Development Project Ideas Goris, Tegh, Gorhayk, Meghri, Vayk

Total Page:16

File Type:pdf, Size:1020Kb

Development Project Ideas Goris, Tegh, Gorhayk, Meghri, Vayk Ministry of Territorial Administration and Development of the Republic of Armenia DEVELOPMENT PROJECT IDEAS GORIS, TEGH, GORHAYK, MEGHRI, VAYK, JERMUK, ZARITAP, URTSADZOR, NOYEMBERYAN, KOGHB, AYRUM, SARAPAT, AMASIA, ASHOTSK, ARPI Expert Team Varazdat Karapetyan Artyom Grigoryan Artak Dadoyan Gagik Muradyan GIZ Coordinator Armen Keshishyan September 2016 List of Acronyms MTAD Ministry of Territorial Administration and Development ATDF Armenian Territorial Development Fund GIZ German Technical Cooperation LoGoPro GIZ Local Government Programme LSG Local Self-government (bodies) (FY)MDP Five-year Municipal Development Plan PACA Participatory Assessment of Competitive Advantages RDF «Regional Development Foundation» Company LED Local economic development 2 Contents List of Acronyms ........................................................................................................................ 2 Contents ..................................................................................................................................... 3 Structure of the Report .............................................................................................................. 5 Preamble ..................................................................................................................................... 7 Introduction ................................................................................................................................ 9 Approaches to Project Implementation ................................................................................... 9 Mechanism of holding the workshops ................................................................................... 13 GORIS: ANALYSIS OF ECONOMIC SITUATION ..................................................................... 15 Goris municipality ..................................................................................................................16 Competitive advantages of Goris ...........................................................................................16 Goris economy brief ..............................................................................................................17 Development initiatives ..........................................................................................................18 Priority initiatives ...................................................................................................................20 TEGH: ANALYSIS OF ECONOMIC SITUATION ...................................................................... 23 Tegh municipality ..................................................................................................................24 Competitive advantages of Tegh ...........................................................................................24 Tegh economy brief ...............................................................................................................24 Development initiatives ..........................................................................................................25 Priority initiatives ...................................................................................................................26 GORHAYK: ANALYSIS OF ECONOMIC SITUATION .............................................................. 29 Gorhayk municipality .............................................................................................................30 Competitive advantages of Gorhayk ......................................................................................30 Gorhayk economy brief .........................................................................................................31 Development Initiatives .........................................................................................................34 Priority initiatives ...................................................................................................................34 МEGHRI: ANALYSIS OF ECONOMIC SITUATION .................................................................. 37 Meghri municipality ................................................................................................................38 Competitive advantages of Meghri ........................................................................................38 Meghri economy brief ............................................................................................................38 Development initiatives ..........................................................................................................41 Priority initiatives ...................................................................................................................42 NOYEMBERYAN: ANALYSIS OF ECONOMIC SITUATION .................................................... 44 Noyemberyan municipality .....................................................................................................45 Competitive advantages of Noyemberyan .............................................................................45 Noyemberyan economy brief .................................................................................................46 Development initiatives ..........................................................................................................51 Priority initiatives ...................................................................................................................52 AYRUM: ANALYSIS OF ECONOMIC SITUATION ................................................................... 55 Ayrum municipality ................................................................................................................56 Competitive advantages of Ayrum .........................................................................................56 Ayrum economy brief .............................................................................................................56 Development initiatives ..........................................................................................................60 Priority initiatives ...................................................................................................................60 KOGHB: ANALYSIS OF ECONOMIC SITUATION ................................................................... 63 Koghb municipality ................................................................................................................64 Competitive advantages of Koghb .........................................................................................64 Koghb economy brief .............................................................................................................64 Development initiatives ..........................................................................................................67 3 Priority initiatives ...................................................................................................................68 VAYK: ANALYSIS OF ECONOMIC SITUATION ...................................................................... 