Sample Procurement Plan

Agriculture and Land Growth Management Project (P151469)
I. General

2.

Bank’s approval Date of the procurement Plan: Original: January 2016 – Revision PP:

December 2016 – February 2017
3. 4.

Date of General Procurement Notice: - Period covered by this procurement plan: July 2016 to December 2017

II. Goods and Works and non-consulting services.

1.

Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable

procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.]

  • Type de contrats
  • Montant contrat Méthode de passation de Contrat soumis à revue a

  • en US$ (seuil)
  • marchés
  • priori de la banque

  • 1. Travaux
  • ≥ 5.000.000
  • AOI
  • Tous les contrats

< 5.000.000 < 500.000

  • AON
  • Selon PPM

  • Selon PPM
  • Consultation des

fournisseurs

Tout montant

≥ 500.000 < 500.000 < 200.000

  • Entente directe
  • Tous les contrats

Tous les contrats Selon PPM

  • 2. Fournitures
  • AOI

AON
Consultation des Selon PPM fournisseurs

  • Entente directe
  • Tout montant

Tout montant
Tous les contrats Tous les contrats

Marchés passes auprès d’institutions de l’organisation des Nations Unies

2.

Prequalification. Bidders for _Not applicable _ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines.

July 9, 2010

  • 3.
  • Proposed Procedures for CDD Components (as per paragraph. 3.17 of the

Guidelines: -

4.

Reference to (if any) Project Operational/Procurement Manual: Manuel de

procedures (execution – procedures administratives et financières – procedures de passation de marches): décembre 2016 – émis par l’Unite de Gestion du projet Casef (Croissance Agricole et Sécurisation Foncière)

5.

6.

Any Other Special Procurement Arrangements: [including advance procurement and

retroactive financing, if applicable] -

Summary of the Procurement Packages planned during the first 18 months after project

effectiveness ( including those that are subject to retroactive financing and advanced procurement)

[List the Packages which require Bank’s prior review first and then the other packages]

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Ref. No.

  • Description
  • Estimated

Cost
US$ million

  • Packages
  • Domestic

Preference
(yes/no)
Review by Bank
(Prior / Post)
Comments

Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works)

No No No
Prior Prior Prior
1,025 5,821
2

  • 2
  • 1st contract

for Prior Review 1st contract for Prior Review

Summary of the NCB (Goods)

  • 0,257325
  • 1
  • No
  • Prior

Summary of the ICB (Non-Consultant Services) CFN (Consultations de Fournisseurs) – (travaux) CFN (Consultations de Fournisseurs) – (Fournitures)

  • -
  • -
  • No

No No
Prior Prior Prior

  • -
  • -

  • 0,0884
  • 1

Entente directe (fournitures) Marchés passes auprès d’institutions de l’organisation des Nations Unies

0,031 0,703
1 2
No No
Prior Prior

Summary of the NCB (Works) Summary of the NCB (Goods)

  • 4,243
  • 2

3
No No
Post

  • Post
  • 0,2031

July 9, 2010

CFN (Consultations de Fournisseurs) – (travaux) CFN (Consultations de Fournisseurs – Achat à commande) – (Fournitures et services autres que services de

0,095 0,101
4 5
No No
Post Post

consultants)

III. Selection of Consultants

1.

Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

  • Type de contrats
  • Montant contrat Méthode de passation Contrat soumis à revue

  • en US$ (seuil)
  • de marchés

SFQC, SFQ, SCBD Tous les contrats SMC, SQC,

SFQC, SFQ, SCBD Selon PPM SMC, SQC a priori de la banque
3. Consultants (firmes)
≥ 200.000
,

< 200.000

≥ 100.000 < 100.000
,
Consultant individuels
Comparaison de 3 CVs
Tous les contrats
Comparaison de 3 CVs
Selon PPM

  • Firmes et individuels Tout montant
  • Entente directe
  • Tous les contrats

  • 2.
  • Short list comprising entirely of national consultants: Short list of consultants for

services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

  • 3.
  • Any Other Special Selection Arrangements: [including advance procurement and

retroactive financing, if applicable or delete if not applicable]

  • 4.
  • Consultancy Assignments with Selection Methods and Time Schedule

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6

  • Ref. No.
  • Description of

Assignment
Estimated Cost

US$

  • Packages
  • Review

by Bank (Prior / Post)
Comments

million
Summary of 5,6291 number of

  • 4
  • Prior

contracts that
July 9, 2010 will be let under QCBS

Summary of 13,75775 23

number of

  • Prior
  • SFQ, CI,

SQC,

contracts that will be let

entente directe

under other methods Summary of 0,609 number of contracts that will be let under QCBS Summary of 0,117 number of

  • 4
  • Post

  • Post
  • 11
  • CI, SQC

contracts that will be let under other methods

July 9, 2010

PROCUREMENT PLAN
Madagascar : Madagascar Agriculture Rural Growth and Land Management Project
General Information

  • Country:
  • Bank sApproval Date of the Original Procurement Plan:

Revised Plan Date(s): (comma delineated, leave blank if none) 2018-04-09 GPN Date:

  • 2017-04-13
  • Madagascar

P151469

Project ID: Project Name:

