Sample Procurement Plan Agriculture and Land Growth Management Project (P151469)

Public Disclosure Authorized I. General

2. Bank’s approval Date of the procurement Plan: Original: January 2016 – Revision PP: December 2016 – February 2017 3. Date of General Procurement Notice: - 4. Period covered by this procurement plan: July 2016 to December 2017

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable

Public Disclosure Authorized procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.]

Type de contrats Montant contrat Méthode de passation de Contrat soumis à revue a en US$ (seuil) marchés priori de la banque 1. Travaux ≥ 5.000.000 AOI Tous les contrats

< 5.000.000 AON Selon PPM

< 500.000 Consultation des Selon PPM fournisseurs Public Disclosure Authorized Tout montant Entente directe Tous les contrats

2. Fournitures ≥ 500.000 AOI Tous les contrats

< 500.000 AON Selon PPM

< 200.000 Consultation des Selon PPM fournisseurs Tout montant Entente directe Tous les contrats

Tout montant Marchés passes auprès Tous les contrats d’institutions de l’organisation des Nations Unies Public Disclosure Authorized

2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines.

July 9, 2010 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: -

4. Reference to (if any) Project Operational/Procurement Manual: Manuel de procedures (execution – procedures administratives et financières – procedures de passation de marches): décembre 2016 – émis par l’Unite de Gestion du projet Casef (Croissance Agricole et Sécurisation Foncière)

5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] -

6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement)

[List the Packages which require Bank’s prior review first and then the other packages]

1 2 3 4 5 6 7

Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ million (yes/no) (Prior / Post) Summary of the ICB No Prior (Works) Summary of the ICB 1,025 2 No Prior (Goods) Summary of the 5,821 2 No Prior 1st contract NCB (Works) for Prior Review Summary of the 0,257325 1 No Prior 1st contract NCB (Goods) for Prior Review Summary of the ICB - - No Prior (Non-Consultant Services) CFN (Consultations - - No Prior de Fournisseurs) – (travaux) CFN (Consultations 0,0884 1 No Prior de Fournisseurs) – (Fournitures) Entente directe 0,031 1 No Prior (fournitures) Marchés passes 0,703 2 No Prior auprès d’institutions de l’organisation des Nations Unies Summary of the 4,243 2 No Post NCB (Works) Summary of the 0,2031 3 No Post NCB (Goods)

July 9, 2010 CFN (Consultations 0,095 4 No Post de Fournisseurs) – (travaux) CFN (Consultations 0,101 5 No Post de Fournisseurs – Achat à commande) – (Fournitures et services autres que services de consultants)

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Type de contrats Montant contrat Méthode de passation Contrat soumis à revue en US$ (seuil) de marchés a priori de la banque 3. Consultants ≥ 200.000 SFQC, SFQ, SCBD Tous les contrats (firmes) SMC, SQC, , < 200.000 SFQC, SFQ, SCBD Selon PPM SMC, SQC , Consultant ≥ 100.000 Comparaison de 3 Tous les contrats individuels CVs < 100.000 Comparaison de 3 Selon PPM CVs Firmes et individuels Tout montant Entente directe Tous les contrats

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable]

4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6

Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 5,6291 4 Prior number of contracts that

July 9, 2010 will be let under QCBS Summary of 13,75775 23 Prior SFQ, CI, number of SQC, contracts that entente will be let directe under other methods Summary of 0,609 4 Post number of contracts that will be let under QCBS Summary of 0,117 11 Post CI, SQC number of contracts that will be let under other methods

July 9, 2010 PROCUREMENT : Madagascar Agriculture Rural Growth and Land Management Project PLAN General Information Country: Madagascar Banks Approval Date of the Original Procurement Plan: 2017-04-13 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-05-14 Project ID: P151469 GPN Date: Project Name: Madagascar Agriculture Rural Growth and Land Management Project Loan / Credit No: IDA / 57750 Executing Agency(ies): PROJECT MANAGEMENT UNIT AGRICULTURE GROWTH AND LAND MANAGEMENT, Intervention Funds for Development

WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

MG-UGP CASEF-16720-CW- RFQ / T 2-16/C4: Travaux Component 4. Project Request for Single Stage - One d'aménagement du bureau IDA / 57750 Post Limited 23,000.00 5,395.55 Signed 2017-06-17 2017-08-18 2017-07-28 2017-09-04 2018-08-27 Management and Coordination Quotations Envelope annexe pour cellule nationale à

MG-UGP CASEF-16721-CW- Component 4. Project Request for Single Stage - One Pending RFQ / T 3-16/C4: Rénovation IDA / 57750 Post Limited 50,000.00 0.00 2017-06-20 2017-08-01 2018-10-29 Management and Coordination Quotations Envelope Implementation locaux cellule

MG-UGP CASEF-16722-CW- RFQ / T 4-16/C4: Travaux Component 4. Project Request for Single Stage - One d'aménagement du bureau IDA / 57750 Post Limited 9,000.00 16,912.40 Signed 2017-06-15 2017-08-07 2017-07-25 2017-09-04 2018-08-23 Management and Coordination Quotations Envelope annexe pour cellule Vakinankaratra

MG-UGP CASEF-16723-CW- RFQ / T 5-16/C4: Rénovation Component 4. Project Request for Single Stage - One Pending IDA / 57750 Post Limited 7,000.00 0.00 2017-06-19 2017-07-30 2018-08-28 locaux cellule et Management and Coordination Quotations Envelope Implementation antenne

DRAM1TRMPE1701 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 81,044.09 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe LOT Emergency Response Envelope

01

DRAM1TRMPE1702 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 94,155.44 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope

02

DRAM1TRMPE1703 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 81,044.09 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope

10

DRAM1TRMPE1704 / Travaux Component 5. Contingency Single Stage - One de Reconstruction CSB1 IDA / 57750 Post Request for Bids Open - National 68,247.65 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Beanana

DRAM1TRMPE1705 / Travaux Component 5. Contingency Single Stage - One de Reconstruction CSB1 IDA / 57750 Post Request for Bids Open - National 68,247.65 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Mahasoa

DRAM1TRMPE1706 / Travaux Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 68,247.65 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 de ReconstructionCSB1 Vinanibe Emergency Response Envelope

DRAM1TRMPE1707 / Travaux Component 5. Contingency Single Stage - One de Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 63,982.17 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Maroantsetra LOT 03

DRAM1TRMPE1708 / Travaux Component 5. Contingency Single Stage - One de Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 66,825.83 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Maroantsetra LOT 04

DRAM1TRMPE1709 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 94,551.44 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe totalement détruites Emergency Response Envelope

MAROANTSETRA LOT 03

DRAM1TRMPE1710 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 81,044.09 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope

04

DRAM1TRMPE1711 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 94,551.44 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope

05

DRAM1TRMPE1712 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 94,551.44 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope

06

DRAM1TRMPE1713 / Travaux Component 5. Contingency Single Stage - One de réhabilitation MPI IDA / 57750 Post Request for Bids Open - National 48,342.09 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Ambinanintelo

DRAM1TRMPE1714 / Travaux Component 5. Contingency Single Stage - One de Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 76,778.61 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Maroantsetra LOT 01

DRAM1TRMPE1715 / Travaux Component 5. Contingency Single Stage - One de Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 98,106.00 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Maroantsetra LOT 02

DRAM1TRMPE1716 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 81,044.09 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope

07

DRAM1TRMPE1717 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 94,551.44 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope

08

DRAM1TRMPE1718 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 94,551.44 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope

09

DRAM1TRMPE1719 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 81,044.09 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2018-01-28 2018-07-07 classe MAROANTSETRA LOT Emergency Response Envelope

11

DRAM1TRMPE1720 / Travaux Component 5. Contingency Single Stage - One de Reconstruction CSB1 IDA / 57750 Post Request for Bids Open - National 68,247.65 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Antevibe

DRAM1TRMPE1721 / Travaux Component 5. Contingency Single Stage - One de Reconstruction CSB1 IDA / 57750 Post Request for Bids Open - National 68,247.65 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Madiotsifafana

DRAM1TRMPE1722 / Travaux Component 5. Contingency Single Stage - One de Reconstruction CSB1 IDA / 57750 Post Request for Bids Open - National 68,247.65 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Sakatihina

DRAM1TRMPE1723 / Travaux Component 5. Contingency Single Stage - One de Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 38,389.30 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Maroantsetra LOT 05

DRAM1TRMPE1724 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 94,551.44 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope

12

DRAM1TRMPE1725 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 69,100.75 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope

13

DRAM1TRMPE1726 / Travaux deReconstruction des salles de Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 69,100.75 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope

14

DRAM1TRMPE1727 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 76,778.61 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope

15

DRAM1TRMPE1728 / Travaux Component 5. Contingency Single Stage - One de réhabilitation MPI Sahena IDA / 57750 Post Request for Bids Open - National 68,816.38 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope LOT 01

DRAM1TRMPE1729 / Travaux Component 5. Contingency Single Stage - One de réhabilitation MPI Sahena IDA / 57750 Post Request for Bids Open - National 68,816.38 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope LOT 02

DRAM1TRMPE1730 / Travaux Component 5. Contingency Single Stage - One de Reconstruction CSB 2 IDA / 57750 Post Request for Bids Open - National 68,247.65 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Maroantsetra

DRAM1TRMPE1731 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructures IDA / 57750 Post Request for Bids Open - National 31,280.17 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope agricole Maroantsetra LOT 01

DRAM1TRMPE1732 / Travaux Component 5. Contingency Single Stage - One de Reconstruction CHRD2 IDA / 57750 Post Request for Bids Open - National 61,817.87 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Ambodifotatra

DRAM1TRMPE1733 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 54,998.11 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Sainte marie LOT 01

DRAM1TRMPE1734 / Travaux Component 5. Contingency Single Stage - One de Réabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 58,123.00 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical BRICKAVILLE LOT 01

DRAM1TRMPE1735 / Travaux Component 5. Contingency Single Stage - One de Reconstruction CSB2 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope BRICKAVILE

DRAM1TRMPE1736 / Travaux Component 5. Contingency Single Stage - One de Reconstruction CSB2 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope FETRAOMBY

Page 1 DRAM1TRMPE1737 / Travaux Component 5. Contingency Single Stage - One de Reconstruction CSB2 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope RANOMAINTY

DRAM1TRMPE1738 / Travaux de Reconstruction et réparation Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 98,809.10 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 infrastructure médical Emergency Response Envelope

BRICKAVILLE LOT 01

DRAM1TRMPE1739 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 29,061.50 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical FENERIVE EST LOT 01

DRAM1TRMPE1740 / Travaux de Reconstruction CSB1 Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 MAROVOVONANA Emergency Response Envelope

MAROVOVONANA

DRAM1TRMPE1741 / Travaux Component 5. Contingency Single Stage - One de Reconstruction CSB1 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Ambavala

DRAM1TRMPE1742 / Travaux Component 5. Contingency Single Stage - One de Reconstruction CSB1 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Anamborano

DRAM1TRMPE1743 / Travaux Component 5. Contingency Single Stage - One de Reconstruction CSB2 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope

DRAM1TRMPE1744 / Travaux Component 5. Contingency Single Stage - One de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 82,825.28 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope classe FENERIVE EST LOT 01

DRAM1TRMPE1745 / Travaux Component 5. Contingency Single Stage - One de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 82,825.28 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope classe FENERIVE EST LOT 02

DRAM1TRMPE1746 / Travaux Component 5. Contingency Single Stage - One de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 82,825.28 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope classe FENERIVE EST LOT 03

DRAM1TRMPE1747 / Travaux Component 5. Contingency Single Stage - One de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 82,825.28 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope classe FENERIVE EST LOT 04

DRAM1TRMPE1748 / Travaux Component 5. Contingency Single Stage - One de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 82,825.28 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope classe FENERIVE EST LOT 05

DRAM1TRMPE1749 / Travaux Component 5. Contingency Single Stage - One de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 96,629.49 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope classe FENERIVE EST LOT 06

DRAM1TRMPE1750 / Travaux Component 5. Contingency Single Stage - One de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 96,629.49 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope classe FENERIVE EST LOT 07

DRAM1TRMPE1751 / Travaux Component 5. Contingency Single Stage - One de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 90,235.96 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope classe FENERIVE EST LOT 09

DRAM1TRMPE1752 / Travaux Component 5. Contingency Single Stage - One de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 90,235.96 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope classe FENERIVE EST LOT 10

DRAM1TRMPE1753 / Travaux Component 5. Contingency Single Stage - One de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 90,235.96 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope classe FENERIVE EST LOT 11

DRAM1TRMPE1754 / Travaux Component 5. Contingency Single Stage - One de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 74,542.75 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope classe FENERIVE EST LOT 12

DRAM1TRMPE1755 / Travaux Component 5. Contingency Single Stage - One de Réhabilitation MPI IDA / 57750 Post Request for Bids Open - National 50,857.63 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Ambodifira

DRAM1TRMPE1756 / Travaux Component 5. Contingency Single Stage - One de Réhabilitation MPI IDA / 57750 Post Request for Bids Open - National 59,285.46 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Andongozabe

DRAM1TRMPE1757 / Travaux Component 5. Contingency Single Stage - One de Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 79,919.13 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Mahanoro LOT 01

DRAM1TRMPE1758 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Mahanoro LOT 01

DRAM1TRMPE1759 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Mahanoro LOT 02

DRAM1TRMPE1760 / Travaux Component 5. Contingency Single Stage - One de Réhabilitation MPI IDA / 57750 Post Request for Bids Open - National 17,436.90 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Ambinanisasika

DRAM1TRMPE1761 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 84,278.35 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Mahanoro LOT 03

DRAM1TRMPE1762 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 58,123.00 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Mahanoro LOT 04

DRAM1TRMPE1763 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Mahanoro LOT 05

DRAM1TRMPE1764 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Mahanoro LOT 06

DRAM1TRMPE1765 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Mahanoro LOT 07

DRAM1TRMPE1766 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Mahanoro LOT 08

DRAM1TRMPE1767 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Mahanoro LOT 09

DRAM1TRMPE1768 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Mahanoro LOT 10

DRAM1TRMPE1769 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 43,592.25 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Mahanoro LOT 11

DRAM1TRMPE1770 / Travaux Component 5. Contingency Single Stage - One de Reconstruction CSB2 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Fanorahana

DRAM1TRMPE1771 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructures IDA / 57750 Post Request for Bids Open - National 89,364.11 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope agricole Mananara LOT 01

DRAM1TRMPE1772 / Travaux de Reconstruction et Component 5. Contingency Single Stage - One Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 84,568.97 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical LOT 02

DRAM1TRMPE1773 / Travaux de Reconstruction et Component 5. Contingency Single Stage - One Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 95,902.95 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical Soanierana Ivongo LOT 01

DRAM1TRMPE1774 / Travaux Component 5. Contingency Single Stage - One de Réhabilitation CSB IDA / 57750 Post Request for Bids Open - National 52,310.70 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Ambohijafy

DRAM1TRMPE1775 / Travaux de Réhabilitationet réparation Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 55,216.85 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 infrastructure médical Emergency Response Envelope