70 Vayk Municipality ...................................................................................................................71 Vayk economy brief ...............................................................................................................73 Development initiatives ..........................................................................................................74 Priority initiatives ...................................................................................................................75 JERMUK: ANALYSIS OF ECONOMIC SITUATION ................................................................. 79 Jermuk municipality ...............................................................................................................80 Competitive advantages of Jermuk ........................................................................................80 Jermuk economy brief ...........................................................................................................81 Development initiatives ..........................................................................................................82 Priority initiatives ...................................................................................................................83 ZARITAP: ANALYSIS OF ECONOMIC SITUATION ................................................................. 86 Zaritap Municipality................................................................................................................87 Competitive advantages of Zaritap ........................................................................................87 Zaritap economy brief ............................................................................................................88 Development initiatives ..........................................................................................................90 Priority initiatives ...................................................................................................................90 Sers settlement ..................................................................................................................92 Gomk Settlement ...............................................................................................................92 Nor Aznaberd Settlement ...................................................................................................92
Recommended publications
  • Akhuryan Basin Management Area KEY WATER ISSUES
    ARMENIA Akhuryan Basin Management Area KEY WATER ISSUES EEnvi ronmenPt al Pr otectioIn of IntRe rnati onal RivBe r Basin s The project is funded This project is implemented by a consortium by the European Union led by Hulla & Co. Human Dynamics KG The Environmental Protection of International River Basins (EPIRB) project aims to improve the quality of water in transboundary river basins in the wider Black Sea region and Belarus, including Armenia. One of the specific objectives is to improve technical capacities by developing river basin management plans (RBMPs) in selected pilot river basins, according to the requirements of the EU Water Framework Directive (WFD). One of the selected pilot basins is the Akhuryan basin management area, which includes the Akhuryan River basin, located in the western part of the Republic of Armenia, and the Metsamor River basin, which is adjacent to the Akhuryan River basin. 2 Good water status The Water Framework Directive is achieved when pollution is and river basin management plans controlled and there is One of the requirements of the WFD is the achievement and sufficient flow for ecosystems preservation of good water status by managing waters in natural to function and survive. units — that is, in river basins. River basin planning follows a structured approach: finding out facts, deciding on necessary actions, making a management plan, and putting the plan into practice. An important first step is to identify significant water management issues so that appropriate solutions and measures can be developed. The impacts of human activities Human activities can lead to serious problems in terms of both water quality and quantity.
    [Show full text]
  • Agricultural Value-Chains Assessment Report April 2020.Pdf
    1 2 ABOUT THE EUROPEAN UNION The Member States of the European Union have decided to link together their know-how, resources and destinies. Together, they have built a zone of stability, democracy and sustainable development whilst maintaining cultural diversity, tolerance and individual freedoms. The European Union is committed to sharing its achievements and its values with countries and peoples beyond its borders. ABOUT THE PUBLICATION: This publication was produced within the framework of the EU Green Agriculture Initiative in Armenia (EU-GAIA) project, which is funded by the European Union (EU) and the Austrian Development Cooperation (ADC), and implemented by the Austrian Development Agency (ADA) and the United Nations Development Programme (UNDP) in Armenia. In the framework of the European Union-funded EU-GAIA project, the Austrian Development Agency (ADA) hereby agrees that the reader uses this manual solely for non-commercial purposes. Prepared by: EV Consulting CJSC © 2020 Austrian Development Agency. All rights reserved. Licensed to the European Union under conditions. Yerevan, 2020 3 CONTENTS LIST OF ABBREVIATIONS ................................................................................................................................ 5 1. INTRODUCTION AND BACKGROUND ..................................................................................................... 6 2. OVERVIEW OF DEVELOPMENT DYNAMICS OF AGRICULTURE IN ARMENIA AND GOVERNMENT PRIORITIES.....................................................................................................................................................
    [Show full text]
  • Ra Vayots Dzor Marzma
    RA VAYOTS DZOR MARZMA RA VAYOTS DZOR MARZ Marz centre - Eghegnadzor town Territories -Vayk and Eghegnadzor Towns - Eghegnadzor, Jermuk and Vayk RA Vayots Dzor marz is situated in Southern part of the Republic. In the South borders with Nakhijevan, in the North it borders with RA Grgharkunik marz, in the East – RA Syunik marz and in the West – RA Ararat marz. Territory 2308 square km Territory share of the marz in the territory of RA 7.8 % Urban communities 3 Rural communities 41 Towns 3 Villages 52 Population number as of January 1, 2006 55.8 ths. persons including urban 19.4 ths. persons rural 36.4 ths. persons Share of urban population size 34.8% Share of marz population size in RA population size, 2005 1.7% Agricultural land 209262 ha including - arable land 16287 ha Vayots dzor is surrounded with high mountains, water-separately mountain ranges, that being original natural banks between its and neighbouring territories, turn that into a geographical single whole. Vayots dzor marz has varied fauna and flora. Natural forests comprise 6.7% or 13240.1 ha of territory. Voyots dzor surface is extraordinary variegated. Volcanic forces, earthquakes, waters of Arpa river and its tributaries raised numerous mountain ranges stretching by different directions with big and small tops, mysterious canyons, mountain passes, plateaus, concavities, fields, meadows and natural varied buildings, the most bright example of which is Jermuk wonderful waterfall (60 m). Marzes of the Republic of Armenia in Figures, 2002-2006 269 The Vayots dzor climate on the whole is continental with cold or moderate cold winters and hot or warm summers.
