrack/RER • Relief Line Project Assessment • Scarborough Subway Extension Project Assessment • Metrolinx LRT Program • King Streetcar Enhancements • “Feeling Congested?” Transportation Official Plan Review ruill_TORDNIO 2 City Planning Division PROGRAMS • Application Review • Business Performance & Standards • Civic Design • Committee of Adjustment • Design Review • Community Policy • Environmental Planning • Graphics & Visualization • Heritage Preservation • Official Plan & Zoning By-law • Outreach and Engagement • Public Art • Research & Information • Strategic Initiatives • Transit Planning • Waterfront Renewal 3 Transit Implementation Unit Objective Transit planning in the City of Toronto requires a transparent, -
Attachment 4 – Assessment of Ontario Line
EX9.1 Attachment 4 – Assessment of Ontario Line As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed Ontario Line. The details of this assessment are provided in this attachment. 1. Project Summary 1.1. Project Description The Ontario Line was included as part of the 2019 Ontario Budget1 as a transit project that will cover similar study areas as the Relief Line South and North, as well as a western extension. The proposed project is a 15.5-kilometre higher-order transit line with 15 stations, connecting from Exhibition GO station to Line 5 at Don Mills Road and Eglinton Avenue East, near the Science Centre station, as shown in Figure 1. Figure 1. Ontario Line Proposal (source: Metrolinx IBC) Since April 2019, technical working groups comprising staff from the City, TTC, Metrolinx, Infrastructure Ontario and the Ministry of Transportation met regularly to understand alignment and station location options being considered for the Ontario 1 http://budget.ontario.ca/2019/contents.html Attachment 4 - Assessment of Ontario Line Page 1 of 20 Line. Discussions also considered fleet requirements, infrastructure design criteria, and travel demand modelling. Metrolinx prepared an Initial Business Case (IBC) that was publicly posted on July 25, 2019.2 The IBC compared the Ontario Line and Relief Line South projects against a Business As Usual scenario. The general findings by Metrolinx were that "both Relief Line South and Ontario Line offer significant improvements compared to a Business As Usual scenario, generating $3.4 billion and $7.4 billion worth of economic benefits, respectively. -
Rapid Transit in Toronto Levyrapidtransit.Ca TABLE of CONTENTS
The Neptis Foundation has collaborated with Edward J. Levy to publish this history of rapid transit proposals for the City of Toronto. Given Neptis’s focus on regional issues, we have supported Levy’s work because it demon- strates clearly that regional rapid transit cannot function eff ectively without a well-designed network at the core of the region. Toronto does not yet have such a network, as you will discover through the maps and historical photographs in this interactive web-book. We hope the material will contribute to ongoing debates on the need to create such a network. This web-book would not been produced without the vital eff orts of Philippa Campsie and Brent Gilliard, who have worked with Mr. Levy over two years to organize, edit, and present the volumes of text and illustrations. 1 Rapid Transit in Toronto levyrapidtransit.ca TABLE OF CONTENTS 6 INTRODUCTION 7 About this Book 9 Edward J. Levy 11 A Note from the Neptis Foundation 13 Author’s Note 16 Author’s Guiding Principle: The Need for a Network 18 Executive Summary 24 PART ONE: EARLY PLANNING FOR RAPID TRANSIT 1909 – 1945 CHAPTER 1: THE BEGINNING OF RAPID TRANSIT PLANNING IN TORONTO 25 1.0 Summary 26 1.1 The Story Begins 29 1.2 The First Subway Proposal 32 1.3 The Jacobs & Davies Report: Prescient but Premature 34 1.4 Putting the Proposal in Context CHAPTER 2: “The Rapid Transit System of the Future” and a Look Ahead, 1911 – 1913 36 2.0 Summary 37 2.1 The Evolving Vision, 1911 40 2.2 The Arnold Report: The Subway Alternative, 1912 44 2.3 Crossing the Valley CHAPTER 3: R.C. -
Service Improvements for 2002
