World Bank Document Sample Procurement Plan Agriculture and Land Growth Management Project (P151469) Public Disclosure Authorized I. General 2. Bank’s approval Date of the procurement Plan: Original: January 2016 – Revision PP: December 2016 – February 2017 3. Date of General Procurement Notice: - 4. Period covered by this procurement plan: July 2016 to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable Public Disclosure Authorized procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Type de contrats Montant contrat Méthode de passation de Contrat soumis à revue a en US$ (seuil) marchés priori de la banque 1. Travaux ≥ 5.000.000 AOI Tous les contrats < 5.000.000 AON Selon PPM < 500.000 Consultation des Selon PPM fournisseurs Public Disclosure Authorized Tout montant Entente directe Tous les contrats 2. Fournitures ≥ 500.000 AOI Tous les contrats < 500.000 AON Selon PPM < 200.000 Consultation des Selon PPM fournisseurs Tout montant Entente directe Tous les contrats Tout montant Marchés passes auprès Tous les contrats d’institutions de l’organisation des Nations Unies Public Disclosure Authorized 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. July 9, 2010 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: - 4. Reference to (if any) Project Operational/Procurement Manual: Manuel de procedures (execution – procedures administratives et financières – procedures de passation de marches): décembre 2016 – émis par l’Unite de Gestion du projet Casef (Croissance Agricole et Sécurisation Foncière) 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] - 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ million (yes/no) (Prior / Post) Summary of the ICB No Prior (Works) Summary of the ICB 1,025 2 No Prior (Goods) Summary of the 5,821 2 No Prior 1st contract NCB (Works) for Prior Review Summary of the 0,257325 1 No Prior 1st contract NCB (Goods) for Prior Review Summary of the ICB - - No Prior (Non-Consultant Services) CFN (Consultations - - No Prior de Fournisseurs) – (travaux) CFN (Consultations 0,0884 1 No Prior de Fournisseurs) – (Fournitures) Entente directe 0,031 1 No Prior (fournitures) Marchés passes 0,703 2 No Prior auprès d’institutions de l’organisation des Nations Unies Summary of the 4,243 2 No Post NCB (Works) Summary of the 0,2031 3 No Post NCB (Goods) July 9, 2010 CFN (Consultations 0,095 4 No Post de Fournisseurs) – (travaux) CFN (Consultations 0,101 5 No Post de Fournisseurs – Achat à commande) – (Fournitures et services autres que services de consultants) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Type de contrats Montant contrat Méthode de passation Contrat soumis à revue en US$ (seuil) de marchés a priori de la banque 3. Consultants ≥ 200.000 SFQC, SFQ, SCBD Tous les contrats (firmes) SMC, SQC, , < 200.000 SFQC, SFQ, SCBD Selon PPM SMC, SQC , Consultant ≥ 100.000 Comparaison de 3 Tous les contrats individuels CVs < 100.000 Comparaison de 3 Selon PPM CVs Firmes et individuels Tout montant Entente directe Tous les contrats 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 5,6291 4 Prior number of contracts that July 9, 2010 will be let under QCBS Summary of 13,75775 23 Prior SFQ, CI, number of SQC, contracts that entente will be let directe under other methods Summary of 0,609 4 Post number of contracts that will be let under QCBS Summary of 0,117 11 Post CI, SQC number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Madagascar : Madagascar Agriculture Rural Growth and Land Management Project PLAN General Information Country: Madagascar Banks Approval Date of the Original Procurement Plan: 2017-04-13 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-10-16 Project ID: P151469 GPN Date: Project Name: Madagascar Agriculture Rural Growth and Land Management Project Loan / Credit No: IDA / 57750 Executing Agency(ies): PROJECT MANAGEMENT UNIT AGRICULTURE GROWTH AND LAND MANAGEMENT, Intervention Funds for Development WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-UGP