Notice of the Start of Segments I and Ii Construction

Total Page:16

File Type:pdf, Size:1020Kb

Notice of the Start of Segments I and Ii Construction NOTICE OF THE START OF SEGMENTS I AND II CONSTRUCTION Case No. 19-T-0549, Application of LS Power Grid New York, LLC, LS Power Grid New York Corporation I, and the New York Construction activities for Segment Power Authority for a Certificate of Environmental Compatibility I of the Project are anticipated and Public Need Pursuant to Article VII for Edic/Marcy to New to start on or about February 8, Scotland; Princetown to Rotterdam Project 2021. Subject to approval of the EM&CP for Segment II by the Commission, construction activities are anticipated to start on or about March 1, 2021. Surveys may begin prior to these dates. The New York State Public Service Commission (“Commission”) approved the A map of the Project’s Segments Environmental Management & Construction Plans (“EM&CP”) for Segment I of I and II work is provided at the the Marcy to New Scotland Upgrade Project (the “Project”) on January 21, 2021 end of this notice. Comments, and the EM&CP for Segment II may be approved by the Commission as soon as questions, and concerns regarding February 11, 2021. the construction of the Project may be provided to the Project team by The Project, which is anticipated to be constructed predominantly within calling (518) 888-2047 or contacting: approximately 93 miles of existing utility-owned transmission line corridor, n Casey Carroll includes the following components: (1) upgrades to the Marcy and Edic Assistant Vice President substations; (2) reconductoring, involving the replacement of two circuits of 230 LS Power Grid New York kV transmission line with two circuits of 345 kV transmission line on existing 1700 Broadway, 35th Floor structures, extending for approximately 13 miles from the Edic substation; (3) New York, NY 10019 removal of two existing single circuit 230 kV transmission lines on H-frame Phone: (518) 888-2047 structures, and replacement with a new 345 kV double circuit transmission line on Email: [email protected] steel monopoles, extending for approximately 55 miles (with the exception of up to two segments where the double circuit lines may split into single circuits); (4) The Project is under the jurisdiction construction of a new 345 kV substation in the Town of Princetown; (5) removal of the New York State Public Service of two existing single circuit 230 kV transmission lines on H-frame structures, Commission, which is responsible and replacement with two new single circuit 345 kV transmission lines on steel for enforcing compliance with monopoles between the new Princetown substation and Rotterdam 345 kV (a/k/a environmental and construction Gordon Road) substation, extending for approximately 5 miles, one of which conditions. The Commission may be will connect to the new Princetown substation and the other will loop in the contacted at: Edic portion of the existing Edic to New Scotland 345 kV line; (6) construction n Matthew Smith of the new 345/230/115 kV Gordon Road substation adjacent to the existing Environmental Certification & Rotterdam substation yard and upgrades at the existing Rotterdam substation; (7) Compliance, Office of Electric, construction of a new double circuit 345 kV transmission line on steel monopoles Gas and Water, Department of between the new Princetown substation and the New Scotland substation, Public Service extending for approximately 20 miles, rebuild of an existing single circuit 345 Three Empire State Plaza kV transmission line on new steel monopoles starting at the new Princetown Albany, NY 12223 substation and extending approximately 6 miles southward in that same corridor, Telephone: (518) 474-8702 and partial removal and/or removal from service of the existing Rotterdam to New Email: [email protected] Scotland 115 kV line in a portion of that same corridor; and (8) upgrades to the existing New Scotland substation. The EM&CP for Segment I generally includes the following scopes of work: Project elements (5) and (6) described above, and construction preparation activities, such as approximately 1.5 acres of new tree clearing in the vicinity of the New Scotland substation and establishing a laydown yard in the Town of Guilderland. The EM&CP for Segment II generally includes Project elements (4) and (7) described above. KEEPING YOU INFORMED For updates and more information about the project, visit: www.LSPGridNewYork.com or call (518) 888-2047 Article VII Case No. 19-T-0549 at on.ny.gov/30wYSrU More information about the Project is available electronically at the Project website www.LSPGridNewYork.com and in print copy at the following local libraries: Holland Patent Free Library Weller Library Canajoharie Library & Art Gallery Bethlehem Public Library 9580 Main Street 41 West Main Street 2 Erie Boulevard 451 Delaware Avenue Holland Patent, NY 13354 Mohawk, NY 13407 Canajoharie, NY 13317 Delmar, NY 12054 Utica Public