World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Sample Procurement Plan Agriculture and Land Growth Management Project (P151469) Public Disclosure Authorized I. General 2. Bank’s approval Date of the procurement Plan: Original: January 2016 – Revision PP: December 2016 – February 2017 3. Date of General Procurement Notice: - 4. Period covered by this procurement plan: July 2016 to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable Public Disclosure Authorized procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Type de contrats Montant contrat Méthode de passation de Contrat soumis à revue a en US$ (seuil) marchés priori de la banque 1. Travaux ≥ 5.000.000 AOI Tous les contrats < 5.000.000 AON Selon PPM < 500.000 Consultation des Selon PPM fournisseurs Public Disclosure Authorized Tout montant Entente directe Tous les contrats 2. Fournitures ≥ 500.000 AOI Tous les contrats < 500.000 AON Selon PPM < 200.000 Consultation des Selon PPM fournisseurs Tout montant Entente directe Tous les contrats Tout montant Marchés passes auprès Tous les contrats d’institutions de l’organisation des Nations Unies Public Disclosure Authorized 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. July 9, 2010 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: - 4. Reference to (if any) Project Operational/Procurement Manual: Manuel de procedures (execution – procedures administratives et financières – procedures de passation de marches): décembre 2016 – émis par l’Unite de Gestion du projet Casef (Croissance Agricole et Sécurisation Foncière) 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] - 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ million (yes/no) (Prior / Post) Summary of the ICB No Prior (Works) Summary of the ICB 1,025 2 No Prior (Goods) Summary of the 5,821 2 No Prior 1st contract NCB (Works) for Prior Review Summary of the 0,257325 1 No Prior 1st contract NCB (Goods) for Prior Review Summary of the ICB - - No Prior (Non-Consultant Services) CFN (Consultations - - No Prior de Fournisseurs) – (travaux) CFN (Consultations 0,0884 1 No Prior de Fournisseurs) – (Fournitures) Entente directe 0,031 1 No Prior (fournitures) Marchés passes 0,703 2 No Prior auprès d’institutions de l’organisation des Nations Unies Summary of the 4,243 2 No Post NCB (Works) Summary of the 0,2031 3 No Post NCB (Goods) July 9, 2010 CFN (Consultations 0,095 4 No Post de Fournisseurs) – (travaux) CFN (Consultations 0,101 5 No Post de Fournisseurs – Achat à commande) – (Fournitures et services autres que services de consultants) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Type de contrats Montant contrat Méthode de passation Contrat soumis à revue en US$ (seuil) de marchés a priori de la banque 3. Consultants ≥ 200.000 SFQC, SFQ, SCBD Tous les contrats (firmes) SMC, SQC, , < 200.000 SFQC, SFQ, SCBD Selon PPM SMC, SQC , Consultant ≥ 100.000 Comparaison de 3 Tous les contrats individuels CVs < 100.000 Comparaison de 3 Selon PPM CVs Firmes et individuels Tout montant Entente directe Tous les contrats 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 5,6291 4 Prior number of contracts that July 9, 2010 will be let under QCBS Summary of 13,75775 23 Prior SFQ, CI, number of SQC, contracts that entente will be let directe under other methods Summary of 0,609 4 Post number of contracts that will be let under QCBS Summary of 0,117 11 Post CI, SQC number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Madagascar : Madagascar Agriculture Rural Growth and Land Management Project PLAN General Information Country: Madagascar Banks Approval Date of the Original Procurement Plan: 2017-04-13 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-10-03 Project ID: P151469 GPN Date: Project Name: Madagascar Agriculture Rural Growth and Land Management Project Loan / Credit No: IDA / 57750 Executing Agency(ies): PROJECT MANAGEMENT UNIT AGRICULTURE GROWTH AND LAND MANAGEMENT, Intervention Funds for Development WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-UGP CASEF-16720-CW- RFQ / T 2-16/C4: Travaux Component 4. Project Request for Single Stage - One Pending d'aménagement du bureau IDA / 57750 