OPEN TENDER (For Civil Engg

Total Page:16

File Type:pdf, Size:1020Kb

OPEN TENDER (For Civil Engg Annexure: A DETAILS OF CONTRACTS PLACED BY OPEN TENDER (For Civil Engg. /Elect. Engg. /S & T/Mech. etc works) (Status for the Month : From APRIL 2012 To MARCH 2013) Works Awarded : APRIL 2012 Quantity Rate (for supply (for supply Contractor’s contract)/ contract)/ Scheduled S. Tender Date of Description of Item/ LOA No. Value of Name and Estimated Cost Tendered Cost completion N. No. opening Work and date Contract address (For Engg./Elect. (For date /S&T/ Mech. etc Engg./Elect./S&T/ Works) Mech. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 23.02.2012 System design, supply, IRCON/9038/SLR.S& M/s Kiran Infra USD 2,381,349 6.5% below the USD 18 - months from 9038/ installation, testing & T/TELE.WORKS.PKG Engineers Ltd., B- estimated cost. 2,226,561.32 the date of issue of SLR.S&T/ commissioning of STM-4, -1/18/LOA/251 141, Road No. 9D, LOA TELE. STM-1, ADMs systems, dated 04.04.2012 Vishwakarma WORKS. GPS clock, Public Industrial Area, PKG-I/18 Address System, VHF Jaipur-302 013 Dated system and trenching, Fax: 0141-2331808, 11.01.2012 laying, splicing/jointing, 2260073 back filling, terminating, testing and commissioning of 24 fiber underground armoured OFC with 6 Quad/PIJF cable, provision of Emergency Socket, Headquarter/ Wayside Control Equipment and communication at L-Xing and important locations over section of Anuradhapura to Kankasanthurei and Medawachchiya to Talaimannar Pier of Sri Lanka Railway Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 2 IRCON/101 14.02.2012 Construction of IRCON/1014/J&K- M/s Dineshchandra `1276.00 Lacs `13,72,52,693.26 06 - months from 4/J&K- Infrastructure Facilities DQ/ T-80 Circulating R. Agrawal the date of issue of CELL/T-80 consisting of Duty Hut, Area/1908 dated Infracon Pvt. Ltd., LOA Circulating Area/ Date: Morchas, Parking 16.04.2012 Engineers & 02.01.2012 Space, Access road and Contractors, 401, helipad, water tank for The Grand Mall, fire fighting and all other S.M. Road, ancillary works at tunnel Ambawadi, T-80 Portals in Zone-V Ahmedabad of D-Q section in 380015 connection with Udhampur - Srinagar - Baramulla Rail Link Project in the state of J&K. (Package-T-80 Circulating Area) 3 IRCON/J& 27.03.2012 Construction of Type-III IRCON/J&K M/s Zeal `402.00 Lacs ` 4,79,87,193.89 09 - months from K & Type-IV Quarters cum Cell/JAT/14/1014/D- Construction Co., the date of issue of Cell/JAT/1 temporary offices and Q/Sangaldan Qtrs- J&K Bank Building, LOA 4/1014/D- other related works at Office/SQ-4/1909 Pantha Chowk, Q/Sangald Sangaldan Camp near dated 17.04.2012 Srinagar, an Qtrs- proposed Sangaldan Kashmir - 191 101 Office/SQ- Railway Station on Mob.09419003883 4 Date Dharma-Katra section of : 09419060731 05.03.12 USBRL project (J&K) Fax: 01933-224060 (Package: SQ-4) 4 IRCON/ 11.10.2011 Supply, Erection, Testing IRCON/MECH/1029 M/s BISIACH & 01 no. `25,16,47,363.56 `25,16,47,363.56 240 days from the MECH/10 & Commissioning of 01 /RCF.RBL-II/Spot CARRU s.PA `30001.00 Lacs date of LC 29/RCF. No. CNC Spot Welding Welding/41 Capital Sociale RBL-II/ Machine at Rail Coach Dtd. 18.04.2012 Interamente Spot Factory, Lalganj, Versato-I-10078, Welding/ Raebareli, UP-(INDIA) Venarai (Torino), 41 Italy-C SO Dtd. Piemonte 36. 08.09.11 Email: [email protected] Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 5 IRCON/ 09.04.2012 Re-gradation of NH-200 IRCON/2036/TSTPS M/s Nanda Infra `699.00 Lacs ` 8,01,41,113.50 90 - Days from 2036/TSTP in connection with the /L-XING/NIC/25338/ Construction (P) the date of issue P/TENDER construction of 3.5 Km 56 dated 20.04.2012 Ltd., College of LOI dated /LC/06/12 Railway track connecting Road, South 19.04.2012 Date the existing MGR of Balanda, Talcher, 16.03.12 NTPC Kaniha to Kaniha Distt.