IMPROVING DRAFT MASTER PLAN FOR - 2031

FINAL REPORT

Prepared for, Department of Urban Development & Housing, Govt. of

Prepared by, CEPT, Ahmadabad FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

FINAL REPORT

IMPROVING DRAFT MASTER PLAN FOR PATNA - 2031

Client: Urban Development & Housing Department Patna, Bihar

i

Prepared by: Center for Environmental Planning and Technology (CEPT) University Kasturbhai Lalbhai Campus, University Road, Navrangpura, – 380 009 Gujarat State Tel: +91 79 2630 2470 / 2740 l Fax: +91 79 2630 2075 www.cept.ac.in I www.spcept.ac.in

CEPT UNIVERSITY I AHMEDABAD i FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

TABLE OF CONTENTS

TABLE OF CONTENTS i

LIST OF TABLES v

LIST OF FIGURES vii

LIST OF MAPS viii

LIST of ANNEXURE ix

1 INTRODUCTION 10 1.1 Introduction 11 1.2 Planning Significance of Patna as a 12 1.3 Economic Profile 14 1.4 Existing Land Use – Patna Municipal Corporation Area 14 1.5 Previous Planning Initiatives 16 1.5.1 Master Plan (1961-81) 16 1.5.2 Plan Update (1981-2001) 17 1.5.3 Master Plan 2001-21 18 1.6 Need for the Revision of the Master Plan 19 1.7 Methodology 20 1.7.1 Stage 1: Project initiation 20 1.7.2 Stage 02 and 03: Analysis of existing situation & Future projections and Concept Plan 21 1.7.3 Stage 04: Updated Base Map and Existing Land Use Map 21 1.7.4 Stage 5: Pre-final Master Plan and DCR 24

2 DELINEATION OF PATNA PLANNING AREA 25 i 2.1 Extent of Patna Planning Area (Project Area) 26 2.2 Delineation of Patna Planning Area (Project Area) 27 2.3 Delineated Area – Patna Planning Area (PPA) 31 2.4 Constituents of Patna Planning Area 33

3 CHAPTER: PATNA PLANNING AREA PROFILE 36 3.1 Regional Connectivity 37 3.2 Physical Features 38 3.3 Demographics and Socio-Economic Profile 39

CEPT UNIVERSITY I AHMEDABAD i FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

3.4 Growth Rate 41 3.5 Population Density 41 3.6 Sex Ratio 41 3.7 Schedule Caste and Schedule Tribes Population 41 3.8 Rate 41 3.9 Work Force and Occupation Structure 42 3.10 42 3.11 Urbanization 55 3.12 Existing Land Cover – Project Area including PPA 56

4 CHAPTER: DEVELOPMENT VISION & PLANNING NORMS ADOPTED 58 4.1 Guiding Principles 59 4.1.1 Multiple Nuclei Concept 60 4.1.2 Urban Rural Continuum 60 4.1.3 Transit Oriented Development (TOD) 61 4.1.4 Urban Growth Boundary 62 4.1.5 Peri urban development 63 4.1.6 Provision of Social Amenities 63 4.1.7 Environmentally Suitable Development 63 4.2 Planning Norms and Standards Adopted 63 4.2.1 Community Level Facilities 66 4.2.2 Neighbourhood Level Facilities 67 4.2.3 Sector Level Facilities 67 4.2.4 Node Level Facilities 68 4.2.5 Zone Level Facilities 69 4.2.6 CBD Level Facilities 70 ii 5 CHAPTER: PLANNING PROPOSALS 72 5.1 Population Projection 73 5.2 Employment projection 77 5.3 Proposed Land Use Distribution and Land Requirements 78 5.4 Land Use Classification 81 5.4.1 Residential Zone 81 5.4.2 Commercial Zone 81 5.4.3 Industrial Zone 81 5.4.4 Public, Semi-public amenities and utilities Zone 81 5.4.5 Open Space Zone 82 5.4.6 Old city / Inner City Zone 82

CEPT UNIVERSITY I AHMEDABAD ii FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

5.4.7 Urban Centers Zone (Uc) 82 5.4.8 Village Settlements Zone (VS) 82 5.4.9 Urban Agriculture Zone 82 5.4.10 Conservation Zone 82 5.4.11 Water Bodies Zone 82 5.4.12 Special Reservations Zone 83 5.4.13 Transportation and Communication Zone 83 5.5 Proposed Transportation Network 83 5.5.1 Existing Road Network 83 5.5.2 Proposed Hierarchy of Roads 87 5.5.3 Proposed Public Transport route 90 5.5.4 Proposed Rail Network 91 5.5.5 Proposed Air network 92 5.5.6 Waterways 93 5.6 Proposed Physical Infrastructure 94 5.6.1 Water Supply 94 5.6.2 Water supply source 94 5.6.3 Issues 95 5.6.4 Water demand estimation 95 5.6.5 Storage 98 5.6.6 Alternative water harvesting system 98 5.6.7 Recyle 99 5.6.8 Sewerage and Sanitation 99 5.6.9 DEWATS – Decentralised Wastewater Management 100 5.6.10 Storm Water Drainage 101 5.6.11 Existing storm water drainage 102 5.6.12 Solid Waste Management 104 5.6.13 Hazardous Wastes 108 5.6.14 Power Supply 108 iii 5.7 Proposed Social Infrastructure & Amenities 109 5.7.1 Scalogram Analysis 109 5.7.2 Educational facilities 111 5.7.3 Health facilities 114 5.7.4 Communication facilities 117 5.7.5 Financial services 118 5.8 Social Infrastructure: 119 5.8.1 Community Level Facilities 120 5.8.2 Neighborhood Level Facilities 121 5.8.3 Sector Level Facilities 122 5.8.4 Node Level Facilities 123 5.8.5 Zone Level Facilities 124

CEPT UNIVERSITY I AHMEDABAD iii FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

5.8.6 CBD Level Facilities 126

6 CHAPTER: IMPLEMENTATION MECHANISM OF TOWN PLANNING/ AREA PLANNING SCHEME 129 6.1 Legislative Framework 130 6.1.1 Formation of & Development Board 130 6.1.2 Declaration of Planning Area/s 130 6.1.3 Constitution of Planning Authority 130 6.1.4 Preparation of Land Use Map 131 6.1.5 Preparation of the Development Plan 131 6.1.6 Area Development Scheme 131 6.2 Implementation Mechanism of Area Planning Scheme 132 6.2.1 Development Plan (DP) 132 6.2.2 Town Planning Schemes (TPS) 132 6.2.3 Implementation history in Ahmedabad 133 6.2.4 TPS preparation in Vinzol (TPS no. 90 Vinzol 2), Ahmedabad: 135 6.2.5 The TPS preparation process 136 6.2.6 The financial aspects of the TPS 150 6.2.7 Key Advantages, Limitations and Potentials of the TPS 151

iv

CEPT UNIVERSITY I AHMEDABAD iv FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

LIST OF TABLES Table 1: Area and Population of Patna Urban Agglomeration Area ...... 13 Table 2: Existing Land use – Patna Municipal Corporation Area ...... 15 Table 3: Chronology of urban events and initiatives ...... 17 Table 4: List of information available and data sources available with CEPT ...... 22 Table 5: Data classification for land resource inventories ...... 24 Table 6: Study Block falling in the Project Area ...... 26 Table 7: Delineation of PPA - Alternatives ...... 32 Table 8: Constituents of Patna Planning Area ...... 34 Table 9: Village Details of PPA ...... 40 Table 10 : Growth of Urban Population - PPA ...... 43 Table 11: Growth of Urban Population in PPA ...... 55 Table 12 : Existing Land Use Classification in Project Area including PPA ...... 56 Table 13: Provision of Physical Infrastructure – Manual of Water Supply ...... 64 Table 14: Provision of Social Infrastructure – UDPFI Guidelines ...... 66 Table 15: Provision of Social Infrastructure – Housing Cluster (UDPFI Guidelines) ...... 66 Table 16: Provision of Social Infrastructure – Neighborhood Level (UDPFI Guidelines) ...... 67 Table 17: Provision of Social Infrastructure – Sector Level (UDPFI Guidelines) ...... 68 Table 18: Provision of Social Infrastructure – Node Level (UDPFI Guidelines) ...... 69 Table 19: Provision of Social Infrastructure – Zone level (UDPFI Guidelines) ...... 70 Table 20: Provision of Social Infrastructure – CBD level (UDPFI Guidelines) ...... 71

Table 21: Population Projection ...... 74 v Table 22: Projected Employment...... 77 Table 23: Area statements against Projected Employment ...... 78 Table 24: Land requirement categories in PPA ...... 79 Table 25: Land requirement categories in PPA ...... 79 Table 26: Existing Width of Roads ...... 84 Table 27: Air Traffic Movement ...... 93 Table 28: Airport Traffic Volume...... 93 Table 29: Water Demand Calculation – Patna Planning Area (PPA) ...... 97 Table 30: Provision of Water Storage Facilities ...... 98

CEPT UNIVERSITY I AHMEDABAD v FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 31: Location and capacities of STPs ...... 99 Table 32: Existing Landfill site for Patna ...... 105 Table 33: Estimation of solid waste generation for Patna Planning Area for 2021 & 2031 ...... 106 Table 34: Estimation of solid waste generation zone wise for Project area for 2021 & 2031 ...... 107 Table 35: Electrical Sub Stations ...... 108 Table 36: Primary Schools, Available and Required at CD Block Level ...... 111 Table 37: Middle schools, available and required at CD block level ...... 112 Table 38: Secondary schools, available and required at CD block level ...... 113 Table 39: Colleges, available and required at CD block level ...... 114 Table 40: Primary Health Centres, available and required at CD block level ...... 115 Table 41: Primary Health Sub-Centres, available and required at CD block level ...... 116 Table 42: Hospitals, available and required at CD block level ...... 116 Table 43: Post Offices, available and required at CD block level ...... 117 Table 44: Commercial Banks, available and required at CD block level ...... 118 Table 45: Agricultural Credit Societies, available and required at CD block level ...... 119 Table 46: Provision of social infrastructure – UDPFI Guidelines ...... 119 Table 47: Provision of social infrastructure – Housing cluster (UDPFI Guidelines) ...... 120 Table 48: Provision of social infrastructure – Neighborhood level (UDPFI Guidelines) ...... 121 Table 49: Provision of social infrastructure – Sector level (UDPFI Guidelines) ...... 122 Table 50: Provision of social infrastructure – Node level (UDPFI Guidelines) ...... 123 Table 51: Provision of social infrastructure – Zone level (UDPFI Guidelines) ...... 125

Table 52: Provision of social infrastructure – CBD level (UDPFI Guidelines) ...... 127 vi Table 53: List of survey number with their original plots ...... 148 Table 54: List of survey number with plots after deducting area for roads and amenity ...... 149

CEPT UNIVERSITY I AHMEDABAD vi FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

LIST OF FIGURES Figure 1: Location of Patna in Bihar State ...... 11 Figure 2: showing Regional Connectivity of Patna ...... 37 Figure 3: Growth Options...... 60 Figure 4: Town planning schemes in Ahmedabad over years ...... 134 Figure 5: Location Map of TPS 90 Vinzol 2 ...... 135 Figure 6: Survey of the area for preparing TPS ...... 136 Figure 7: Various types of records collected to establish ownership details ...... 137 Figure 8: Base Map for preparation the TPS ...... 138 Figure 9: Defining the boundary of the TPS ...... 139 Figure 10: Marking original plots on survey ...... 140 Figure 11: F Form for the TPS indicating ownership details and original plot sizes ...... 141 Figure 12: Road network in the TPS ...... 142 Figure 13: Road network and amenity plots in the TPS ...... 143 Figure 14: Form for the TPS indicating land values and final plot sizes ...... 144 Figure 15: Proposed road network, amenity plots and FPs ...... 145 Figure 16: Delineation of final plots in the TPS ...... 145 Figure 17: G Form for the TPS indicating financials ...... 146 Figure 18: F Form for the TPS indicating betterment charges ...... 147 Figure 19: Original irregular land ...... 149 Figure 20: Original and final parcels with proposed roads and amenities ...... 150

vii

CEPT UNIVERSITY I AHMEDABAD vii FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

LIST OF MAPS Map 1 : Existing Land use Map – Patna Municipal Corporation Area ...... 15 Map 2: Map Showing Flood Water over the affected state of Bihar, ...... 28 Map 3: Map Showing Development Index ...... 29 Map 4: Map Showing Urban Villages in the Project Area ...... 30 Map 5: Map Showing Demographic and Socio-Economic Profile of the Project Area ...... 31 Map 6: Delineation of PPA – Conceptual Plan ...... 32 Map 7: Study Area to delineate the Patna Planning Area ...... 33 Map 8: Map showing Patna Planning Area ...... 35 Map 9 : Population Distribution - PPA ...... 44 Map 10: Population Growth Rate - PPA ...... 45 Map 11: Population Density - PPA ...... 46 Map 12: Sex Ratio - PPA ...... 47 Map 13: Distribution of SC Population - PPA ...... 48 Map 14: Distribution of ST Population - PPA ...... 49 Map 15: Distribution of Literate Population - PPA ...... 50 Map 16: Distribution of Main Workers - PPA ...... 51 Map 17: Distribution of Marginal Workers - PPA ...... 52 Map 18: Distribution of Primary Workers - PPA ...... 53 Map 19: Distribution of Non Primary Workers - PPA ...... 54 Map 20: Existing Land Cover – Project Area including PPA ...... 57

Map 21: Proposed Land Use, PPA ...... 80 viii Map 22: Proposed Road Network, PPA ...... 88 Map 23: Public Transport Route, PPA ...... 90 Map 24: Proposed Station ...... 91 Map 25: Location of existing & proposed STPs ...... 100 Map 26: Storm Water Network, Patna Planning Area ...... 104 Map 27: Existing Solid wasteland fill site ...... 106

CEPT UNIVERSITY I AHMEDABAD viii FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

LIST of ANNEXURE Annexure 1: CD Block & their Share in PPA ...... 154 Annexure 2: List of Administrative units coming under PPA ...... 155 Annexure 3: Total Population, Growth, Density, and sex ratio 2001 at level ...... 168 Annexure 4: Total Population, Growth, Density, and sex ratio 2001, CD Block Level, PPA ...... 168 Annexure 5: District wise Schedule Tribe- Schedule Caste population in PPA ...... 169 Annexure 6: CD Block wise Schedule Tribe- Schedule Caste population in PPA ...... 169 Annexure 7: District wise Literacy rate and Female literacy, PPA ...... 169 Annexure 8: CD Block wise Literacy rate and Female literacy, PPA...... 170 Annexure 9: Occupational Structure, CD block level ...... 170 Annexure 10: Employment structure, CD block wise ...... 171 Annexure 11: Main workers, Marginal workers, Non-workers and those marginal workers, non- workers seeking/available for work classified by age and sex ...... 172 Annexure 12: Main workers, marginal workers, non-workers and those marginal workers, non- workers seeking/ available for work classified by educational level and sex ...... 174 Annexure 13: Main workers, Marginal workers, Non-workers and those marginal workers, non- workers seeking/available for work classified by age and sex ...... 175 Annexure 14: Statewise details of IEMs implemented ...... 178 Annexure 15: Road Sections ...... 179 Annexure 16: Salient features of different wasterwater treatment technologies ...... 182 Annexure 17: Technical note on solid waste landfill site...... 183 Annexure 18: Scalogram Analysis - Study Area ...... 184

ix

CEPT UNIVERSITY I AHMEDABAD ix FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

1 INTRODUCTION

10

Chapter Contents • Introduction • Importance of Patna • Previous Planning Initiatives • Need of the Revision of Master Plan • Methodology

CEPT UNIVERSITY I AHMEDABAD 10 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

1.1 Introduction Patna is the city of Bihar State situated 15 km along the confluence of the River . It is an entirely land–locked state and lies mid-way between the humid West in the east and the sub humid in the west which provides it with a transitional position in respect of climate, economy and culture.

Figure 1: Location of Patna in Bihar State

Patna City is located on the south bank of the river Ganga and it is an important administrative and educational centre. The city has a very long river line surrounded on three sides by rivers – The Ganga, Sone, and . The river Gandak flows into the river Ganga making it a unique place having four largish rivers in its vicinity to the north of Patna. The bridge over the river Ganges named Setu is 5575m long connecting Patna in the south to in the north of Biharand is the longest river bridge in India.

Since the city of Patna is also a gateway to the Buddhist and Jain centers of , 11 , , Bodhgaya and , it attracts many tourists, apart from business class people. This shows that Patna not only played an important part economically, culturally, politically but also spiritually.

Out of 35 million plus (2001 Census) in India, Patna is 17th in rank with a total Urban Agglomeration population of 1,707,429. Patna Urban Agglomeration (PUA) area has been experiencing rapid growth at rate of 48.13 %( 1991-2001). Both the migration from the hinterland as well as the internal growth of population of Patna has contributed to this phenomenon. To meet this Department of Urban Development & Housing has decided to delineate the Patna Planning Area (PPA) comprises , its Patna Urban Agglomerates, and their influence area to prepare a Revised Master Plan of Patna up to the year 2031.

CEPT UNIVERSITY I AHMEDABAD 11 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Master Plan is a policy document showing the ways and means to achieve the desired objectives of the sustainable development of the concerned Planning Area vis-à-vis the population living therein for a given period. It is pertinent to note that development means integrated development of both physical infrastructures (basic amenities) and community development including health care facilities in the planning area.

The main objective of the Master Plan is to ensure improved quality of life for the population residing in the PPA at present and in the future (i.e. up to the year 2031) mainly through allocation of land for various uses, specifying demands for various physical and social infrastructure.

The target population of the Master Plan includes not only the resident population of the Planning Area. In addition, the populations of the influence zone of the Planning Area, daily commuters, and floating population, like tourists etc. It has been done to avoid the future shortfall in terms of land allocation for various uses and urban infrastructure both physical and socio-economic.

1.2 Planning Significance of Patna as a City Patna is the largest corporation with 44.1% share of the population of 7 corporations, and 20% of total urban population of Bihar State. Out of 35 million plus cities (2001 Census) in India, Patna is 17th in rank with a total Urban Agglomeration population of 1,707,429. Patna Urban Agglomeration Area has been experiencing rapid growth at rate of 48.13% (1991-2001) which higher than Average growth (30.65%) and State average growth of 28%.

PUA Area had a population of 16.98 lakhs as per the 2001 Census while the PMC had a population of 13.66 lakh (2001 Census). The growth of population in the PUA has increased rapidly in 1991-2001. Thus, using the 1991-2001 decadal growth rate as an indicator, the population of the PUA is expected to be 22.50 lakhs in the year 2011 and 28.01 lakhs in the year 2021. In addition, the floating population who commute from the to the PUA each day is expected to be 3.00 lakhs by 2021 against around 2.00 lakhs at present. The population of the PMC constitutes 80% of the population of the PUA. The density of population of the PMC is 137.40 persons per hectare (pph). 12 The next highest density is of NPP, Phulwarisharif NPP and Digha-Mainpura NPP areas respectively. The areas with high growth rate, which varies from 48-73%, are OG, Khalilpura OG, Digha-Mainpura OG, NPP, Phulwarisharif NPP, the PMC,and Sabazpura OG. The extraordinary growth rate of Saidpura is due to the increase of its area. The growth rates of the outgrowth areas exceed that of the PMC.1

1City Development Plan Report, Patna, 2006

CEPT UNIVERSITY I AHMEDABAD 12 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 1: Area and Population of Patna Urban Agglomeration Area Name of Place 2001 Area 1991 2001 Density of Growth (in sq.km) Population Population Population Rate of (in Lakhs) (in Lakhs) (pph) Population 2001 1991-2001 Patna Municipal 99.45 9.17 13.66 137.40 48.97 Corporation Patliputra Housing 0.64 0.04 0.05 70.31 2.18 Colony (outgrowth ofPMC) Digha-Mainpura 6.99 0.35 0.53 77.20 55.20 (Out Growth of PMC) Sabazpura 0.39 0.01 0.02 44.65 48.22 (Outgrowth of PMC) Khalilpura 0.80 0.03 0.05 60.53 73.43 (Outgrowth of PMC) 0.67 0.01 0.01 10.86 24.49 (Outgrowth of PMC) Phulwarisharif Nagar 6.48 0.35 0.53 82.49 52.18 Parishad Danapur Nagar Parishad 11.63 0.85 1.31 112.79 55.03 Danapur Cantonment 3.42 0.23 0.28 82.56 20.19 Area Khagaul Nagar Parishad 3.66 0.40 0.48 131.98 19.41 Saidpura 1.66 0.02 0.05 27.72 181.86 (Outgrowth ofKhagaul) Total for PUAA 135.79 11 17 125 48.13 Source: Primary Census Abstract, Census 2001, Directorate of Census, India 13

CEPT UNIVERSITY I AHMEDABAD 13 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

1.3 Economic Profile The total workers population of PUA is 25.2% of the total population, whereas the male worker population is 3.8 lakhs (41.4%) and that of females is 0.45 lakhs (5.8%).This is lesser than the percentage of workers population in Bihar state, which is 33%. Industries are spread over the PUA whereas services and institutions are concentrated in the PMC area.

The Industrial State received a major setback after the reorganization of States and the creation of State where most of the large Industrial centers and important mineral producing districts of erstwhile Bihar were transferred. Currently, in Bihar, mineral based industries are almost non-existent. The large industrial establishments of the PUA include: Shri Lakshmi Cold Storage Ltd., Patna City; Pradip Lamp Works, Patna; The Bihar Cotton Mills, Phulwarisharif; Shri Baidynath Ayurvedic Bhavan Ltd. Patna; Hindusthan Manufacturing & Industrial Corporation Ltd., Phulwarisharif; Ambuja Electocasting Ltd. Patna; Bata India Ltd. Bataganj, Patna; Modi Steels Ltd. There are also several brick kilns lined along the bypass road. It has developed the first Software Technology Park of Bihar at Patna by the Bihar State Electronics Development Corporation Limited (BSEDC), the nodal agency for development of IT industry in the State.

1.4 Existing Land Use – Patna Municipal Corporation Area Patna is growing and emerging as trade and business center in last ten-fifteen years and witnessing rapid in migration from immediate hinterland and different part of the state of Bihar. It resulted in to rapid urbanization in neighboring areas of Patna Municipal Area become outgrowths of Patna City. In the absence of planning interventions since 1981, rapid growth led to haphazard development in the city of Patna. Haphazard development resulted into deterioration of open space and forest area (only 2.34 sq.m. per capita), uncontrolled and unregulated construction activities and brick Kilns in and along the riverbed of Ganga, formation of slum and unregulated construction within core city.