Post Limited 23,000.00 0.00 2017-06-17 2017-07-28 2018-08-27 Management and Coordination Quotations Envelope Implementation annexe pour cellule nationale à Antananarivo MG-UGP CASEF-16721-CW- Component 4. Project Request for Single Stage - One Pending RFQ / T 3-16/C4: Rénovation IDA / 57750 Post Limited 50,000.00 0.00 2017-06-20 2017-08-01 2018-10-29 Management and Coordination Quotations Envelope Implementation locaux cellule Vakinankaratra MG-UGP CASEF-16722-CW- RFQ / T 4-16/C4: Travaux Component 4. Project Request for Single Stage - One Pending d'aménagement du bureau IDA / 57750 Post Limited 9,000.00 0.00 2017-06-15 2017-07-25 2018-08-23 Management and Coordination Quotations Envelope Implementation annexe pour cellule Vakinankaratra MG-UGP CASEF-16723-CW- RFQ / T 5-16/C4: Rénovation Component 4. Project Request for Single Stage - One Pending IDA / 57750 Post Limited 7,000.00 0.00 2017-06-19 2017-07-30 2018-08-28 locaux cellule Toamasina et Management and Coordination Quotations Envelope Implementation antenne Analanjirofo DRFM1TRMPE17ATEC001 / TRAVAUX DE REHABILITATION DU BARRAGE BETSIMISOTRA - Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 91,703.47 0.00 2017-11-19 2017-11-23 2017-12-03 2017-12-05 2017-12-20 2019-05-19 COMMUNE RURALE Emergency Response Envelope Implementation BETSIMISOTRA - DISTRICT FANDRIANA DRFM1TRMPE17ATEC002 / TRAVAUX DE REHABILITATION DU BARRAGE VOLAMENA Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 42,988.40 0.00 2017-11-19 2017-11-23 2017-12-03 2017-12-05 2017-12-20 2019-05-19 DANS LA COMMUNE RURALE Emergency Response Envelope Implementation DE VOLAMENA - DISTRICT AMBALAVAO DRFM1TRMPE17ATEC003 / TRAVAUX DE RECONSTITUTION DES BERGES ET TRAITEMENT Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 15,011.82 0.00 2017-11-19 2017-11-23 2017-12-03 2017-12-05 2017-12-20 2019-05-19 BRECHES SAHAREVO - Emergency Response Envelope Implementation COMMUNE RURALE ILAKA CENTRE - DISTRICT AMBOSITRA DRTM1TRMPE1701 / Travaux de reconstruction de la digue Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 100,314.13 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23 Ambalanosy à Antanifotsy - Emergency Response Envelope Implementation Commune Ambodiriana DRTM1TRMPE1702 / Travaux de reconstruction du MPI à Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 84,587.87 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23 Antsirabe II - Commune Emergency Response Envelope Implementation Ambohimiarivo DRTM1TRMPE1703 / Travaux de reconstruction du MPI à Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 84,587.87 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23 Antsirabe II - Commune Emergency Response Envelope Implementation Mandrosohasina DRTM1TRMPE1704 / Travaux de reconstruction de la digue de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 67,610.60 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23
Recommended publications
  • TDR Annexe7 Rapport Analyse 322 Communes OATF
    ETAT DES LIEUX DES 319 COMMUNES POUR LE FINANCEMENT ADDITIONNEL DU PROJET CASEF Février 2019 TABLE DES MATIERES TABLE DES MATIERES .................................................................................................................... i LISTE DES ACRONYMES ................................................................................................................ iii Liste des tableaux ......................................................................................................................... v Listes des Cartes ........................................................................................................................... v Liste des figures ............................................................................................................................vi Liste des photos ...........................................................................................................................vi I INTRODUCTION ....................................................................................................................... 1 II METHODOLOGIES .................................................................................................................... 2 II.1 CHOIX DES 322 COMMUNES OBJETS D’ENQUETE ............................................................... 2 II.2 CHOIX DES CRITERES DE SELECTION DES COMMUNES ........................................................ 5 II.3 METHODOLOGIE DE COLLECTE DE DONNEES ET ACTIVITES ................................................. 6