-Angul Mines of MCL (Orissa) PIN: 759 116 6 IRCON/J 10.04.2012 Construction of Multi IRCON/J&K- M/s Kapahi `750.00 Lacs ` 7,95,49,378.13 11 - months from &K- Functional Complex CELL/JAT/14/7004/ Construction Co., the date of issue of CELL/JA (MFC) comprising of Rail 03/1951 dated A-2 Central LOA T/14/700 Yatri Niwas and 25.04.2012 Mezzanine Floor, 4/03 Passenger Amenities South Block, Bahu Date Center at Jammu Tawi Plaza, Jammu 12.03.12 Railway Station, J&K (J&K) Ph.:0911-2470051 Works Awarded : MAY 2012 Quantity Rate (for supply (for supply Contractor’s contract)/ contract)/ Scheduled S. Tender Date of Description of Item/ LOA No. Value of Name and Estimated Cost Tendered Cost completion N. No. opening Work and date Contract address (For Engg./Elect. (For date /S&T/ Mech. etc Engg./Elect./S&T/ Works) Mech. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 20.04.2012 Design, Supply, IRCON/9038/SLR. M/s Angelique $1,516,112.00 1.11% below the $14,99,283.16 06 - months from 9038/SLR Installation, Testing & S&T/SIG.Works International Ltd., estimated cost the date of issue .S&T/SIG Commissioning of Relay PKG-I (R) /08 dated 104-107, Hemkunt of LOA .Works Based Panel Interlocking 02.05.2012 Tower, 1st Floor, PKG-I (R) System at 6 stations 98, Nehru Place, /08 dated (Anuradhapura, Mihintale, New Delhi-19 30.03.12 Parasangahawewa, Ph.: 011-26413873 Medawachchiya, Vavunia Fax:011-26413876 & Omanthai of Sri Lanka Railways Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 2 IRCON/ 12.03.2012 Supply of SMPS Based IRCON/9038/SLR. M/s Statcon Power $ 5,60,976.00 `3,38,40,005/- 15 - months from 9038/ SLR. Integrated Power Supply S&T/SIG.IPS.PKG- Controls Ltd., A-34, the date of issue of S&T/SIG. System as per RDSO XIV/36 Sec-59, Gautam LOA IPS.PKG- specification no. RDSO/ Dated 04.05.2012 Budh Nagar, Noida- XIV/36 SPN/165/2004 (Amd-5) or 201 301 Dated latest for 27 Stations of Ph.: 0120-4640200- 28.02.12 Sri Lanka Railways 210 FAX: 0120-4640240 3 IRCON/ 25.01.2012 Construction of Road IRCON/3015/TN/ M/s C&C `15022.34 Lacs `15022.34 Lacs `167,78,59,000/- 16 - months from 3015/ Over Bridge (ROB's) & its ROB-RAJ/CLS- Constructions Ltd., the date of issue of TN/ROB- approaches as per B/12/27/1080 Plot No.: 70, LC200 - Bassi `3,373.46 Lacs LOA RAJ/CLS Specifications, Drawing & Date: 16.05.2012 Sector – 32, - Design, Maintaining all Gurgaon B/12/027 Quality Control Standards PIN- 122 001 LC89-Dadi Ka `3,200.35 Lacs Date etc. complete under ROB Ph.: 0124-4536666 Phatak 11.04.12 Cluster Package "B" in FAX:0124-4536799 Lieu of various LCs at LC228-Khirni Ka `3,040.69 Lacs Jaipur: Dadi Ka Phatak Phatak (LC-89), Khirni Ka Phatak (LC-228), Bindayaka (LC- LC233-Bindayaka `4,323.99 Lacs 233) & Bassi (LC-200) and at Reengus (LC-108), in Rajasthan state. LC108-Reengus `2,840.10 Lacs 4 IRCON/ 10.01.2012 Supply, Installation, IRCON/3014/ M/s KEC `10,47,19,030/- `8,90,11,176/- `8,90,11,176/- 20.11.2012 Elect/30 testing, commissioning, Jhalawar/OHE International 14/Jhala handover and Erection/01 Limited, Building war/ maintenance of Overhead dated 21.05.2012 No. 9-A, 1st Floor, OHE Equipment (OHE) Railway DLF Cyber City, Erection/ Electrification work of 33 DLF Phase-III, 01 dated TKM at RRVUNL Siding Gurgaon-122002 15.12.11 at Kalisindh Thermal Power Station, Jhalawar on Ramganj Mandi - Jhalawar (New BG) section. Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 5 IRCON/ 23.01.2012 Supply of copper IRCON/ELECT./301 M/s Chandra Metals `4,93,50,000/- `3,70,80,422/- `3,70,80,422/- 07.09.2012 Elect/30 conductors for Design, 4/ Jhalawar/ Copper Limited, 1&2 14/Jhala Engineering, Conductor/03/ 2863 MNNIT, Industrial war/ Manufacturing, Supply to dated 21.05.12 Estate Teliarganj, Copper site, construction, Allahabad-211004 Conduct installation, or/ 03 Commissioning of dated Railway siding (within 30.12.11 Railway premises) and upto RVUN Power Plant boundary and also within RVUN's premises of Kalisindh TPS for 2 x 600 MW unit # 1 & 2, Kalisindh thermal Power Project stage-1 Jhalawar 6 IRCON/ 06.02.2012 01 No. 3D Co-ordinate IRCON/MECH/ 1029/ M/s Carl Zeiss (01 no.) `393.63 Lacs `393.63 Lacs Delivery within MECH/ Measuring Machine RCF.RBL-II/3D CMM/56 Industrielle `451 Lacs 255 days from the 1029/ dtd.21.05.12 Messtechnik GmbH date of LOA i.e. Postfach 1369/1380, RCF. D-73446, 31.01.2013 RBL-II/3 Oberkochen, D CMM/ Germany 56 dtd Tel:+49 7364 202790, 17.12.11 Fax:+49 7364 202424 7 IRCON/ 03.05.2012 Supply, Installation, IRCON/ ELECT/ M/s Aaryan `632.00 Lacs `5,51,99,168/- 08 - months from ELECT/ Testing & Commissioning 1029/RCF-RBL/ Infratech, 44A the date of issue 1029/RCF- of Internal Lighting and INTERNAL ELECT Laxmi Plaza, of LOA RBL/ Power Distribution GREEN BUILDINGS/ Cantt Road, INTERNAL Network system inside 42 Date: 28.05.2012 Lucknow ELECT Administrative Building, (UP) GREEN Technical Training BUILDING Centre, Technical S/ 42 Training Hostel and Shopping Complex at New Rail Coach Factory, Rae Bareli (UP) Works Awarded : JUNE 2012 Quantity Rate Contractor’s Scheduled S.
Recommended publications
  • Information Brochure for Phd Admissions
    Information Brochure for PhD Admissions INDIAN INSTITUTE OF TECHNOLOGY PATNA BIHTA, PATNA, BIHAR 801106 Page 1 of 28 A General 1. Message to Candidate 2. The Institute 3. Important Date/Academic Calendar 4. Research Facilities 5. Student Amenities + Hostel Accommodation 6. Ph.D. Programme 7. Eligibility Criterion for Admission + General Guidelines 8. Application Categories and Financial Support 9. Admission Procedure 10. Payment of Fees and Deposits + Fee Structure + Mess Fee 11. Registration for the Ph.D. Degree 12. Confirmation f Registration 13. Submission of Thesis and Award of Degree + Credit System 14. Reservation of Seats B Department and Disciplines 1. Computer Science & Engineering 2. Electrical Engineering 3. Mechanical Engineering 4. Material Science & Engineering 5. Chemical & Biochemical Engineering 6. Civil & Environmental Engineering 7. Physics 8. Chemistry 9. Math 10. Humanities & Social Sciences C Centre of Excellence 1. SA IF D Appendices 1. Fees and Deposits + Refund of FEE 2. Refund of Fee 3. Financial Assistance Page 2 of 28 4. Sponsorship letter for full-time candidates 5. Employer’s Letter in case of candidates joining Ph.D. programme on Study leave 6. Sponsorship Certificate for External Registration 7. No Objection Certificate for college Teacher 8. Co -Guide particulars of External Registration E How to reach Institute F International Student Admission G Important contact number A-GENERAL Message to Candidate Indian Institute of Technology Patna is an Institution of National Importance and a new addition to the hallowed IIT System that has proven its worth in last 50+ years. The alumni of IIT are internationally known for their caliber and contribution. Since its inception in 2008, IIT Patna- like its young as well as established peers- has pursued excellence with steadfast determination.