    [Show full text]
  • Environmental Assessment Report Armenia: North-South Road
    Environmental Assessment Report Environmental Impact Assessment (EIA) Document Stage: Draft Sub-project Number: 42145 August 2010 Armenia: North-South Road Corridor Investment Program Tranches 2 & 3 Prepared by Ministry of Transport and Communications (MOTC) of Armenia for Asian Development Bank The environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Armenia: North-South Road Corridor Investment Program Tranches 2 & 3 – Environmental Impact Assessment Report ABBREVIATIONS ADB Asian Development Bank AARM ADB Armenian Resident Mission CO2 carbon dioxide EA executing agency EARF environmental assessment and review framework EIA environmental impact assessment EMP environmental management and monitoring plan IUCN International Union for Conservation of Nature LARP Land Acquisition and Resettlement Plan MFF multi-tranche financing facility MNP Ministry of Nature Protection MOC Ministry of Culture MOH Ministry of Health MOTC Ministry of Transport and Communication NGO nongovernment organization NO2 nitrogen dioxide NO nitrogen oxide MPC maximum permissible concentration NPE Nature Protection Expertise NSS National Statistical Service PAHs polycyclic aromatic hydrocarbons PMU Project Management Unit PPTA Project Preparatory Technical Assistance RA Republic of Armenia RAMSAR Ramsar Convention on Wetlands REA Rapid Environmental Assessment (checklist) SEI State Environmental Inspectorate
    [Show full text]
  • Birdwatching Tour
    PIRT “Via Pontica” Birdwatching Tour PROMOTING INNOVATIVE RURAL TOURISM IN THE BLACK SEA BASIN REGION 2014 Table of Contents Birdwatching Sites .......................................................................................................................................................................................................... 2 Armenia ...................................................................................................................................................................................................................... 2 Bulgaria .................................................................................................................................................................................................................... 18 Georgia ..................................................................................................................................................................................................................... 36 Turkey ...................................................................................................................................................................................................................... 51 Technical Requirements, Issues and Solutions ............................................................................................................................................................ 70 Detailed Itinerary ........................................................................................................................................................................................................
    [Show full text]
  • 5 Environmental Examination
    5 ENVIRONMENTAL EXAMINATION ENVIRONMENTAL STUDY FOR IMPROVEMENT OF EXAMINATION FOR RURAL WATER SUPPLY AND THE PROPOSED PROJECT SEWAGE SYSTEMS IN RA 5-1 Environmental Examination for Cultural Properties (1/2) Nos. of Nos. of Community cultural Rating Community cultural Rating properties properties ARAGATSOTN MARZ Akunq 9 D Lusagyugh 10 D Aghdzq 9 D Tsaghkahovit 5 D Antarut 3 D Tsaghkashen 2 D Ashnak 16 D Tsilqar 6 D Avan+Khnusik 36 D Katnaghbyur 10 D Avtona 13 D Karmrashen 13 D Aragats (Aparan district) 12 D Kaqavadzor 9 D Arayi 6 D Hartavan 15 D Arteni 1 D Dzoraglukh 14 D Apnagyugh 10 D Dzoragyugh 3 D Baysz 4 D Meliqgyugh 3 D Byurakan 40 D Miraq 4 D Garnahovit 10 D Mulqi 2 D Geghadir 1 D Nigavan 9 D Gegharot 11 D Norashen (Aparan district) 8 D Norashen (Aragats Davtashen 5 D District) 2 D Dian 4 D Shenavan 4 D Yeghipartush 8 D Shgharshik 2 D Yeghnik 10 D Vosketas 2 D Yernjatap 14 D Chqnagh 6 D Zovasar 3 D Vardenis 14 D Ttujur 7 D Vardenut 5 D Irind 6 D Verin Sasunik 18 D Lernapar 4 D Tegher 2 D Lernarot 24 D Orgov 24 D SHIRAK MARZ Alvar 3 D Krasar 6 D Aghvorik 2 D Hovit 11 D Ardenis 3 D Dzorashen 1 D Arpeni 6 D Mets Sariar 3 D Bandivan 14 D Musaelyan 19 D Bashgyugh 8 D Shaghik 3 D Garnaritch + Yeghnajur 4 D Shirak 2 D Kamkhut 2 D Pemzashen 12 D Lernakert 12 D Jajur 4 D Lernut 4 D Jrarat 18 D Tsaghkut 5 D Sarnaghbyur 45 D Kamo 12 D Sarapat 2 D Karmrakar 10 D Sizavet 1 D Kaqavasar 3 D Tzoghamarg 8 D Krashen 2 D Poqr Sariar 2 D Source: The Study Team (2007) EE-1-1/2 ENVIRONMENTAL STUDY FOR IMPROVEMENT OF EXAMINATION FOR RURAL WATER SUPPLY AND THE PROPOSED PROJECT SEWAGE SYSTEMS IN RA 5-1 Environmental Examination for Cultural Properties (2/2) Nos.