    [Show full text]
  • MAEP: Rapport Annuel 2019
    RAPPORT ANNUEL 2019 1 INTRODUCTION 1 UNE VISION CLAIRE 4 CHIFFRES CLES 5 EVENEMENTS MARQUANTS 2019 7 AGRICULTURE 8 ELEVAGE 28 PêCHE 37 Sommaire ADMINISTRATION 50 COOPERATION 60 CONCLUSION 64 2 MINISTÈRE DE L’AGRICULTURE, DE L’ELEVAGE ET DE LA PECHE Introduction Le Ministère de l’Agriculture, de l’Elevage et de la Pêche Des efforts considérables ont été menés afin d’ajuster (MAEP) a pour objectif d’atteindre l’autosuffisance nos orientations stratégiques vers l’IEM, comme témoigne alimentaire et l’Emergence d’un secteur Agricole l’esprit de rupture insufflé dans l’élaboration du Plan moderne. Emergence de Madagascar. Cela, afin de se tourner vers la Transformation durable de l’Agriculture malagasy. Cette Pour Madagascar, l’année 2019, sous la présidence de rupture tient également compte de la capitalisation des SEM Andry RAJOELINA, est synonyme de démarrage pour bonnes pratiques afin d’œuvrer dans la continuité. rattraper en cinq ans le retard de développement accumulé La mobilisation de tous les acteurs du développement depuis plus de 50 ans. Cet objectif est matérialisé par rural, dont principalement le Secteur Privé et les Partenaires toutes les actions de grandes envergures qui sont d’ores Techniques et Financiers (PTF), ont aussi figuré parmi nos et déjà menées par le régime. priorités. Pour le développement rural, cette année a été marquée Le présent rapport fait état des efforts menés et rend par la réunification des trois sous-secteurs agriculture, compte des principales réalisations physiques du MAEP à élevage et pêche au sein d’un même Ministère (MAEP) travers les différentes entités et les programmes et projets après 11 ans de séparation.
    [Show full text]
  • Diagnostic Territorial De La Région Du Vakinankaratra À Madagascar
    « Prospective territoriale sur les dynamiques démographiques et le développement rural en Afrique subsaharienne et à Madagascar » ETUDE pour le compte de l’AGENCE FRANCAISE DE DEVELOPPEMENT RAPPORT PAYS Diagnostic Territorial de la Région du Vakinankaratra à Madagascar Auteurs : Jean-Michel SOURISSEAU, Patrick RASOLOFO, Jean-François BELIERES, Jean-Pierre GUENGANT, Haja Karmen RAMANITRINIONY, Robin BOURGEOIS, Tovonirina Théodore RAZAFIMIARANTSOA, Voahirana Tantely ANDRIANANTOANDRO, Manda RAMARIJAONO, Perrine BURNOD, Hajatiana RABEANDRIAMARO, Nathalie BOUGNOUX Version finale Février 2016 Avant-Propos Ce rapport est un des produits de l’étude « Prospective territoriale sur les dynamiques démographiques et le développement rural en Afrique subsaharienne et à Madagascar » menée dans deux régions d’Afrique : la région de Ségou au Mali et la région de Vakinankaratra à Madagascar Il s’agit du diagnostic territorial rétrospectif de la Région du Vakinankaratra. Une première version a servi à la préparation de l’atelier de prospective « Les avenirs de Vakinankaratra en 2035 » qui s’est tenu du 17 au 21 août 2015 à Antsirabe et qui a donné lieu à la production d’un rapport, également disponible. Une deuxième version, très largement enrichie, datée de janvier 2016, a été éditée à cent cinquante exemplaires, et diffusée lors des ateliers de restitution qui ont eu lieu à Antsirabe et Antananarivo, les 02 et 04 février 2016. Ce document (daté de février 2016) constitue la version finale qui prend en compte les remarques faites lors de ces ateliers. Ce rapport sur la région de Vakinankaratra est le pendant du document établi pour la région de Ségou au Mali. Ses principaux enseignements, complétés par les produits de l’atelier, sont intégrés dans le rapport de synthèse de l’étude, produit final rassemblant les acquis de la prospective dans les deux régions et les perspectives en termes de méthode et de reproduction dans d’autres situations.
