Annexure: A DETAILS OF CONTRACTS PLACED BY OPEN TENDER (For Civil Engg. /Elect. Engg. /S & T/Mech. etc works) (Status for the Month : From APRIL 2012 To MARCH 2013) Works Awarded : APRIL 2012 Quantity Rate (for supply (for supply Contractor’s contract)/ contract)/ Scheduled S. Tender Date of Description of Item/ LOA No. Value of Name and Estimated Cost Tendered Cost completion N. No. opening Work and date Contract address (For Engg./Elect. (For date /S&T/ Mech. etc Engg./Elect./S&T/ Works) Mech. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 23.02.2012 System design, supply, IRCON/9038/SLR.S& M/s Kiran Infra USD 2,381,349 6.5% below the USD 18 - months from 9038/ installation, testing & T/TELE.WORKS.PKG Engineers Ltd., B- estimated cost. 2,226,561.32 the date of issue of SLR.S&T/ commissioning of STM-4, -1/18/LOA/251 141, Road No. 9D, LOA TELE. STM-1, ADMs systems, dated 04.04.2012 Vishwakarma WORKS. GPS clock, Public Industrial Area, PKG-I/18 Address System, VHF Jaipur-302 013 Dated system and trenching, Fax: 0141-2331808, 11.01.2012 laying, splicing/jointing, 2260073 back filling, terminating, testing and commissioning of 24 fiber underground armoured OFC with 6 Quad/PIJF cable, provision of Emergency Socket, Headquarter/ Wayside Control Equipment and communication at L-Xing and important locations over section of Anuradhapura to Kankasanthurei and Medawachchiya to Talaimannar Pier of Sri Lanka Railway Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 2 IRCON/101 14.02.2012 Construction of IRCON/1014/J&K- M/s Dineshchandra `1276.00 Lacs `13,72,52,693.26 06 - months from 4/J&K- Infrastructure Facilities DQ/ T-80 Circulating R. Agrawal the date of issue of CELL/T-80 consisting of Duty Hut, Area/1908 dated Infracon Pvt. Ltd., LOA Circulating Area/ Date: Morchas, Parking 16.04.2012 Engineers & 02.01.2012 Space, Access road and Contractors, 401, helipad, water tank for The Grand Mall, fire fighting and all other S.M. Road, ancillary works at tunnel Ambawadi, T-80 Portals in Zone-V Ahmedabad of D-Q section in 380015 connection with Udhampur - Srinagar - Baramulla Rail Link Project in the state of J&K. (Package-T-80 Circulating Area) 3 IRCON/J& 27.03.2012 Construction of Type-III IRCON/J&K M/s Zeal `402.00 Lacs ` 4,79,87,193.89 09 - months from K & Type-IV Quarters cum Cell/JAT/14/1014/D- Construction Co., the date of issue of Cell/JAT/1 temporary offices and Q/Sangaldan Qtrs- J&K Bank Building, LOA 4/1014/D- other related works at Office/SQ-4/1909 Pantha Chowk, Q/Sangald Sangaldan Camp near dated 17.04.2012 Srinagar, an Qtrs- proposed Sangaldan Kashmir - 191 101 Office/SQ- Railway Station on Mob.09419003883 4 Date Dharma-Katra section of : 09419060731 05.03.12 USBRL project (J&K) Fax: 01933-224060 (Package: SQ-4) 4 IRCON/ 11.10.2011 Supply, Erection, Testing IRCON/MECH/1029 M/s BISIACH & 01 no. `25,16,47,363.56 `25,16,47,363.56 240 days from the MECH/10 & Commissioning of 01 /RCF.RBL-II/Spot CARRU s.PA `30001.00 Lacs date of LC 29/RCF. No. CNC Spot Welding Welding/41 Capital Sociale RBL-II/ Machine at Rail Coach Dtd. 18.04.2012 Interamente Spot Factory, Lalganj, Versato-I-10078, Welding/ Raebareli, UP-() Venarai (Torino), 41 Italy-C SO Dtd. Piemonte 36. 08.09.11 Email: [email protected]

Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 5 IRCON/ 09.04.2012 Re-gradation of NH-200 IRCON/2036/TSTPS M/s Nanda Infra `699.00 Lacs ` 8,01,41,113.50 90 - Days from 2036/TSTP in connection with the /L-XING/NIC/25338/ Construction (P) the date of issue P/TENDER construction of 3.5 Km 56 dated 20.04.2012 Ltd., College of LOI dated /LC/06/12 Railway track connecting Road, South 19.04.2012 Date the existing MGR of Balanda, Talcher, 16.03.12 NTPC Kaniha to Kaniha Distt.-Angul Mines of MCL (Orissa) PIN: 759 116 6 IRCON/J 10.04.2012 Construction of Multi IRCON/J&K- M/s Kapahi `750.00 Lacs ` 7,95,49,378.13 11 - months from &K- Functional Complex CELL/JAT/14/7004/ Construction Co., the date of issue of CELL/JA (MFC) comprising of Rail 03/1951 dated A-2 Central LOA T/14/700 Yatri Niwas and 25.04.2012 Mezzanine Floor, 4/03 Passenger Amenities South Block, Bahu Date Center at Jammu Tawi Plaza, Jammu 12.03.12 Railway Station, J&K (J&K) Ph.:0911-2470051

Works Awarded : MAY 2012 Quantity Rate (for supply (for supply Contractor’s contract)/ contract)/ Scheduled S. Tender Date of Description of Item/ LOA No. Value of Name and Estimated Cost Tendered Cost completion N. No. opening Work and date Contract address (For Engg./Elect. (For date /S&T/ Mech. etc Engg./Elect./S&T/ Works) Mech. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 20.04.2012 Design, Supply, IRCON/9038/SLR. M/s Angelique $1,516,112.00 1.11% below the $14,99,283.16 06 - months from 9038/SLR Installation, Testing & S&T/SIG.Works International Ltd., estimated cost the date of issue .S&T/SIG Commissioning of Relay PKG-I (R) /08 dated 104-107, Hemkunt of LOA .Works Based Panel Interlocking 02.05.2012 Tower, 1st Floor, PKG-I (R) System at 6 stations 98, Nehru Place, /08 dated (Anuradhapura, Mihintale, New -19 30.03.12 Parasangahawewa, Ph.: 011-26413873 Medawachchiya, Vavunia Fax:011-26413876 & Omanthai of Sri Lanka Railways Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

2 IRCON/ 12.03.2012 Supply of SMPS Based IRCON/9038/SLR. M/s Statcon Power $ 5,60,976.00 `3,38,40,005/- 15 - months from 9038/ SLR. Integrated Power Supply S&T/SIG.IPS.PKG- Controls Ltd., A-34, the date of issue of S&T/SIG. System as per RDSO XIV/36 Sec-59, Gautam LOA IPS.PKG- specification no. RDSO/ Dated 04.05.2012 Budh Nagar, Noida- XIV/36 SPN/165/2004 (Amd-5) or 201 301 Dated latest for 27 Stations of Ph.: 0120-4640200- 28.02.12 Sri Lanka Railways 210 FAX: 0120-4640240 3 IRCON/ 25.01.2012 Construction of Road IRCON/3015/TN/ M/s C&C `15022.34 Lacs `15022.34 Lacs `167,78,59,000/- 16 - months from 3015/ Over Bridge (ROB's) & its ROB-RAJ/CLS- Constructions Ltd., the date of issue of TN/ROB- approaches as per B/12/27/1080 Plot No.: 70, LC200 - Bassi `3,373.46 Lacs LOA RAJ/CLS Specifications, Drawing & Date: 16.05.2012 Sector – 32, - Design, Maintaining all Gurgaon B/12/027 Quality Control Standards PIN- 122 001 LC89-Dadi Ka `3,200.35 Lacs Date etc. complete under ROB Ph.: 0124-4536666 Phatak 11.04.12 Cluster Package "B" in FAX:0124-4536799 Lieu of various LCs at LC228-Khirni Ka `3,040.69 Lacs Jaipur: Dadi Ka Phatak Phatak (LC-89), Khirni Ka Phatak (LC-228), Bindayaka (LC- LC233-Bindayaka `4,323.99 Lacs 233) & Bassi (LC-200) and at Reengus (LC-108), in Rajasthan state. LC108-Reengus `2,840.10 Lacs

