Sample Procurement Plan
Agriculture and Land Growth Management Project (P151469)
I. General
2.
Bank’s approval Date of the procurement Plan: Original: January 2016 – Revision PP:
December 2016 – February 2017
3. 4.
Date of General Procurement Notice: - Period covered by this procurement plan: July 2016 to December 2017
II. Goods and Works and non-consulting services.
1.
Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable
procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.]
- Type de contrats
- Montant contrat Méthode de passation de Contrat soumis à revue a
- en US$ (seuil)
- marchés
- priori de la banque
- 1. Travaux
- ≥ 5.000.000
- AOI
- Tous les contrats
< 5.000.000 < 500.000
- AON
- Selon PPM
- Selon PPM
- Consultation des
fournisseurs
Tout montant
≥ 500.000 < 500.000 < 200.000
- Entente directe
- Tous les contrats
Tous les contrats Selon PPM
- 2. Fournitures
- AOI
AON
Consultation des Selon PPM fournisseurs
- Entente directe
- Tout montant
Tout montant
Tous les contrats Tous les contrats
Marchés passes auprès d’institutions de l’organisation des Nations Unies
2.
Prequalification. Bidders for _Not applicable _ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines.
July 9, 2010
- 3.
- Proposed Procedures for CDD Components (as per paragraph. 3.17 of the
Guidelines: -
4.
Reference to (if any) Project Operational/Procurement Manual: Manuel de
procedures (execution – procedures administratives et financières – procedures de passation de marches): décembre 2016 – émis par l’Unite de Gestion du projet Casef (Croissance Agricole et Sécurisation Foncière)
5.
6.
Any Other Special Procurement Arrangements: [including advance procurement and
retroactive financing, if applicable] -
Summary of the Procurement Packages planned during the first 18 months after project
effectiveness ( including those that are subject to retroactive financing and advanced procurement)
[List the Packages which require Bank’s prior review first and then the other packages]
- 1
- 2
- 3
- 4
- 5
- 6
- 7
Ref. No.
- Description
- Estimated
Cost
US$ million
- Packages
- Domestic
Preference
(yes/no)
Review by Bank
(Prior / Post)
Comments
Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works)
No No No
Prior Prior Prior
1,025 5,821
2
- 2
- 1st contract
for Prior Review 1st contract for Prior Review
Summary of the NCB (Goods)
- 0,257325
- 1
- No
- Prior
Summary of the ICB (Non-Consultant Services) CFN (Consultations de Fournisseurs) – (travaux) CFN (Consultations de Fournisseurs) – (Fournitures)
- -
- -
- No
No No
Prior Prior Prior
- -
- -
- 0,0884
- 1
Entente directe (fournitures) Marchés passes auprès d’institutions de l’organisation des Nations Unies
0,031 0,703
1 2
No No
Prior Prior
Summary of the NCB (Works) Summary of the NCB (Goods)
- 4,243
- 2
3
No No
Post
- Post
- 0,2031
July 9, 2010
CFN (Consultations de Fournisseurs) – (travaux) CFN (Consultations de Fournisseurs – Achat à commande) – (Fournitures et services autres que services de
0,095 0,101
4 5
No No
Post Post
consultants)
III. Selection of Consultants
1.
Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:
- Type de contrats
- Montant contrat Méthode de passation Contrat soumis à revue
- en US$ (seuil)
- de marchés
SFQC, SFQ, SCBD Tous les contrats SMC, SQC,
SFQC, SFQ, SCBD Selon PPM SMC, SQC a priori de la banque
3. Consultants (firmes)
≥ 200.000
,
< 200.000
≥ 100.000 < 100.000
,
Consultant individuels
Comparaison de 3 CVs
Tous les contrats
Comparaison de 3 CVs
Selon PPM
- Firmes et individuels Tout montant
- Entente directe
- Tous les contrats
- 2.
- Short list comprising entirely of national consultants: Short list of consultants for
services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.
- 3.
- Any Other Special Selection Arrangements: [including advance procurement and
retroactive financing, if applicable or delete if not applicable]
- 4.