CASEF-16720-CW- RFQ / T 2-16/C4: Travaux Component 4. Project Request for Single Stage - One Pending d'aménagement du bureau IDA / 57750 Post Limited 23,000.00 0.00 2017-06-17 2017-07-28 2018-08-27 Management and Coordination Quotations Envelope Implementation annexe pour cellule nationale à Antananarivo MG-UGP CASEF-16721-CW- Component 4. Project Request for Single Stage - One Pending RFQ / T 3-16/C4: Rénovation IDA / 57750 Post Limited 50,000.00 0.00 2017-06-20 2017-08-01 2018-10-29 Management and Coordination Quotations Envelope Implementation locaux cellule Vakinankaratra MG-UGP CASEF-16722-CW- RFQ / T 4-16/C4: Travaux Component 4. Project Request for Single Stage - One Pending d'aménagement du bureau IDA / 57750 Post Limited 9,000.00 0.00 2017-06-15 2017-07-25 2018-08-23 Management and Coordination Quotations Envelope Implementation annexe pour cellule Vakinankaratra MG-UGP CASEF-16723-CW- RFQ / T 5-16/C4: Rénovation Component 4. Project Request for Single Stage - One Pending IDA / 57750 Post Limited 7,000.00 0.00 2017-06-19 2017-07-30 2018-08-28 locaux cellule Toamasina et Management and Coordination Quotations Envelope Implementation antenne Analanjirofo DRFM1TRMPE17ATEC001 / TRAVAUX DE REHABILITATION DU BARRAGE BETSIMISOTRA - Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 91,703.47 0.00 2017-11-19 2017-11-23 2017-12-03 2017-12-05 2017-12-20 2019-05-19 COMMUNE RURALE Emergency Response Envelope Implementation BETSIMISOTRA - DISTRICT FANDRIANA DRFM1TRMPE17ATEC002 / TRAVAUX DE REHABILITATION DU BARRAGE VOLAMENA Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 42,988.40 0.00 2017-11-19 2017-11-23 2017-12-03 2017-12-05 2017-12-20 2019-05-19 DANS LA COMMUNE RURALE Emergency Response Envelope Implementation DE VOLAMENA - DISTRICT AMBALAVAO DRFM1TRMPE17ATEC003 / TRAVAUX DE RECONSTITUTION DES BERGES ET TRAITEMENT Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 15,011.82 0.00 2017-11-19 2017-11-23 2017-12-03 2017-12-05 2017-12-20 2019-05-19 BRECHES SAHAREVO - Emergency Response Envelope Implementation COMMUNE RURALE ILAKA CENTRE - DISTRICT AMBOSITRA DRTM1TRMPE1701 / Travaux de reconstruction de la digue Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 100,314.13 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23 Ambalanosy à Antanifotsy - Emergency Response Envelope Implementation Commune Ambodiriana DRTM1TRMPE1702 / Travaux de reconstruction du MPI à Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 84,587.87 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23 Antsirabe II - Commune Emergency Response Envelope Implementation Ambohimiarivo DRTM1TRMPE1703 / Travaux de reconstruction du MPI à Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 84,587.87 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23 Antsirabe II - Commune Emergency Response Envelope Implementation Mandrosohasina DRTM1TRMPE1704 / Travaux de reconstruction de la digue de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 67,610.60 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23
Recommended publications
  • TDR Annexe7 Rapport Analyse 322 Communes OATF
    ETAT DES LIEUX DES 319 COMMUNES POUR LE FINANCEMENT ADDITIONNEL DU PROJET CASEF Février 2019 TABLE DES MATIERES TABLE DES MATIERES .................................................................................................................... i LISTE DES ACRONYMES ................................................................................................................ iii Liste des tableaux ......................................................................................................................... v Listes des Cartes ........................................................................................................................... v Liste des figures ............................................................................................................................vi Liste des photos ...........................................................................................................................vi I INTRODUCTION ....................................................................................................................... 