TOAMASINA I et II

DRAM1TRMPE1776 / Travaux Component 5. Contingency Single Stage - One de Réhabilitation BUREAU IDA / 57750 Post Request for Bids Open - National 58,123.00 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Toamasina I

DRAM1TRMPE1777 / Travaux de Réhabilitation infrastructure Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 52,310.70 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 médical IFIRP Analankininina Emergency Response Envelope

Hopitaly Be

DRAM1TRMPE1778 / Travaux de Réparation CSB 2 Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 26,155.35 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 TANAMBAO VAHATRAKAKA Emergency Response Envelope

LOT 01

DRAM1TRMPE1779 / Travaux Component 5. Contingency Single Stage - One de Réhabilitation MPI IDA / 57750 Post Request for Bids Open - National 43,592.25 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Ambohimiadana

DRAM1TRMPE1780 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 47,951.48 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical VATOMANDRY LOT 01

DRAM1TRMPE1781 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 92,996.80 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical VATOMANDRY LOT 02

DRAM1TRMPE1782 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 82,825.28 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical VATOMANDRY LOT 03

Page 2 DRAM1TRMPE1783 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 84,278.35 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical VATOMANDRY LOT 04

DRAM1TRMPE1784 / Travaux Component 5. Contingency Single Stage - One de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical VATOMANDRY LOT 05

DRAM1TRMPE1785 / Travaux Component 5. Contingency Single Stage - One de Reconstruction CSB2 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope

DRAM1TRMPE1786 / Travaux Component 5. Contingency Single Stage - One de Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.49 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope médical LOT 01

DRAM1TRMPE1787 / Travaux Component 5. Contingency Single Stage - One de Reconstruction CSB1 IDA / 57750 Post Request for Bids Open - National 69,747.59 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Miarinarivo

DRAM1TRMPE1788 / Component 5. Contingency Single Stage - One Reconstruction CSB2 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Ambodimanga

DRAM1TRMPE1789 / Travaux de Réparation infrastructure Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 65,388.38 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 médical région atsinanana LOT Emergency Response Envelope

01

DRAM1TRMPE1790 / Travaux de Réparation infrastructure Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 95,031.11 0.00 Canceled 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 médical région atsinanana LOT Emergency Response Envelope

02

DRKM1TRMPE17002 / Travaux Component 5. Contingency Single Stage - One Pending réhabilitation barrage Ambihilava IDA / 57750 Post Request for Bids Open - National 42,737.01 0.00 2017-11-10 2017-11-12 2017-11-23 2017-11-25 2017-12-20 2018-04-29 Emergency Response Envelope Implementation -Farafangana-MAROVANDRIKA

DRKM1TRMPE17003 / Travaux Réhabilitation Bevinany, Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 42,737.01 0.00 2017-11-10 2017-11-12 2017-11-23 2017-11-25 2017-12-20 2018-04-29 Lavahandry : affaissement digue- Emergency Response Envelope Implementation

Érosion Farafangana-IABOHAZO

DRKM1TRMPE17001 / Travaux réhabilitation brèche sur digue Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 58,361.47 0.00 2017-11-10 2017-11-12 2017-11-23 2017-11-25 2017-12-20 2018-04-29 Enitravy Farafangana- Emergency Response Envelope Implementation

MAHAFASA CENTRE

DRFM1TRMPE17ATEC003 / TRAVAUX DE REHABILITATION DU PERIMETRE Component 5. Contingency Single Stage - One Pending ANDREAMALAMA - IDA / 57750 Post Request for Bids Open - National 7,215.96 0.00 2017-11-19 2017-11-23 2017-12-03 2017-12-05 2017-12-20 2019-05-19 Emergency Response Envelope Implementation COMMUNE RURALE ANDOHARANOMAITSO - DISTRICT ISANDRA

DRFM1TRMPE17ATEC004 / TRAVAUX DE REHABILITATION PERIMETRE LAMBOHAVANA- Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 14,171.85 0.00 2018-01-11 2018-01-16 2018-02-15 2018-02-19 2018-03-03 2019-07-31 COMMUNE RURALE Emergency Response Envelope Implementation

AMBALAKELY - DISTRICT LALANGINA

DRSM1TRMPE17001 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP Vohitsoa - CR IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 Emergency Response Envelope Implementation LANJARIVO -

DRSM1TRMPE17002 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP LANJARIVO - IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 Emergency Response Envelope Implementation CR LANJARIVO - ANTALAHA

DRSM1TRMPE17003 / Component 5. Contingency Single Stage - One Pending TRAVAUX : CEG LANJARIVO - IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 Emergency Response Envelope Implementation CR LANJARIVO - ANTALAHA

DRSM1TRMPE17004 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending AMBODILALONA - CR IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 Emergency Response Envelope Implementation AMBODILALONA - ANTALAHA - SAVA

DRSM1TRMPE17005 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending - CR IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 Emergency Response Envelope Implementation - ANTALAHA - SAVA

DRTM1TRMPE1701 / TRAVAUX DE REHABILITATION DU Component 5. Contingency Single Stage - One Pending PERIMETRE IRRIGUE IDA / 57750 Post Request for Bids Open - National 66,110.86 0.00 2018-02-26 2018-02-27 2018-03-09 2018-03-15 2018-03-28 2018-07-06 Emergency Response Envelope Implementation ANDRANOTAKATRA - CR - DISTR

DRTM1TRMPE1702 / TRAVAUX DE REHABILITATION DU PERIMETRE IRRIGUE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 59,749.23 0.00 2018-02-26 2018-02-27 2018-03-09 2018-03-15 2018-03-28 2018-07-06 - CR Emergency Response Envelope Implementation

AMBOHITOMPOINA - DISTR

DRTM1TRMPE1703 / TRAVAUX DE REHABILITATION DU PERIMETRE IRRIGUE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 93,427.29 0.00 2018-02-26 2018-02-27 2018-03-09 2018-03-15 2018-03-28 2018-07-06 AMBODIALA - CR Emergency Response Envelope Implementation

MANDROSOHASINA - DISTR II

DRTM1TRMPE1704 / TRAVAUX DE REHABILITATION DIGUE IMAMBA PROTECTION Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 57,827.07 0.00 2018-02-26 2018-02-27 2018-03-09 2018-03-15 2018-03-28 2018-07-06 PERIMETRE ANKOTRIKA - CR Emergency Response Envelope Implementation

TALATAMATY -

DRTM1TRMPE1705 / TRAVAUX DE REHABILITATION DU Component 5. Contingency Single Stage - One Pending PERIMETRE IRRIGUE IFASINA - IDA / 57750 Post Request for Bids Open - National 44,109.43 0.00 2018-02-26 2018-02-27 2018-03-09 2018-03-15 2018-03-28 2018-07-06 Emergency Response Envelope Implementation CR - DISTR ANTSIRABE II

DRTM1TRMPE1706 / TRAVAUX DE REHABILITATION DIGUE SISAONY PROTECTION DE PERIMETRE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 41,131.74 0.00 2018-02-26 2018-02-27 2018-03-09 2018-03-15 2018-03-28 2018-07-06 ANDREFAN'AMBOHIMANDROS Emergency Response Envelope Implementation

O - CR FENOARIVO - DISTR ANTANANARIVO ATSIMONDRANO

DRTM1TRMPE1707 / TRAVAUX DE RECONSTRUCTION OUVRAGE DE Component 5. Contingency Single Stage - One Pending FRANCHISSEMENT IDA / 57750 Post Request for Bids Open - National 66,141.29 0.00 2018-02-26 2018-02-27 2018-03-09 2018-03-15 2018-03-28 2018-07-06 Emergency Response Envelope Implementation - CR ANDRAMASINA - DISTR ANDRAMASINA

DRTM1TRMPE1708 / TRAVAUX DE REHABILITATION DU PERIMETRE IRRIGUE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 99,151.29 0.00 2018-02-26 2018-02-27 2018-03-09 2018-03-15 2018-03-28 2018-07-06 ANKERIBE ET AMBOHIDAVA - Emergency Response Envelope Implementation

CR - DISTR

DRTM1TRMPE1709 / TRAVAUX DE REHABILITATION DU PERIMETRE IRRIGUE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 9,966.25 0.00 2018-02-26 2018-02-27 2018-03-09 2018-03-15 2018-03-28 2018-06-06 - CR Emergency Response Envelope Implementation

AMBOHIMIADANA - DISTR ANDRAMASINA

DRTM1TRMPE1710 / TRAVAUX DE REHABILITATION DIGUE SISAONY PROTECTION Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 28,838.71 0.00 2018-02-26 2018-02-27 2018-03-09 2018-03-15 2018-03-28 2018-07-06 PERIMETRE AMBOHINAORINA Emergency Response Envelope Implementation

- CR FIADANANA - DISTR AMBOHIDRATRIMO

DRTM1TRMPE1711 / TRAVAUX DE REHABILITATION DU PERIMETRE IRRIGUE MORARANO ET COMBLEMENT Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 58,814.52 0.00 2018-02-26 2018-02-27 2018-03-09 2018-03-28 2018-07-06 BRECHE SUR DIGUE Emergency Response Envelope Implementation

AMBATODIDY - CR - DISTR ANTANIFOTSY

DRTM1TRMPE1712 / TRAVAUX DE REHABILITATION DU PERIMETRE IRRIGUE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 46,816.45 0.00 2018-02-26 2018-02-27 2018-03-09 2018-03-28 2018-07-06 BETAOLANA - CR Emergency Response Envelope Implementation

AMBOANANA - DISTR ARIVONIMAMO

DRTM1TRMPE1713 / TRAVAUX DE REHABILITATION DU Component 5. Contingency Single Stage - One Pending PERIMETRE IRRIGUE ANKALA IDA / 57750 Post Request for Bids Open - National 26,574.52 0.00 2018-02-26 2018-02-27 2018-03-09 2018-03-28 2018-07-06 Emergency Response Envelope Implementation - CR - DISTR SOAVINANDRIANA

DGM1TRMPE1701 / Travaux de Component 5. Contingency Single Stage - One Pending réhabilitation du secteur IV IDA / 57750 Post Request for Bids Open - National 118,085.57 0.00 2018-01-26 2018-01-30 2018-02-09 2018-02-13 2018-02-16 2018-06-19 Emergency Response Envelope Implementation d'Ambolomoty Marovoay

DGM1TRMPE1702 / Travaux de Component 5. Contingency Single Stage - One Pending réhabilitation du périmètre IDA / 57750 Post Request for Bids Open - National 59,005.31 0.00 2018-01-26 2018-01-30 2018-02-09 2018-02-13 2018-02-16 2018-06-20 Emergency Response Envelope Implementation d'Anjiajia, District d'Ambatoboeny

DGM1TRMPE1703 / Travaux de réhabilitation du périmètre Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 69,256.03 0.00 2018-01-26 2018-01-30 2018-02-09 2018-02-13 2018-02-16 2018-06-21 d'Ambalabe, CR Bekobay Emergency Response Envelope Implementation

Mahajanga II

DGM1TRMPE1704 / Travaux de réhabilitation du MPI d': Eboulement sur Component 5. Contingency Single Stage - One Pending une longueur de 500 m dans le IDA / 57750 Post Request for Bids Open - National 42,165.74 0.00 2018-02-02 2018-02-05 2018-02-15 2018-02-19 2018-02-22 2018-06-20 Emergency Response Envelope Implementation CP - Ensablement Localisation: Befandriana Nord -

DGM1TRMPE1705 / Travaux de Component 5. Contingency Single Stage - One Pending réhabilitationde Beanatsindra, CR IDA / 57750 Post Request for Bids Open - National 120,288.74 0.00 2018-02-02 2018-02-05 2018-02-15 2018-02-19 2018-02-22 2018-06-21 Emergency Response Envelope Implementation

Page 3 DGM1TRMPE1706 / Travaux de Component 5. Contingency Single Stage - One Pending réhabilitation du MPI d'Ankorefo, IDA / 57750 Post Request for Bids Open - National 13,420.16 0.00 2018-02-02 2018-02-05 2018-02-15 2018-02-19 2018-02-22 2018-06-28 Emergency Response Envelope Implementation CR Diégo II

DGM1TRMPE1707 / Travaux de Component 5. Contingency Single Stage - One Pending réhabilitation du périmètre IDA / 57750 Post Request for Bids Open - National 27,587.16 0.00 2018-02-02 2018-02-05 2018-02-15 2018-02-19 2018-02-22 2018-06-29 Emergency Response Envelope Implementation d', Diégo II

DRFM1TRMPE17ATEC002 / TRAVAUX DE REHABILITATION DU BARRAGE VOLAMENA Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 38,953.98 0.00 2017-11-19 2017-11-23 2017-12-03 2017-12-05 2017-12-20 2019-05-19 DANS LA COMMUNE RURALE Emergency Response Envelope Implementation

DE VOLAMENA - DISTRICT AMBALAVAO

DRFM1TRMPE17ATEC001 / TRAVAUX DE REHABILITATION DU BARRAGE BETSIMISOTRA - Component 5. Contingency Single Stage - One Under IDA / 57750 Post Request for Bids Open - National 93,376.90 0.00 2017-11-19 2018-02-15 2017-11-23 2017-12-03 2018-02-26 2017-12-05 2017-12-20 2019-05-19 COMMUNE RURALE Emergency Response Envelope Implementation

BETSIMISOTRA - DISTRICT FANDRIANA

DRSM1TRMPE17006 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending ANDRAMPENGY - CR IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 Emergency Response Envelope Implementation AMPAHANA - ANTALAHA - SAVA

DRSM1TRMPE17007 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending AMBODIMANGA MAHATSARA - IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 Emergency Response Envelope Implementation CR AMPAHANA - ANTALAHA - SAVA

DRSM1TRMPE17008 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP ANDAMASINA IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 Emergency Response Envelope Implementation - CR AMPAHANA - ANTALAHA

DRSM1TRMPE17009 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending - CR IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 Emergency Response Envelope Implementation AMBINANIFAHO - ANTALAHA - SAVA

DRSM1TRMPE170010 / TRAVAUX : CEG Component 5. Contingency Single Stage - One Pending AMBINANIFAHO - CR IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 Emergency Response Envelope Implementation AMBINANIFAHO - ANTALAHA - SAVA

DRSM1TRMPE170011 / TRAVAUX : CEG Component 5. Contingency Single Stage - One Pending ANDRORANGA - VR IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 Emergency Response Envelope Implementation ANDRORANGA - ANTALAHA - ANTALAHA

DRSM1TRMPE170012 / TRAVAUX : LYCEE Component 5. Contingency Single Stage - One Pending - CR IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 Emergency Response Envelope Implementation ANTAHANORO - ANTALAHA - SAVA

DRSM1TRMPE170013 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending MANGATSAHATSA - CR IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 Emergency Response Envelope Implementation LANJARIVO - ANTALAHA - SAVA

DRSM1TRMPE170014 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending ANTSOROLAVA - CR IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 Emergency Response Envelope Implementation ANTSAHANORO - ANTALAHA - SAVA