Madagascar Agriculture Rural Growth and Land Management Project IDA 57750

  • Loan
  • /
  • Credit No:

/
Executing Agency(ies) PROJECT MANAGEMENT UNIT AGRICULTURE GROWTH AND LAND MANAGEMENT, Intervention Funds for Development

WORKS

  • Activity Reference No. /
  • Bid Evaluation Report

and Recommendation for Award
Procurement Process
Prequalification
(Y/N)
Estimated Amount (US$)
Actual Amount
(US$)
Process Status
Draft Pre-qualification Documents
Prequalification Evaluation Report

  • Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission
  • /

  • Description
  • Loan
  • /
  • Credit No.
  • Component
  • Review Type
  • Method
  • Market Approach
  • Signed Contract
  • Contract Completion

  • /
  • Justification
  • Notice / Invitation
  • Issued
  • Opening
  • /
  • Minutes

  • Planned
  • Actual
  • Planned
  • Actual
  • Planned
  • Actual
  • Planned
  • Actual
  • Planned Actual
  • Planned
  • Actual
  • Planned
  • Actual
  • Planned
  • Actual
  • Planned
  • Actual

MG-UGP CASEF-16720-CW-

  • RFQ
  • /
  • T
  • 2-16/C4: Travaux

Component 4. Project Management and Coordination
Request for Quotations
Single Stage Envelope
---One One One d'amé nagementdu bureau annexe pour cellule nationale Antananarivo
IDA IDA IDA
///57750 57750 57750

  • Post
  • Limited

Limited Limited
23,000.00 50,000.00 9,000.00
5,395.55
0.00

  • Signed
  • 2017-06-17

2017-06-20 2017-06-15

  • 2017-08-18
  • 2017-07-28

2017-08-01 2017-07-25

  • 2017-09-04
  • 2018-08-27

à

MG-UGP CASEF-16721-CW- RFQ 3-16/C4: Ré novation locaux cellule Vakinankaratra
Component 4. Project Management and Coordination
Request for Quotations
Single Stage Envelope
Pending Implementation

  • /
  • T
  • Post

Post
2018-10-29 2018-08-23
MG-UGP CASEF-16722-CW- RFQ d'amé nagementdu bureau annexe pour cellule Vakinankaratra

  • /
  • T
  • 4-16/C4: Travaux
  • Component 4. Project

Management and Coordination
Request for Quotations
Single Stage Envelope

  • 16,912.40
  • Signed
  • 2017-08-07
  • 2017-09-04

MG-UGP CASEF-16723-CW-

  • RFQ
  • /
  • T
  • 5-16/C4: Ré novation
  • Component 4. Project

Management and Coordination
Request for Quotations
Single Stage Envelope
---One One One
Pending Implementation
IDA IDA IDA
///57750 57750 57750
Post Post Post

  • Limited
  • 7,000.00

81,044.09 94,155.44
0.00 0.00 0.00
2017-06-19 2017-11-27 2017-11-27
2017-07-30 2017-12-28 2017-12-28
2018-08-28 2018-06-06 2018-06-06 locaux cellule Toamasina et antenne Analanjirofo

  • DRAM1TRMPE1701 Travaux
  • /

de Reconstruction des salles de classe MAROANTSETRA LOT 01
Component 5. Contingency Emergency Response
Single Stage Envelope
Request for Bids Request for Bids
Open Open
--National National
Canceled Canceled
2017-11-25 2017-11-25
2017-12-07 2017-12-07
2017-12-17 2017-12-17

  • DRAM1TRMPE1702 Travaux
  • /

de Reconstruction des salles de classe MAROANTSETRA LOT 02
Component 5. Contingency Emergency Response
Single Stage Envelope

  • DRAM1TRMPE1703 Travaux
  • /

de Reconstruction des salles de classe MAROANTSETRA LOT 10
Component 5. Contingency Emergency Response
Single Stage Envelope
--One One
IDA IDA
//57750 57750
Post Post
Request for Bids Request for Bids
Open Open
--National National
81,044.09 68,247.65
0.00 0.00 Canceled Canceled
2017-11-25 2017-11-25
2017-11-27 2017-11-27
2017-12-07 2017-12-07
2017-12-17 2017-12-17
2017-12-28 2017-12-28
2018-06-06 2018-06-06

  • DRAM1TRMPE1704 Travaux
  • /
  • Component 5. Contingency

Emergency Response
Single Stage Envelope de Reconstruction CSB1 Beanana

DRAM1TRMPE1705 Travaux de Reconstruction CSB1 Mahasoa
/
Component 5. Contingency Emergency Response
Single Stage Envelope
---One One One
IDA IDA IDA
///57750 57750 57750
Post Post Post
Request for Bids Request for Bids Request for Bids
Open Open Open
---National National National
68,247.65 68,247.65 63,982.17
0.00 0.00 0.00 Canceled Canceled Canceled
2017-11-25 2017-11-25 2017-11-25
2017-11-27 2017-11-27 2017-11-27
2017-12-07 2017-12-07 2017-12-07
2017-12-17 2017-12-17 2017-12-17
2017-12-28 2017-12-28 2017-12-28
2018-06-06 2018-06-06 2018-06-06