- Consultancy Assignments with Selection Methods and Time Schedule
- 1
- 2
- 3
- 4
- 5
- 6
- Ref. No.
- Description of
Assignment
Estimated Cost
US$
- Packages
- Review
by Bank (Prior / Post)
Comments
million
Summary of 5,6291 number of
- 4
- Prior
contracts that
July 9, 2010 will be let under QCBS
Summary of 13,75775 23
number of
- Prior
- SFQ, CI,
SQC,
contracts that will be let
entente directe
under other methods Summary of 0,609 number of contracts that will be let under QCBS Summary of 0,117 number of
- 4
- Post
- Post
- 11
- CI, SQC
contracts that will be let under other methods
July 9, 2010
PROCUREMENT PLAN
Madagascar : Madagascar Agriculture Rural Growth and Land Management Project
General Information
- Country:
- Bank sApproval Date of the Original Procurement Plan:
Revised Plan Date(s): (comma delineated, leave blank if none) 2018-04-09 GPN Date:
- 2017-04-13
- Madagascar
P151469
Project ID: Project Name:
Madagascar Agriculture Rural Growth and Land Management Project IDA 57750
- Loan
- /
- Credit No:
/
Executing Agency(ies) PROJECT MANAGEMENT UNIT AGRICULTURE GROWTH AND LAND MANAGEMENT, Intervention Funds for Development
WORKS
- Activity Reference No. /
- Bid Evaluation Report
and Recommendation for Award
Procurement Process
Prequalification
(Y/N)
Estimated Amount (US$)
Actual Amount
(US$)
Process Status
Draft Pre-qualification Documents
Prequalification Evaluation Report
- Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission
- /
- Description
- Loan
- /
- Credit No.
- Component
- Review Type
- Method
- Market Approach
- Signed Contract
- Contract Completion
- /
- Justification
- Notice / Invitation
- Issued
- Opening
- /
- Minutes
- Planned
- Actual
- Planned
- Actual
- Planned
- Actual
- Planned
- Actual
- Planned Actual
- Planned
- Actual
- Planned
- Actual
- Planned
- Actual
- Planned
- Actual
MG-UGP CASEF-16720-CW-
- RFQ
- /
- T
- 2-16/C4: Travaux
Component 4. Project Management and Coordination
Request for Quotations
Single Stage Envelope
---One One One d'amé nagementdu bureau annexe pour cellule nationale Antananarivo
IDA IDA IDA
///57750 57750 57750
- Post
- Limited
Limited Limited
23,000.00 50,000.00 9,000.00
5,395.55
0.00
- Signed
- 2017-06-17
2017-06-20 2017-06-15
- 2017-08-18
- 2017-07-28
2017-08-01 2017-07-25
- 2017-09-04
- 2018-08-27
à
MG-UGP CASEF-16721-CW- RFQ 3-16/C4: Ré novation locaux cellule Vakinankaratra
Component 4. Project Management and Coordination
Request for Quotations
Single Stage Envelope
Pending Implementation
- /
- T
- Post
Post
2018-10-29 2018-08-23
MG-UGP CASEF-16722-CW- RFQ d'amé nagementdu bureau annexe pour cellule Vakinankaratra
- /
- T
- 4-16/C4: Travaux
- Component 4. Project
Management and Coordination
Request for Quotations
Single Stage Envelope
- 16,912.40
- Signed
- 2017-08-07
- 2017-09-04
MG-UGP CASEF-16723-CW-
- RFQ
- /
- T
- 5-16/C4: Ré novation
- Component 4. Project
Management and Coordination
Request for Quotations
Single Stage Envelope
---One One One
Pending Implementation
IDA IDA IDA
///57750 57750 57750
Post Post Post
- Limited
- 7,000.00
81,044.09 94,155.44
0.00 0.00 0.00
2017-06-19 2017-11-27 2017-11-27
2017-07-30 2017-12-28 2017-12-28