DRSM1TRMPE170015 / TRAVAUX : EPP ANTEVIALA - Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 CU ANTALAHA - ANTALAHA - Emergency Response Envelope Implementation

SAVA

DRSM1TRMPE170016 / TRAVAUX : LYCEE HORACE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 FRANCOIS - CU ANTALAHA - Emergency Response Envelope Implementation

ANTALAHA - SAVA

DRSM1TRMPE170017 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending AMBODIKAKAZO - CU IDA / 57750 Post Request for Bids Open - National 27,093.56 0.00 2018-03-25 2018-04-01 2018-04-11 2018-04-13 2018-04-28 2018-07-27 Emergency Response Envelope Implementation ANTALAHA - ANTALAHA - SAVA

DRSM1TRMPE170018 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending TSARAFANAHY - CR IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-17 2018-04-09 2018-07-18 Emergency Response Envelope Implementation - ANTALAHA - SAVA

DRSM1TRMPE170019 / TRAVAUX : CEG Component 5. Contingency Single Stage - One Pending MAROFINARITRA - CR IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-17 2018-04-09 2018-07-18 Emergency Response Envelope Implementation MAROFINARITRA - ANTALAHA - SAVA

DRSM1TRMPE170020 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending ANKAZOARINA - CR IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-17 2018-04-09 2018-07-18 Emergency Response Envelope Implementation - ANTALAHA - SAVA

DRSM1TRMPE170021 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending ANTSERASERA - CR IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-17 2018-04-09 2018-07-18 Emergency Response Envelope Implementation ANTOMBANA - ANTALAHA - SAVA

DRSM1TRMPE170022 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending LAVATSIRAKA - CR IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-17 2018-04-09 2018-07-18 Emergency Response Envelope Implementation ANTOMBANA - ANTALAHA - SAVA

DRSM1TRMPE170023 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-17 2018-04-09 2018-07-18 Emergency Response Envelope Implementation - CR ANTOMBANA - ANTALAHA

DRSM1TRMPE170024 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP ANTOMBANA - IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-17 2018-04-09 2018-07-18 Emergency Response Envelope Implementation CR ANTOMBANA - ANTALAHA

DRSM1TRMPE170025 / TRAVAUX : EPP MANAKANA - Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,570.25 0.00 2018-02-09 2018-02-14 2018-03-01 2018-03-04 2018-03-26 2018-07-04 CR AMBODIAMPANA - Emergency Response Envelope Implementation

SAMBAVA

DRSM1TRMPE170026 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,571.87 0.00 2018-02-09 2018-02-14 2018-03-01 2018-03-04 2018-03-26 2018-07-04 - CR Emergency Response Envelope Implementation

AMBODIVOARA -

DRSM1TRMPE170027 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,570.25 0.00 2018-02-09 2018-02-14 2018-03-01 2018-03-04 2018-03-26 2018-07-04 - CR Emergency Response Envelope Implementation

AMBOHIMALAZA - SAMBAVA

DRSM1TRMPE170028 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending AMBODISAMBALAHY - CR IDA / 57750 Post Request for Bids Open - National 27,570.25 0.00 2018-02-09 2018-02-14 2018-03-01 2018-03-03 2018-03-26 2018-07-04 Emergency Response Envelope Implementation - SAMBAVA

DRSM1TRMPE170029 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending ANJOMBALAVA - CR IDA / 57750 Post Request for Bids Open - National 27,570.25 0.00 2018-02-09 2018-02-14 2018-03-01 2018-03-03 2018-03-26 2018-07-04 Emergency Response Envelope Implementation ANJANGOVERATRA - SAMBAVA

DRSM1TRMPE170030 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,570.90 0.00 2018-02-09 2018-02-14 2018-03-01 2018-03-03 2018-03-26 2018-07-04 - CR ANJINJAOMBY - Emergency Response Envelope Implementation

SAMBAVA

DRSM1TRMPE170031 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP IDA / 57750 Post Request for Bids Open - National 27,570.90 0.00 2018-02-09 2018-02-14 2018-03-01 2018-03-04 2018-03-26 2018-07-04 Emergency Response Envelope Implementation - CR FARAHALANA - SAMBAVA

DRAM1TRMPE18001 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 43,587.10 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-22 2018-06-30 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP TENINA

DRAM1TRMPE18002 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 12,789.44 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-22 2018-06-30 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EC TAMPOLO

DRAM1TRMPE18003 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 26,125.36 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP SAHANDRANO

DRAM1TRMPE18004 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 22,776.97 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-22 2018-06-30 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP

DRAM1TRMPE18005 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 23,851.92 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-22 2018-06-30 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP VODIVOHITRA

DRAM1TRMPE18006 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 22,903.23 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP MAROGISA

DRAM1TRMPE18007 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 59,711.71 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP SOANIERANA

DRAM1TRMPE18008 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 48,387.10 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP MANGABE

Page 4 DRAM1TRMPE18009 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 66,320.71 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB1 RANTOHELY

DRAM1TRMPE18010 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 67,741.94 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB1 SAHATANY

DRAM1TRMPE18011 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 67,741.94 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2

DRAM1TRMPE18012 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 67,741.94 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION LOGEMENT CHEF CSB

DRAM1TRMPE18013 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 24,606.31 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-22 2018-06-30 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION BSD MAROANTSETRA

DRAM1TRMPE18014 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 31,165.63 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP ANDROKAROKA

DRAM1TRMPE18015 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 214,871.58 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION CHRD2 MAROANTSETRA

DRAM1TRMPE18016 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 67,741.94 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 VOLOINA

DRAM1TRMPE18017 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 54,383.23 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CEG

DRAM1TRMPE18018 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 21,979.68 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP AMBINANITELO

DRAM1TRMPE18019 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 50,153.55 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP AMBODIARAMY

DRAM1TRMPE18020 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 47,741.94 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-26 2018-07-08 Emergency Response Envelope Implementation CTION CEG COMMUNAUTAIRE AMBODIARAMY

DRAM1TRMPE18021 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 29,170.00 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-15 2018-06-23 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP MAROVAKA

DRAM1TRMPE18022 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 33,199.68 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-22 2018-06-30 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP AMBODIVOANGY

DRAM1TRMPE18023 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 67,128.39 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION CSB1 MAROVOVONANA CR AMBINANITELO

DRAM1TRMPE18024 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 30,186.13 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP MADIOTSIFAFANA

DRAM1TRMPE18025 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 48,912.26 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CEG

DRAM1TRMPE18026 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 24,803.32 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 ANJANAZANA

DRAM1TRMPE18027 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,829.45 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2

DRAM1TRMPE18028 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 21,936.46 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-22 2018-06-30 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP MAHARANINA

DRAM1TRMPE18029 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 31,432.37 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2

DRAM1TRMPE18030 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 14,865.81 0.00 2018-02-18 2018-02-20 2018-03-02 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CTION CSB1 TANAMBAO AMPANO

DRAM1TRMPE18031 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 79,326.32 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP

DRAM1TRMPE18032 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 66,105.27 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CEG ANTAKOTAKO

DRAM1TRMPE18033 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 30,849.13 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP ANKADIBE

DRAM1TRMPE18034 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 26,442.11 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP AMPOAFAMBOAY

DRAM1TRMPE18035 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 30,849.13 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP SAHAVARY

DRAM1TRMPE18036 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 26,442.11 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP MAROFOTOTRA

DRAM1TRMPE18037 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 26,442.11 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP SAHAMBATRA

DRAM1TRMPE18038 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 26,442.11 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP SAHAMELOKA

DRAM1TRMPE18039 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 30,849.13 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP SAKATIHINA

DRAM1TRMPE18040 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 66,801.11 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB1 SAKATIHINA

DRAM1TRMPE18041 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 66,801.11 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 AMBODIMANGA

DRAM1TRMPE18042 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 37,575.63 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CTION LOGEMENT SDSP MAROANTSETRA

DRAM1TRMPE18043 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 66,105.27 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION LYCEE ANJAHANA

DRAM1TRMPE18044 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 26,442.11 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP MANAMBIA

DRAM1TRMPE18045 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 8,018.49 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION EPP ANKAZOMANDROKO

DRAM1TRMPE18046 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 15,914.39 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP IVONTAKA

DRAM1TRMPE18047 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 7,957.20 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CEG ANOVE

Page 5 DRAM1TRMPE18048 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 7,957.20 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CEG

DRAM1TRMPE18049 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 11,935.79 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EC ANKOFABE

DRAM1TRMPE18050 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 7,957.20 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CEG

DRAM1TRMPE18051 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 7,957.20 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP

DRAM1TRMPE18052 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 7,515.13 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP ANTSIRADRANO

DRAM1TRMPE18053 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 7,515.13 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP MAFAIPOZA

DRAM1TRMPE18054 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 7,515.13 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP AMBODIRANO

DRAM1TRMPE18055 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 7,515.13 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP TANAMBAO

DRAM1TRMPE18056 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 7,515.13 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP

DRAM1TRMPE18057 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 7,515.13 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP ANJAHAMARINA II

DRAM1TRMPE18058 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 7,515.13 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP NANDRAHANANA

DRAM1TRMPE18059 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 11,272.69 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CEG

DRAM1TRMPE18060 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 7,515.13 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CEG MANAMBOLO

DRAM1TRMPE18061 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 11,272.69 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP SAHABOSINY

DRAM1TRMPE18062 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 7,515.13 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-06-24 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP MANAMBOLO

DRAM1TRMPE18063 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 11,272.69 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CTION EPP SAHAJINJA AMPANO

DRAM1TRMPE18064 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 11,272.69 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CEG AMBODIMANGA

DRAM1TRMPE18065 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 11,272.69 0.00 2018-02-22 2018-02-24 2018-03-06 2018-04-06 2018-07-15 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CEG ANDRANOFOTSY

DRAM1TRMPE18066 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 11,272.69 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP ANDRANOFOTSY

DRAM1TRMPE18067 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 7,515.13 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP MATSOTARIHINA

DRAM1TRMPE18068 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 66,801.11 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CTION LOGEMENT DRSP ANALANJIROFO

DRAM1TRMPE18069 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 30,617.18 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CTION MPI MAROANTSETRA - ANJAHANA

DRAM1TRMPE18070 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 50,564.20 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 Emergency Response Envelope Implementation CTION CHRD2 AMBODIFOTATRA

DRAM1TRMPE18071 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 26,678.65 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 AGNIRIBE

DRAM1TRMPE18072 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,949.68 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION BSD AMBODIFOTATRA

DRAM1TRMPE18073 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 6,451.62 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 BRICKAVILE

DRAM1TRMPE18074 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 48,387.10 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 RANOMAINTY

DRAM1TRMPE18075 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 38,709.68 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 AMBINANINONY

DRAM1TRMPE18076 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 68,269.27 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB1 AMBILAMAINA

DRAM1TRMPE18077 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 38,709.68 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 FANANDRANA

DRAM1TRMPE18078 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 30,617.18 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION MPI TANAMBAO TSIAZONTENY

DRAM1TRMPE18079 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 30,617.18 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION MPI IANAKONITRA

DRAM1TRMPE18080 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 28,445.53 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB1 AMBODIARA I

DRAM1TRMPE18081 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 28,445.53 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 AMBODIBONARA

DRAM1TRMPE18082 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 30,617.18 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION MPI TANAMBAO RANOMAFANA

DRAM1TRMPE18083 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 30,617.18 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION MPI ANGOJA

DRAM1TRMPE18084 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 48,387.10 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION CSB1 MAROVOVONANA CR MAROVOVONANA

DRAM1TRMPE18085 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 44,261.30 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CEG

DRAM1TRMPE18086 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 83,458.07 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-05 2018-06-13 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CEG SAHAVOLA

Page 6 DRAM1TRMPE18087 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 24,516.13 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 AMBODIMANGA I

DRAM1TRMPE18088 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 38,709.68 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB1 ANKORABE

DRAM1TRMPE18089 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 38,709.68 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION LOGEMENT ADJOINT TECHNIQUE

DRAM1TRMPE18090 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 23,077.42 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 AMPASINA

DRAM1TRMPE18091 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 106,961.30 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 Emergency Response Envelope Implementation CTION CEG

DRAM1TRMPE18092 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 34,225.81 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP ANTSARA

DRAM1TRMPE18093 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 32,016.13 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CTION CEG

DRAM1TRMPE18094 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 34,893.55 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP AMBODIATAFANA

DRAM1TRMPE18095 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 34,477.42 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP BENAVONY

DRAM1TRMPE18096 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 35,138.71 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP

DRAM1TRMPE18097 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 40,522.59 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP FOTSIALANANA

DRAM1TRMPE18098 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 28,093.55 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP AMPASIMPOTSY

DRAM1TRMPE18099 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 28,390.33 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP SAHAVOLA

DRAM1TRMPE18100 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 38,709.68 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION LYCEE AMPASIMBE MANANTSATRANA

DRAM1TRMPE18101 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 40,196.78 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION LYCEE FENERIVE EST

DRAM1TRMPE18102 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 34,264.52 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP AMPASIMBOLA

DRAM1TRMPE18103 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 35,277.42 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP AMBOHIMALAZA

DRAM1TRMPE18104 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 33,203.23 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP SAHAFITARINA

DRAM1TRMPE18105 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 33,864.52 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP

DRAM1TRMPE18106 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 33,116.13 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION LYCEE VOHILENGO

DRAM1TRMPE18107 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 21,138.71 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CEG VOHILENGO

DRAM1TRMPE18108 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 35,148.39 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP VOHILAZA

DRAM1TRMPE18109 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 38,709.68 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP SAHAVARY

DRAM1TRMPE18110 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 36,406.46 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CEG MAHANORO

DRAM1TRMPE18111 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 38,709.68 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CEG

DRAM1TRMPE18112 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 15,360.59 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP ANJAHAMARINA

DRAM1TRMPE18113 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 19,200.74 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CEG

DRAM1TRMPE18114 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 9,677.42 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP SALAFAINA

DRAM1TRMPE18115 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 35,138.71 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP AMBONIVATO

DRAM1TRMPE18116 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 31,793.55 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION EPP VOHITRAMBO

DRAM1TRMPE18117 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,580.65 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION MPI AMBODIFIRA

DRAM1TRMPE18118 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 61,935.49 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION MPI SAHAVAVIANA

DRAM1TRMPE18119 / TRAVAUX DE REHABILITATION/RECONSTRU Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 36,381.67 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 CTION CHRD 2 MAHANORO Emergency Response Envelope Implementation bâtiment labo, dentisterie, pédiatrie Mahanoro

DRAM1TRMPE18120 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 11,162.26 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CTION CHRD 2 MAHANORO Cuisine Mahanoro

DRAM1TRMPE18121 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 36,936.48 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CTION CHRD 2 MAHANORO bâtiment Maternité Mahanoro

DRAM1TRMPE18122 / TRAVAUX DE REHABILITATION/RECONSTRU Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 26,569.68 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 CTION CHRD 2 MAHANORO Emergency Response Envelope Implementation bâtiment annexe hospitalisation Mahanoro

DRAM1TRMPE18123 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 16,251.34 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 SMI MAHANORO

