
<p><strong>Sample Procurement Plan </strong></p><p><strong>Agriculture and Land Growth Management Project (P151469) </strong><br><strong>I. General </strong></p><p>2. </p><p><strong>Bank’s approval Date of the procurement Plan: </strong>Original: January 2016 – Revision PP: </p><p>December 2016 – February 2017 <br>3. 4. </p><p><strong>Date of General Procurement Notice</strong>: - <strong>Period covered by this procurement plan</strong>: July 2016 to December 2017 </p><p><strong>II. Goods and Works and non-consulting services. </strong></p><p><strong>1. </strong></p><p><strong>Prior Review Threshold</strong>: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement<em>: [Thresholds for applicable </em></p><p><em>procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] </em></p><p></p><ul style="display: flex;"><li style="flex:1">Type de contrats </li><li style="flex:1">Montant contrat Méthode de passation de Contrat soumis à revue a </li></ul><p></p><ul style="display: flex;"><li style="flex:1">en US$ (seuil) </li><li style="flex:1">marchés </li><li style="flex:1">priori de la banque </li></ul><p></p><ul style="display: flex;"><li style="flex:1">1. Travaux </li><li style="flex:1">≥ 5.000.000 </li><li style="flex:1">AOI </li><li style="flex:1">Tous les contrats </li></ul><p>< 5.000.000 < 500.000 </p><ul style="display: flex;"><li style="flex:1">AON </li><li style="flex:1">Selon PPM </li></ul><p></p><ul style="display: flex;"><li style="flex:1">Selon PPM </li><li style="flex:1">Consultation des </li></ul><p>fournisseurs </p><p>Tout montant </p><p>≥ 500.000 < 500.000 < 200.000 </p><ul style="display: flex;"><li style="flex:1">Entente directe </li><li style="flex:1">Tous les contrats </li></ul><p>Tous les contrats Selon PPM </p><ul style="display: flex;"><li style="flex:1">2. Fournitures </li><li style="flex:1">AOI </li></ul><p>AON <br>Consultation des Selon PPM fournisseurs </p><p></p><ul style="display: flex;"><li style="flex:1">Entente directe </li><li style="flex:1">Tout montant </li></ul><p>Tout montant <br>Tous les contrats Tous les contrats </p><p>Marchés passes auprès d’institutions de l’organisation des Nations Unies </p><p><strong>2. </strong></p><p><strong>Prequalification</strong>. Bidders for _<em>Not applicable _ </em>shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. </p><p>July 9, 2010 </p><p></p><ul style="display: flex;"><li style="flex:1"><strong>3. </strong></li><li style="flex:1"><strong>Proposed Procedures for CDD Components (as per paragraph. 3.17 of the </strong></li></ul><p><strong>Guidelines: </strong>- </p><p><strong>4. </strong></p><p><strong>Reference to (if any) Project Operational/Procurement Manual: </strong>Manuel de </p><p>procedures (execution – procedures administratives et financières – procedures de passation de marches): décembre 2016 – émis par l’Unite de Gestion du projet Casef (Croissance Agricole et Sécurisation Foncière) </p><p><strong>5. </strong></p><p><strong>6. </strong></p><p><strong>Any Other Special Procurement Arrangements</strong>: [<em>including advance procurement and </em></p><p><em>retroactive financing, if applicable</em>] <em>- </em></p><p><strong>Summary of the Procurement Packages planned during the first 18 months after project </strong></p><p><strong>effectiveness ( including those that are subject to retroactive financing and advanced procurement) </strong></p><p><em>[List