Library Jordanville Public Library Frothingham Free Library Guilderland Public Library 303 Genesee Street 189 Main Street 28 West Main Street 2228 Western Avenue Utica, NY 13501 Jordanville, NY 13361 Fonda, NY 12068 Guilderland, NY 12084 Frankfort Free Library Little Falls Public Library Fort Plain Free Library Altamont Free Library 123 South Frankfort Street 10 Waverly Place 19 Willett Street 179 Main Street Frankfort, NY 13340 Little Falls, NY 13365 Fort Plain, NY 13339 Altamont, NY 12009 Ilion Free Public Library Fort Hunter Free Library Rotterdam Branch Library Voorheesville Public Library 78 West Street 167 Fort Hunter Road 1100 North Westcott Road 51 School Road Ilion, NY 13357 Amsterdam, NY 12010 Schenectady, NY 12306 Voorheesville, NY 12186 Warren County Hamilton County Marcy Substation Edic !( Substation !( Oneida County Herkimer County Fulton County Saratoga County Montgomery County Princetown to Gordon Road Gordon Road Substation Transmission Lines *## Rotterdam *##!( Substation Madison County Princetown Substation Schenectady County Princetown to New Scotland Transmission Lines )"" Otsego County Depot Road Albany County Laydown Yard Schoharie County !( New Scotland Substation (Limited New Tree Clearing) Delaware County Major Project Components 0 5 10 20 Marcy to New Scotland *# New Substation Segment I Project Transmission Lines Miles Upgrade Project !( Upgraded Substation Segment II Project Transmission Lines ² Case No. 19-T-0549 )" Laydown Yard Project Transmission Lines Segment I - Red; Segment II - Green Segments I and II KEEPING YOU INFORMED For updates and more information about the project, visit: www.LSPGridNewYork.com or call (518) 888-2047 Article VII Case No. 19-T-0549 at on.ny.gov/30wYSrU.
Recommended publications
  • Two Bells October 26, 1925
    I £ PEDRO ■■■ n 0 s BELLS VoL. VI OCTOBER 26. 1925 No. 22 A Herald of Good Cheer and Cooperation Published by and for Employes of the Los Angeles Railway Edited by J. G. JEFFERY, Director of Public Relations Community Chest Drive Outlined Billy Snyder, Married Division 1 Makes G. B. A. BACK 20 Consecutive Y ears, NINE MAJORS Given Suprise Party 99 Percent Mark In Association FROM EAST IN celebration of the twentieth wed- FOR SECOND ding anniversary of Mr. and Mrs. W. H. Snyder, an enthusiastic but or- DIVISION One has set a high derly party of supervisors and dis- mark in the Wives' Death WITH NEW patchers descended upon the family benefit branch of the Coopera- CHARITY home at 1104 West Thirty-eighth tive Association. Ninety-nine street October 17, as unexpectedly as per cent of the men under Su- a prohibition enforcement raiding perintendent E. C. Williams who squad, and proceeded to "throw a are eligible to participate in this IDEAS party." Mr. Snyder has been with the branch of the Association have APPEAL Los Angeles Railway 23 years, and is filed the necessary cards. now assistant director of traffic. The Wives' Death benefit Organization of the various depart- George Baker Anderson, manager of The big moment of the evening branch is intended to increase transportation, and R. B. Hill, super- came when W. B. Adams, director of ments of the Los Angeles Railway for the value of the Association. An participation in the second annual intendent of operation, have returned traffic, presented Mr. and Mrs.
    [Show full text]
  • 1 of 1 Forecast of Contracts to Be Advertised and Proposals to Be Solicited
    Welcome to the latest MTA "Eye on the Future," in which we present currently funded capital projects that are planned to be advertised from September 2017 through August 2018. The "Eye" is hosted along with other information and resources about the MTA Capital Program in one convenient location. It is part of our commitment to improve business practices and we hope that it is useful to you. The MTA Capital Program is very important for the safety and reliability of the MTA transportation system and is vital for the regional economy. As described in this issue of the "Eye," the MTA is preparing to undertake 145 projects valued at approximately $4.71 billion in capital work. This work spans many areas, including civil, structural, and electrical, as well as new technologies. These projects are crucial for the reliability, growth and resiliency of the system and contribute to the regional economy. This amount of investment is projected to generate approximately $8.29 billion in economic activity for the New York region. We want to make sure you’re aware of our recently-launched web-portal: MyMTA.info. This portal enables suppliers and bidders to the MTA to search procurement opportunities and information across all MTA agencies, respond to sourcing events online, select categories for the goods and services your sell and more. Contractors and suppliers have a critical stake in the success of the Capital Program. We appreciate your interest in and support of the projects included in this issue of the "Eye," and we look forward to your participation.