4 IRCON/ 10.01.2012 Supply, Installation, IRCON/3014/ M/s KEC `10,47,19,030/- `8,90,11,176/- `8,90,11,176/- 20.11.2012 Elect/30 testing, commissioning, Jhalawar/OHE International 14/Jhala handover and Erection/01 Limited, Building war/ maintenance of Overhead dated 21.05.2012 No. 9-A, 1st Floor, OHE Equipment (OHE) Railway DLF Cyber City, Erection/ Electrification work of 33 DLF Phase-III, 01 dated TKM at RRVUNL Siding Gurgaon-122002 15.12.11 at Kalisindh Thermal Power Station, Jhalawar on Ramganj Mandi - Jhalawar (New BG) section. Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 5 IRCON/ 23.01.2012 Supply of copper IRCON/ELECT./301 M/s Chandra Metals `4,93,50,000/- `3,70,80,422/- `3,70,80,422/- 07.09.2012 Elect/30 conductors for Design, 4/ Jhalawar/ Copper Limited, 1&2 14/Jhala Engineering, Conductor/03/ 2863 MNNIT, Industrial war/ Manufacturing, Supply to dated 21.05.12 Estate Teliarganj, Copper site, construction, Allahabad-211004 Conduct installation, or/ 03 Commissioning of dated Railway siding (within 30.12.11 Railway premises) and upto RVUN Power Plant boundary and also within RVUN's premises of Kalisindh TPS for 2 x 600 MW unit # 1 & 2, Kalisindh thermal Power Project stage-1 Jhalawar 6 IRCON/ 06.02.2012 01 No. 3D Co-ordinate IRCON/MECH/ 1029/ M/s Carl Zeiss (01 no.) `393.63 Lacs `393.63 Lacs Delivery within MECH/ Measuring Machine RCF.RBL-II/3D CMM/56 Industrielle `451 Lacs 255 days from the 1029/ dtd.21.05.12 Messtechnik GmbH date of LOA i.e. Postfach 1369/1380, RCF. D-73446, 31.01.2013 RBL-II/3 Oberkochen, D CMM/ Germany 56 dtd Tel:+49 7364 202790, 17.12.11 Fax:+49 7364 202424 7 IRCON/ 03.05.2012 Supply, Installation, IRCON/ ELECT/ M/s Aaryan `632.00 Lacs `5,51,99,168/- 08 - months from ELECT/ Testing & Commissioning 1029/RCF-RBL/ Infratech, 44A the date of issue 1029/RCF- of Internal Lighting and INTERNAL ELECT Laxmi Plaza, of LOA RBL/ Power Distribution GREEN BUILDINGS/ Cantt Road, INTERNAL Network system inside 42 Date: 28.05.2012 Lucknow ELECT Administrative Building, (UP) GREEN Technical Training BUILDING Centre, Technical S/ 42 Training Hostel and Shopping Complex at New Rail Coach Factory, Rae Bareli (UP) Works Awarded : JUNE 2012 Quantity Rate Contractor’s Scheduled S. Tender Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/ date Mech. etc Works) Mech. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 29.05.2012 Construction of Road IRCON/ 3015/ROB- M/s Rajdeep `12285.87 9.55% above `134,58,70,000/- 13-17 months 3015/TN/ Over Bridge (ROB's)/RUB RAJ/JDPR-C- Buildcon Pvt Ltd, tender amount i.e. from the date of ROB-RAJ/ & its approaches as per Open/12/29 “Rajdeep House”, at `13485.70 Lacs issue of LOA JDPR-C- specifications, drawings & dated 05.06.12 Savedi, LC-160 Nr. Banar at 3.81% above `2981.71 Lacs 15-months Open/12/ design, maintaining all Ahmednagar Jodhpur: `2872.28 Lacs 29 Dt. quality control standards PIN– 414 003, LC-165 at Jodhpur: 12.68% above `4734.10 Lacs 17-months 05.05.12 etc. complete under Maharashtra `4201.37 Lacs ROB/RUB cluster Ph.: 0241-2424072, LC-C2 Pavta B-Road at 18.97% above `1517.37 Lacs 13-months Package "C" at Jodhpur, 2423631, 2424101 Jodhpur:`1275.42 Lacs Makrana & Suratgarh in Fax: 0241-2425812 LC-34 E2 at 8.46% above `2307.10 Lacs 13-months Makrana :`2127.14 Lacs Lieu of various LCs in LC-95 at Suratgarh: 6.01% above `1918.42 Lacs 13-months Rajasthan State. `1809.66 Lacs

2 IRCON/ 11.05.2012 Improvement/Upgradation IRCON/ CC/TN/ M/s Siemens `448.03 Lacs 15.00% below the `3,80,82,949.94 06-months from CC/TN/ of existing Branch/Link -SH/12/653/23 Construction, B-9, estimated cost the date of issue RSVY- Road up to 25m. Length Dated 20.06.2012 Abhiyanta Nagar, of LOA BIHAR/12 covering Package 1A(i) & Near Ashiyana Post /653 1A(ii) in & Office, District under - 800 025 RSVY Project Bihar (Bihar) (Package- 1A- Link Road)

3 IRCON/ 11.05.2012 Improvement/Upgradation IRCON/ CC/TN/ M/s Siemens `681.40 Lacs 15.00% below the `5,79,19,264.19 06-months from CC/TN/ of existing Branch/Link Bihar-SH/12/654/22 Construction, B-9, estimated cost the date of issue RSVY- Road up to 25m. Length Dated 20.06.2012 Abhiyanta Nagar, of LOA BIHAR/12 covering Package 1B(ii-i), Near Ashiyana Post /654 1B(iii) & 1B(iv) in Office, under Patna - 800 025 RSVY Project Bihar (Bihar) (Package- 1B- Link Road) Contd.../- Quantity Rate Contractor’s Scheduled S. Tender Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/ date Mech. etc Works) Mech. etc Works)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/ 11.05.2012 Improvement/Upgradation IRCON/ CC/TN/ M/s Adarsh `736.61 Lacs 12.50% below the `6,44,53,662.49 06-months from CC/TN/ of existing Branch/Link Bihar-SH/12/655/21 Construction, Lal estimated cost the date of issue RSVY- Road up to 25m. Length Dated 20.06.2012 Koyhi, Main Road, of LOA BIHAR/12 covering Package 1B(i), Mairwa, Siwan /655 1C(i) & 1C(ii) in (Bihar) District under RSVY Project Bihar (Package- 1C- Link Road) 5 IRCON/ 07.06.2012 Construction of Road IRCON/ M/s C&C `13549.69 11.5% above `151,07,90,000/- 13-15 months from 3015/TN/ Over Bridge (ROB's) & 3015/TN/ROB- Constructions Ltd., tender amount i.e. the date of issue ROB- its approaches as per RAJ/Clstr-A-Open Plot No.: 70, at of LOA RAJ/CLS specifications, drawing & Tender/12/031/1313 Sector - 32, `151,07,90,000/- TR- design, maintaining all dated 22.06.12 Gurgaon - 122 001 LC-116 Alwar Yard: 13.89% above `2200.35 Lacs 13-months A/12/031 quality control standards Ph.: 0124-4536666 `1932.00 Lacs FAX:0124-4536799 Dt. etc. complete under LC-76 Neem ka Thana: 10.02% above `2902.07 Lacs 13-months 15.05.12 ROB cluster Package `2637.77 Lacs "A" in Lieu of various LC-32 Kishangarh: 15.13% above `3339.12 Lacs 15-months LCs at ALWAR YARD, `2900.30 Lacs NEEM KA THANA, LC-113 Alwar: 10.46% above `3340.58 Lacs 15-months `3024.24 Lacs KISHANGARH, ALWAR LC-43 & 43/1 Ajmer: 8.85% above `3325.78 Lacs 13-months & AJMER, in Rajasthan `3055.38 Lacs State. Works Awarded : JULY 2012 Quantity Rate Contractor’s Scheduled S. Tender Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/ date Mech. etc Works) Mech. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 11.05.2012 Improvement/Upgradatio IRCON/ CC/TN/ M/s Adarsh `764.43 Lacs 12.50% below the `6,68,88,125.92 06-months from CC/TN/ n of existing Branch/Link Bihar-SH/12/656/71 Construction, Lal estimated cost the date of issue RSVY- Road up to 25m. Length Dated 09.07.2012 Koyhi, Main Road, of LOA BIHAR/12 covering Package 1D(i), Mairwa, Siwan /656 1D(ii), 1D(iii) & 1D(Y) in (Bihar) Madhubani District under RSVY Project Bihar (Package- 1D- Link Road) 2 IRCON/ 11.07.2012 Design, Supply, IRCON/9038/SLR. M/s Kiran Infra $51,98,695 9.90% below the USD46,84,024.20 18-months from 9038/SLR Installation, Testing and S&T/SIG.WORKS. Engineers Ltd., estimated cost the date of issue .S&T/SIG. Commissioning of Relay PH-II/PKG-XIII/31 B-141, of LOA WORKS. Based Panel Interlocking Dtd. 18.07.12 Road No. 9-D, PH-II/ System at 21 stations of Vishwakarma PKG- Sri Lanka Railways Industrial Area, XIII/31 Jaipur, Rajasthan- Dtd. 302013 31.05.12 Ph.:+91-141- 2330305, Fax:+91-141- 2331808, 2260073 Works Awarded : AUGUST 2012 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 11.05.2012 Road Connectivity IRCON/CC/TN/Bihar M/s Brajendra `1289.66 Lacs 9.07% below the `11,72,69,690.38 09-months from CC/TN/ between SH-52 and NH- -SH/12/652/121 Kumar Builders Pvt. estimated cost the date of issue RSVY- 57 at Kamla Balan Bund Dated 04.08.2012 Ltd., Barh, Patna of LOA BIHAR/ Near Mehat Dhala in 12/652(Re Madhubani District Under -tender) Rashtriya Sam Vikas Yojana (RSVY) Project Bihar (Package – 1D (iii-a)