2018-08-28 2018-06-06 2018-06-06 locaux cellule Toamasina et antenne Analanjirofo
- DRAM1TRMPE1701 Travaux
- /
de Reconstruction des salles de classe MAROANTSETRA LOT 01
Component 5. Contingency Emergency Response
Single Stage Envelope
Request for Bids Request for Bids
Open Open
--National National
Canceled Canceled
2017-11-25 2017-11-25
2017-12-07 2017-12-07
2017-12-17 2017-12-17
- DRAM1TRMPE1702 Travaux
- /
de Reconstruction des salles de classe MAROANTSETRA LOT 02
Component 5. Contingency Emergency Response
Single Stage Envelope
- DRAM1TRMPE1703 Travaux
- /
de Reconstruction des salles de classe MAROANTSETRA LOT 10
Component 5. Contingency Emergency Response
Single Stage Envelope
--One One
IDA IDA
//57750 57750
Post Post
Request for Bids Request for Bids
Open Open
--National National
81,044.09 68,247.65
0.00 0.00 Canceled Canceled
2017-11-25 2017-11-25
2017-11-27 2017-11-27
2017-12-07 2017-12-07
2017-12-17 2017-12-17
2017-12-28 2017-12-28
2018-06-06 2018-06-06
- DRAM1TRMPE1704 Travaux
- /
- Component 5. Contingency
Emergency Response
Single Stage Envelope de Reconstruction CSB1 Beanana
DRAM1TRMPE1705 Travaux de Reconstruction CSB1 Mahasoa
/
Component 5. Contingency Emergency Response
Single Stage Envelope
---One One One
IDA IDA IDA
///57750 57750 57750
Post Post Post
Request for Bids Request for Bids Request for Bids
Open Open Open
---National National National
68,247.65 68,247.65 63,982.17
0.00 0.00 0.00 Canceled Canceled Canceled
2017-11-25 2017-11-25 2017-11-25
2017-11-27 2017-11-27 2017-11-27
2017-12-07 2017-12-07 2017-12-07
2017-12-17 2017-12-17 2017-12-17
2017-12-28 2017-12-28 2017-12-28
2018-06-06 2018-06-06 2018-06-06
- DRAM1TRMPE1706
- /
- Travaux
- Component 5. Contingency
Emergency Response
Single Stage
- Envelope
- de ReconstructionCSB1 Vinanibe
- DRAM1TRMPE1707 Travaux
- /
Component 5. Contingency Emergency Response
Single Stage Envelope de Ré habilitationinfrastructure mé dicalMaroantsetra LOT 03
DRAM1TRMPE1708 Travaux de Ré habilitationinfrastructure mé dicalMaroantsetra LOT 04
/
Component 5. Contingency Emergency Response
Single Stage Envelope
--One One
IDA IDA
//57750 57750
Post Post
Request for Bids Request for Bids
Open Open
--National National
66,825.83 94,551.44
0.00 0.00 Canceled Canceled
2017-11-25 2017-11-25
2017-11-27 2017-11-27
2017-12-07 2017-12-07
2017-12-17 2017-12-17
2017-12-28 2017-12-28
2018-06-06 2018-06-06
- DRAM1TRMPE1709 Travaux
- /
de Reconstruction des salles de classe totalement dé truites MAROANTSETRA LOT 03
Component 5. Contingency Emergency Response
Single Stage Envelope
- DRAM1TRMPE1710 Travaux
- /
de Reconstruction des salles de classe MAROANTSETRA LOT 04
Component 5. Contingency Emergency Response
Single Stage Envelope
---One One One
IDA IDA IDA
///57750 57750 57750
Post Post Post
Request for Bids Request for Bids Request for Bids
Open Open Open
---National National National
81,044.09 94,551.44 94,551.44
0.00 0.00 0.00 Canceled Canceled Canceled
2017-11-25 2017-11-25 2017-11-25
2017-11-27 2017-11-27 2017-11-27
2017-12-07 2017-12-07 2017-12-07
2017-12-17 2017-12-17 2017-12-17
2017-12-28 2017-12-28 2017-12-28
2018-06-06 2018-06-06 2018-06-06
- DRAM1TRMPE1711 Travaux