    [Show full text]
  • Small Hydro Resource Mapping in Madagascar
    Public Disclosure Authorized Small Hydro Resource Mapping in Madagascar INCEPTION REPORT [ENGLISH VERSION] August 2014 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized This report was prepared by SHER Ingénieurs-Conseils s.a. in association with Mhylab, under contract to The World Bank. It is one of several outputs from the small hydro Renewable Energy Resource Mapping and Geospatial Planning [Project ID: P145350]. This activity is funded and supported by the Energy Sector Management Assistance Program (ESMAP), a multi-donor trust fund administered by The World Bank, under a global initiative on Renewable Energy Resource Mapping. Further details on the initiative can be obtained from the ESMAP website. This document is an interim output from the above-mentioned project. Users are strongly advised to exercise caution when utilizing the information and data contained, as this has not been subject to full peer review. The final, validated, peer reviewed output from this project will be a Madagascar Small Hydro Atlas, which will be published once the project is completed. Copyright © 2014 International Bank for Reconstruction and Development / THE WORLD BANK Washington DC 20433 Telephone: +1-202-473-1000 Internet: www.worldbank.org This work is a product of the consultants listed, and not of World Bank staff. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work and accept no responsibility for any consequence of their use.
    [Show full text]
  • WEEKLY EPIDEMIOLOGICAL RECORD RELEVE EPIDEMIOLOGIQUE HEBDOMADAIRE 15 SEPTEMBER 1995 ● 70Th YEAR 70E ANNÉE ● 15 SEPTEMBRE 1995
    WEEKLY EPIDEMIOLOGICAL RECORD, No. 37, 15 SEPTEMBER 1995 • RELEVÉ ÉPIDÉMIOLOGIQUE HEBDOMADAIRE, No 37, 15 SEPTEMBRE 1995 1995, 70, 261-268 No. 37 World Health Organization, Geneva Organisation mondiale de la Santé, Genève WEEKLY EPIDEMIOLOGICAL RECORD RELEVE EPIDEMIOLOGIQUE HEBDOMADAIRE 15 SEPTEMBER 1995 c 70th YEAR 70e ANNÉE c 15 SEPTEMBRE 1995 CONTENTS SOMMAIRE Expanded Programme on Immunization – Programme élargi de vaccination – Lot Quality Assurance Evaluation de la couverture vaccinale par la méthode dite de Lot survey to assess immunization coverage, Quality Assurance (échantillonnage par lots pour l'assurance de la qualité), Burkina Faso 261 Burkina Faso 261 Human rabies in the Americas 264 La rage humaine dans les Amériques 264 Influenza 266 Grippe 266 List of infected areas 266 Liste des zones infectées 266 Diseases subject to the Regulations 268 Maladies soumises au Règlement 268 Expanded Programme on Immunization (EPI) Programme élargi de vaccination (PEV) Lot Quality Assurance survey to assess immunization coverage Evaluation de la couverture vaccinale par la méthode dite de Lot Quality Assurance (échantillonnage par lots pour l'assurance de la qualité) Burkina Faso. In January 1994, national and provincial Burkina Faso. En janvier 1994, les autorités nationales et provin- public health authorities, in collaboration with WHO, con- ciales de santé publique, en collaboration avec l’OMS, ont mené ducted a field survey to evaluate immunization coverage une étude sur le terrain pour évaluer la couverture vaccinale des for children 12-23 months of age in the city of Bobo enfants de 12 à 23 mois dans la ville de Bobo Dioulasso. L’étude a Dioulasso. The survey was carried out using the method of utilisé la méthode dite de Lot Quality Assurance (LQA) plutôt que Lot Quality Assurance (LQA) rather than the 30-cluster la méthode des 30 grappes plus couramment utilisée par les pro- survey method which has traditionally been used by immu- grammes de vaccination.