the Packages which require Bank’s prior review first and then the other packages</em>] </p><p></p><ul style="display: flex;"><li style="flex:1"><strong>1</strong></li><li style="flex:1"><strong>2</strong></li><li style="flex:1"><strong>3</strong></li><li style="flex:1"><strong>4</strong></li><li style="flex:1"><strong>5</strong></li><li style="flex:1"><strong>6</strong></li><li style="flex:1"><strong>7</strong></li></ul><p><strong>Ref. No. </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Description </strong></li><li style="flex:1"><strong>Estimated </strong></li></ul><p><strong>Cost </strong><br><strong>US$ million </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Packages </strong></li><li style="flex:1"><strong>Domestic </strong></li></ul><p><strong>Preference </strong><br><strong>(yes/no) </strong><br><strong>Review by Bank </strong><br><strong>(Prior / Post) </strong><br><strong>Comments </strong></p><p>Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works) </p><p><em>No No No </em><br><em>Prior Prior Prior </em><br><em>1,025 5,821 </em><br><em>2</em></p><ul style="display: flex;"><li style="flex:1"><em>2</em></li><li style="flex:1"><em>1</em><sup style="top: -0.303em;"><em>st </em></sup><em>contract </em></li></ul><p><em>for Prior Review 1</em><sup style="top: -0.303em;"><em>st </em></sup><em>contract for Prior Review </em></p><p>Summary of the NCB (Goods) </p><p></p><ul style="display: flex;"><li style="flex:1"><em>0,257325 </em></li><li style="flex:1"><em>1</em></li><li style="flex:1"><em>No </em></li><li style="flex:1"><em>Prior </em></li></ul><p></p><p>Summary of the ICB (Non-Consultant Services) CFN (Consultations de Fournisseurs) – (travaux) CFN (Consultations de Fournisseurs) – (Fournitures) </p><p></p><ul style="display: flex;"><li style="flex:1"><em>-</em></li><li style="flex:1"><em>-</em></li><li style="flex:1"><em>No </em></li></ul><p><em>No No </em><br><em>Prior Prior Prior </em></p><ul style="display: flex;"><li style="flex:1"><em>-</em></li><li style="flex:1"><em>-</em></li></ul><p></p><ul style="display: flex;"><li style="flex:1"><em>0,0884 </em></li><li style="flex:1"><em>1</em></li></ul><p></p><p>Entente directe (fournitures) Marchés passes auprès d’institutions de l’organisation des Nations Unies </p><p><em>0,031 0,703 </em><br><em>1 2</em><br><em>No No </em><br><em>Prior Prior </em></p><p>Summary of the NCB (Works) Summary of the NCB (Goods) </p><p></p><ul style="display: flex;"><li style="flex:1"><em>4,243 </em></li><li style="flex:1"><em>2</em></li></ul><p><em>3</em><br><em>No No </em><br><em>Post </em></p><ul style="display: flex;"><li style="flex:1"><em>Post </em></li><li style="flex:1"><em>0,2031 </em></li></ul><p></p><p>July 9, 2010 </p><p>CFN (Consultations de Fournisseurs) – (travaux) CFN (Consultations de Fournisseurs – Achat à commande) – (Fournitures et services autres que services de </p><p><em>0,095 0,101 </em><br><em>4 5</em><br><em>No No </em><br><em>Post Post </em></p><p>consultants) </p><p><strong>III. Selection of Consultants </strong></p><p><strong>1. </strong></p><p><strong>Prior Review Threshold</strong>: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: </p><p></p><ul style="display: flex;"><li style="flex:1">Type de contrats </li><li style="flex:1">Montant contrat Méthode de passation Contrat soumis à revue </li></ul><p></p><ul style="display: flex;"><li