Northeast Corridor

Total Page:16

File Type:pdf, Size:1020Kb

Northeast Corridor U.S. System Summary: NORTHEAST CORRIDOR Northeast Corridor High-Speed Rail System (Source: NEC Future) The Northeast Corridor high-speed rail system is an the Northeast Corridor high-speed rail system are part of existing system containing 669 miles of routes in three the federally-designated Northeast Corridor High-Speed segments across the Northeastern and Mid-Atlantic U.S. Rail Corridor. Amtrak, the U.S. national railroad passen- states, encompassing major U.S. cities including Boston, ger corporation, owns a majority of the right-of-way in the MA; New York, NY; Philadelphia, PA; and Washington, two segments of the Northeast Corridor high-speed rail D.C. High-speed rail service is currently Operational system between Boston, New York, and Washington, D.C. in the two segments between Boston, MA, and Wash- Due to the high density of development along the route, ington, D.C., with train speeds up to 150 mph between most improvements to operational high-speed rail service Boston and New York and up to 135 mph between New would likely be contained within the existing Northeast York and Washington, D.C. A second, alternative route Corridor (NEC) right-of-way. The latest proposed “Next segment between Boston, MA, and New York, NY, has Gen” route, however, calls for constructing new railroad been outlined in Amtrak’s most recent plan update and infrastructure over a new, shorter route between Boston is currently in the Proposed stage. All three segments of and New York with maximum train speeds up to 220 mph. U.S. HIGH-SPEED RAIL SYSTEM SUMMARY: NORTHEAST CORRIDOR | 1 SY STEM DESCRIPTION AND HISTORY System Description The Northeast Corridor high-speed rail system consists of three segments, as summarized below. Northeast Corridor High-Speed Rail System Segment Characteristics Segment Description Distance Segment Status Designated Corridor? Segment Population Boston, MA, to New York, NY (Shoreline) 231 Miles Operational Yes 19,508,811 Boston, MA, to New York, NY (Next Gen) 212 Miles Proposed Yes 20,721,192 New York, NY, to Washington, D.C. 226 Miles Operational Yes 28,348,493 The Boston, MA, to New York, NY, segment of the North- average speed of approximately 86 mph. Amtrak owns the east Corridor high-speed rail system is described as two entire 226-mile segment. Amtrak’s conventional North- segments: a “Shoreline” segment and a Next Gen segment. east Regional trains also operate over the same corridor at The Shoreline segment is 231 miles in length and connects slower speeds. The total population of communities served Boston and New York via Providence, RI; New London, by existing Acela Express service along this segment was CT, New Haven, CT, and Stamford, CT. Existing high- 28,348,493 in 2010. speed rail service on the Shoreline segment is currently operated by Amtrak’s Acela Express electric high-speed System History rail service over existing right-of-way owned by Amtrak Development of high-speed intercity passenger rail service or local commuter rail transit agencies. The Acela Express in the Northeast Corridor high-speed rail system dates achieves a maximum speed of 150 mph in three sections back to the High-Speed Ground Transportation Act of 1965, totaling approximately 34 miles of the 231-mile segment, which authorized more than $51 million for improvements with an overall average speed of approximately 62 mph. to the NEC route. At that time, the line was owned by the Amtrak’s conventional Northeast Regional trains operate Pennsylvania Railroad, who had electrified the New York over the same corridor, although at slower overall speeds. to Washington, D.C., segment in the early 1930s. Initial The total population of communities served by existing high-speed train demonstration projects were implement- Acela Express service along this segment was 19,508,811 in ed by the Penn Central Railroad on both segments of the 2010. The Next Gen alignment, proposed by Amtrak as a corridor in the late 1960s, and these projects were shifted to future improvement plan to service in the New York-Bos- Amtrak when it took over U.S. passenger train operations ton segment of the NEC, is 212 miles in length and con- in May 1971. In 1976, as part of the Penn Central restruc- nects Boston and New York via Providence, RI, Hartford, turing into Conrail, ownership of the Northeast Corridor CT, and New Rochelle, NY. The Next Gen segment defini- right-of-way was transferred to Amtrak. The Northeast tion is inspired by Amtrak’s A Vision for High-Speed Rail Corridor Improvement Project was also initiated in 1976, in the Northeast Corridor, which proposes next generation with $1.6 billion authorized for improvements across the electric high-speed rail service over a combination of new Boston to Washington, D.C., route. The improvement right-of-way and existing