  • DRAM1TRMPE1706
  • /
  • Travaux
  • Component 5. Contingency

Emergency Response
Single Stage

  • Envelope
  • de ReconstructionCSB1 Vinanibe

  • DRAM1TRMPE1707 Travaux
  • /

Component 5. Contingency Emergency Response
Single Stage Envelope de Ré habilitationinfrastructure mé dicalMaroantsetra LOT 03

DRAM1TRMPE1708 Travaux de Ré habilitationinfrastructure mé dicalMaroantsetra LOT 04
/
Component 5. Contingency Emergency Response
Single Stage Envelope
--One One
IDA IDA
//57750 57750
Post Post
Request for Bids Request for Bids
Open Open
--National National
66,825.83 94,551.44
0.00 0.00 Canceled Canceled
2017-11-25 2017-11-25
2017-11-27 2017-11-27
2017-12-07 2017-12-07
2017-12-17 2017-12-17
2017-12-28 2017-12-28
2018-06-06 2018-06-06

  • DRAM1TRMPE1709 Travaux
  • /

de Reconstruction des salles de classe totalement dé truites MAROANTSETRA LOT 03
Component 5. Contingency Emergency Response
Single Stage Envelope

  • DRAM1TRMPE1710 Travaux
  • /

de Reconstruction des salles de classe MAROANTSETRA LOT 04
Component 5. Contingency Emergency Response
Single Stage Envelope
---One One One
IDA IDA IDA
///57750 57750 57750
Post Post Post
Request for Bids Request for Bids Request for Bids
Open Open Open
---National National National
81,044.09 94,551.44 94,551.44
0.00 0.00 0.00 Canceled Canceled Canceled
2017-11-25 2017-11-25 2017-11-25
2017-11-27 2017-11-27 2017-11-27
2017-12-07 2017-12-07 2017-12-07
2017-12-17 2017-12-17 2017-12-17
2017-12-28 2017-12-28 2017-12-28
2018-06-06 2018-06-06 2018-06-06

  • DRAM1TRMPE1711 Travaux
  • /

de Reconstruction des salles de classe MAROANTSETRA LOT 05
Component 5. Contingency Emergency Response
Single Stage Envelope

  • DRAM1TRMPE1712 Travaux
  • /

de Reconstruction des salles de classe MAROANTSETRA LOT 06
Component 5. Contingency Emergency Response
Single Stage Envelope

DRAM1TRMPE1713 de ré habilitationMPI Ambinanintelo
//Travaux Travaux
Component 5. Contingency Emergency Response
Single Stage Envelope
---One One One
IDA IDA IDA
///57750 57750 57750
Post Post Post
Request for Bids Request for Bids Request for Bids
Open Open Open
---National National National
48,342.09 76,778.61 98,106.00
0.00 0.00 0.00 Canceled Canceled Canceled
2017-11-25 2017-11-25 2017-11-25
2017-11-27 2017-11-27 2017-11-27
2017-12-07 2017-12-07 2017-12-07
2017-12-17 2017-12-17 2017-12-17
2017-12-28 2017-12-28 2017-12-28
2018-06-06 2018-06-06 2018-06-06
DRAM1TRMPE1714 de Ré habilitationinfrastructure mé dicalMaroantsetra LOT 01
Component 5. Contingency Emergency Response
Single Stage Envelope

DRAM1TRMPE1715 Travaux de Ré habilitationinfrastructure mé dicalMaroantsetra LOT 02
/
Component 5. Contingency Emergency Response
Single Stage Envelope

  • DRAM1TRMPE1716 Travaux
  • /

de Reconstruction des salles de classe MAROANTSETRA LOT 07
Component 5. Contingency Emergency Response
Single Stage Envelope
----One One One One
IDA IDA IDA IDA
////57750 57750 57750 57750
Post Post Post Post
Request for Bids Request for Bids Request for Bids Request for Bids
Open Open Open Open
----National National National National
81,044.09 94,551.44 94,551.44 81,044.09
0.00 0.00 0.00 0.00 Canceled Canceled Canceled Canceled
2017-11-25 2017-11-25 2017-11-25 2017-11-25
2017-11-27 2017-11-27 2017-11-27 2017-11-27
2017-12-07 2017-12-07 2017-12-07 2017-12-07
2017-12-17 2017-12-17 2017-12-17 2017-12-17
2017-12-28 2017-12-28 2017-12-28 2018-01-28
2018-06-06 2018-06-06 2018-06-06 2018-07-07

  • DRAM1TRMPE1717 Travaux
  • /

de Reconstruction des salles de classe MAROANTSETRA LOT 08
Component 5. Contingency Emergency Response
Single Stage Envelope

  • DRAM1TRMPE1718 Travaux
  • /

de Reconstruction des salles de classe MAROANTSETRA LOT 09
Component 5. Contingency Emergency Response
Single Stage Envelope

  • DRAM1TRMPE1719 Travaux
  • /

de Reconstruction des salles de classe MAROANTSETRA LOT 11
Component 5. Contingency Emergency Response
Single Stage Envelope