2 IRCON/ 27.07.2012 Construction of Road LOA No. M/s Brahmaputra `3642.00 Lacs 7.86% above on `39,28,23,555.00 15-months from 3015/TN/ Over Bridge (ROB's) & its IRCON/3015/TN/ Infraprojects Ltd., abstract tender the date of issue ROB-RAJ/ approaches as per ROB-RAJ/HINDAUN/ Brahmaputra BOQ amount of LOA HINDAUN Specifications, Drawing & 12/038/1612 Dated: House, /12/038 Design, Maintaining all 16.08.12 A-7, Mahipalpur, Dt: Quality Control Standards (NH-8 -Mahipalpur 07.07.12 etc. complete in Lieu of Crossing) LC No. 201-B at Railway New Delhi KM 136/9-10 in Hindaun PIN - 110 037 Town in Rajasthan State. (Package - HND 201/02) Works Awarded : SEPTEMBER 2012 Quantity Rate Contractor’s Scheduled S. Tender Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/ date Mech. etc Works) Mech. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 10.05.2012 Construction of Tunnel T- LOA No.: M/s Hindustan `86300.00 Lacs `883,89,71,723/ 05.09.2017 J&KCell/ 48 between Km. 100 and IRCON/J&K Construction Co. JAT/14/ Km. 110.2 (approx) on CELL/JAT/1014/T- Ltd, 1014/T48/ Dharam-Qazigund 48/210/1395 dtd. Hincon House, 210 Dtd. Section of Udhampur- 06.09.12 Lal Bahadur 05.03.12 Srinagar-Baramulla New Shastri Marg, BG Railway Line Project. Vikhroli (West), (Package–T48) – 400083 Tel: +91-22-25775959 Fax: +91-22-25777568 2 IRCON/ 20.07.2012 Design and Construction LOA No. M/s M. M. Shawl `1104.29 Lacs 21.786% above `13,45,00,019/- 13 months from 3015/TN/ of Two Lane Road Under IRCON/3015/TN/ 601, Plot No. 19, the scheduled the date of issue ROB-RAJ/ Bridge (RUB) by Cut & ROB-RAJ/C HOMU- Kirti Mahal, items rates of LOA CHOMU- Cover Technique RUB-110/RT1/12/ Rajendra Place, mentioned in BOQ RUB-110/ comprising Two Boxes of 036/ 1701 Dated: New Delhi. RT1/12/ internal dimensions 6.25 06.09.2012 PIN: 110 008 036 Dtd.: m (W) x 4.00 m (H) each Tele-fax: 011- 28.06.12 including it’s approaches, 45702552 Design, Casting & Placing box segments in traffic block, Drainage, Allied Road works & Junction Development etc. complete, as per Specifications & Drawings, Maintaining all Quality Control Standards complete near LC No. 110 on Jaipur-Sikar Railway Line of N.W. Railways at Chomu, Jaipur in Rajasthan State Contd.../- Works Awarded : SEPTEMBER 2012 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 3 IRCON/ 09.08.2012 Construction of 11 kV LOA No.: M/s Absolute `537.54 Lacs Schedule A-16% Below `4,39,33,719/- 06.06.2013 J&K Feeder Line for IRCON/J&K Projects (India) `10999059.75 Cell/JAT/15 illumination of major Cell/JAT/15/1008/Q- Ltd., /1008/ bridges, duty huts and B/11KV Feeder 4222/1, Laxmi Schedule B-19% Below Q-B/11KV L.C. Gates including Line/144/2416 dtd. Kunj (1st Floor), `32934658.89 Feeder Line/144 construction of pole- 07.09.12 Ansari Road, dtd. mounted electrical Darya Ganj, 12.07.12 substations/ isolation New Delhi 110002 points along the Railway Ph.: 011-23261775 track on Qazigund – Fax: 011-43528498 Baramulla section of USBRL project, J&K (Package-11kV Feeder) 4 IRCON/ 03.09.2012 Construction of Balance Counter Offer No.: M/s Pro-Tech `297.75 Lacs At PAR `297.75 Lacs Within 14 weeks J&K Cell/ Structural Work of Electrical IRCON/J&K Enterprises, from the date of JAT/1014/ Sub-station Building above Cell/JAMMU/1014/D- 73A, Hauzkhas issue of letter D- Plinth Level at South Portal Q/Balance Work of Village, Q/Balance of Pir-Panjal Tunnel (T-80) Electric Sub Station New Delhi Work of by Pre-Engineered Building Building South PIN- 110016 Electric Solution i.e. made up of pre- Portal/Package OB- Ph.:+91-11- fabricated steel structure in Sub 8R2/Date 26862048 place of RCC structure & Station brick wall paneling including 18.09.2012 Building doors, windows, rolling South shutters etc. in Zone V of Portal/Pac Dharam-Qazigund section of kage OB- Udhampur-Srinagar- 8R2 dtd. Baramulla New BG Railway 27.08.12 Line Project (Package : OB-8R2) 5 IRCON/ 29.11.2011 Supply, Erection, Testing LOA No.: M/s Cyril Bath 1610 01 No./ $17,60,000/- + 210 days from MECH/ & Commissioning of 01 IRCON/MECH/1029 Airport Road `950.00 Lacs AMC at date of opening of 1029/RCF- No. Stretch Bend Forming /RCF-RBL-II/ Monroe North $3,88,500/- LC RBL-II/ Machine at Rail Coach Caroline, 28110 Stretch Stretch Bend USA through M/s Factory at Lalganj, Bend Forming/33 dtd. Empire Machine Forming/33 Raebareli, UP-(INDIA) 26.09.12 Tools, Empire Dated House, 414, 08.10.11 Senapati Bapat Marg, Mumbai- 400013 Contd.../- Works Awarded : SEPTEMBER 2012 Quantity Rate Contractor’s Scheduled S. Tender Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/ date Mech. etc Works) Mech. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 6 IRCON/ 24.02.2012 Supply, Erection, Testing LOA No.: M/s 02 nos. `9,45,99,773/- `18,91,99,546/- 240 days from MECH/ & Commissioning of 02 IRCON/MECH/1029/ Electropneumatics `2025.00 Lacs date of issue of 1029/RCF. nos. (800 T) four column RCF-RBL-II/ Hyd & Hydraulic (India) LOA RBL-II/ hydraulic press at Rail Press/50/ 1587 dtd. Pvt. Ltd. Hyd Press Coach Factory at Lalganj, 28.09.12 A 302/303, /50 Dtd. Raebareli, UP-(INDIA) Universal Business 21.01.12 Park Chandivali Farm Road, Andheri (East), Mumbai Ph.: 022-40492525 7 IRCON/ 30.04.2012 Construction of LOA No.: M/s Tantia `4019.1 `3817.31 Lacs 27.12.2013 CC/TN/ Embankment, Side IRCON/CC/TN/JBN Construction Ltd., JBNRL- Drains, Retaining Walls RL- DD-30, 7th Floor, 2051/12/ and Blanketing Works, 2051/EMBANK/12/6 Sector-1, Salt Lake 650 Bridges (Minor & Major) 50/ 1134 dtd. City, Dated and other ancillary items 28.09.12 PIN- 7000645 31.01.12 for “Construction of New Ph.: 033-4019000 Broad Gauge Railway FAX: 033- Lines from Jogbani (India) 40190001 to Biratnagar () in Nepal portion from Km 5+445 to Km 18+601” Works Awarded : OCTOBER 2012 S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled N. No. opening Work and date Name and (for supply contract)/ (for supply contract)/ Contract completion Estimated Cost (For Tendered Cost (For address Engg./Elect. /S&T/ Engg./Elect./S&T/ Mech. date Mech. etc Works) etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ME 25.01.12 Supply, Erection, Testing LOA M/s Po Chiao 1 No./238.00 USD 2,88,610.00 USD 2,88,610.00 180 days from CH/1029 & Commissioning of 01 No.Ircon/MECH/10 Industry Co. Ltd., Lacs + AMC at + AMC at date of opening /RCF.RBL No. CNC Vertical 29/RCF-RBL-II/ No.279-1, Tung `18,00,000/- `18,00,000/- of LC. II/CVSMM/ Spindle Moulder CVSMM/46/1600 Chou Rd.,shen 46 dtd. Machine. dtd.03.10.12 kang Dist, 17.12.11 Taichung 42942,Taiwan 2 IRCON/ME 12.03.12 Supply of 04 Nos. of LOA M/s Geeta 04 Nos./ `42,57,904/- `1,70,31,617/- 300 days from CH/1029/ Radial Drilling Machines. No.Ircon/MECH/10 Machine Tools 155.60 Lacs date of issue of RCF.RBLII/ 29/RCF-RBL- Pvt. Ltd., LOA Radial II/Radial Drill/RET- Jamnagar- Drill/RET II- II-13/1666 361002 (Gujrat) 13 & 17.02.12 dtd.03.10.12 3 IRCON/ 17.07.12 Construction of Road over LOA No. IRCON/ M/s BSC-C&C JV, `4038.86 Lacs 10.90% above `44,79,10,099/- 15-months from 2049/ROB- Bridge both railway span 2049/ ROB-II-BIHAR/ Plot No.: 70, the date of issue II-BIHAR/ and adjacent approaches LC-35B/ LOA/67 Dtd: Sector-32, of LOA TENDER/ span including Reinforced 06.10.12 Gurgaon, LC -35B/I/ Earth wall/ Retaining wall in Haryana 2012/15 lieu of LC-35 B at Km Date 613/11-13 between section PIN: 122 001 25.06.2012 Phulwarisharif - Danapur Section on Patna Mughalsarai Route in Danapur Division of E C Railway, Bihar.