Northeast Corridor alignment project was successful at reducing trip times along the cor- with maximum speeds of 220 mph. The total population ridor and other capacity improvements. of communities being considered for proposed Amtrak Next-Gen high-speed rail service along this segment was In the early 1990s, further improvement projects were au- 20,721,192 in 2010. thorized and funded, laying the groundwork for the imple- mentation of true high-speed rail along the entire corridor. The New York, NY, to Washington, D.C., segment of the In July 1994, the Federal Railroad Administration pub- Northeast Corridor high-speed rail system described in lished The Northeast Corridor Transportation Plan: New this summary is 226 miles in length and includes ma- York City to Boston, in which it outlined the plan for elec- jor communities such as Newark, NJ; Philadelphia, PA; trification of the Boston to New York segment of the cor- Wilmington, DE; and Baltimore, MD, along the route. ridor and other improvements needed to implement mod- The Amtrak Acela Express high-speed rail service also ern high-speed rail along the corridor. In December 2000, currently operates over this segment, with train speeds after a number of delays, the Acela Express high-speed rail reaching up to 135 mph along portions of the route with an service was inaugurated by Amtrak in the Northeast Cor- 2 | U.S. HIGH-SPEED RAIL SYSTEM SUMMARY: NORTHEAST CORRIDOR Acela Express High-Speed Train Operating on Existing NEC (Source: Bombardier) ridor between Boston, New York, and Washington, D.C. high-speed rail system in the Northeast Corridor. The first Ridership on the Acela Express has grown steadily in more step, called the NEC Upgrade Program (or NEC-UP), is a than a decade of service, and the route is the flagship of the set of proposed projects that would provide a maximum Amtrak national intercity passenger rail network. authorized speed of 160 mph across the Northeast Corri- dor, increase capacity in constrained areas of the line, and In May 2010, the Northeast Corridor Infrastructure Master bring the corridor into a state of good repair. The NEC- Plan was released. The Master Plan was developed by a UP program would be completed between 2015 and 2025 region-wide collaboration, which included 12 Northeast- and lay the groundwork for the second program step, the ern states, the District of Columbia, Amtrak, the Federal NEC Next-Generation High-Speed Rail (NEC NextGen Railroad Administration, eight commuter rail operators, HSR). The NEC NextGen HSR program would be com- and three freight railroads operating in the Northeast Cor- pleted between 2025 and 2040 and includes as its center- ridor. Initiated in 2007, the Master Plan reflects existing piece a new, dedicated high-speed intercity passenger rail goals and plans for rail operations in the Northeast Cor- alignment between New Rochelle, NY, and Providence, ridor through 2030, and outlines infrastructure projects RI. The proposed alignment (called the Boston to New that would be necessary to meet those goals. In September York Next Gen segment in this summary) would deviate 2010, Amtrak released a report entitled A Vision for High- from Amtrak’s existing route (called the Shoreline seg- Speed Rail in the Northeast Corridor. In this report, Am- ment in this summary) and would be a more direct route trak outlined its proposal for a next-generation high-speed between New York and Boston resulting in additional re- rail system covering a new Boston to New York “Next Gen” duced travel time. Between New York and Washington, high-speed passenger rail segment and the existing New D.C., the proposed NEC NextGen HSR would generally York to Washington, D.C., segment. In July 2012, Am- follow Amtrak’s existing right-of-way. As proposed, the trak released an update to the 2010 Vision Plan. The 2012 NEC NextGen HSR service would operate using electric- update report consolidated the projects outlined in the powered trains at a maximum speed of 220 mph, reducing Master Plan and the 2010 Vision Plan with a Business & travel times between Boston and New York from 214 min- Financial Plan developed in 2011 by Amtrak for its North- utes in 2010 to 94 minutes in 2040 if implemented. Travel east Corridor high-speed rail services. times between New York and Washington, D.C. would be reduced from 160 minutes to 94 minutes under the Next Amtrak’s July 2012 update report outlined a “stair-step” Gen plan. phasing strategy for implementing its proposed Next-Gen U.S. HIGH-SPEED RAIL SYSTEM SUMMARY: NORTHEAST CORRIDOR | 3 Union Station, Washington, D.C. Recently, the Federal Railroad Administration initiated passenger train service between the metropolitan areas of planning studies for major long-term improvement of Washington, D.C.; Philadelphia, PA; New York, NY; and high-speed intercity passenger rail in the Northeast Cor- Boston, MA.