The existing land use map is updated based in on data collected through ground surveys and it is also verified by the govt. officials. 14

CEPT UNIVERSITY I AHMEDABAD 14 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 2: Existing Land use – Patna Municipal Corporation Area Land Use Area (sq.km) Percentage (%) Residential 49.56 47.55 Commercial 4.65 4.46 Mix Use 3.52 3.37 Industrial 1.09 1.05 Public and Semi-Public 10.61 10.18 Open Space / Recreational 3.20 3.07 Transport / Roads 6.15 5.90 Airport 1.10 1.05 Brick Kiln 0.73 0.70 River / Flood Plain 3.49 3.35 Water Body 1.06 1.01 Vacant Land / Agriculture Land 18.40 17.66 Forest 0.67 0.64 Total PMC Area* 104.22 100.00 *Note: Total Area is subject to change based on cadastral information

Map 1 : Existing Land use Map – Patna Municipal Corporation Area

15

Source: CEPT, Ahmedabad

CEPT UNIVERSITY I AHMEDABAD 15 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Patna being the capital of one of the poorest state of India with all kinds of disadvantages, it becomes necessary to develop Patna as a National level Competitive City so that it can reduce the impact of various kinds of disadvantages present in Bihar economy. In last ten to fifteen years Patna is developed as emerging trade and business hub in Eastern India. Therefore the vision of The Master Plan of Patna should be to make it a National level Competitive City and Regional Trade Centre in Eastern India by next two decades.

The development of Patna is also required to take advantage of Asian Highway-1, Asian Highway-2 and Asian Highway-42 passing through Bihar.

1.5 Previous Planning Initiatives The details of the initiatives taken under different urban development authorities for the planned growth of the former region are listed below:

1.5.1 Master Plan (1961-81) In order to initiate for the planned development, a legislation was enacted in the form of Bihar Town Planning and Improvement Trust Act 1951 (Bihar Act XXXV of 1951) and the Patna Improvement Trust was set up there-under. In accordance to section 33 of the said Act, the Trust prepared a Master Plan for Patna for a 20 years period which was approved by the State Government vide Notification No. 4860 dated 20th June, 1967. The plan in reality was a rapid broad-brush land use exercise. Furthermore, the Trust did not have adequate infrastructure or legal support to implement the Plan. It was set up according to the new Act enacted in form of the Bihar Regional Development Authorities Act, 1982 transforming the Ordinance of 1975 under which the Patna Regional Development Authority.

16

CEPT UNIVERSITY I AHMEDABAD 16 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 3: Chronology of urban events and initiatives Year Events Agency setup 1951 Bihar Town Planning and Improvement Trust, Patna Improvement Trust 1951 (Bihar Act XXXV of 1951) and prepared Master Plan for Patna 1967 Master Plan approved by State Government vide - Notification No. 4860 dated 20th June 1982 Bihar Regional Development Authorities Act Patna Regional Development Authority 1979-81 Directives issued for Revision of Master Plan for - Patna 1981-2001 (Not Notified by Govt.) August, Constitution of sub-committee for scrutiny - 1985 1986 Draft of Revised Master Plan for Patna (1981- - 2001) prepared by PRDA 1989 Scrutiny of Master Plan completed - 1990 Revised Master Plan-2001 approved PRDA - 2006 Draft Master Plan 2021 prepared and approved by PRDA 2007 Patna Municipal Act. 2007 Strengthen the Urban Local Body 2008 Draft Master Plan 2021 submitted to DoUD&H for - Approval 2011 Revision of Draft Master Plan 2021 taken up by CEPT, Ahmedabad is appoint to DoUD & H prepare DRAFT MASTER PLAN for 2021 2011 Preparation of Draft Bihar Urban Planning & Development Act is under taken by the department with assistance provided by CEPT, 17 Ahmedabad 2012 Bihar Urban Planning & Development Act, 2012 Formation of Bihar Urban Planning & Development Board (2014) Source: CDP, Patna and Draft Master Plan Report, prepared by DCPL, and updated by CEPT, Ahmedabad

1.5.2 Plan Update (1981-2001) Development, which happened in and around Patna during the broad-brush Master Plan period 1962 to 1982, was largely unplanned in addition to existing organic growth. This prompted the authorities of Urban Development Department, , to take up a new plan before the lapse of the period. The city and its suburbs were facing urgent problems related to traffic and transportation, housing, drainage, water supply etc. due to population growth, putting pressures on

CEPT UNIVERSITY I AHMEDABAD 17 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

all lifestyles. A re-orientation of the whole land use system is required for the area. After a series of meetings of technical and administrative personnel of Government of Bihar during 1979-81 directives were issued in 1980 to the Patna Regional Development Authority for preparing a revised Master Plan for Patna. As per provisions of section 16, 17 and 18 of Bihar Regional Development Authorities Act, it is a statutory obligation to prepare Master Plans for all urban centers located within PRDA's defined territorial jurisdictions i.e. PUA, Fatwah, Maner, Hajipur and Sonepur. However, priority for preparation of plan was required for PMC considering its primacy as the capital of the State, its rank, size, and complexities of its problems. Draft of the Revised Master Plan of PMC for the period 1982 - 2001 was prepared for PRDA by a team of planners and other urban agglomerations experts of Patna in 1986.

These were then placed before a sub- committee specifically constituted by the Authority vides its resolution no.40/85 dated 13th. August 1985. The committee went into merits and demerits of each objections/comments separately and where necessary visited concerned site before finally coming to a unanimous conclusion on related issues. This process of scrutiny was completed in August 1989 and maps and reports were modified in the light of sub- committee’s resolution soon thereafter. The revised Master Plan was prepared for the plan period up to 2001. As the plan period is almost over there is urgent need of preparation of a New Master Plan for a plan period of 20 years.

This Master Plan was only partially successful mainly because of the various socioeconomic forces. The directions of growth emerged from this plan but there were several problems with its implementation. Widening of existing roads was not possible due to both financial and legal constraints. The rapid population growth, inadequate infrastructure for controlling development and paucity of funds lead to unplanned organic growth, the zoning, sub division regulations were rarely applied, and growth seemed to emerge despite the plan. Parking norms were basic. This situation was typical of many urban areas of eastern India.

1.5.3 Master Plan 2001-21

PRDA took the initiative to prepare Master Plan for year 2021 to augment of Patna's infrastructure in 18 terms of Sewerage, Drainage, Water Supply and Solid Waste Disposal. Hence, PRDA decided to prepare a Master Plan of Patna for the year 2001-2021.

PRDA is dissolved in 2006 on repelled of Bihar Regional Development Act, 1981, conferred its power to Patna Municipal Corporation. Draft Master Plan – 2021 for Patna is submitted to Government in 2008 for approval.

In the absence to constitutional framework and lack of geo-spatial reference of Master Plan proposals, it is inconceivable to approve the Draft Master Plan – 2021. The government took immediate response to prepare Bihar Urban Planning & Development Act and proceed for modification in Draft Master Plan – 2021. The Government notified the Act in 2012. Under the provision of the Act, The Bihar Urban Planning & Development Board is constituted in 2014. The

CEPT UNIVERSITY I AHMEDABAD 18 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

functions of the Board shall be to advise the Government in matters relating to planning and development and use of rural and urban land in the State, to guide, direct and assist the Planning Committee or any other Planning Authority/ (i.e.) constituted under the Section -9 of the Act. The Board shall advise on advice on the delineation of the Planning Area(s) for purposes of planned development and direct the preparation of Development/ Master Plan by the Planning Authorities.

1.6 Need for the Revision of the Master Plan Patna, located on the south bank of Ganges is the administrative, political, financial, and legal capital of Bihar state. , Patna do not possess the Master Plan since 1981 resulting in unplanned and haphazard development in the peripheral areas. Patna has been replicating the urban fabric in a series of repeating modules, as the city grows outwards. These new activity nodes influence land use in surrounding areas, reflected in significantly higher land / property prices. Moreover, there has been a lack of infrastructure investment, limiting accessible land.

The first Master Plan was prepared in the year 1962-81 and in reality; it was a quick land use exercise. It was partially develop as per the Master Plan. The city and its suburban area were facing critical problems due to high population growth trend, housing demands, water supply, drainage, etc. It creates a chaotic situation due to unplanned development and traffic congestion. This encouraged the authorities to take up revision of the Master Plan before the lapse of the time by Urban Development Department, Government of Bihar.

After the formation of PRDA, the master plan was updated in the year 1982-2001. This master plan was only partially successful due to various socio-economic forces as well as statutory compliances. There was no constitutional intervention after 1962-81 Master Plan leading to lack of infrastructure investment and a rapid overflow of (unplanned and haphazard) physical growth of the city beyond the former jurisdiction of the urban development authority.

To cater the demand of population and to regulate the development, PRDA decided to prepare a Master Plan of Patna Urban Area for the year 2001-2021. As per provision of section 16, 17 and 18 of 19 Bihar Regional Development Authorities Act, it is a statuary obligation to prepare Master Plan for all urban centers located within PRDA’s defined territorial jurisdiction i.e. Patna, Danapur, Khagul, Hazipur, Fatwah and . These directives were issued to the PRDA vide letter no. Na Vi/Ni/106/80-2272 dater 20th December 1980 for preparing revised Master Plan. However, priority for preparation of Master Plan was given to Patna considering its primacy as a capital of the State, its rank, size and complexities of its problems. However, in 2006-07, Patna Regional Development Authority (PRDA) was dissolved. There is an immediate requirement for apex institutional framework to ensure integrated and inclusive development of Patna and Its Urban Agglomerates as well as Neighboring Urban centres such as Maner Nagar Pachayat and Fatwah Nagar Panchayat.

Patna is also facing a major problem of drainage, as the city is surrounded by major rivers Ganga, Sone, and Pun pun; during the , the spillover from river tends to flood the city. Therefore,

CEPT UNIVERSITY I AHMEDABAD 19 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

there is a need to channelize and provide storm water channels as rational measures from flooding. In this context, the department of Urban Development and Housing, Bihar took the initiative; as a result Bihar Urban Planning and Development Act 2012 (BUDPA) came into existence in 2012. Urban Planning and Development Board, Bihar is constituted under the framework of the act mentioned above. Such a apex institutional framework is responsible for planned development of Urban centers in the state of Bihar. The department also took initiative to revise the draft master plan for Patna – 2021.

1.7 Methodology The project is largely concerned with the revision of Patna Master Plan 2021. The methodology will be comprised of preparing baseline information on population characteristics and its socio-economic attributes, revising, proposing land utilization details in order to cater the requirement of the projected future population growth, density, migration, and employment into consideration. Modifications/new, proposals will be made in the provided draft plan by keeping proposed developments in the region in addition to the natural growth of Patna. The detailed methodology adopted for every stage is given below:

1.7.1 Stage 1: Project initiation The objective of this stage is to initiate the project by finalizing the work plan, methodology, and the familiarization of the project team with the project area. • Project team mobilization: The project team has already been mobilized and a local office has been setup in Patna in order to initiate the work on the Revised Master Plan for Patna 2031. • Identification of secondary sources and required data: The project team initiated identification and collection of secondary data from respective sources immediately after the team mobilization. • Baseline profile of the project area: The baseline profile of the project area has been compiled as the part of this stage i.e., inception report. It comprised of description of location, area, administrative units, physical setting, regional connectivity along with 20 delineation rationale, demographic and economic aspects of the project area. • Conceptualization of the project area: Conceptualization was prepared based on initial understanding of the project area by reconnaissance survey. It is prepared along major development and transportation corridors in order to understand the varying spatial patterns and upcoming development along outer rims for the delineated study area. • Finalization of the methodology and work plan • Initial perception of the project area • Study of previous planning initiatives: It involves the review of the previous planning initiatives that has been undertaken by different authorities for the project area. It has been done to assess the constraints and shortcomings associated with the previous plans.

CEPT UNIVERSITY I AHMEDABAD 20 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

1.7.2 Stage 02 and 03: Analysis of existing situation & Future projections and Concept Plan The existing situation analysis had been done in this stage for the delineated PPA. Following steps has been involved in accomplishment of the task:

• Socio-Economic Analysis: Socio-economic analysis has been prepared for all the 21 CD blocks as well villages coming under the PPA region for the year 1991 and 2001. Population growth, distribution occupational structure, workforce participation rate etc has been analyzed and has been further converted into thematic maps in order to show the spatial variation. • Settlement Structure Analysis: Under this, the settlement hierarchy in terms of population size has been analyzed to understand the spatial distribution of the settlement structure both in urban and rural settlements. • Land Potential Analysis: The Land Potential Analysis has been prepared in order to identify he potential areas for development under different land uses. The Parameters considered for evaluation of the project area are: connectivity (major/minor road analysis), proximity to existing urban centers and village sites, proximity to existing industrial areas, land/property values, etc. • Existing Infrastructure Assessment: Existing infrastructure and demand estimates for social infrastructure such as education, health facilities demand assessment has been undertaken at village and town level. It also involves an analysis of physical infrastructure such as road, railways, water supply, solid waste management, sewerage, sanitation, drainage etc. It will help in assessing the demand-supply scenario, identification of gaps and related issues. • Future Projections and Final Concept Plan: Population projection has been prepared for 2031 based on trend. In order to estimate population, share and shift method been adopted. It has been projected for the region as a whole as well as CD block and village level. It has also been validated by the provisional figures released by Census of India. • Economic forecasting has been prepared in terms of requirement of workforce including skilled and professional workforce. This forecasting comprises of two main components i.e., forecasting occupational structure and employment structure. This would be based on 21 percentage share of primary, secondary, and tertiary workers in the region. It will help in understanding the need of redistribution of development activities and prioritizing future growth.

1.7.3 Stage 04: Updated Base Map and Existing Land Use Map Due the increase in the present area of the existing PUA as proposed by CEPT, need for updating the existing base map prepared by DCPL consultants has been aroused for the extended PPA. The following steps have been taken in order to accomplish the task: • Information available and updated base map: base map is a map containing visible surface features and boundaries, essential for locating additional layers or types of geo-referenced information for the project area. generally, it includes administrative boundaries, city boundaries, water features, physiographic features, parks, landmarks, highways, roads,

CEPT UNIVERSITY I AHMEDABAD 21 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

railways, airports, and buildings overlaid on land cover and shaded relief imagery for added context. Various other maps in a geographic information system are developed from the control document.

The purpose of making base map is to delineate the project area from surrounding and segregating the administrative divisions coming within area. The following information has been captured in the base map at this stage of the project which also represents the most latest information related to that feature that we have received from various sources.

Table 4: List of information available and data sources available with CEPT No Spatial Data Sources Features

1 Topo sheets – Survey of India ( mention year) Natural features like rivers, wetlands, 1:50000 water bodies 2 Patna, Saran Administrative Atlas Census of Administrative boundaries of Municipal and Vaishali India 2001 Corporation and villages, major road & District Maps railway 3 LANDSAT Imagery provided by DFID-SPUR, Used for geo-referencing cadastral maps Image (2005) Bihar with 30 meter resolution 4 Cadastral Procured from Bihar Survey Village boundaries, survey boundaries with Maps office for entire villages and numbers. Spatial coordinates, major roads urban centers coming within & railways delineated region by CEPT 5 Google earth Google earth Used for geo-referencing cadastral maps in images order to update the land use and cadastral boundaries 6 Road Updating base map prepared by Road ROW, Section, Alignment for Alignment and DCPL (hard copy)with the help regional connectivity and detailed

Section of Revenue Map, Toposheets, Municipal roads 22 information provided by Road Construction Department, DCPL and DFID-SPUR 7 Water Supply DCPL report, City Development Pipeline alignment for municipal area Network Plan 8 Solid waste DCPL report, City Development management Plan

The databases used for preparing base map:

Census villages and CD Blocks Maps – 1991- 2001: CD Block level and village Census maps are used as the base source in order to initiate the mapping exercise. Census maps are the authentic source

CEPT UNIVERSITY I AHMEDABAD 22 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

for capturing the administrative boundaries. All individual villages and CD Block maps have been scanned, and then they are intermediated as mosaic image to minimize the overlapping errors. Following features have been captured from the mosaic image: • Administrative Features • District, CD Blocks and Village Boundaries • Village Codes & Names • Inhibited and Un-inhabited Villages • Physical Features • Roads – National Highway, State Highway, Other District Road • Railways – Broad Gauge, Meter Gauge • Natural Features • Water Bodies – Rivers etc • Soil • Forest • Geology and Geomorphology Topographical Maps/sheets: A topographic map is characterized by large-scale detail and quantitative representation of relief, usually using contour lines in modern mapping of any demarcated area. It provides the data, which has been surveyed in 1976.

Identification of Natural Resources:

Identification of natural resources will incorporate the location and spatial extent of the above mentioned features. There are different sources that have been used for the identification of natural resources as listed below: • Census Map • Topographical sheets • Other relevant department (like DFID-SPUR)

Land Resource Inventories: Building land resource inventory entails a comprehensive collection of 23 information and data related to land use and land cover. The enlisted information in the inventories are collated from different sources, and they are arranged in a systematic form.

The purpose of preparing land resource inventories is to formalize the method of land capability and land suitability classification for appropriate allocation of land uses in the region. The key features included in the inventories will be extracted as per the requirement of features in the land capability and land suitability classification.

CEPT UNIVERSITY I AHMEDABAD 23 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 5: Data classification for land resource inventories Sr. No. Classification / Data inputs Category Type Data source 1 Geographical area - - Census maps, 2001 2 Reporting Area for land - - utilisation statistics( 1 to 5) I. Reserve and protected Land cover Spatial Census maps, forest topography sheets II. Not available for Land cover Spatial Village Directory, cultivation 2001 III. Other uncultivated land Land cover Spatial Topography sheets (excluding fallow land)(a+b+c) (a) Permanent Pastures and Sub-class - - other grazing land (b) Land under Sub-class - - Miscellaneous tree crops and groves (not included in net area sown) (c) Culturable Wasteland Sub-class Quantitative Village directory, 2001 IV. Fallow Land (a+b) Land cover Spatial LANDSAT 3 Irrigated area Land use Spatial Village directory, 2001

1.7.4 Stage 5: Pre-final Master Plan and DCR Reformulation will also be done in the provided DCR as at present there is complete absence of such regulations leading to unplanned growth in the study area and the draft regulations provided are not adequate. Finally, proposal will be made in order to help to ascertain the future development trends. It will comprise of providing the land requirement for future development with appropriate 24 density standards and requirements for various activities and land use zones along with zoning, phasing and providing land development mechanisms for the same. This would enable possible ways of generating revenue.

This report contains the following chapters below as Chapter 2 describes the procedure to delineate Patna Planning Area (PPA), Chapter 3 focuses on profiling the Patna Planning Area in context to demographic and socio-economic dividend, Connectivity and accessibility, Land Cover, to assess the present state of Patna Planning Area. Chapter 4 reveals the development visions and the planning norms adopted to prepare the Master Plan Proposals. Whereas Master plan proposals containing Land Use, Proposed Road Network, Physical and social Infrastructure contained in Chapter 5. Chapter 6 deals with the relevant Legislative Framework and demonstration of preparation of Area Planning Schemes to implement Mater Plan Proposals to ensure planned development in Patna Planning Area (PPA) for next 20 years.

CEPT UNIVERSITY I AHMEDABAD 24 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

2 DELINEATION OF PATNA PLANNING AREA

25

Chapter Contents • Patna Profile • Extent of Project Area • Delineation of Project Area • Constituents of Project Area • Demographic Profile

CEPT UNIVERSITY I AHMEDABAD 25 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

2.1 Extent of Patna Planning Area (Project Area) Under the Bihar Regional Development Authorities Act, 1982 by transforming the ordinance of 1975 under which the Patna Regional Development Authority was set up and dissolved so as to derive optimum scale agglomeration economies.

To delineate the Patna Planning Area (PPA), study needs to be carried out in context to the demographic and Socio-economic dividend, spatial location of urban administrative units of 21 CD Blocks neighboring to Patna Rural CD Blocks. The study area comprises jurisdiction of erstwhile Patna Regional Development Authority Area and its influence area. Patna district includes 15 CD blocks (5 fully and 10 partially falling in the area), (3 partially falling in the area) and (3 fully falling in the area.) The total population of Patna Planning Region is 42.35 lakhs of which 20.36 lakh (48.1%) is urban and 21.98 lakh (51.9%) is rural having an area of 2258.1 sq. Km and total 1155 villages.

Table 6: Study Block falling in the Project Area District S. No. CD blocks Partially/ fully falling in the Project area Patna 1 Maner Partial 2 Danapur-cum-Khagaul Full 3 Patna rural Full 4 Sampatchak Full 5 Phulwari Full 6 Partial 7 Partial 8 Partial 9 Dhanuara Partial 10 Punpun Full 11 Fatwah Partial 12 Daniawan Partial 26 13 Partial 14 Bakhtiyarpur Partial 15 Athmagola Partial Saran 1 Partial 2 Dariyapur Partial 3 Sonepur Partial Vaishali 1 Hajipur Full 2 Raghopur Full 3 Bidupur Full

CEPT UNIVERSITY I AHMEDABAD 26 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

2.2 Delineation of Patna Planning Area (Project Area) As per the 2001 Census, Patna would be declared as a emerging trade and centre, the second in the country’s eastern region after Kolkata. It as primate city in the state, has witnessed rapid growth leading the uncontrolled population expansion beyond the urban jurisdiction. The uncontrolled expansion could turn into haphazard development and obnoxious city escape. Hence, realizing the need for control development, the extent of Planning areas has been developed. The delineation of the Patna Planning Area been prepared after understanding the following needs below: • To develop the potentiality of region by enhancing the urban-economic growth • To identify the growth centers and formulating organization of urban centers in the Planning Area • Enhance the industrial development in the region with conformity to the development and land utilization aspects. The delineation been prepared based on the following factors below:

Administrative boundary An administrative unit is one of the formal parameter which delineates area on the basis of political boundaries. The Delineation of the master plan is done on the basis of District Boundary, Community Development Block Boundary (CD Block). The delineated region lies within the districts of Patna, Saran and Vaishali, which belong to three different administrative divisions.