4 IRCON/ 18.07.12 Construction of Road over LOA No. IRCON/ M/s Brahmaputra `4339.5 Lacs 8.86% above `47,23,98,396/- 15-months from 2049/ROB- Bridge both railway span 2049/ROB-II-BIHAR/ InfraProject Ltd., the date of issue II-BIHAR/ and adjacent approaches LC-23B/LOA/66 Dtd: Brahmaputra of LOA LC-23B/I/ span including Reinforced 06.10.2012 House, TENDER/ Earth wall/ Retaining Earth A-7, Mahipalpur, 2012/16 wall in lieu of LC-23 B at (NH-8 -Mahipalpur X-ing) Dtd: Km 123/9-8 between New Delhi 26.06.2012 section Khagaria and Mansi PIN - 110 037 , Bihar (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

5 IRCON/ 25.07.12 Construction of Road over LOA No. IRCON/ M/s Bumi Geo `1680.85 Lacs 10.25% above `18,53,14,118/- 15-months from 2049/ ROB- Bridge both railway span 2049/ ROB-II-BIHAR/ Engineering Ltd., the date of issue II-BIHAR/ and adjacent approaches LC-53A/ LOA/68 Dtd: No.-85/1, NAC of LOA LC-53A/I/ span including Reinforced 06.10.12 Tower, 2nd & 3rd TENDER/2 Earth wall/ Retaining wall Floor, Dr. 012/17 Dtd: in lieu of LC-53A B at Km 03.07.12 Radhakrishna 613/19-21 between Salai, Myalpore, Kauriya Halt-Bihiya Chennai Section on Patna- PIN - 600 004 Muglasarai Route in Danapur Division of E.C Railway, Bihar

6 IRCON/ 17.08.12 Construction of Road over LOA No.IRCON/ M/s TRG `2586.93 Lacs 8.0% above `27,93,88,662/- 15-months from 2049/ROB- Bridge both railway span 2049/ROB-II-BIHAR/ Industries Pvt. the date of issue II-BIHAR/ and adjacent approaches TENDER/ LC-31/ Ltd., of LOA TENDER/ span including Reinforced 2012/19/LOA/69 E-461, Greater LC-31/I/ Earth wall/ Retaining wall Date: 11.10.2012 Kailash-II, 2012/19 in lieu of LC No 31 at Km. New Delhi Date: 261/4-5 between 25.07.2012 PIN: 110 048 Narkatiagunj – Harinagar Fax: 011- section on Motihari- 29210167 Gorakhpur Route in Samastipur Division of E.C Railway, Bihar

7 IRCON/ 27.08.12 Construction of Road over LOA No. IRCON/ M/s TRG `3360.22 Lacs 8.85% above `36,57,59,585/- 15-months from 2049/ROB- Bridge both railway span 2049/ROB-II-BIHAR/ Industries Pvt. the date of issue II-BIHAR/ and adjacent approaches LC-102/I/LOA/ 70 Ltd., of LOA TENDER/ span including Reinforced Date: 15.10.2012 E-461, Greater LC- Earth wall/ Retaining wall Kailash-II, 102/I/TEND in lieu of LC No 102 at ER/ New Delhi Km. 403/11-12 on PIN: 110 048 2012/21 Mairwa-Jiradei Section on Date: Fax: 011- Siwan-Gorakhpur Route 03.08.2012 29210167 in Varanasi Division of North Eastern Railway

Contd.../- Works Awarded : OCTOBER 2012

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

8 IRCON/ 17.09.12 Design Consultancy LOI NO. M/s Stup `4.96 Crore `5,98,10,000/- 36 Months from CC/TN/ Services for Proposed IRCON/ 2052/ Consultants Pvt. the date of issue SANTRA Development at SANTRAGACHI/ Ltd., of LOI, which GACHI/ Santragachi Station, (S. E. CONSUL/STUP/ P-11, Darga expires on 25345/ 724 dated 12/664 Railway) West Bengal, Road, Park 17.10.2015 including Architectural, 18.10.12 dated & LOA NO. Circus, 22.08.12 Structural, Mechanical, Kolkata-700 017. Electrical & other design IRCON/ 2052/ SANTRAGACHI/CON services; Detailed Site SUL/STUP/25345/ Survey; Geo-technical 767 dated 06.11.12 investigation and Quality Control.

9 IRCON/ 30.07.2012 Supply of PVC Insulated, IRCON/9038/SLR.S M/s CMI Limited, $8,82,963 $9,00,475 3-months from the 9038/SLR. Armoured, Unscreened, &T/SIG.CABLES.PK C-483, date of issue of S&T/SIG. Underground Railway. G-XXI/71/558 Yojana Vihar LOA CABLES. Signalling Cables of size Dtd. 19.10.12 Delhi - 110 092 199 Kms $4,525.00 PKG- 19x1.5 Sqmm (Copper Ph.:011-49570000 XXI/71 Conductor) as per RDSO Fax: 011-22160411 Dtd. Specification No.: IRS: S- 06.07.12 63/2007 (Amd-2) or latest for Sri Lanka Railway

10 IRCON/ME 08.11.11 Supply, Erection, Testing LOA No. Magadh Precision 01 No./ `20,42,05,759/- + ` 20,42,05,759/- 180 days from CH/1029/R & Commissioning of 01 Ircon/MECH/1029/ Equipment Limited `3100.00 Lacs AMC at + date of issue of CF.RBL- 11, Industrial Area II/Cut To No. Slitter Cum Cut to RCF-RBL-II/Cut to `4,31,86,080/- AMC at LOA. Length/10 Length Combination line length/10/1679 No. 2, A.B.Road, ` 4,31,86,080/- dtd. dtd.23.10.12 Dewas-455001, 11.08.11 M.P India.