Recommended publications
  • Amtrak's Rights and Relationships with Host Railroads
    Amtrak’s Rights and Relationships with Host Railroads September 21, 2017 Jim Blair –Director Host Railroads Today’s Amtrak System 2| Amtrak Amtrak’s Services • Northeast Corridor (NEC) • 457 miles • Washington‐New York‐Boston Northeast Corridor • 11.9 million riders in FY16 • Long Distance (LD) services • 15 routes • Up to 2,438 miles in length Long • 4.65 million riders in FY16 Distance • State‐supported trains • 29 routes • 19 partner states • Up to 750 miles in length State- • 14.7 million riders in FY16 supported3| Amtrak Amtrak’s Host Railroads Amtrak Route System Track Ownership Excluding Terminal Railroads VANCOUVER SEATTLE Spokane ! MONTREAL PORTLAND ST. PAUL / MINNEAPOLIS Operated ! St. Albans by VIA Rail NECR MDOT TORONTO VTR Rutland ! Port Huron Niagara Falls ! Brunswick Grand Rapids ! ! ! Pan Am MILWAUKEE ! Pontiac Hoffmans Metra Albany ! BOSTON ! CHICAGO ! Springfield Conrail Metro- ! CLEVELAND MBTA SALT LAKE CITY North PITTSBURGH ! ! NEW YORK ! INDIANAPOLIS Harrisburg ! KANSAS CITY ! PHILADELPHIA DENVER ! ! BALTIMORE SACRAMENTO Charlottesville WASHINGTON ST. LOUIS ! Richmond OAKLAND ! Petersburg ! Buckingham ! Newport News Norfolk NMRX Branch ! Oklahoma City ! Bakersfield ! MEMPHIS SCRRA ALBUQUERQUE ! ! LOS ANGELES ATLANTA SCRRA / BNSF / SDN DALLAS ! FT. WORTH SAN DIEGO HOUSTON ! JACKSONVILLE ! NEW ORLEANS SAN ANTONIO Railroads TAMPA! Amtrak (incl. Leased) Norfolk Southern FDOT ! MIAMI Union Pacific Canadian Pacific BNSF Canadian National CSXT Other Railroads 4| Amtrak Amtrak’s Host Railroads ! MONTREAL Amtrak NEC Route System
    [Show full text]
  • Amtrak Timetables-Virginia Service
    Effective July 13, 2019 VIRGINIA SERVICE - Southbound serving BOSTON - NEW YORK - WASHINGTON DC - CHARLOTTESVILLE - ROANOKE - RICHMOND - NEWPORT NEWS - NORFOLK and intermediate stations Amtrak.com 1-800-USA-RAIL Northeast Northeast Northeast Silver Northeast Northeast Service/Train Name4 Palmetto Palmetto Cardinal Carolinian Carolinian Regional Regional Regional Star Regional Regional Train Number4 65 67 89 89 51 79 79 95 91 195 125 Normal Days of Operation4 FrSa Su-Th SaSu Mo-Fr SuWeFr SaSu Mo-Fr Mo-Fr Daily SaSu Mo-Fr Will Also Operate4 9/1 9/2 9/2 9/2 Will Not Operate4 9/1 9/2 9/2 9/2 9/2 R B y R B y R B y R B y R B s R B y R B y R B R s y R B R B On Board Service4 Q l å O Q l å O l å O l å O r l å O l å O l å O y Q å l å O y Q å y Q å Symbol 6 R95 BOSTON, MA ∑w- Dp l9 30P l9 30P 6 10A 6 30A 86 10A –South Station Boston, MA–Back Bay Station ∑v- R9 36P R9 36P R6 15A R6 35A 8R6 15A Route 128, MA ∑w- lR9 50P lR9 50P R6 25A R6 46A 8R6 25A Providence, RI ∑w- l10 22P l10 22P 6 50A 7 11A 86 50A Kingston, RI (b(™, i(¶) ∑w- 10 48P 10 48P 7 11A 7 32A 87 11A Westerly, RI >w- 11 05P 11 05P 7 25A 7 47A 87 25A Mystic, CT > 11 17P 11 17P New London, CT (Casino b) ∑v- 11 31P 11 31P 7 45A 8 08A 87 