    [Show full text]
  • Anandpur, Ps – Bihta, Ancha
    SUMMARY The proposed sand mine project is situated at Village -Thekha, Mauza - Anandpur, Post – Anandpur, P.s – Bihta, Anchal – Bihta, District-Patna (Bihar) over an area of 19.9 hectares. The state government has given consent for mining for five years to Mineral Development Officer, District Mining office, Patna via letter no- 3880 A/M, dated 11-11-2019. This project falls under Category- “B1” as per EIA Notification 2006 (amended till date) of the Ministry of Environment and Forests & Climate Change, New Delhi. The proposed cost of the project is 0.39 carore. The proposed project activity will be carried out in inactive channel of riverbed of Son River. Project Proponent The details are as given below: Name of the applicant Mineral Development Officer, District Mining office, Patna Name & Address of Lessee Beer chand Patel Path, Adalatganj, Veerchand Patel Road Area, Patna, Bihar 800001 Name of Mine Sand mine project on inactive channel of riverbed Mineral Sand Area (ha) 19.9 ha Status of Mine Fresh Application for EC (new) Location The mining lease area is located in Village -Thekha, Mauza - Anandpur, Post – Anandpur, P.s – Bihta, Anchal – Bihta, District-Patna (Bihar) over an area of 19.9 hectares. The proposed project activity will be carried out in the bed of the River Son. Toposheet No. - 72 C/14 (G45M14 ). The project site is located at: Pillar No. Latitude /Longitude A 25°37' 8.41'' N 84°50'2.38 '' E B 25°36' 52.16'' N 84°50' 1.49'' E C 25°36' 56.88'' N 84°49' 44.02'' E D 25°37' 2.47'' N 84°49' 49.13'' E 1 Production The proposed mine has lease over an area of 19.9 ha.
    [Show full text]
  • Ground Water Year Book, Bihar (2015 - 2016)
    का셍ााल셍 उप셍ोग हेतू For Official Use GOVT. OF INDIA जल ल MINISTRY OF WATER RESOURCES CENTRAL GROUND WATER BOARD जल ,, (2015-2016) GROUND WATER YEAR BOOK, BIHAR (2015 - 2016) म鵍य पूर्वी क्षेत्र, पटना सितंबर 2016 MID-EASTERN REGION, PATNA September 2016 ` GOVT. OF INDIA जल ल MINISTRY OF WATER RESOURCES जल CENTRAL GROUND WATER BOARD ,, (2015-2016) GROUND WATER YEAR BOOK, BIHAR (2015 - 2016) म鵍य पर्वू ी क्षेत्र, पटना MID-EASTERN REGION, PATNA सितंबर 2016 September 2016 GROUND WATER YEAR BOOK, BIHAR (2015 - 2016) CONTENTS CONTENTS Page No. List of Tables i List of Figures ii List of Annexures ii List of Contributors iii Abstract iv 1. INTRODUCTION.............................................................................................................1 2. HYDROGEOLOGY..........................................................................................................1 3. GROUND WATER SCENARIO......................................................................................4 3.1 DEPTH TO WATER LEVEL........................................................................................8 3.1.1 MAY 2015.....................................................................................................................8 3.1.2 AUGUST 2015..............................................................................................................10 3.1.3 NOVEMBER 2015........................................................................................................12 3.1.4 JANUARY 2016...........................................................................................................14
    [Show full text]
  • District Plan 2011 - 12
    I DISTRICT PLAN 2011 - 12 SUPAUL - i I Submitted by : District Planning Committee, Supaul Submitted to: Department of Planning & Development, Government of Bihar DISTRICT PLAN 2011 - 12 SUPAUL ¥ V *k g f II A © H f: © f&T SJkH*»»* Submitted by : District Planning Committee, Supaul Submitted to: Department of Planning & Development, Government of Bihar ACKNOWLEDGEMENTS For sustainable and planned economic development it is essential to formulate the Annual District Plan on the basis of available resources. As per the direction of the Department of Planning and Development, Government of Bihar, with an objective to prepare the effective Plan, we have collected relevant information and data ensuring the assimilation of district level important components from various departments as well as the priority sectors like Health, Education, Livelihood and Infrastructure etc. Keeping in view the past experience of formulation and implementation of various sectoral Action Annual Plans and recent directions of the department the Annual District Plan 2011 -12 for Rs. 103142.3 89 lakh has been prepared for the maximum utilization of available resources, so that the socio-economic development of the district can be further accelerated. I would like to thank Mr. Kunwar Jung Bahadur, Deputy Development Commissioner, Mr. D.N. Mishra, Regional Planning officer, Kosi Division, Mr. Prakash Yadav, District Planning Officer, Mr. Vivek Sharan (Ex. District Facihtator) and Mr. D P Karn, District Facihtator, GoI-UN Joint Convergence Program for their important contribution in formulation of Annual District Plan 2011 -12 for the district of Supaul. Mr. Brajesh Kumar Vikal, DPRO also deserves special thanks for his support in the Plan formulation.
