World Bank Document 49333 Project Procurement Plan Dated: 7 July 2009 Armenia: Additional Financing - Lifeline Roads Improvement Project a) Works and Goods s k ) t e t n s g n n a o d n a e o ) B i e Expected d P o * k t t i t m o m Contract / e c * y t e a s t e l h e Package Description/ Location a Bid- Start a Public Disclosure Authorized $ B o r a t t t R p m P Award i S e i a u C D t No. w Opening Date f v O c m U s D I e o M n Date o ( o i I . E r Date R v C o e P P ( N R A B C D E F G H I K 1. WORKS for rehabilitation of roads: 1 Brnakot-Sisian * 1.62 2 NCB Prior 17-Jun-09 9-Jul-09 30-Jul-09 3-Aug-09 30-Nov-10 2 M17-Meghri * 0.84 1 NCB Prior 15-Jul-09 5-Aug-09 28-Aug-09 1-Sept-09 30-Nov-10 3 Geghavanq-Kavjut-M2 * 1.62 2 NCB Post 15-Jul-09 5-Aug-09 28-Aug-09 1-Sept-09 30-Nov-10 4 Alvanq-M17 * 0.73 1 NCB Post 15-Jul-09 5-Aug-09 28-Aug-09 1-Sept-09 30-Nov-10 M2-Levaz-Vahravar-Gudemnis-Kuris-Karjevan 5 1.48 2 NCB Post 15-Jul-09 5-Aug-09 28-Aug-09 1-Sept-09 30-Nov-10 (Vahravar-Kuris section) * 6 M12-Hartashen * 1.82 1 NCB Post 15-Jul-09 5-Aug-09 28-Aug-09 1-Sept-09 30-Nov-10 7 M2-Vardanidzor, M2-Tkhkut and Shvanidzor-M17 * 0.75 1 NCB Post 15-Jul-09 5-Aug-09 28-Aug-09 1-Sept-09 30-Nov-10 Public Disclosure Authorized 8 M2-Agarak and Agarak bypass * 0.88 1 NCB Post 15-Jul-09 5-Aug-09 28-Aug-09 1-Sept-09 30-Nov-10 9 H62, Sisian-Aghitu * 1.4 2 NCB Post 15-Jul-09 5-Aug-09 28-Aug-09 1-Sept-09 30-Nov-10 10 H3, Yerevan-Garni-Geghard (km 10+770-km 13+850) * 0.86 1 NCB Post 15-Jul-09 5-Aug-09 28-Aug-09 1-Sept-09 30-Nov-10 11 Tcambarak-Vahan * 1.68 2 NCB Post 15-Jul-09 5-Aug-09 28-Aug-09 1-Sept-09 30-Nov-10 12 Gharibjanyan-Akhurik * 0.50 1 NCB Post 15-Jul-09 5-Aug-09 28-Aug-09 1-Sept-09 30-Nov-10 13 Gyumri-Akhuryan-Musaelyan-Jrarat 5.07 5 ICB Prior 15-Jan-10 26-Feb-10 19-Mar-10 25-Mar-10 30-Nov-11 14 M4-Gagarin-Geghamavan 3.4 4 ICB Prior 15-Jan-10 26-Feb-10 19-Mar-10 25-Mar-10 30-Nov-11 15 Araks-Metsamor-Haikashen 1.67 2 NCB Prior 15-Jan-10 12-Feb-10 26-Feb-10 15-Mar-10 30-Nov-11 16 Qirs-Qyurut 0.56 1 NCB Post 22-Jan-10 19-Feb-10 5-Mar-10 22-Mar-10 30-Nov-11 17 Geghi-Geghavanq 1.68 2 NCB Prior 22-Jan-10 19-Feb-10 5-Mar-10 22-Mar-10 30-Nov-11 18 H39-Karmirgyugh-Gegharquniq 1.30 2 NCB Prior 22-Jan-10 19-Feb-10 5-Mar-10 22-Mar-10 30-Nov-11 Gavar-Tsaghkashen Public Disclosure Authorized 19 1.79 2 NCB Prior 22-Jan-10 19-Feb-10 5-Mar-10 22-Mar-10 30-Nov-11 20 M10-Yeranos 0.56 1 NCB Post 22-Jan-10 19-Feb-10 5-Mar-10 22-Mar-10 30-Nov-11 21 Martuni-Vaghashen 0.70 1 NCB Post 22-Jan-10 19-Feb-10 5-Mar-10 22-Mar-10 30-Nov-11 22 H17-Armavir-Isahakyan-Gyumri (km 9+425-km18+850) 2.63 3 ICB Prior 29-Jan-10 12-Mar-10 2-Apr-10 9-Apr-10 30-Nov-11 23 Achajur-M4 0.56 1 NCB Post 29-Jan-10 26-Feb-10 12-Mar-10 29-Mar-10 30-Nov-11 24 Lusahovit-Khashtarak-M4 1.12 2 NCB Prior 29-Jan-10 26-Feb-10 12-Mar-10 29-Mar-10 30-Nov-11 25 Movsesgyugh-Norashen-Verin Karmir Aghbyur 2.41 3 ICB Prior 29-Jan-10 12-Mar-10 2-Apr-10 9-Apr-10 30-Nov-11 26 M4-Tsakhkadzor-H28-Marmarik 1.29 2 NCB Prior 29-Jan-10 26-Feb-10 12-Mar-10 29-Mar-10 30-Nov-11 27 Roads safety improvement on selected roads 1.2 4 NCB Prior 1-Mar-10 29-Mar-10 12-Apr-10 15-Apr-10 30-Nov-11 28 Pilot concrete roads 0.6 2 NCB Post 1-Mar-10 29-Mar-10 12-Apr-10 15-Apr-10 30-Nov-11 Contingencies 1.0 Total 1. for works 41.72 * the contract will be subject to retroactive financing ** including 1 year DLP Public Disclosure Authorized 2. GOODS 1 4WD Vehicle for Supervision 0.05 1 SH Post 24-Nov-09 8-Dec-09 11-Dec-09 14-Dec-09 15-Jan-10 2 Laboratory equipment 0.05 2 SH Post 24-Nov-09 8-Dec-09 11-Dec-09 14-Dec-09 15-Jan-10 s k ) t e t n s g n n a o d n a e o ) B i e Expected d P o * k t t i t m m o Contract / e c * y t e a s t e l h e Package Description/ Location a Bid- Start a $ B o r a t t t R p m P Award i S e i a u C D t Opening No. w Date f v O c m U s D I e o M Date n o ( o i I . E r Date R v C o e P P ( N R Total 2. for goods 0.1 Legend: ICB = International Competitive Bidding (in accordance with section 2 of the Guidelines) For works contracts valued at or more than US$2.0 m For goods contracts valued at or more than US$0.1 m NCB = National Competitive Bidding (in accordance with section 3.3 of the Guidelines) For works contracts valued less than US$2.0 m SH = Shopping (in accordance with section 3.5 of the Guidelines) For goods and works contracts valued at or less than US$0.1 m Prior review For Works contracts: All ICB contracts and NCB contracts valued at or more than US$ 1 m. However, streamlined procedures would apply for civil works contracts to be procured till the end of 2009, hence only first two NCB contacts will be subject to prior review. Pre For works contracts valued at or more than US$3.0 m Qualification= Domestic will apply to ICB works contracts only Preference= b) Consulting Services d n m e Review Adverti- Expected d o t / t o i Contract Comple- a t s ) Package h by Bank sement Proposal Start c o t $ m Award tion e e i l C S No. Description of Assignment/ Location t Prior / for EOI Submission Date e s M U Date Date S ( E Post Date Date 3. CONSULTANTS’ SERVICES Design & Supervision of LRIP Additional Financing (Y2) 1 1.5 QCBS Prior 12-Jun-09 10-Aug-09 15-Oct-09 1-Oct-09 30-Nov-11 roads* Design Author Supervision LRIP Additional Financing 2 0.11 SSS Prior N/A 20-July-09 27-July-09 3-Aug-09 30-Nov-09 (Y1) roads* 3 Design and EMP of Highway 2 Project roads 1.1 QCBS Prior 15-July-09 15-Oct-09 1-Dec-09 15-Mar-10 30-Oct-10 4 Road Safety Audit Manual 0.1 IC Prior 15-Aug-09 1-Oct-09 1-Nov-09 15-Nov-09 24-Dec-09 5 Road Safety Audit 0.1 IC Prior 15-Jan-10 15-Mar-10 1-Apr-10 15-Apr-10 1-Jun-10 6 Independent Technical Audit 0.1 IC Prior 15-Jan-10 15-Mar-10 1-Apr-10 15-Apr-10 30-Nov-10 7 Road Safety Improvement 0.1 CQ Prior 1-March-10 1-May-10 1-Jun-10 15-Jun-10 1-Sep-10 8 Road Safety Secretariat 0.1 IC Prior 15-March-10 10-May-10 15-Jun-10 1-Jul-10 1-Jul-11 9 Training 0.1 SOE Prior 15-Jun-10 30-Jul-10 10-Aug-10 15-Aug-10 1-Nov-10 10 Project Audit for 2 years 0.1 QCBS Prior 1-Jul-10 15-Sept-10 15-Nov-10 10-Dec-10 15-Mar-12 Total 3. For Consultancy Services 3.41 * the contract will be subject to retroactive financing 4. Operating Cost 0.4 TOTAL FOR PROJECT 45.63 Legend QCBS = Quality and Cost-based Selection (in accordance with sections 2.1 - 2.28 of the Consultant’s Guidelines) CQS = Selection based on Consultant’s Qualification (in accordance with section 3.7-3.8 of the Consultant’s Guidelines) SSS= Single source Selection (in accordance with section 3.9-13 of the Consultant’s Guidelines) IC = Individual Consultant (in accordance with section V of the Consultant’s Guidelines) Prior Review For firms: All contracts above US$100,000.
Recommended publications
  • Georgia Armenia Azerbaijan 4
    ©Lonely Planet Publications Pty Ltd 317 Behind the Scenes SEND US YOUR FEEDBACK We love to hear from travell ers – your comments keep us on our toes and help make our books better. Our well- travell ed team reads every word on what you loved or loathed about this book. Although we cannot reply individually to postal submissions, we always guarantee that your feedback goes straight to the appropriate authors, in time for the next edition. Each person who sends us information is thanked in the next edition – the most useful submissions are rewarded with a selection of digital PDF chapters. Visit lonelyplanet.com/contact