45A Old Saybrook, CT ∑w- 11 53P 11 53P 8 04A 8 27A 88 04A Springfield, MA ∑v- 7 05A 7 25A 7 05A Windsor Locks, CT > 7 24A 7 44A 7 24A Windsor, CT > 7 29A 7 49A 7 29A Train 495 Train 495 Hartford, CT ∑v- 7 39A Train 405 7 59A 7 39A Berlin, CT >v D7 49A 8 10A D7 49A Meriden, CT >v D7 58A 8 19A D7 58A Wallingford, CT > D8 06A 8 27A D8 06A State Street, CT > q 8 19A 8 40A 8 19A New Haven, CT ∑v- Ar q q 8 27A 8 47A 8 27A NEW HAVEN, CT ∑v- Ar 12 30A 12 30A 4 8 41A 4 9 03A 4 88 41A Dp l12 50A l12 50A 8 43A 9 05A 88 43A Bridgeport, CT >w- 9 29A Stamford, CT ∑w- 1 36A 1 36A 9 30A 9 59A 89 30A New Rochelle, NY >w- q 10 21A NEW YORK, NY ∑w- Ar 2 30A 2 30A 10 22A 10 51A 810 22A –Penn Station Dp l3 00A l3 25A l6 02A l5 51A l6 45A l7 17A l7 25A 10 35A l11 02A 11 05A 11 35A Newark, NJ ∑w- 3 20A 3 45A lR6 19A lR6 08A lR7 05A lR7 39A lR7 44A 10 53A lR11 22A 11 23A 11 52A Newark Liberty Intl.
    [Show full text]
  • FY20-Fed-State-SOGR-Project-Recipients
    FY 2020 Federal-State Partnership for State of Good Repair Grant Program California — San Diego Next Generation Signaling and Grade Crossing Modernization Up to $9,836,917 North County Transit District Replaces and upgrades obsolete signal, train control, and crossing equipment on a 60-mile section of North County Transit District right-of-way the carrier shares with Amtrak intercity service and freight rail. Brings signal and train control components into a state of good repair, including installing new signal houses, signals, and cabling. Replaces components at more than 15 grade crossings along the corridor. California — Pacific Surfliner Corridor Rehabilitation and Service Reliability Up to $31,800,000 Southern California Regional Rail Authority Rehabilitates track, structures, and grade crossings in Ventura County and northern Los Angeles County on infrastructure used by Amtrak intercity service, Metrolink commuter service, and BNSF freight service. Work for member agency Ventura County Transportation Commission includes track, tie, ballast, and culvert replacements, grade crossing rehabilitation, and tunnel track and structure replacements. Reduces trip times, increases reliability, and improves safety by reducing need for slow orders and conflicts at grade crossings in the corridor. Connecticut — Walk Bridge Replacement Up to $79,700,000 Connecticut Department of Transportation & Amtrak Replaces the Connecticut-owned movable Norwalk River Bridge, built in 1896, with two, independent, two-track, vertical lift rail bridges in Norwalk, Connecticut. Includes associated embankment and retaining wall improvements on the bridge approaches, new catenary structures, and signal system upgrades. The existing bridge is beyond its useful life and prone to malfunctions, especially during opening or closing. The replacement will reduce slow orders, reduce the risk of service disruptions, and improve resiliency to extreme weather events.