    [Show full text]
  • World Bank Document
    ARMENIA E2061 TRANSPORT PIU Public Disclosure Authorized LIFELINE ROADS IMPROVEMENT PROJECT Public Disclosure Authorized Public Disclosure Authorized EENNVVIIRROONNMMEENNTTAALL FFRRAAMMEEWWOORRKK for rehabilitation of selected sections of Lifeline Roads Network Public Disclosure Authorized Yerevan 2009 TABLE OF CONTENTS LIST OF ACRONYMS ..................................................................................................... 3 INTRODUCTION ............................................................................................................. 4 WORLD BANK SAFEGUARD POLICIES ...................................................................... 5 NATIONAL LEGISLATION ............................................................................................. 6 INSTITUTIONAL SETTING ............................................................................................ 9 PROPOSED PROJECT DESCRIPTION ....................................................................... 11 ENVIRONMENTAL SCREENING ................................................................................. 12 POTENTIAL IMPACTS AND RISKS ............................................................................ 12 MITIGATION MEASURES ............................................................................................ 14 STAKEHOLDER CONSULTATION .............................................................................. 15 ENVIRONMENTAL MANAGEMENT PLANS ............................................................... 15 2 LIST OF ACRONYMS
    [Show full text]
  • Plate Tectonics Earthquakes in Christchurch and Northern Japan in 2011 and the Haiti Earthquake in 2010 Caused Massive Destruction and Loss of Life
    PROOFS 5 PAGE PLATE TECTONICS Earthquakes in Christchurch and northern Japan in 2011 and the Haiti earthquake in 2010 caused massive destruction and loss of life. What caused these and other earthquakes and volcanic eruptionsUNCORRECTED in the Earth’s history? From space, the Earth looks very peaceful, but movements of the Earth’s surface can cause huge changes. Did you know that the highest place on the Earth, Mount Everest, was once under the sea? It has been pushed up by movements of the Earth’s surface. Similar fossil specimens and rock types have been found on opposite sides of vast oceans. How can this be explained? TECTONIC PLATES 5.1 Looking at a map of the world it is easy to see why people started wondering if the continents once fitted together like a giant jigsaw puzzle. The distribution of some plants and animals and even fossil species cannot be explained unless the continents had drifted apart over time. These continents have slowly moved across the face of the planet, separating and potentially isolating populations. Whilst these organisms have adapted to their new unique environmental conditions, the rocks that were formed when the continents were joined have remained the same. Students: » •outline how the theory of plate tectonics changed ideas about the structure of and changes in the Earth’s surface » •relate continental drift to convectionPROOFS currents and gravitational forces ACTIVITY AT PLAPAGETE BOUN DARIES 5.2 As the huge tectonic plates move across the surface of the Earth, they collide, grind past one another or slowly pull away from each other.