    [Show full text]
  • Répartition De La Caisse-École 2020 Des Collèges D'enseignement
    Repartition de la caisse-école 2020 des Collèges d'Enseignement Général DREN ALAOTRA-MANGORO CISCO AMBATONDRAZAKA Prestataire OTIV ALMA Commune Code Etablissement Montant AMBANDRIKA 503010005 CEG AMBANDRIKA 1 598 669 AMBATONDRAZAKA 503020018 C.E.G. ANOSINDRAFILO 1 427 133 AMBATONDRAZAKA 503020016 CEG RAZAKA 3 779 515 AMBATONDRAZAKA SUBURBAINE 503030002 C.E.G. ANDINGADINGANA 1 142 422 AMBATOSORATRA 503040001 CEG AMBATOSORATRA 1 372 802 AMBOHIBOROMANGA 503070012 CEG ANNEXE AMBOHIBOROMANGA 878 417 AMBOHIBOROMANGA 503150018 CEG ANNEXE MARIANINA 775 871 AMBOHIBOROMANGA 503150016 CEGFERAMANGA SUD 710 931 AMBOHIDAVA 503040017 CEG AMBOHIDAVA 1 203 171 AMBOHITSILAOZANA 503050001 CEG AMBOHITSILAOZANA 1 671 044 AMBOHITSILAOZANA CEG TANAMBAO JIAPASIKA 622 687 AMPARIHINTSOKATRA 503060013 CEG AMPARIHINTSOKATRA 1 080 499 AMPITATSIMO 503070001 CEG AMPITATSIMO 1 530 936 AMPITATSIMO 503070015 CEG ANNEXE AMBOHITANIBE 860 667 ANDILANATOBY 503080025 CEG ANDRANOKOBAKA 760 039 ANDILANATOBY 503080001 CEG ANDILANATOBY 1 196 620 ANDILANATOBY 503080026 CEG ANNEXE SAHANIDINGANA 709 718 ANDILANATOBY 503080027 CEG COMMUNAUTAIRE AMBODINONOKA 817 973 ANDILANATOBY 503080031 CEG COMMUNAUTAIRE MANGATANY 723 676 ANDILANATOBY 503080036 CEG COMMUNAUTAIRE RANOFOTSY 668 769 ANDROMBA 503090005 CEG ANDROMBA 1 008 043 ANTANANDAVA 503100020 CEG ANTANANDAVA 1 056 579 ANTSANGASANGA 503110004 CEG ANTSANGASANGA 757 763 BEJOFO 503120016 C.E.G.
    [Show full text]
  • Infected Areas As on 9 June 1988 — Zones Infectées Au 9 Juin 1988 for Criteria Used in Compiling This List, See No
    Wklv Eptdem Rec : No. 24 - 10 June 1988 - 182 - Relevé àpidém bebd. : N° 24 - 10 juin 1988 (i) 423 notifications saved in the 15 years following 100 000 i) 423 notifications évitées au cours des 15 années suivant les immunizations in the years 1972-1976; 100 000 vaccinations administrées de 1972 à 1976; (Ü) 212 notifications saved in the 15 years following 100 000 ii) 212 .notifications .évitées au cours des 15 années suivant les immunizations in the years 1977-1981 ; 100000 vaccinations administrées de 1977 à 1981; (iii) 100 notifications saved in the 15 years following 100 000 iii) 100 notifications'évitées au cours des 15 années suivant les . immunizations in the years 1982-1986. 100 000 vaccinations administrées de 1982 à 1986. ' Approximately 65 000 BCG immunizations are given annually Quelque 65 000 vaccinations par le BCG sont administrées chaque in Scotland, therefore the saving per year is estimated at 65 cases année en Ecosse; on estime donc à 65 le nombre des cas évités chaque in the 15-29 year age group. année dans le groupe d’âge 15-29 ans. To stop using BCG would mean an increase in disease among Ne plus utiliser le BCG entraînerait Une progression de la maladie members of the 15-29 year age group, local outbreaks would be chez les 15-29 ans, un risque accru de poussées locales du fait de la perte expected if herd resistance is lost and the individual would be at de résistance collective et une augmentation du risque individuel pour increased risk when moving from an area of low infectivity in quiconque pénétrerait dans une zone de haute infectivité, au Royaume- the United Kingdom to an area of high infectivity either in the Uni ou à l’étranger, en provenance d’une zone de faible infectivité au United Kingdom or abroad.