1 II METHODOLOGIES .................................................................................................................... 2 II.1 CHOIX DES 322 COMMUNES OBJETS D’ENQUETE ............................................................... 2 II.2 CHOIX DES CRITERES DE SELECTION DES COMMUNES ........................................................ 5 II.3 METHODOLOGIE DE COLLECTE DE DONNEES ET ACTIVITES ................................................. 6
    [Show full text]
  • MAEP: Rapport Annuel 2019
    RAPPORT ANNUEL 2019 1 INTRODUCTION 1 UNE VISION CLAIRE 4 CHIFFRES CLES 5 EVENEMENTS MARQUANTS 2019 7 AGRICULTURE 8 ELEVAGE 28 PêCHE 37 Sommaire ADMINISTRATION 50 COOPERATION 60 CONCLUSION 64 2 MINISTÈRE DE L’AGRICULTURE, DE L’ELEVAGE ET DE LA PECHE Introduction Le Ministère de l’Agriculture, de l’Elevage et de la Pêche Des efforts considérables ont été menés afin d’ajuster (MAEP) a pour objectif d’atteindre l’autosuffisance nos orientations stratégiques vers l’IEM, comme témoigne alimentaire et l’Emergence d’un secteur Agricole l’esprit de rupture insufflé dans l’élaboration du Plan moderne. Emergence de Madagascar. Cela, afin de se tourner vers la Transformation durable de l’Agriculture malagasy. Cette Pour Madagascar, l’année 2019, sous la présidence de rupture tient également compte de la capitalisation des SEM Andry RAJOELINA, est synonyme de démarrage pour bonnes pratiques afin d’œuvrer dans la continuité. rattraper en cinq ans le retard de développement accumulé La mobilisation de tous les acteurs du développement depuis plus de 50 ans. Cet objectif est matérialisé par rural, dont principalement le Secteur Privé et les Partenaires toutes les actions de grandes envergures qui sont d’ores Techniques et Financiers (PTF), ont aussi figuré parmi nos et déjà menées par le régime. priorités. Pour le développement rural, cette année a été marquée Le présent rapport fait état des efforts menés et rend par la réunification des trois sous-secteurs agriculture, compte des principales réalisations physiques du MAEP à élevage et pêche au sein d’un même Ministère (MAEP) travers les différentes entités et les programmes et projets après 11 ans de séparation.
    [Show full text]
  • World Bank Document
    Sample Procurement Plan Agriculture and Land Growth Management Project (P151469) Public Disclosure Authorized I. General 2. Bank’s approval Date of the procurement Plan: Original: January 2016 – Revision PP: December 2016 – February 2017 3. Date of General Procurement Notice: - 4. Period covered by this procurement plan: July 2016 to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable Public Disclosure Authorized procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Type de contrats Montant contrat Méthode de passation de Contrat soumis à revue a en US$ (seuil) marchés priori de la banque 1. Travaux ≥ 5.000.000 AOI Tous les contrats < 5.000.000 AON Selon PPM < 500.000 Consultation des Selon PPM fournisseurs Public Disclosure Authorized Tout montant Entente directe Tous les contrats 2. Fournitures ≥ 500.000 AOI Tous les contrats < 500.000 AON Selon PPM < 200.000 Consultation des Selon PPM fournisseurs Tout montant Entente directe Tous les contrats Tout montant Marchés passes auprès Tous les contrats d’institutions de l’organisation des Nations Unies Public Disclosure Authorized 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. July 9, 2010 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: - 4. Reference to (if any) Project Operational/Procurement Manual: Manuel de procedures (execution – procedures administratives et financières – procedures de passation de marches): décembre 2016 – émis par l’Unite de Gestion du projet Casef (Croissance Agricole et Sécurisation Foncière) 5.