style="flex:1">en US$ (seuil) </li><li style="flex:1">de marchés </li></ul><p>SFQC, SFQ, SCBD Tous les contrats SMC, SQC, </p><p>SFQC, SFQ, SCBD Selon PPM SMC, SQC a priori de la banque <br>3. Consultants (firmes) <br>≥ 200.000 <br>,</p><p>< 200.000 </p><p>≥ 100.000 < 100.000 <br>,<br>Consultant individuels <br>Comparaison de 3 CVs <br>Tous les contrats <br>Comparaison de 3 CVs <br>Selon PPM </p><ul style="display: flex;"><li style="flex:1">Firmes et individuels Tout montant </li><li style="flex:1">Entente directe </li><li style="flex:1">Tous les contrats </li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>2. </strong></li><li style="flex:1"><strong>Short list comprising entirely of national consultants</strong>: Short list of consultants for </li></ul><p></p><p>services, estimated to cost less than $_<em>300,000</em>_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. </p><p></p><ul style="display: flex;"><li style="flex:1"><strong>3. </strong></li><li style="flex:1"><strong>Any Other Special Selection Arrangements: </strong><em>[including advance procurement and </em></li></ul><p></p><p><em>retroactive financing, if applicable or delete if not applicable] </em></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>4. </strong></li><li style="flex:1"><strong>Consultancy Assignments with Selection Methods and Time Schedule </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>1</strong></li><li style="flex:1"><strong>2</strong></li><li style="flex:1"><strong>3</strong></li><li style="flex:1"><strong>4</strong></li><li style="flex:1"><strong>5</strong></li><li style="flex:1"><strong>6</strong></li></ul><p></p><ul style="display: flex;"><li style="flex:1"><strong>Ref. No. </strong></li><li style="flex:1"><strong>Description of </strong></li></ul><p><strong>Assignment </strong><br><strong>Estimated Cost </strong></p><p>US$ </p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Packages </strong></li><li style="flex:1"><strong>Review </strong></li></ul><p><strong>by Bank (Prior / Post) </strong><br><strong>Comments </strong></p><p>million <br>Summary of <em>5,6291 </em>number of </p><p></p><ul style="display: flex;"><li style="flex:1"><em>4</em></li><li style="flex:1"><em>Prior </em></li></ul><p></p><p>contracts that <br>July 9, 2010 will be let under QCBS </p><p>Summary of <em>13,75775 23 </em></p><p>number of </p><p></p><ul style="display: flex;"><li style="flex:1"><em>Prior </em></li><li style="flex:1"><em>SFQ, CI, </em></li></ul><p><em>SQC, </em></p><p>contracts that will be let </p><p><em>entente directe </em></p><p>under other methods Summary of <em>0,609 </em>number of contracts that will be let under QCBS Summary of <em>0,117 </em>number of </p><p></p><ul style="display: flex;"><li style="flex:1"><em>4</em></li><li style="flex:1"><em>Post </em></li></ul><p></p><ul style="display: flex;"><li style="flex:1"><em>Post </em></li><li style="flex:1"><em>11 </em></li><li style="flex:1"><em>CI, SQC </em></li></ul><p></p><p>contracts that will be let under other methods </p><p>July 9, 2010 </p><p><strong>PROCUREMENT PLAN </strong><br><strong>Madagascar : Madagascar Agriculture Rural Growth and Land Management Project </strong><br><strong>General Information </strong></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Country: </strong></li><li style="flex:1"><strong>Bank sApproval Date of the Original Procurement Plan: </strong></li></ul><p><strong>Revised Plan Date(s): (comma delineated, leave blank if none) </strong>2018-04-09 <strong>GPN Date: </strong></p><p></p><ul style="display: flex;"><li style="flex:1">2017-04-13 </li><li style="flex:1">Madagascar </li></ul><p>P151469 </p><p><strong>Project ID: Project Name: </strong></p><p>Madagascar Agriculture Rural Growth and Land Management Project IDA 57750 </p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Loan </strong></li><li style="flex:1"><strong>/</strong></li><li style="flex:1"><strong>Credit No: </strong></li></ul><p></p><p>/<br><strong>Executing Agency(ies) </strong>PROJECT MANAGEMENT UNIT AGRICULTURE GROWTH AND LAND MANAGEMENT, Intervention Funds for Development </p><p><strong>WORKS </strong></p><p></p><ul style="display: flex;"><li style="flex:1">Activity Reference No. / </li><li style="flex:1">Bid Evaluation Report </li></ul><p>and Recommendation for Award <br>Procurement Process <br>Prequalification <br>(Y/N) <br>Estimated Amount (US$) <br>Actual Amount <br>(US$) <br>Process Status <br>Draft Pre-qualification Documents <br>Prequalification Evaluation Report </p><ul style="display: flex;"><li style="flex:1">Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission </li><li style="flex:1">/</li></ul><p></p><ul style="display: flex;"><li style="flex:1">Description </li><li style="flex:1">Loan </li><li style="flex:1">/</li><li style="flex:1">Credit No. </li><li style="flex:1">Component </li><li style="flex:1">Review Type </li><li style="flex:1">Method </li><li style="flex:1">Market Approach </li><li style="flex:1">Signed Contract </li><li style="flex:1">Contract Completion </li></ul><p></p><ul style="display: flex;"><li style="flex:1">/</li><li style="flex:1">Justification </li><li style="flex:1">Notice / Invitation </li><li style="flex:1">Issued </li><li style="flex:1">Opening </li><li style="flex:1">/</li><li style="flex:1">Minutes </li></ul><p></p><ul style="display: flex;"><li style="flex:1">Planned </li><li style="flex:1">Actual </li><li style="flex:1">Planned </li><li style="flex:1">Actual </li><li style="flex:1">Planned </li><li style="flex:1">Actual </li><li style="flex:1">Planned </li><li style="flex:1">Actual </li><li style="flex:1">Planned Actual </li><li style="flex:1">Planned </li><li style="flex:1">Actual </li><li style="flex:1">Planned </li><li style="flex:1">Actual </li><li style="flex:1">Planned </li><li style="flex:1">Actual </li><li style="flex:1">Planned </li><li style="flex:1">Actual </li></ul><p></p><p>MG-UGP CASEF-16720-CW- </p><ul style="display: flex;"><li style="flex:1">RFQ </li><li style="flex:1">/</li><li style="flex:1">T</li><li style="flex:1">2-16/C4: Travaux </li></ul><p>Component 4. Project Management and Coordination <br>Request for Quotations <br>Single Stage Envelope <br>---One One One d'amé nagementdu bureau annexe pour cellule nationale Antananarivo <br>IDA IDA IDA <br>///57750 57750 57750 </p><ul style="display: flex;"><li style="flex:1">Post </li><li style="flex:1">Limited </li></ul><p>Limited Limited <br>23,000.00 50,000.00 9,000.00 <br>5,395.55 <br>0.00 </p><ul style="display: flex;"><li style="flex:1">Signed </li><li style="flex:1">2017-06-17 </li></ul><p>2017-06-20 2017-06-15 </p><ul style="display: flex;"><li style="flex:1">2017-08-18 </li><li style="flex:1">2017-07-28 </li></ul><p>2017-08-01 2017-07-25 </p><ul style="display: flex;"><li