    [Show full text]
  • Situation Report - Bihar Floods
    SITUATION REPORT - BIHAR FLOODS NAME OF THE DISASTER: FLOODS DATE: 15.07.04 at 7:30 PM Rain in the upper catchment areas of Nepal has resulted in the rise of the water levels of all the major rivers of Bihar and so far 16 districts (out of a total of 38 districts) have been affected by the flood waters. 11.128 million people are affected by the unprecedented floods in Darbhanga, Madhubhani, Sitamarhi, Sheohar and East Champaran Districts. Situation is grim with continuous rains over the northern portion of the state and is likely to get critical with rain/thundershowers forecasted over Bihar by the Indian Meteorological department. As per the Central Water Commission report, river Kamala Balan, Budhi Gandak, Bagmati, Kosi, Mahananda and Adhwara group of rivers are flowing above the danger level. The districts so far affected are Supaul, Darbhanga, Bhagalpur, W.Champaran, Muzaffarpur, Sitamarhi, Khagaria , Sheohar, Madhubani, Araria, Saharsa , E. Champaran, Katihar, Kishanganj & Samastipur. The worst affected districts are Darbhanga, Sheohar, Madhubani and Sitamarhi. Sitamarhi, Darbhanga & Sheoher districts are cut off from the state head quarter.In many districts Rail & Road communications are also cut off. DAMAGES DETAILS: No. of District Affected 16 No. of Block Affected 127 No. of Panchayat affected 1529 No. of Villages affected 4889 Flood Affected Area 4.3253 million Hect. Population affected 11.128 million No of Human lives lost 41 No. of Cattle lives lost 557 No of house damages 283225 Estimated value of damage to houses 24.056 million Rs. Estimated value of damage of public properties 43.63 million Rs.
    [Show full text]
  • Thursday, July 11, 2019 / Ashadha 20, 1941 (Saka) ______
    LOK SABHA ___ SYNOPSIS OF DEBATES* (Proceedings other than Questions & Answers) ______ Thursday, July 11, 2019 / Ashadha 20, 1941 (Saka) ______ SUBMISSION BY MEMBERS Re: Farmers facing severe distress in Kerala. THE MINISTER OF DEFENCE (SHRI RAJ NATH SINGH) responding to the issue raised by several hon. Members, said: It is not that the farmers have been pushed to the pitiable condition over the past four to five years alone. The miserable condition of the farmers is largely attributed to those who have been in power for long. I, however, want to place on record that our Government has been making every effort to double the farmers' income. We have enhanced the Minimum Support Price and did take a decision to provide an amount of Rs.6000/- to each and every farmer under Kisan Maan Dhan Yojana irrespective of the parcel of land under his possession and have brought it into force. This * Hon. Members may kindly let us know immediately the choice of language (Hindi or English) for obtaining Synopsis of Lok Sabha Debates. initiative has led to increase in farmers' income by 20 to 25 per cent. The incidence of farmers' suicide has come down during the last five years. _____ *MATTERS UNDER RULE 377 1. SHRI JUGAL KISHORE SHARMA laid a statement regarding need to establish Kendriya Vidyalayas in Jammu parliamentary constituency, J&K. 2. DR. SANJAY JAISWAL laid a statement regarding need to set up extension centre of Mahatma Gandhi Central University, Motihari (Bihar) at Bettiah in West Champaran district of the State. 3. SHRI JAGDAMBIKA PAL laid a statement regarding need to include Bhojpuri language in Eighth Schedule to the Constitution.