DRAM1TRMPE18124 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 44,941.67 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 Emergency Response Envelope Implementation CTION CHRD 2 MAHANORO bâtiment Médecine

Page 7 DRAM1TRMPE18125 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 25,687.10 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 Emergency Response Envelope Implementation CTION ANNEXE BSD MAHANORO

DRAM1TRMPE18126 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 32,066.78 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CTION CSB1 ANDRANAMBOMARO

DRAM1TRMPE18127 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 16,894.20 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 BETSIZARAINA

DRAM1TRMPE18128 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 20,377.10 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB1 AMPASIMBOLA

DRAM1TRMPE18129 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 25,806.46 0.00 2018-02-26 2018-02-28 2018-03-10 2018-04-10 2018-10-07 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSMI TANAMBAO 2

DRAM1TRMPE18130 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 25,806.46 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION CSB2 DEPOT ANALAKININA

DRAM1TRMPE18131 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 30,619.65 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION CSB2 TANAMBAO VERRERIE

DRAM1TRMPE18132 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 31,463.75 0.00 2018-02-26 2018-02-28 2018-03-10 2018-04-02 2018-07-11 Emergency Response Envelope Implementation CTION DISPENSAIRE URBAIN TANAMBAO I TOAMASINA

DRAM1TRMPE18133 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 31,160.24 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION CSB2 LAZARET CR TOAMASINA SUBURBAINE

DRAM1TRMPE18134 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 45,340.33 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 MASOMELOKA

DRAM1TRMPE18135 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,960.33 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB1 MANAKANA

DRAM1TRMPE18136 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 15,556.46 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-03-25 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB1 SAHATELO

DRAM1TRMPE18137 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 28,462.59 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB1 NAMIRANA

DRAM1TRMPE18138 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION CSB URBAIN VATOMANDRY

DRAM1TRMPE18139 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION CHRD2 VATOMANDRY MATERNITE

DRAM1TRMPE18140 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION CSB2 AMPASIMBE ONIBE

DRAM1TRMPE18141 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 ANDONDABE

DRAM1TRMPE18142 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 AMBODILAZANA

DRAM1TRMPE18143 / TRAVAUX DE REHABILITATION/RECONSTRU Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 CTION CHRD 2 VATOMANDRY Emergency Response Envelope Implementation

Salle de soins, gynécologie- obstétrique

DRAM1TRMPE18144 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION CHRD 2 VATOMANDRY Annexe Médecine

DRAM1TRMPE18145 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION CHRD 2 VATOMANDRY Annexe Chirurgie

DRAM1TRMPE18146 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 37,806.13 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 AMBODIHARINA

DRAM1TRMPE18147 / TRAVAUX DE REHABILITATION/RECONSTRU Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 CTION CHRD 2 VATOMANDRY Emergency Response Envelope Implementation

Salle d'hospitalisation Génécologie

DRAM1TRMPE18148 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION CHRD 2 VATOMANDRY Pédiatrie

DRAM1TRMPE18149 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB 1 MANAMBONITRA

DRAM1TRMPE18150 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION CHRD 2 VATOMANDRY Salle acupuncture

DRAM1TRMPE18151 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 45,516.13 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 FANORAHANA

DRAM1TRMPE18152 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 22,390.33 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CTION MPI AMBATOFITARAFANA

DRAM1TRMPE18153 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 41,483.88 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 RANTABE

DRAM1TRMPE18154 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 41,483.88 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 MORONIVO

DRAM1TRMPE18155 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 15,593.55 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CTION LOGEMENT CHEF CSB AMBODIAMPANA

DRAM1TRMPE18156 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 38,311.19 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 MANAKATAFANA

DRAM1TRMPE18157 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 38,709.68 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB1 AMBOHIJAFY

DRAM1TRMPE18158 / CSB2 Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 34,134.64 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 SAHAMBALA Emergency Response Envelope Implementation

DRAM1TRMPE18159 / TRAVAUX DE REHABILITATION/RECONSTRU Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 64,516.13 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 CTION BUREAU HOPITALY BE Emergency Response Envelope Implementation et autres bâtiments(IFIRP) ANALANKININA

DRAM1TRMPE18160 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 30,645.17 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB 2 ANKIRIHIRY

DRAM1TRMPE18161 / TRAVAUX DE REHABILITATION/RECONSTRU Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 30,617.18 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 CTION MPI Emergency Response Envelope Implementation

ANDRORANGAMBO/ANALALA MBANA/ FIRARAZANA

Page 8 DRAM1TRMPE18162 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 22,170.97 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 SAHAMATEVINA

DRAM1TRMPE18163 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 23,683.88 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 ANOSIMANASA

DRAM1TRMPE18164 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 26,412.91 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 AMBODITAVOLO

DRAM1TRMPE18165 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 25,003.23 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 NIHERENANA

DRAM1TRMPE18166 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 25,129.04 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 AMBALAVOLO

DRAM1TRMPE18167 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 60,100.00 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CTION CSB2 ANTANAMBAO MAHATSARA

DRAM1TRMPE18168 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 30,645.17 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 IFASINA I

DRAM1TRMPE18169 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION CSB 2 ILAKA EST Bâtiment Maternité

DRAM1TRMPE18170 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 36,983.88 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION BSD VATOMANDRY

DRAM1TRMPE18171 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 20,296.78 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 MAINTINANDRY

DRAM1TRMPE18172 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 26,461.30 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CTION CSB2 AMBODIVOANANTO

DRAM1TRMPE18173 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 20,767.75 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 AMPASIMADINIKA

DRAM1TRMPE18174 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-04-29 2018-08-07 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB 2 TSIVANGIANA

DRAM1TRMPE18175 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION CHRD 2 BRICKAVILLE Bâtiment Médecine et pédiatrie

DRAM1TRMPE18176 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2

DRAM1TRMPE18177 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB1 VAVAZAHANA

DRAM1TRMPE18178 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB1

DRAM1TRMPE18179 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 MAROFINARITRA

DRAM1TRMPE18180 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRC Emergency Response Envelope Implementation

SB2

DRAM1TRMPE18181 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 50,064.52 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 TANAMARINA

DRAM1TRMPE18182 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 29,032.26 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB2 ANJAHAMBE

DRAM1TRMPE18183 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 34,205.62 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB1

DRAM1TRMPE18184 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 37,096.78 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION CHD 1 TANAMBAO MANAMPOTSY

DRAM1TRMPE18185 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 121,637.99 0.00 2018-02-22 2018-02-24 2018-03-06 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CTION BSD TOAMASINA II ET BSD TOAMASIN I

DRAM1TRMPE18186 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 22,264.52 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION PHAGDIS

DRAM1TRMPE18187 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 25,600.00 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 REHABILITATION/RECONSTRU Emergency Response Envelope Implementation

CTION CSB1 TANAMBAO I

DRAM1TRMPE18188 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 28,970.97 0.00 2018-02-11 2018-02-13 2018-02-23 2018-03-15 2018-06-23 Emergency Response Envelope Implementation CTION LOGEMENT SSD MAHANORO

DRAM1TRMPE18189 / TRAVAUX DE Component 5. Contingency Single Stage - One Pending REHABILITATION/RECONSTRU IDA / 57750 Post Request for Bids Open - National 37,096.78 0.00 2018-02-26 2018-02-28 2018-03-10 2018-03-30 2018-07-08 Emergency Response Envelope Implementation CTION BSD TANAMBAO MANAMPOTSY

DRSM1TRMPE180032 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,570.90 0.00 2018-02-09 2018-02-14 2018-03-01 2018-03-04 2018-03-26 2018-07-04 MASOVARIAKA - CR Emergency Response Envelope Implementation

FARAHALANA - SAMBAVA

DRSM1TRMPE180033 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,570.90 0.00 2018-02-09 2018-02-14 2018-03-01 2018-03-04 2018-03-26 2018-07-04 LOKOHO - CR MAROAMBIHY - Emergency Response Envelope Implementation

SAMBAVA

DRSM1TRMPE180034 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP ANDAMPY - IDA / 57750 Post Request for Bids Open - National 27,570.90 0.00 2018-02-09 2018-02-14 2018-03-01 2018-03-04 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CR - SAMBAVA

DRSM1TRMPE180035 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP NOSIVOLO - IDA / 57750 Post Request for Bids Open - National 27,570.90 0.00 2018-02-09 2018-02-14 2018-03-01 2018-03-04 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CR NOSIARINA - SAMBAVA

DRSM1TRMPE180036 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP ANDAMOTY - IDA / 57750 Post Request for Bids Open - National 27,570.90 0.00 2018-02-09 2018-02-14 2018-03-01 2018-03-04 2018-03-26 2018-07-04 Emergency Response Envelope Implementation CU SAMBAVA - SAMBAVA

DRSM1TRMPE180037 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP ANTANIFOTSY IDA / 57750 Post Request for Bids Open - National 27,570.90 0.00 2018-02-09 2018-02-14 2018-03-01 2018-03-04 2018-03-26 2018-07-04 Emergency Response Envelope Implementation - CU SAMBAVA - SAMBAVA

DRSM1TRMPE180038 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,570.90 0.00 2018-02-09 2018-02-14 2018-03-01 2018-03-04 2018-03-26 2018-07-04 AMBATOFITATRA - CU Emergency Response Envelope Implementation

SAMBAVA - SAMBAVA

DRSM1TRMPE180039 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,554.61 0.00 2018-02-09 2018-02-14 2018-03-01 2018-03-04 2018-03-26 2018-07-04 AMBARIOMIHAMBANA - CU Emergency Response Envelope Implementation

SAMBAVA - SAMBAVA

DRSM1TRMPE180040 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP ANKIJABE - IDA / 57750 Post Request for Bids Open - National 27,425.19 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 Emergency Response Envelope Implementation CR - VOHEMAR

DRSM1TRMPE180041 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP IDA / 57750 Post Request for Bids Open - National 27,425.19 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 Emergency Response Envelope Implementation - CR FANAMBANA - VOHEMAR

DRSM1TRMPE180042 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,425.19 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 ANTSAHATOPY - CR Emergency Response Envelope Implementation

FANAMBANA - VOHEMAR

DRSM1TRMPE180043 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,425.19 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 AMBONY - CR FANAMBANA - Emergency Response Envelope Implementation

VOHEMAR

Page 9 DRSM1TRMPE180044 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP BELINTA - CR IDA / 57750 Post Request for Bids Open - National 27,425.19 0.00 2018-02-26 2018-02-28 2018-03-15 2018-03-26 2018-04-09 2018-07-18 Emergency Response Envelope Implementation - VOHEMAR

DRSM1TRMPE180045 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP MAINTIALAKA IDA / 57750 Post Request for Bids Open - National 27,425.19 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 Emergency Response Envelope Implementation - CR AMPONDRA - VOHEMAR

DRSM1TRMPE180046 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP ANDILANA - IDA / 57750 Post Request for Bids Open - National 27,425.19 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 Emergency Response Envelope Implementation CR AMPONDRA - VOHEMAR

DRSM1TRMPE180047 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP MANAMBERY IDA / 57750 Post Request for Bids Open - National 27,425.19 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 Emergency Response Envelope Implementation - CR AMPONDRA - VOHEMAR

DRSM1TRMPE180048 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,425.19 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 AMPIZAMATANA - CR Emergency Response Envelope Implementation

AMPONDRA - VOHEMAR

DRSM1TRMPE180049 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,425.19 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 AVARATRA - CR Emergency Response Envelope Implementation

AMPANEFENA - VOHEMAR

DRSM1TRMPE180050 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,425.19 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 MANASAMODY - CR Emergency Response Envelope Implementation

ANTSIRABE NORD - VOHEMAR

DRSM1TRMPE180051 / Component 5. Contingency Single Stage - One Pending TRAVAUX : CEG ANTOMBANA - IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 Emergency Response Envelope Implementation CR ANTOMBANA - ANTALAHA

DRSM1TRMPE180052 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 ANDONGOZABE - CR Emergency Response Envelope Implementation

SAHANTAHA - ANTALAHA

DRSM1TRMPE180053 / Component 5. Contingency Single Stage - One Pending TRAVAUX : CEG SAHANTAHA - IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 Emergency Response Envelope Implementation CR SAHANTAHA - ANTALAHA

DRSM1TRMPE180054 / Component 5. Contingency Single Stage - One Pending TRAVAUX : EPP MORAFENO - IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 Emergency Response Envelope Implementation CR - ANTALAHA

DRSM1TRMPE180055 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 AMBODIVOANGIBE - CR Emergency Response Envelope Implementation

AMPOHIBE - ANTALAHA

DRSM1TRMPE180056 / TRAVAUX : CEG Component 5. Contingency Single Stage - One Pending - CR IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 Emergency Response Envelope Implementation AMBOHITRALANANA - ANTALAHA

DRSM1TRMPE180057 / Component 5. Contingency Single Stage - One Pending TRAVAUX : CEG AMBALABE - IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 Emergency Response Envelope Implementation CR AMBALABE - ANTALAHA

DRSM1TRMPE180058 / TRAVAUX : EPP RUE DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 MARSEILLE- CU ANTALAHA - Emergency Response Envelope Implementation

ANTALAHA

DRSM1TRMPE180059 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 AMBATOMITRAKA - CU Emergency Response Envelope Implementation

ANTALAHA - ANTALAHA

DRSM1TRMPE180060 / TRAVAUX : EPP Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,303.82 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 AMBONDRONA - CU Emergency Response Envelope Implementation

ANTALAHA - ANTALAHA

DRSM1TRMPE180061 / TRAVAUX : CSB I Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 72,146.13 0.00 2018-02-10 2018-02-16 2018-03-03 2018-03-05 2018-03-28 2018-07-06 ANDRAMPENGY - CR Emergency Response Envelope Implementation

ANDRAMPENGY - ANTALAHA

DRSM1TRMPE180062 / TRAVAUX : CSB 2 Component 5. Contingency Single Stage - One Pending AMBODIAMPANA LOKOHO - IDA / 57750 Post Request for Bids Open - National 72,128.08 0.00 2018-02-10 2018-02-16 2018-03-03 2018-03-05 2018-03-28 2018-07-06 Emergency Response Envelope Implementation CR AMBODIAMPANA - SAMBAVA

DRSM1TRMPE180063 / TRAVAUX : CSB 1 Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 72,130.00 0.00 2018-02-10 2018-02-16 2018-03-03 2018-03-05 2018-03-28 2018-07-06 AMBATOJOBY - CR Emergency Response Envelope Implementation

AMBATOJOBY - SAMBAVA

DRSM1TRMPE180064 / TRAVAUX : CSB 2 Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 72,162.26 0.00 2018-02-10 2018-02-16 2018-03-03 2018-03-05 2018-03-28 2018-07-06 FARAHALANA - CR Emergency Response Envelope Implementation

FARAHALANA - SAMBAVA

DRSM1TRMPE180065 / Component 5. Contingency Single Stage - One Pending TRAVAUX : CSB 2 AMPAHANA IDA / 57750 Post Request for Bids Open - National 72,152.58 0.00 2018-02-10 2018-02-16 2018-03-03 2018-03-05 2018-03-28 2018-07-06 Emergency Response Envelope Implementation - CR AMPAHANA - ANTALAHA

DRSM1TRMPE180066 / Component 5. Contingency Single Stage - One Pending TRAVAUX : CSB 2 NOSIARINA - IDA / 57750 Post Request for Bids Open - National 44,054.35 0.00 2018-02-10 2018-02-16 2018-03-03 2018-03-05 2018-03-28 2018-07-06 Emergency Response Envelope Implementation CR NOSIARINA - SAMBAVA

DRSM1TRMPE180067 / TRAVAUX : CHRD 2 Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 36,179.65 0.00 2018-02-10 2018-02-16 2018-03-03 2018-03-05 2018-03-28 2018-07-06 AMBONDRONA - CU Emergency Response Envelope Implementation

ANTALAHA - ANTALAHA

DRSM1TRMPE180068 / TRAVAUX : MPI Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 5,580.81 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 ANTSAMBALAHIBE - CR Emergency Response Envelope Implementation

AMPANEFENA - VOHEMAR

DRSM1TRMPE180069 / TRAVAUX : TUERIE DE Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 59,380.00 0.00 2018-02-21 2018-02-28 2018-03-15 2018-03-18 2018-04-09 2018-07-18 SAMBAVA - CU SAMBAVA - Emergency Response Envelope Implementation

SAMBAVA

GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

MG-UGP CASEF-8681-GO-RFQ / F6-16/CN: Fournitures de matériels informatiques (laptops, desktops, imprimantes, Component 4. Project Request for Single Stage - One IDA / 57750 Post Limited 88,400.00 73,813.11 Signed 2017-04-24 2017-05-12 2017-05-26 2017-07-17 2017-06-09 scanners, etc.) et de kits Management and Coordination Quotations Envelope autonome de capture d'humidité, pour (UGP) pour central, Foncier, cellules régionales, etc.