    [Show full text]
  • NORTHEAST CORRIDOR New York - Washington, DC
    NORTHEAST CORRIDOR New York - Washington, DC September 5, 2017 NEW YORK and WASHINGTON, DC NEW YORK - NEWARK - TRENTON PHILADELPHIA - WILMINGTON BALTIMORE - WASHINGTON, DC and intermediate stations Acela Express,® Reserved Northeast RegionalSM and Keystone Service® THIS TIMETABLE SHOWS ALL AMTRAK SERVICE FROM BOSTON OR SPRINGFIELD TO POINTS NEW YORK THROUGH WASHINGTON, DC. Also see Timetable Form W04 for complete Boston/Springfield to Washington, DC schedules, and Timetable Form W06 for service to Virginia locations. FALL HOLIDAYS Special Thanksgiving timetables for the period, November 20 through 27, 2017, will appear on Amtrak.com shortly and temporarily supersede these schedules. 1-800-USA-RAIL Amtrak.com Amtrak is a registered service mark of the National Railroad Passenger Corporation. National Railroad Passenger Corporation, Washington Union Station, 60 Massachusetts Ave. N.E., Washington, DC 20002. NRPC Form W2–Internet only–9/5/17. Schedules subject to change without notice. Depart Depart Depart Depart Depart Arrive Depart Depart Depart Depart Depart Arrive Train Name/Number Frequency New York Newark Newark Intl. Air. Metropark Trenton Philadelphia Philadelphia Wilmington Baltimore BWI New Carrollton Washington Northeast Regional 67 Mo-Fr 3 25A 3 45A —— 4 00A 4 25A 4 52A 5 00A 5 22A 6 10A 6 25A 6 40A 7 00A Northeast Regional 151 Mo-Fr 4 40A R4 57A —— 5 12A 5 35A 6 04A 6 07A 6 28A 7 27A 7 40A D7 59A 8 14A Northeast Regional 111 Mo-Fr 5 30A R5 46A —— 6 00A 6 26A 6 53A 6 55A 7 15A 8 00A 8 15A D8 29A 8 50A Acela Express 2103 Mo-Fr
    [Show full text]
  • Pioneering the Application of High Speed Rail Express Trainsets in the United States
    Parsons Brinckerhoff 2010 William Barclay Parsons Fellowship Monograph 26 Pioneering the Application of High Speed Rail Express Trainsets in the United States Fellow: Francis P. Banko Professional Associate Principal Project Manager Lead Investigator: Jackson H. Xue Rail Vehicle Engineer December 2012 136763_Cover.indd 1 3/22/13 7:38 AM 136763_Cover.indd 1 3/22/13 7:38 AM Parsons Brinckerhoff 2010 William Barclay Parsons Fellowship Monograph 26 Pioneering the Application of High Speed Rail Express Trainsets in the United States Fellow: Francis P. Banko Professional Associate Principal Project Manager Lead Investigator: Jackson H. Xue Rail Vehicle Engineer December 2012 First Printing 2013 Copyright © 2013, Parsons Brinckerhoff Group Inc. All rights reserved. No part of this work may be reproduced or used in any form or by any means—graphic, electronic, mechanical (including photocopying), recording, taping, or information or retrieval systems—without permission of the pub- lisher. Published by: Parsons Brinckerhoff Group Inc. One Penn Plaza New York, New York 10119 Graphics Database: V212 CONTENTS FOREWORD XV PREFACE XVII PART 1: INTRODUCTION 1 CHAPTER 1 INTRODUCTION TO THE RESEARCH 3 1.1 Unprecedented Support for High Speed Rail in the U.S. ....................3 1.2 Pioneering the Application of High Speed Rail Express Trainsets in the U.S. .....4 1.3 Research Objectives . 6 1.4 William Barclay Parsons Fellowship Participants ...........................6 1.5 Host Manufacturers and Operators......................................7 1.6 A Snapshot in Time .................................................10 CHAPTER 2 HOST MANUFACTURERS AND OPERATORS, THEIR PRODUCTS AND SERVICES 11 2.1 Overview . 11 2.2 Introduction to Host HSR Manufacturers . 11 2.3 Introduction to Host HSR Operators and Regulatory Agencies .