DRAM1TRMPE1720 Travaux de Reconstruction CSB1 Antevibe
/
Component 5. Contingency Emergency Response
Single Stage Envelope
----One One One One
IDA IDA IDA IDA
////57750 57750 57750 57750
Post Post Post Post
Request for Bids Request for Bids Request for Bids Request for Bids
Open Open Open Open
----National National National National
68,247.65 68,247.65 68,247.65 38,389.30
0.00 0.00 0.00 0.00 Canceled Canceled Canceled Canceled
2017-11-25 2017-11-25 2017-11-25 2017-11-25
2017-11-27 2017-11-27 2017-11-27 2017-11-27
2017-12-07 2017-12-07 2017-12-07 2017-12-07
2017-12-17 2017-12-17 2017-12-17 2017-12-17
2017-12-28 2017-12-28 2017-12-28 2017-12-28
2018-06-06 2018-06-06 2018-06-06 2018-06-06

  • DRAM1TRMPE1721 Travaux
  • /

Component 5. Contingency Emergency Response
Single Stage

  • Envelope
  • de Reconstruction CSB1

Madiotsifafana

Recommended publications
  • Rano HP Et Ranon'ala

    Rano HP Et Ranon'ala

    EVALUATION OF THE USAID/MADAGASCAR WATER SUPPLY, SANITATION AND HYGIENE BILATERAL PROJECTS: RANO HP ET RANON’ALA September 2014 This publication was produced at the request of the United States Agency for International Development. It was prepared independently by CAETIC Développement ACKNOWLEDGEMENTS The authors would like to acknowledge Jean-Claude RANDRIANARISOA, COR, for his constant guidance during this whole assignment. Discussions and exchanges we had with him were always fruitful and encouraging and of a high technical level. This document could not have reached this level of quality without the invaluable inputs from Jacky Ralaiarivony and from USAID Madagascar Program Office staff, namely Vololontsoa Raharimalala. The authors: Balsama ANDRIANTSEHENO Jean Marie RAKOTOVAO Ramy RAZAFINDRALAMBO Jean Herivelo RAKOTONDRAINIBE FINAL EVALUATION OF USAID/MADAGASCAR WSSH PROJECTS: EVALUATION OF THE USAID/MADAGASCAR WATER SUPPLY, SANITATION AND HYGIENE BILATERAL PROJECTS: RANO HP ET RANON’ALA SEPTEMBER 9, 2014 CONTRACT N° AID-687-C-13-00004 DISCLAIMER The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. CONTENTS ...................................................................................................................................................................... 1 LIST OF ACRONYMS ...................................................................................................................................
  • Tana Lsms Hh

    Tana Lsms Hh

    This PDF generated by katharinakeck, 1/24/2017 10:08:32 AM Sections: 10, Sub-sections: 38, Questionnaire created by opm, 8/4/2016 10:22:56 AM Questions: 366. Last modified by katharinakeck, 1/24/2017 3:00:47 PM Questions with enabling conditions: 206 Questions with validation conditions: 30 Shared with: Rosters: 18 opm (last edited 10/19/2016 10:14:02 AM) Variables: 34 aarau (last edited 10/25/2016 9:18:23 AM) seanoleary (last edited 10/17/2016 4:20:41 PM) arinay (never edited) rharati (never edited) kirsten (never edited) andrianina (never edited) mmihary_r (never edited) sergiy (never edited) janaharb (last edited 10/21/2016 4:55:02 PM) opm (last edited 10/19/2016 10:14:02 AM) gabielte (never edited) TANA_LSMS_HH START Sub-sections: 4, No rosters, Questions: 23, Variables: 5. CONSENT FORM No sub-sections, No rosters, Questions: 1, Static texts: 2. ROSTER No sub-sections, Rosters: 1, Questions: 5, Static texts: 2, Variables: 2. RESPONDENT SELECTION No sub-sections, No rosters, Questions: 7, Variables: 3. MAIN RESPONDENT Sub-sections: 22, Rosters: 10, Questions: 236, Static texts: 4, Variables: 5. CONSUMPTION Sub-sections: 6, Rosters: 5, Questions: 18, Static texts: 4, Variables: 13. HOUSEHOLD HEAD Sub-sections: 2, Rosters: 1, Questions: 18, Static texts: 1, Variables: 3. LABOUR Sub-sections: 4, Rosters: 1, Questions: 42, Variables: 3. OBSERVATIONS No sub-sections, No rosters, Questions: 12. RESULT No sub-sections, No rosters, Questions: 4. APPENDIX A — INSTRUCTIONS APPENDIX B — OPTIONS APPENDIX C — VARIABLES LEGEND 1 / 65 START EA ID NUMERIC: INTEGER ea_id SCOPE: PREFILLED DWELLING ID NUMERIC: INTEGER dwllid SCOPE: PREFILLED TYPE DWELLING ID AGAIN NUMERIC: INTEGER dwllid2 V1 self==dwllid M1 Dwelling ID does not match V2 ea_id*100+1<=self && self <=ea_id*100+30 M2 Dwelling ID and EA ID do not match VARIABLE DOUBLE dwlnum dwllid-100*ea_id THIS IS A REPLACEMENT DWELLING.
  • TDR Annexe7 Rapport Analyse 322 Communes OATF