to submit your updates and suggestions or to ask for help. Our award-winning website also features inspirational travel stories, news and discussions. Note: We may edit, reproduce and incorporate your comments in Lonely Planet products such as guidebooks, websites and digital products, so let us know if you don’t want your comments reproduced or your name acknowledged. For a copy of our privacy policy visit lonelyplanet.com/privacy. Stefaniuk, Farid Subhanverdiyev, Valeria OUR READERS Many thanks to the travellers who used Superno Falco, Laurel Sutherland, Andreas the last edition and wrote to us with Sveen Bjørnstad, Trevor Sze, Ann Tulloh, helpful hints, useful advice and interest- Gerbert Van Loenen, Martin Van Der Brugge, ing anecdotes: Robert Van Voorden, Wouter Van Vliet, Michael Weilguni, Arlo Werkhoven, Barbara Grzegorz, Julian, Wojciech, Ashley Adrian, Yoshida, Ian Young, Anne Zouridakis. Asli Akarsakarya, Simone
    [Show full text]
  • Table of Contents
    Table of Contents 1. Social Economic Background & Current Indicators of Syunik Region...........................2 2. Key Problems & Constraints .............................................................................................23 Objective Problems ...................................................................................................................23 Subjective Problems..................................................................................................................28 3. Assessment of Economic Resources & Potential ..............................................................32 Hydropower Generation............................................................................................................32 Tourism .....................................................................................................................................35 Electronics & Engineering ........................................................................................................44 Agriculture & Food Processing.................................................................................................47 Mineral Resources (other than copper & molybdenum)...........................................................52 Textiles......................................................................................................................................55 Infrastructures............................................................................................................................57
    [Show full text]
  • Development Project Ideas Goris, Tegh, Gorhayk, Meghri, Vayk
    Ministry of Territorial Administration and Development of the Republic of Armenia DEVELOPMENT PROJECT IDEAS GORIS, TEGH, GORHAYK, MEGHRI, VAYK, JERMUK, ZARITAP, URTSADZOR, NOYEMBERYAN, KOGHB, AYRUM, SARAPAT, AMASIA, ASHOTSK, ARPI Expert Team Varazdat Karapetyan Artyom Grigoryan Artak Dadoyan Gagik Muradyan GIZ Coordinator Armen Keshishyan September 2016 List of Acronyms MTAD Ministry of Territorial Administration and Development ATDF Armenian Territorial Development Fund GIZ German Technical Cooperation LoGoPro GIZ Local Government Programme LSG Local Self-government (bodies) (FY)MDP Five-year Municipal Development Plan PACA Participatory Assessment of Competitive Advantages RDF «Regional Development Foundation» Company LED Local economic development 2 Contents List of Acronyms ........................................................................................................................ 2 Contents ..................................................................................................................................... 