SERVICE IMPROVEMENTS FOR 2002 Subway Streetcars Buses RT October 2001 Service Improvements for 2002 - 2 - Table of contents Table of contents Summary................................................................................................................................................................4 Recommendations ..............................................................................................................................................5 1. Planning transit service ...............................................................................................................................6 2. Recommended new and revised services for the Sheppard Subway .......................................10 Sheppard Subway.................................................................................................................................................................................10 11 BAYVIEW – Service to Bayview Station...........................................................................................................................................10 25 DON MILLS – Service to Don Mills Station ....................................................................................................................................11 Don Mills/Scarborough Centre – New limited-stop rocket route ....................................................................................................11 Finch East – Service to Don Mills Station...........................................................................................................................................11 -
SW Agincourt Consultation Summary November 2020
Southwest Agincourt Transportation Connections Study Public Consultation Report December 2020 Prepared by: Stephanie Gris Senior Public Consultation Coordinator Public Consultation Unit, City of Toronto Contents 1.0 Introduction ........................................................................................................................................... 3 1.1 Study Background ........................................................................................................................... 3 1.2 Potential Transportation Solutions ................................................................................................ 4 2.0 Notification ............................................................................................................................................ 5 3.0 Consultation Activities ......................................................................................................................... 5 3.1 Indigenous Community Consultation ........................................................................................... 5 3.2 Agency and Utility Consultation ..................................................................................................... 6 3.3 Property Owner Consultation ......................................................................................................... 6 3.4 Consultation with the Agincourt Village Community Association ............................................. 6 3.5 Consultation with the Public .......................................................................................................... -
(BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016
Bolton Residential Expansion Study (BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016 The purpose of this memorandum is to review the professional literature pertaining to the potential develop- ment of a Transit-Oriented Development (TOD) in the Bolton Residential Expansion Study area, in response to the Region of Peel’s recent release of the Discussion Paper. The Discussion Paper includes the establishment of evaluation themes and criteria, which are based on provincial and regional polices, stakeholder and public comments. It should be noted that while the Discussion Paper and the Region’s development of criteria does not specifi- cally advocate for TOD, it is the intent of this memorandum to illustrate that TOD-centric planning will not only adequately address such criteria, but will also complement and enhance the Region’s planning principles, key points and/or themes found in stakeholder and public comments. In the following are research findings related to TOD generally, and specifically, theMetrolinx Mobility Hub Guidelines For The Greater Toronto and Hamilton Area (September 2011) objectives. Additionally, following a review and assessment of the “Response to Comments Submitted on the Bolton Residential Expansion Study ROPA” submission prepared by SGL Planning & Design Inc. (March 15, 2016), this memorandum evaluates some of the key arguments and assumptions made in this submission relative to the TOD research findings. Planning for Transit-Oriented Developments TOD policy and programs can result in catalytic development that creates walkable, livable neighborhoods around transit providing economic, livability and equitable benefits. The body of research on TODs in the United States has shown that TODs are more likely to succeed when project planning takes place in conjunction with transit system expansion. -