Natural setting Natural setting includes rivers and/or water bodies are paramount for the delineation of the Patna Planning area. Patna is located on the south bank of the Ganga river also straddles the rivers son, gandak and punpun. A characteristic of the geography of Patna is its confluence of rivers. The Ganga River is the largest; it is joined by four other rivers: , gandak, punpun and sone. Patna is unique in having four large rivers in its vicinity.

Ecologically fragile area Ecologically fragile zones are the most sensitive environments, which have to be protected, 27 conserved and managed. A discerning study and analysis of all natural determinants like flood, cyclones and seismic zones.

The Patna Planning Area falls at the risk zone for floods. The Planning Area is along the middle course of River Ganga, where the vulnerability of flood is very high. This vulnerable position has caused immense damage to the Planning area. causes heavy flood damages to the east of Patna Planning Area. A series of bund/embankments have been constructed along River Punpun to control the floodwaters.

Apart from being flood prone Patna is also at risk of cyclones and it lays in the high wind damage risk zones as well as lies in zone IV of the seismic zones.

CEPT UNIVERSITY I AHMEDABAD 27 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 2: Map Showing Flood Water over the affected state of Bihar, India

CEPT UNIVERSITY I AHMEDABAD 28 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Transportation Axis National Highways, state highways, major district (metalled) roads and railway lines the features been used to demarcate the Planning area.

The Patna Planning Area (PPA) is well connected by railway, road, air, and waterways. The Planning area is served by several major road highways like NH-19 that links Uttar Pradesh with Patna and NH-31 is important as it acts as a gateway to the states in north-. NH- 83 and 30 are entirely within the state and forms the regional connectivity of the area. Patna city is also a major railway hub as it forms the core of the Planning area; hence the area is well connected by rails.

Demographic and Economic Attributes Demographic and socio-economic attributes used for the delineation of the master plan to know growth areas and employment areas. The following are the parameters studied: • Population Density • Population Growth Rate • Sex-Ratio • Literacy Rate • Percentage (%) Main Worker • Percentage (%) Marginal Worker • Percentage (%) Non- Primary Worker The map shows that nearly 98 villages are developing in the project area in all the above respect.

Map 3: Map Showing Development Index

29

CEPT UNIVERSITY I AHMEDABAD 29 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Urbanization The Urban areas are located around the Patna city and the urban settlements been developed along the transportation axis. The lists of factors studied are growth rate, population density, sex ratio, workforce participation, and literacy rate, percentage workforce in main, marginal, and other categories. The analysis shows that there are nearly 55 villages, which have population of 5000 or above. The map shows the transformation of villages into urbanization.

Map 4: Map Showing Urban Villages in the Project Area

Economy Economy is one of the significant features for formal delineation of sub region. Economy includes 30 main & marginal workers, primary secondary and tertiary workers.

Patna is an important commercial centre and the major commercial establishments are located along the major roads. The study analysis shows that the concentration of non-primary activities (secondary & tertiary) in and around Patna and other emerging urban areas is more.

CEPT UNIVERSITY I AHMEDABAD 30 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 5: Map Showing Demographic and Socio-Economic Profile of the Project Area

2.3 Delineated Area – Patna Planning Area (PPA) There are three different alternatives been proposed for delineation of the Patna Planning Area (PPA) as described below:

The process for delineation of Patna Planning Area (PPA) began by analyzing the 9 districts 31 surrounding Patna. These districts were Saran, Vaishali, , Bhegusarai, Lukeesarai, Sheikhpura, Nalanada, Jahanabad and Bhojpur. The basic premise of analysis is to depict the socio- economic, urbanization and demographic aspects. In order to delimit the jurisdiction of the planning area, 3 alternatives were proposed, on the basis of the above factors. The basic difference between the models is the extent of the area.

CEPT UNIVERSITY I AHMEDABAD 31 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 7: Delineation of PPA - Alternatives Alternative Options for Delineation of Area in Sq. Km No. of District No. of CD Blocks Patna Planning Area Option 1 (preferred) 1500 3 20 Option 2 3000 5 36 Option 3 4000 6 51

Option 1 (1500 Sq.Km): It is focusing on the integrated development physically near to the urban centres such as Patna, Danapur, Phulwari Sherif,, Khagol, Maner of Patna District, Hajipur (Vaishali District) and Sonpur (Saran Distict)

Option 2 (3000 Sq.Km): This option emphasis to promote regional development considering the locations of urban centres and connectivity. In this, alternative, apart from urban centres of option 1, Digwara from Saran District also taken into consideration.

Option 3 (4000 Sq.Km): This option comprises of Masaurhi (Patna District), Chapra (Saran District) and urban centres of option 1 are considered. This option is required to promote the regional connectivity and development in the surrounding areas of the city.

Map 6: Delineation of PPA – Conceptual Plan

32

CEPT UNIVERSITY I AHMEDABAD 32 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Preferred Option – 1,500 sq.km The spread of urban characteristics from Patna Planning Area to immediate surroundings which can be concluded by analyzing the parameters like population density, population growth rate, urban villages and non-primary workers along the Patna Planning Area. In addition, the maps relating to Literacy Rate, Work Force Participation Ratio, Sex Ratio, and Main Workers were studied to garner a better understanding to help simplify the analytical process Based on the analysis of 3 options mentioned above, a final option was proposed. CEPT in consensus with the Department of Housing and Urban Development, Govt, of Bihar, has finalized the proposal. CEPT has proposed Patna Planning Area of 1144.92 Sq. Km. comprises Patna City and its urban agglomerates and neighboring urban viz. Maner Nagar Parishad and Fatwah Nagar Parishad of Patna District and their influence rural area.

Map 7: Study Area to delineate the Patna Planning Area

33

2.4 Constituents of Patna Planning Area Proposed Patna Planning Area would have area of 1,144.92 sq.km. It is spread across thirteen Community Development Blocks (C.D. Blocks) of Patna Districts. There are 564 Administrative Block from these thirteen C.D. Blocks. Out of 564 Administrative Units, 6 Administrative Units are Urban Centers viz. Patna Municipal Corporation, Danapur Nagar Parisad, Khagaul Nagar Parishad Phawari Nagar Parishad, Maner Nagar Panchayat and Fatwah Nagar Panchayat. Refer – Annexure 1 for the C.D.Blocks and their share in PPA

CEPT UNIVERSITY I AHMEDABAD 33 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 8: Constituents of Patna Planning Area S. C. D. Blocks No. of Rural Area No. of Urban Area Total Area No. Administrative sq.km Administrative sq.km Administrative sq.km Units* Units* Units per C.D. Block* 1 Bihta 80 157.17 0 0.00 80 157.17 2 Danapur-cum- 31 66.38 2 19.45 33 85.83 Khagual 3 Danaura 15 24.14 0 0.00 15 24.14 4 Daniyawan 5 14.66 0 0.00 5 14.66 5 Fatwah 76 114.84 1 6.75 77 121.59 6 Khusrupur 2 3.24 0 0.00 2 3.24 7 Maner 41 135.22 1 9.81 42 145.25 8 Masaurhi 6 14.04 0 0.00 6 14.04 9 Naubatpur 93 138.82 0 0.00 93 138.82 10 Patna Rural 24 39.35 1 96.80 25 136.15 11 Phulwari 64 101.45 1 9.60 65 111.05 12 Punpun 83 127.65 0 0.00 83 127.65 13 Sampat 38 65.33 0 0.00 38 65.33 Sub - Total 558 1,002.29 6 142.41 564 1,144.92 Administrative Units Total 564 Administrative Units * Note: Number and area of administrative subject to change based on cadastral information.

Detailed list of Administrative Units under jurisdiction of Patna Planning Area PPA) shown in

Annexure -2. 34

CEPT UNIVERSITY I AHMEDABAD 34 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 8: Map showing Patna Planning Area

CEPT UNIVERSITY I AHMEDABAD 35 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

3 CHAPTER: PATNA PLANNING AREA PROFILE

36

Chapter Contents • Regional Connectivity • Demographic Profile • Socio-Economic Profile • Urbanisation • Land Cover

CEPT UNIVERSITY I AHMEDABAD 36 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

3.1 Regional Connectivity Patna, being a major transport node in the National Movement Grid, has well-developed regional transportation network and linkages.

Roads: The Planning Area is served by several major road highways and state highways, including National Highways 19, 30, 31 and 83. NH-19 that links Uttar Pradesh and NH-31 is important as it acts as a gateway to the states in northeast India. NH- 83 and 30 are entirely within the state and forms the regional connectivity of the area. National Highway 30 that links at Gaya to the nation’s prime developing multilane highway system -The Golden Quadrilateral. The city airport has direct linkage by air to , Kolkata, , and Kathmandu.

Figure 2: showing Regional Connectivity of Patna

37

Railways: Patna is a major railway hub; there are three railway lines running across the district from north to south viz., the Patna Gaya Branch line the Fatwah-Islampur Light Railway and the -Rajgir Branch line. Major railway hub and has five major stations: Patna Junction, Rajendranagar Terminal, Station, Danapur Station, and Patna Station. Patna Junction is the principal railway station, which is located in the town and links all the key cities of India through the network of express and super fast trains. The various cities connected with Patna are Delhi, , Kolkata, , , , , , and . The

CEPT UNIVERSITY I AHMEDABAD 37 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

construction of India’s longest road-cum-rail bridge is underway on the banks of the River Ganges and it will connect Patna to Pahleja Ghat. The main line of the East Central Railway passes through the entire length of the district running parallel to the Ganga.

Airways: Patna has excellent air connection to many important Indian cities like, Delhi, Mumbai, and Kolkata. Several Airlines serve this airport with regular flights. Patna Airport isknown as Jaiprakash Narayan International Airport named after "Lok Nayak" (1902–1979), an Indian independence activist and political leader. It is the smallest international airport of the country.

3.2 Physical Features Climate The region has a subtropical climate, which is largely homogenous. It is of moderate type characterized by quite hot summers to moderately cold winters. It varies from varies from 43 °C – 30 °C during the summers and 21.4 °C – 5 °C during the winters. The summer begins in April and peaks in June/July with the temperature soaring up to 43 °C. The rains last through August & September continue into early October and receives medium to heavy rainfall in the . Relative can go up to 100% during summers2.

Topography and Geomorphology The region is a part of the Indo-Gangetic alluvium, one of the three main physiographic divisions of India, which separates Extra-Peninsular regions on the north from the peninsular region on the south. The level plain is known to be the outcome of a granular filling of a great depression with alluvial sediments since Middle Pleistocene times. The region forms a part of the flood plains of the Ganga and has a monotonously flat relief. The area under study is underlain by alluvial sediments of quaternary age. The quaternary sediments deposited unconformable on the Archaean basement.

Soil and vegetation The farming conditions in the study region are mainly dependent as soil, topography, and irrigation systems prevalent in the area. The region has mainly four types of soils ranging from moderately 38 well drained to poorly drained, acidic to slightly alkaline and medium to heavy textured. From the farming point of view only four types of soils may be recognized as light to heavy in texture namely Heavy clay (Kewal), Loam (Domat), Very Light soil (Balsundri) and Alkaline (Rehara) respectively3.

Vulnerabilities Environmental vulnerability expresses the multidimensionality of disasters by focusing attention on the totality of relationships in a given social situation, which constitute a condition that, in combination with environmental forces, produces a disaster. The delineated region comes under vulnerabilities like flood and seismicity. Patna lies in zone IV of the earthquake zones, which is a

2 City Development Plan, Patna 3 “Ground Water Information Booklet”, Patna district, Bihar state

CEPT UNIVERSITY I AHMEDABAD 38 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

high-risk zone. Therefore, the development controls in the area requires earthquake resistant buildings.

Patna also falls in the risk zone for floods. A series of bund/embankments have been constructed along River Punpun to control the floodwaters. During the monsoons, the spillover from River Ganga tends to flood Patna and cause spread of disease. Therefore there is need to channelize the river and to devise and implement a proper disaster mitigation plan. Apart from being flood prone, Patna is also at risk due to cyclones as it lies in the wind high damage risk zone4.

Rivers Flanked by three large rivers – the Ganga, Son and Punpun and situated at the confluence of the Ganga and its three tributaries (the Son, Ghaghra and Gandak), Patna, the capital of Bihar enjoys the unique advantage of being one of the richest banks of surface water in the country.

Waterways: The city has a fixed terminal on National Waterway No.1., this route of navigable water runs from on the , across the extremity of Jharkhand province, across the centre of Bihar and then to in Uttar Pradesh. The inland waterways system along River Ganga links it to Kolkata.

The Ganges is navigable throughout the year and there is considerable boat traffic for transporting cargo. The smaller rivers, e.g., Punpun and Dardha become navigable only during the rains when they are used for transporting agricultural produce to the grain market at Fatwah.

Mineral deposits Bihar has lost its mineral rich endowments (iron ore and coal particularly) in the south with mineral resources after the formation of the new state of Jharkhand.

3.3 Demographics and Socio-Economic Profile 39 The analysis for different socio-economic parameters has been done at CD block level. The total area (urban-rural) of PPA is 1,144.92 sq.km, which is approximately 1.15% of the total area of Bihar state. There are 13 CD blocks coming under PPA comprising 558 villages out of which 45 villages (7%) are uninhabited, a major reason being coming under the influence zone of floods. Major part of the PPA comes under Patna district.

4 City Development Plan, Patna

CEPT UNIVERSITY I AHMEDABAD 39 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 9: Village Details of PPA

Name Districts CD blocks Area Total Administrative Unit (Patna) (sq.km) Total villages Inhabited Un-inhabited

PPA 1 (Partial) 13 (Partial) 1,144.92 558 519 45 Source: Census of India, 2001

Population distribution Patna Planning Area (PPA) has total population of 28.74 lakh as per 2001 census. Patna Urban Agglomeration, which includes Municipal Corporation of Patna and 4 census towns, contributes 61.4% of the total population in PPA.

Region U/R/ Distric Status Components No of Populatio Populatio T t HH n 1991 n 2001 PMC Patna Town (a) Patna (M Corp+OG) 23061 956417 1432209 8 Part of urban U Patna (b) Phulwari Sharif (NA) 7725 35123 53451 agglomeratio U Patna (c) Dinapur Nizamat (M) 18809 81333 131176 n U Patna (d) Dinapur Cantonment 4174 23491 28234 (CB) U Patna (e) Khagaul (M+OG) 8293 40453 52906 A - PUA Patna UA 26961 1136817 1697976 9 Maner Nagar U Patna Nagar - 3928 24343 30082 Panchayat Panchayat Fatwah Nagar U Patna Nagar - 5484 30668 38672 Panchayat Panchayat PPA Urban 27903 1191828 1766730 1 PPA Rural R Patna Village 558 16777 859603 1107846 2

PPA Total 44680 2051431 2874576 40 3 Source: : Directorate of Census, 2001

The population of Patna Urban Agglomeration in 2001 was estimated to be 1.69 million, which has grown to 2.04 million in 2011 at an annual compound growth rate of 2.5% per annum. However, the Patna Urban Agglomeration has grown at an annual compound growth rate of 3.11% per annum during 1951-2011. During 1991-2001, Patna Urban Agglomeration had a growth rate of 4% per annum, which is one of the fastest in India. The share and shift method is carried out for the projection of population.

The PPA has an area of 1078.8 sq.km with a population of 2.85 million. Out of the total population of PPA, almost 29.9% occupies the total population of PRDA while extended area occupies 9% of total

CEPT UNIVERSITY I AHMEDABAD 40 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

population. Comparative growth Parameters such as Growth rate, Density , Population Distribution, Share of SC, ST Population, Working Population, Primary and Non primary workers population has been analysed at State level, District level and Patna Planning Area

3.4 Growth Rate The decadal growth rate of Patna Planning Area (PPA) is 43.17% for urban area, which is higher than the overall growth rate of PPA having 38.92%. The growth rate is higher in urban areas due to the increase in urbanization and development. The percentage share of growth rate of PPA to Patna District is also higher with 88.63% for urban area. Refer Annexure 3 for District level and Annexure 4 for CD Block Level, PPA.

3.5 Population Density The population density of PPA is 2,475 persons per sq.kms, which is higher than the Bihar state average of 880 persons per sq.km, an important reason being the presence of Patna city core area in the study region, which is the highest urbanized city of Bihar state offering employment and business opportunities. Refer Annexure 3 for District level and Annexure 4 for CD Block Level, PPA.

3.6 Sex Ratio The sex ratio of the PPA is 893, which is lower than the average of Bihar state (921) as well as the respective districts coming under the study region. Refer Annexure 3. Refer Annexure 3 for District level and Annexure 4 for CD Block Level, PPA.

3.7 Schedule Caste and Schedule Tribes Population Out of the total population of PPA, nearly 12% belong to Scheduled Caste category while only 0.1% of population belongs to Schedule Tribe category. Refer Annexure 5 for District level and Annexure 6 for CD Block Level, PPA. . 41 3.8 Literacy Rate Development is a dynamic process and it requires educated, skilled, and competent people. Literacy plays important role in providing skilled work force as well as literate consumer demands more for better lifestyle. Literacy rate refers to the number of literate population to the total.

The literacy rate of PPA is 58.4% which is higher than the district rate of 51.9%, while the literacy rate of PPA-Rural Area is 43% which is lower than the district literacy rate. Refer Annexure 7 for District level and Annexure 8 for CD Block Level, PPA.

CEPT UNIVERSITY I AHMEDABAD 41 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

3.9 Work Force and Occupation Structure The following sections analyze these differences in terms of workforce participation, worker population by type, and sub-region wise contribution to NSDP.

Workforce Participation The total population of PPA is 28.75 lakhs, out of which the total worker population is 7.93 lakhs which means nearly 28% of the total population comprises worker population. The workforce participation rate found in the PPA-Rural area is around 32.1% whereas that of PPA-Urban area is 25.2%. Of this worker population, about 85% are the main workers whereas the remaining 15% are the marginal workers. In the PPA region, of the total main workers, about 37% are engaged in primary sector and related activities whereas the remaining 63% are engaged in secondary and tertiary sector (non-primary sector). Refer Annexure 10 for CD Block Level and Annexure 11 for State level, Annexure 12 for District level, and PPA.

Occupational structure refers to the aggregate distribution of occupations according to skill level and economic function. It is adopted based on various factors like structure of economy (the relative weight of different industries), technology and administrative responsibility, labor market, etc. Refer Annexure 9 for CD Block Level.

3.10 Urbanization Urbanization refers to a process in which an increasing proportion of an entire population lives in a city and the suburbs of city. The following section deals with the urban dynamics of the whole PPA as well as urban development and it is potential in terms of settlements with urban character.

42

CEPT UNIVERSITY I AHMEDABAD 42 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 10 : Growth of Urban Population - PPA

Name of Town Status of 2001 Area 1991 2001 Density of Growth Town(Class) (in SQKM) Population Population Population Rate of (in Lakhs) (in Lakhs) (PPHa.) 2001 Population 1991-2001 Patna Municipal I 99.45 9.17 13.66 137.40 48.97 Corporation Patliputra HousingColony OG 0.64 0.04 0.05 70.31 2.18 (outgrowth of PMC) Digha-Mainpura (Out OG 6.99 0.35 0.53 77.20 55.20 Growth of PMC) Sabazpura (Outgrowth of OG 0.39 0.01 0.02 44.65 48.22 PMC) Khalilpura (Outgrowth of OG 0.80 0.03 0.05 60.53 73.43 PMC) Badalpura (Outgrowth of OG 0.67 0.01 0.01 10.86 24.49 PMC) Phulwarisharif II 6.48 0.35 0.53 82.49 52.18 NagarParishad Danapur Nagar Parishad I 11.63 0.85 1.31 112.79 55.03 Danapur Cantonment III 3.42 0.23 0.28 82.56 20.19 Area Khagaul Nagar Parishad II 3.66 0.40 0.48 131.98 19.41 Saidpura (Outgrowth of OG 1.66 0.02 0.05 27.72 181.86 Khagaul) Maner Nagar Parishad III 12 0.2 0.3 25.06 23.58 Fatwah (NP) III 4.9 0.3 0.4 78.92 26.10 Total for PPA 152.69 12 18 118 47.02 Source: Primary Census Abstract, Census 2001, Directorate of Census, India

43

CEPT UNIVERSITY I AHMEDABAD 43 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 9 : Population Distribution - PPA

CEPT UNIVERSITY I AHMEDABAD 44 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 10: Population Growth Rate - PPA

CEPT UNIVERSITY I AHMEDABAD 45 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 11: Population Density - PPA

CEPT UNIVERSITY I AHMEDABAD 46 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 12: Sex Ratio - PPA

CEPT UNIVERSITY I AHMEDABAD 47 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 13: Distribution of SC Population - PPA

CEPT UNIVERSITY I AHMEDABAD 48 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 14: Distribution of ST Population - PPA

CEPT UNIVERSITY I AHMEDABAD 49 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 15: Distribution of Literate Population - PPA

CEPT UNIVERSITY I AHMEDABAD 50 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 16: Distribution of Main Workers - PPA

CEPT UNIVERSITY I AHMEDABAD 51 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 17: Distribution of Marginal Workers - PPA

CEPT UNIVERSITY I AHMEDABAD 52 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 18: Distribution of Primary Workers - PPA

CEPT UNIVERSITY I AHMEDABAD 53 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 19: Distribution of Non Primary Workers - PPA

CEPT UNIVERSITY I AHMEDABAD 54 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

3.11 Urbanization Urbanization refers to a process in which an increasing proportion of an entire population lives in a city and the suburbs of city. The following section deals with the urban dynamics of the whole PPA as well as urban development and it is potential in terms of settlements with urban character.