    [Show full text]
  • Annexure-V State/Circle Wise List of Post Offices Modernised/Upgraded
    State/Circle wise list of Post Offices modernised/upgraded for Automatic Teller Machine (ATM) Annexure-V Sl No. State/UT Circle Office Regional Office Divisional Office Name of Operational Post Office ATMs Pin 1 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA PRAKASAM Addanki SO 523201 2 Andhra Pradesh ANDHRA PRADESH KURNOOL KURNOOL Adoni H.O 518301 3 Andhra Pradesh ANDHRA PRADESH VISAKHAPATNAM AMALAPURAM Amalapuram H.O 533201 4 Andhra Pradesh ANDHRA PRADESH KURNOOL ANANTAPUR Anantapur H.O 515001 5 Andhra Pradesh ANDHRA PRADESH Vijayawada Machilipatnam Avanigadda H.O 521121 6 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA TENALI Bapatla H.O 522101 7 Andhra Pradesh ANDHRA PRADESH Vijayawada Bhimavaram Bhimavaram H.O 534201 8 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA VIJAYAWADA Buckinghampet H.O 520002 9 Andhra Pradesh ANDHRA PRADESH KURNOOL TIRUPATI Chandragiri H.O 517101 10 Andhra Pradesh ANDHRA PRADESH Vijayawada Prakasam Chirala H.O 523155 11 Andhra Pradesh ANDHRA PRADESH KURNOOL CHITTOOR Chittoor H.O 517001 12 Andhra Pradesh ANDHRA PRADESH KURNOOL CUDDAPAH Cuddapah H.O 516001 13 Andhra Pradesh ANDHRA PRADESH VISAKHAPATNAM VISAKHAPATNAM Dabagardens S.O 530020 14 Andhra Pradesh ANDHRA PRADESH KURNOOL HINDUPUR Dharmavaram H.O 515671 15 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA ELURU Eluru H.O 534001 16 Andhra Pradesh ANDHRA PRADESH Vijayawada Gudivada Gudivada H.O 521301 17 Andhra Pradesh ANDHRA PRADESH Vijayawada Gudur Gudur H.O 524101 18 Andhra Pradesh ANDHRA PRADESH KURNOOL ANANTAPUR Guntakal H.O 515801 19 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA
    [Show full text]
  • East Central Railway
    10.1.1 पूव मय रेलवे EAST CENTRAL RAILWAY 20192019----2020 के िलए पƗरसंपिēयĪ कƙ खरीद , िनमाϕण और बदलाव Assets-Acquisition, Construction and Replacement for 2019-20 (Figures in thousand of Rupees)(आंकड़े हजार Đ . मĞ) पूंजी पूंजी िनिध मूआिन िविन संिन रारेसंको जोड़ िववरण Particulars Capital CF DRF. DF SF RRSK TOTAL 11 (a) New Lines (Construction) 248,00,00 .. .. .. 200,00,00 .. 448,00,00 14 G Gauge Conversion 185,00,00 .. .. .. .. .. 185,00,00 15 ह Doubling 10,00,00 .. .. .. .. .. 10,00,00 16 - G Traffic Facilities-Yard 16,46,33 .. .. 3,05,00 .. 8,82,18 28,33,51 G ^ G Remodelling & Others 17 Computerisation 2,01,00 .. 5,00,00 57,50 .. .. 7,58,50 21 Rolling Stock 16,80,00 .. .. 1,75,00 .. 13,20,00 31,75,00 22 * 4 - Leased Assets - Payment 511,32,64 202,97,36 .. .. .. .. 714,30,00 of Capital Component 29 E G - Road Safety Works-Level .. .. .. .. .. 59,28,48 59,28,48 Crossings. 30 E G -/ Road Safety Works-Road .. .. .. .. .. 144,62,00 144,62,00 Over/Under Bridges. 31 Track Renewals .. .. .. .. .. 634,84,29 634,84,29 32 G Bridge Works 4,35,00 .. .. .. .. 51,95,90 56,30,90 33 G Signalling and 4,00 .. .. .. .. 132,40,02 132,44,02 Telecommunication 36 ^ G - G Other Electrical Works 29,07,31 .. 2,03,84 1,97,81 .. 78,22 33,87,18 K excl TRD 37 G G Traction Distribution 1,00,00 .. .. .. .. 84,69,86 85,69,86 Works 41 U Machinery & Plant 4,16,35 .