    [Show full text]
  • Manandona Power Plant Study.Pdf
    Antananarivo Antsirabe Manandona Hydropower Plant Location Map List of Contents Executive Summary .....................................................................................................ES-1 Chapter 1 Introduction................................................................................................1-1 1.1 Background and Objectives...................................................................................... 1-1 1.1.1 Background of the Study........................................................................................... 1-1 1.1.2 Objectives of the Study............................................................................................. 1-6 1.2 Scope of Works......................................................................................................... 1-7 1.3 Study Area................................................................................................................ 1-7 1.4 Study Schedule ......................................................................................................... 1-7 1.5 Study Team Member................................................................................................. 1-7 Chapter 2 Socio-economic Condition in Madagascar ...........................................2-1 2.1 People and Culture.................................................................................................... 2-1 2.2 Economy................................................................................................................... 2-1
    [Show full text]
  • World Bank Document
    Sample Procurement Plan Agriculture and Land Growth Management Project (P151469) Public Disclosure Authorized I. General 2. Bank’s approval Date of the procurement Plan: Original: January 2016 – Revision PP: December 2016 – February 2017 3. Date of General Procurement Notice: - 4. Period covered by this procurement plan: July 2016 to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable Public Disclosure Authorized procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Type de contrats Montant contrat Méthode de passation de Contrat soumis à revue a en US$ (seuil) marchés priori de la banque 1. Travaux ≥ 5.000.000 AOI Tous les contrats < 5.000.000 AON Selon PPM < 500.000 Consultation des Selon PPM fournisseurs Public Disclosure Authorized Tout montant Entente directe Tous les contrats 2. Fournitures ≥ 500.000 AOI Tous les contrats < 500.000 AON Selon PPM < 200.000 Consultation des Selon PPM fournisseurs Tout montant Entente directe Tous les contrats Tout montant Marchés passes auprès Tous les contrats d’institutions de l’organisation des Nations Unies Public Disclosure Authorized 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. July 9, 2010 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: - 4. Reference to (if any) Project Operational/Procurement Manual: Manuel de procedures (execution – procedures administratives et financières – procedures de passation de marches): décembre 2016 – émis par l’Unite de Gestion du projet Casef (Croissance Agricole et Sécurisation Foncière) 5.
    [Show full text]
  • Table Des Matieres La Region…………………………………………………….…………………..……………….1 1 Milieu Physique
    TABLE DES MATIERES LA REGION…………………………………………………….…………………..……………….1 1 MILIEU PHYSIQUE ........................................................................................................................13 1.1 RELIEF .......................................................................................................................................13 1.2 GEOLOGIE .................................................................................................................................13 1.3 CLIMAT ......................................................................................................................................14 1.3.1 Le réseau de stations météorologiques ................................................................................15 1.3.2 Température ........................................................................................................................16 1.3.3 Pluviométrie ........................................................................................................................17 1.3.4 Diagrammes ombrothermiques ...........................................................................................18 1.3.5 Cyclones ..............................................................................................................................19 1.4 HYDROLOGIE ...........................................................................................................................19 1.5 SOLS ET VEGETATIONS .........................................................................................................20
    [Show full text]
  • Evolution De La Couverture De Forets Naturelles a Madagascar
    EVOLUTION DE LA COUVERTURE DE FORETS NATURELLES A MADAGASCAR 1990-2000-2005 mars 2009 La publication de ce document a été rendue possible grâce à un support financier du Peuple Americain à travers l’USAID (United States Agency for International Development). L’analyse de la déforestation pour les années 1990 et 2000 a été fournie par Conservation International. MINISTERE DE L’ENVIRONNEMENT, DES FORETS ET DU TOURISME Le présent document est un rapport du Ministère de l’Environnement, des Forêts et du Tourisme (MEFT) sur l’état de de l’évolution de la couverture forestière naturelle à Madagascar entre 1990, 2000, et 2005. Ce rapport a été préparé par Conservation International. Par ailleurs, les personnes suivantes (par ordre alphabétique) ont apporté leur aimable contribution pour sa rédaction: Andrew Keck, James MacKinnon, Norotiana Mananjean, Sahondra Rajoelina, Pierrot Rakotoniaina, Solofo Ralaimihoatra, Bruno Ramamonjisoa, Balisama Ramaroson, Andoniaina Rambeloson, Rija Ranaivosoa, Pierre Randriamantsoa, Andriambolantsoa Rasolohery, Minoniaina L. Razafindramanga et Marc Steininger. Le traitement des imageries satellitaires a été réalisé par Balisama Ramaroson, Minoniaina L. Razafindramanga, Pierre Randriamantsoa et Rija Ranaivosoa et les cartes ont été réalisées par Andriambolantsoa Rasolohery. La réalisation de ce travail a été rendu possible grâce a une aide financière de l’United States Agency for International Development (USAID) et mobilisé à travers le projet JariAla. En effet, ce projet géré par International Resources Group (IRG) fournit des appuis stratégiques et techniques au MEFT dans la gestion du secteur forestier. Ce rapport devra être cité comme : MEFT, USAID et CI, 2009. Evolution de la couverture de forêts naturelles à Madagascar, 1990- 2000-2005.