3 Structure of the Report .............................................................................................................. 5 Preamble ..................................................................................................................................... 7 Introduction ................................................................................................................................ 9 Approaches to Project Implementation ..................................................................................
    [Show full text]
  • Durham Research Online
    Durham Research Online Deposited in DRO: 31 May 2016 Version of attached le: Accepted Version Peer-review status of attached le: Peer-reviewed Citation for published item: Rezeau, H. and Moritz, R. and Wotzlaw, J.-F. and Tayan, R. and Melkonyan, R. and Ulianov, A. and Selby, D. and d'Abzac, F.-X. and Stern, R.A. (2016) 'Temporal and genetic link between incremental pluton assembly and pulsed porphyry Cu-Mo formation in accretionary orogens.', Geology., 44 (8). pp. 627-630. Further information on publisher's website: http://dx.doi.org/10.1130/g38088.1 Publisher's copyright statement: Additional information: Use policy The full-text may be used and/or reproduced, and given to third parties in any format or medium, without prior permission or charge, for personal research or study, educational, or not-for-prot purposes provided that: • a full bibliographic reference is made to the original source • a link is made to the metadata record in DRO • the full-text is not changed in any way The full-text must not be sold in any format or medium without the formal permission of the copyright holders. Please consult the full DRO policy for further details. Durham University Library, Stockton Road, Durham DH1 3LY, United Kingdom Tel : +44 (0)191 334 3042 | Fax : +44 (0)191 334 2971 https://dro.dur.ac.uk Manuscript Click here to download Manuscript Manuscript_Geology_Rezeau_FINAL.docx 1 Temporal and genetic link between incremental pluton assembly 2 and pulsed porphyry Cu-Mo formation in accretionary orogens 3 Hervé Rezeau1,*, Robert Moritz1, Jörn-Frederik Wotzlaw2, Rodrik Tayan3,†, Rafael 4 Melkonyan3, Alexey Ulianov4, David Selby5, François-Xavier d'Abzac1 and Richard A.
    [Show full text]
  • Power Transmission Rehabilitation Project”, the Following Construction Activities Were Implemented During the Reporting Period (January-June, 2019)
    Environmental Monitoring Report _________________________________________________________________________ 2019 1 st Semestral Report July 2019 ARM: Power Transmission and Rehabilitation Project Prepared by the Closed Joint Stock Company Electro Power Systems Operator (EPSO) for the Republic of Armenia and the Asian Development Bank (ADB). 2 This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. 2 SAEMR, January -June, 2019 _________________________________________________________________________ Table of Contents 1 INTRODUCTION ......................................................................................................................... 1 1.1 Preamble............................................................................................................................ 1 1.2 Headline Information ......................................................................................................... 1 2 PROJECT DESCRIPTION AND CURRENT ACTIVITIES .................................................................... 3 2.1 Project Description ...........................................................................................................