MG-UGP CASEF-12803-GO-UN / F1-16/CN-F2-16/CN: Fournitures de 33 Motos pour les services de protection des végétaux, les services fonciers, Component 4. Project IDA / 57750 Prior UN Agencies (Direct) Direct 703,000.00 389,691.47 Signed 2017-02-10 2017-04-13 2017-02-13 2017-04-13 2017-03-17 2017-03-17 2017-05-31 cellules régionales, Management and Coordination correspondants, UGP et de 09 véhicules tout terrain pour la mise en Suvre des activités par CCRF, les cellules régionales

MG-UGP CASEF-16559-GO- RFQ / F 2-17/C2.2 Fournitures Component 2. Support to Land de mobiliers de bureau pour 11 Request for Single Stage - One Pending IDA / 57750 Policy and Land Rights Post Limited 51,075.00 0.00 2017-06-14 2017-07-27 2017-09-10 Services fonciers régionaux pour Quotations Envelope Implementation Registration fiabilisation du PLOF et pour 20 CRIF et GF standards

MG-UGP CASEF-16576-GO- RFB / F 7-17/CN: Fournitures de matériels bureautiques Component 4. Project Single Stage - One Pending (photocopieuses/Duplicopieurs, IDA / 57750 Post Request for Bids Open - National 50,200.00 0.00 2017-06-06 2017-06-13 2017-07-13 2017-07-27 2017-08-16 2017-09-15 Management and Coordination Envelope Implementation vidéoprojecteurs, etc.) pour central, foncier et cellules régionales

MG-UGP CASEF-16587-GO- RFQ / F 8-17/CN: Fournitures de divers matériels de communication et d'audiovisuels Component 4. Project Request for Single Stage - One Pending IDA / 57750 Post Limited 28,350.00 0.00 2017-06-14 2017-07-23 2017-08-22 (appareils photos professionnels, Management and Coordination Quotations Envelope Implementation dictaphones, smartphone, etc.) pour central et cellules régionales

MG-UGP CASEF-16592-GO- RFQ / F 12-17/CN: Fourniture de divers matériels de bureau: calculatrice, machine pour reliure, agrafeuse géante, Component 4. Project Request for Single Stage - One Pending perforateur GM, massicot, IDA / 57750 Post Limited 41,250.00 0.00 2017-06-13 2017-07-21 2017-08-21 Management and Coordination Quotations Envelope Implementation supports pour flipchart avec accessoires complets et tableaux mous muraux pour affichage (usage atelier) avec supports de

MG-UGP CASEF-13419-GO- RFQ / F10-17/CN: Fournitures de mobiliers de bureau (antennes Itasy-Analanjirofo- F/D,CER Régionales, UGP, DPPI, etc.) et Component 4. Project Request for Single Stage - One IDA / 57750 Post Limited 86,600.00 39,792.67 Signed 2017-05-02 2017-05-18 2017-06-27 2017-07-24 2017-12-24 fourniture de mobiliers en bois Management and Coordination Quotations Envelope dur du pays (armoires vitrés pour exposition, cadres photos A4 - A3, cadres posters/cartes thématiques)

MG-UGP CASEF-16684-GO- RFQ / F 13-17/CN: Fournitures Component 4. Project Request for Single Stage - One Pending ménagères: Bouilloires, machine IDA / 57750 Post Limited 2,000.00 0.00 2017-06-13 2017-07-21 2017-08-21 Management and Coordination Quotations Envelope Implementation à café, verres, etc. (UGP, CER régionales et DPPI)

Page 10 MG-UGP CASEF-16686-GO- RFQ / F 17-17/CN Fourniture et Component 4. Project Request for Single Stage - One Pending installation des équipements IDA / 57750 Post Limited 17,000.00 0.00 2017-06-23 2017-08-01 2017-09-01 Management and Coordination Quotations Envelope Implementation complets pour visio-conférence (UGP/MPAE)

MG-UGP CASEF-16717-GO- RFQ / F 16-16/CN: Fournitures de fournitures de bureau, de Component 4. Project Request for Single Stage - One produits d'entretien et diverses IDA / 57750 Post Limited 33,500.00 3,676.30 Signed 2017-08-21 2017-10-30 2017-09-29 2017-11-21 2017-10-30 Management and Coordination Quotations Envelope fournitures, de consommables informatiques,etc. (UGP, CER Régionales, DPPI)

MG-UGP CASEF-24129-GO- RFB / F 2-17/C1.1: Fourniture Component 1. Agribusiness Single Stage - One IDA / 57750 Post Request for Bids Open - National 50,000.00 19,235.25 Signed 2017-08-21 2017-10-06 2017-08-26 2017-09-25 2017-11-10 2017-10-13 2017-12-05 2017-10-23 2017-12-19 2017-11-22 d'Equipements du laboratoire de Value Chain Development Envelope la DPAL

MG-UGP CASEF-24452-GO- RFB / F 3-17/C1.1: Fourniture Component 1. Agribusiness Single Stage - One IDA / 57750 Post Request for Bids Open - National 102,900.00 11,551.18 Signed 2017-08-21 2017-10-21 2017-08-26 2017-09-25 2017-11-21 2017-10-13 2017-11-28 2017-10-23 2017-12-29 2017-11-22 d'Equipements du laboratoire de Value Chain Development Envelope la DPV

DGM1FRNS1704 / Acquisition Component 5. Contingency Single Stage - One Under IDA / 57750 Post Request for Bids Open - National 52,185.71 0.00 2017-09-11 2018-03-01 2017-09-11 2017-09-21 2017-09-26 2017-09-29 2017-11-13 tentes pour CSB Emergency Response Envelope Implementation

DGM1FRNS1705 / Marchés multiples: Acquisition des Component 5. Contingency Request for Single Stage - One IDA / 57750 Post Limited 33,696.74 25,081.03 Completed 2017-09-05 2017-06-13 2017-09-23 2017-09-14 2017-09-30 2017-10-03 matériels informatiques pour le Emergency Response Quotations Envelope personnel

DGM1FRNS1706 / Marchés Component 5. Contingency Request for Single Stage - One multiples: Acquisition mobiliers IDA / 57750 Post Limited 10,931.87 9,428.21 Completed 2017-09-05 2017-09-13 2017-09-23 2017-10-10 2017-09-30 2017-10-20 Emergency Response Quotations Envelope de bureau pour le personnel

DGM1FRNS1703 / Acquisition Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 53,140.67 50,393.30 Completed 2017-09-11 2018-01-08 2017-09-11 2017-09-21 2018-02-13 2017-09-26 2018-02-28 2017-09-29 2018-03-22 2017-11-13 2018-03-23 mobiliers pour CSB Emergency Response Envelope

DGM1FRNS1701 / Acquisition Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 464,996.01 446,025.56 Completed 2017-09-11 2017-12-13 2017-09-11 2017-09-21 2018-01-16 2017-09-26 2018-02-20 2017-09-29 2018-03-27 2017-12-28 2018-03-27 équipement médical pour CSB Emergency Response Envelope

DGM1FRNS1702 / Acquisition Component 5. Contingency Single Stage - One matériels informatiques pour IDA / 57750 Post Request for Bids Open - National 42,159.80 37,098.95 Completed 2017-09-08 2018-01-15 2017-09-11 2017-09-21 2018-02-19 2017-09-26 2018-03-16 2017-09-29 2018-03-27 2017-11-13 2018-04-28 Emergency Response Envelope CSB

MG-UGP CASEF-16557-GO- RFB / F 1-16/C2.2 Fournitures matériels informatiques pour 11 Component 2. Support to Land Single Stage - One Under Services fonciers régionaux pour IDA / 57750 Policy and Land Rights Post Request for Bids Open - National 257,325.00 0.00 2017-10-28 2017-12-19 2018-02-17 Envelope Implementation la fiabilisation du PLOF et pour Registration 20 CRIF et GF standards pour la gestion des certificats fonciers

MG-UGP CASEF-33031-GO- Component 2. Support to Land RFQ / F2-17/C2.2 Fournitures et Request for Single Stage - One Pending IDA / 57750 Policy and Land Rights Post Limited 60,000.00 0.00 2017-11-20 2018-01-15 2018-07-14 consommables pour le traitement Quotations Envelope Implementation Registration et l'édition de certificats fonciers

MG-UGP CASEF-38757-GO- RFB / F1-16/C1.1 Fourniture Component 1. Agribusiness Single Stage - One Under d'équipement pour le laboratoire IDA / 57750 Prior Request for Bids Open - International 1,200,000.00 0.00 2017-12-13 2018-03-11 2017-12-27 2018-03-16 2018-02-12 2018-03-29 2018-05-04 2018-09-01 Value Chain Development Envelope Implementation de l'Institut Pasteur de Madagascar (IPM) - relance

MG-UGP CASEF-13414-GO- RFB / F1-16/C1.1 Fourniture Component 1. Agribusiness Single Stage - One équipement de laboratoire de IDA / 57750 Prior Request for Bids Open - International 900,000.00 0.00 Canceled 2017-01-10 2017-05-12 2017-01-23 2017-03-09 2017-03-09 2017-05-06 2017-05-25 2017-08-17 Value Chain Development Envelope l'Institut Pasteur de Madagascar (IPM)

MG-UGP CASEF-60806-GO- Component 2. Support to Land RFQ / F01-18/C2.1: Edition et Request for Single Stage - One Pending IDA / 57750 Policy and Land Rights Post Limited 15,000.00 0.00 2018-05-18 2018-07-01 2019-03-28 reproduction de supports de Quotations Envelope Implementation Registration formations pour le foncier

MG-UGP CASEF-60807-GO- RFQ / F03-18/C2.2: Acquisition Component 2. Support to Land Request for Single Stage - One Pending des fournitures et consommables IDA / 57750 Policy and Land Rights Post Limited 60,000.00 0.00 2018-05-28 2018-07-12 2019-02-07 Quotations Envelope Implementation pour le traitement et édition des Registration certificats fonciers

MG-UGP CASEF-60808-GO- RFQ / F04-18/C2.2 Acquisition Component 2. Support to Land des matériels informatiques pour Request for Single Stage - One Pending IDA / 57750 Policy and Land Rights Post Limited 180,000.00 0.00 2018-05-28 2018-07-12 2019-02-07 la fiabilisation du PLOF et pour Quotations Envelope Implementation Registration les CRIF (scanners, photocopieuses, ect...)

MG-UGP CASEF-60810-GO- Component 2. Support to Land RFB / F05-18/C2.2: Acquisition Single Stage - One Pending IDA / 57750 Policy and Land Rights Post Request for Bids Open - International 700,000.00 0.00 2018-06-14 2018-06-19 2018-08-03 2018-09-02 2018-10-23 2019-01-21 d'images satellitaires pour Envelope Implementation Registration l'élaboration des PLOFs

MG-UGP CASEF-16591-GO-DIR Component 4. Project Pending / F 9-17/CN: Fourniture de IDA / 57750 Prior Direct Selection Direct 14,000.00 0.00 2018-06-09 2018-06-14 2018-07-25 2018-08-24 Management and Coordination Implementation Logiciel TOM2PRO

NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

MG-UGP CASEF-16562-NC- Component 2. Support to Land RFQ / F 1-16/C2.1 Edition et Request for Single Stage - One IDA / 57750 Policy and Land Rights Post Limited 25,000.00 12,181.40 Signed 2017-06-09 2017-07-18 2017-07-18 2017-08-04 2017-08-17 reproduction de supports de Quotations Envelope Registration formations pour le foncier

MG-UGP CASEF-16560-NC- RFQ / F 3-17/CN: Service de transit pour dédouanement Component 4. Project Request for Single Stage - One IDA / 57750 Post Limited 37,000.00 8,560.45 Signed 2017-06-09 2017-07-05 2017-07-18 2017-07-28 2017-09-16 matériels roulants et service de Management and Coordination Quotations Envelope mise en circulation du véhicule et moto

MG-UGP CASEF-16630-NC- RFQ / F 4-17/CN: Création, Component 4. Project Request for Single Stage - One IDA / 57750 Post Limited 15,000.00 1,325.87 Signed 2017-07-10 2017-10-20 2017-08-21 2017-11-08 2017-09-20 maintenance et mise à jour de Management and Coordination Quotations Envelope site web pour le projet CASEF

DGM1PRLOC1701 / Location Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 100,001.89 0.00 Canceled 2017-09-08 2017-09-08 2017-09-18 2017-09-23 2017-09-26 2017-10-17 véhicules Emergency Response Envelope

DGM1PRLOC1702 / Location Component 5. Contingency Single Stage - One IDA / 57750 Post Request for Bids Open - National 1,903.95 0.00 Canceled 2017-09-08 2017-09-08 2017-09-18 2017-09-23 2017-09-26 2017-10-17 motos Emergency Response Envelope

DGM1PRLOC1701M / Component 5. Contingency Request for Single Stage - One Under IDA / 57750 Post Limited 100,001.89 0.00 2018-01-26 2018-01-26 2018-02-12 2018-08-11 LOCATION VEHICULES Emergency Response Quotations Envelope Implementation

CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

MG-UGP CASEF-13206-CS- QCBS / C1-16/C2.2 Appui aux GF et CRIF pour la délivrance des certificats fonciers, Component 2. Support to Land opérations de recensement et de Quality And Cost- Under IDA / 57750 Policy and Land Rights Prior Open - International 4,393,100.00 0.00 2017-02-25 2017-05-10 2017-03-11 2017-05-11 2017-05-12 2017-06-12 2017-06-27 2017-07-21 2017-08-21 2018-08-21 certification, inventaire du Based Selection Implementation Registration domaine privé titré au nom de l'Etat,impression et diffusion du PLOF, appui aux SAC (schéma d'aménagements communaux)

MG-UGP CASEF-16594-CS- QBS / C 1-17/C1 et 3: Component 1. Agribusiness Quality Based Under Assistance technique à l'appui IDA / 57750 Prior Open - International 2,800,000.00 0.00 2017-06-09 2017-07-26 2017-06-20 2017-08-09 2017-07-19 2018-03-01 2017-09-24 2017-10-09 2017-11-07 2017-11-23 2021-05-21 Value Chain Development Selection Implementation aux chaines de valeurs agricoles sur la côte Est

MG-UGP CASEF-16622-CS- QBS / C 2-17/C1 et 3 Assistance Component 1. Agribusiness Quality Based Under technique à l'appui aux chaines IDA / 57750 Prior Open - International 6,400,000.00 0.00 2017-06-09 2017-07-26 2017-06-20 2017-08-09 2017-07-19 2018-03-16 2017-09-25 2017-10-10 2017-11-08 2017-11-24 2021-05-22 Value Chain Development Selection Implementation de valeurs agricoles sur les Hautes terres

MG-UGP CASEF-20504-CS- QBS / C1-16/C2.2: Appui aux Guichets Fonciers et CRIFs pour délivrance certificats fonciers, Component 2. Support to Land opérations recensement et Quality Based Under IDA / 57750 Policy and Land Rights Prior Open - International 8,400,000.00 0.00 2017-02-25 2017-09-06 2017-03-11 2017-09-18 2017-07-31 2017-10-19 2017-09-29 2017-12-05 2017-10-19 2018-03-07 2017-11-21 2017-11-28 2021-03-31 certification, inventaire domaine Selection Implementation Registration privé titré au nom de l'Etat, impression et diffusion PLOF, appui aux SAC (schéma d'aménagements communaux)

MG-UGP CASEF-24079-CS- CQS / FOR 03-17/C1.1: Consultant Component 1. Agribusiness Pending Formations locales pour IDA / 57750 Post Qualification Open - National 20,000.00 0.00 2017-08-14 2017-08-28 2017-09-28 2017-11-13 2017-11-17 2017-12-17 Value Chain Development Implementation renforcement de capacités des Selection agents de la DPAL

DRAM1CFATEC1701 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency IDA / 57750 Post Qualification Open - National 58,568.30 58,965.70 Completed 2017-09-05 2016-11-18 2017-09-07 2017-09-20 2017-10-13 2017-10-01 2017-11-09 2017-10-16 2017-11-28 2018-06-16 2017-11-29 RECONSTRUCTION ET Emergency Response Selection REHABILITATION DES INFRASTRUCTURES DE BASE MAROANTSETRA LOT 01

DRAM1CFATEC1702 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency IDA / 57750 Post Qualification Open - National 58,146.44 45,112.55 Completed 2017-09-05 2016-11-18 2017-09-07 2017-09-20 2017-11-03 2017-10-01 2017-11-17 2017-10-16 2017-11-29 2018-06-16 2017-11-29 RECONSTRUCTION ET Emergency Response Selection REHABILITATION DES INFRASTRUCTURES DE BASE MAROANTSETRA LOT 02

DRAM1CFATEC1703 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency IDA / 57750 Post Qualification Open - National 58,779.23 40,791.80 Completed 2017-09-05 2016-11-18 2017-09-07 2017-09-20 2017-10-19 2017-10-01 2017-11-27 2017-10-16 2017-12-11 2018-06-16 2017-12-11 RECONSTRUCTION ET Emergency Response Selection REHABILITATION DES INFRASTRUCTURES DE BASE MAROANTSETRA LOT 03

Page 11 DRAM1CFATEC1704 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency IDA / 57750 Post Qualification Open - National 54,068.45 99,965.90 Completed 2017-09-05 2016-11-18 2017-09-07 2017-09-20 2017-11-23 2017-10-01 2017-12-15 2017-10-16 2017-12-22 2018-06-16 2017-12-22 RECONSTRUCTION ET Emergency Response Selection REHABILITATION DES INFRASTRUCTURES DE BASE MAROANTSETRA LOT 04

DRAM1CFATEC1705 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency IDA / 57750 Post Qualification Open - National 15,929.45 6,928.54 Completed 2017-09-05 2016-11-18 2017-09-07 2017-09-20 2017-10-19 2017-10-01 2017-11-07 2017-10-16 2017-11-20 2018-06-16 2017-11-20 RECONSTRUCTION ET Emergency Response Selection REHABILITATION DES INFRASTRUCTURES DE BASE SAINTE MARIE LOT 01

DRAM1CFATEC1706 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency IDA / 57750 Post Qualification Open - National 27,561.55 29,696.85 Completed 2017-09-05 2016-11-18 2017-09-07 2017-09-20 2017-10-19 2017-10-01 2017-11-27 2017-10-16 2017-12-15 2018-06-16 2017-12-15 RECONSTRUCTION ET Emergency Response Selection REHABILITATION DES INFRASTRUCTURES DE BASE BRICKAVILLE LOT 01

DRAM1CFATEC1707 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency IDA / 57750 Post Qualification Open - National 48,123.34 20,173.20 Completed 2017-09-05 2016-11-18 2017-09-07 2017-09-20 2017-10-19 2017-10-01 2017-11-08 2017-10-16 2017-11-28 2018-06-16 2017-11-28 RECONSTRUCTION ET Emergency Response Selection REHABILITATION DES INFRASTRUCTURES DE BASE FENERIVE EST LOT 01

DRAM1CFATEC1708 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency IDA / 57750 Post Qualification Open - National 55,057.48 70,736.10 Completed 2017-09-05 2016-11-18 2017-09-07 2017-09-20 2017-10-19 2017-10-01 2017-11-08 2017-10-16 2017-12-11 2018-06-16 2017-12-11 RECONSTRUCTION ET Emergency Response Selection REHABILITATION DES INFRASTRUCTURES DE BASE FENERIVE EST LOT 02

DRAM1CFATEC1709 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency IDA / 57750 Post Qualification Open - National 37,733.08 43,384.79 Completed 2017-09-05 2016-11-18 2017-09-07 2017-09-20 2017-10-19 2017-10-01 2017-11-03 2017-10-16 2017-12-11 2018-06-16 2017-12-11 RECONSTRUCTION ET Emergency Response Selection REHABILITATION DES INFRASTRUCTURES DE BASE MAHANORO LOT 01

DRAM1CFATEC1710 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency IDA / 57750 Post Qualification Open - National 41,342.33 44,654.43 Completed 2017-09-05 2016-11-18 2017-09-07 2017-09-20 2017-11-24 2017-10-01 2017-12-19 2017-10-16 2017-12-22 2018-06-16 2017-12-22 RECONSTRUCTION ET Emergency Response Selection REHABILITATION DES INFRASTRUCTURES DE BASE MAHANORO LOT 02

DRAM1CFATEC1711 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR LES TRAVAUX DE Consultant Component 5. Contingency RECONSTRUCTION ET IDA / 57750 Post Qualification Open - National 25,560.06 18,903.49 Completed 2017-09-05 2017-10-18 2017-09-07 2017-09-20 2017-11-03 2017-10-01 2017-11-17 2017-10-16 2017-11-30 2018-06-16 2017-11-30 Emergency Response REHABILITATION DES Selection INFRASTRUCTURES DE BASE MANANARA/SOENIERANA IVONGO LOT 01

DRAM1CFATEC1712 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency IDA / 57750 Post Qualification Open - National 16,405.69 6,096.50 Completed 2017-09-05 2017-12-08 2017-09-07 2017-09-20 2017-12-21 2017-10-01 2018-01-04 2017-10-16 2018-01-15 2018-06-16 2018-01-15 RECONSTRUCTION ET Emergency Response Selection REHABILITATION DES INFRASTRUCTURES DE BASE TOAMASINA LOT 01

DRAM1CFATEC1713 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency IDA / 57750 Post Qualification Open - National 34,998.80 35,109.78 Completed 2017-09-05 2017-10-17 2017-09-07 2017-09-20 2017-10-31 2017-10-01 2017-11-15 2017-10-16 2017-11-28 2018-06-16 2017-11-28 RECONSTRUCTION ET Emergency Response Selection REHABILITATION DES INFRASTRUCTURES DE BASE VATOMANDRY LOT 01

DRAM1CFATEC1714 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency IDA / 57750 Post Qualification Open - National 17,061.91 22,104.69 Completed 2017-09-05 2017-10-04 2017-09-07 2017-09-20 2017-10-19 2017-10-01 2017-11-03 2017-10-16 2017-12-04 2018-06-16 2017-12-04 RECONSTRUCTION ET Emergency Response Selection REHABILITATION DES INFRASTRUCTURES DE BASE VAVATENINA LOT 01

DRAM1CFATEC1715 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency IDA / 57750 Post Qualification Open - National 12,074.58 27,046.06 Signed 2017-09-05 2017-10-05 2017-09-07 2017-09-20 2017-10-19 2017-10-01 2017-11-02 2017-10-16 2017-11-14 2018-06-16 2017-11-14 RECONSTRUCTION ET Emergency Response Selection REHABILITATION DES INFRASTRUCTURES DE BASE ATSINANANA LOT 01

DGM1CFMO1701 / Maîtrise d'oeuvre des travaux de réhabilitation du MPI Consultant Beanatsindra: Canal principal Component 5. Contingency IDA / 57750 Post Qualification Open - National 14,999.48 0.00 Canceled 2017-09-10 2017-09-10 2017-09-15 2017-10-04 2017-10-24 2018-06-19 ensablé sur 3km et canal de 15m Emergency Response Selection détruit, canal 2km- Endommagé - Localisation: Bealanana - Ambatosia

DRKM1CFMO17001 / Maitrise d'Suvre réhabilitation brèche sur Component 5. Contingency Pending IDA / 57750 Post Least Cost Selection Open - National 4,136.38 0.00 2017-09-12 2017-09-12 2017-09-12 2017-09-27 2017-09-28 2017-09-30 2017-10-22 2018-03-29 digue Enitravy Farafangana- Emergency Response Implementation

MAHAFASA CENTRE

DGM1CFMO1703 / Maîtrise Consultant d'oeuvre des travaux de Component 5. Contingency IDA / 57750 Post Qualification Open - National 5,624.81 0.00 Canceled 2017-09-10 2017-09-10 2017-09-16 2017-10-04 2017-10-24 2018-06-19 réhabilitation de l'abattoir - Emergency Response Selection Localisation AMBILOBE

DRKM1CFMO17002 / Maitrise d'Suvre réhabilitation barrage Component 5. Contingency Pending IDA / 57750 Post Least Cost Selection Open - National 4,136.38 0.00 2017-09-12 2017-09-12 2017-09-12 2017-09-27 2017-09-28 2017-09-30 2017-10-22 2018-03-29 Ambihilava -Farafangana- Emergency Response Implementation

MAROVANDRIKA

DGM1CFMO1702 / Maîtrsie d'oeuvre des travaux de Consultant Component 5. Contingency réhabilitation du MPI au secteur IDA / 57750 Post Qualification Open - National 14,587.00 0.00 Canceled 2017-09-10 2017-09-10 2017-09-15 2017-10-04 2017-10-24 2018-06-19 Emergency Response 4: brèches de 120 m - Selection Localisation: Marovoay

DGM1CFMO1704 / Maîtrise d'oeuvre des travaux de réhabilitation du MPI Ambarijeby: Consultant Component 5. Contingency Eboulement sur une longueur de IDA / 57750 Post Qualification Open - National 5,624.81 0.00 Canceled 2017-09-10 2017-09-10 2017-09-16 2017-10-04 2017-10-24 2018-02-24 Emergency Response 500m dans CP - Ensablement Selection Localisation: Befandriana Nord - Antsakanalabe

DGM1CFMO1705 / Maîtrise d'oeuvre des travaux de Consultant Component 5. Contingency réhabilitation du MPI au secteur IDA / 57750 Post Qualification Open - National 3,374.88 0.00 Canceled 2017-09-10 2017-09-10 2017-09-16 2017-10-04 2017-10-24 2018-06-19 Emergency Response 11: brêches, rehaussement Selection berge - Localisation: Marovoay

DGM1CFMO1706 / Maîtrsie d'oeuvre des travaux de réhabilitation du MPI Consultant d'Antsakoabe: murette 55m, Component 5. Contingency IDA / 57750 Post Qualification Open - National 2,662.41 0.00 Canceled 2017-09-10 2017-09-10 2017-09-16 2017-10-04 2017-10-24 2018-06-19 canal Antsahalalina: murette Emergency Response Selection 35m, canal Anjavibe: murette 20m - Localisation: II - Antsakoabe

DRKM1CFMO17003 / Maitrise d'Suvre Réhabilitation Bevinany, Component 5. Contingency Pending IDA / 57750 Post Least Cost Selection Open - National 4,136.38 0.00 2017-09-12 2017-09-12 2017-09-12 2017-09-27 2017-09-28 2017-09-30 2017-10-22 2018-03-29 Lavahandry : affaissement digue- Emergency Response Implementation

Érosion Farafangana-IABOHAZO

MG-UGP CASEF-33027-CS- QCBS / C1-17/C3.1 Etude de Component 3. Support to génie civil, études d'impact Quality And Cost- Pending IDA / 57750 Marketing Infrastructure Post Open - National 294,000.00 0.00 2017-10-31 2017-11-14 2017-11-29 2017-12-29 2018-01-08 2018-01-28 2018-02-12 2019-07-12 environnemental, contrôle et Based Selection Implementation Development and Maintenance surveillance sur les pistes identifiées de la côte Est

MG-UGP CASEF-33029-CS- QCBS / C3-17/C1.3 Étude, Component 3. Support to contrôle et surveillance sur les Quality And Cost- Under IDA / 57750 Marketing Infrastructure Post Open - National 240,000.00 0.00 2017-10-30 2017-11-13 2017-12-03 2018-01-02 2018-01-12 2018-02-05 2018-02-20 2019-07-20 travaux de réhabilitation et/ou de Based Selection Implementation Development and Maintenance construction des ouvrages de franchissement dans la côte Est

DRFM1CFMO17003 / MAITRISE D'OEUVRE DE LA RAHBILITATION DE LA Component 5. Contingency Quality And Cost- PERIMETRE ANDREAMALAMA IDA / 57750 Post Open - National 4,746.95 17,984.15 Signed 2017-09-05 2017-11-14 2017-09-06 2017-09-13 2017-11-16 2017-10-03 2017-11-30 2017-10-04 2017-11-30 2017-10-07 2017-11-30 2017-10-11 2017-12-08 2018-10-11 Emergency Response Based Selection - COMMUNE RURALE ANDOHARANOMAITSO - DISTRICT ISANDRA