11 IRCON/ME 07.06.12 Pipelines for LOA No.: M/s Legris India `300.00 Lacs `2,65,27,588/- 90 days from CH/1029/R Compressed Air Supply IRCON/MECH/ Pvt. Ltd., (Parker date of issue of CF-RBL-II/ Hannifin Group) Pipelines/0 System in Wheel, 1029/RCF-RBL-II/ LOA. 28A/028A Transport, Machine, Pipelines/028A/1682 Plot No. 99, Place Development Shop and dtd. 23.10.12 City-1, Sector-37, Headers. Gurgaon Contd.../- Works Awarded : OCTOBER 2012 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 12 IRCON/ 03.08.12 Construction of Road over LOA No. M/s SMC `2712.11 Lacs 7.86% above `29,25,29,158/- 15-months from 2049/ Bridge both railway span IRCON/2049/ROB- Infrastructure Pvt. the date of issue ROB-II- and adjacent approaches II-BIHAR/LC- Ltd., 101, Akriti, of LOA BIHAR/ span including Reinforced 47B/LOA/73/2517 SMC, LBS Marg, LC-47B/I/ Earth wall/ Retaining wall in Date 26.10.2012 Khopat, Thane TENDER/ lieu of LC No 47 B at Km. (West) 2012/18 163/6-7 between PIN: 400 601 dtd. - Tilrath Section of E C. Maharashtra 13.07.12 Railway under Sonepur Division of E.C Railway, Bihar 13 IRCON/MECH/ 16.04.12 01 No. CNC Tool Room LOA No. M/s Deckel Maho 01 No./`546.00 `1,54,07,300/- & `1,54,07,300/- 240 days from 1029 /RCF.RBL- Milling Machine. Ircon/MECH/1029/ Pfronten GmbH Lacs EURO 553,090/- & date of opening II/1/CNC RCF-RBL-II/CNC DECKEL MAHO- (excluding taxes) EURO of LC TOOL ROOM MILLING Tool Room Milling Strabe 1 87459 + AMC at 553,090/- + MACHINE/ 76 machine/76/1701 Pfronten, `1,50,00,000/- AMC at Dtd. 17.02.12 dtd.29.10.12 Germany `1,50,00,000/- 14 IRCON/ 25.09.12 Design consultancy services LOI No. IRCON/2053/ M/s Consulting `4.81 Crore `4,62,00,000/- 36 months from CC/TN/ for proposed development at SHALIMAR/CONSUL/ Engineering the date of issue SALIMAR/ Shalimar Station (S.E. CES/25347/739 Services (I) Pvt. of LOI, which 12/665 Railway) West Bengal dated 29.10.12 & Ltd., expires on including Architecture, LOA No. dated CES Centre, 28.10.2015 Structural, Track, IRCON/2053/ 27.08.12 Mechanical, Electrical and SHALIMAR/ DM-3 & 4, other Design Services, CONSUL/CES/ Sector - V, Detailed Site Survey, Geo- 25347/760 Salt Lake, technical investigation and dated 05.11.12 Kolkata - 700091. Quality Control. 15 IRCON/ 01.06.12 Finishing works for Indoor LOA No. IRCON/ M/s RAMKY `20.99 Crore `21.03 Crore `26,71,33,142.49 8 months from 2048/ISC- Stadium under construction 2048/ISC- Infrastructure Ltd., the date of issue BEHALA/ i.e. Interior including flooring BEHALA/FIN Jindal Towers, of LOA TENDER/ and seating arrangement, WORKS/RIL/ Block-A, 4th floor, lifting, acoustic, internal & FINISHING 25346/748 dated 21/1A/3, Darga external electrical, HVAC, WORKS/ water supply system, S.T.P., 31.10.2012 Road, Kolkata – 06/12 misc. works etc. as per BOQ 700017. dated for new Sports Complex of 25.04.12 Eastern Railway at Gholsapur (Behala), Kolkata, W.B. Works Awarded : NOVEMBER 2012 S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled (for supply contract)/ (for supply contract)/ N. No. opening Work and date Name and Estimated Cost (For Tendered Cost (For Contract completion address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. etc date etc Works) Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 31.10.2011 Supply 07 nos. CNC IRCON/MECH/ M/s BAYKAL MAKINE `2797.50 Lacs Euro 2,478,792 + 270 days for 100T (02 SANAYI VE TICARET MECH/1029/ Hydraulic Press Brake 1029/RCF.RBL- `2,11,17,980/- + nos), 160T (01 no.) & RCF.RBL- A.S., Organize Sanayi 350 T (02 nos) & 390 Machines at Rail Coach II/Hyd. Press Bolgesi, 16140 Bursa/ AMC at II/Hyd. Press days for 650T (01 no) Turkey `3,25,50,000 + Brake/21 Factory at Lalganj, Brake/21/1741 & 800T (01 no) from dtd.11.08.11 Raebareli, UP-(INDIA) Dated : 08.11.12 Email: Custom duty as [email protected] per actual date of opening of LC IRCON/ USD 12,04,800 for Machine A 2 13.03.2012 Supply and Erection, IRCON/MECH/ M/s SIS `2786.00 Lacs + USD 25,25,152.00 180 days from MECH/ USD 13,20,352 for Machine B Installation & 1029/ RCF.RBL- Corporation, 208- + + the date of 1029/RCF. INR47,83,683.00 for Machine INR 96,98,347.00 Commissioning of 02 II//Laser 6, Dalcheon- A + opening of LC RBL-II// + AMC at USD Laser Nos. CNC Laser Cutting Cutting/RET/06/ dong, Buk-Gu, INR49,14,664.00 for Machine B + 2,42,880.00 + Cutting/ Machines at Rail Coach 1737 Dated : Ulsan, Korea AMC at USD 1,21,440 for Machine A + INR 37,05,000.00 RET/06 Dtd. + Factory at Lalganj, 08.11.12 683-470, Ph.: + 17.02.12 USD 1,21,440 for Machine B Raebareli, UP-(INDIA) 052-245-5390 INR18,52,500 for Machine A Custom duty as + INR18,52,500 for Machine per actual B 3 IRCON/M 21.02.2011 Supply and Erection, IRCON/MECH/ M/s Alpha `2210.48 Lacs `20,77,79,502/- 360 days from ECH/1029 Installation & 1029/ RCF.RBL- Services SPA + AMC at date of issue of / Commissioning of Electric II/EOT CRANES/44 531, RIICO `15,28,758/- LOA RCF.RBL- Overhead Travelling Dated : 14.11.12 Industrial Area, II/EOT Cranes (20T – 08 nos, Bhiwadi, CRANES/ 15T – 04 nos, 10T – 10 Rajasthan – 44 dtd. nos, 5T- 13 nos.) at Rail 301019 21.01.12 Coach Factory at Lalganj, e-mail: Raebareli, UP-(INDIA) [email protected] 4 IRCON/ 13.08.2012 Overlay of 50 mm Bituminous LOA No.: M/s GHV(I) Pvt. `2534.22 Lacs 16.90% below `21,05,93,941/- 6-Months CC/TN/ Concrete, Extra Layer to IRCON/CC/TN/RS Ltd., ALA Centre-I, including Strengthen Hazipur - Tajpur RSVY- VY-BIHAR/ 12/660 8, Mahal Industrial monsoon BIHAR/12/ Road of SH-49 in the District of Majkali Caves Vaishali & Samastipur Under dtd. 14.11.12 660 dtd. RSVY Project, Bihar. Package Road, Andheri (E), 22.07.12 1A(iii) Mumbai-400 093 5 IRCON/204 24.08.2012 Construction of Road over IRCON/2049/ROB- M/s TRG Industries `2391.97 Lacs 11.80% above `26,74,22,095/- 15 - months 9/ROB-II- Bridge both railway span and II-BIHAR/LC- Pvt. Ltd., including the adjacent approaches span BIHAR/LC- 17C/LOA/76/2688 E-461, Greater monsoon period 17C/I/TEND including Reinforced Earth Kailash-II, wall/ Retaining wall in lieu of dtd. 22.11.2012 from the date of ER/2012/20 New Delhi LC No 17C at Km. 27/15-16 on issue of Letter of dtd. PIN: 110 048 Hathua-Thawe Stations in Acceptance 24.08.12 Varanasi Division of North Fax: 011-29210167 Eastern Railway, Bihar. Works Awarded : DECEMBER 2012 S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled (for supply contract)/ (for supply contract)/ N. No. opening Work and date Name and Estimated Cost (For Tendered Cost (For Contract completion address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. etc date etc Works) Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/C 10.09.2012 (i) Construction of 4x24m LOA No.: M/s Naraindas `1890.57 Lacs 6.5% above `20,13,46,060/- 11-Months C/TN/RSV span H.L.RCC Bridge at IRCON/CC/TN/RS Construction Pvt. including Y-BIHAR/ Km. 26+900 (Sanauli) on VY-BIHAR/ Ltd., 14/441, monsoon 12/663 Benipatti – Pupri Road at 12/663/312 dtd. Binodpur, Power SH-52 in Madhubani district dtd. 05.12.12 House Road, under RSVY project 17.08.12 (ii) Construction of Multi-cell Culvert at CH.20+350 on PIN: 854 105 Benipatti to Pupri Road at (Bihar) SH-52 in Madhubani district Tel: 06452 – (iii) Widening of Concrete 243327, Road between gaps of FAX: 06452 - PQC Road and drain from 246082 Pandasarai to Mabbi (CH0+000 to 10+491 Km) and to Kathalbari (CH. 0+000 to 5.517 Km) by PQC material in Darbhanga town Pkg. 1D-I (Bridge) 2 IRCON/20 16.11.2012 (a)Supply, fabrication, LOA No.: M/s S.S.G. `1134.51 Lacs 6.5% below `10,60,76,749/- 15-months 49& 2034/ assembly, erection and IRCON/2034 - 2049/ Techno Services including the ROB-II & I painting of Bowstring girder ROB-I & II – Pvt. Ltd., 29, monsoon period – BIHAR/ in Railway portion, steel stair BIHAR/LOA/80/2838 Ashutosh Pally, from the date of case in connection to TENDER/ Dtd 07.12.2012 P.O.: Garia, issue of Letter of Construction of ROB at LC- 2012/28 47 at Begusarai and at LC Kolkata - 700084 acceptance Dtd No.23B (Khagaria) in state of 25.10.201 Bihar. 2 and (b)Supply, fabrication, assembly, erection and painting of Foot over Bridge in connection to Construction of ROB at LC-45 at , at LC No.46 (Jamui), at LC-72 (Patna City) and at LC-74 (Kumrahar) in state of Bihar. Contd.../- Works Awarded : DECEMBER 2012 S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled (for supply contract)/ (for supply contract)/ N. No. opening Work and date Name and Estimated Cost (For Tendered Cost (For Contract completion address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. etc date etc Works) Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 3 IRCON/M 16.05.2012 Supply and Erection, LOA No.: M/s Modern 600.00 Lacs `11,169.70 `5,58,48,500/- 1000 within 2- ECH/1029 Installation & IRCON/MECH/1029/ Prefab Systems months from LOA, /RCF.RBL Commissioning of 5000 RCF.RBL-II/Box Pvt. Ltd., Plot 2000 within 6 -II/Box Nos. Box Type Pallets/78/1960 No. 273, 274 months from LOA Pallets/78 Pallets at Rail Coach dated 19.12.2012 Sector-7, IMT and 2000 within 9 dated Factory, Lalganj, Manesar, months from LOA 17.04.12 Raebareli, UP (INDIA). Gurgaon-122050 4 IRCON/ 30.04.2012 Supply and Erection, LOA No.: M/s Global `1150.00 Lacs `9,73,41,229/- + `9,73,41,229/- + 240 days from the MECH/ Installation & IRCON/MECH/102 Engineers Ltd., AMC @ AMC @ date of issue of 1029/RCF. Commissioning of 9/RCF.RBL-II/Bogie GEL Tower, Plot `1,94,00,000/- `1,94,00,000/- LOA RBL- Bogie Frame and Painting No.: 16, Sector- II/Bogie Bogie Bolster Shot line/75/1966 Dtd. 20, Dwarka, Painting Blasting and Painting 21.12.12 New Delhi-75 line/75 System at Rail Coach Dtd. Factory, Lalganj, 17.02.12 Raebareli, UP (INDIA).