    [Show full text]
  • Répartition De La Caisse-École 2020 Des Collèges D'enseignement
    Repartition de la caisse-école 2020 des Collèges d'Enseignement Général DREN ALAOTRA-MANGORO CISCO AMBATONDRAZAKA Prestataire OTIV ALMA Commune Code Etablissement Montant AMBANDRIKA 503010005 CEG AMBANDRIKA 1 598 669 AMBATONDRAZAKA 503020018 C.E.G. ANOSINDRAFILO 1 427 133 AMBATONDRAZAKA 503020016 CEG RAZAKA 3 779 515 AMBATONDRAZAKA SUBURBAINE 503030002 C.E.G. ANDINGADINGANA 1 142 422 AMBATOSORATRA 503040001 CEG AMBATOSORATRA 1 372 802 AMBOHIBOROMANGA 503070012 CEG ANNEXE AMBOHIBOROMANGA 878 417 AMBOHIBOROMANGA 503150018 CEG ANNEXE MARIANINA 775 871 AMBOHIBOROMANGA 503150016 CEGFERAMANGA SUD 710 931 AMBOHIDAVA 503040017 CEG AMBOHIDAVA 1 203 171 AMBOHITSILAOZANA 503050001 CEG AMBOHITSILAOZANA 1 671 044 AMBOHITSILAOZANA CEG TANAMBAO JIAPASIKA 622 687 AMPARIHINTSOKATRA 503060013 CEG AMPARIHINTSOKATRA 1 080 499 AMPITATSIMO 503070001 CEG AMPITATSIMO 1 530 936 AMPITATSIMO 503070015 CEG ANNEXE AMBOHITANIBE 860 667 ANDILANATOBY 503080025 CEG ANDRANOKOBAKA 760 039 ANDILANATOBY 503080001 CEG ANDILANATOBY 1 196 620 ANDILANATOBY 503080026 CEG ANNEXE SAHANIDINGANA 709 718 ANDILANATOBY 503080027 CEG COMMUNAUTAIRE AMBODINONOKA 817 973 ANDILANATOBY 503080031 CEG COMMUNAUTAIRE MANGATANY 723 676 ANDILANATOBY 503080036 CEG COMMUNAUTAIRE RANOFOTSY 668 769 ANDROMBA 503090005 CEG ANDROMBA 1 008 043 ANTANANDAVA 503100020 CEG ANTANANDAVA 1 056 579 ANTSANGASANGA 503110004 CEG ANTSANGASANGA 757 763 BEJOFO 503120016 C.E.G.
    [Show full text]
  • Table Des Matieres La Region…………………………………………………….…………………..……………….1 1 Milieu Physique
    TABLE DES MATIERES LA REGION…………………………………………………….…………………..……………….1 1 MILIEU PHYSIQUE ........................................................................................................................13 1.1 RELIEF .......................................................................................................................................13 1.2 GEOLOGIE .................................................................................................................................13 1.3 CLIMAT ......................................................................................................................................14 1.3.1 Le réseau de stations météorologiques ................................................................................15 1.3.2 Température ........................................................................................................................16 1.3.3 Pluviométrie ........................................................................................................................17 1.3.4 Diagrammes ombrothermiques ...........................................................................................18 1.3.5 Cyclones ..............................................................................................................................19 1.4 HYDROLOGIE ...........................................................................................................................19 1.5 SOLS ET VEGETATIONS .........................................................................................................20
    [Show full text]
  • Evolution De La Couverture De Forets Naturelles a Madagascar
    EVOLUTION DE LA COUVERTURE DE FORETS NATURELLES A MADAGASCAR 1990-2000-2005 mars 2009 La publication de ce document a été rendue possible grâce à un support financier du Peuple Americain à travers l’USAID (United States Agency for International Development). L’analyse de la déforestation pour les années 1990 et 2000 a été fournie par Conservation International. MINISTERE DE L’ENVIRONNEMENT, DES FORETS ET DU TOURISME Le présent document est un rapport du Ministère de l’Environnement, des Forêts et du Tourisme (MEFT) sur l’état de de l’évolution de la couverture forestière naturelle à Madagascar entre 1990, 2000, et 2005. Ce rapport a été préparé par Conservation International. Par ailleurs, les personnes suivantes (par ordre alphabétique) ont apporté leur aimable contribution pour sa rédaction: Andrew Keck, James MacKinnon, Norotiana Mananjean, Sahondra Rajoelina, Pierrot Rakotoniaina, Solofo Ralaimihoatra, Bruno Ramamonjisoa, Balisama Ramaroson, Andoniaina Rambeloson, Rija Ranaivosoa, Pierre Randriamantsoa, Andriambolantsoa Rasolohery, Minoniaina L. Razafindramanga et Marc Steininger. Le traitement des imageries satellitaires a été réalisé par Balisama Ramaroson, Minoniaina L. Razafindramanga, Pierre Randriamantsoa et Rija Ranaivosoa et les cartes ont été réalisées par Andriambolantsoa Rasolohery. La réalisation de ce travail a été rendu possible grâce a une aide financière de l’United States Agency for International Development (USAID) et mobilisé à travers le projet JariAla. En effet, ce projet géré par International Resources Group (IRG) fournit des appuis stratégiques et techniques au MEFT dans la gestion du secteur forestier. Ce rapport devra être cité comme : MEFT, USAID et CI, 2009. Evolution de la couverture de forêts naturelles à Madagascar, 1990- 2000-2005.