Metrolinx GO Expansion: Time Extension of Dowry Street Temporary Road Closure
Revised SC10.18 REPORT FOR ACTION Metrolinx GO Expansion: Time Extension of Dowry Street Temporary Road Closure Date: September 24, 2019 To: Scarborough Community Council From: Director, Planning and Capital Program, Transportation Services Wards: Ward 22 Scarborough-Agincourt SUMMARY This staff report is about a matter that Community Council has delegated authority to make a final decision provided that it is not amended so that it varies with City policy or by-laws. Metrolinx's contractor EllisDon is currently undertaking infrastructure improvements at the Agincourt GO Station. A 44.1 metre long section of Dowry Street leading up to the Station is currently closed to facilitate construction work. A time extension of the existing road closure on Dowry Street is required from November 6, 2019 to October 31, 2021 to complete the required works. RECOMMENDATIONS The Director, Planning and Capital Program, Transportation Services recommends that: 1. Scarborough Community Council temporarily close Dowry Street to vehicular traffic between a point 15 metres west of the east end of Dowry Street and a point 44.1 metres further west, from November 6, 2019 to October 31, 2021 inclusive, to facilitate infrastructure improvements at the Agincourt GO Station. FINANCIAL IMPACT There is no financial impact to the City of Toronto associated with this report. EllisDon, the contractor for this Metrolinx project, is required to implement all recommendations as conditions of permit approval. The Chief Financial Officer has reviewed this report and agrees with the financial impact information. Metrolinx GO Expansion: Time Extension of Dowry Street Temporary Road Closure DECISION HISTORY At its meetings on May 22, 23 and 24 2018, City Council adopted an amended Item PW29.1 entitled "Metrolinx Projects: Temporary Delegation for Long-Term Road Closures". -
Assessment of Provincial Proposals Line 2 East Extension
EX9.1 Attachment 5 – Assessment of Provincial Proposals Line 2 East Extension As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed 3-stop Line 2 East Extension. The details of this assessment are provided in this attachment. 1. Project Summary 1.1 Project Description The Line 2 East Extension (L2EE), as proposed by the Province, is an approximately 8 kilometre underground extension of Line 2 Bloor-Danforth from Kennedy Station that will have three stations – at Lawrence and McCowan, Scarborough Centre and Sheppard and McCowan, as shown in Figure 1. The Province's plan for the L2EE is similar to what was being planned by the City and TTC prior to 2016. Figure 1 - Line 2 East Extension Reference Map Note: Map produced by City/TTC based on current understanding of project Attachment 5 – Assessment of Line 2 East Extension Page 1 of 9 As proposed, the extension will be fully integrated with the existing Line 2 and have through service at Kennedy Station. A turn-back may be included east of Kennedy Station to enable reduced service to Scarborough Centre, subject to demand and service standards. The extension will require approximately seven additional six-car, 138-metre-long trains to provide the service. The trains would be interoperable with the other trains on Line 2. With the station at Sheppard and McCowan supporting storage of up to six trains, there is sufficient storage and maintenance capacity existing at the TTC’s Line 2 storage and maintenance facilities to accommodate this increase in fleet size. -
Metrolinx Annual Report 2011-2012 Cover Photo: Glass Panel Installation at Union Station As Part of the Revitalization Project, April 2012
Metrolinx Annual Report 2011-2012 Cover photo: Glass panel installation at Union Station as part of the Revitalization project, April 2012. Table of Contents MESSAGE FROM THE CHAIR 4 MESSAGE FROM THE CEO 5 GOVERNANCE STRUCTURE 6 OUR VISION, MISSION, VALUES 7 TRANSFORMING TRANSPORTATION 8 KEY ACHIEVEMENTS 9 Rapid Transit Implementation 9 Air Rail Link 9 GO Transit Infrastructure 10 Union Station 10 Acquiring Rail Corridors – More Ownership, Greater Control 10 Substainability 10 SERVICE EXPANSION 11 CUSTOMER SATISFACTION 12 PLAN 14 Regional Planning 14 GO Planning 14 Mobility Hubs 15 INNOVATION 16 INVEST 17 SUMMARY OF FINANCIAL RESULTS 18 AUDITED FINANCIAL STATEMENTS 34 2011-2012 • METROLINX ANNUAL REPORT 3 Letter from the Chair The 2011-12 fiscal year was another transformative one for Metrolinx and the organization made significant progress towards reshaping transportation in this region. Metrolinx