5 IRCON/20 22.11.2012 Supply, Fabrication, LOA No.: M/s S.S.G. `989.25 Lacs 2.0% below `9,69,46,740/- 15-months 49/ROB-II- Assembly , Erection and IRCON/2049/ROB-II- Techno Services including the BIHAR/TE Painting of Bowstring BIHAR/LOA/83/3005 Pvt. Ltd., 29, monsoon period NDER/II/2 girder in Railway Dtd. 27.12.2012 Ashutosh Pally, from the date of 012/29 portion , steel stair case P.O.: Garia, issue of Letter of Dtd. in connection to Kolkata - 700084 acceptance 31.10.12 Construction of ROB at LC-31 in Harinagar, at LC No.53A in Bihia and at L.C no.102 in Jiradei in the state of Bihar Works Awarded : JANUARY 2013 S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled (for supply contract)/ (for supply contract)/ N. No. opening Work and date Name and Estimated Cost (For Tendered Cost (For Contract completion address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. etc date etc Works) Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) IRCON/CC/ S. Description Amount 1 10.12.2012 Construction of IRCON/3013/NUC. M/s Canon N. (`) 06-months TN/3013/ Gymnasium under Phase- VERSOVA/PH- Engineering A DSR Item 25340065.31 inclusive of NUC.VERS B Mumbai SSR 8160561.85 III works at CIFE New III/729 dtd. Construction, 50- C NS Items 1748190.00 monsoon period OVA/PH- University Complex, Pnch 04.01.2013 51, Canon from the date of III/12/670 D Electrical 1604940.00 Marg, Versova, Mumbai House, 5, Items issue of LOA dtd. Matharpakhadi TOTAL 36853757.16 12.11.2012 (A+B+C+D) 32.52% ABOVE(+)11984841.83 `48838598.99 Road, Mazgaon, E Extra Items 9234221.57 7.86% BELOW (-)725809.82 `8508411.75 Mumbai-400 010 TOTAL `57347010.74 2 IRCON/ 15.06.2012 Supply and Erection, IRCON/MECH/ M/s KUKA `2850.00 Lacs `19,84,71,840/- + `19,84,71,840/- 240 days from MECH/ Installation & Commissioning 1029/RCF.RBL-II/ Systems (I) Pvt. AMC for 5 years + AMC for 5 the date of 1029/RCF. of Bogie Fabrication Line BOGIE LINE/ Ltd., H Block, Plot @ INR years @ INR opening of LC RBL-II/ with Mechanized Material 82/2075 dated No-A_6/7/8, 1,75,28,160/- 1,75,28,160/- Handling System for Bogie BOGIE 10.01.2013 Pimpri-MIDC, Shop having Robotic + Optional + Optional LINE/82 Welding Centre for Side Pune-4110818 Accessories Accessories dated Frame, Brake Beam, Bolster @`75,64,075. @`75,64,075. 17.04.2012 and Complete Bogie Frame + Cost of Spares + Cost of Spares for Bogie Shop at Rail Coach EURO EURO Factory at Lalganj, 1,22,562.82 1,22,562.82 Raebareli, UP 3 IRCON/ 22.10.2012 Construction of Staff LOA No.: M/s Ram Schedule Estimated Cost %age Rate Amount (`) 18-months (`) CC/TN/ Quarters, Passenger & including the IRCON/2050/ Chhabila Rai, AI 3,03,60,810.37 36% above 41290702.10 JBRLP/ Goods Platforms, Over BGL.JBB/Tender/ P.P. Road, monsoon period 2050/12/ Head Water Tank and Pkg-03 (India)/165 Rambagh, Buxar AII 2,09,49,406.93 36% above 28491193.43 from the date of 667 Date : Pump House of India side dtd. 12.01.2013 (Bihar) issue of LOA 37,26,316.47 28.09.12 of alignment portion at PIN: 802 101 AIII 20% above 4471579.76 Jaynagar in connection Tel.: 06183- AIV 1,52,861.83 30% above 198720.38 with Gauge Conversion & 222039 construction of new Broad B 50,00,000.00 30% above 6500000.00 Gauge Railway Line from JAYNAGAR (INDIA) to TOTAL: 6,01,89,395.60 8,09,52,195.67 BARDIBAS (NEPAL) Package No.- Quarters & Platforms - 03 Say, `: 6,01,89,396.00 `8,09,52,196/- (INDIA) Contd.../- Works Awarded : JANUARY 2013 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 4 IRCON/ 21.11.2012 Supply and Erection, IRCON/MECH/ M/s Shrodder- `594.00 Lacs Euro 2,45,030/- + Euro 4,90,060/- 180 days from MECH/ Installation & 1029/RCF.RBL-II/ Fasti Technology INR 24,87,240/- + INR date of opening 1029/RCF. Commissioning of (02 FOLDING/RET- GmbH, 49,74,480/- of LC RBL-II/ nos) CNC Folding II/08 /2094 Dtd: Elbringhausen,1D FOLDING/ Machines at Rail Coach 14.01.2013 -42929 RET-II/08 Factory at Lalganj, Wermelskirchen, Dtd. Raebareli, UP-(INDIA) Deutchland. 30.10.12 Email: [email protected] 5 IRCON/ 09.11.2012 Construction of Workshop No. M/s. Gangotri `20.26 Cr (i) Sch-A (DSR- `19.57 Cr 15 Months Civil/102 Office Complex, IRCON/Civil/1029/ Enterprises Ltd., 12 Items):5.00% i.e. 14.04.2014 9/RCF- Laboratory Complex, RCF- B-158, Sector A, (Five Percent) RBL/10/ Office Cum Locker Blocks, RBL/10/Tender/3/O Mahanagar, Below i.e. at total Tender/3 Toilet Cum Parking Blocks, T/27/2715 Dated: Lucknow-226006 cost of /OT/27 Scrap Yard in RCC 15.01.2013 Ph-0522- `16,21,16,066/- Dt.16.10. Framed/ Load Bearing 2321103, and 13 Structures and Product 2331280 (ii) Sch-B (NS Development Centre, TTC FAX: 0522- Items): 5.00% Workshops in PEB 2321104, (Five Percent) Structures & other 2324539 above i.e. at total Miscellaneous works for cost of Factory & Township area `3,35,41,479/- of RCF Rae Bareli at Lalganj (UP) 6 IRCON/ 09.11.2012 Supply, Installation, IRCON/ELECT/ M/s Aaryan `817.00 Lacs `7.47 Crores `8.94 Crores 10 months from ELECT/ testing & commissioning 1029/RCF-RBL/ Infratech, 44A the date of LOA 1029/RCF- of internal lighting and HOSP & MISC/45 Laxmi Plaza, RBL/ power distribution network dated 16.01.2013 Cantt Road, HOSP & system in various Lucknow, UP MISC/45 buildings such as 75 bedded hospital, schools, officer’s club, guest houses, Maintenance offices etc. at New Rail Coach Factory, Rae Bareli (U.P.)