    [Show full text]
  • Résultats Détaillés Antananarivo
    RESULTATS SENATORIALES DU 29/12/2015 FARITANY: 1 ANTANANARIVO BV reçus: 313 sur 313 GASIKA MARINA HVM MAPAR MMM NY AREMA ASSOCI TIM RA MANGA ATION MAINTS RANO MALAG N°BV Emplacement AP AT Inscrits Votants B N S E O MALAZA ASY SAMBA REGION 11 ANALAMANGA BV reçus 140 sur 140 DISTRICT: 1101 AMBOHIDRATRIMO BV reçus24 sur 24 01 AMBATO 0 0 8 7 0 7 0 3 4 0 0 0 0 0 0 02 AMBATOLAMPY 0 0 8 8 0 8 0 1 4 1 0 0 0 0 2 03 AMBOHIDRATRIMO 0 0 10 10 0 10 0 1 8 0 0 0 0 0 1 04 AMBOHIMANJAKA 0 0 6 6 0 6 0 3 3 0 0 0 0 0 0 05 AMBOHIMPIHAONANA 0 0 6 6 0 6 0 0 3 0 0 0 0 1 2 06 AMBOHITRIMANJAKA 0 0 8 8 0 8 0 0 6 0 0 0 0 0 2 07 AMPANGABE 0 0 8 7 0 7 0 1 6 0 0 0 0 0 0 08 AMPANOTOKANA 0 0 8 8 0 8 0 4 2 0 1 0 0 0 1 09 ANJANADORIA 0 0 6 6 0 6 0 0 5 0 0 0 0 0 1 10 ANOSIALA 0 0 8 8 0 8 0 2 2 1 0 0 0 0 3 11 ANTANETIBE MAHAZA 0 0 8 8 0 8 0 0 6 0 0 0 0 0 2 12 ANTEHIROKA 0 0 8 6 0 6 0 0 5 0 0 0 0 0 1 13 ANTSAHAFILO 0 0 6 6 0 6 0 3 2 0 0 0 0 0 1 14 AVARATSENA 0 0 6 5 0 5 0 0 5 0 0 0 0 0 0 15 FIADANANA 0 0 6 6 0 6 0 0 3 0 0 0 0 0 3 16 IARINARIVO 0 0 6 6 0 6 0 2 3 0 0 0 0 0 1 17 IVATO 0 0 8 8 0 8 0 1 4 2 0 0 0 0 1 18 MAHABO 0 0 6 6 0 6 0 0 4 0 0 0 0 0 2 19 MAHEREZA 0 0 6 5 0 5 0 0 5 0 0 0 0 0 0 20 MAHITSY 0 0 8 8 0 8 0 4 3 0 0 0 0 0 1 21 MANANJARA 0 0 6 5 0 5 0 0 5 0 0 0 0 0 0 22 MANJAKAVARADRAN 0 0 6 6 0 6 0 1 2 1 0 0 0 1 1 23 MERIMANDROSO 0 0 8 8 0 8 0 2 5 0 1 0 0 0 0 24 TALATAMATY 0 0 8 8 0 8 0 0 3 2 0 0 0 0 3 TOTAL DISTRICT 0 0 172 165 0 165 0 28 98 7 2 0 0 2 28 DISTRICT: 1102 ANDRAMASINA BV reçus14 sur 14 01 ALAROBIA VATOSOLA 0 0 8 8 0 8 0 2 6 0 0 0 0 0 0 02 ALATSINAINY
    [Show full text]
  • Randrianomananamandimbihery R1 SOCIO M2 08
    RANDRIANOMANANA Université d’Antananarivo Mandimbihery Roger Faculté de Droit, d’Economie, de Adresse : CU Ambohipo Gestion et de Sociologie Bloc 115.Porte D2 Département SOCIOLOGIE Tél : 0331154031 MEMOIRE DE D.E.A (Diplôme d’ Etude Approfondie) Thème de recherche : IMPACTS SOCIO-ECONOMIQUES DE L’IMPLANTATION DE LA MICRO-FINANCE DANS LE MILIEU RURAL : Cas de la CECAM dans la commune rurale d’Ambohimiadana Présenté par RANDRIANOMANANA Mandimbihery Roger Encadré par Mme RAMANDIMBIARISON Noëline Rubrique : SOCIOLOGIE DE DEVELOPPEMENT Année Universitaire : 2007-2008 Date de soutenance : 06 juin 2008 IMPACTS SOCIO-ECONOMIQUES DE L’IMPLANTATION DE LA MICRO- FINANCE DANS LE MILIEU RURAL : Cas de la CECAM dans la commune rurale d’Ambohimiadana REMERCIEMENTS Nous