    [Show full text]
  • Quarterly Report on the Performance and Service Quality of Intercity Passenger Train Operations
    Pursuant to Section 207 of the Passenger Rail Investment and Improvement Act of 2008 (Public Law 110-432, Division B): Quarterly Report on the Performance and Service Quality of Intercity Passenger Train Operations Covering the Quarter Ended June, 2019 (Third Quarter of Fiscal Year 2019) Federal Railroad Administration United States Department of Transportation Published August 2019 Table of Contents (Notes follow on the next page.) Financial Table 1 (A/B): Short-Term Avoidable Operating Costs (Note 1) Table 2 (A/B): Fully Allocated Operating Cost covered by Passenger-Related Revenue Table 3 (A/B): Long-Term Avoidable Operating Loss (Note 1) Table 4 (A/B): Adjusted Loss per Passenger- Mile Table 5: Passenger-Miles per Train-Mile On-Time Performance (Table 6) Test No. 1 Change in Effective Speed Test No. 2 Endpoint OTP Test No. 3 All-Stations OTP Train Delays Train Delays - Off NEC Table 7: Off-NEC Host Responsible Delays per 10,000 Train-Miles Table 8: Off-NEC Amtrak Responsible Delays per 10,000 Train-Miles Train Delays - On NEC Table 9: On-NEC Total Host and Amtrak Responsible Delays per 10,000 Train-Miles Other Service Quality Table 10: Customer Satisfaction Indicator (eCSI) Scores Table 11: Service Interruptions per 10,000 Train-Miles due to Equipment-related Problems Table 12: Complaints Received Table 13: Food-related Complaints Table 14: Personnel-related Complaints Table 15: Equipment-related Complaints Table 16: Station-related Complaints Public Benefits (Table 17) Connectivity Measure Availability of Other Modes Reference Materials Table 18: Route Descriptions Terminology & Definitions Table 19: Delay Code Definitions Table 20: Host Railroad Code Definitions Appendixes A.
    [Show full text]
  • 20210419 Amtrak Metrics Reporting
    NATIONAL RAILROAD PASSENGER CORPORATION 30th Street Station Philadelphia, PA 19104 April 12, 2021 Mr. Michael Lestingi Director, Office of Policy and Planning Federal Railroad Administrator U.S. Department of Transportation 1200 New Jersey Avenue, SE Washington, DC 20590 Dear Mr. Lestingi: In accordance with the Metrics and Minimum Standards for Intercity Passenger Rail Service final rule published on November 16, 2020 (the “Final Rule”), this letter serves as Amtrak’s report to the Federal Railroad Administration that, as of April 10, 2021, Amtrak has provided the 29 host railroads over which Amtrak currently operates (listed in Appendix A) with ridership data for the prior month consistent with the Final Rule. The following data was provided to each host railroad: . the total number of passengers, by train and by day; . the station-specific number of detraining passengers, reported by host railroad whose railroad right-of-way serves the station, by train, and by day; and . the station-specific number of on-time passengers reported by host railroad whose railroad right- of-way serves the station, by train, and by day. Please let me know if you have any questions. Sincerely, Jim Blair Sr. Director, Host Railroads Amtrak cc: Dennis Newman Amtrak Jason Maga Amtrak Christopher Zappi Amtrak Yoel Weiss Amtrak Kristin Ferriter Federal Railroad Administration Mr. Michael Lestingi April 12, 2021 Page 2 Appendix A Host Railroads Provided with Amtrak Ridership Data Host Railroad1 Belt Railway Company of Chicago BNSF Railway Buckingham Branch Railroad
    [Show full text]
  • Virginia Service-Boston-Norfolk-March162020