    [Show full text]
  • Genocide and Deportation of Azerbaijanis
    GENOCIDE AND DEPORTATION OF AZERBAIJANIS C O N T E N T S General information........................................................................................................................... 3 Resettlement of Armenians to Azerbaijani lands and its grave consequences ................................ 5 Resettlement of Armenians from Iran ........................................................................................ 5 Resettlement of Armenians from Turkey ................................................................................... 8 Massacre and deportation of Azerbaijanis at the beginning of the 20th century .......................... 10 The massacres of 1905-1906. ..................................................................................................... 10 General information ................................................................................................................... 10 Genocide of Moslem Turks through 1905-1906 in Karabagh ...................................................... 13 Genocide of 1918-1920 ............................................................................................................... 15 Genocide over Azerbaijani nation in March of 1918 ................................................................... 15 Massacres in Baku. March 1918................................................................................................. 20 Massacres in Erivan Province (1918-1920) ...............................................................................
    [Show full text]
  • Study of Legal Framework Acting in the Republic of Armenia Regulating the Activities of Cooperatives
    Study of legal framework acting in the Republic of Armenia regulating the activities of Cooperatives YEREVAN 2014 Study of legal framework acting in the Republic of Armenia regulating the activities of Cooperatives Necessity and importance of cooperatives................................................. 3 a. Legal acts regulating the activities of cooperatives acting in the Republic of Armenia (Law, Decision of the Government, Normative Act, etc.)................................................................................................. 18 List of the legal acts regulating the activities of cooperative acting in the Republic of Armenia............................................................................... 35 b. Analysis of strengths and weaknesses of legal acts focusing on legal acts related to agricultural cooperatives............................... 36 c. Study and analysis of draft legal acts on cooperatives currently circulated within the RA Government (focusing on agricultural cooperatives); expected outcomes of adoption (approval) of draft legal acts............................................................ 42 2 Study of legal framework acting in the Republic of Armenia regulating the activities of Cooperatives. Necessity and importance of Cooperatives Cooperatives have existed for over two hundred years. Acting in all spheres of economic activity, cooperatives are more durable than investment tended companies. Cooperative model has permanently adapted to the changing conditions, and the innovative new ways of cooperation
    [Show full text]
  • Armenian Tourist Attraction