    [Show full text]
  • High Voltage Direct Current Transmission – Proven Technology for Power Exchange
    www.siemens.com/energy/hvdc High Voltage Direct Current Transmission – Proven Technology for Power Exchange Answers for energy. 2 Contents Chapter Theme Page 1 Why High Voltage Direct Current? 4 2 Main Types of HVDC Schemes 6 3 Converter Theory 8 4 Principle Arrangement of an HVDC Transmission Project 11 5 Main Components 14 5.1 Thyristor Valves 14 5.2 Converter Transformer 18 5.3 Smoothing Reactor 20 5.4 Harmonic Filters 22 5.4.1 AC Harmonic Filter 22 5.4.2 DC Harmonic Filter 25 5.4.3 Active Harmonic Filter 26 5.5 Surge Arrester 28 5.6 DC Transmission Circuit 31 5.6.1 DC Transmission Line 31 5.6.2 DC Cable 32 5.6.3 High Speed DC Switches 34 5.6.4 Earth Electrode 36 5.7 Control & Protection 38 6 System Studies, Digital Models, Design Specifications 45 7 Project Management 46 3 1 Why High Voltage Direct Current? 1.1 Highlights from the High Voltage Direct In 1941, the first contract for a commercial HVDC Current (HVDC) History system was signed in Germany: 60 MW were to be supplied to the city of Berlin via an underground The transmission and distribution of electrical energy cable of 115 km length. The system with ±200 kV started with direct current. In 1882, a 50-km-long and 150 A was ready for energizing in 1945. It was 2-kV DC transmission line was built between Miesbach never put into operation. and Munich in Germany. At that time, conversion between reasonable consumer voltages and higher Since then, several large HVDC systems have been DC transmission voltages could only be realized by realized with mercury arc valves.
    [Show full text]
  • Final Gold Line Report
    STRATEGIC PLANNING STUDY REPORT FOR METRO GOLD LINE FOOTHILL EXTENSION TO LA/ONTARIO INTERNATIONAL AIRPORT PREPARED FOR Metro Gold Line Foothill Extension Construction Authority Funded By San Bernardino Associated Governments and The Southern California Association of Governments December 2008 ACKNOWLEDGMENTS: Metro Gold Line Foothill Extension Construction Authority Southern California Association of Governments San Bernardino Associated Governments San Bernardino County Board of Supervisors Los Angeles World Airports PREPARED BY: KOA Corporation In Association with: STV Incorporated J.L. Patterson & Associates, INC. Consensus Planning Group, Inc. CITYWORKS DESIGN Metro Gold Line Foothill Extension to LA/Ontario International Airport Strategic Planning Study Table of Contents EXECUTIVE SUMMARY ........................................................................................................................... E-1 BACKGROUND ............................................................................................................................................................................. E-1 PLANNING TEAM APPROACH AND PUBLIC OUTREACH .......................................................................................................... E-1 THE ALIGNMENTS ........................................................................................................................................................................ E-2 ADDITIONAL STUDY CONSIDERATIONS ...................................................................................................................................