Contd.../- Works Awarded : JANUARY 2013 S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled (for supply contract)/ (for supply contract)/ N. No. opening Work and date Name and Estimated Cost (For Tendered Cost (For Contract completion address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. etc date etc Works) Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 7 IRCON/ME 15.06.2012 Supply and Erection, IRCON/MECH/1029/ M/s DMG Mori `275.00 Lacs Euro 492,130 + Euro 492,130 + 240 days from CH/1029/R Installation & RCF.RBL-II/Turning Seiki India INR 46,75,000 INR 46,75,000 the date of CF.RBL-II/ Commissioning of (01 Centre/RET-II/18A Machines opening of LC Turning No.) CNC TURNING dated 18.01.2013 and Services Pvt. Centre/ CENTRE at Rail Coach Ltd., RET-II/ 18A dated Factory at Lalganj, Bangalore- 17.04.12 Raebareli, UP-(INDIA) 560058 8 IRCON/ME 25.06.2012 Supply and Erection, IRCON/MECH/102 M/s TOS Kurim, Alta `1100.00 Lacs Euro 1,190,000/- Euro 1,190,000/- 180 days from the CH/1029/R Installation & 9/RCF.RBL-II/CNC Group, Stefanikova + INR 64,20,800 + INR 64,20,800 date of opening of CF.RBL- Commissioning of (01 No.) Bed Milling/92 4160200 Brno + COST of AMC + COST of AMC LC II/CNC Bed CNC BED MILLING dated 22.01.13 Czech Republic FOR 5 YEARS @ FOR 5 YEARS Milling/92 MACHINE at Rail Coach email: INR 75,00,000 @ INR dated Factory at Lalganj, marketing@tos- 17.04.12 75,00,000 Raebareli, UP-(INDIA) kurim.cz 9 IRCON/ 31.08.2012 Supply and Erection, IRCON/MECH/1029/ M/s J.S. `233.28 Lacs `85,970/- `1,37,55,200/- 40 nos. within 3-4 MECH/1029 Installation & RCF.RBL-II/Dummy Industries,16/2, months from the /RCF. RBL- Commissioning of (160 Bogie/139/2142 Mathura Road date of issue of II/ Dummy Nos.) Dummy Bogies dated 23.01.2013 (Karkhana Bagh) LOA & 120 nos. Bogie/139 (Diplory) at Rail Coach Faridabad- will be supplied dtd.22.06.12 Factory at Lalganj, 121002 by 30.03.2013 Raebareli, UP-(INDIA) 10 IRCON/ 29.11.2012 Supply, fabrication, IRCON/ 2049/ ROB- M/s JCL Infra Ltd., `817.17 Lacs 12.5% above `9,19,32,059/- 15-months 2049/ assembly, erection and II/ BIHAR/LC- Industrial Area, including the ROB-II/ painting of Bowstring 35/LOA/86/205 Delhi Road, monsoon period BIHAR/ girder in Railway portion, Dated. 24.01.13 Partap pur, from the date of TENDER/ steel stair case in Meerut – 250 103 issue of LOA II/2012/30 connection to Dtd. Construction of ROB at 09.11.12 LC-35B at Phulwarisarif and Danapur section on Patna Mughalsarai route in Danapur Division of E.C. Railway, Bihar Contd.../- Works Awarded : JANUARY 2013 S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled (for supply contract)/ (for supply contract)/ N. No. opening Work and date Name and Estimated Cost (For Tendered Cost (For Contract completion address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. etc date etc Works) Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 11 IRCON/ 10.12.2012 Supply, Fabrication, IRCON/ 2049/ ROB- M/s JCL Infra Ltd., `512.28 Lacs 10.00% above `5,63,50,342/- 15-months 2049/ Assembly, Erection and II/ BIHAR/LC-35 - Industrial Area, including the ROB-II/ Painting of Bowstring 3SPL/LOA/85/203 Delhi Road, monsoon period BIHAR/ girder in Railway portion , Dated. 24.01.13 Partap pur, from the date of TENDER/ steel stair case in Meerut – 250 103 issue of LOA LC-3 connection to Construction SPL/II/ of Road Over Bridge at LC 2012/34 No 3 SPL at Km. 51/09-10 Dtd. between - 17.11.12 section on Barauni – Gorakhpur Route in Sonpur Division of East Central Railway, Bihar 12 IRCON/M 19.07.2012 Supply and Erection, IRCON/MECH/ M/s Fanuc `162.00 Lacs Yen 17,522,320 + Yen 17,522,320 180 days from the ECH/1029 Installation & 1029/RCF.RBL-II/ Corporation 3580 USD 4000 +INR + USD 4000 date of opening of /RCF.RBL Commissioning of (01 CNC Wire Cut Shibokusa Aza- 3,82,249 + AMC +INR 3,82,249 LC -II/CNC No.) CNC WIRE CUT EDM/93/2149 Komanba Oshino- for 5 years @ + AMC for 5 Wire Cut EDM MACHINE at Rail dated 28.01.13 Mura, INR 8,25,000/- years @ INR Minamistsuru-Gun EDM/93 Coach Factory at Lalganj, 8,25,000/- Yamanashi dated Raebareli, UP-(INDIA) 17.04.12 Prefecture, 401- 0597 Japan 13 IRCON/ 29.11.2012 Design, Supply, IRCON/ELECT/1029/ M/s Tata Power `2242.00 Lacs - `1560.00 Lacs 08 months from ELECT/ Installation, testing & RCF-RBL/2MW Solar Systems Ltd., the date of LOA 1029/RCF- commissioning of Grid SOLAR PLANT/44B 78, Electronics City, RBL/ Solar connected Solar power dated 30.01.2013 Phase I, Hosur Plant/ 44B plant of 2MW capacity Road, Bangalore - with all the electrical and 560 100 India associated equipments including civil works at New Rail Coach Factory, Rae Bareli (U.P.)