    TDR Annexe7 Rapport Analyse 322 Communes OATF

    ETAT DES LIEUX DES 319 COMMUNES POUR LE FINANCEMENT ADDITIONNEL DU PROJET CASEF Février 2019 TABLE DES MATIERES TABLE DES MATIERES .................................................................................................................... i LISTE DES ACRONYMES ................................................................................................................ iii Liste des tableaux ......................................................................................................................... v Listes des Cartes ........................................................................................................................... v Liste des figures ............................................................................................................................vi Liste des photos ...........................................................................................................................vi I INTRODUCTION ....................................................................................................................... 1 II METHODOLOGIES .................................................................................................................... 2 II.1 CHOIX DES 322 COMMUNES OBJETS D’ENQUETE ............................................................... 2 II.2 CHOIX DES CRITERES DE SELECTION DES COMMUNES ........................................................ 5 II.3 METHODOLOGIE DE COLLECTE DE DONNEES ET ACTIVITES ................................................. 6
  • MAHAJANGA BV Reçus: 246 Sur 246

    MAHAJANGA BV Reçus: 246 Sur 246

    RESULTATS SENATORIALES DU 29/12/2015 FARITANY: 4 MAHAJANGA BV reçus: 246 sur 246 INDEPE TIM MANAR AREMA MAPAR HVM NDANT ANARA : FANILO N°BV Emplacement AP AT Inscrits Votants B N S E ASSOCI REGION 41 BETSIBOKA BV reçus 39 sur 39 DISTRICT: 4101 KANDREHO BV reçus7 sur 7 01 AMBALIHA 0 0 6 6 0 6 0 0 0 1 0 5 02 ANDASIBE 0 0 6 6 0 6 0 2 0 0 0 4 03 ANTANIMBARIBE 0 0 6 6 0 6 0 2 0 0 1 3 04 BEHAZOMATY 0 0 6 6 0 6 0 3 0 0 0 3 05 BETAIMBOAY 0 0 6 5 0 5 0 1 0 0 0 4 06 KANDREHO 0 0 6 6 0 6 0 3 0 0 0 3 07 MAHATSINJO SUD 0 0 6 5 0 5 0 0 0 0 0 5 TOTAL DISTRICT 0 0 42 40 0 40 0 11 0 1 1 27 DISTRICT: 4102 MAEVATANANA BV reçus19 sur 19 01 AMBALAJIA 0 0 6 5 0 5 0 2 0 0 2 1 02 AMBALANJANAKOMBY 0 0 6 6 0 6 0 2 0 0 1 3 03 ANDRIBA 0 0 8 8 0 8 0 2 0 0 2 4 04 ANTANIMBARY 0 0 8 8 0 8 0 1 0 0 0 7 05 ANTSIAFABOSITRA 0 0 8 8 0 8 0 3 0 0 0 5 06 BEANANA 0 0 6 5 0 5 0 1 0 0 0 4 07 BEMOKOTRA 0 0 6 6 0 6 0 3 0 0 1 2 08 BERATSIMANINA 0 0 6 6 0 6 0 0 0 0 0 6 09 BERIVOTRA 5/5 0 0 6 5 0 5 0 1 0 0 0 4 10 MADIROMIRAFY 0 0 6 6 0 6 0 1 0 0 1 4 11 MAEVATANANA I 0 0 10 9 0 9 0 3 0 0 2 4 12 MAEVATANANA II 0 0 8 8 0 8 0 2 0 0 0 6 13 MAHATSINJO 0 0 8 8 0 8 0 0 0 0 0 8 14 MAHAZOMA 0 0 8 8 0 8 0 2 0 0 2 4 15 MANGABE 0 0 8 7 0 7 0 1 0 0 1 5 16 MARIA 0 0 6 5 0 5 0 1 0 0 1 3 17 MAROKORO 0 0 6 6 0 6 0 2 0 0 0 4 18 MORAFENO 0 0 6 3 0 3 0 3 0 0 0 0 19 TSARARANO 0 0 8 8 0 8 0 3 0 0 2 3 TOTAL DISTRICT 0 0 134 125 0 125 0 33 0 0 15 77 DISTRICT: 4103 TSARATANANA BV reçus13 sur 13 01 AMBAKIRENY 0 0 8 8 0 8 0 4 0 0 0 4 02 AMPANDRANA 0 0 6 6 0 6 0 3 0 0 0 3 03 ANDRIAMENA 0 0 8 7 0 7 0 4 0 0 0 3 04
  • Candidats Fenerive Est Ambatoharanana 1

