Annexure: A DETAILS OF CONTRACTS PLACED BY OPEN TENDER (For Civil Engg. /Elect. Engg. /S & T/Mech. etc works) (Status for the Month : From APRIL 2012 To MARCH 2013) Works Awarded : APRIL 2012 Quantity Rate (for supply (for supply Contractor’s contract)/ contract)/ Scheduled S. Tender Date of Description of Item/ LOA No. Value of Name and Estimated Cost Tendered Cost completion N. No. opening Work and date Contract address (For Engg./Elect. (For date /S&T/ Mech. etc Engg./Elect./S&T/ Works) Mech. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 23.02.2012 System design, supply, IRCON/9038/SLR.S& M/s Kiran Infra USD 2,381,349 6.5% below the USD 18 - months from 9038/ installation, testing & T/TELE.WORKS.PKG Engineers Ltd., B- estimated cost. 2,226,561.32 the date of issue of SLR.S&T/ commissioning of STM-4, -1/18/LOA/251 141, Road No. 9D, LOA TELE. STM-1, ADMs systems, dated 04.04.2012 Vishwakarma WORKS. GPS clock, Public Industrial Area, PKG-I/18 Address System, VHF Jaipur-302 013 Dated system and trenching, Fax: 0141-2331808, 11.01.2012 laying, splicing/jointing, 2260073 back filling, terminating, testing and commissioning of 24 fiber underground armoured OFC with 6 Quad/PIJF cable, provision of Emergency Socket, Headquarter/ Wayside Control Equipment and communication at L-Xing and important locations over section of Anuradhapura to Kankasanthurei and Medawachchiya to Talaimannar Pier of Sri Lanka Railway Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 2 IRCON/101 14.02.2012 Construction of IRCON/1014/J&K- M/s Dineshchandra `1276.00 Lacs `13,72,52,693.26 06 - months from 4/J&K- Infrastructure Facilities DQ/ T-80 Circulating R. Agrawal the date of issue of CELL/T-80 consisting of Duty Hut, Area/1908 dated Infracon Pvt. Ltd., LOA Circulating Area/ Date: Morchas, Parking 16.04.2012 Engineers & 02.01.2012 Space, Access road and Contractors, 401, helipad, water tank for The Grand Mall, fire fighting and all other S.M. Road, ancillary works at tunnel Ambawadi, T-80 Portals in Zone-V Ahmedabad of D-Q section in 380015 connection with Udhampur - Srinagar - Baramulla Rail Link Project in the state of J&K. (Package-T-80 Circulating Area) 3 IRCON/J& 27.03.2012 Construction of Type-III IRCON/J&K M/s Zeal `402.00 Lacs ` 4,79,87,193.89 09 - months from K & Type-IV Quarters cum Cell/JAT/14/1014/D- Construction Co., the date of issue of Cell/JAT/1 temporary offices and Q/Sangaldan Qtrs- J&K Bank Building, LOA 4/1014/D- other related works at Office/SQ-4/1909 Pantha Chowk, Q/Sangald Sangaldan Camp near dated 17.04.2012 Srinagar, an Qtrs- proposed Sangaldan Kashmir - 191 101 Office/SQ- Railway Station on Mob.09419003883 4 Date Dharma-Katra section of : 09419060731 05.03.12 USBRL project (J&K) Fax: 01933-224060 (Package: SQ-4) 4 IRCON/ 11.10.2011 Supply, Erection, Testing IRCON/MECH/1029 M/s BISIACH & 01 no. `25,16,47,363.56 `25,16,47,363.56 240 days from the MECH/10 & Commissioning of 01 /RCF.RBL-II/Spot CARRU s.PA `30001.00 Lacs date of LC 29/RCF. No. CNC Spot Welding Welding/41 Capital Sociale RBL-II/ Machine at Rail Coach Dtd. 18.04.2012 Interamente Spot Factory, Lalganj, Versato-I-10078, Welding/ Raebareli, UP-(INDIA) Venarai (Torino), 41 Italy-C SO Dtd. Piemonte 36. 08.09.11 Email: [email protected] Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 5 IRCON/ 09.04.2012 Re-gradation of NH-200 IRCON/2036/TSTPS M/s Nanda Infra `699.00 Lacs ` 8,01,41,113.50 90 - Days from 2036/TSTP in connection with the /L-XING/NIC/25338/ Construction (P) the date of issue P/TENDER construction of 3.5 Km 56 dated 20.04.2012 Ltd., College of LOI dated /LC/06/12 Railway track connecting Road, South 19.04.2012 Date the existing MGR of Balanda, Talcher, 16.03.12 NTPC Kaniha to Kaniha Distt.-Angul Mines of MCL (Orissa) PIN: 759 116 6 IRCON/J 10.04.2012 Construction of Multi IRCON/J&K- M/s Kapahi `750.00 Lacs ` 7,95,49,378.13 11 - months from &K- Functional Complex CELL/JAT/14/7004/ Construction Co., the date of issue of CELL/JA (MFC) comprising of Rail 03/1951 dated A-2 Central LOA T/14/700 Yatri Niwas and 25.04.2012 Mezzanine Floor, 4/03 Passenger Amenities South Block, Bahu Date Center at Jammu Tawi Plaza, Jammu 12.03.12 Railway Station, J&K (J&K) Ph.:0911-2470051 Works Awarded : MAY 2012 Quantity Rate (for supply (for supply Contractor’s contract)/ contract)/ Scheduled S. Tender Date of Description of Item/ LOA No. Value of Name and Estimated Cost Tendered Cost completion N. No. opening Work and date Contract address (For Engg./Elect. (For date /S&T/ Mech. etc Engg./Elect./S&T/ Works) Mech. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 20.04.2012 Design, Supply, IRCON/9038/SLR. M/s Angelique $1,516,112.00 1.11% below the $14,99,283.16 06 - months from 9038/SLR Installation, Testing & S&T/SIG.Works International Ltd., estimated cost the date of issue .S&T/SIG Commissioning of Relay PKG-I (R) /08 dated 104-107, Hemkunt of LOA .Works Based Panel Interlocking 02.05.2012 Tower, 1st Floor, PKG-I (R) System at 6 stations 98, Nehru Place, /08 dated (Anuradhapura, Mihintale, New Delhi-19 30.03.12 Parasangahawewa, Ph.: 011-26413873 Medawachchiya, Vavunia Fax:011-26413876 & Omanthai of Sri Lanka Railways Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 2 IRCON/ 12.03.2012 Supply of SMPS Based IRCON/9038/SLR. M/s Statcon Power $ 5,60,976.00 `3,38,40,005/- 15 - months from 9038/ SLR. Integrated Power Supply S&T/SIG.IPS.PKG- Controls Ltd., A-34, the date of issue of S&T/SIG. System as per RDSO XIV/36 Sec-59, Gautam LOA IPS.PKG- specification no. RDSO/ Dated 04.05.2012 Budh Nagar, Noida- XIV/36 SPN/165/2004 (Amd-5) or 201 301 Dated latest for 27 Stations of Ph.: 0120-4640200- 28.02.12 Sri Lanka Railways 210 FAX: 0120-4640240 3 IRCON/ 25.01.2012 Construction of Road IRCON/3015/TN/ M/s C&C `15022.34 Lacs `15022.34 Lacs `167,78,59,000/- 16 - months from 3015/ Over Bridge (ROB's) & its ROB-RAJ/CLS- Constructions Ltd., the date of issue of TN/ROB- approaches as per B/12/27/1080 Plot No.: 70, LC200 - Bassi `3,373.46 Lacs LOA RAJ/CLS Specifications, Drawing & Date: 16.05.2012 Sector – 32, - Design, Maintaining all Gurgaon B/12/027 Quality Control Standards PIN- 122 001 LC89-Dadi Ka `3,200.35 Lacs Date etc. complete under ROB Ph.: 0124-4536666 Phatak 11.04.12 Cluster Package "B" in FAX:0124-4536799 Lieu of various LCs at LC228-Khirni Ka `3,040.69 Lacs Jaipur: Dadi Ka Phatak Phatak (LC-89), Khirni Ka Phatak (LC-228), Bindayaka (LC- LC233-Bindayaka `4,323.99 Lacs 233) & Bassi (LC-200) and at Reengus (LC-108), in Rajasthan state. LC108-Reengus `2,840.10 Lacs 4 IRCON/ 10.01.2012 Supply, Installation, IRCON/3014/ M/s KEC `10,47,19,030/- `8,90,11,176/- `8,90,11,176/- 20.11.2012 Elect/30 testing, commissioning, Jhalawar/OHE International 14/Jhala handover and Erection/01 Limited, Building war/ maintenance of Overhead dated 21.05.2012 No. 9-A, 1st Floor, OHE Equipment (OHE) Railway DLF Cyber City, Erection/ Electrification work of 33 DLF Phase-III, 01 dated TKM at RRVUNL Siding Gurgaon-122002 15.12.11 at Kalisindh Thermal Power Station, Jhalawar on Ramganj Mandi - Jhalawar (New BG) section. Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 5 IRCON/ 23.01.2012 Supply of copper IRCON/ELECT./301 M/s Chandra Metals `4,93,50,000/- `3,70,80,422/- `3,70,80,422/- 07.09.2012 Elect/30 conductors for Design, 4/ Jhalawar/ Copper Limited, 1&2 14/Jhala Engineering, Conductor/03/ 2863 MNNIT, Industrial war/ Manufacturing, Supply to dated 21.05.12 Estate Teliarganj, Copper site, construction, Allahabad-211004 Conduct installation, or/ 03 Commissioning of dated Railway siding (within 30.12.11 Railway premises) and upto RVUN Power Plant boundary and also within RVUN's premises of Kalisindh TPS for 2 x 600 MW unit # 1 & 2, Kalisindh thermal Power Project stage-1 Jhalawar 6 IRCON/ 06.02.2012 01 No. 3D Co-ordinate IRCON/MECH/ 1029/ M/s Carl Zeiss (01 no.) `393.63 Lacs `393.63 Lacs Delivery within MECH/ Measuring Machine RCF.RBL-II/3D CMM/56 Industrielle `451 Lacs 255 days from the 1029/ dtd.21.05.12 Messtechnik GmbH date of LOA i.e. Postfach 1369/1380, RCF. D-73446, 31.01.2013 RBL-II/3 Oberkochen, D CMM/ Germany 56 dtd Tel:+49 7364 202790, 17.12.11 Fax:+49 7364 202424 7 IRCON/ 03.05.2012 Supply, Installation, IRCON/ ELECT/ M/s Aaryan `632.00 Lacs `5,51,99,168/- 08 - months from ELECT/ Testing & Commissioning 1029/RCF-RBL/ Infratech, 44A the date of issue 1029/RCF- of Internal Lighting and INTERNAL ELECT Laxmi Plaza, of LOA RBL/ Power Distribution GREEN BUILDINGS/ Cantt Road, INTERNAL Network system inside 42 Date: 28.05.2012 Lucknow ELECT Administrative Building, (UP) GREEN Technical Training BUILDING Centre, Technical S/ 42 Training Hostel and Shopping Complex at New Rail Coach Factory, Rae Bareli (UP) Works Awarded : JUNE 2012 Quantity Rate Contractor’s Scheduled S.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages28 Page
-
File Size-