    [Show full text]
  • EPA SPCC Tier I Template Instructions for Farms
    SPCC 40 CFR Part 112 Tier I Template Instructions (for farms) Insert Instructor Names Insert HQ Office/Region Insert Date Today’s Agenda I. SPCC/Qualified Facility Applicability II. Tier I Qualified Facility SPCC Plan Template III. Questions and Answers Part I: SPCC/ Qualified Facility Applicability Is the facility or part of the facility (e.g., complex) considered non- NO transportation-related? YES Is the facility engaged in drilling, producing, gathering, storing, NO processing, refining, transferring, distributing, using, or consuming oil? YES The facility is Could the facility reasonably be expected to discharge oil in quantities NO not subject that may be harmful into navigable waters or adjoining shorelines? to SPCC Rule YES Is the total aggregate capacity of completely buried storage greater than Is the total aggregate capacity of 42,000 U.S. gallons of oil? aboveground storage greater than 1,320 U.S. gallons of oil? (Do not include the capacities of: - completely buried tanks and connected (Do not include the capacities of: underground piping, ancillary equipment, - less than 55-gallon containers, and containment systems subject to all of - permanently closed containers, the technical requirements of 40 CFR part - motive power containers, OR 280 or 281, NO - hot-mix asphalt and hot-mix - nuclear power generation facility asphalt containers, underground emergency diesel generator - single-family residence heating tanks deferred under 40 CFR part 280 and oil containers, licensed by and subject to any design and - pesticide application
    [Show full text]
  • 2012 Chevrolet Volt Owner Manual M
    Chevrolet Volt Owner Manual - 2012 Black plate (1,1) 2012 Chevrolet Volt Owner Manual M In Brief . 1-1 Safety Belts . 3-11 Infotainment System . 7-1 Instrument Panel . 1-2 Airbag System . 3-19 Introduction . 7-1 Initial Drive Information . 1-4 Child Restraints . 3-32 Radio . 7-7 Vehicle Features . 1-17 Audio Players . 7-12 Battery and Efficiency. 1-20 Storage . 4-1 Phone . 7-20 Performance and Storage Compartments . 4-1 Trademarks and License Maintenance . 1-25 Additional Storage Features . 4-2 Agreements . 7-31 Keys, Doors, and Instruments and Controls . 5-1 Climate Controls . 8-1 Windows . 2-1 Instrument Panel Overview. 5-4 Climate Control Systems . 8-1 Keys and Locks . 2-1 Controls . 5-6 Air Vents . 8-8 Doors . 2-13 Warning Lights, Gauges, and Vehicle Security. 2-14 Indicators . 5-9 Driving and Operating . 9-1 Exterior Mirrors . 2-16 Information Displays . 5-29 Driving Information . 9-2 Interior Mirrors . 2-17 Vehicle Messages . 5-45 Starting and Operating . 9-16 Windows . 2-17 Vehicle Personalization . 5-53 Electric Vehicle Operating Universal Remote System . 5-62 Modes . 9-21 Seats and Restraints . 3-1 Engine Exhaust . 9-26 Head Restraints . 3-2 Lighting . 6-1 Electric Drive Unit . 9-28 Front Seats . 3-4 Exterior Lighting . 6-1 Brakes . 9-29 Rear Seats . 3-8 Interior Lighting . 6-4 Ride Control Systems . 9-33 Lighting Features . 6-5 Chevrolet Volt Owner Manual - 2012 Black plate (2,1) 2012 Chevrolet Volt Owner Manual M Cruise Control . 9-36 Service and Maintenance . 11-1 Customer Information .
    [Show full text]
  • EXHIBITD SCOPE of DEVELOPMENT I. General Overview
    EXHIBITD SCOPE OF DEVELOPMENT I. General Overview All capitalized terms not defined herein shall have the meanings set forth in the Ground Lease (Stadium Disposition and Development Agreement (Stadium Lease) entered into by and between the City of Santa Clara, a municipal corporation (the "City"), as ground lessor, and Santa Clara Stadium Authority, a joint exercise of powers entity, created through Government Code Section 6500 et seq. ("Lessee") as ground lessee, to which this Scope of Development is attached and made a part thereof. The proposed project consists of the design, construction and installation of: (a) on the Stadium Site, (i) an outdoor stadium suitable for NFL Games containing approximately 1.85 million square feet, and with a permanent seating capacity of up to approximately 68,500 seats, including all suite, club and general admission seating (with the possibility for expansion to approximately 75,000 seats for larger events such as an NFL Super Bowls) (the "Stadium"), (ii) a plaza surrounding the Stadium that provides a physical and visual transition from the offsite area to the Stadium Site, and (iii) building systems, utilities, infrastructure and other improvements for the Stadium Site (together with the Stadium, collectively, the "Stadium Project"); and (b) in the vicinity of the Stadium Site several infrastructure projects to facilitate the operation of the Stadium, generally described below (the "Ancillary Improvements"), all of which shall be consistent with the Schematic Design Drawings. II. Stadium Structure The Stadium structure will be designed using structural steel and concrete elements with portions of the exterior enclosed by metal panels and glass.