style="flex:1">2017-09-04 </li><li style="flex:1">2018-08-27 </li></ul><p>à</p><p>MG-UGP CASEF-16721-CW- RFQ 3-16/C4: Ré novation locaux cellule Vakinankaratra <br>Component 4. Project Management and Coordination <br>Request for Quotations <br>Single Stage Envelope <br>Pending Implementation </p><ul style="display: flex;"><li style="flex:1">/</li><li style="flex:1">T</li><li style="flex:1">Post </li></ul><p>Post <br>2018-10-29 2018-08-23 <br>MG-UGP CASEF-16722-CW- RFQ d'amé nagementdu bureau annexe pour cellule Vakinankaratra </p><ul style="display: flex;"><li style="flex:1">/</li><li style="flex:1">T</li><li style="flex:1">4-16/C4: Travaux </li><li style="flex:1">Component 4. Project </li></ul><p>Management and Coordination <br>Request for Quotations <br>Single Stage Envelope </p><ul style="display: flex;"><li style="flex:1">16,912.40 </li><li style="flex:1">Signed </li><li style="flex:1">2017-08-07 </li><li style="flex:1">2017-09-04 </li></ul><p>MG-UGP CASEF-16723-CW- </p><ul style="display: flex;"><li style="flex:1">RFQ </li><li style="flex:1">/</li><li style="flex:1">T</li><li style="flex:1">5-16/C4: Ré novation </li><li style="flex:1">Component 4. Project </li></ul><p>Management and Coordination <br>Request for Quotations <br>Single Stage Envelope <br>---One One One <br>Pending Implementation <br>IDA IDA IDA <br>///57750 57750 57750 <br>Post Post Post </p><ul style="display: flex;"><li style="flex:1">Limited </li><li style="flex:1">7,000.00 </li></ul><p>81,044.09 94,155.44 <br>0.00 0.00 0.00 <br>2017-06-19 2017-11-27 2017-11-27 <br>2017-07-30 2017-12-28 2017-12-28 <br>2018-08-28 2018-06-06 2018-06-06 locaux cellule Toamasina et antenne Analanjirofo </p><p></p><ul style="display: flex;"><li style="flex:1">DRAM1TRMPE1701 Travaux </li><li style="flex:1">/</li></ul><p>de Reconstruction des salles de classe MAROANTSETRA LOT 01 <br>Component 5. Contingency Emergency Response <br>Single Stage Envelope <br>Request for Bids Request for Bids <br>Open Open <br>--National National <br>Canceled Canceled <br>2017-11-25 2017-11-25 <br>2017-12-07 2017-12-07 <br>2017-12-17 2017-12-17 </p><ul style="display: flex;"><li style="flex:1">DRAM1TRMPE1702 Travaux </li><li style="flex:1">/</li></ul><p>de Reconstruction des salles de classe MAROANTSETRA LOT 02 <br>Component 5. Contingency Emergency Response <br>Single Stage Envelope </p><p></p><ul style="display: flex;"><li style="flex:1">DRAM1TRMPE1703 Travaux </li><li style="flex:1">/</li></ul><p>de Reconstruction des salles de classe MAROANTSETRA LOT 10 <br>Component 5. Contingency Emergency Response <br>Single Stage Envelope <br>--One One <br>IDA IDA <br>//57750 57750 <br>Post Post <br>Request for Bids Request for Bids <br>Open Open <br>--National National <br>81,044.09 68,247.65 <br>0.00 0.00 Canceled Canceled <br>2017-11-25 2017-11-25 <br>2017-11-27 2017-11-27 <br>2017-12-07 2017-12-07 <br>2017-12-17 2017-12-17 <br>2017-12-28 2017-12-28 <br>2018-06-06 2018-06-06 </p><ul style="display: flex;"><li style="flex:1">DRAM1TRMPE1704 Travaux </li><li style="flex:1">/</li><li style="flex:1">Component 5. Contingency </li></ul><p>Emergency Response <br>Single Stage Envelope de Reconstruction CSB1 Beanana </p><p>DRAM1TRMPE1705 Travaux de Reconstruction CSB1 Mahasoa <br>/<br>Component 5. Contingency Emergency Response <br>Single Stage Envelope <br>---One One One <br>IDA IDA IDA <br>///57750 57750 57750 <br>Post