Table 11: Growth of Urban Population in PPA Name of Town Status of 2001 1991 2001 Density of Growth Town Area Population Population Population Rate of (Class) (in (in Lakhs) (in Lakhs) (pph) Population sq.km) 2001 1991-2001 Patna Municipal I 99.45 9.17 13.66 137.40 48.97 Corporation Patliputra Housing OG 0.64 0.04 0.05 70.31 2.18 Colony (outgrowth of PMC) Digha-Mainpura OG 6.99 0.35 0.53 77.20 55.20 (Out Growth of PMC) Sabazpura OG 0.39 0.01 0.02 44.65 48.22 (Outgrowth of PMC) Khalilpura OG 0.80 0.03 0.05 60.53 73.43 (Outgrowth of PMC) Badalpura OG 0.67 0.01 0.01 10.86 24.49 (Outgrowth of PMC) Phulwarisharif Nagar II 6.48 0.35 0.53 82.49 52.18 Parishad Danapur Nagar Parishad I 11.63 0.85 1.31 112.79 55.03 Danapur Cantonment III 3.42 0.23 0.28 82.56 20.19 Area 55 Khagaul Nagar Parishad II 3.66 0.40 0.48 131.98 19.41 Saidpura OG 1.66 0.02 0.05 27.72 181.86 (Outgrowth of Khagaul) Maner Nagar Parishad III 12 0.2 0.3 25.06 23.58 Fatwah (NP) III 4.9 0.3 0.4 78.92 26.10 Total for PPA 152.69 12 18 118 47.02 Source: Primary Census Abstract, Census 2001, Directorate of Census, India

CEPT UNIVERSITY I AHMEDABAD 55 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

3.12 Existing Land Cover – Project Area including PPA Information on the spatial spread and dynamics of the land use/land cover is the basic prerequisite for planning and implementing various developmental activities. Land use essentially refers to the purpose for which land and its resources are employed: for example, farming, mining, or other developmental activities. Land cover describes the physical state of the land surface: as in cropland, mountains, or forests. The term land cover originally referred to the kind and state of vegetation (such as forest or grass cover), but it has broadened in subsequent usage to include anthropogenic structures such as buildings or pavement and other aspects of the natural environment, such as soil type, biodiversity, and surface and groundwater.

Table 12 : Existing Land Use Classification in Project Area including PPA

Sr.no Land Cover Classes Percentage 1 Double Crop 40% 2 Fallow Land 0.50% 3 Industrial 0.37% 4 Kharif 2.24% 5 Marshy / Swampy 0.25% 6 Plantation 1% 7 Rabi 30.32% 8 River 10% 9 Settlement 12% 10 Water Body 0.22% 11 Zaid Crop 3% 12 Brick Kiln 0.1% 13 Total 100% Source: LANDSAT image 2005, Toposheet (Survey of India), Census of India 56

CEPT UNIVERSITY I AHMEDABAD 56 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 20: Existing Land Cover – Project Area including PPA

CEPT UNIVERSITY I AHMEDABAD 57 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

4 CHAPTER: DEVELOPMENT VISION & PLANNING NORMS ADOPTED

58

Chapter Contents • Vision Statement and Objectives • Guiding Principles • Planning Norms Adopted

CEPT UNIVERSITY I AHMEDABAD 58 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Economic growth is the key word for the development of the Patna Planning Area. Simultaneously, ecological sustainability is also considered as a major design criteria. ‘Development’ inherently implies good education, health, and provision of adequate and good infrastructure and civic amenities to the residents of the region.

Based on the studies of the existing conditions and considering the growth opportunities and potential of the site, the following vision statement was arrived at:

“To develop Patna Planning Area as a modern economic region with

locally competitive infrastructure and social amenities to address

future requirements in harmony with its ecological resources”

The Vision of this Master Plan and broad objectives are translated into the following specific development strategies:

• Creation of a compact city to achieve sustainable development.

• Transit Oriented Development (TOD) is proposed along the major corridors, which will emphasize movement through public transport. The above-mentioned Centers are well- linked to the core city.

• Integration of the peripheral areas with the core and intermediate areas, so that the entire PPA acts as one entity (through TOD).Creation of Growth Centres (GC) and Satellite Town - Proposing multi-nuclei centers will help reduce pressure on the core area. Thus, each Center will act as a self-contained zone which will include an employment hub. This Center will also provide economic opportunity and higher order social facilities to the surrounding areas.

• Proposing Master Plan with the objectives of protecting rural livelihoods and catering to the needs of the population by providing agricultural zones.

• Provision of adequate infrastructure to influence overall development in the region. 59

4.1 Guiding Principles The Guiding Principles for Master Plan preparation for the region are derived from planning theory and practice across the world and it includes • Multiple nuclei concept,

• Rural Urban Continuum,

• Transit Oriented Development,

• Urban Growth Boundary,

• Peri urban development,

CEPT UNIVERSITY I AHMEDABAD 59 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

• Provision of Social Amenities, and

• Environmentally Suitable Development.

4.1.1 Multiple Nuclei Concept The projected population figures indicate that the urban population in PPA by 2031 will be around 12.12 million. A Planning area encompasses of persons and activities intensely "interrelated and integrated with reference to daily requirements" by virtue of their diversity or differences (Hawley, 1950, 257). A Planning area performs significant coordinating functions through specialization, usually requiring sufficient population and infrastructure size. Creating multiple nuclei centres/ sub centres will help to take the overload from the center or core nuclei.

Figure 3: Growth Options

60

These nodes/ nuclei centres are identified as physical demarcation / accumulation of cluster of activities. They are not the absolute population accumulation in a particular area but the service population with different size/scale of the nodes. Various urban nodes proposed in Master Plan are commercial, Transportation, Industrial nodes.

4.1.2 Urban Rural Continuum Rural Urban Continuum is essentially the gradual change observed in terms of intensity of development from core city areas towards the peripheral area. The nature of settlement structure

CEPT UNIVERSITY I AHMEDABAD 60 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

helps to understand the rural – urban dichotomy or continuity. Settlement structures refer to the distribution of settlements according to their population size. With the flow of new migrants into the city, the core city areas are no longer able to absorb growth and the city begins to expand physically, first through the development of vacant land within the city itself and later by slow encroachment on land in areas lying outside city limits. Sometimes, the new migrants, particularly from the poorer sections, stay in villages around the city and commute to the city for work. Therefore, the rural – urban fringe is an area of rapid change in land utilization and population characteristics. This transformation of fringe villages to urban areas takes place due to their close proximity to the city.

The first stage of transformation is evident in agricultural land use change. The initial impact of the city growth is seen on agricultural land-use in a village, in terms of high commercialization of agriculture activities. In this stage, there are three major factors, which trigger development, viz.: (i) growth of urban population and consequent demand for products such as milk and vegetables, (ii) improved transport facilities, particularly construction or improvement of roads and introduction of bus services, and (iii) cumulative increase in people’s awareness and direct contact with the city over a period.

In the second stage, there is a change in occupational structure as the village population responds to the employment opportunities in the city. As time passes, the range of private enterprises widens to include almost every type of enterprise. Public transport is the means of commutation to the city. Houses are improved and better furnished, while basic amenities such as water supply, sewage disposal, and drainage do not show any improvement.

In the third stage, urban land use growth observed. This change is because of increasing interaction of the rural populace with the city. The few plots of land belonging to farmers in the village are purchased by real estate agents and developed into residential colonies or industrial sites. Land values in the village tend to increase rapidly. Simultaneously, new immigrants from rural areas who come to the city in search of employment settle in the fringe villages, finding city areas expensive. Sometimes they settle in i squatters or slums near factories, on the roadside, near drains. Farming as 61 an occupation sees a progressive decline, and the way of life in the village is increasingly urbanized.

The urban village stage is that in which transformation of the fringe village is reached when all the land that was under agricultural use is taken up for urban uses. There is no agricultural land around the village and farming is not possible. All around the old village site, there are a number of urban residential localities.

4.1.3 Transit Oriented Development (TOD) Transit Oriented Development is compact, mixed use development within easy walking distance of a transit corridor. Its pedestrian-oriented design encourages residents and workers to reduce use of personalized vehicles and use mass transit more often. These settlements are usually moderate to high density compatible with the existing scale of development, and can be new construction or

CEPT UNIVERSITY I AHMEDABAD 61 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

redevelopment. Mixed uses include residential, commercial space and office space, or a combination of the same. The success of TOD depends on a variety of characteristics. TOD is development designed to create connections between communities and transit the system in a way that encourages its use through walking and cycling instead of creating dependence on automobiles. A well designed TOD displays the following physical characteristics:

• Mixed land use • Compact, higher residential densities than typical development • A transit stop or station that is a center of activity • Easily accessible via all modes of transportation • Pedestrian and bicycle friendly • Provides adequate amenities and open spaces for the linear city, extremely efficient with respect to community

TOD’s success depends on the benefits it brings to a particular community. Each community has different goals and objectives for transportation and land use planning, whether promoting reinvestment in older towns or reducing traffic congestion in rapidly growing suburbs.

4.1.4 Urban Growth Boundary This circumscribes an entire urbanized area/ rural area which has future potential to grow, is used by local governments as a guide to zoning and land use decisions. It is also called as urban service boundary. It is an officially adopted and mapped line beyond which the local or regional government does not support development for a specified period of time. Growth is supported inside the boundary with utilities and development-friendly policies. Growth is discouraged outside the boundary.

Generally in Planning region, growth occurs in areas where there is already urban and suburban development. The purpose of providing urban services is to synchronize existing urban growth with the provision of infrastructure needed to accommodate future growth. The two most “fundamental 62 purposes (1) to promote compact and contiguous development patterns that can be effectively served by public services and (2) to preserve open space, agricultural land, and environmentally sensitive areas that are not currently suitable for urban development. Thus the urban growth boundary in the Master Plan has been defined phase wise in this boundary.

Urban growth boundary should: 1. Accommodate long-range urban population growth requirements consistent with state and local goals and policies. 2. Fulfill local needs for housing, employment opportunities, and livability; 3. Provide public facilities and services in an orderly manner; 4. Maximize efficiency for land uses in or at the fringe of existing urban areas; 5. Consider all environmental, energy, economic, and social consequences;

CEPT UNIVERSITY I AHMEDABAD 62 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

6. Preserve farm, forest, and other resource lands; and 7. Ensure compatibility of proposed urban uses with nearby rural settlements.

4.1.5 Peri urban development UNDP (1996) defines Peri urban as an activity that produces, processes and markets food and other products, on land and water in urban and peri-urban areas, applying intensive production methods and reusing natural resources and urban wastes to yield a diversity of crops and livestock. Peri urban in addition can also involve animal husbandry, aquaculture, agro-forestry and horticulture. The Von Thunen Model (1826) of agricultural land use exhibits relationships between markets, production, and distance. For this purpose, the agricultural landscape is looked upon in context to the city center. The model signifies its economic imperatives in terms of relative costs for transporting different agricultural commodities to the central market. The most productive activities will thus compete for the closest land to the market and activities not productive enough will locate further away. There are rings of agricultural activity surrounding the city. Dairying and intensive farming occur in the ring closest to the city; since vegetables, fruit, milk and other dairy products must get to the market quickly, they would be produced close to the city. Similarly, other, less perishable agricultural commodities are produced in subsequent rings.

Providing for agricultural zones in the Master Plan with the objectives of protecting rural livelihoods and catering to the needs of the population therefore assumes importance.

4.1.6 Provision of Social Amenities Social amenities at village level are proposed according to UDPFI guidelines for 2021 and 2031 year respectively. Higher level of amenities for education, health and finance are proposed identified spatially at CD level and proposed at village level.

4.1.7 Environmentally Suitable Development The proposed Master Plan for the PPA ensures development in harmony with the environment. Proper zoning for segregation of residential, commercial and industrial areas with buffer zones 63 between these land uses has been provided.

Existing major corridors and proposed corridor need to have a green buffer so as to protect the residential area from air and noise pollution.

Clustering of industries has been given priority based on the type of waste generation. Decentralized and specialized treatment plants need to be installed in these local clusters, thereby reducing the cost of infrastructure development.

4.2 Planning Norms and Standards Adopted One of the important objectives of Master Plan preparation is to develop various civic facilities to support the future population. The provision of the amenities shall be adequate in terms of number

CEPT UNIVERSITY I AHMEDABAD 63 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

and area of amenities. In the proposed plan, these amenities are provided at various levels, depending on the nature of the particular amenity. The number and area of each type of amenity depends on the level at which the amenity is being provided, and the size of population it is envisaged to support. Table 13: Provision of Physical Infrastructure – Manual of Water Supply S. Aspect Small (< 50,000) Medium Large and Metro No. (>50,000) (>10 lakh) a Domestic i) Absolute Min. 70 lpcd 70-100 upper 135 lpcd it can be limit above reduced upto 70 lpcd 100,000 ii) Desirable 100 lpcd 135-150 lpcd 150-200 lpcd upper limits for metro cities income areas the standards to lpcd b Non-Domestic i) Institutional Institutions Litres per head per day Hospital(including laundry) a. No. of beds exceeding 100 450 (per bed) b. No of beds not exceeding 100 340 (per bed) Hotels 180 (per bed) Hostels 135 Nurses homes & medical quarters 135 Boarding schools/colleges 135 Restaurants 70 (per seat) Airports & seaports 70 Junction stations & intermediate 70 64 stations where mail or express stoppage (both railway and bus stations) is provided Terminal stations 45 Intermediate stations(excluding 45 (could be reduced to 25 where mail and express stops) bathing facilities are not provided) Day schools/colleges 45 Offices 45 Factories 45 (could be reduced to 30 where no bathing rooms are required to be provided)

CEPT UNIVERSITY I AHMEDABAD 64 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Cinemas, concert halls and theatres 15

ii) Industrial Industry Unit of Water Requirement Production in Kilolitres per unit Automobile Vehicle 40 Distillery Kilolitre 122-170 (proof alcohol) Fertilizers Tonne 80-200 Leather 100 kg 4 (tanned) Paper Tonne 200-400 Spl. Quality paper Tonne 400-1,000 Straw Board Tonne 75-100 Petroleum Refinery Tonne (crude) 1--2 Steel Tonne 200-250 Sugar Tonne (cane 1--2 crushed) Textile 100 kg 8--14 (goods) iii) Firefighting 1% of total demand iv) Public 10-15 lpcd 20-25 lpcd 30-35 lpcd purpose

65

CEPT UNIVERSITY I AHMEDABAD 65 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 14: Provision of Social Infrastructure – UDPFI Guidelines Amenity Population No. of Facilities CBD Level 12 lakhs - 15 Lakhs 4 Zone Level 4 lakhs - 5 Lakhs 11 Node Level 1 lakhs – 1.5 lakhs 39 Sector Level 40,000 - 50,000 108 Neighborhood Level 10,000 – 12,000 443 Community Level 5,000 - 6,000 887

4.2.1 Community Level Facilities The community level facilities are provided as per the UDPFI Guidelines are as follows, the area required per facility for Nursery School and Primary School of 10,000 sq.m (1 Hectare). The community hall of 660 sq.m of area has to be provided with few other facilities for each facility, such as Milk Booth of 25 sq.m and ATM of 10 sq.m.

Each facility is provided for facility shop of 440 sq.m with 280 sq.m per 3,500 population, Convenience Shopping of 880 sq.m with 160 sq.m per 1,000 population and Open Spaces of 8,250 sq.m at 1.5 sq.m per capita.

Table 15: Provision of Social Infrastructure – Housing Cluster (UDPFI Guidelines) Population No. of Nature of Utility and Social facility Land Area / Facility Threshold Facilities (sq.m) Community 887 Nursery School + Primary School 10,000 Level Community Hall 660 5,000 – 6,000 Milk Booth 25 ATM 10 Facilities shop (280 sq.m/3,500 pop) 440 Convenience shopping 880 66 ( 160 sq.m/1,000 ) Open Spaces ( @ 1.5 sq.m / capita ) 8,250 Sub Total (Amenities) 10,660 Sub Total (Commercial) 1,355 Sub Total (Open Space) 8,250 Total @ community Level 20,265

CEPT UNIVERSITY I AHMEDABAD 66 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

4.2.2 Neighbourhood Level Facilities The Neighborhood level facilities are provided as per the UDPFI Guidelines are as follows, the senior secondary school of 16,000 sq.m (1.6 Hectares) area is required per facilities. The community hall with Library and Gymnasium of 4,000 sq.m of area required per facility. There are few other facilities provided per facility, such as religious buildings of 200 sq.m.

Each facilities are provided for Retail cum Commercial of 3,300 sq.m with 300 sq.m per 1,000 population, Electric Sub stations of 350 sq.m with 415 V, dispensary of 1,200 sq.m, Bank with ATMs of 2 No’s (1,000 sq.m) and Open Spaces of 16,500 sq.m.

Table 16: Provision of Social Infrastructure – Neighborhood Level (UDPFI Guidelines) Population No. of Nature of Utility And Social Facility Land Area / Facility Threshold Facilities (sq.m)

Neighborhood 443 Sr. Secondary School 16,000 Level Community Hall, Library and Gymnasium 4,000 10,000-12,000 Religious building 200 Retail Commercial (300 sq.m/1,000) 3,300 Electric Sub-Station (415 V) 350 Dispensary 1,200 Bank with ATM (2 no’s) 1,000 Open Spaces (@ 1.5 sq.m /capita ) 16,500 Sub Total (Amenities) 21,750 Sub Total (Commercial) 4,300 Sub Total (Open Space) 16,500 Total @ Neighborhood Level 42,550

4.2.3 Sector Level Facilities The Sector level facilities are provided as per the UDPFI Guidelines are as follows, One health centre of 3,000 sq.m (0.3 Hectares) area with nursery, child welfare and maternity centre. There are few 67 other facilities have to be provided, such as Sub-Post office of 150 sq.m, School for Handicapped of 5,000 sq.m, and Police Post of 1600 sq.m. Each facilities are required religious buildings of 750 sq.m, Communication Centre of 1500 sq.m with STD, ISD, Data transmission and ISDN, Retail cum Commercial of 22,500 sq.m with 500 sq.m per 1000 population and Open Spaces of 45,000 sq.m with at 1 sq.m per capita.

CEPT UNIVERSITY I AHMEDABAD 67 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 17: Provision of Social Infrastructure – Sector Level (UDPFI Guidelines) Population No. of Nature of Utility and Social facility Land Area / Threshold Facilities Facility (sq.m) Sector 108 Sub Post-Office 150 Level School for Handicapped 5,000 40,000 - Health Centre-Nursery, Child Welfare, Maternity Centre 3,000 50,000 Police Post 1,600 Religious building 750 Communication Centre (with STD, ISD, Data 1,500 transmission, ISDN ) Retail Commercial ( 500 sq.m/1000) 22,500 Open Spaces ( @ 1 sq.m / capita ) 45,000 Sub Total (Amenities) 10,500 Sub Total (Commercial) 24,000 Sub Total (Open Space) 45,000 Total @ Sector Level 79,500

4.2.4 Node Level Facilities The Node level facilities are provided as per the UDPFI Guidelines are as follows, the Electric Sub Station of 3,500 Sq.m (0.35 Hectares) area with 11 KV per facility. There are few other facilities are required, such as Integrated school without hostels of 35,000 sq.m, LPG Godown of 600 sq.m, Petrol Pump of 2,000 sq.m and Bus Terminal (2,500 sq.m).

The other facilities required per facility are College of 40,000 sq.m, Community Centre with PHC, Library and Hall of 2,500 sq.m, Polyclinic with 20 beded of 3,000 sq.m and Intermediate Hospital with Category B – 100 Beds of 10,000 sq.m. The other facilities as per standards are Meditation and Spiritual Centre of 5,000 sq.m, Music, Dance and Drama Centre of 1000 sq.m and Recreational Club of 10,000 sq.m.

The other public facilities required are Police Station of 15,000 sq.m, Post with Telegraph of 3,500 68 sq.m, Overhead Reservoirs of 10,000 sq.m. The required luxurious facilities are Cineplex of 15,000 sq.m, Retail cum Commercial with 500 sq.m per 1000 persons of 62,500 sq.m and Open Spaces at 1 sq.m per capita of 45,000 sq.m.

CEPT UNIVERSITY I AHMEDABAD 68 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 18: Provision of Social Infrastructure – Node Level (UDPFI Guidelines) Population No. of Nature of Utility and Social facility Land Area / Threshold Facilities Facility (sq.m) Node Level 39 Electric Sub-Station (11 KV) 3,500 100,000 - Integrated school without hostel 35,000 150,000 LPG Go-down 600 Petrol Pump 2,000 Bus Terminal 2,500 College 40,000 Community Centre (with PHC, Library, Hall ) 2,500 Polyclinic (20 bed ) 3,000 Intermediate Hospital (Category-B: 100 beds) 10,000 Meditation and Spiritual centre 5,000 Music, Dance and Drama Centre 1,000 Recreational Club 10,000 Police Station 15,000 Post and Telegraph 3,500 Over head reservoirs 10,000 Cineplex 15,000 Retail Commercial ( 500 sq.m/1000) 62,500 Open Spaces ( @ 1 sq.m / capita ) 45,000 Sub Total (Amenities) 143,600 Sub Total (Commercial) 77,500 Sub Total (Open Space) 45,000 Total (Node Level) 266,100

4.2.5 Zone Level Facilities The Zone level facilities are provided as per the UDPFI Guidelines are as follows, the Electric Sub Station with captive power of 8,000 Sq.m (0.8 Hectares) area. There are few other facilities required per facility, such as fire station of 16000 Sq.m, Intermediate Hospital with 200 Beds of 37,000, Bus 69 Terminal of 15,000 sq.m and Electric receiving Substation with 220 per 660 KV of 20,000. The requirement of facilities per facility of land area are Hotel with convention facilities of 40,000 sq.m, Water treatment plant of 10,000 sq.m, Electric substation with 11KV of 3500 sq.m and Telephone exchange of 2,500 sq.km. The social facilities are Retail cum Commercial with 880 sq.m per 1,000 persons of 396,000 sq.m, Super market of 6,000 sq.m and Open Spaces at one sq.m per capita of 450,000 sq.m.