is committed to the three cornerstones of strategic focus: planning, investing and delivering. Over the past year, the continued work on building our infrastructure projects, planning for the future connectivity of the region and ensuring we’re investing in the communities we serve are directly aligned to these areas. Demonstrating our commitment to building major regional rapid transit projects, we started construction on the Eglinton Crosstown LRT; a project that is one of the most transformative transit projects in Toronto’s history, and one of great focus over the next decade. Our work continued with our partners on rapid transit in York Region and dedicated bus lanes in Mississauga. Our continued commitment to the GO Transit passenger experience was exemplified with more service to new regions, providing more riders with different transit options. -
Decision Document City Council
2010-05-11 Decision Document - City Council http://www.toronto.ca/legdocs/mmis/2010/cc/decisions/2010-05-11-cc4... Decision Document City Council Meeting No. 49 Contact Marilyn Toft, Manager Meeting Date Tuesday, May 11, 2010 Phone 416-392-7032 Wednesday, May 12, 2010 Start Time 9:30 AM E-mail [email protected] Location Council Chamber, City Hall The Decision Document is for preliminary reference purposes only. Please refer to the Council Minutes for the official record of Council's proceedings. Routine Matters - Meeting 49 RM49.1 Presentation Received Ward: All Moment of Silence City Council Decision May 11, 2010 Members of Council observed a moment of silence and remembered the following persons who passed away: Florence Honderich Louis (Lou) Lockyer, and Carlo Varone May 12, 2010 Members of Council observed a moment of silence and remembered the following person who passed away: Fred Foster Background Information (City Council) Condolence Motion for Florence Honderich (http://www.toronto.ca/legdocs/mmis/2010/rm/bgrd/backgroundfile-30358.pdf ) Condolence Motion for Louis (Lou) Lockyer (http://www.toronto.ca/legdocs/mmis/2010/rm/bgrd/backgroundfile-30359.pdf ) Condolence Motion for Carlo Varone (http://www.toronto.ca/legdocs/mmis/2010/rm/bgrd/backgroundfile-30360.pdf ) Condolence Motion for Fred Foster (http://www.toronto.ca/legdocs/mmis/2010/rm/bgrd/backgroundfile-30361.pdf ) 1 of 162 6/18/2010 11:57 PM 2010-05-11 Decision Document - City Council http://www.toronto.ca/legdocs/mmis/2010/cc/decisions/2010-05-11-cc4... RM49.2 ACTION Adopted Ward: All Confirmation of Minutes City Council Decision City Council confirmed the Minutes of Council from the regular meeting held on March 31 and April 1, 2010, and the special meeting held on April 15, 2010, in the form supplied to the Members. -
Relief Line South Environmental Project Report, Section 5 Existing and Future Conditions
Relief Line South Environmental Project Report Section 5 - Existing and Future Conditions The study area is unique in that it is served by most transit modes that make up the Greater 5 Existing and Future Conditions Toronto Area’s (GTA’s) transit network, including: The description of the existing and future environment within the study area is presented in this • TTC Subway – High-speed, high-capacity rapid transit serving both long distance and local section to establish an inventory of the baseline conditions against which the potential impacts travel. of the project are being considered as part of the Transit Project Assessment Process (TPAP). • TTC Streetcar – Low-speed surface routes operating on fixed rail in mixed traffic lanes (with Existing transportation, natural, social-economic, cultural, and utility conditions are outlined some exceptions), mostly serving shorter-distance trips into the downtown core and feeding within this section. More detailed findings for each of the disciplines have been documented in to / from the subway system. the corresponding memoranda provided in the appendices. • TTC Conventional Bus – Low-speed surface routes operating in mixed traffic, mostly 5.1 Transportation serving local travel and feeding subway and GO stations. • TTC Express Bus – Higher-speed surface routes with less-frequent stops operating in An inventory of the existing local and regional transit, vehicular, cycling and pedestrian mixed traffic on high-capacity arterial roads, connecting neighbourhoods with poor access transportation networks in the study area is outlined below. to rapid transit to downtown. 5.1.1 Existing Transit Network • GO Rail - Interregional rapid transit primarily serving long-distance commuter travel to the downtown core (converging at Union Station).