Post Post <br>Request for Bids Request for Bids Request for Bids <br>Open Open Open <br>---National National National <br>68,247.65 68,247.65 63,982.17 <br>0.00 0.00 0.00 Canceled Canceled Canceled <br>2017-11-25 2017-11-25 2017-11-25 <br>2017-11-27 2017-11-27 2017-11-27 <br>2017-12-07 2017-12-07 2017-12-07 <br>2017-12-17 2017-12-17 2017-12-17 <br>2017-12-28 2017-12-28 2017-12-28 <br>2018-06-06 2018-06-06 2018-06-06 </p><ul style="display: flex;"><li style="flex:1">DRAM1TRMPE1706 </li><li style="flex:1">/</li><li style="flex:1">Travaux </li><li style="flex:1">Component 5. Contingency </li></ul><p>Emergency Response <br>Single Stage </p><ul style="display: flex;"><li style="flex:1">Envelope </li><li style="flex:1">de ReconstructionCSB1 Vinanibe </li></ul><p></p><ul style="display: flex;"><li style="flex:1">DRAM1TRMPE1707 Travaux </li><li style="flex:1">/</li></ul><p>Component 5. Contingency Emergency Response <br>Single Stage Envelope de Ré habilitationinfrastructure mé dicalMaroantsetra LOT 03 </p><p>DRAM1TRMPE1708 Travaux de Ré habilitationinfrastructure mé dicalMaroantsetra LOT 04 <br>/<br>Component 5. Contingency Emergency Response <br>Single Stage Envelope <br>--One One <br>IDA IDA <br>//57750 57750 <br>Post Post <br>Request for Bids Request for Bids <br>Open Open <br>--National National <br>66,825.83 94,551.44 <br>0.00 0.00 Canceled Canceled <br>2017-11-25 2017-11-25 <br>2017-11-27 2017-11-27 <br>2017-12-07 2017-12-07 <br>2017-12-17 2017-12-17 <br>2017-12-28 2017-12-28 <br>2018-06-06 2018-06-06 </p><ul style="display: flex;"><li style="flex:1">DRAM1TRMPE1709 Travaux </li><li style="flex:1">/</li></ul><p>de Reconstruction des salles de classe totalement dé truites MAROANTSETRA LOT 03 <br>Component 5. Contingency Emergency Response <br>Single Stage Envelope </p><p></p><ul style="display: flex;"><li style="flex:1">DRAM1TRMPE1710 Travaux </li><li style="flex:1">/</li></ul><p>de Reconstruction des salles de classe MAROANTSETRA LOT 04 <br>Component 5. Contingency Emergency Response <br>Single Stage Envelope <br>---One One One <br>IDA IDA IDA <br>///57750 57750 57750 <br>Post Post Post <br>Request for Bids Request for Bids Request for Bids <br>Open Open Open <br>---National National National <br>81,044.09 94,551.44 94,551.44 <br>0.00 0.00 0.00 Canceled Canceled Canceled <br>2017-11-25 2017-11-25 2017-11-25 <br>2017-11-27 2017-11-27 2017-11-27 <br>2017-12-07 2017-12-07 2017-12-07 <br>2017-12-17 2017-12-17 2017-12-17 <br>2017-12-28 2017-12-28 2017-12-28 <br>2018-06-06 2018-06-06 2018-06-06 </p><ul style="display: flex;"><li style="flex:1">DRAM1TRMPE1711 Travaux </li><li style="flex:1">/</li></ul><p>de Reconstruction des salles de classe MAROANTSETRA LOT 05 <br>Component 5. Contingency Emergency Response <br>Single Stage Envelope </p><p></p><ul style="display: flex;"><li style="flex:1">DRAM1TRMPE1712 Travaux </li><li style="flex:1">/</li></ul><p>de Reconstruction des salles de classe MAROANTSETRA LOT 06 <br>Component 5. Contingency Emergency Response <br>Single Stage Envelope </p><p>DRAM1TRMPE1713 de ré habilitationMPI Ambinanintelo <br>//Travaux Travaux <br>Component 5. Contingency Emergency Response <br>Single Stage Envelope <br>---One One One <br>IDA IDA IDA <br>///57750 57750 57750 <br>Post Post Post <br>Request for Bids Request for Bids Request for Bids <br>Open Open Open <br>---National National National <br>48,342.09 76,778.61 