    [Show full text]
  • The Bulletin R-42S MAKE THEIR FINAL, FINAL RUN Published by the Electric Railroaders’ Association, Inc
    ERA BULLETIN — MARCH, 2020 The Bulletin Electric Railroaders’ Association, Incorporated Vol. 63, No. 3 March, 2020 The Bulletin R-42S MAKE THEIR FINAL, FINAL RUN Published by the Electric Railroaders’ Association, Inc. P. O. Box 3323 Grand Central Station New York, NY 10163 For general inquiries, or Bulletin submissions, contact us at bulletin@erausa. org or on our website at erausa. org/contact Editorial Staff: Jeffrey Erlitz Editor-in-Chief Ronald Yee Tri-State News and Commuter Rail Editor Alexander Ivanoff North American and World News Editor David Ross Production Manager Copyright © 2019 ERA This Month’s Cover Photo: Second Avenue Elevated, looking north from 34th The R-42s are seen at Hammels Wye on the last trip northbound from Far Rockaway-Mott Av to Inwood-207 St. Street in about 1937, pho- Marc A. Hermann photograph tographer unknown. MTA New York City Transit retired the last thusiasts joined MTA Chairman and CEO remaining R-42 subway cars from service Patrick J. Foye and NYC Transit President today, ending a 51-year run. The cars have Andy Byford riding the last R-42 in passen- been used on two dozen lines, each traveling ger service. more than seven million miles. They had a “These cars have served the MTA well as a memorable role in an iconic car-vs.-train reliable fleet over the last 50 years,” said Sal- In This Issue: chase in the classic 1971 film French Con- ly Librera, Senior Vice President, Department LIRR Main Line nection. of Subways for New York City Transit. “As Third-Track The final run followed a send-off ceremony technology advances, we’re looking to mod- at the New York Transit Museum, and was ernize our fleet of subway cars to best serve Project Update scheduled to proceed through a final trip on New Yorkers.” …Page 3 the A line from Euclid Av to Far Rockaway (Continued on page 2) to 207 St, before returning to Euclid Av to close its doors for the last time.
    [Show full text]
  • February 27, 2019 FARE and TOLL CHANGE BOOK TABLE of CONTENTS
    Fare and Toll Change Materials February 27, 2019 FARE AND TOLL CHANGE BOOK TABLE OF CONTENTS • Staff Summary and Board Resolution on 2019 Fare Increases • Attachment A Additional Material Relating to Staff Summary on 2019 Fare Increases o NYCT & Affiliates, MTABC Tariff (Redline version) o MNR Fare Change Summary and Fare Tables o LIRR Fare Change Summary and Fare Tables Attachmento B o Title VI Summary • Negative Declaration and Type II Determination • Just and Reasonable Report • Staff Summary and Board Resolution on Environmental and "Just and Reasonable" Determinations • Staff Summary and Board Resolution on Crossing Charge Increase STAFF SUMMARY Subject Date 2019 Fare Increases February 27, 2019 Department Vendor Name Chief Financial Officer Department Head Name Contract Number Robert Foran Department Head Signature Contract Manager Name Project Manager Name Table of Contents Ref # Monica Murray Board Action Internal Approvals Order To Date Approval Info Other Order Approval Order Approval 1 Chief Financial Officer 1 Board 2/27/2019 2 Legal 3 Chief of Staff Narrative Purpose: To obtain the Board’s adoption and approval of a Resolution authorizing proposed fare increases, below the rate of inflation, as set forth in Attachment A to the Resolution. Discussion: Fares and tolls are essential revenue that support the quality and quantity of service the MTA provides while helping to meet rising costs and achieve a balanced budget as required by law. For this reason, the MTA Financial Plan includes proposed increases every two years. The Proposed Financial Plan 2019-2022 presented at the July 25, 2018 Board meeting contemplates implementation of increased fares to achieve budgeted revenue targets.
    [Show full text]
  • Minutes of Claremore Public Works Authority Meeting Council Chambers, City Hall, 104 S
    MINUTES OF CLAREMORE PUBLIC WORKS AUTHORITY MEETING COUNCIL CHAMBERS, CITY HALL, 104 S. MUSKOGEE, CLAREMORE, OKLAHOMA MARCH 03, 2008 CALL TO ORDER Meeting called to order by Mayor Brant Shallenburger at 6:00 P.M. ROLL CALL Nan Pope called roll. The following were: Present: Brant Shallenburger, Buddy Robertson, Tony Mullenger, Flo Guthrie, Mick Webber, Terry Chase, Tom Lehman, Paula Watson Absent: Don Myers Staff Present: City Manager Troy Powell, Nan Pope, Serena Kauk, Matt Mueller, Randy Elliott, Cassie Sowers, Phil Stowell, Steve Lett, Daryl Golbek, Joe Kays, Gene Edwards, Tim Miller, Tamryn Cluck, Mark Dowler Pledge of Allegiance by all. Invocation by James Graham, Verdigris United Methodist Church. ACCEPTANCE OF AGENDA Motion by Mullenger, second by Lehman that the agenda for the regular CPWA meeting of March 03, 2008, be approved as written. 8 yes, Mullenger, Lehman, Robertson, Guthrie, Shallenburger, Webber, Chase, Watson. ITEMS UNFORESEEN AT THE TIME AGENDA WAS POSTED None CALL TO THE PUBLIC None CURRENT BUSINESS Motion by Mullenger, second by Lehman to approve the following consent items: (a) Minutes of Claremore Public Works Authority meeting on February 18, 2008, as printed. (b) All claims as printed. (c) Approve budget supplement for upgrading the electric distribution system and adding an additional Substation for the new Oklahoma Plaza Development - $586,985 - Leasehold improvements to new project number assignment. (Serena Kauk) (d) Approve budget supplement for purchase of an additional concrete control house for new Substation #5 for Oklahoma Plaza Development - $93,946 - Leasehold improvements to new project number assignment. (Serena Kauk) (e) Approve budget supplement for electrical engineering contract with Ledbetter, Corner and Associates for engineering design phase for Substation #5 - Oklahoma Plaza Development - $198,488 - Leasehold improvements to new project number assignment.