    [Show full text]
  • 14Th December, 2018 at Netaji Subhas Institute Of
    Faculty Development Program (FDP) About NIT Patna knowledge base, skills and tools to equip the teaching On community with better knowledge and understanding. National Institute of Technology Patna is the 18th National Advances in Industrial Automation Institute of Technology created by the Ministry of H.R.D. Objective and Scope Under the banner of Government of India after rechristening the erstwhile Bihar The main objective of this FDP is to make the aspiring Electronics and ICT Academy, NIT Patna College of Engineering Patna on 28.01.2004. The Institute academicians/engineers acquainted with the conceptual as and is situated on the south bank of holy river Ganges behind well as practical knowledge of the Industrial Automation & Gandhi Ghat (where the ash of father of the Nation, Coordinated by latest technologies being used to achieve industrial Mahatma Gandhi was offered in the river Ganges). The automation. National Institute of Technology, Patna Institute imparts high level education training, research and By the end of the program, the participants should be able & development in science, engineering technology and to understand the technical core issue of the following Netaji Subhas Institute of Technology(NSIT), humanities along with high quality education and values at topics: Bihta UG, PG and Ph.D. level. At present the Institute offers o Evolution In Industrial Automation & From courses in six major technical disciplines viz. Architecture, Different Type Of Control Mechanisms th th Civil Engineering, Computer Science & Engg., Electrical o PLC Advantages Over Microcontrollers 10 - 14 December, 2018 Engg., Electronics & Communication Engg. and o Motor Drives/Sensors Introduction & Mechanical Engg.
    [Show full text]
  • Madhubani District, Bihar State
    भूजल सूचना पुस्तिका मधुबनी स्जला, बबहार Ground Water Information Booklet Madhubani District, Bihar State ADMINISTRATIVE MAP BIHAR STATE N MADHUBANI DISTRICT, BIHAR W E Ganga R. Harlakhi S Ladania Madhwapur Jaynagar Basopatti Laukaha Khajauli Laukahi Babubarhi Benipatti Rajnagar Andhratharhi Phulparas MADHUBANI Bisfi Ghoghordiha Jhanjharpur Pandaul LEGEND District Boundary Lakhnaur Block Boundary Madhepur River Road Km.8 0 8 16 Km. Railway District HQ. SCALE Block HQ. के न्द्रीय भमू मजल बो셍 ड Central Ground water Board Ministry of Water Resources जल संसाधन मंत्रालय (Govt. of India) (भारि सरकार) Mid-Eastern Region मध्य-पर्वू ी क्षेत्र Patna पटना मसिंबर 2013 September 2013 PREPARED BY - Shri S. Sahu Sc. B UNDER SUPERVISION OF - Shri A.K.Agrawal, Sc-’D’ CARTOGRAPHY - Shri Lokendra Kumar, Draughtsman UPDATED BY - ShriCONTENTS S.N. Dwivedi, Sc- C & Dr.Fakhre Alam, STA(Hg) 2 DISTRICT AT A GLANCE 5 - 6 1.0 INTRODUCTION 7 - 9 1.1.1 Location, Area and Population 1.2 Basin/Sub-Basin and Drainage 1.4 Landuse Pattern, Agriculture and Irrigation Practices 1.5 Activities Carried out by CGWB 2.0 CLIMATE AND RAINFALL 9-10 3.0 GEOMORPHOLOGY AND SOIL TYPES 10 4.0 GROUND WATER SCENARIO 11 - 16 4.1 Hydrogeology 4.2 Depth to Water Level 4.2 Ground water Resources 4.3 Status of Ground Water development 4.4 Ground Water Quality 5.0 GROUND WATER MANAGEMENT STRATEGY 16 - 18 5.1 Ground Water development 5.2 Design of Tube Wells 5.2.1 Sallow Tube Wells 5.2.2 Deep Tube Wells 5.3 Water Conservation and Artificial Recharge: 6.0 GROUND WATER RELATED ISSUES AND PROBLEMS: 18 7.0 MASS AWARENESS AND TRAINING PROGRAMME: 18 8.0 AREA NOTIFIED BY CENTRAL GROUND WATER AUTHORITY/ STATE GROUND WATER AUTHORITY 19 9.0 RECOMMENDATION 19 3 LIST OF TABLES Table 1 Principal Rivers and their Tributaries in Madhubani District Table 2 Rainfall Pattern in the Madhubani district during 1997-98 Table 3 Replenishable ground water resource in the district as on 31st March- 2009.