    Effective March 16, 2020 VIRGINIA SERVICE - Southbound serving BOSTON - NEW YORK - WASHINGTON DC - CHARLOTTESVILLE - ROANOKE - RICHMOND - NEWPORT NEWS - NORFOLK and intermediate stations Amtrak.com BOOK TRAVEL, CHECK TRAIN STATUS, ACCESS YOUR ETICKET AND MORE THROUGH THE Amtrak app. 1-800-USA-RAIL Northeast Northeast Northeast Silver Northeast Northeast Service/Train Name4 Palmetto Cardinal Carolinian Carolinian Regional Regional Regional Star Regional Regional Train Number4 65 67 89 51 79 79 95 91 195 125 Normal Days of Operation4 FrSa Su-Th Daily SuWeFr SaSu Mo-Fr Mo-Fr Daily SaSu Mo-Fr 5/24,7/2, 5/25,7/3, 5/25,7/3, Will Also Operate4 9/6 9/7 9/7 5/24,7/2, 5/25,7/3, 5/25,7/3, 5/25,7/3, Will Not Operate4 9/6 9/7 9/7 9/7 R B y R B y R B y R s d y R B y R B y R B R s y R B R B On Board Service4 Q l å OQ l å O l å O l å O l å O l å O y Q å l å O y Q å y Q å Symbol 6 R95 Boston, MA ∑w-u Dp l9 30P l9 30P 6 05A 6 30A 36 05A –South Station Boston, MA–Back Bay Station ∑v- 9 36P 9 36P 6 10A 6 35A 3R6 10A Route 128, MA ∑w- l9 50P l9 50P 6 20A 6 45A 3R6 20A Providence, RI i1 ∑w- l10 22P l10 22P 6 45A 7 10A 36 45A Kingston, RI b2 ∑w- 10 48P 10 48P 7 06A 7 31A 37 06A Westerly, RI >w- 11 05P 11 05P 7 20A 7 45A 37 20A Mystic, CT > 11 17P 11 17P 7 30A 37 30A New London, CT (Casino b) ∑v- 11 31P 11 31P 7 43A 8 07A 37 43A Old Saybrook, CT ∑w- 11 53P 11 53P 8 02A 8 27A 38 02A Greenfield, MA >w 5 45A 5 45A Northampton, MA >v 6 10A 6 10A Holyoke, MA >v t 6 25A 6 25A Springfield, MA ∑v- Ar 6 53A 7 25A 6 53A Dp 7 05A 7 05A Windsor Locks, CT > 7 24A 7 44A 7 24A Windsor, CT > 7 29A 7 49A 7 29A Valley Flyer Train 495 Hartford, CT ∑v- Valley Flyer Train 495 7 39A 7 59A 7 39A Berlin, CT >v 7 49A 8 10A 7 49A Meriden, CT >v 7 58A 8 19A 7 58A Wallingford, CT > 8 06A 8 27A 8 06A Amtrak Hartford Line Train 405 New Haven, CT–State St.
    [Show full text]
  • Empire Corridor
    U.S. System Summary: EMPIRE CORRIDOR Empire Corridor High-Speed Rail System (Source: NYSDOT) The Empire Corridor high-speed rail system is an es- rently in the Planning/Environmental stage with a vision tablished high-speed rail system containing 463 miles of to implement higher train speeds throughout the corridor. routes in two segments wholly contained within the State The entire route is part of the federally-designated Em- of New York, connecting New York City, Albany, Syra- pire Corridor High-Speed Rail Corridor. Operational and cuse, Rochester, Buffalo, and Niagara Falls. High-speed proposed high-speed rail service in the Empire Corridor intercity passenger rail service is currently Operational in high-speed rail system is based primarily on incremen- small portions of each segment, with maximum speeds up tal improvements to existing railroad rights-of-way, with to 110 mph. The entire 463-mile Empire Corridor is cur- maximum train speeds up to 125 mph being considered. U.S. HIGH-SPEED RAIL SYSTEM SUMMARY: EMPIRE CORRIDOR | 1 SY STEM DESCRIPTION AND HISTORY System Description The Empire Corridor high-speed rail system consists of two segments, as summarized below. Empire Corridor High-Speed Rail System Segment Characteristics Segment Description Distance Segment Status Designated Corridor? Segment Population New York City, NY, to Albany, NY 141 Miles Operational Yes 13,362,857 Albany, NY, to Niagara Falls, NY 322 Miles Planning/Environmental Yes 4,072,741 The New York City, NY, to Albany, NY, segment is 141 Transportation Study, which determined that new tech- miles in length and includes major communities such as nology over a new dedicated right-of-way would be neces- Poughkeepsie and Rhinecliff-Kingston along the route.