Works Awarded : FEBRUARY 2013 S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled (for supply contract)/ (for supply contract)/ N. No. opening Work and date Name and Estimated Cost (For Tendered Cost (For Contract completion address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. etc date etc Works) Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRSDC/C 27.11.2012 Architect and Technical IRSDC/CT-2 of M/s GMP NA NA `4,35,83,765/- 140 Days T-2 of Consultant for preparation 2012/Chandigarh/81 International (including 2012/ of Technical Feasibility Dtd. 01.02.2013 GmbH – Germany Service Tax and Chandigarh study and Master plan for (lead Partner) + Additional development/ Intercontinental Costs) redevelopment of Consultants and Chandigarh Railway Technocrates Pvt. Station on the Indian Ltd- New Delhi ( India) Railway Network 2 IRSDC/ 29.11.2012 Architect and Technical IRSDC/CT-3 of M/s GMP NA NA `4,23,67,115/- 140 Days CT-3 of Consultant for preparation 2012/ Habibganj- International (including 2012/ of Technical Feasibility Bhopal/ 82 GmbH – Germany Service Tax and Habibganj- study and Master plan for Dtd.01.02.2013 (lead Partner) + Additional Bhopal development/ Intercontinental Costs) redevelopment of Consultants and Habibganj-Bhopal Railway Technocrates Pvt. Station on the Indian Ltd- New Delhi ( India) Railway Network 3 IRCON/ 29.11.2012 Supply of 1000 Nos. IRCON/MECH/1029/ M/s. J.S. `285.17 Lacs 250 nos @ `2,35,52,000/- 500 nos. within 03 MECH/1029/ Flat Pallets for Bogie RCF.RBL-II/Flat Industries,16/2, `89,01,000/-, months from the RCF.RBL-II/ Shop at Rail Coach Pallets/78A/2177 Mathura Road 250 nos @ date of issue of Flat dated 04.02.2013 (Karkhana Bagh)- `27,83,000/-, LOA and 500 nos. Pallets/78A Factory at Lalganj, Faridabad- 121002; within 06-months Dtd. Raebareli, UP-(INDIA) 500 nos @ 30.10.12 jsindustries@sarna `1,18.68,00/- from the date of group.com issue of LOA 4 IRSDC/C 30.11.2012 Architect and Technical IRSDC/CT-5 of M/s Sener NA NA `5,10,80,945/- 210 Days T-5 of Consultant for preparation of 2012/Bijwasan - Ingeniera Y (including 2012/ Technical Feasibility study New Delhi/83 Sistemas S.A. Service Tax and Bijwasan and Master plan for Dtd. 04.02.2013 (lead Member) + Additional development/ redevelopment – New Balaji Railroad of Bijwasan – New Delhi Costs) Delhi Railway Station on the Indian System Limited Railway Network (BARSYL)-India Contd.../- Works Awarded : FEBRUARY 2013 S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled (for supply contract)/ (for supply contract)/ N. No. opening Work and date Name and Estimated Cost (For Tendered Cost (For Contract completion address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. etc date etc Works) Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 5 IRCON/ 18.05.2012 Supply of 01 No. 3-D Co- IRCON/MECH/1029/ M/s Accurate 01 No. `3,40,42,157/- `3,40,42,157/- 120 days from MECH/ 1029/ ordinate Measuring RCF.RBL-II/3D CMM Gauging & (`451.00 Lacs) the date of RCF.RBL-II/ Machine for Bogie Shop at (BOGIE Instruments Pvt Ltd issue of PO 3D CMM Gauge House, 67, (BOGIE Rail Coach Factory at SHOP)/71/2195 Hadapsar Industrial SHOP)/71 Lalganj, Raebareli, UP- Dtd.07.02.2013 Dtd. 17.02.12 (INDIA) Estate, Pune-411013 6 IRCON/ 26.11.2012 Supply of 05 Nos. Shuttle IRCON/MECH/1029/ M/s Unique Industrial 05 nos. 2 Nos. @ `5,50,74,807/- 150 days from MECH/1029/ (i.e. Transfer Cars) RCF.RBL- Handlers Pvt. Ltd. (`736.00 Lacs) `2,45,76,072/-, the date of RCF.RBL-II/ for Bogie Shop at Rail II/Shuttle/114 dated 206-207, Nahar & 1 Nos. @ issue of LOA Shuttle/114 Coach Factory at Lalganj, 11.02.2013 Seth Industrial `1,24,06,789/-, Dtd. Estate Chakala, Raebareli, UP-(INDIA) 30.10.12 Andheri (E) Mumbai- 1 No. @ 400099. `76,33,479/-, Email:sales@unicrane 1 no. @ .com `1,04,58,467/- 7 IRCON/ 05.11.2012 System Design, Supply, IRCON/ M/s Silica Infotech `226.00 Lacs 11.08% below the `2,01,60,317.64 6-months from 9038/SLR Installation, Testing & 9038/SLR.S&T/ Pvt. Ltd., 142, estimated cost the date of .S&T/ Commissioning of IP EXCHANGE.PKG- Ground Floor, Sant issue of LOA EXCHAN based EPABX and other II/50/V Nagar, East of GE.PKG- associated work at stations Dtd.15.02.2013 Kailash, New Delhi – II/50 Dtd. over Northern Province of 110065 19.09.12 Sri Lanka Railways Tel.:011-41622583, 41622915; FAX: 011- 26468258 8 IRCON/ 04.02.2013 Supply, Fabrication, LOA No.: M/s S.P. `787.81 Lacs 6.90% above `8,42,16,500.95 15-months 2049/ Assembly, Erection and IRCON/2049/ROB- Developers & tender cost including ROB-II- Painting of Bowstring II-BIHAR/Steel Decorators, monsoon period BIHAR/ girder in Railway portion, Girder/LOA/93/417 #3195, Paradise from the date of TENDER/ steel stair case in dtd.18.02.2013 Enclave, Sector-50 issue of LOA STEEL GIRDER/ connection to D, Chandigarh II/2013/3 Construction of Road Mob.: Date: over Bridge at LC – 17 C, 09646031286, 15.01.2013 (Thawe), LC – 45 AB FAX: 0172- (Chapra) and LC – 159 2673195 (Motihari) in state of Bihar Contd.../- Works Awarded : FEBRUARY 2013 S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled (for supply contract)/ (for supply contract)/ N. No. opening Work and date Name and Estimated Cost (For Tendered Cost (For Contract completion address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. etc date etc Works) Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 9 IRSDC/CT- 03.12.2012 Architect and Technical IRSDC/CT-4 of M/s Sener Ingeniera NA NA `3,70,90,495/- 140 Days 4 of 2012/ Consultant for 2012/Shivaji Nagar- Y Sistemas S.A. (including Shivaji preparation of Technical Pune/124 (lead Member) + Service Tax and Nagar - Feasibility study and Dtd. 20.02.2013 Balaji Railroad Additional Pune Master plan for System Limited Costs) development/ (BARSYL)-India redevelopment of Shivaji Nagar - Pune Railway Station on the Indian Railway Network Works Awarded : MARCH 2013 S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled (for supply contract)/ (for supply contract)/ N. No. opening Work and date Name and Estimated Cost (For Tendered Cost (For Contract completion address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. etc date etc Works) Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 02.01.2013 Supply of Fire Hydrants LOA No.: M/s Thermosystems `764.45 Lacs `550.11 Lacs `550.11 Lacs 180 days from MECH/102 Supply Lines & Pumps IRCON/MECH/ Pvt. Ltd., the date of issue 9/RCF. etc. and Fire Alarm 1029/RCF.RBL-II/ Plot No.:262, of LOA RBL-II/ Fire System at Rail Coach Fire Hydrant 1st Floor, I.T.D.C., Hydrant & Factory at Lalganj, & Fire Alarm MB Road, Five Fire Alarm Raebareli, UP-(INDIA) System/142/2318 Senses Road, System/ dtd.01.03.13 Saidulajab, 142 Dtd. New Delhi 30.10.12 PIN - 110 030 2 IRCON/ 05.02.2013 RCC Bored Cast-in-situ LOA No.: M/s Reacon `1925.00 Lacs `15,79,52,773.34 08 months K-RO/TN/ Piling works for IRCON/2052/ Engineers (ind) Pvt. (excluding SRC&SHM Construction of SANTRAGACHI/ Ltd, monsoon period /12/3 Dtd. Substructure of Flyover/ PILING/REIPL/ 142, Lenin Sarai, for 2 months 08.01.13 Road over Bridge and 1200 dtd. Kolkata between July & adjacent approach 01.03.2012 PIN:700 013 September) spans in connection with Station Development at Santragachi and Shalimar Stations for South Eastern Railway in W.B. 3 IRCON/ 11.12.2012 Construction of Balance LOA No.: M/s K.S. `6,53,11,126.00 8.00% below `6,00,86,235.92 10/03/13 JK Cell/ works in Harog - IRCON/J&K Constructions, JAT/14/ Megdhar Access Road Cell/JAT/14/1014/ 114, Housing 1014/D-Q/ under Dharam-Qazigund DQ/ Bal. Works- Colony, Phase-II, Bal.works- Rail Link Works in Zone Har.-Meg-Zone-I/ Udhamnpur, J&K Har.–Meg- –I Section in connection M-5R/240/2975 Tele Fax: 01992 - Zone-I/M- with the Construction of dtd.08.03.13 272831 5R/240 USBRL Project Date: (Jammu and Kashmir) 19.11.2012 (Package: M- 5R)

Contd.../- Works Awarded : MARCH 2013

S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled (for supply contract)/ (for supply contract)/ N. No. opening Work and date Name and Estimated Cost (For Tendered Cost (For Contract completion address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. etc date etc Works) Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 4 IRCON/EL 06.03.2013 Design, Supply, LOA No.: M/s LG Electronics `1043.00 Lacs Item Rate `8,68,60,003/- 06 months from ECT/1029/ Installation, Testing & IRCON/ELECT/ India Pvt Ltd, the date of issue RCF- Commissioning of 1029/RCF-RBL/ A-27, Mohan Co-op. of LOA RBL/HVAC “VRV/VRF” type HVAC HVAC-ADM/47A Industrial Estate, -ADM/47A system in Administrative dtd.18.03.2013 Mathura Road, Dtd. Buildings (GF and FF) at Delhi-110 044 11.02.13 New Rail Coach Factory, Rae Bareli (U.P.)