    [Show full text]
  • LOK SABHA ___ SYNOPSIS of DEBATES (Proceedings Other Than
    LOK SABHA ___ SYNOPSIS OF DEBATES (Proceedings other than Questions & Answers) ______ Tuesday, July 15, 2014 / Ashadha 24, 1936 (Saka) ______ STATEMENT BY MINISTER Re: Reported meeting of an Indian journalist with Hafiz Saeed in Pakistan. THE MINISTER OF EXTERNAL AFFAIRS AND MINISTER OF OVERSEAS INDIAN AFFAIRS (SHRIMATI SUSHMA SWARAJ): On the issue which was raised yesterday in the House, I, with utmost responsibility and categorically and equivocally would like to inform this House that the Government of India has no connection to the visit by Shri Ved Prakash Vaidik to Pakistan or his meeting with Hafiz Saeed there. Neither before leaving for Pakistan nor at his arrival there, he informed the Government that he was to meet Hafiz Saeed there. This was his purely private visit and meeting. It has been alleged here that he was somebody‟s emissary, somebody‟s disciple or the Government of India had facilitated the meeting. This is totally untrue as well as unfortunate. I would like to reiterate that the Government of India has no relation to it whatsoever. *MATTERS UNDER RULE 377 (i) SHRI BHARAT SINGH laid a statement regarding need to start work on multipurpose project for development of various facilities in Ballia Parliamentary constituency, Uttar Pradesh. (ii) SHRI BHANU PRATAP SINGH VERMA laid a statement regarding need to extend Shram Shakti Express running between New Delhi to Kanpur upto Jhansi. (iii) SHRIMATI JAYSHREEBEN PATEL laid a statement regarding need to expedite development of National Highway No. 228 declared as a Dandi Heritage route. (iv) SHRI DEVJI M. PATEL laid a statement regarding need to provide better railway connectivity in Jalore Parliamentary Constituency in Rajasthan.
    [Show full text]
  • Master Plan for Patna - 2031
    IMPROVING DRAFT MASTER PLAN FOR PATNA - 2031 FINAL REPORT Prepared for, Department of Urban Development & Housing, Govt. of Bihar Prepared by, CEPT, Ahmadabad FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA - 2031 Client: Urban Development & Housing Department Patna, Bihar i Prepared by: Center for Environmental Planning and Technology (CEPT) University Kasturbhai Lalbhai Campus, University Road, Navrangpura, Ahmedabad – 380 009 Gujarat State Tel: +91 79 2630 2470 / 2740 l Fax: +91 79 2630 2075 www.cept.ac.in I www.spcept.ac.in CEPT UNIVERSITY I AHMEDABAD i FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031 TABLE OF CONTENTS TABLE OF CONTENTS i LIST OF TABLES v LIST OF FIGURES vii LIST OF MAPS viii LIST of ANNEXURE ix 1 INTRODUCTION 10 1.1 Introduction 11 1.2 Planning Significance of Patna as a City 12 1.3 Economic Profile 14 1.4 Existing Land Use – Patna Municipal Corporation Area 14 1.5 Previous Planning Initiatives 16 1.5.1 Master Plan (1961-81) 16 1.5.2 Plan Update (1981-2001) 17 1.5.3 Master Plan 2001-21 18 1.6 Need for the Revision of the Master Plan 19 1.7 Methodology 20 1.7.1 Stage 1: Project initiation 20 1.7.2 Stage 02 and 03: Analysis of existing situation & Future projections and Concept Plan 21 1.7.3 Stage 04: Updated Base Map and Existing Land Use Map 21 1.7.4 Stage 5: Pre-final Master Plan and DCR 24 2 DELINEATION OF PATNA PLANNING AREA 25 i 2.1 Extent of Patna Planning Area (Project Area) 26 2.2 Delineation of Patna Planning Area (Project Area) 27 2.3 Delineated
    [Show full text]