adressons nos plus vifs remerciements à tous ceux qui, de près ou de loin, ont contribué à la réalisation du présent mémoire. Avant tout, il y a Dieu, sans sa bénédiction nous ne pouvons rien faire. De plus nous tenons à exprimer notre gratitude aux personnalités ci-après : M. Allain B. SOLOFOMIARANA RAPANOEL qui a accepté avec bienveillance de juger ce mémoire malgré ses lourdes responsabilités au sein de notre département. Mme Noëline RAMANDIMBIARISON qui nous a apporté son assistance et son appui avec patience et diligence, tout le long de notre recherche, malgré les diverses tâches qui lui incombent. Elle nous a montré le véritable amour d’une mère envers son fils, entendu dans le proverbe malgache « Ny zanaka tiana tsy itsitsiana rantsan-kazo ». Enfin, nous n’oublions pas d’adresser une reconnaissance particulière à tous les membres de notre famille ainsi qu’à nos amis qui nous ont soutenu moralement et matériellement.
    [Show full text]
  • STRATEGIES Et PROGRAMMATION Des ACTIVITES 2020-2023
    STRATEGIES et PROGRAMMATION des ACTIVITES 2020-2023 DIRECTION GENERALE DES SERVICES FONCIERS Version finale Décembre 2020 Sommaire 1. Etat des lieux 5 1.1. Réalisations 5 1.1.1. Répartition des Services Fonciers sur le territoire national : 5 1.1.2. Evolution de la sécurisation foncière à madagascar 6 1.1.3. Situation de la dématérialisation des documents fonciers 6 1.1.4. Situation des plans locaux d’occupation foncière (PLOFS) 7 1.1.5. Situation de couverture en image satellitaire 7 1.2. Limites 7 1.2.1. Situation des archives 7 1.2.2. Situation des ressources 7 1.2.3. Les projets financés par les partenaires techniques et financiers (PTF) 8 1.2.4. Situation du budget alloué par l’etat à l’administration foncière-ressources propres internes (RPI) 9 2. Stratégies de développement du secteur foncier 11 2.1. Les documents de référence 11 2.2. Vision et objectifs 12 2.3. Présentation des axes stratégiques 12 3. Programmation des activités et budgétisation 13 3.1. Indicateurs de résultats (2021-2023) 13 3.2. Projection d’indicateurs en 2030 13 3.2.1. Axe 1 : sécurisation foncière massive 14 3.2.1.1. Budget et indicateurs des activités de l’axe 1 : sécurisation foncière massive (2020 à 2030) 16 3.2.2. Axe 2 : modernisation des services fonciers 19 3.2.2.1. Budget et indicateur des activités de l’axe 2 : modernisations des services fonciers (2020 à 2030) 22 3.2.3. Axe 3 : la bonne gouvernance de l’administration foncière 28 3.2.3.1.