    Candidats Fenerive Est Ambatoharanana 1

    NOMBRE DISTRICT COMMUNE ENTITE NOM ET PRENOM(S) CANDIDATS CANDIDATS GROUPEMENT DE P.P MMM (Malagasy Miara FENERIVE EST AMBATOHARANANA 1 KOMPA Justin Miainga) GROUPEMENT DE P.P IRMAR (Isika Rehetra Miarka FENERIVE EST AMBATOHARANANA 1 RAVELOSAONA Rasolo Amin'ny Andry Rajoelina) GROUPEMENT DE P.P MMM (Malagasy Miara FENERIVE EST AMBODIMANGA II 1 SABOTSY Patrice Miainga) GROUPEMENT DE P.P IRMAR (Isika Rehetra Miarka FENERIVE EST AMBODIMANGA II 1 RAZAFINDRAFARA Elyse Emmanuel Amin'ny Andry Rajoelina) FENERIVE EST AMBODIMANGA II 1 INDEPENDANT TELO ADRIEN (Telo Adrien) TELO Adrien AMPASIMBE INDEPENDANT BOTOFASINA ANDRE (Botofasina FENERIVE EST 1 BOTOFASINA Andre MANANTSANTRANA Andre) AMPASIMBE GROUPEMENT DE P.P IRMAR (Isika Rehetra Miarka FENERIVE EST 1 VELONORO Gilbert MANANTSANTRANA Amin'ny Andry Rajoelina) AMPASIMBE FENERIVE EST 1 GROUPEMENT DE P.P MTS (Malagasy Tonga Saina) ROBIA Maurille MANANTSANTRANA AMPASIMBE INDEPENDANT KOESAKA ROMAIN (Koesaka FENERIVE EST 1 KOESAKA Romain MANANTSANTRANA Romain) AMPASIMBE INDEPENDANT TALEVANA LAURENT GERVAIS FENERIVE EST 1 TALEVANA Laurent Gervais MANANTSANTRANA (Talevana Laurent Gervais) GROUPEMENT DE P.P MMM (Malagasy Miara FENERIVE EST AMPASINA MANINGORY 1 RABEFIARIVO Sabotsy Miainga) GROUPEMENT DE P.P IRMAR (Isika Rehetra Miarka FENERIVE EST AMPASINA MANINGORY 1 CLOTAIRE Amin'ny Andry Rajoelina) INDEPENDANT ROBERT MARCELIN (Robert FENERIVE EST ANTSIATSIAKA 1 ROBERT Marcelin Marcelin) GROUPEMENT DE P.P IRMAR (Isika Rehetra Miarka FENERIVE EST ANTSIATSIAKA 1 KOANY Arthur Amin'ny Andry Rajoelina)
  • Rep 2 out Public 2010 S Tlet Sur of Ma Urvey Rvey Adagas Repor Scar Rt

    Rep 2 out Public 2010 S Tlet Sur of Ma Urvey Rvey Adagas Repor Scar Rt

    Evidence for Malaria Medicines Policy Outlet Survey Republic of Madagascar 2010 Survey Report MINSTERE DE LA SANTE PUBLIQUE www. ACTwatch.info Copyright © 2010 Population Services International (PSI). All rights reserved. Acknowledgements ACTwatch is funded by the Bill and Melinda Gates Foundation. This study was implemented by Population Services International (PSI). ACTwatch’s Advisory Committee: Mr. Suprotik Basu Advisor to the UN Secretary General's Special Envoy for Malaria Mr. Rik Bosman Supply Chain Expert, Former Senior Vice President, Unilever Ms. Renia Coghlan Global Access Associate Director, Medicines for Malaria Venture (MMV) Dr. Thom Eisele Assistant Professor, Tulane University Mr. Louis Da Gama Malaria Advocacy & Communications Director, Global Health Advocates Dr. Paul Lavani Executive Director, RaPID Pharmacovigilance Program Dr. Ramanan Senior Fellow, Resources for the Future Dr. Matthew Lynch Project Director, VOICES, Johns Hopkins University Centre for Dr. Bernard Nahlen Deputy Coordinator, President's Malaria Initiative (PMI) Dr. Jayesh M. Pandit Head, Pharmacovigilance Department, Pharmacy and Poisons Board‐Kenya Dr. Melanie Renshaw Advisor to the UN Secretary General's Special Envoy for Malaria Mr. Oliver Sabot Vice‐President, Vaccines Clinton Foundation Ms. Rima Shretta Senior Program Associate, Strengthening Pharmaceutical Systems Dr. Rick Steketee Science Director, Malaria Control and Evaluation Partnership in Africa Dr. Warren Stevens Health Economist Dr. Gladys Tetteh CDC Resident Advisor, President’s Malaria
  • Boissiera 71