    [Show full text]
  • Table of Contents
    Table of Contents 1. Social Economic Background & Current Indicators of Syunik Region...........................2 2. Key Problems & Constraints .............................................................................................23 Objective Problems ...................................................................................................................23 Subjective Problems..................................................................................................................28 3. Assessment of Economic Resources & Potential ..............................................................32 Hydropower Generation............................................................................................................32 Tourism .....................................................................................................................................35 Electronics & Engineering ........................................................................................................44 Agriculture & Food Processing.................................................................................................47 Mineral Resources (other than copper & molybdenum)...........................................................52 Textiles......................................................................................................................................55 Infrastructures............................................................................................................................57
    [Show full text]
  • Shirak Guidebook
    Wuthering Heights of Shirak -the Land of Steppe and Sky YYerevanerevan 22013013 1 Facts About Shirak FOREWORD Mix up the vast open spaces of the Shirak steppe, the wuthering wind that sweeps through its heights, the snowcapped tops of Mt. Aragats and the dramatic gorges and sparkling lakes of Akhurian River. Sprinkle in the white sheep fl ocks and the cry of an eagle. Add churches, mysterious Urartian ruins, abundant wildlife and unique architecture. Th en top it all off with a turbulent history, Gyumri’s joi de vivre and Gurdjieff ’s mystical teaching, revealing a truly magnifi cent region fi lled with experi- ences to last you a lifetime. However, don’t be deceived that merely seeing all these highlights will give you a complete picture of what Shirak really is. Dig deeper and you’ll be surprised to fi nd that your fondest memories will most likely lie with the locals themselves. You’ll eas- ily be touched by these proud, witt y, and legendarily hospitable people, even if you cannot speak their language. Only when you meet its remarkable people will you understand this land and its powerful energy which emanates from their sculptures, paintings, music and poetry. Visiting the province takes creativity and imagination, as the tourist industry is at best ‘nascent’. A great deal of the current tourist fl ow consists of Diasporan Armenians seeking the opportunity to make personal contributions to their historic homeland, along with a few scatt ered independent travelers. Although there are some rural “rest- places” and picnic areas, they cater mainly to locals who want to unwind with hearty feasts and family chats, thus rarely providing any activities.
    [Show full text]
  • Ra Shirak Marz
    RA SHIRAK MARZ 251 RA SHIRAK MARZ Marz center – Gyumri town Territories - Artik, Akhuryan, Ani, Amasia and Ashotsk Towns - Gyumri, Artik, Maralik RA Shirak marz is situated in the north-west of the republic. In the West it borders with Turkey, in the North it borders with Georgia, in the East – RA Lori marz and in the South – RA Aragatsotn marz. Territory 2681 square km. Territory share of the marz in the territory of RA 9 % Urban communities 3 Rural communities 116 Towns 3 Villages 128 Population number as of January 1, 2006 281.4 ths. persons including urban 171.4 ths. persons rural 110.0 ths. persons Share of urban population size 60.9 % Share of marz population size in RA population size, 2005 39.1 % Agricultural land 165737 ha including - arable land 84530 ha Being at the height of 1500-2000 m above sea level (52 villages of the marz are at the height of 1500-1700 m above sea level and 55 villages - 2000 m), the marz is the coldest region 0 of Armenia, where the air temperature sometimes reaches -46 C in winter. The main railway and automobile highway connecting Armenia with Georgia pass through the marz territory. The railway and motor-road networks of Armenia and Turkey are connected here. On the Akhuryan river frontier with Turkey the Akhuryan reservoir was built that is the biggest in the country by its volume of 526 mln. m3. Marzes of the Republic of Armenia in figures, 1998-2002 252 The leading branches of industry of RA Shirak marz are production of food, including beverages and production of other non-metal mineral products.
    [Show full text]
  • TYPHUS EXANTHÉMATIQUE. TYPHUS. Amérique : America : Asie : Asia
    — 420 Dernière période, ' t^^iode. précédente. ijdiest pértod. Prebious, period. D ate C. D. C. D. I n d e f r a n ç a i s e ; F r e n c h I n d i a ; Terr, de Karikal 26.VII-1.VIII 32 18 — — Karikal Terr. In d e p o r t u g a is e . P o r t u g u e s e I n d i a ; Velim 19-25.VII 1 — 1 !— Velim 5-ll.V II ■---- ----- 1 , 1 I r a k 2-8.V11I 4 — __ — I raq Li-wa de Muntafik » 3 — — — Muntaflq Liwa J a p o n : O saka 23-29.V1II 5 — 3 - — J a p a n : O saka T u r q u i e 1-31.V11 16 1 21 — T u r k e y VUayets: Kars » 1 1 — — Vilayets : Kars Ismid » 1 — — — Izmid Bitiis » 2 ___ — — Bitiis Sivas » I l — 21 — Sivas Europe ; Europe : F r a n c e 1-31.V11 36 63 — F r a n c e Dép. : Aube » 1 — — — Dept. : Aube Bouches-du-Rhône » 1 ----- 1 — Bouches-du-Rhône {varioloïde') » (varioloid) Dép. ; Eure » 14 54 — Dept. : Eure Nord » 20 — -----■ — Nord P o r t u g a l 1-30.VI 39 3 24 5 * P o r t u g a l T u r q u i e (Terr, en Europe) T u r k e y (European lerr.) ; Vilayet: Stamboul 1-31.VII . 1 — — — Vilayet: Istanbul * Chiffre corrigé. — Corrected figure.
    [Show full text]