    [Show full text]
  • [ Manuel De Verification'i
    ~POBLIKAN'I MADAGASIKARA Tanindrazana - Fahafahanâ - Fahamarinana YIN1ST~RB DE L' ECONOMIE, DU PLAN ET DU REDRBSSBMENT SOCIAL DIRBCTION' GBNERALE DE LA BANQUE DES DON NEES DE L'BTAT COMMISSION N'ATIONALE DIRECTION DV RECENSEMBNT GENERAL- DU iECBNSENENT ~ENERAL DE LA POPULATION ET DE L'HABITAT DB LA 1'OPULATION ST J)E L'HABITAT ,. DEUXIEME RECENSEMENT GENERAL DE LA POPULATION ET DE L'HABITAT 1993 --- 1 / [ MANUEL DE VERIFICATION ' I Version 2.s . fO\<l.ocrsph\lIIanveT2.8 Janvier 94 REPOBLlKAN'I MADAGASlKARA 'farundrazalla - Fahafahana - Fahamarinana UINISTERE DE L'ECONOMIE, DU PLAN ET DU REDRESSEMENT SOCIAL DIRECTIO:-: GENERALE DE LA BANQUE DES DONNEES DE L'ETAT COMMISSION NATIONALE DIREC1ION Dl! RECENSEMENT GENERAL DU RECENSEMENT GENERAL DE LA POP U LATIO:i ET DE l' HABITAT DE LA POPULATION ET DE L'HABITAT DEUXIEME RECENSEMEl\rrr GEN]~RAL DE LA POPULATION Err DE L ~HA,BI'TAT 1993 MANUEL DE VERIFICATION 1 Il Version 2.s fb\docrBPh\manver2.s Janvier 94 SOI\.iMA1RE INTRODUCTIO~~ . 2 l - GENERALITES SUR LA VERIFICATION 1.1 - LA SECTION V"ERIFICATION ..•.........' , . ,........... 2 1.2 - LE TR~ VAIL DU \lt:RlFICATEUR ..................... 2 1.3 - L'IDEN1IFICATION DES QUESTIONNAIRES .. ,.... ~, ...... 3 1.4- LES QUESTIOl'.~.AIRES-SUITE ...................... 5 ,2 '- METIIODE DE'VERIFICATION o - MILIEU ..............................••........ 5 l - 'FARITA.N1" 2 - F IVONDRONA1\fPOK0l'41 Al"\""l , 3 - FIRAISM1POKONTMry· ..............•...•..........• 5 4 -. N°DE LA ZONE 5 - N e DU S EGME?\l . ~ . .. .... 6 6 "- FOKONTAl~l'· 7 - LOCALITE .... ' .....•..............•..... la ••' • • • • • • 8 8 - N ~ 'DU B.ATIMEr1T .•..-. _ .....•.. ~ ..••.•' .•••.•..•• · • 8 . 9 - TI'1>E' D'UTILISATION . '........................ · . 8 , <> DU ,..,.-c.... TAGE .. 9 ,~ 10. ~ _N Ir}...!::..l'" .• • .