CEPT UNIVERSITY I AHMEDABAD 69 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 19: Provision of Social Infrastructure – Zone level (UDPFI Guidelines) Population No. of Nature of Utility and Social facility Land Area / Threshold Facilities Facility (sq.m) Zone Level 11 33 KV Electric sub-station + Captive Power 8,000 400,000 - Fire Station 16,000 500,000 Intermediate Hospital (Category-A : 200 beds) 37,000 Bus Terminal 15,000 Electric receiving sub-station ( 220 / 660 KV ) 20,000 Hotel with Convention Facilities 40,000 Water treatment plant 10,000 Electric Sub-Station (11KV) 3,500 Telephone Exchange 2,500 Retail Commercial 396,000 (880 sq.m /1000) Super Market 6,000 Open Space ( @ 1 Sqm / capita ) 450,000 Sub Total (Amenities) 112,000 Sub Total (Commercial) 442,000 Sub Total (Open Space) 450,000 Total @ Node Level 1,004,000

4.2.6 CBD Level Facilities The CBD level facilities are provided as per the UDPFI Guidelines are as follows, One Museum with Art Gallery of 5,000 Sq.m (0.5 Hectares) area. One Hotel with Convention facilities of 40,000 Sq.m of area have to be provided at zone level. There are few other facilities for amenities have to be provided, such as for Institutional like Polytechnic College, Engineering College, Medical College, University Campus area, Socio-Cultural Centre, Library and International School with Hostel. 70

There are few other facilities for common amenities have to be provided, such as Regional Hospital, Health Resort , Hotel with convention facilities, Transport Nagar, Telephone exchange, Police Station with accommodation, Head Post Office, Bus Terminal with Depot, Electric receiving Substation, Fire Station, Central Sewage treatment Plant with zonal treatment plant, Crematorium & Burial Ground and Water reservoirs and distribution systems. There are few other facilities also to be provided, Such as Communication centre (with STD, IDD, Data Transmission, ISDN), Retail, Commercial, Zonal Shopping centre and Open Spaces.

CEPT UNIVERSITY I AHMEDABAD 70 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 20: Provision of Social Infrastructure – CBD level (UDPFI Guidelines) Population No. of Nature of Utility and Social Facility Land Area / Threshold Facilities Facility (sq.m) CBD Level 4 Museum & Art Gallery 5,000 1,200,000 – Hotel with Convention facilities 40,000 1,500,000 Regional Hospital 60,000 Polytechnic College 40,000 Engineering College 600,000 Medical College 150,000 University Campus Area 600,000 Health Resort 30,000 Socio-Cultural Centre 150,000 Library 5,000 International school with hostel 40,000 Transport Nagar 50,000 Telephone Exchange 10,000 Police Station with accommodation 10,000 Head Post Office 10,000 Bus Terminal with Depot 30,000 Electric Receiving Substation (220/660 KV) 50,000 Fire Station 10,000 Central STP + zonal treatment plants 700,000 Crematorium & Burial Ground 45,000 Water reservoirs and distribution systems 30,000 Communication centre(with STD, IDD, Data 10,000 Transmission, ISDN) Retail Commercial / Zonal Shopping centre (880 1,100,000 sq,m/1000) Open Space (@ 1 sq.m/cap) (Golf course, 1,250,000 Exhibition, Trade fairs) 71 Sub Total (Amenities) 2,625,000 Sub Total (Commercial) 1,150,000 Sub Total (Open Space) 1,250,000 Total @ CBD Level 5,025,000

CEPT UNIVERSITY I AHMEDABAD 71 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

5 CHAPTER: PLANNING PROPOSALS

72

Chapter Contents • Projections • Proposed Land Use • Proposed Road Network • Physical Infrastructure • Social Infrastructure & Amenities

CEPT UNIVERSITY I AHMEDABAD 72 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

To prepare the Master plan for Patna for next 20 years, it is essential to estimate the future population, employment and their area requirements. The following section contains population projection, Employment Generation. In the Subsequent sections, Proposed Land use is provided along with Proposed Road Network and estimated physical and social infrastructures for projected population for the year 2031.

5.1 Population Projection Development activities and consequent population growth in the PPA influenced by external factors, the area cannot be considered as an individual entity while projecting the population.

Population projection for the PPA carried out based on share and shift analysis, which gives a more precise estimate of the expected future population. This method has especially high relevance for estimating the population of the PMR, since the study of comparative share of smaller spatial units to its succeeding larger spatial unit, the pattern of change in such shares gives the estimated figure of greater accuracy, and helps avoid discrepancies. The following steps are followed for this method of population projection:

Population of 1981, 1991 and 2001 has been drawn from the relevant Census reports for India, Bihar and Patna District. The population figures for 2011 for India and Bihar is drawn from Census 2011: Provisional Report. The estimated population of India for 2021 and 2031 has been put based on the estimates worked out by Census in 2006, and updating it in accordance with the 2011 provisional figures.

• Identification of the share of Bihar population to the India population for the years 1981, 1991, 2001 & 2011.

• Estimating the share of Bihar population to India population for 2021 & 2031.

• Identifying the population share of Patna District with the State for 1981, 1991 and 2001. 73

• Analyzing the change in the share over the years, and the changing pattern of urban population of each district with respect to the State urban population.

• Estimating the total population and urban population of Patna district for the year 2011, 2021 and 2031.

• Calculating the change in the population share of PPA in the Patna district.

The share of the PPA population to the district population (total population and urban population) is estimated for the years 2011, 2021 & 2031 on the basis of the change in population share calculated above, leading to the population estimation for the PPA for these years.

CEPT UNIVERSITY I AHMEDABAD 73 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 21: Population Projection

India Category Total Pop. Total Pop. Projected pop. Projected pop. Projected pop. 1991 2001 2011 2021 2031 Rural 628691676 741660293 833463448 910724000 970561339 Urban 217611012 285354954 377106125 455769018 593749695 Share to Total (%) 25.71 27.78 31.15 33.52 36.71 increase 2.38 2.07 3.37 2.37 3.18 % increase 10.21 8.06 12.12 7.61 9.50 Decadal Growth Rate (%) 36.51 31.13 32.15 20.86 30.27 Total 846302688 1027015247 1210569573 1359612233 1506324685 Decadal Growth Rate (%) 23.86 21.35 17.87 12.31 10.79 Bihar State (excl. Category Total Pop. Total Pop. Projected pop. Projected pop. Projected pop. Jharkhand) 1991 2001 2011 2021 2031 Rural 58025043 74316709 92341436 109712559 126884300 Share to India Rural (%) 9.23 10.02 11.08 12.05 13.07 % increase in share 2.25 8.57 10.57 8.73 8.52 Decadal Growth Rate (%) 22.71 28.08 24.25 18.81 15.65 Urban 6505581 8681800 11758016 14529635 19341972 Share to India Urban (%) 2.99 3.04 3.12 3.19 3.26 % increase in share -5.04 1.77 2.48 2.24 2.19 Decadal Growth Rate (%) 29.63 33.45 35.43 23.57 33.12 Share to Total (%) 10.08 10.46 11.29 11.69 13.23 Total 64530624 82998509 104099452 124242195 146226271 Share to India Total (%) 7.63 8.08 8.60 9.14 9.71 increase -0.03 0.46 0.52 0.54 0.57 % increase in share -0.39 5.99 6.41 6.27 6.23 Decadal Growth Rate (%) 23.38 28.62 25.42 19.35 17.69

CEPT UNIVERSITY I AHMEDABAD 74 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Patna District Category Total Pop. Total Pop. Projected pop. Projected pop. Projected pop. 1991 2001 2011 2021 2031 Rural 2241510 2757060 3323875 3352143 3123481 Share to Bihar Rural (%) 3.86 3.71 3.60 3.06 2.46 % increase in share -3.96 -2.97 -3.30 -3.39 Decadal Growth Rate (%) 23.00 20.56 0.85 -6.82 Urban 1370098 1961532 2514590 3590134 5036759 Share to Bihar Urban (%) 21.06 22.59 23.51 24.71 26.04 increase -1.27 1.53 0.91 1.20 1.33 % increase in share -5.69 7.28 4.04 5.12 5.39 Decadal Growth Rate (%) 22.25 43.17 28.20 42.77 40.29 Share to Total (%) 37.94 41.57 43.07 51.71 61.72 % increase in share 9.58 3.61 20.07 19.35 Total 3611608 4718592 5838465 6942277 8160240 Share to Bihar Total (%) 5.60 5.69 5.61 5.59 5.58 % increase in share 1.58 -1.35 -0.37 -0.13 Decadal Growth Rate (%) 30.65 23.73 18.91 17.54 Patna Planning Area Category Total Pop. Total Pop. Projected pop. Projected pop. Projected pop. (PPA) 1991 2001 2011 2021 2031 Rural 859603 1107846 1667522 1445845 1148103 Share to Patna District 38.35 40.18 50.17 43.13 36.76 Rural (%) % increase in share 4.78 24.85 -14.03 -14.78 Decadal Growth Rate (%) 28.88 50.52 -13.29 -20.59 Share to Total (%) 41.84 38.54 43.78 29.91 19.05 Urban 1195111 1766730 2141124 3387483 4877129 Share to Patna District 87.23 90.07 92.02 94.36 96.83 Urban (%)

CEPT UNIVERSITY I AHMEDABAD 75 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

% increase in share 3.26 2.17 2.53 2.62 Decadal Growth Rate (%) 20.27 47.83 21.19 58.21 43.97 Share to Total (%) 58.16 61.46 56.22 70.09 80.95 Total 2054714 2874576 3808646 4833328 6025232 Share to Patna District Total 56.89 60.92 65 70 74 (%) % increase in share 7.08 7.08 6.73 6.05 Decadal Growth Rate (%) 39.90 32.49 26.90 24.66

Population of Patna Planning Area is estimated to 60,25,232 of which urban population estimated to 48,77,129 for year 2031, Share of urban of PPA is stands at 96.83% of urban for district.

CEPT UNIVERSITY I AHMEDABAD 76 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

5.2 Employment projection Employment generation is one of the major objectives of the Master Plan for Patna. An understanding of the likely future growth of the local economy serves as the basis for employment projection and identification of probable locations of employment centers for the Master Plan. Corresponding improvements to the transport network and other infrastructure services to meet future requirements are proposed on this basis.

Table 22: Projected Employment Components 2001 2031 Population 2874576 6025232 Urban Population 1766730 4877120 WFPR 25 33 Total Worker (33% of urban population) 441683 1609450 Distribution of Worker Primary Sector (%) 10 5 Secondary Sector (%) 5 20 Tertiary Sector (%) 85 75 Total Populalation of Secondary workers 22084 321890 Total Populalation of Tertiary' workers 375430 1207087

The total projected population for 2031 in PPA is 60.25 lakhs, out of which the estimated urban population is around 48.77 lakhs. The Work force Participation rate (WFPR) of 25% is observed based on the situation analysis for Patna Planning Area in 2001 and 33% is assumed in 2031. The total worker in 2031 is estimated to be ~16.09 lakhs considering the 33% of the urban population. The distribution of urban workers assumed for Secondary sector with 20% and Tertiary sector of 75%. The total population proposed for secondary workers is 3.21 lakhs, and Tertiary workers are 16.09 lakhs in 2031. 77 To promote industrial based economy 60% of secondary workers is accommodated in Industrial land use, while and rest 40% to be accommodated in Commercial/Institutional and Mixed land use. For secondary workers, area per person required is 50 sq. m, therefore total area required for industrial land use is 966 hectares.

CEPT UNIVERSITY I AHMEDABAD 77 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 23: Area statements against Projected Employment

Area Statement for Industrial land Use 2001 2031

Total Population of Secondary workers 22084 321890

Nos. of Secondary workers to be accommodated in Industrial Zone (60% 193133.95 of total secondary workers), 40% in Commercial and Mixed Land Use

Area required @ 50sq.m per secondary worker (in Ha) 966

Area Statement for Commercial and Mixed Land Use 2001 2031

Total Populalation of Tertiary' workers 375430 1207087

Area required @ 15sq.m per secondary worker (in Ha) 1811

Nos. of Secondary workers to be accommodated in Commercial and 128755.97 Mixed Land Use (40% of total secondary worker)

Area required @ 30sq.m per secondary worker (in Ha) 386

Total area Statement for Commercial and Mixed Land Use 2197

For tertiary workers, area per person required is 15 sq. m. The total area requirement for tertiary workers is 1811 hectares. Area required for commercial and mixed land use is calculated by taking into account of total area of tertiary workers and 40% of secondary workers. The total area estimated for Commercial and mixed land use is 2197 hectares. Out of total area proposed 50% will be functioning at lower level – neighbourhood and community level. While the other 50% shall be accommodated at higher threshold level – CBD, Zone and Sector level. Hence around 1099 hectares is specifically designated in proposed Land use zone.

78 5.3 Proposed Land Use Distribution and Land Requirements The total project area includes Patna Urban Agglomerations and Urban Centre viz. Maner Nagar Parishad and Fatwah Nagar Parishad of Patna district and its influence area Patna Planning Region. Area other than settlements and developmental activities, such as open land (waste land, open / vacant land), brick kiln, wet lands (used for recreational development), Tree covers can be foreseen based on development potential, feasibility, suitability, and consultation with stakeholders.

CEPT UNIVERSITY I AHMEDABAD 78 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 24: Land requirement categories in PPA Sr. Land use Categories Standard taken according to Proposed land use for the No. UDPFI Guidelines (%) project area (%) 1 Residential 42 46.89 2 Commercial 5 10.76 3 Manufacturing 8 7.1 4 Public and Semi-Public 14 8.93 5 Open Space Zone/ 15 8.72 Recreation 6 Transportation & 16 14.95 Communications Total 100 100

The PPA has total area of 1144.92 Sq. Km, out of this around 50.33% is non-developable area (water bodies, nallas) and rest of the 49.57% is available for development. Around 567.63 sq.kms of area is available for development and urban agriculture area proposed around 134.06 sq. Kms.

Table 25: Land requirement categories in PPA LAND USE ZONE PPA URBANIZABLE AREA Area in % Area in % (Sq Km) (Sq Km)

Residential 333.82 29.16 315.47 55.58 Commercial 33.64 2.94 33.64 5.93 Industrial 12.18 1.06 12.18 2.15 Public and Semi-public 44.78 3.91 44.78 7.89 Public Utility 4.11 0.36 4.11 0.72 Transport/ Roads 58.43 5.10 58.43 10.29

Airport 15.31 1.34 15.31 2.70 79 River/Waterbody/Canal/Streem 52.78 4.61 2.83 0.50 Cantonment / Defence area 7.09 0.62 7.09 1.25 Old Built-up Area 18.39 1.61 18.39 3.24 Urban Agriculture 134.06 11.71 0.00 0.00 Forest 6.41 0.56 6.41 1.13 Open Space/Recreation/Buffer 48.98 4.28 48.98 8.63 Conservation/Bio-conservation 374.88 32.74 0.00 0.00 Total 1144.92 100.0 567.63 100.00 0

CEPT UNIVERSITY I AHMEDABAD 79 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 21: Proposed Land Use, PPA

CEPT UNIVERSITY I AHMEDABAD 80 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

5.4 Land Use Classification The various land use classification shall be in the following zones: 5.4.1 Residential Zone Residential Zone is further classified into four micro zones viz. R1, R2. The parameters applied for the sub-classification are as under:

1) Residential Zone- 1 (R1) (Contiguous Planning Core Area): Residential Zone falling within the proposed contiguous Planning core area, i.e. the contiguous area in north and south of River Ganga, and wherein the detailed planning of roads and various urban use zones are proposed.

2) Residential Zone- 2 (R2) (Planning Growth Nodes): Residential Zone falling within the proposed non-contiguous Planning growth nodes, i.e. the non-contiguous area that is separated from the Planning core by Urban Agriculture Zone in between, and wherein the detailed planning of roads and various urban use zones are proposed.

5.4.2 Commercial Zone Commercial Zone is further classified into two micro zones viz. C1, C2. The parameters applied for the sub-classification are as under:

1) Commercial Zone- 1 (C1) (Contiguous Planning Core Area): Commercial Zone falling within the proposed contiguous Planning core area, i.e. the contiguous area in north and south of River Ganga and wherein the detailed planning of roads and various urban use zones are proposed.

2) Commercial Zone- 2 (C2) (Planning Growth Nodes): Commercial Zone falling within the proposed non-contiguous Planning growth nodes, i.e. the non-contiguous area that is separated from the Planning core by Urban Agriculture Zone in

between, and wherein the detailed planning of roads and various urban use zones are 81 proposed.

5.4.3 Industrial Zone Areas earmarked as Industrial Use Zone in the proposed Land Use Plan only.

5.4.4 Public, Semi-public amenities and utilities Zone Areas earmarked as Public, Semi-public Amenities and Utilities Zone in the proposed Land Use Plan, and the sites specifically earmarked for any such public/semi-public use.

CEPT UNIVERSITY I AHMEDABAD 81 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

5.4.5 Open Space Zone 1) Open Space Recreational: Areas earmarked as Open Space Recreational in the proposed Land Use Plan, and the sites specifically earmarked as Parks, Playgrounds, and Exhibition Grounds.

2) Open Space Buffer: Areas specifically earmarked as Open Space Buffer around the Water Bodies containing various types of existing water bodies.

5.4.6 Old city / Inner City Zone Area of the old city/ inner city as specifically earmarked in the proposed Land Use Plan based on the existing built character, in order to preserve the same.

5.4.7 Urban Centers Zone (Uc) The remaining urban centers other than the proposed Contiguous Planning Core Area and Planning Growth Nodes, along with their surrounding areas as earmarked in the proposed Land Use Plan. The whole identified centres/areas have been classified as Urban Centres Zone, with no further classification of different use zones earmarked in the Master Plan.

5.4.8 Village Settlements Zone (VS) All the Village Settlements other than the proposed Contiguous Planning Core Area and Planning Growth Nodes, as earmarked in the Revenue Records (Khasra Maps) shall be considered as Village Settlements Zone. For all these settlements, an additional 100 M wide belt outside the settlement shall also be considered within this zone to cater the natural expansion of settlements.

5.4.9 Urban Agriculture Zone Areas earmarked as Urban Agriculture Zone, around the identified ‘Contiguous Planning Core Area’ and ‘Planning Growth Nodes’ in the proposed Land Use Plan.

5.4.10 Conservation Zone 82 Areas beyond the Urban Agriculture zone and that spreads almost all over the remaining regional area, but excluding the Urban Centres Zone and Village Settlements Zone, as earmarked in the proposed Land Use Plan.

Note: Though the area around the rural settlements (earmarked as VS Zone) is presented to be Conservation Zone in the proposed Land Use Plan, a 100 M wide belt outside these rural settlements shall be considered as RVS Zone to cater the natural expansion of the settlements, and the same shall not be considered as Conservation Zone.

5.4.11 Water Bodies Zone Water Bodies Zone indicates all existing water bodies, i.e. Rivers, Streams, Lakes, Tanks, as indicated in the topographical sheets published by the Survey of India, the State Irrigation Department or

CEPT UNIVERSITY I AHMEDABAD 82 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Revenue Department or other competent authorities. The boundary of the water bodies relate to the Full Tank Level as indicated in relevant maps, covering both perennial and non perennial parts when such distinction exists.

5.4.12 Special Reservations Zone Areas earmarked as Special Reservations Zone in the proposed Land Use Plan, and/or the sites specifically earmarked as special reservations, with any of the following categories. • Heritage Buildings and Areas • Bio Conservation Zone • Natural Heritage • Defense / Military Lands • Others (Any Other Special Reservations)

5.4.13 Transportation and Communication Zone All the roads as earmarked in the proposed Land Use Plan, and the sites specifically earmarked for related facilities as classified below- • Parking • Railways and Railway Stations (including mono rail, metro rail and their stations) • Airports • Logistics Hubs (Bus Depots and Truck Terminals) • Tele-Communication

5.5 Proposed Transportation Network This section deals with the status of traffic and transportation in the study area. A study of the regional road, rail and air network is undertaken. The following section focus on existing situation and transportation of the study area. Patna Planning Region (PPA) is well connected with other major cities of India by the following: • Roadways • Railways • Airways 83 • Waterways

5.5.1 Existing Road Network PPA is directly connected to hinterland by National Highways NH-30, NH-31, NH-83 and NH-98. It is connected to NH-2, which is a part of the Golden quadrilateral, by NH-83. The NH-2, originally the , connects it to Delhi on the northwest and Kolkata on the southeast. The State highways, by-pass roads and other regional road connect it to its hinterland. The National Highway 30 (NH-30) connects it to its hinterland from the west and NH-31 from the east. The NH-77 through 4-lane Ganga Bridge viz is the major connector to the northern portion of PPA as well as northern Bihar.

CEPT UNIVERSITY I AHMEDABAD 83 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

The most important factor determine the form of road network system is the presence of river Ganga in the north and low lying area of River Pun Pun in the south, this linear type of urbanization coupled with limited number of river crossing has given rise to dominant east-west orientation of arterial roads. However, the city does not posses significant hierarchy of roads. The whole road network system is deficient in terms of road geometric and traffic management aspects. Refer

Ashok Raj Path and including its extended part as Danapur road and NH-30 constitutes the longest road in Patna serving as major arterial roads. Sudarshan path is also another major arterial road, which is running through east-west direction in the city. Patna old by-pass road was the first major corridor to strengthen east-west movement. Bailey road, traversing in east-west direction in the western zone, it is much wider compared to other roads except the bypass road.

The City has been facilitated with major East-West corridor passes through city along with New Patna By-pass road to reduce congestion. The Ganga Bridge approach has been connected to new Patna by-pass by grade separated corridor.