    Boissiera 71

    Taxonomic treatment of Abrahamia Randrian. & Lowry, a new genus of Anacardiaceae BOISSIERA from Madagascar Armand RANDRIANASOLO, Porter P. LOWRY II & George E. SCHATZ 71 BOISSIERA vol.71 Director Pierre-André Loizeau Editor-in-chief Martin W. Callmander Guest editor of Patrick Perret this volume Graphic Design Matthieu Berthod Author instructions for www.ville-ge.ch/cjb/publications_boissiera.php manuscript submissions Boissiera 71 was published on 27 December 2017 © CONSERVATOIRE ET JARDIN BOTANIQUES DE LA VILLE DE GENÈVE BOISSIERA Systematic Botany Monographs vol.71 Boissiera is indexed in: BIOSIS ® ISSN 0373-2975 / ISBN 978-2-8277-0087-5 Taxonomic treatment of Abrahamia Randrian. & Lowry, a new genus of Anacardiaceae from Madagascar Armand Randrianasolo Porter P. Lowry II George E. Schatz Addresses of the authors AR William L. Brown Center, Missouri Botanical Garden, P.O. Box 299, St. Louis, MO, 63166-0299, U.S.A. [email protected] PPL Africa and Madagascar Program, Missouri Botanical Garden, P.O. Box 299, St. Louis, MO, 63166-0299, U.S.A. Institut de Systématique, Evolution, Biodiversité (ISYEB), UMR 7205, Centre national de la Recherche scientifique/Muséum national d’Histoire naturelle/École pratique des Hautes Etudes, Université Pierre et Marie Curie, Sorbonne Universités, C.P. 39, 57 rue Cuvier, 75231 Paris CEDEX 05, France. GES Africa and Madagascar Program, Missouri Botanical Garden, P.O. Box 299, St. Louis, MO, 63166-0299, U.S.A. Taxonomic treatment of Abrahamia (Anacardiaceae) 7 Abstract he Malagasy endemic genus Abrahamia Randrian. & Lowry (Anacardiaceae) is T described and a taxonomic revision is presented in which 34 species are recog- nized, including 19 that are described as new.
  • Madagascar Cyclone Enawo

    Madagascar Cyclone Enawo

    Antalaha ! ! MA002_10 ! ! Mandritsara Tsaratanana Mahanoro ! Andilambe ! Manambolosy Vanono ! Sahavia ! Behota Vanono Vanono Antsirabe Fanorah!ana Centre Manambolosy Ambalaben'Ifasina ! Ampanafanana Ambinaniboka ! Antsirabato ! Mahalina ! ! ! Ambodisatrana I Andasibe I Ambodiampana Fahambahy Antsiatsiaka ! ! Antsirat!enina Tsaratanana! Lampibe Andapanampambo ! Ambodimanga Ankoetrika ! ! Ambodiampana ! ! Aniribe Ankoba Bealampona ! ! Fitana Mananara !Marotandrano ! ! Fitana Marovato Ambodimadiro ! Riamena Avaratra Soavinarivo ! MANANARA Saromaona ! ! ! ! Analalava ! Marotandr!ano Mahatsinjo Sahazono ! ! Ambodivoanio Ambohim!ahavelona Befoza Ambodisatrana ! Andilamboahangy Antsirakivolo Ambodifano ! ! ! ! ! Ambodirotra ! ! Ambohipierenana Amboditangena ! Ambohimahavelona Ambodivoanio ! Mahafinaritra Tsarahasina Imorona Ambodisatrana ! ! Ambodivoangibe Vodivohitra Ambatofitarafana Antsiraka ! ! ! Ambatambaky ! Antanetilava ! Antsirabe Ambalavary Mananara-Avaratra ! Seranambe ! ! ! Makadabo Ambohimena ! Vohibe Antanambe ! Antanambao!be ! ! Antenina Andaparatibe ! Antsiraka Ambodisatrana Antanananivo ! ! Imorona Antsiatsiaka ! Antanambaon'amberina Antanananivo Sandrakatsy ! Fasina ! Sandrakatsy Sahasoa ! Antambontsona ! Ambodivato Ambodimanga ! Tanibe ! Fahatrosy ! Ambodimangatelo ! Sahakondro ! ANTANAMBAON'AMBERINA Antevialabe Belalona ! ! ! Ambatoharanana ! Antanambe Antsahamaloto ! Ambodimapay ! ! Ampasina ! Sahavoay Andranombazaha ! ! Analambola Antanambe ! ! Ambatoharanana Sahasoa Antevialabe ! ! Antenina Ampatakamaroreny Antenina Antanetilava
  • Annexe 2 : Hydrogéologie Et Génie Rural

    Annexe 2 : Hydrogéologie Et Génie Rural

    Etudes préparatoires Projet Agriculture Durable par une Approche Paysage (PADAP) Paysages de Iazafo et de Soanierana-Ivongo Région Analanjirofo Madagascar Annexe 2 : Hydrogéologie et Génie rural Septembre 2018 2 Contenu 1. Hydrologie et gestion intégrée de l’eau. ....................................................................................................... 9 1.1 Objectif volet « hydrogéologie et gestion intégrée des ressources en eaux » ............................................. 9 1.2 Activités menées ........................................................................................................................................... 9 2. Génie rural ................................................................................................................................................ 12 2.1 Objectifs ...................................................................................................................................................... 12 2.2 Activités menées ......................................................................................................................................... 13 3. Principaux résultats .................................................................................................................................... 18 3.1 Les paysages : d’abord des bassins versants. ............................................................................................. 18 3.2 Climat, géomorphologie, géologie, sols, eau. ............................................................................................
  • 3 Districts A1