    [Show full text]
  • Liste Des Communes Beneficiaires Au Financement Papsp-Fdl
    LISTE DES COMMUNES BENEFICIAIRES AU FINANCEMENT PAPSP-FDL DATE ORDRE DE CATEG APPORT MONTANT TYPE RÉGION DISTRICT COMMUNE SOUS-PROJET MONTANT FDL MODE D'EXECUTION TYPE DE TRAVAUX SECTEUR VIREMENT FDL ORIE COMMUNE TOTAL INFRASTRUCTURE VERS TRESORS ALAOTRA MANGORO AMBATONDRAZAKA AMBANDRIKA CR 2 FANORENANA BIRAOM-POKOTANY AO AMBANIALA 15 000 000 480 15 000 480 TACHERON CONSTRUCTION GOUVERNANCE BUREAU FOKONTANY ALAOTRA MANGORO AMBATONDRAZAKA AMBATONDRAZAKA CU FANARENANA TRANO FIVORIAN'NY KAOMININA 15 000 000 15 000 000 TACHERON REHABILITATION GOUVERNANCE SALLE DE REUNION 28/03/2018 ALAOTRA MANGORO AMBATONDRAZAKA AMBATONDRAZAKA SUBURBAINE CR 1 FANARENANA TETEZANA TELO 15 000 000 15 000 000 TACHERON REHABILITATION PISTE RURALE PONT 13/04/2018 ALAOTRA MANGORO AMBATONDRAZAKA AMBATOSORATRA CR 2 FANORENANA LYCEE AO AMBATOSORATRA 15 000 000 15 730 900 30 730 900 TACHERON CONSTRUCTION EDUCATION LYCEE 13/04/2018 ALAOTRA MANGORO AMBATONDRAZAKA AMBOHIBOROMANGA CR 2 FANAMBOARANA TETEZANA 15 000 000 15 000 000 TACHERON CONSTRUCTION PISTE RURALE PONT 13/04/2018 ALAOTRA MANGORO AMBATONDRAZAKA AMBOHIDAVA CR 2 FANORENANA EPP AO AMPARIHIPONY 15 000 000 9 300 15 009 300 TACHERON CONSTRUCTION EDUCATION EPP 13/04/2018 ALAOTRA MANGORO AMBATONDRAZAKA AMBOHITSILAOZANA CR 2 FANORENANA SEKOLY CEG 15 000 000 210 000 15 210 000 TACHERON CONSTRUCTION EDUCATION CEG 13/04/2018 ALAOTRA MANGORO AMBATONDRAZAKA AMPARIHITSOKATRA CR 2 FANORENANA EFITRANO FIVORIANA AO @ KAOMINA AMPARIHITSOKATRA 15 000 000 156 100 15 156 100 TACHERON CONSTRUCTION GOUVERNANCE SALLE DE REUNION 13/04/2018
    [Show full text]
  • EITI-Madagascar
    Rapport de réconciliation 2017 – EITI-Madagascar EITI-Madagascar Rapport de réconciliation 2017 Annexes Version finale Novembre 2019 Confidentiel – Tous droits réservés - Ernst & Young Madagascar Rapport final | 1 Rapport de réconciliation 2017 – EITI-Madagascar Sommaire ANNEXES .......................................................................................................................................................... 3 Annexe 1: Points de décision en matière de divulgation de la propriété réelle ......................................... 4 Annexe 2 : Tableau de correspondance entre flux de paiements et entités réceptrices ............................ 9 Annexe 3 : Données brutes pour sélectionner les compagnies ............................................................... 11 Annexe 4: Identification des sociétés...................................................................................................... 12 Annexe 5 : Arbre capitalistique des sociétés suivant déclaration dans canevas partie B ......................... 29 Annexe 6 : Présentation des flux de paiement ........................................................................................ 35 Annexe 7 : Matérialité des régies et des flux concernés par les taxes et revenus pour 2015 et 2016 (#4.1) 39 Annexe 8 : Cas Mpumalanga – Lettre du Ministre ................................................................................... 40 Annexe 9 : Cas Mpumalanga – Acte de rejet du BCMM .........................................................................
    [Show full text]