- /
de Reconstruction des salles de classe MAROANTSETRA LOT 05
Component 5. Contingency Emergency Response
Single Stage Envelope
- DRAM1TRMPE1712 Travaux
- /
de Reconstruction des salles de classe MAROANTSETRA LOT 06
Component 5. Contingency Emergency Response
Single Stage Envelope
DRAM1TRMPE1713 de ré habilitationMPI Ambinanintelo
//Travaux Travaux
Component 5. Contingency Emergency Response
Single Stage Envelope
---One One One
IDA IDA IDA
///57750 57750 57750
Post Post Post
Request for Bids Request for Bids Request for Bids
Open Open Open
---National National National
48,342.09 76,778.61 98,106.00
0.00 0.00 0.00 Canceled Canceled Canceled
2017-11-25 2017-11-25 2017-11-25
2017-11-27 2017-11-27 2017-11-27
2017-12-07 2017-12-07 2017-12-07
2017-12-17 2017-12-17 2017-12-17
2017-12-28 2017-12-28 2017-12-28
2018-06-06 2018-06-06 2018-06-06
DRAM1TRMPE1714 de Ré habilitationinfrastructure mé dicalMaroantsetra LOT 01
Component 5. Contingency Emergency Response
Single Stage Envelope
DRAM1TRMPE1715 Travaux de Ré habilitationinfrastructure mé dicalMaroantsetra LOT 02
/
Component 5. Contingency Emergency Response
Single Stage Envelope
- DRAM1TRMPE1716 Travaux
- /
de Reconstruction des salles de classe MAROANTSETRA LOT 07
Component 5. Contingency Emergency Response
Single Stage Envelope
----One One One One
IDA IDA IDA IDA
////57750 57750 57750 57750
Post Post Post Post
Request for Bids Request for Bids Request for Bids Request for Bids
Open Open Open Open
----National National National National
81,044.09 94,551.44 94,551.44 81,044.09
0.00 0.00 0.00 0.00 Canceled Canceled Canceled Canceled
2017-11-25 2017-11-25 2017-11-25 2017-11-25
2017-11-27 2017-11-27 2017-11-27 2017-11-27
2017-12-07 2017-12-07 2017-12-07 2017-12-07
2017-12-17 2017-12-17 2017-12-17 2017-12-17
2017-12-28 2017-12-28 2017-12-28 2018-01-28
2018-06-06 2018-06-06 2018-06-06 2018-07-07
- DRAM1TRMPE1717 Travaux
- /
de Reconstruction des salles de classe MAROANTSETRA LOT 08
Component 5. Contingency Emergency Response
Single Stage Envelope
- DRAM1TRMPE1718 Travaux
- /
de Reconstruction des salles de classe MAROANTSETRA LOT 09
Component 5. Contingency Emergency Response
Single Stage Envelope
- DRAM1TRMPE1719 Travaux
- /
de Reconstruction des salles de classe MAROANTSETRA LOT 11
Component 5. Contingency Emergency Response
Single Stage Envelope
DRAM1TRMPE1720 Travaux de Reconstruction CSB1 Antevibe
/
Component 5. Contingency Emergency Response
Single Stage Envelope
----One One One One
IDA IDA IDA IDA
////57750 57750 57750 57750
Post Post Post Post
Request for Bids Request for Bids Request for Bids Request for Bids
Open Open Open Open
----National National National National
68,247.65 68,247.65 68,247.65 38,389.30
0.00 0.00 0.00 0.00 Canceled Canceled Canceled Canceled
2017-11-25 2017-11-25 2017-11-25 2017-11-25
2017-11-27 2017-11-27 2017-11-27 2017-11-27
2017-12-07 2017-12-07 2017-12-07 2017-12-07
2017-12-17 2017-12-17 2017-12-17 2017-12-17
2017-12-28 2017-12-28 2017-12-28 2017-12-28
2018-06-06 2018-06-06 2018-06-06 2018-06-06
- DRAM1TRMPE1721 Travaux
- /
Component 5. Contingency Emergency Response
Single Stage
- Envelope
- de Reconstruction CSB1
Madiotsifafana