    3 Districts A1

    Desserte en eau par commune Décembre 2014 48°40'0"E dans le49°0'0s"E 3 Districts 49°20'0"E 49°40'0"E S S " " 0 0 ' ' 0 0 2 2 ° ° 6 6 1 Analanjirofo ± 1 SS oo ff ii aa P Antenina M a n o m p a n a . S S " " 0 0 ' 2 AEPG ' 0 0 4 4 ° ° 6 6 1 39 FPMH 1 P Ambahoabe P A m b o d i a m p a n a . 2 PPMH FID P A n t a n i f o t s y P 1 AEPG "Commune" 21 FPMH et PPMH Fotsialanana Andapafito P P P AA nn aa ll aa nn jj ii rr oo ff oo S o a n i e r a n a I v o n g o . 1 AEPG JIRAMA 7 AEPG autres S S " " 0 0 ' 26 PPMH ' 0 0 ° ° 7 7 1 A n t s i a t s i a k a . 15 Puits 1 1 AEPG MATEZA 15 PMH MATEZA P P A m p a s i m b e M a n a n t s a t r a n a . 1 AEPG "Province" 45 PPMH Vohipeno P AA ll aa oo tt rr aa MM aa nn gg oo rr oo S a r a n a m b a n a . Miorimivalana A m p a s i n a M a n i n g o r y. 2 AEPG MATEZA P V o h i l e n g o P 6 AEPG 2 AEPG FIKRIFAMA 1 AEPG en cours 2 AEPG en cours 2 PPMH 15 FPMH et PPMH 2 villages ratés 28 Puits P 1 Station Ranontsika A n d a s i b e A m b a t o h a r a n a n a .
  • MADAGASCAR 5Æ Tropical Cyclone Analanjirofo Region / Maroantsetra District Imagery Analysis: 08 March 2017 | Published 9 March 2017 | Version 1.0 TC20170306MDG

    MADAGASCAR 5Æ Tropical Cyclone Analanjirofo Region / Maroantsetra District Imagery Analysis: 08 March 2017 | Published 9 March 2017 | Version 1.0 TC20170306MDG

    MADAGASCAR 5Æ Tropical Cyclone Analanjirofo region / Maroantsetra district Imagery analysis: 08 March 2017 | Published 9 March 2017 | Version 1.0 TC20170306MDG ¥¦¬Moroni 49°34'0"E 49°36'0"E 49°38'0"E 49°40'0"E 49°42'0"E 49°44'0"E 49°46'0"E 49°48'0"E 49°50'0"E 49°52'0"E 49°54'0"E 49°56'0"E Map location Antananarivo ¥¦¬ 15°18'0"S 15°18'0"S Saint-Denis¥¦¬ ¥¦¬ MADAGASCAR 15°20'0"S Satellite Detected Waters (08 March 15°20'0"S 2017) in Maroantsetra area, Analanjirofo region, Madagascar Ambinanitelo V o h i m a r o This map illustrates satellite-detected flood waters over Mariarano Maroantsetra area, Analanjirofo region in Madagastcar as observed from the TerraSAR-X radar image acquired on 08 March 2017 compared with Radarsat-2 15°22'0"S 15°22'0"S Fampanambo image acquired on 04 May 2014. Several zones seem to be inundated and have experienced an increase of standing waters. These zones are mainly agricultural M a n a m b o l o and/or swamps around the town of Maroantsetra. These waters seem to be the results of the recent heavy rain related also to the cyclone ENAWO-17 Ankofa which made landfall the 07 March 2017. It is likely that 15°24'0"S flood waters have been systematically underestimated 15°24'0"S Anjanavana along highly vegetated areas along main river banks and within built-up urban areas because of the special Mahalevona characteristics of the satellite data used.
  • Analyse Institutionnelle Et Contextuelle Des Structures Paysannes Dans La Filiere Vanille

    Analyse Institutionnelle Et Contextuelle Des Structures Paysannes Dans La Filiere Vanille

    ANALYSE INSTITUTIONNELLE ET CONTEXTUELLE DES STRUCTURES PAYSANNES DANS LA FILIERE VANILLE PROJET: UPSCALING SUSTAINABILITY INITIATIVES TOWARDS IMPROVED LIVELIHOODS IN VANILLA FARMING COMMUNITIES OF SAVA REGION JUILLET – AOUT 2017 Contact: Narcisse Kalisa Directeur Pays Sedera Rajoelison Search for Common Ground Madagascar Chargé du suivi et évaluation Search for Common Ground Madagascar LOT II K 50 M Mahatony Ivandry (261) 20 22 493 40 LOT II K 50 M Mahatony Ivandry [email protected] (261) 20 22 493 40 [email protected] Analyse institutionnelle et contextuelle | Fandriaka – aout 2017 Les opinions exprimées dans ce document sont celles des auteurs, et ne reflètent pas forcément les vues de la GIZ Mandaté par: Projet Alliance Stratégique Symrise-unilever-GIZ Développement de partenariat avec le Secteur privé – develoPPP.de Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Immeuble Ramanandraibe Ankevaheva - Andapa Equipe de recherche de SFCG Madagascar ● Koloina Randriamiary ● Sedera Rajoelison ● Benjamin Beaud ● Emma Ridings ● Aina Ramanantsiarovana ● Dominique Ralambotiana ● Kevin Charles ● Berthe Rahitasoa ● Antoine Rajarison ● Ando Ralandison Et 4 enquêteurs L’équipe est appuyée par l’Institutional Learning Team de SFCG Antananarivo / Madagascar – Aout 2017 2 | P a g e Analyse institutionnelle et contextuelle | Fandriaka – aout 2017 Table des matières Liste des abréviations ................................................................................................................................. 4 Liste des