    [Show full text]
  • The Ohio & Lake Erie Regional Rail Ohio Hub Study
    The Ohio & Lake Erie Regional Rail Ohio Hub Study TECHNICAL MEMORANDUM & BUSINESS PLAN July 2007 Prepared for The Ohio Rail Development Commission Indiana Department of Transportation Michigan Department of Transportation New York Department of Transportation Pennsylvania Department of Transportation Prepared by: Transportation Economics & Management Systems, Inc. In association with HNTB, Inc. The Ohio & Lake Erie Regional Rail - Ohio Hub Study Technical Memorandum & Business Plan Table of Contents Foreword...................................................................................................................................... viii Acknowledgements..........................................................................................................................x Executive Summary.........................................................................................................................1 1. Introduction....................................................................................................................1-1 1.1 System Planning and Feasibility Goals and Objectives................................................... 1-3 1.2 Business Planning Objectives.......................................................................................... 1-4 1.3 Study Approach and Methodology .................................................................................. 1-4 1.4 Railroad Infrastructure Analysis...................................................................................... 1-5 1.5 Passenger
    [Show full text]
  • Chapter V: Transportation
    Transportation CHAPTER V: TRANSPORTATION A. GENERAL CHARACTERISTICS Located at the junction of Interstate 91 and Interstate 95, as well as a key access point to the Northeast Corridor rail line, New Haven is the highway and rail gateway to New England. It is the largest seaport in the state and the region and also the first city in Connecticut to have joined the national complete streets movement in 2008 by adopting the City’s Complete Streets Design Manual, balancing the needs of all roadway users including pedestrians, bicyclists, and motorists. Journey to Work Data For a U.S. city of its size, New Haven has substantial share (45 Aerial view of New Haven seaport: largest in the state and the region. percent) of commuters who use a form of transportation other than driving alone. Approximately 15 percent of all commuters travel via carpool, close to 14 percent walk to work, while over 11 percent use a form of public transportation. Of the 10 largest cities in New England, only Boston has a higher percentage of residents who travel to work via non-motorized transportation. Also, out of this same group of cities, New Haven ranked highest in the percentage of people who walked to work. New Haven Vision 2025 V-1 Transportation Vehicular Circulation There are 255 miles of roadway in the city, ranging from Interstate highways to purely local residential streets. Of these roadways, 88 percent are locally-maintained public roads and 12 percent are state-maintained roads and highways. There are 43 locally- maintained bridges in the city.
    [Show full text]
  • Amtrak CEO Flynn House Railroads Testimony May 6 20201
    Testimony of William J. Flynn Chief Executive Officer National Railroad Passenger Corporation Before the United States House of Representatives House CommiFee on Transportation & Infrastructure SubcommiFee on Railroads, Pipelines, and Hazardous Materials When Unlimited Potential Meets Limited Resources: The Benefits and Challenges of High-Speed Rail and Emerging Rail Technologies Thursday, May Q, RSRT TT:SS a.m. Rayburn House Office Building, Room RTQU Amtrak T MassachuseFs Avenue, N.W. Washington, DC RSSST-TYST (RSR) \SQ-]\T^ WHEN UNLIMITED POTENTIAL MEETS LIMITED RESOURCES: THE BENEFITS AND CHALLENGES OF HIGH-SPEED RAIL AND EMERGING RAIL TECHNOLOGIES Introduction Good morning, Chairman Payne, Ranking Member Crawford, and Members of this SubcommiFee. Thank you for inviting me to testify at this hearing on behalf of Amtrak. My name is William Flynn, and I am Amtrak’s Chief Executive Officer. I am particularly honored to be representing Amtrak at this hearing. It takes place six days after Pres- ident Biden traveled to Philadelphia to join us in celebrating Amtrak’s fiftieth anniversary. The American Jobs Plan he has proposed, which would provide $^S billion for Amtrak and high- speed and intercity passenger rail, is an important first step in developing an improved passenger rail system that would enhance mobility by serving more communities; provide more frequent and more equitable service; generate significant economic benefits; and reduce greenhouse gas emissions. Amtrak has accomplished a great deal since we began service on May T, T\UT with a mandate to transform unprofitable intercity passenger rail services operated by private railroads into “a modern, efficient intercity railroad passenger service”1 – with an initial appropriation of only $YS million.
    [Show full text]