Table 26: Existing Width of Roads Metalled Pavement Avg. Max. /Min width Width No. Name of the road Width (in Width Left Right M) (in M) (in M) (M) (M) 26.21 / 1 Rajendra Path 16.76 16.62 1.60 .40 10.97 23.54/ 2. Barj Kishore Path 20.11 8.94 1.01 - 17.06 32.16/ 3 Mazharul Haque Path 27.0 15.24 0.69 0.46 22.66 4 Bhattacharya Road 8.76/ 7.47 8.08 5.18 - -

5 Bhikhna Pahari Road 18.29/ 7.01 8.79 6.10 - - 84 6 Salimpur Ahara Raod 6.70/ 3.35 5.48 5.48 - - 7 Bakarganh Gola Road 5.48/ 3.66 4.47 4.47 - - 8 Dariapur Savji Bagh Rd 7.62/ 5.48 6.50 6.50 - - 9. Dariapur Gola Road 7.32/ 3.05 5.48 3.35 - - 10. Dargah Road 11.28/ 6.25 8.69 3.89 - - 11. Kun-Kun Singh Lane 7.62/ 5.48 5.18 3.51 - - 12 Ramna Rd. 7.01/ 5.79 6.60 3.20 - - 13 Khajanchi Rd. 8.84/ 6.70 7.72 2.94 - - 14 Sanichara Asthan Rd. 6.70/ 4.87 6.10 4.27 - - 15 Makhania Kuan Road 7.32/ 4.88 6.30 3.15 16 Govind Mitra Rd. 8.53/ 7.62 8.12 3.45 - - 17. Bihari Sao Lane 3.51/ 2.59 3.00 2.23 5.92 2.44

CEPT UNIVERSITY I AHMEDABAD 84 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Metalled Pavement Avg. Max. /Min width Width No. Name of the road Width (in Width Left Right M) (in M) (in M) (M) (M) 18. Saidpur Rd. 16.76/ 4.88 11.74 4.42 - - 26.77/ 19. R.K Mission Rd. 20.04 8.96 5.92 2.44 14.63 21.95/ 20. Bari Path 14.33 7.11 5.54 5.48 10.97 ( to Engg. 25.00/ 21. 21.23 12.73 4.57 4.27 College turning) 13.81 Ashok Rajpath (Engg. College turning 22. 13.56/ 7.62 10.00 6.34 - - to Ganga Bridge Fly Over.) 23 Prithvi Rajpath 15.09/ 7.16 10.92 10.00 - - 24 Budha Marg 21.95/ 7.94 14.8 9.83 - - Shershah Path 25 10.67/ 3.66 8.05 4.36 - - (Nunmuhia to Ganga Bridge Fly-Over) 26 English Ganj Rd (Chiraian Tal) 10.00/ 5.33 7.33 14.93 - - 27 Old Bye-Pass 35.3/ 20.42 24.74 14.93 - - 28 Patna Punpun Rd 11.43/ 6.01 7.92 3.80 - - 29 D.V.C. Raod 4.57/ 4.34 4.27 3.05 - - 34.44/ 30 Khagaul Road 19.12 5.79 - - 15.24 19.20/ 31 Chitra Gupta Nagar Rd. 11.27 4.27 - - 11.58 32 Bhut Nath Asram Rd. 13.41/ 5.18 6.70 3.05 - - 18.29/ 33 to Pump House Rd. 13.71 4.87 - - 11.88 85 Shershah Path (Ganga Bridge Fly-Over 34 14.02/ 6.40 10.00 5.03 - - to Pachim Darwaja0 Ashok Rajpath (Ganga Bridge Fly-over 35 10.20/ 7.62 8.53 4.27 - - to Malsalami) 36 Sudarshan Path 10.97/ 4.27 7.32 4.57 - - 37 Ajat Shatru Path 12.19/ 9.75 10.36 5.44 - - 37 Ajat Shatru Path 12.19/ 9.75 10.36 5.44 - - 38 path 19.51/ 9.14 14.12 7.14 - - 14.93/ 39 Nawab Bahadur Rd. 13.41 9.14 - - 12.19 40 Sadargali Road 4.44/ 2.44 3.65 2.29 - - 41 Maroofganj Road 7.62/ 3.05 5.03 2.44 - -

CEPT UNIVERSITY I AHMEDABAD 85 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Metalled Pavement Avg. Max. /Min width Width No. Name of the road Width (in Width Left Right M) (in M) (in M) (M) (M) Patna Danapur Rd. (Golghar to Digha 39.47/ 42 20.73 7.21 - - P.S.) 11.58 22.86/ 43 19.63 14.02 - - 15.24 18.29/ 44 Boring Canal Road 17.37 6.60 - - 15.54 34.44/ 45 Ali Imam Path 31.09 21.66 - - 27.58 Bailey Road-from Saguna more to 87.17/ 46 87.17 - - - Patna Canal 87.17 Bailey Road-from Patna Canal to 66.45/ 47 Dhanaut & Rukunpura Boundary (upto 66.45 - - - 66.45 168 M from canal) Bailey Road-from Rukunpura Boundary 51.82/ 48 to Rukunpura 27.43 M Master Plan 51.82 - - - 51.82 Road(in a distance of91.44M) Bailey Road-from Rukunpura Master 45.72/ 49 45.72 - - - Plan Road to Ashiana More 45.72 Bailey Road-f Ashiana More to J.P 30.48/ 50 30.48 - - - Round About 30.48 Source: Draft Master Plan for Patna-2021,DCPL Consultants, Kolkata

86

CEPT UNIVERSITY I AHMEDABAD 86 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

5.5.2 Proposed Hierarchy of Roads The proposed Draft Master plan for Patna exhibits a definitive hierarchy in its structure. The proposed road network would increase connectivity within the region, simultaneously helping alleviate traffic problems. The proposed road network is in grid iron pattern with hierarchy in structure.

The whole concept is to integrate the existing road of PMC with proposed road in PPA. The whole road network in PMC is reworked and hierarchies of roads are proposed by retaining proposals of Master Plan 1981. The proposed hierarchies of roads proposed in PMC are 12m, 18m, 27m, 30m and 36m wide. Refer Anexxure 15 for the different sections of roads.

87

CEPT UNIVERSITY I AHMEDABAD 87 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 22: Proposed Road Network, PPA

CEPT UNIVERSITY I AHMEDABAD 88 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

1. Central spine – 80m wide road This road is the 1st order in hierarchy in the urban area. The central spine proposed in southern contiguous urban area runs along east west direction. This spine is well connected to major roads, NH 98, NH 83, NH 30, and NH 19. Canal is proposed in the center of the spine along the road to drain the ground water.

2. Pocket outer road 60 meter wide This road is the 2nd order in hierarchy in the urban area. This ring road is along the growth pockets. The outer ring road of southern contiguous urban area is well connected to various urban nodes by public transport route. Few of these roads will have canal running along, depending upon the design of the drainage line. Canal will help to drainage the surface water to the river.

3. Pocket major road 45 meter wide The 45 m wide proposed road is 3rd order in hierarchy in the urban area. Each of the urban nodes are well connected by 45 m wide road. The sectoral road forming a grid varying between 2.5 X 2.5 km approximately. Few of these roads are proposed with canal running along, depending upon the design of the drainage line. Canal will help to drainage the surface water to the river.

4. Pocket minor road 30 meter wide The 30 m wide proposed road is 4th order in hierarchy in the urban area. The sectoral road forming a grid varying between 1.5 X 1.5 km.

89

CEPT UNIVERSITY I AHMEDABAD 89 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

5.5.3 Proposed Public Transport route The Proposed Draft Master Plan has well connected Public Transport Network. The roads which are passing through the outer ring road of southern contiguous urban area (60 m) and the central spine (80 m) will have dedicated public transport route (e.g. BRTS, Metro). The public transport route (SH02, NH98) passes through the proposed urban nodes.

Map 23: Public Transport Route, PPA

90

CEPT UNIVERSITY I AHMEDABAD 90 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 24: Proposed Bus Station

The proposed bus station is located in Pahari village 14-2 in Patna city. Total area of Bus Stand is 25.02 Acre.

5.5.4 Proposed Rail Network Rail Network According to information available5, the Howrah-Delhi railway line, aligned through the city on the southern bank of Ganga, has 5 major railway station serving Patna urban area viz Patna sahib, Gulzar Bagh, Patna junction and Phulwari Sharif and Danapur. The railway line towards south connects the PUA and PPA to Gaya. The railway infrastructure on the northern bank is growing fast as the head 91 quarter of Eastern Central Railway is located at Hajipur. At present, Hajipur is connected by railways from , Samastipur and . In the near future, the new railway bridge over River Ganga will increase connectivity of PPA with the entire .

The railway line traverses through the entire Patna city length in the east-west direction. Therefore, the railway tracks serve both as a major movement corridor and as a barrier to north south connectivity of Patna city. To mitigate the linkage problem of northern part and southern part of the city across lines, road over bridges have been constructed on the north-south links. The BMU system of local trains connects the PUA brings the floating population from destination link areas in the west, Mokamah in the east as well as and Gaya in the south.

5Report submitted by DCPL Consultants

CEPT UNIVERSITY I AHMEDABAD 91 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Major railway stations along main line with in PUA are as follows: • Patna Junction • Rajendra Nagar Terminus • Patna City • Danapur

Minor railway stations along main line within PUA are as follows • Gulzarbag • Deedargang Halt • Sachiwalya Half • Phlwarisharif

There are 4 stations along Patna-Digha with in PUA area • Digha • Rajeev Nagar • Secretariat • R. Block

There is a proposal for new railway station Patliputra railway station along Patna –Hajipur rail link. In the proposed Master Plan existing rail network connecting Danapur railway station- railway station- FCI gowndown – Patna railway station is proposed as 45m wide road.

5.5.5 Proposed Air network

Air Network:

Primarily behaving as a domestic airport, Patna is directly connected with , Kolkata, Bombay, Lucknow, Varanasi, &Ranchi. Like Bangalore, , Ahmedabad etc Patna is also a customs airport having customs and immigration facilities for limited International operations by national carriers and for foreign tourist and cargo charter flights. 92

Traffic movement at Patna airport: The aircraft, passenger and cargo movement at the airport with their past trends are shown as below. Aircraft movement includes domestic aircraft -360 per month (180 arrival and 180 departure) and international-none. Schedule flights are total 7 per day with mostly national carriers operating and no international carriers.

CEPT UNIVERSITY I AHMEDABAD 92 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 27: Air Traffic Movement Period Movement No of aircraft movements No of passengers Cargo in tones 2000-2001 NA 176916 NA 2001-2002 NA 156490 NA 2002-2003 NA 162800 NA 2003-2004 4166 159683 1035 2004-2005 3844 208114 1184 2005-2006 - 218824 1419 Source: Draft Master Plan for Patna-2021, DCPL Consultants, Kolkata and AAI, Patna Airport

Passenger Traffic: Mostly businesspersons and government officials had so far used the airport. Tourists are seasonal, mostly during the winter months that also had been greatly affected by the Gaya airport and the trends are declining. The trend in passenger inflow so far through the airport is as shown below.

Table 28: Airport Traffic Volume Year International Domestic Total 2000-2001 9029 167887 176916 2001-02 2545 153945 156490 2002-03 1804 160996 162800 2003-04 0 159683 159683 2004-05 0 208114 208114 2005-06 0 218824 218824 Source: Draft Master Plan for Patna-2021, DCPL Consultants and AAI, Patna Airport

With addition of 924 villages and 4 Notified areas extending on all the four sides, there is tremendous increase in growth of population. The new airport proposed is well connected by NH 83 and it is adjacent to Dumri Node. The total area proposed for airport is 17.6 sq.kms. 93 5.5.6 Waterways Patna has an additional advantage of perennial river link of Ganga on its entire northern flanks. It can be used as alternative to surface transport Patna can be linked to at least 21 class-I cities stretching over thousands of kilometre length in northern India, if inland waterways are developed. A navigable channel has been dredged from Patna to downstream up to Kolkata.

Patna is at the nodal point of a potential waterways system. It is located at the confluence of river Ganga and Gandak, a few kilometres upstream the river Ghagra and son meet the river Ganga. With the opening of Ganga Bridge and proper navigation the trans-river goods movement has reduced considerably. However, some traditional mainly country boats, still carry goods through the Ghats. The use of country boats for goods movement will reduce further after the construction of railway

CEPT UNIVERSITY I AHMEDABAD 93 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

bridge over river Ganges although the transportation cost by the waterways is possible much lower. Hence there is a tremendous potential for development of comprehended inland waterways. 5.6 Proposed Physical Infrastructure The present section deals with proposed utilities and infrastructure requirements including water supply, sewerage system, storm water drainage and solid waste management for the Master Plan area.

5.6.1 Water Supply The existing water supply system of Patna town is based on ground water sources. According to data available, at present, Patna urban area has 85 deep tube wells apart from individual tube wells (privately owned) in the outskirt of the city as well as some affluent people have sunk tube well in water scarcity area to meet their own water demand.

The water supply for Patna City has been through decentralized system with single or group of tube well having definite command area. The existing distribution system is very old and suffers from heavy leakage and much incrustation reducing its carrying capacity and giving rise to severe water pollution.

The water distribution network has been framed and executed by grouping a number of tube wells as and when required on piece meal basis. As a result, in some areas water supply is in excess and in some areas water supply is very much inadequate. This is due to unequal distribution of water. For assuring equal distribution of water in all the areas, it is essential to analyze the pipeline networks zone wise and to follow optimal network by route rationalization. It may be mentioned here that there is every possibility of development of negative pressure during non-supply hours and this may cause help in entry of polluted and/or contaminated water through leaky joints in waterlines. Further, PMC area has been divided into 25 water districts, having individual water source. The distribution lines are interconnected, so that water can be diverted from one place to the other.

5.6.2 Water supply source

The Patna town divided into two parts by Delhi-Howrah railway line. The part of the town north of 94 the Delhi-Howrah railway line supplied with surface water from river Ganga, where as part of town south of railway line supplied by ground water from Tube wells. (Source: December 2011, Bid Document, Design, Build, Operate, Manage, and Maintain Water Supply System in Patna). As Patna has excellent ground water resources, a large number of private tube wells exist for domestic as well as non-domestic use. The private tube wells are to supplement or an alternative to the public water supply. The city region ground water table exploited due to misuse of the surface. Due to high investment cost, the surface water resources such as river Ganga in north and Sone in south are under utilized for the drinking purpose

The water can be diverted from one place to another, because the distribution lines are interconnected. The distribution system includes 23 OHSRs, although most of them are currently not

CEPT UNIVERSITY I AHMEDABAD 94 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

in use. The system is old and inadequately maintained, with the result that estimated water losses are very high.

Though the Patna city is situated on the right bank of river Ganges, the ground water source has been found more suitable as compared to surface water for the purpose of water supply to the city owing to the reason that it does not require any rigorous treatment with operation & maintenance excepting chlorination for the purpose of disinfection. Thus, ground water supply is cheaper in cost.

5.6.3 Issues The main problem with the existing system is non-uniform supply in different area and contamination due to various leakages. • The UFW loss is above 40% due to poor and oldsupply network. • Problem of arsenic content in water in surrounding areas second layer of geological strata. • The pipes are in the centre of the road due to road widening and facing heavy traffic, resulting in loss of carrying capacity, contamination of water, problem in repair and maintenance. • In many colonies the drinking water and sewerage pipelines are interceding each other, with sewer line on topof water line increasing the possibility of contamination. • Multi-lateral institutional arrangement for management of water supply system. • Highly Subsidized water supply • High Operation and Maintenance cost.

5.6.4 Water demand estimation Water demand for any area depends on the land use pattern of the area and type of living standards of the population residing in the area. Future water demand for the project area is estimated based on the projected population of the area. The population of the PPA area is 2,874,576 as per 2001. The projected population in the PPA area for the year 2031 has been estimated at 6,025,232 of which the urban population is 4,877,129 while the rural population is 1,148,103. 95

Water demand has been estimated separately for both urban and rural areas with phase wise increment in per capita per day (lpcd) supply for the Master Plan area. Water demand as per CPHEEO norms a per capita supply rate of 135 lpcd has been considered for working out the water demand for domestic and commercial uses. Additional 15% of this demand is to be added to account for UFW.

Water Supply Norms: It is assumed that there shall be continuous improvement in living standards of the population residing in the project area after 2011 and so there be an increase in water demand. The UDPFI Guidelines suggest for large Planning cities a domestic standard of 135 lpcd as the minimum and 150-200 lpcd as the desirable norm. In addition, a non-domestic demand of 30-35 lpcd is prescribed.

CEPT UNIVERSITY I AHMEDABAD 95 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

The water demand assumption is based on the following considerations: • Present water source and service levels • CPHEEO norms for Planning areas • Source augmentation potential in the region, and • The need for realistic targets.

The standards considered for 2011 the domestic demand is 110 lpcd for urban. In addition with the non-domestic demand (excluding industrial demand) around 25 lpcd is assumed. The standards considered for 2021 the domestic demand is 70 lcpd for rural areas and 135 lpcd for urban areas. In addition with the non-domestic demand (excluding industrial demand), around 80 lcpd for rural areas and 180 lcpd for urban areas are assumed.

For 2031 the domestic demand is assumed to be 90 lcpd for rural areas and 150 lcpd for urban areas. In addition with the non-domestic demand (excluding industrial demand), it is assumed around 15 lcpd for rural areas and 50 lcpd for urban areas. The water demand for industries is calculated based on industrial area proposed for 2031.

The demand estimation for industry is made by adopting CPHEEO’s general norm of 45 cum/ha for industrial areas. Over and above the net demand for industrial areas, 20% additional demand is taken into account for ancillary industries. The net industrial area water demand projected for 2031 is 97.2 MLD including demand for ancillary industries.

The total water demands for the Patna Planning area for 2021 is 961 MLD and for 2031 is 1413 MLD, which covers the following sections below. The projected total water demand of domestic and non- domestic activities is 36 MLD for 2021 and 55 MLD for 2031. The projected water demand for Public and Semi-Public Use is based on the 5% of the domestic activities with 36 MLD for 2021 and 55 MLD for 2031. The projected water demand for industrial area is 65 MLD for 2021 and 66 MLD for 2031, which is based on the proposed industrial area and water demand calculations. The proposed water demand for Firefighting is 8MLD for 2021 and 12MLD for 2031. The proposed water losses is 835

MLD for 2021 and 184 MLD for 2031 considering 15% of the water demand 96

The Table below shows the estimation of water demand for domestic, non-domestic, and Industrial sectors based on the foregoing norms.

CEPT UNIVERSITY I AHMEDABAD 96 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 29: Water Demand Calculation – Patna Planning Area (PPA)

Water Demand Calculation – Patna Planning Area (PPA) Water supply per activity 2011 2021 2031 2011 2021 2031 LPCD MLD Urban Domestic 235523640.0 457310205.0 731569350.0 236 457 732 Non-domestic 53528100.0 152436735.0 243856450.0 54 152 244 Total 289051740.0 609746940.0 975425800.0 289 610 975 Rural Domestic 83376100.0 101209150.0 103329270.0 83 101 103 Non-domestic 16675220.0 14458450.0 17221545.0 17 14 17 Total 100051320.0 115667600.0 120550815.0 100 116 121 Total Water Demand for Domestic and Non-domestic Activities (Excluding Industrial 389103060.0 725414540.0 1095976615.0 389 725 1096 Activities) - D-ND Activities Water Demand Calculation for Publc and Semi - public (5% to D- Activites or 35 lpcd) 19455153.0 36270727.0 54798830.8 19 36 55 Water Demand Calculation for Industies Proposed Industrial Area sq.km 12.1 12.1 12.18 Ha 1210 1210 1218 Water Demand Calculation Assumed 1 ha = 45CuM 54450 54450 54810 1 CuM = 1000 54450000 54450000 54810000 54 54 55 20% for Ancillary Industries 10890000 10890000 10962000 11 11 11 Total Water Demand for Industrial Area 65340000 65340000 65772000 65 65 66 Sub -total - 1 473898213.0 827025267.0 1216547445.8 474 827 1217 Fire Fighting (1% of Total Demand) 4738982.13 8270252.67 12165474.46 5 8 12 Sub -total - 2 478637195.1 835295519.7 1228712920.2 479 835 1229 Water Losses (Assumed 15% water demand) 71795579.27 125294328 184306938 72 125 184 Total Water Demand for Master Plan Area LPCD 550432774.4 960589847.6 1413019858.2 550 961 1413 MLD 550 961 1413

CEPT UNIVERSITY I AHMEDABAD 97 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

5.6.5 Storage The storage requirements have been calculated as per the water demand in the project area for the year 2031. The normal one-day storage is proposed for the water supply scheme. Also for firefighting requirement which is a provision and not a supply made on a day-to-day basis, therefore, provision for this quantity is kept in mind while planning the system. Thus, total storage capacity is the total water demand for one day, including the fire fighting and other demands.

Table 30: Provision of Water Storage Facilities Provision of Water Storage Facilities Water Demand Water Sotage No. of (in MLD) Capacity (in Water MLD) Storage facilities Total Water Demand for Master Plan Area (MLD) 1413 ESR - Elevated Service Reservoir Capacity (MLD) 1.5 471 314 GLSR - Ground Level Service Reservoir Capacity 3 942 314 (MLD) Water supply for Development Plan is inclusive of the losses i.e. 15%. For storage of water supply in ESR & GSR additional 1% of the total demand for fighting supply is calculated.

5.6.6 Alternative water harvesting system The term “Water harvesting” can be been explained as collection/storage of rainwater and other activities aimed at harvesting surface and groundwater, prevention of losses through evaporation/seepage and all other hydrological studies/ engineering interventions, aimed at conservation and efficient utilization of limited water endowment of physiographic unit such as watershed. • Need for rain water harvesting

• Short spells of high intensity/ heavy runoff/ low ground water recharging.

98 • Acute shortage of drinking water.

• Importance to tapping of rainwater by harvesting it for recharging or direct use.

• Components of Rain Water Harvesting

• Catchment: surface (paved/ unpaved) contributing water to a system by directly receiving rainfall; eg. Terrace, courtyard, lawn or open ground.

• Conduits: pipelines or drains (PVC/ Asbestos/ GI etc) carrying rainwater from catchment to harvesting system.

• Filters: tank with different layers of stand/ pebbles for filtering water before reaching tank.

CEPT UNIVERSITY I AHMEDABAD 98 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

• Storage Facility: Commonly used storage containers (RCC/ Masonry/ plastic etc) maintenance measures (cleaning/ disinfection etc) required for ensuring quality of water.

• Recharge Facility: rainwater charged directly to aquifers through bore well, dug wells, recharge trenches and recharge pits.

5.6.7 Recyle Water recycling has the main benefit of preserving water supplies. Appropriate measures to be adopted to maximize savings, optimal and economical use of water resources. Some of the measures are briefly mentioned below- • Water saving fixtures • Reduction in landscape water demand by using efficient system and using native species plantation • Waste water management

5.6.8 Sewerage and Sanitation The objective of a public waste water collection and disposal system is to ensure that sewage or excreta and sullage discharged from communities is properly collected, transported, treated to the required degree and finally disposed off without causing any health or environmental problems. Patna is a linear city and is about 30km in length from east to west and 5-7km wide fromnorth to south. The city is situated between the river Ganga in north, river Punpun in Southand Sone in the west. The general level Urban Area except old city is lower than the floodlevel. The general slope of the city is north to south and from west to east. The main east west road (Ashok Raj Path) running almost parallel to river Ganga forms ridge in the north.

In PUA, Patna MC Area and some part of Phulwari & Danapur NP are covered by underground sewerage system. The Sewerage System in Patna City was established in 1936. There are 3 sewage treatment plant located at Saidpur & Beur in South & South West and Pahari in North of the City.