98,106.00 <br>0.00 0.00 0.00 Canceled Canceled Canceled <br>2017-11-25 2017-11-25 2017-11-25 <br>2017-11-27 2017-11-27 2017-11-27 <br>2017-12-07 2017-12-07 2017-12-07 <br>2017-12-17 2017-12-17 2017-12-17 <br>2017-12-28 2017-12-28 2017-12-28 <br>2018-06-06 2018-06-06 2018-06-06 <br>DRAM1TRMPE1714 de Ré habilitationinfrastructure mé dicalMaroantsetra LOT 01 <br>Component 5. Contingency Emergency Response <br>Single Stage Envelope </p><p>DRAM1TRMPE1715 Travaux de Ré habilitationinfrastructure mé dicalMaroantsetra LOT 02 <br>/<br>Component 5. Contingency Emergency Response <br>Single Stage Envelope </p><p></p><ul style="display: flex;"><li style="flex:1">DRAM1TRMPE1716 Travaux </li><li style="flex:1">/</li></ul><p>de Reconstruction des salles de classe MAROANTSETRA LOT 07 <br>Component 5. Contingency Emergency Response <br>Single Stage Envelope <br>----One One One One <br>IDA IDA IDA IDA <br>////57750 57750 57750 57750 <br>Post Post Post Post <br>Request for Bids Request for Bids Request for Bids Request for Bids <br>Open Open Open Open <br>----National National National National <br>81,044.09 94,551.44 94,551.44 81,044.09 <br>0.00 0.00 0.00 0.00 Canceled Canceled Canceled Canceled <br>2017-11-25 2017-11-25 2017-11-25 2017-11-25 <br>2017-11-27 2017-11-27 2017-11-27 2017-11-27 <br>2017-12-07 2017-12-07 2017-12-07 2017-12-07 <br>2017-12-17 2017-12-17 2017-12-17 2017-12-17 <br>2017-12-28 2017-12-28 2017-12-28 2018-01-28 <br>2018-06-06 2018-06-06 2018-06-06 2018-07-07 </p><ul style="display: flex;"><li style="flex:1">DRAM1TRMPE1717 Travaux </li><li style="flex:1">/</li></ul><p>de Reconstruction des salles de classe MAROANTSETRA LOT 08 <br>Component 5. Contingency Emergency Response <br>Single Stage Envelope </p><p></p><ul style="display: flex;"><li style="flex:1">DRAM1TRMPE1718 Travaux </li><li style="flex:1">/</li></ul><p>de Reconstruction des salles de classe MAROANTSETRA LOT 09 <br>Component 5. Contingency Emergency Response <br>Single Stage Envelope </p><p></p><ul style="display: flex;"><li style="flex:1">DRAM1TRMPE1719 Travaux </li><li style="flex:1">/</li></ul><p>de Reconstruction des salles de classe MAROANTSETRA LOT 11 <br>Component 5. Contingency Emergency Response <br>Single Stage Envelope </p><p>DRAM1TRMPE1720 Travaux de Reconstruction CSB1 Antevibe <br>/<br>Component 5. Contingency Emergency Response <br>Single Stage Envelope <br>----One One One One <br>IDA IDA IDA IDA <br>////57750 57750 57750 57750 <br>Post Post Post Post <br>Request for Bids Request for Bids Request for Bids Request for Bids <br>Open Open Open Open <br>----National National National National <br>68,247.65 68,247.65 68,247.65 38,389.30 <br>0.00 0.00 0.00 0.00 Canceled Canceled Canceled Canceled <br>2017-11-25 2017-11-25 2017-11-25 2017-11-25 <br>2017-11-27 2017-11-27 2017-11-27 2017-11-27 <br>2017-12-07 2017-12-07 2017-12-07 2017-12-07 <br>2017-12-17 2017-12-17 2017-12-17 2017-12-17 <br>2017-12-28 2017-12-28 2017-12-28 2017-12-28 <br>2018-06-06 2018-06-06 2018-06-06 2018-06-06 </p><ul style="display: flex;"><li style="flex:1">DRAM1TRMPE1721 Travaux </li><li style="flex:1">/</li></ul><p>Component 5. Contingency Emergency Response <br>Single Stage </p><ul style="display: flex;"><li style="flex:1">Envelope </li><li style="flex:1">de Reconstruction CSB1 </li></ul><p>Madiotsifafana </p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages19 Page
-
File Size-