Road Infrastructure Safety Facility Standards in Thailand
Presented By
Sujin Mungnimit Director, Bureau of Highway Safety Department of Highways THAILAND
3 October 2016 1. Line marking
Optical Speed Bars Traverse Rumble Strips
No Passing Line on Curve Object Marker 2. Centerline / edgeline rumble strip
3. Raised pavement marker
4. Flexible delineation posts Distances between delineation posts for curvature
Radius of Distance between posts curvature (m) S S1 S2 S3 15 6 12 18 36 75 13 26 39 78 100 16 32 48 90 150 20 40 60 90 200 23 46 69 90 300 29 58 87 90 400 33 66 90 90 500 37 74 90 90 5. Roadside barrier and Median barrier New Jersey Type Concrete barrier 6. Safety barrier end treatment
7. Lighting
High Pressure Sodium Metal Halide
Rural Urban Lamp Spectrum Monochromatic color Recommended Use for lighting
Super HPS LED 1. Life Time 24,000 Hrs. 50,000 Hrs 2. Cost 8,500 Baht 22,000 Baht 3. Watt 150 w. 130 W. 4. Maintenance Costs Only part Change new set 5. Frequency of Maintenance More Less Recommended Use Rural Urban 7. Pedestrian crossings
Black Spot Black Spot Improvement Improvement 500 Intersection Intersection 15.5 13% Improvement Improvement 13% 300 9.5 8% 8%
Road Safety Road Safety Asian Hwys Asian Hwys 100 3 Road Safety Road Safety 3% 3% Activity Activity 2800 87.5 76% 76% Road Safety Activity
Road Delineator, 120 Road Delineator, 3.5
Traffic Traffic Sign Sign 220 220 Road Lighting, 480 Road Lighting, 15.0 Traffic Signal, 65 Traffic Signal, 2.0 Maintenance Maintenance Road Marking Road Marking Lighting&Signal Lighting&Signal 435 435 175 5.5 Guard Rail, 65 Guard Rail, 2.0 Bicycle Lane, 10 Bicycle Lane, 0.5 Ped. Bridge, 50 Road Inprovement, Road Ped. Bridge, 1.5 1,150 Inprovement, 35.0
Thailand 12 AH Routes in Thailand
AH1: Aranyaprathet-Hin Kong-Bang pa –in Nakhon Sawan-Tak-Mae Sot: 701 Km AH13 AH2: Sa Dao-Hat Yai-Bangkok-Nakhon Sawan Lampang-Chiang Rai-Tachilek: 1,913 Km AH3: Chiang Kong -Chaing Rai: 117 Km AH12:Nong Khai-Udon Thani-Nakhon Ratchasima-Hin Kong: 511 Km AH13: Nakhon Sawan-Phitsanulok-Prae-Nan- Huai Kon : 557 Km AH15: Nakhon Phanom-Udon Thani : 243 Km AH16: Tak- Khon Kaen-Mukhdahan: 689 Km AH18: Hat Yai-Sungai Kolok: 268 Km AH19: Bangkok-Laem Chabang-Kabin Buri – Nakhon Ratchasima: 458 Km AH112: Klong Loy-Bang Saphan: 29 Km AH121: Mukdaharn-Yasothon-Buriram – Sakaeo: 421 Km AH123: BongTi-Kanchanaburi-Nakhon Pathom - Bangkok-Chonburi-Laem Chabang - Maptaput-Rayong-Trat-Hat Lek : 574 Km Total: 6,693 km
AH13
6,700 Kms. Asian Highway will be Audit and improve road safety facility. Civil work budget was estimate 0.5 M.Baht per Km. of audit route, then the total budget of the activity is 3,350 M.Baht (105 M.US$) Thank You For your attention
Bureau of Highway Safety Department of Highways