Table 31: Location and capacities of STPs 99 S. No. Name Capacity (MLD) 1 Saidpur 45 2 Beur 35 3 Pahari 25 4 Karmalichak 8 Total 113

The total water requirement for the Project Area for is 1439 MLD for 2031. The sewerage flows have been calculated assuming that the total sewerage flow is generally 80% of the total water demand with 5% of this as infiltration. The total sewage generated in the PPA in the year 2031 is 1151 MLD.

CEPT UNIVERSITY I AHMEDABAD 99 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 25: Location of existing & proposed STPs

While planning for the proposed sewerage system, consideration is given to the natural drainage pattern. The sewerage system is planned in such a way that there will be minimum pumping involved in collection and conveyance of sewage.

For treatment purposes, apart from conventional methods, STPs can be based on SAFF (Submerged Aerated Fixed Film) technology, Activated Sludge Process (ASP), Extended Aeration with ASP, UASB process (Up-flow Anaerobic Sludge Blanket) etc.

10 5.6.9 DEWATS – Decentralised Wastewater Management 0

DEWATS application is based on low cost of operation and maintenance. It is applied in smaller areas ideally less than 1000 people where a conventional sewage system can prove less efficient and expensive. It is a convenient treatment for domestic and institutional waste. DEWATS to be used in rural areas of project area.

Total sewage generated in rural areas of project area is around 261. The salient features of a DEWATS include: • Fulfillment of National Standard of WWTP Effluent • 90% contaminant removal • Able to treat wastewater up to 1000 m3/day • Tolerant to inflow and loading fluctuation

CEPT UNIVERSITY I AHMEDABAD 100 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

• Low maintenance and long interval of de-sludging • Low operation cost • Efficient • DEWATS Modules and Technology • Bio-Digester (to treat high organics concentration wastewater, energy source to produce biogas for lighting and cooking) • Septic Tank (system with two simple compartments, sludge stabilizing) • Anaerobic Baffle Reactor (wastewater flows through activated sludge and contaminants are removed by contact with microorganism, BOD/COD removal to 90%, integrated sedimentation to avoid solid particles get into baffles) • Anaerobic Filter (wastewater flows to layer of filter media and reach 90% of contaminant removal, no space consuming due to underground construction) • Horizontal Sand Filter (aerobic treatment for pre-treated wastewater, able to remove phosphate to 80%, reduce pathogen bacteria effectively) • Aerobic Pond (advance treatment to reduce organic loading and increase oxygen supply, easy in construction). Refer Annexure 16 for different wastewater treatment technologies.

5.6.10 Storm Water Drainage The purpose of providing storm water drains is to carry the rainfall (storm) runoff from the terraces, paved courtyards, footpaths, roads etc. in the developed area so that flooding does not occur.

Topographically, PPA is like a saucer having a mild slope from North to South. It is located covering the river Ganga in the North, Pun pun in the South and the river Son in the west. The railway line virtually divides the topographic conditions of the town. Area in the south of railway line is almost flat and rainwater often remains accumulated on a vast span of urban land for the major part of the year.

During monsoon, when the water level reaches high flood level in the river Ganges, flood water from the river Ganges enter into the city as well as back flow occurs from the river Ganges through the 10 Pun pun river and floods the low lying areas of the southern part of the city of Patna. The general 1 level of Patna excepting old Patna city is lower than the flood level. Of the river Ganges the old H.F.L. as recorded in 1984 and 1975 are 168.45 and 169.29 feet respectively. The general contour of the city is much below the H.F.L. of the River Ganges.

There is need for an integrated drainage plan for PPA. The estimation of runoff reaching the storm water drains is dependent on the intensity and duration of rainfall, characteristics of the drainage area and time required for such flow to reach the storm water drains. Storm water drains are not designed for the peak flow of rare occurrence of rainfall such as once in 20 years or more; but it is necessary to provide sufficient capacity to avoid frequent flooding.

CEPT UNIVERSITY I AHMEDABAD 101 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

The proposed storm water drainage system in PPA has to be linked with rain water harvesting and recharge activities. All across the PPA area, blockages and encroachments on natural watercourses need to be addressed; these have implications on the drainage system for the entire region. All areas with urban as well as rural character in the PPA need to be provided with underground drainage and storm water drainage, so that the practice of sullage and solid waste disposal into natural water courses and storm drains is not followed. Apart from provision of drains, maintenance of inlets from roads to drains, keeping natural watercourses clean and encroachment free is important measures that ensure efficiency of proposed drainage infrastructure.

5.6.11 Existing storm water drainage The existing storm water drainage system of Patna and its outgrowths have been divided into four distinct zones: • Eastern zone • Western zone • Southern zone • Central zone

EASTERN ZONE: • It extends from north of new bypass road and east of Nalanda Medical College Hospital and Ganga Bridge and upto Didarganj. • There is no well-defined drainage system in this area due to narrow streets. The area drainage in the northern part of this zone takes place through Agamkuan Nullah which is 18 kms in length; leads to Pahari pumping station and discharges in to River Ganga in North and Low lying area. WESTERN ZONE: • It extends from west of Fraser Road to Danapur-Khagul Road • Serpentine channel, the old bed of the River Sone was only out let in the western zone. Total length of 7 kms of storm water drainage, it accumulates water of Jakanpur areaNorth of Patna Gaya Rail Line and South of Patna Pulwari

road. This collects to the MandiriPumping 10 • Station and discharges in to River Ganga at Mandiri outfall 2 • Boring canal having length of 3.0 kms was excavated to intercept water of serpentine channel. It leads to Rajapur pumping station and discharges into River Ganga at Rajapur outfall. • The 4.6 kms long SK Puri Drain covers area of Patel Nagar, Punaichak, AN college area, Anandpuri, New Patliputra colony near AN college, Nehru Nagar etc leads to PunaichakPumpingStation. • Kurjee Drain having length of 6.9 kms covers area of veterinary college, SK nagar, Western Patel Nagar, CDA Colony, AG Colony, New Patliputra Colony, Kurjee and Rajiv Nagar. It flows into KurjeePumpingStation and discharges into River Gangaat Kurjeeoutfall.

CEPT UNIVERSITY I AHMEDABAD 102 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

• Area south of Railway line upto Phulwari Sherif from Anishabad turning has no drainage system and remains water logged on roads and low lying area. • Area near Patna Canal and Saguna turning has outgrowth of city with residential and institutional landuses. The Sadaquat Ashram, Brajkishore Memorial, Loyala School and other establishment has no drainagesystem causing storm water flowing from Kurjee to Polytechnic road. CENTRAL ZONE: • It extends from Patna Gaya road in west to Nalanda Medical College hospital road in east and Ganga Bridge approach road in North to Delhi- Howarh Railway Line in South. • Bakarganj Channel having 15 kms of length covers area of from Phirmuhai to AshokRajpath and Lohanipur area,Rajender Nagar Railway Station,Karbhgahia area etc. The area is having Storm water drainage andNatural Drainage System. It discharges into SaidpurPumping Plant • The channel suffers water logging problems hence not functioning properly. • Kadamkuan/ Agamkuan Nala (18 kms.) covers area of Junction of RK avenue to Station Road and from Kadamkaun to Premchand Round about near Aryakumar road covered by 48” diameter UGD (3-4ft deep). Area from Arya kumar road to Saidpur Road is covered by Brick drain (72” to 90” OD). the storm water goes into Pahari Pumping Station and R.K. Avenue Lift Pumps to SaidpurPumping Station and discharges into Punpun River. It also caters area on East of Rajendra NagarStadium, Hostelswith Own Drainage Systemdeveloped by PHED but pumpingStation not Operational. This goes to Saidpur Pumping Station and discharges into Punpun River. SOUTHERN ZONE: • It is bounded by old bye pass road in north, new by-pass road in south,Agamkaun road in east and Patna Gaya Railway line in the west • Joginagar Drainage system caters area of Lohianagar housing colony is served by 670HP pumping station. It discharges into River Punpun.

• In the area west of Chiraiyatar andKarbigahia and unplanned development 10 beyond housing boardcolony in , Bahadurpurand Nagar 3 has nodrainage system.

Proposed storm water drainage is proposed to synchronize with existing storm water drainage network. The storm water canal is proposed in the center of the spine of 80 m wide road, few of the 60 m & 45 wide roads will have canal running along the road depending upon the design of the drainage line. These would help to drainage the surface water to the river and help in reducing floodwater to some extent.

CEPT UNIVERSITY I AHMEDABAD 103 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 26: Storm Water Network, Patna Planning Area

5.6.12 Solid Waste Management There are 925 streets and lanes in Patna city and the city has been divided into 3 Anchals having total number of 37 wards. There are approximately 600 nos. of wheelbarrows, 122 nos of tractor- trailers and 29 nos. tippers available with Patna Municipal Corporation. As regard landuse, Patna Municipal Corporation area may be considered as a mixed area and on an average the per capita solid waste generation of solid waste may be taken as 500grms.

In PMC area, house to house (HTH) collection system is not in practice. The pick-up station (PS) 10 collection system of solid waste is also not practiced scientifically. The number of collection points 4 /vats is not adequate to receive the quantum of solid waste generated daily. Moreover, solid waste finds its way into the roadside open drains and nullahs which causes blockage in flow of waste water. Thus, the roadside drains have become the receptacles of solid waste.

The solid waste dumped by individual households indiscriminately by the sides of streets and lanes is collected by the majdoors and transferred into the roadside vats/collection points. The solid waste from the vats is collected and transported to dumping sites by means of open trucks and tractor- trailers. There is no fired site of dumping. Land reclamation is done most unscientifically by dumping solid waste in low-lying areas from one place to the other. Presently solid waste is dumped on both sides of flanks in certain stretches of the bye-pass road.

CEPT UNIVERSITY I AHMEDABAD 104 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

In Patna, the present scenario of Municipal Solid Waste management as per DPR prepared under JNNURM is as below:

Patna is estimated to generate approximately 1000 tonnes of waste every day. The per capita waste generation rate is about 450 to 600 grams/person/day. The projected waste generation is estimated at 1150 tonnes per day by the year 2011. 1. Storage of Waste: 75% of the households and 80% of shops and establishments continue to throw the waste on the streets. 2. Segregation of recyclable waste is hardly practiced. 91% citizens do not segregate the waste at source. 3. Collection at Source: Door to door waste collection has been limited to some parts of the city 4. Secondary storage system - Most of the waste storage depots are open and unhygienic. 5. Transportation of only 60% of waste on a day-to-day basis is collected. 6. Treatment & Disposal: The situation of treatment and disposal of waste is extremely poor. Patna Municipal Corporation does not do any treatment or scientific disposal of waste. The entire waste, which is approximate 1000 MTs a day, is disposed in low-lying areas.

Solid waste management forms an obligatory function of Urban Local Bodies (ULBs) and hence, it calls for proper disposal of waste with appropriate strategy. At present there is no designated dumping site and garbage is dumped at all available places in the town leading to foil smell, unhygienic conditions and mosquito breeding.

The proposed solid waste landfill site is located in Raman chak village having an area of 80.5 acres of land which was acquired by state government for a solid waste-processing complex at Ramachak Bairiya. Refer Annexure 17 for the general guidelines followed for the solid waste landfill site.

Table 32: Existing Landfill site for Patna

S. no C.D Block Village Plot no Area (acre) Area (sq. km) Waste 10 disposed 5 (MT/day) 1 Sampatchak Raman chak – 118 80.5 0.32 1000 Bairiya

CEPT UNIVERSITY I AHMEDABAD 105 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Map 27: Existing Solid wasteland fill site

With the kind of development envisaged for the area of PUA, it is assumed that the per capita waste generated will increase for the projected population with the improvement in living standards. A study by NEERI states, waste generation in Hyderabad is 570 grams per capita per day. Taking NEERI study as base, same standards of 600 grams & 800 grams per capita of solid waste generation have been applied for estimation of quantum of waste generation for the Master Plan area in 2021& 2031 for urban area and 150 grams & 200 grams per capita for rural areas in 2021 & 2031 year respectively. Based on the assumptions, the solid waste generated in PPA is 2249 MT per day for 2021 and 4131 MT per day for 2031 respectively.

Table 33: Estimation of solid waste generation for Patna Planning Area for 2021 & 2031 Spatial Unit Population Projected Population GM/DAY MT/DAY

Category 1881 1991 2001 2011 2021 2031 2021 2031 2021 2031

10 Urban - 1195111 1766730 2141124 3387483 4877129 2032489800 3901703200 2032 3902 6 Rural - 859603 1107846 1667522 1445845 1148103 216876750 229620600 217 230

Total - 2054714 2874576 3808646 4833328 6025232 2249366550 4131323800 2249 4131

Solid waste management forms an obligatory function of Urban Local Bodies (ULBs) and hence, it calls for proper disposal of waste with appropriate strategy. Area for the waste disposal site for estimated waste generation is essential to earmarked in the master plan.

CEPT UNIVERSITY I AHMEDABAD 106 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 34: Estimation of solid waste generation zone wise for Project area for 2021 & 2031 Parameter Year Total area required (in Hect Acre (sq.kms) Ha)

Density tonnes/(cu.m) 0.8 2021 4.91 13.93 34.41 0.139 height required for Landfill 10 2031 9.02 Density tonnes/(cu.m) 0.8 2021 3.27 9.28 22.94 0.093 height required for Landfill 15 2031 6.01 Density tonnes/(cu.m) 0.5 2021 3.07 8.70 21.51 0.087 height required for Landfill 10 2031 5.64 Density tonnes/(cu.m) 0.5 2021 2.05 5.80 14.34 0.058 height required for Landfill 15 2031 3.76

The waste collected from sources can be segregated either at the source itself or can be segregated in the transfer station. There should be incentives given to the sweeper/ staff for collecting the waste from the source. They can collect the waste, segregate the waste like recyclable waste, and sell it.

All the waste collected through Primary Collection System, from the households, shops, and establishments has to be taken to the processing or disposal site either directly. Necessitating a large fleet of vehicles and manpower or through cost effective systems which are designed to ensure that all the waste collected from the sources of waste generation is temporarily stored at a common place called "Waste Storage Depots" and then transported in bulk to the processing or disposal sites. The general Guidelines for selection of Landfill site is given in Annexure 18

In large cities where disposal sites are more than 10 km. away from the city boundary smaller vehicles are used for transportation of waste, it may prove economical to set up transfer stations to save transportation time and fuel provided such cities have a good performance record of vehicle maintenance and adequate facilities to maintain large size vehicles and containers. Large size 15 to 20 cu. m. containers to be kept at transfer stations to receive waste from small vehicles. A ramp 10 facility may be provided to facilitate unloading of vehicles or dumper places containers, directly into 7 large containers at transfer station. The idea behind setting up this facility is to reduce the cost incurred in transporting the waste from site to dump site. Transfer stations are facilities at which municipal solid waste is dropped off by relatively small vehicles, loaded into larger containers or onto larger vehicles, and hauled to an off- site management facility for further processing or final disposal. A vegetated or landscaped buffer zone of at least 15 metres to be left around the perimeter of the active transfer area, in order to minimize any potential nuisance associated with noise, dust, or odors or any objections based on visual aesthetics.

The container/containers of at least twice the capacity may be placed at such locations to prevent over flow of bins and have freedom to lift the bin at the local body's convenience.

CEPT UNIVERSITY I AHMEDABAD 107 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

5.6.13 Hazardous Wastes Hazardous wastes may be defined as wastes of industrial, institutional or consumer origin which, because of their physical, chemical or biological characteristics are potentially dangerous to human and the environment. In some cases although the active agents may be liquid or gaseous, they are classified as solid wastes because they are confined in solid containers. Typical examples are: solvents, paints and pesticides whose spent containers are frequently mixed with municipal wastes and become part of the urban waste stream. Certain hazardous wastes cause explosions in incinerators and fires at landfill sites. Others, such as pathological wastes from hospitals and radioactive wastes, require special handling at all time. Good management practice should ensure that hazardous wastes are stored, collected, transported and disposed off separately, preferably after suitable treatment to render them innocuous.

5.6.14 Power Supply Power for Patna Urban Area is supplied from the following power stations: • Paptratu • Khalgawar •

Table 35: Electrical Sub Stations S. Location Capacity S. Location Capacity

No. No. 1 33/11KVA 23 Subdiv. 33/11KVA 2 Kankerbagh 33/11KVA 24 (E.E.) Dak Bunglow Div. 33/11KVA 3 Rajendra Nagar 33/11KVA 25 Chowk Subdiv. 33/11KVA 4 5VA Banda Baghicha 33/11KVA 26 Katra Subdiv. 33/11KVA 5 Maurya Lok 4x5 MVA 27 Marufganj Subdiv. 33/11KVA 6 Kadam Kuna 2x5 MVA 28 (E.E.) Patna city 33/11KVA 7 Machua Toli 33/11KVA 29 Kankarbagh Subdiv. 33/11KVA 10 8 Karbigahiya 3x5 MVA 30 Karbigahia Subdiv 33/11KVA 8 9 Sechai Bhavan 33/11KVA 31 Bahadurpur Subdiv. 33/11KVA 10 Excise colour Velenary 33/11KVA 32 (E.E) Kankarbagh 33/11KVA 11 B.S.E.B. Colony 33/11KVA 33 Mina Bazar Subdiv. 33/11KVA 12 S.K.Puri sub Div. 33/11KVA 34 Karbigahia Subdiv 33/11KVA 13 Patliputra Sub Div. 33/11KVA 35 Bahadurpur Subdiv. 33/11KVA 14 Sadkat Ashram Sub Div. 33/11KVA 36 (E.E) Kankarbagh 33/11KVA 15 Patliputra subdiv. 33/11KVA 37 Mina Bazar Subdiv. 33/11KVA 16 Khagaul Sub. div. 33/11KVA 38 Gulzar bagh Subdivi. 33/11KVA 17 Danapur subdiv. 33/11KVA 39 Bankipurn Subdi. 33/11KVA 18 (E.E.)Danapur Div. 33/11KVA 40 University Subdiv. 33/11KVA 19 Garatanibagh Subdiv. 33/11KVA 41 (E.E.)Bankipur Div. 33/11KVA

CEPT UNIVERSITY I AHMEDABAD 108 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

S. Location Capacity S. Location Capacity

No. No. 20 Jak anpur Subdiv. 33/11KVA 42 Rajendra Nagar Subdiv. 33/11KVA 21 (E.E.) Gardanibagh Div. 33/11KVA 43 Machhuatali subdiv. 33/11KVA 22 Kadam Kunna Subdiv. 33/11KVA Source: PESU

5.7 Proposed Social Infrastructure & Amenities

Infrastructure is the basic physical and organizational structures needed for the operation of a society, or the services and facilities necessary for an economy to function. For the provisions of amenities, UDPFI guidelines are considered as the basis for estimation of gaps/additional requirements. For PMR, analysis of existing and required social amenities has been done at CD block level under following categories. • Education • Health • Water supply • Post offices • Banking facilities • Post and telecommunication • Roads and Railways

Demand assessment is an important step to be done at CD block level so that the further amenities can be distributed at village level. Availability and adequacy of amenities at village level have been reviewed through a spatial planning technique – scalogram analysis.

5.7.1 Scalogram Analysis

Scalogram is a technique to rank the village or settlements, based on the functional complexity of 10 9 facilities and services in a settlement ranked according to the number of people living in the settlement. The main assessment criteria for each of the villages are availability and adequacy of the facilities and services. Hence, a detailed scalogram been made for village level so that allocation of the infrastructure facilities at village level can be assessed and gaps are fulfilled. These parameters were judged based on statistics available from village directory 2001 due to unavailability of provisional/published figures for year 2011.

The allocation of infrastructure facilities at village level for Patna district in the Patna Planning Area (PPA) has been provided.

The Scalogram Analysis is used to indicate the hierarchy of settlements in the PPA. The functional Matrix /Scalogram show the major settlements, the populations and their corresponding

CEPT UNIVERSITY I AHMEDABAD 109 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

services/facilities existing in them. The facilities used in the scalogram analysis as can be seen in the matrix are under the following broad sectors: • Education • Health • Water supply • Banking • Post and telecommunication • Roads and railways

Steps followed: In our project area there are total 1155 villages out of which 1000 villages were studied and out of 1155 total 155 villages were un-inhabited. (Refer Annexure Anx 19 Table 19).

1. Facilities were given BINARY CODING: a. 1 = Presence of facility b. 0 = Absence of facility 2. Arranging population from higher to lower number 3. Arranging facilities from higher to lower order. For example frequency of some facilities i.e. hand pump, well and primary school is high, facilities such as colleges, hospitals etc have low frequency (present in few villages).

Ranking of settlements: Weightage = 100 / total number of primary school in project area. More the number of facilities less is the weightage is observed. For example there are total 853 primary school, having 0.12 weightage while there are 15 colleges having 6.67 weightage. Total weightage for all the facilities at village level is added to get the centrality index at village level. Settlements have been scaled in order of their functional influence or centrality using the following criteria. 1. 1st order 46-70

2. 2nd order 45-21 11 3. 3rd order below 20 0

From the scalogram analysis Naubatpur stands out 1st order settlement with total centrality index 53.73; this is because the village has 13 facilities out of 28 Sherpur village stands out 2nd order with total centrality score of 22.37; this is because the village has 9 facilities out of 28.

Implications for future development: The empty/blank or yellow cells on the scalogram/functional matrix implies that in the district’s future development, more facilities and services should be provided in villages which are least endowed to ensure a more balanced spatial development. This in future will influence the quality of

CEPT UNIVERSITY I AHMEDABAD 110 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

life/ potential for attracting people and economic activities in the PPA. Refer Annexure 18 for detailed Scalogram Analysis for the study area.

5.7.2 Educational facilities 5.7.2.1 Primary Schools Primary school is an institution in which children receive the first stage of compulsory education. Its availability and strength (in terms of number of children enrolled and dropouts) determines the literacy and economic structure of the society.

Adequacy of Primary Schools is assessed at CD Block level to understand the differential requirement for the projected population of 2011, 2021 and 2031, respectively. As per UDPFI guidelines, one primary school is required for every 2500 population.