    Armenian Tourist Attractions: Rediscover Armenia Guide http://mapy.mk.cvut.cz/data/Armenie-Armenia/all/Rediscover%20Arme... rediscover armenia guide armenia > tourism > rediscover armenia guide about cilicia | feedback | chat | © REDISCOVERING ARMENIA An Archaeological/Touristic Gazetteer and Map Set for the Historical Monuments of Armenia Brady Kiesling July 1999 Yerevan This document is for the benefit of all persons interested in Armenia; no restriction is placed on duplication for personal or professional use. The author would appreciate acknowledgment of the source of any substantial quotations from this work. 1 von 71 13.01.2009 23:05 Armenian Tourist Attractions: Rediscover Armenia Guide http://mapy.mk.cvut.cz/data/Armenie-Armenia/all/Rediscover%20Arme... REDISCOVERING ARMENIA Author’s Preface Sources and Methods Armenian Terms Useful for Getting Lost With Note on Monasteries (Vank) Bibliography EXPLORING ARAGATSOTN MARZ South from Ashtarak (Maps A, D) The South Slopes of Aragats (Map A) Climbing Mt. Aragats (Map A) North and West Around Aragats (Maps A, B) West/South from Talin (Map B) North from Ashtarak (Map A) EXPLORING ARARAT MARZ West of Yerevan (Maps C, D) South from Yerevan (Map C) To Ancient Dvin (Map C) Khor Virap and Artaxiasata (Map C Vedi and Eastward (Map C, inset) East from Yeraskh (Map C inset) St. Karapet Monastery* (Map C inset) EXPLORING ARMAVIR MARZ Echmiatsin and Environs (Map D) The Northeast Corner (Map D) Metsamor and Environs (Map D) Sardarapat and Ancient Armavir (Map D) Southwestern Armavir (advance permission
    [Show full text]
  • ՀՀ ՍՅՈՒՆԻՔԻ ՄԱՐԶ RA SYUNIK MARZ Մարզկենտրոնը` Marz Centre Ք
    ՀՀ ՍՅՈՒՆԻՔԻ ՄԱՐԶ RA SYUNIK MARZ Մարզկենտրոնը` Marz centre ք. Կապան Kapan town Տարածաշրջանները` Territoires Կապան, Kapan, Գորիս, Goris, Սիսիան, Sisian, Մեղրի Meghri Քաղաքները` Towns Կապան, Kapan, ¶որիս, Goris, Սիսիան, Sisian, Մեղրի, Meghri, ք.Կապան Ագարակ, Agarak, s.Kapan Քաջարան, Qajaran, Դաստակերտ Dastakert ՀՀ Սյունիքի մարզը գտնվում է Հայաստանի Syunik marz is situated in the south of the Republic of Հանրապետության տարածքի հարավում: Armenia. Մարզը հյուսիսից սահմանակից է ՀՀ Վայոց ձորի In the North the marz borders with RA Vayots Dzor մարզին, հարավից պետական սահմանով սահմանակից marz, in the South it borders with Iran, (the length of border է Իրանին (սահմանի երկարությունը 42 կմ է), is 42 km), in the West - Nakhijevan and in the East - արևմուտքից` Նախիջևանին և արևելքից` Արցախին: Artsakh. Տարածքը 4506 քառ. կմ / Territory sq. km ՀՀ տարածքում մարզի տարածքի տեսակարար կշիռը 15.1% Territory share of the marz in the territory of RA Քաղաքային համայնքներ 7 Urban communities Գյուղական համայնքներ 102 Rural communities Քաղաքներ 7 Towns Գյուղեր 127 Villages Բնակչության թվաքանակը 2010թ. հունվարի 1-ի դրությամբ 152.9 հազ. մարդ / Population number as of January 1, 2010 ths. persons այդ թվում` including: քաղաքային 103.7 հազ. մարդ / urban ths. persons գյուղական 49.2 հազ. մարդ / rural ths. persons ՀՀ բնակչության ընդհանուր թվաքանակում մարզի բնակչության թվաքանակի տեսակարար կշիռը, 2009թ. 4.7% Share of marz population size in RA population size, 2009 Քաղաքային բնակչության թվաքանակի տեսակարար կշիռը 67.8% Share of urban population size Գյուղատնտեսական նշանակության հողեր 333598 հա / Agricultural land ha այդ թվում` վարելահողեր 43790 հա/ including: arable land ha Օգտակար հանածոներով հանրապետության It is the richest marz of the republic with useful minerals.