    [Show full text]
  • Résultats Détaillés Antananarivo
    RESULTATS SENATORIALES DU 29/12/2015 FARITANY: 1 ANTANANARIVO BV reçus: 313 sur 313 GASIKA MARINA HVM MAPAR MMM NY AREMA ASSOCI TIM RA MANGA ATION MAINTS RANO MALAG N°BV Emplacement AP AT Inscrits Votants B N S E O MALAZA ASY SAMBA REGION 11 ANALAMANGA BV reçus 140 sur 140 DISTRICT: 1101 AMBOHIDRATRIMO BV reçus24 sur 24 01 AMBATO 0 0 8 7 0 7 0 3 4 0 0 0 0 0 0 02 AMBATOLAMPY 0 0 8 8 0 8 0 1 4 1 0 0 0 0 2 03 AMBOHIDRATRIMO 0 0 10 10 0 10 0 1 8 0 0 0 0 0 1 04 AMBOHIMANJAKA 0 0 6 6 0 6 0 3 3 0 0 0 0 0 0 05 AMBOHIMPIHAONANA 0 0 6 6 0 6 0 0 3 0 0 0 0 1 2 06 AMBOHITRIMANJAKA 0 0 8 8 0 8 0 0 6 0 0 0 0 0 2 07 AMPANGABE 0 0 8 7 0 7 0 1 6 0 0 0 0 0 0 08 AMPANOTOKANA 0 0 8 8 0 8 0 4 2 0 1 0 0 0 1 09 ANJANADORIA 0 0 6 6 0 6 0 0 5 0 0 0 0 0 1 10 ANOSIALA 0 0 8 8 0 8 0 2 2 1 0 0 0 0 3 11 ANTANETIBE MAHAZA 0 0 8 8 0 8 0 0 6 0 0 0 0 0 2 12 ANTEHIROKA 0 0 8 6 0 6 0 0 5 0 0 0 0 0 1 13 ANTSAHAFILO 0 0 6 6 0 6 0 3 2 0 0 0 0 0 1 14 AVARATSENA 0 0 6 5 0 5 0 0 5 0 0 0 0 0 0 15 FIADANANA 0 0 6 6 0 6 0 0 3 0 0 0 0 0 3 16 IARINARIVO 0 0 6 6 0 6 0 2 3 0 0 0 0 0 1 17 IVATO 0 0 8 8 0 8 0 1 4 2 0 0 0 0 1 18 MAHABO 0 0 6 6 0 6 0 0 4 0 0 0 0 0 2 19 MAHEREZA 0 0 6 5 0 5 0 0 5 0 0 0 0 0 0 20 MAHITSY 0 0 8 8 0 8 0 4 3 0 0 0 0 0 1 21 MANANJARA 0 0 6 5 0 5 0 0 5 0 0 0 0 0 0 22 MANJAKAVARADRAN 0 0 6 6 0 6 0 1 2 1 0 0 0 1 1 23 MERIMANDROSO 0 0 8 8 0 8 0 2 5 0 1 0 0 0 0 24 TALATAMATY 0 0 8 8 0 8 0 0 3 2 0 0 0 0 3 TOTAL DISTRICT 0 0 172 165 0 165 0 28 98 7 2 0 0 2 28 DISTRICT: 1102 ANDRAMASINA BV reçus14 sur 14 01 ALAROBIA VATOSOLA 0 0 8 8 0 8 0 2 6 0 0 0 0 0 0 02 ALATSINAINY
    [Show full text]