DRFM1CFMO17004 / MAITRISE D'OEUVRE POUR LE TRAVAUX DE REHABILITATION Component 5. Contingency Quality And Cost- PERIMETRE LAMBOHAVANA - IDA / 57750 Post Open - National 4,614.86 17,984.15 Signed 2017-11-19 2017-11-14 2017-11-20 2017-11-24 2017-11-16 2017-12-09 2017-11-30 2017-12-10 2017-11-30 2017-12-13 2017-11-30 2017-12-16 2017-12-08 2018-12-16 Emergency Response Based Selection COMMUNE RURALE AMBALAKELY - DISTRICT LALANGINA

MG-UGP CASEF-33028-CS- QCBS / C2-4-17/C3: Etude de génie civil, études d'impact Component 3. Support to environnemental, contrôle et Quality And Cost- Pending IDA / 57750 Marketing Infrastructure Post Open - National 436,000.00 0.00 2017-12-20 2017-12-20 2018-01-09 2018-02-08 2018-02-18 2018-03-04 2018-03-10 2019-08-07 surveillance sur les pistes et Based Selection Implementation Development and Maintenance ponts identifiées des hautes terres ( 2 activités combinées : piste et pont)

Page 12 DRSM1CFATEC17001 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE DES INFRASTRUCTURES SCOLAIRES - CR Lanjarivo : 04 écoles Component 5. Contingency Pending IDA / 57750 Post Least Cost Selection Open - National 44,079.68 0.00 2017-09-17 2017-09-17 2017-09-17 2017-10-02 2017-10-03 2017-10-05 2017-10-26 2018-06-30 - CR Ampahana : 04 écoles Emergency Response Implementation

- CR Ambinanifaho : 02 écoles - CR Androranga : 01 école - CR Antsahanoro : 03 écoles - CU Antalaha : 03 écoles DISTRICT ANTALAHA -

DRSM1CFATEC17002 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE DES INFRASCOLAIRES - CR Marofinaritra : 02 écoles - CR Antombana : 06 écoles Component 5. Contingency Pending IDA / 57750 Post Least Cost Selection Open - National 40,505.24 0.00 2017-09-17 2017-09-17 2017-09-17 2017-10-02 2017-10-03 2017-10-05 2017-10-26 2018-06-30 - CR Sahantaha : 02 écoles Emergency Response Implementation

- CR Ampohibe : 02 écoles - CR Ambohitralanana : 01 école - CR Ambalabe : 01 école - CU Antalaha : 03 ANTALAHA

DRSM1CFATEC17003 / AMOD DES INFRASTRUCTURES SCOLAIRES - CR Ambodiampana : 01 - CR Ambodivoara : 01 - CR Ambohimalaza : 01 Component 5. Contingency Pending - CR Anjangoveratra : 02 IDA / 57750 Post Least Cost Selection Open - National 31,751.61 0.00 2017-09-29 2017-09-29 2017-09-29 2017-10-16 2017-10-17 2017-10-19 2017-11-08 2018-06-30 Emergency Response Implementation - CR Anjinjaomby : 01 - CR Farahalana : 02 - CR Maroambihy : 01 - CR Nosiharina : 02 - CU Sambava : 04 DISTRICT SAMBAVA

DRSM1CFATEC17005 / AMOD DES INFRASTRUCTURES SANITAIRES : - CSB 1 Andrampengy - ANTALAHA - CSB2 Ampahana - ANTALAHA - CHRD2 FKT Ambondrona - Component 5. Contingency Pending IDA / 57750 Post Least Cost Selection Open - National 19,906.13 0.00 2017-09-29 2017-09-29 2017-09-29 2017-10-16 2017-10-17 2017-10-19 2017-11-08 2018-06-30 ANTALAHA Emergency Response Implementation

- CSB 2 Ambodiampana Lokoho - SAMBAVA - CSB 1 Ambatojoby - SAMBAVA - CSB 2 Farahalana - SAMBAVA - CSB 2 Nosiarina -SAMBAVA

DRSM1CFMO17004 / MAITRISE D'RUVRE DES INFRASTRUCTURES SCOLAIRES - CR Fanambana : 04 écoles Component 5. Contingency Pending - CR Ampondra : 05 écoles IDA / 57750 Post Least Cost Selection Open - National 32,516.13 0.00 2017-12-21 2017-12-21 2017-12-21 2018-01-05 2018-01-05 2018-01-08 2018-01-15 2018-06-30 Emergency Response Implementation - CR Ampanefena Avaratra : 01 école - CR : 01 école DISTRICT VOHEMAR - REGION SAVA

DRSM1CFMO17006 / MAITRISE D'OEUVRE DES TRAVAUX DE REHABILITATION DES INFRASTRUCUTRES PRODUCTIVES et AGRICOLES : Component 5. Contingency Pending IDA / 57750 Post Least Cost Selection Open - National 6,967.74 0.00 2017-12-21 2017-12-21 2017-12-21 2018-01-05 2018-01-05 2018-01-08 2018-01-15 2018-06-30 - TUERIE DE SAMBAVA - CU Emergency Response Implementation

SAMBAVA - DISTRICT SAMBAVA - MPI ANTSAMBALAHIBE - CR AMPANEFENA - DISTRICT VOHEMAR

DRTM1CFMO17001 / MAITRISE D'OEUVRE DE Consultant REHABILITATION DU Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 6,663.87 0.00 2017-12-19 2017-12-19 2017-12-22 2018-01-05 2018-01-09 2018-07-06 PERIMETRE IRRIGUE Emergency Response Implementation Selection ANDRANOTAKATRA - CR SOAVINA - DISTR BETAFO

DRTM1CFMO17002 / MAITRISE D'RUVRE DE REHABILITATION Consultant DU PERIMETRE IRRIGUE Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 5,914.84 0.00 2017-12-19 2017-12-19 2017-12-22 2018-01-05 2018-01-09 2018-07-06 ANDOHARANOFOTSY - CR Emergency Response Implementation Selection - DISTR ANTANIFOTSY

DRTM1CFMO17003 / MAITRISE D'RUVRE DE REHABILITATION Consultant DU PERIMETRE IRRIGUE Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 9,336.77 0.00 2017-12-19 2017-12-19 2017-12-22 2018-01-05 2018-01-09 2018-07-06 AMBODIALA - CR Emergency Response Implementation Selection - DISTR ANTSIRABE II

DRTM1CFMO17004 / MAITRISE D'OEUVRE DE REHABILITATION DIGUE Consultant Component 5. Contingency Pending IMAMBA PROTECTION IDA / 57750 Post Qualification Open - National 5,760.00 0.00 2017-12-19 2017-12-19 2017-12-22 2018-01-05 2018-01-09 2018-07-06 Emergency Response Implementation PERIMETRE ANKOTRIKA - CR Selection TALATAMATY - AMBOHIDRATRIMO

DRTM1CFMO17005 / MAITRISE D'OEUVRE DE Consultant REHABILITATION DU Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 4,544.52 0.00 2017-12-19 2017-12-19 2017-12-22 2018-01-05 2018-01-09 2018-07-06 PERIMETRE IRRIGUE IFASINA - Emergency Response Implementation Selection CR AMBOHIDRANANDRIANA - DISTR ANTSIRABE II

DRTM1CFMO17006 / MAITRISE D'OEUVRE DE REHABILITATION DIGUE SISAONY PROTECTION DE Consultant Component 5. Contingency Pending PERIMETRE IDA / 57750 Post Qualification Open - National 4,014.19 0.00 2017-12-19 2017-12-19 2017-12-22 2018-01-05 2018-01-09 2018-07-06 Emergency Response Implementation ANDREFAN'AMBOHIMANDROS Selection O - CR FENOARIVO - DISTR ANTANANARIVO ATSIMONDRANO

DRTM1CFMO17007 / MAITRISE D'OEUVRE DE RECONSTRUCTION OUVRAGE Consultant Component 5. Contingency Pending DE FRANCHISSEMENT IDA / 57750 Post Qualification Open - National 6,646.45 0.00 2017-12-19 2017-12-19 2017-12-22 2018-01-05 2018-01-09 2018-07-06 Emergency Response Implementation ANDRAMASINA - CR Selection ANDRAMASINA - DISTR ANDRAMASINA

DRTM1CFMO17008 / MAITRISE D'OEUVRE DE REHABILITATION DU Consultant Component 5. Contingency Pending PERIMETRE IRRIGUE IDA / 57750 Post Qualification Open - National 9,994.84 0.00 2017-12-19 2017-12-19 2017-12-22 2018-01-05 2018-01-09 2018-07-06 Emergency Response Implementation ANKERIBE ET AMBOHIDAVA - Selection CR AMBOHIMANDRY - DISTR ARIVONIMAMO

DRTM1CFMO17009 / MAITRISE D'OEUVRE DE REHABILITATION DU Consultant Component 5. Contingency Pending PERIMETRE IRRIGUE IDA / 57750 Post Qualification Open - National 2,341.94 0.00 2017-12-19 2017-12-19 2017-12-22 2018-01-05 2018-01-09 2018-07-06 Emergency Response Implementation MANANDONA - CR Selection AMBOHIMIADANA - DISTR ANDRAMASINA

DRTM1CFMO17010 / MAITRISE D'OEUVRE DE REHABILITATION DIGUE Consultant Component 5. Contingency Pending SISAONY PROTECTION IDA / 57750 Post Qualification Open - National 2,814.19 0.00 2017-12-19 2017-12-19 2017-12-22 2018-01-05 2018-01-09 2018-07-06 Emergency Response Implementation PERIMETRE AMBOHINAORINA Selection - CR FIADANANA - DISTR AMBOHIDRATRIMO

DRTM1CFMO17011 / MAITRISE D'OEUVRE DE REHABILITATION DU PERIMETRE IRRIGUE Consultant Component 5. Contingency Pending MORARANO ET COMBLEMENT IDA / 57750 Post Qualification Open - National 5,883.87 0.00 2017-12-19 2017-12-19 2017-12-22 2018-01-05 2018-01-09 2018-07-06 Emergency Response Implementation BRECHE SUR DIGUE Selection AMBATODIDY - CR ANJAMANGA - DISTR ANTANIFOTSY

DRTM1CFMO17012 / MAITRISE D'OEUVRE DE REHABILITATION DU Consultant Component 5. Contingency Pending PERIMETRE IRRIGUE IDA / 57750 Post Qualification Open - National 4,529.03 0.00 2017-12-19 2017-12-19 2017-12-22 2018-01-05 2018-01-09 2018-07-06 Emergency Response Implementation BETAOLANA - CR Selection - DISTR ARIVONIMAMO

DRTM1CFMO17013 / MAITRISE D'OEUVRE DE Consultant REHABILITATION DU Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 2,674.84 0.00 2017-12-19 2017-12-19 2017-12-22 2018-01-05 2018-01-09 2018-07-06 PERIMETRE IRRIGUE ANKALA Emergency Response Implementation Selection - CR SOAVINANDRIANA - DISTR SOAVINANDRIANA

DRFM1CFMO17001 / MAITRISE D'OEUVRE DE LA REHABILITATION DU BARRAGE Component 5. Contingency Quality And Cost- IDA / 57750 Post Open - National 4,557.03 17,984.15 Completed 2017-09-05 2017-11-14 2017-09-07 2017-09-13 2017-11-16 2017-10-03 2017-11-30 2017-10-04 2017-11-30 2017-10-07 2017-11-30 2017-10-11 2017-12-08 2018-10-11 2017-12-08 BETSIMISOTRA - COMMUNE Emergency Response Based Selection

RURALE BETSIMISOTRA - DISTRICT FANDRIANA

DRFM1CFMO17002 / MAITRISE D'OEUVRE DE LA REHABILITATION DE BARRAGE Component 5. Contingency Quality And Cost- IDA / 57750 Post Open - National 4,851.47 17,984.15 Signed 2017-09-05 2017-11-16 2017-09-07 2017-09-13 2017-11-16 2017-10-03 2017-11-30 2017-10-04 2017-11-30 2017-10-07 2017-11-30 2017-10-11 2017-12-08 2018-10-11 VOLAMENA - COMMUNE Emergency Response Based Selection

RURALE VOLAMENA -DISTRICT AMBALAVAO

DGM1CFMO1701M / Component 5. Contingency Under RÉHABILITATION DU SECTEUR IDA / 57750 Post Least Cost Selection Open - National 3,472.43 0.00 2018-01-26 2017-11-03 2018-01-26 2018-01-26 2017-11-06 2018-02-05 2017-11-21 2018-02-08 2018-02-15 2018-02-20 2018-06-20 Emergency Response Implementation IV D'AMBOLOMOTY

DGM1CFMO1702M / Component 5. Contingency Under RÉHABILITATION DU IDA / 57750 Post Least Cost Selection Open - National 3,494.69 0.00 2018-01-26 2017-11-03 2018-01-26 2018-01-26 2017-11-06 2018-02-05 2017-11-21 2018-02-09 2018-02-15 2018-02-16 2018-06-16 Emergency Response Implementation PÉRIMÈTRE D'ANJIAJIA

DGM1CFMO1703M / Component 5. Contingency Under RÉHABILITATION DU IDA / 57750 Post Least Cost Selection Open - National 3,374.21 0.00 2018-01-26 2017-11-03 2018-01-26 2018-01-26 2017-11-06 2018-02-05 2017-11-21 2018-02-08 2018-02-15 2018-02-16 2018-06-16 Emergency Response Implementation PÉRIMÈTRE D'AMBALABE

DGM1CFMO1704M / Component 5. Contingency Quality And Cost- Pending RÉHABILITATION DU IDA / 57750 Post Open - National 4,707.26 0.00 2018-01-26 2018-01-26 2018-01-26 2018-02-05 2018-02-08 2018-02-15 2018-02-16 2018-06-16 Emergency Response Based Selection Implementation PÉRIMÈTRE D'AMBARIJEBY

Page 13 DGM1CFMO1705M / RÉHABILITATION DU Component 5. Contingency Quality And Cost- Pending IDA / 57750 Post Open - National 4,707.26 0.00 2018-01-26 2018-01-26 2018-01-26 2018-02-05 2018-02-08 2018-02-15 2018-02-16 2018-06-16 PÉRIMÈTRE DE Emergency Response Based Selection Implementation

BEANATSINDRA

DGM1CFMO1706M / Component 5. Contingency Quality And Cost- Pending RÉHABILITATION DU IDA / 57750 Post Open - National 5,329.84 0.00 2018-01-26 2018-01-26 2018-01-26 2018-02-05 2018-02-08 2018-02-15 2018-02-16 2018-06-16 Emergency Response Based Selection Implementation PÉRIMÈTRE D'ANKOREFO

DGM1CFMO1707M / Component 5. Contingency Quality And Cost- Pending RÉHABILITATION DU IDA / 57750 Post Open - National 5,329.84 0.00 2018-01-26 2018-01-26 2018-01-26 2018-02-05 2018-02-08 2018-02-15 2018-02-16 2018-06-16 Emergency Response Based Selection Implementation PÉRIMÈTRE D'ANKARONGANA