    [Show full text]
  • (NIH) Individual Career Development Awards (K Series) Template and Instructions for Selected Sections
    Individual Career Development Awards (K series) Updated 12/29/2011 National Institutes of Health (NIH) Individual Career Development Awards (K Series) Template and Instructions for Selected Sections Template begins on page 10 This document contains information from the NIH document “Details of Application Changes for Career Development Application Changes (for due dates on or after January 7, 2011)” dated December 21, 2009 (http://enhancing-peer-review.nih.gov/docs/Details_of_Career_Development_Application_Changes.pdf) along with suggested formatting guidelines for the Specific Aims page. Candidates should refer to the SF 424, PHS 398 and funding notices (e.g., requests for applications, requests for proposals, funding opportunity announcements) and other official NIH documents when preparing their applications. Important Information to Know When Using this Document For Current and Specific information for Career Development Awards (K Series) and other Unsolicited or Investigator-Initiated Applications, see http://grants.nih.gov/grants/guide/parent_announcements.htm 1 Individual Career Development Awards (K series) Updated 12/29/2011 Table of Contents Checklist Page 3-4 Helpful Resources Page 5 Writing the Application Page 6 General Formatting Guidelines Page 6 Candidate’s Biosketch Instructions Page 7-8 K Template Pages 9-12 2 Individual Career Development Awards (K series) Updated 12/29/2011 K Series Checklist SECTION OF APPLICATION LIMITS (INSTRUCTION PAGE #) Letters of Reference At least 3, no more than 5 (I-128) Submitted by referees
    [Show full text]
  • I-TRAM Brochure 2021
    (An Autonomous University established by Government of Gujarat) International Conference on INTELLIGENT INFRASTRUCTURE IN TRANSPORTATION & MANAGEMENT (i-TRAM) 10-11 July, 2021 About IITRAM: Innovaons and Advances in Transport Infrastructure: Instute of Infrastructure, Technology, Research and Management l Advanced driver assistance systems (IITRAM) is an Autonomous University as declared in the Gujarat l Advanced sensing and recognion Government Act no. 5 of 2013- broadly known as IITRAM Act, provides l Human Factors and Travel Behaviour, Modelling Engineering educaon with undergrad and post grad courses in Civil, l Control and Simulaon of ITS Mechanical, Electrical branches. It also offers PhD programs in l Rail Transit System engineering branches of Civil, Mechanical and Electrical along with l Intelligent Public and Para transit system Physics, Chemistry, Mathemacs, English, Sociology and Economics. It l RFID technology and Smart card is an iniave of the Government of Gujarat to impart educaon in l Smart assisng technology for elderly and physical disabled person engineering fields which mainly focuses on Infrastructure and Infrastructure Management. To culvate skill based Engineers, IITRAM Electrical Transportaon Infrastructure: has advanced curriculum, labs, and industry e ups to produce l Advanced Electrical Machines for Electric Vehicle Applicaons l advanced, skilled and trained professionals for technologically Motor Tesng and Range Tesng of Electrical Vehicles l advanced naon. IITRAM is striving hard to bring qualitave Power Electronics and Control Algorithms l Arficial Intelligence and Machine Learning for Intelligent Vehicles improvement in teaching and learning process and achieve excellence l Vehicle to grid and Grid to Vehicle Systems in the field of technical educaon which is capable of responding to the l Baery Storage Systems changing requirements of technical manpower.
    [Show full text]