    [Show full text]
  • Some Endangered Insects of Armenia: Proposals for Renovation of the Country’S Red Book and Development of the System of Especially Protected Nature Areas
    See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/333080541 Some endangered insects of Armenia: proposals for renovation of the country’s red book and development of the system of especially protected nature areas Conference Paper · March 2019 CITATIONS READS 0 29 4 authors, including: Gayane Karagyan Mark Kalashian National Academy of Sciences of Armenia Scientific Centre of Zoology and Hydroecology of the National Academy of Scienc… 37 PUBLICATIONS 89 CITATIONS 118 PUBLICATIONS 211 CITATIONS SEE PROFILE SEE PROFILE Tigran Ghrejyan National Academy of Sciences of Armenia 12 PUBLICATIONS 6 CITATIONS SEE PROFILE Some of the authors of this publication are also working on these related projects: Subtribe Aphanisticina World-wide View project Non-coprofagous Scarabaeoidea from Armenia. View project All content following this page was uploaded by Mark Kalashian on 14 May 2019. The user has requested enhancement of the downloaded file. ТРУДЫ АКСУ-ЖАБАГЛИНСКОГО ГОСУДАРСТВЕННОГО ПРИРОДНОГО ЗАПОВЕДНИКА Выпуск 12 Сборник докладов Международной конференции «Фонд Руффорда и сохранение биоразнообразия Центральной Азии» Шымкент, 2019 AKSU-ZHABAGLY NATURE RESERVE PROCEEDINGS Issue 12 The International Conference «The Rufford Foundation for Biodiversity Research and Conservation in Central Asia» Shymkent, 2019 Труды Аксу-Жабаглинского государственного природного заповедника. Выпуск 12. Шымкент. 2019. 226 с. Этот выпуск Трудов Аксу-Жабаглинского государственного природного заповедника, 12-й по счету, содержит материалы Международной конференции «Фонд Руффорда и сохранение биоразнообразия Центральной Азии», прошедшей в заповеднике 16-18 марта 2019 г. Доклады участников конференции посвящены изучению и охране флоры и растительности, выделению участков под охраняемые территории, а также ихтиологическим, орнитологическим и териологическим изысканиям. Наиболее полно представлены материалы по птицам и млекопитающим региона и сопредельных территорий.
    [Show full text]
  • RA Gegharkunik Marz
    RA Gegharkunik Marz 199 RA GEGHARKUNIK MARZ Marz centr –Gavar town Territory 5348 square km Agricultural land 240033 ha including arable land 95148 ha Urban communities 5 Rural communities 87 Rural settlements 93 Population as of January 1, 2003 238.0 ths. persons including urban 79.6 ths. persons rural 158.4 ths. persons RA Gegharkunik marz is situated in the East of the territory of the Republic of Armenia, surrounding the Lake Sevan. It borders Azerbaijan from the East and occupies the 18% of RA territory (the largest marz by its territory). The marz includes the territories of Gavar, Tchambarak (former Krasnoselsk), Martuni, Sevan and Vardenis. The population of the marz comprised the 7.4% of total population of the republic as of January 1, 2003. The 66.6% of population resides in the rural settlements. The marz includes 5 towns such as Gavar, Tchambarak, Martuni, Sevan, Vardenis and 93 rural settlements. The longest extension of the marz from the North-West to the South-East comprised 115 km, from the West to the East - 85 km, the deepest landslide is the canyon of the Getik river (village of Dsoravank) (1325 m), the highest peak – Ajdahak mountain (3598 m). Spitakasar (3555 m), Vardenis (3522 m) and Geghasar (3446 m) are the highest mountains. Argichi (51 km), Gavaraget (47 km) and Masrik (45 km) are the longest rivers. Marzes of the Republic of Armenia in Figures, 1998-2002 201 Sevan is the largest lake (1260 km2, the height above sea-level is 1898m); the crater lakes of Ajdahak and Aghmaghani are comparatively small lakes - up to 50 m in diameter and at a depth of 15 m.
    [Show full text]
  • Project Baseline Survey Report
    “Health for Families” Project Baseline Survey Report Prepared by: Mikayel Hambardzumyan WV Armenia DME Team – 2010 Disclaimer: This Baseline Report is made possible by the support of the American people through the United States Agency for International Development (USAID). The contents are the responsibility of WV Armenia and do not necessarily reflect the views of USAID or the United States Government. 1 CONTENTS Acknolegements ................................................................................................................................................................. 4 Affirmation ........................................................................................................................................................................... 4 Introduction ......................................................................................................................................................................... 5 Project Description ........................................................................................................................................................... 5 Methodology Description ................................................................................................................................................ 5 Study aim and objectives .................................................................................................................................................. 5 Data collection Methods outline ...................................................................................................................................
    [Show full text]