DRSM1CFMO1801 / RELANCE MAITRE D'OUVRAGE DELEGUE DES INFRASTRUCTURES SCOLAIRES - CR Lanjarivo : 05 écoles Component 5. Contingency Pending IDA / 57750 Post Least Cost Selection Open - National 39,671.71 0.00 2018-02-11 2018-02-11 2018-02-16 2018-02-26 2018-02-26 2018-03-01 2018-03-12 2018-07-27 - CR Ampahana : 04 écoles Emergency Response Implementation

- CR Ambinanifaho : 02 écoles - CR Androranga : 01 école - CR Antsahanoro : 02 écoles - CU Antalaha : 03 écoles DISTRICT ANTALAHA - SAVA

MG-UGP CASEF-60831-CS- Consultant CQS / C03-18/C4.1: Conception Component 4. Project Pending IDA / 57750 Post Qualification Open - National 33,000.00 0.00 2018-05-31 2018-06-10 2018-06-28 2018-08-17 2018-08-19 2018-09-18 et production d'outils de Management and Coordination Implementation Selection communication

MG-UGP CASEF-60836-CS- Consultant CQS / C10-18/C4.2: Evaluation Component 4. Project Pending IDA / 57750 Post Qualification Open - National 30,000.00 0.00 2018-05-15 2018-05-25 2018-06-12 2018-08-01 2018-08-03 2018-12-11 environnementale et sociale Management and Coordination Implementation Selection stratégiques

MG-UGP CASEF-60900-CS- QBS / C23-18/C2.2: Assistance Component 1. Agribusiness Quality Based Pending technique à l'appui aux chaines IDA / 57750 Post Open - National 400,000.00 0.00 2018-05-21 2018-05-25 2018-06-18 2018-07-18 2018-07-28 2018-08-05 2018-08-17 2019-07-13 Value Chain Development Selection Implementation de valeurs agricoles sur les zones sud

MG-UGP CASEF-60913-CS- Component 2. Support to Land Quality Based Pending QBS / C10-18/C2.2: Contrôle IDA / 57750 Policy and Land Rights Post Open - International 50,000.00 0.00 2018-05-16 2018-05-20 2018-07-01 2018-08-15 2018-08-25 2018-09-14 2018-09-16 2019-09-16 Selection Implementation qualité des images sattelitaires Registration

MG-UGP CASEF-61012-CS- Component 2. Support to Land Consultant Pending CQS / C10-18/C2.2: Contrôle IDA / 57750 Policy and Land Rights Post Qualification Open - International 100,000.00 0.00 2018-05-31 2018-06-14 2018-07-03 2018-07-08 2018-08-01 2019-08-01 Implementation qualité des images satellitaires Registration Selection

INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

MG-UGP CASEF-13417-CS- INDV / C7-16/CN4: Recrutement Component 4. Project Individual Consultant IDA / 57750 Prior Open 52,350.00 314,575.68 Signed 2017-04-18 2017-05-12 2017-06-06 2017-10-06 2017-06-27 2018-02-06 2017-08-01 2018-02-09 2018-01-28 d'un Expert politiques publiques Management and Coordination Selection et gouvernance cellule nationale

MG-UGP CASEF-14664-CS- Component 1. Agribusiness CDS / PA 1-16/C1.3 Fonds de IDA / 57750 Prior Direct Selection Direct 1,600,000.00 1,500,000.00 Signed 2016-11-28 2017-05-10 2016-11-28 2017-03-03 2017-03-03 2017-12-31 Value Chain Development garantie partielle de portefeuille

MG-UGP CASEF-23908-CS- INDV / C5-17/C1.2: Identification Component 1. Agribusiness Individual Consultant Under IDA / 57750 Post Open 20,000.00 0.00 2017-08-18 2017-10-18 2017-10-03 2018-03-09 2017-10-15 2017-10-19 2017-12-18 des éléveurs et diagnostic de Value Chain Development Selection Implementation l'état sanitaire du cheptel

MG-UGP CASEF-23910-CS- INDV / C6-17/C1.2: Evaluation de la capacité d'intervention des Component 1. Agribusiness Individual Consultant IDA / 57750 Post Open 7,000.00 7,240.89 Signed 2017-09-01 2017-10-19 2017-10-17 2018-02-05 2017-10-29 2018-02-15 2017-11-02 2018-02-28 2017-12-22 services de santé animale (public Value Chain Development Selection et privé) des régions Androy et Anosy

MG-UGP CASEF-23919-CS- INDV / C 1-17/C2.2: Consultant individuel international chargé appui évaluation propositions Component 2. Support to Land recrutement AT appui GF pour Individual Consultant IDA / 57750 Policy and Land Rights Post Open 25,000.00 6,302.34 Signed 2017-08-18 2017-10-10 2017-10-03 2017-11-22 2017-10-15 2017-11-30 2017-10-19 2017-12-01 2018-01-17 délivrance certificats fonciers, Selection Registration opérations recensement et certification, inventaire domaine privé Etat, impress, diffusion PLOF, appui SAC

MG-UGP CASEF-24383-CS- INDV / C2-17/C1.2: Finalisation Component 1. Agribusiness Individual Consultant Pending IDA / 57750 Post Open 5,000.00 0.00 2017-08-21 2017-10-06 2017-10-18 2017-10-23 2017-12-22 de la Stratégie de Gestion post- Value Chain Development Selection Implementation récolte sur les céréales

DGM2CIATEC1701 / Assistance Component 5. Contingency Individual Consultant Pending technique à la mise en oeuvre IDA / 57750 Post Open 4,800.00 0.00 2017-09-05 2017-09-08 2017-09-12 2017-09-18 2018-07-01 Emergency Response Selection Implementation des activités du MRI

MG-UGP CASEF-24110-CS- CDS / FOR 04-17/C1.1: Stages, Component 1. Agribusiness Under IDA / 57750 Post Direct Selection Direct 20,000.00 0.00 2017-10-23 2017-10-20 2017-11-03 2017-12-07 2018-04-06 visites d'échanges, formations à Value Chain Development Implementation l'extérieur des agents de la DPAL

MG-UGP CASEF-31690-CS- Component 4. Project Individual Consultant INDV / C 1-17/CN4: Auditeur IDA / 57750 Post Open 40,000.00 17,251.38 Signed 2017-10-17 2017-11-17 2017-11-18 2018-02-14 2017-11-22 2018-02-15 2017-11-25 2018-02-19 2018-12-31 Management and Coordination Selection senior interne

MG-UGP CASEF-32711-CS- INDV / C 1 et .2-17/C1.1 Etude sur la répartition des attributions des laboratoires de contrôle Component 1. Agribusiness Individual Consultant IDA / 57750 Post Open 20,000.00 16,575.06 Signed 2017-10-30 2017-11-30 2017-11-28 2018-03-01 2017-12-08 2018-03-15 2017-12-17 2018-03-20 2018-03-02 qualité et identification des Value Chain Development Selection besoins en matière de renforcement de capacités des laboratoires publics

MG-UGP CASEF-33073-CS- INDV / Consultant international pour l'accompagnement du processus de sélection de firme Component 1. Agribusiness Individual Consultant Under chargée de l'assistance IDA / 57750 Post Open 15,000.00 0.00 2017-10-30 2018-03-06 2017-12-18 2018-04-18 2018-01-08 2018-02-12 2018-04-13 Value Chain Development Selection Implementation technique pour le développement des chaînes de valeur d'agriculture commerciale ciblées par le projet CASEF

MG-UGP CASEF-33022-CS- CDS / Consultant individuel Component 1. Agribusiness chargé de l'assistance des IFP IDA / 57750 Post Direct Selection Direct 100,000.00 34,216.49 Signed 2017-11-21 2017-11-29 2017-12-01 2017-11-29 2017-12-30 2017-12-21 2018-12-30 Value Chain Development (ACEP), pour la promotion des FGPP

MG-UGP CASEF-33024-CS- CDS / Consultant individuel Component 1. Agribusiness chargé de l'Assistance technique IDA / 57750 Post Direct Selection Direct 100,000.00 104,294.14 Signed 2017-11-21 2018-02-06 2017-12-01 2018-02-06 2017-12-30 2018-02-26 2018-12-30 Value Chain Development pour la promotion du FGPP auprès des IFP (3ème IFP)

MG-UGP CASEF-33023-CS- CDS / Consultant individuel Component 1. Agribusiness chargé de l'Assistance technique IDA / 57750 Post Direct Selection Direct 100,000.00 95,034.17 Signed 2017-11-21 2017-11-23 2017-12-01 2017-11-23 2017-12-30 2017-11-27 2018-12-30 Value Chain Development pour la promotion du FGPP auprès des IFP (BOA)

MG-UGP CASEF-32716-CS- CDS / C 10-17/C1.3 Abondement 2ème tranche de Fonds de Component 1. Agribusiness Pending IDA / 57750 Prior Direct Selection Direct 1,500,000.00 0.00 2017-10-30 2017-11-09 2018-01-13 1953-08-17 garantie partielle de portefeuille ( Value Chain Development Implementation tranche conditionnelle de l'attente avec SOLIDIS)

MG-UGP CASEF-33026-CS- CDS / PA 3 -16/C2: Renforcement de la Société Component 2. Support to Land Pending Civile intervenant dans le secteur IDA / 57750 Policy and Land Rights Post Direct Selection Direct 120,000.00 0.00 2017-10-30 2017-11-09 2017-12-08 2018-10-29 Implementation foncier pour son implication dans Registration les actions du projet (protocole avec SIF)

MG-UGP CASEF-38667-CS- CDS / PA 1-17/C4.1: Renforcement de capacité de Component 4. Project Pending suivi et démarrage des actions IDA / 57750 Post Direct Selection Direct 50,000.00 0.00 2017-12-08 2018-01-12 2018-03-18 2019-03-18 Management and Coordination Implementation de pérennisation du système de suivi et évaluation ( dispositif ROR)

MG-UGP CASEF-38675-CS- CDS / C8-17/C1.3 : Consultant Component 1. Agribusiness Pending individuel de l'assistance de IDA / 57750 Post Direct Selection Direct 100,000.00 0.00 2017-12-11 2017-12-21 2018-01-19 2018-04-29 Value Chain Development Implementation 4ème IFP pour la promotion des FGPP

MG-UGP CASEF-38699-CS- CDS / C1-17/C4.2: mise à jour de manuel de procédure du Component 4. Project Pending Projet CASEF et appui à IDA / 57750 Post Direct Selection Direct 5,000.00 0.00 2017-12-11 2017-12-21 2018-02-03 2018-02-18 Management and Coordination Implementation l'application de l'annexe A du demande de proposition des consultants

MG-UGP CASEF-38702-CS- CDS / C 4-17/C1.3: assistance Component 1. Agribusiness technique pour la promotion du IDA / 57750 Post Direct Selection Direct 70,000.00 24,904.19 Signed 2017-12-13 2017-12-11 2017-12-23 2017-12-12 2018-01-19 2017-12-21 2018-07-18 Value Chain Development FGPP agricole auprès de l'UGP CASEF

MG-UGP CASEF-38709-CS- CDS / C 3-17/C1.3 Consultant Component 1. Agribusiness individuel chargé de l'assistance IDA / 57750 Post Direct Selection Direct 35,000.00 32,343.89 Signed 2017-12-13 2017-12-12 2017-12-23 2017-12-18 2018-01-19 2018-01-08 2018-07-18 Value Chain Development technique pour la promotion du FGPP après de SOLIDIS

MG-UGP CASEF-57416-CS- INDV / C6-18/C4.2 Recrutement Component 4. Project Individual Consultant Pending IDA / 57750 Post Limited 16,000.00 0.00 2018-04-08 2018-04-25 2018-06-26 2018-07-16 2019-08-30 responsable suivi-évaluation Management and Coordination Selection Implementation national

MG-UGP CASEF-57422-CS- INDV / C8-18/C4.2 Recrutement Component 4. Project Individual Consultant Under IDA / 57750 Post Limited 16,000.00 0.00 2018-04-08 2018-04-16 2018-04-25 2018-06-26 2018-07-16 2019-08-30 Expert senior sauvegarde Management and Coordination Selection Implementation environnementale national

MG-UGP CASEF-57418-CS- INDV / C7-18/C4.2 Recrutement Component 4. Project Individual Consultant Under IDA / 57750 Post Limited 16,000.00 0.00 2018-04-08 2018-04-12 2018-04-25 2018-06-26 2018-07-16 2019-08-30 Expert senior National en Management and Coordination Selection Implementation infrastructure rurale

Page 14 MG-UGP CASEF-60819-CS- Component 2. Support to Land CDS / PA15-18/C2.2: Etats de Pending IDA / 57750 Policy and Land Rights Post Direct Selection Direct 151,000.00 0.00 2018-05-06 2018-05-12 2018-06-15 2018-09-23 lieux des 300 communes pour le Implementation Registration financement additionnel

MG-UGP CASEF-32698-CS- CDS / PA 1-17/C2.2 Appui à la Component 2. Support to Land Pending mise en Suvre des Schémas IDA / 57750 Policy and Land Rights Post Direct Selection Direct 0.00 0.00 2018-06-14 2018-06-16 2018-07-21 2021-04-16 Implementation d'Aménagement Communaux Registration (protocole d'accord avec DGATE)

MG-UGP CASEF-60839-CS- CDS / PA 08-18/C1.1: Appui au Component 1. Agribusiness Pending contrôle sanitaire des filières IDA / 57750 Post Direct Selection Direct 155,000.00 0.00 2018-05-20 2018-05-22 2018-06-28 2018-09-26 Value Chain Development Implementation d'élevage ciblées par le projet (protocole avec DGE)

MG-UGP CASEF-60843-CS- INDV / C12-18/C1.1: Elaboration Component 1. Agribusiness Individual Consultant Pending IDA / 57750 Post Limited 22,500.00 0.00 2018-05-15 2018-06-12 2018-08-01 2018-08-03 2018-11-01 de textes réglementaires sur Value Chain Development Selection Implementation l'agriculture biologique

MG-UGP CASEF-60846-CS- INDV / C18-18/C1.1: Etude de Component 1. Agribusiness Individual Consultant Pending dimensionnement et de gestion IDA / 57750 Post Limited 20,000.00 0.00 2018-05-05 2018-05-15 2018-07-22 2018-08-03 2019-08-03 Value Chain Development Selection Implementation des unités d'azote liquide sur les hautes terre et dans la zone sud

MG-UGP CASEF-60851-CS- CDS / PA20-18/C1.1: Chaine de valeur lait: appui à la production de semence fourragères, appui à Component 1. Agribusiness Pending la recherche de l'amélioration IDA / 57750 Post Direct Selection Direct 70,000.00 0.00 2018-05-10 2018-05-20 2018-06-18 2019-03-31 Value Chain Development Implementation génétique et de production de vache laitières, renforcements de dispositifs d'insémination artificielle, station de monte HT

MG-UGP CASEF-60919-CS- CDS / C14-18/C2.2: Suivi et Component 2. Support to Land Pending contrôle qualité de la réalisation IDA / 57750 Policy and Land Rights Post Direct Selection Direct 80,000.00 0.00 2018-06-11 2018-06-21 2018-08-19 2019-08-19 Implementation des PLOF par la DST ( protocole Registration DST)

Page 15