Table 36: Primary Schools, Available and Required at CD Block Level CD Blocks Population Primary schools Surplus Available Required / (villages under PPA) 2001 2011 2021 2031 2001 2001 Deficit 2011 2021 2031 Bihta 165385 218192 239038 240450 77 66 11 21 8 1 Daniawan 67735 71484 61884 48201 28 27 1 1 0 0 Dhanarua 58600 76883 84090 81368 52 23 29 7 3 0 Dinapur-Cum-Khagaul 76154 102527 114206 116486 23 30 -7 11 5 1 Fatwah 137554 182850 201566 203807 67 55 12 18 7 1 Khusrupur 174390 206923 205335 188208 28 70 -42 13 0 0 Maner 138741 166089 166316 153867 36 55 -19 11 0 0 Masaurhi 9828 10306 8940 7072 57 4 53 0 0 0 Naubatpur 21156 24870 24448 22198 91 8 83 1 0 0 Patna Rural 116394 140789 142456 133176 6 47 -41 10 1 0 Phulwari 107602 130678 132740 124560 55 43 12 9 1 0 Punpun 13933 21569 27110 30760 74 6 68 3 2 1 11 Sampatchak 4853 7030 8389 9129 31 2 29 1 1 0 1 Total 625 437 107 28 4 Source: Village directory, 2001

The available data shows that until 2001, there were total of 625 primary schools available in PPA. The data surplus/ deficit shows the number of schools required in 2001 as against the presence of number of school in that particular CD Block according to the population. For example: In Patna Rural CD Block the required number of school in 2001 is 47 but the presence of school is 6 nos. Therefore, the number of school required based on projected population 2011 is 51 to fulfill deficit of 41 primary school as well as 10 addition school for population projected for 2011 decade in that CD Block. In addition, Dinapur-cum-Khagaul; the number of school is showing ‘0’ in the year 2011. This is because the population of CD Block is declining and there are already total 23 nos. of school. However, as against population it is enough to cater the population of 2011, 2021 and 2031.

CEPT UNIVERSITY I AHMEDABAD 111 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

The total numbers of primary schools required additionally (cumulative) will 107,28 and 4 in 2011 and 2021, respectively.

5.7.2.2 Middle schools As per UDPFI guidelines, one Middle School is required for every 7500 population.

Table 37: Middle schools, available and required at CD block level CD Blocks Population Middle schools Surplus Available Required / (villages under PPA) 2001 2011 2021 2031 2001 2001 Deficit 2011 2021 2031 Bihta 165385 218192 239038 240450 5 22 -17 7 3 0 Daniawan 67735 71484 61884 48201 2 9 -7 0 0 0 Dhanarua 58600 76883 84090 81368 1 8 -7 2 1 0 Dinapur-Cum-Khagaul 76154 102527 114206 116486 2 10 -8 4 2 0 Fatwah 137554 182850 201566 203807 9 18 -9 6 2 0 Khusrupur 174390 206923 205335 188208 2 23 -21 4 0 0 Maner 138741 166089 166316 153867 3 18 -15 4 0 0 Masaurhi 9828 10306 8940 7072 2 1 1 0 0 0 Naubatpur 21156 24870 24448 22198 2 3 -1 0 0 0 Patna Rural 116394 140789 142456 133176 0 16 -16 3 0 0 Phulwari 107602 130678 132740 124560 4 14 -10 3 0 0 Punpun 13933 21569 27110 30760 8 2 6 1 1 0 Sampatchak 4853 7030 8389 9129 1 1 0 0 0 0 Total 41 146 36 9 0 Source: Village directory, 2001

It can be observed from the table that till 2001, total numbers of middle schools available were only 41 while additional requirement is 146 making a deficit of schooling facility in CD blocks. Additionally (cumulative) it requires 36 and, 9 middle school facility in 2011, 2021 respectively middle schools will be required till 2031 keeping the projected figure into consideration. 11 2

5.7.2.3 Secondary schools Generally, secondary schools refer to grade of education from Standards XIth-XIIth. As per UDPFI guidelines, one Secondary School is required for every 7500 population.

Until 2001, PPA had 467 secondary schools. The total numbers of secondary schools required additionally are 146 making a deficit of schooling facility in CD blocks. Additionally (cumulative) it requires 36 and, 9 middle school facility in 2011, 2021 respectively middle schools will be required till 2031 keeping the projected figure into consideration. Here, the available number of school in PPA is 467 as against required 146.

CEPT UNIVERSITY I AHMEDABAD 112 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 38: Secondary schools, available and required at CD block level Secondary schools CD Blocks Population Surplus Available Required / (villages under PMR) 2001 2011 2021 2031 2001 2001 Deficit 2011 2021 2031 Bihta 165385 218192 239038 240450 52 22 30 7 3 0 Daniawan 67735 71484 61884 48201 17 9 8 0 0 0 Dhanarua 58600 76883 84090 81368 33 8 25 2 1 0 Dinapur-Cum-Khagaul 76154 102527 114206 116486 19 10 9 4 2 0 Fatwah 137554 182850 201566 203807 51 18 33 6 2 0 Khusrupur 174390 206923 205335 188208 24 23 1 4 0 0 Maner 138741 166089 166316 153867 33 18 15 4 0 0 Masaurhi 9828 10306 8940 7072 44 1 43 0 0 0 Naubatpur 21156 24870 24448 22198 72 3 69 0 0 0 Patna Rural 116394 140789 142456 133176 3 16 -13 3 0 0 Phulwari 107602 130678 132740 124560 35 14 21 3 0 0 Punpun 13933 21569 27110 30760 57 2 55 1 1 0 Sampatchak 4853 7030 8389 9129 27 1 26 0 0 0 Total 467 146 36 9 0 Source: Village directory, 2001

5.7.2.4 Colleges The term "college" is commonly reserved for institutions that offer degrees. According to UDPFI guidelines, one college is required for every 1,25,000 population.

11 3

CEPT UNIVERSITY I AHMEDABAD 113 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 39: Colleges, available and required at CD block level College CD Blocks Population Surplus Available Required / (villages under PMR) 2001 2011 2021 2031 2001 2001 Deficit 2011 2021 2031 Bihta 165385 218192 239038 240450 1 1 0 0.4 0.2 0.0 Daniawan 67735 71484 61884 48201 0 1 -1 0.0 -0.1 -0.1 Dhanarua 58600 76883 84090 81368 3 0 3 0.1 0.1 0.0 Dinapur-Cum-Khagaul 76154 102527 114206 116486 0 1 -1 0.2 0.1 0.0 Fatwah 137554 182850 201566 203807 1 1 0 0.4 0.1 0.0 Khusrupur 174390 206923 205335 188208 0 1 -1 0.3 0.0 -0.1 Maner 138741 166089 166316 153867 0 1 -1 0.2 0.0 -0.1 Masaurhi 9828 10306 8940 7072 1 0 1 0.0 0.0 0.0 Naubatpur 21156 24870 24448 22198 3 0 3 0.0 0.0 0.0 Patna Rural 116394 140789 142456 133176 0 1 -1 0.2 0.0 -0.1 Phulwari 107602 130678 132740 124560 1 1 0 0.2 0.0 -0.1 Punpun 13933 21569 27110 30760 1 0 1 0.1 0.0 0.0 Sampatchak 4853 7030 8389 9129 0 0 0 0.0 0.0 0.0 Total 11 9 2 0 0 Source: Village directory, 2001

5.7.3 Health facilities This section focuses on the adequacy of educational facilities (PHSC, PHC, and Hospital) at CD Block level in the PPA, based on UDPFI guidelines for the projected population in the region.

5.7.3.1 Primary Health centers According to UDPFI guidelines, one Primary Health Centres is to be provided for a population range of 30000.

11 4

CEPT UNIVERSITY I AHMEDABAD 114 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 40: Primary Health Centres, available and required at CD block level

CD Blocks Population Primary Health Centres Surplus Available Required / (villages under PMR) 2001 2011 2021 2031 2001 2001 Deficit 2011 2021 2031 Bihta 165385 218192 239038 240450 2 6 -4 2 1 0 Daniawan 67735 71484 61884 48201 1 2 -1 0 0 0 Dhanarua 58600 76883 84090 81368 1 2 -1 1 0 0 Dinapur-Cum-Khagaul 76154 102527 114206 116486 1 3 -2 1 0 0 Fatwah 137554 182850 201566 203807 1 5 -4 2 1 0 Khusrupur 174390 206923 205335 188208 0 6 -6 1 0 0 Maner 138741 166089 166316 153867 1 5 -4 1 0 0 Masaurhi 9828 10306 8940 7072 1 0 1 0 0 0 Naubatpur 21156 24870 24448 22198 9 1 8 0 0 0 Patna Rural 116394 140789 142456 133176 2 4 -2 1 0 0 Phulwari 107602 130678 132740 124560 1 4 -3 1 0 0 Punpun 13933 21569 27110 30760 3 0 3 0 0 0 Sampatchak 4853 7030 8389 9129 1 0 1 0 0 0 Total 24 36 9 2 0 Source: Village directory, 2001

During 2001, there were a total of 24 Primary Health centers in PPA. There is a requirement of a total number of 9 and 2 Primary Health Sub-centers in 2011 and 2021 respectively.

5.7.3.2 Primary Health Sub-Centres According to UDPFI guidelines, one Primary Health Sub-centre is to be provided for a population range of 30000. During 2001, there were 1129 Primary Health sub-centers in PPA. There is a requirement of additional 36 fulfill deficit of Primary Health sub-centers in CD blocks and the total number of 9 and 2 Primary Health Sub-centers in 2011 and 2021 respectively. 11 5

CEPT UNIVERSITY I AHMEDABAD 115 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 41: Primary Health Sub-Centres, available and required at CD block level CD Blocks Population Primary Health Sub Centres Surplus Available Required / (villages under PMR) 2001 2011 2021 2031 2001 2001 Deficit 2011 2021 2031 Bihta 165385 218192 239038 240450 127 6 121 2 1 0 Daniawan 67735 71484 61884 48201 43 2 41 0 0 0 Dhanarua 58600 76883 84090 81368 85 2 83 1 0 0 Dinapur-Cum-Khagaul 76154 102527 114206 116486 36 3 33 1 0 0 Fatwah 137554 182850 201566 203807 132 5 127 2 1 0 Khusrupur 174390 206923 205335 188208 52 6 46 1 0 0 Maner 138741 166089 166316 153867 72 5 67 1 0 0 Masaurhi 9828 10306 8940 7072 108 0 108 0 0 0 Naubatpur 21156 24870 24448 22198 155 1 154 0 0 0 Patna Rural 116394 140789 142456 133176 11 4 7 1 0 0 Phulwari 107602 130678 132740 124560 101 4 97 1 0 0 Punpun 13933 21569 27110 30760 142 0 142 0 0 0 Sampatchak 4853 7030 8389 9129 65 0 65 0 0 0 Total 1129 36 9 2 0 Source: Village directory, 2001

5.7.3.3 Hospitals According to UDPFI guidelines, one hospital is required to be provided for 125,000 populations. Table 42: Hospitals, available and required at CD block level Hospitals CD Blocks Population Surplus Available Required / (villages under PMR) 2001 2011 2021 2031 2001 2001 Deficit 2011 2021 2031 Bihta 165385 218192 239038 240450 120 1 119 0.42 0.17 0.01 Daniawan 67735 71484 61884 48201 46 1 45 0.03 -0.08 -0.11 Dhanarua 58600 76883 84090 81368 89 0 89 0.15 0.06 -0.02 11 Dinapur-Cum-Khagaul 76154 102527 114206 116486 35 1 34 0.21 0.09 0.02 6 Fatwah 137554 182850 201566 203807 107 1 106 0.36 0.15 0.02 Khusrupur 174390 206923 205335 188208 46 1 45 0.26 -0.01 -0.14 Maner 138741 166089 166316 153867 55 1 54 0.22 0.00 -0.10 Masaurhi 9828 10306 8940 7072 101 0 101 0.00 -0.01 -0.01 Naubatpur 21156 24870 24448 22198 152 0 152 0.03 0.00 -0.02 Patna Rural 116394 140789 142456 133176 9 1 8 0.20 0.01 -0.07 Phulwari 107602 130678 132740 124560 90 1 89 0.18 0.02 -0.07 Punpun 13933 21569 27110 30760 128 0 128 0.06 0.04 0.03 Sampatchak 4853 7030 8389 9129 47 0 47 0.02 0.01 0.01 Total 1025 9 2 0 0 Source: Village directory, 2001

CEPT UNIVERSITY I AHMEDABAD 116 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Until 2001, there is 1025 hospital facility available at CD block level. Hence, keeping the growing population into consideration, a total of 02 2 required in order to serve the population projected for 2031. 5.7.4 Communication facilities

Amongst various means of communication, post office is an importance means, which is still prevalent and reaches interiors.

5.7.4.1 Post offices According to UDPFI guidelines, one post office is required for 5000 population.

Table 43: Post Offices, available and required at CD block level CD Blocks Population Post Offices Surplus Available Required / (villages under PMR) 2001 2011 2021 2031 2001 2001 Deficit 2011 2021 2031 Bihta 165385 218192 239038 240450 111 33 78 11 4 0 Daniawan 67735 71484 61884 48201 41 14 27 1 0 0 Dhanarua 58600 76883 84090 81368 85 12 73 4 1 0 Dinapur-Cum-Khagaul 76154 102527 114206 116486 35 15 20 5 2 0 Fatwah 137554 182850 201566 203807 98 28 70 9 4 0 Khusrupur 174390 206923 205335 188208 41 35 6 7 0 0 Maner 138741 166089 166316 153867 47 28 19 5 0 0 Masaurhi 9828 10306 8940 7072 98 2 96 0 0 0 Naubatpur 21156 24870 24448 22198 9 4 5 1 0 0 Patna Rural 116394 140789 142456 133176 152 23 129 5 0 0 Phulwari 107602 130678 132740 124560 77 22 55 5 0 0 Punpun 13933 21569 27110 30760 113 3 110 2 1 1 Sampatchak 4853 7030 8389 9129 47 1 46 0 0 0 Total 954 218 54 13 1 11 Source: Village directory, 2001 7

There were 954 post offices, which were serving the region until 2001. In order to serve the population till 2031, total numbers of post offices need to be increased will be 54, 13 and 01 for 2011, 2021 and 2031 respectively.

CEPT UNIVERSITY I AHMEDABAD 117 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

5.7.5 Financial services 5.7.5.1 Commercial banks According to UDPFI guidelines, one commercial bank is to be provided for 25,000 populations.The total numbers of commercial banks available, till 2001, were 1140 where as additionally required commercial banks are 11 and 02 in the year 2021 and 2031.

Table 44: Commercial Banks, available and required at CD block level CD Blocks Population Commercial Banks Surplus Available Required / (villages under PMR) 2001 2011 2021 2031 2001 2001 Deficit 2011 2021 2031 Bihta 165385 218192 239038 240450 139 7 132 2 1 0 Daniawan 67735 71484 61884 48201 45 3 42 0 0 0 Dhanarua 58600 76883 84090 81368 98 2 96 1 0 0 Dinapur-Cum-Khagaul 76154 102527 114206 116486 41 3 38 1 0 0 Fatwah 137554 182850 201566 203807 119 6 113 2 1 0 Khusrupur 174390 206923 205335 188208 50 7 43 1 0 0 Maner 138741 166089 166316 153867 62 6 56 1 0 0 Masaurhi 9828 10306 8940 7072 109 0 109 0 0 0 Naubatpur 21156 24870 24448 22198 176 1 175 0 0 0 Patna Rural 116394 140789 142456 133176 12 5 7 1 0 0 Phulwari 107602 130678 132740 124560 97 4 93 1 0 0 Punpun 13933 21569 27110 30760 134 1 133 0 0 0 Sampatchak 4853 7030 8389 9129 58 0 58 0 0 0 Total 1140 44 11 2 0 Source: Village directory, 2001

5.7.5.2 Agricultural credit societies Financial services are of great importance as the region has a strong agricultural base. According to UDPFI guidelines, one commercial bank is to be provided for 5,000 populations. Total number of agricultural societies required for 218 to fulfil current deficit of facility. There are 54, 14 and 2 11 8 additional facility required in the 2011, 2021 and 2031 respectively.

CEPT UNIVERSITY I AHMEDABAD 118 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 45: Agricultural Credit Societies, available and required at CD block level CD Blocks

(villages under PMR) Population Agricultural Credit Societies Required 2001 2011 2021 2031 Available 2001 2001 2011 2021 2031 Bihta 165385 218192 239038 240450 4 33 11 4 0 Danapur-cum-khagaul 67735 71484 61884 48201 4 14 1 0 0 Daniawan 58600 76883 84090 81368 5 12 4 1 0 Dhanarua 76154 102527 114206 116486 5 15 5 2 0 Fatwah 137554 182850 201566 203807 4 28 9 4 0 Khusrupur 174390 206923 205335 188208 1 35 7 0 0 Maner 138741 166089 166316 153867 7 28 5 0 0 Masaurhi 9828 10306 8940 7072 4 2 0 0 0 Naubatpur 21156 24870 24448 22198 2 4 1 0 0 Patna rural 116394 140789 142456 133176 1 23 5 0 0 Phulwari 107602 130678 132740 124560 18 22 5 0 0 Punpun 13933 21569 27110 30760 4 3 2 1 1 Sampatchak 4853 7030 8389 9129 7 1 0 0 0 Total 66 218 54 14 2 Source: Village directory, 2001

5.8 Social Infrastructure: The required amenities are compensated at respective planning units such as community level, neighborhood level, Sector level, node level, zone level, and Central Business District level. Basic level (lower order) facilities are provided at community level whereas subsequent higher order amenities are provided at respective order of planning units.

Table 46: Provision of social infrastructure – UDPFI Guidelines Amenity Population No. of facilities CBD 10 lakhs - 12 Lakhs 4 11 9 Zone level 4 lakhs - 5 Lakhs 11 Node level 1 lakhs – 1.5 lakhs 39 Sector level 40,000 - 50,000 108 Neighborhood 10,000 – 12,000 443 Community Level 5,000 - 6,000 887

CEPT UNIVERSITY I AHMEDABAD 119 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

5.8.1 Community Level Facilities The community level facilities are provided as per the UDPFI Guidelines are as follows, One Nursery School and Primary School of 10,000 Sq.m (1 Hectare) area with the overall requirement of 886.8 Hectares. One community hall of 660 Sq.m of area have to be provided at community level with the overall requirement of 58.53 Hectares. There are few other facilities have to be provided, such as Milk Booth, ATM, Facility Shop, Convenience Shopping, and Open Spaces.

The total land area provided at community level node is 1797 Hectare, which includes Amenities of 945.3 Hectares, Commercial of 120.2 Hectares and Open spaces of 731.6 Hectares. Both Public and Private Provision share community Level Facilities with Public provision of 403.36 Hectares and Private provision of 1389.74 Hectares.

Table 47: Provision of social infrastructure – Housing cluster (UDPFI Guidelines) Land Area Gross Public Private Population Nature of Utility / Total Land Land Provision Provision Threshold and Social facility Facility Required Required (Ha) (Ha) (sq.m) (Sq.M) (in Ha.) No. of Facilities – 887 Community Nursery School + 10000 8867506.93 886.8 177.35 709.40 5000 - Primary School 6000 Community Hall 660 585255.46 58.5 58.53 Milk Booth 25 22168.77 2.2 1.66 0.55 ATM 10 8867.51 0.9 0.89 Facilities shop 440 390170.31 39.0 39.02 (280 sq.m/3500 pop) Convenience 880 780340.61 78.0 19.51 54.62 shopping ( 160 sq.m/1000 ) Open Spaces ( @ 8250 7315693.22 731.6 146.31 585.26 1.5 sq.m / capita ) 12 0 Sub Total 10,660 9452762.39 945.3 257.05 804.48 (Amenities) Sub Total 1,355 1201547.19 120.2 (Commercial) Sub Total (Open 8,250 7315693.22 731.6 146.31 585.26 Space) Total @ 20265 17970002.80 1797.0 403.36 1389.74 community Level

CEPT UNIVERSITY I AHMEDABAD 120 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

5.8.2 Neighborhood Level Facilities The Neighborhood level facilities are provided as per the UDPFI Guidelines are as follows, One senior secondary school of 16,000 Sq.m (1.6 Hectares) area with the overall requirement of 709.4 Hectares. One community hall with Library and Gymnasium of 4000 Sq.m of area have to be provided at Neighborhood level with the overall requirement of 177.4 Hectares. There are few other facilities have to be provided, such as religious buildings, Retail, Commercial, Electric Sub stations dispensary, Bank with ATMs and Open Spaces.

The total land area provided at Neighborhood level node is 1886.6 hectare, which includes Amenities of 964.3 Hectares, Commercial of 190.7 Hectares and Open spaces of 731.6 Hectares. Both Public and Private Provision share Neighborhood Level Facilities with Public provision of 924.44 Hectares and Private provision of 962.12 hectares. Table 48: Provision of social infrastructure – Neighborhood level (UDPFI Guidelines) Land Area Gross Public Private Population Nature of Utility / Total Land Land Provision Provision Threshold and Social facility Facility Required Required (Ha) (Ha) (sq.m) (Sq.M) (in Ha.) No. of Facilities - 443 Neighbour Sr. Secondary 16000 7094005.5 709.4 354.70 354.70 hood School 5 Community Hall, 4000 1773501.3 177.4 88.68 88.68 10000- Library and 9 12000 Gymnasium Religious building 200 88675.07 8.9 8.87 Retail Commercial ( 3300 1463138.6 146.3 73.16 73.16 300sq.m/1000) 4 Electric Sub-Station 350 155181.37 15.5 15.52 (415V) Dispensary 1200 532050.42 53.2 26.60 26.60 Bank with ATM ( 1000 443375.35 44.3 44.34 12 1 2nos.) Open Spaces ( @ 16500 7315693.2 731.6 365.78 365.78 1.5 sq.m / capita ) 2 Sub Total 21,750 9643413.7 964.3 558.65 596.34 (Amenities) 9 Sub Total 4,300 1906513.9 190.7 (Commercial) 9 Sub Total (Open 16,500 7315693.2 731.6 365.78 365.78 Space) 2 Total @ 42,550 18865621. 1886.6 924.44 962.12 Neighbourhood 00 Level

CEPT UNIVERSITY I AHMEDABAD 121 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

5.8.3 Sector Level Facilities The Sector level facilities are provided as per the UDPFI Guidelines are as follows, One Health Centre of 3000 Sq.m (0.3 Hectares) area with the overall requirement of 32.5 Hectares. There are few other facilities have to be provided, such as Sub-Post office, School for Handicapped, Police Post, religious buildings, Communication Centre, Retail, Commercial and Open Spaces.

The total land area provided at Sector level node is 861.6 hectare, which includes Amenities of 113.8 Hectares, Commercial of 260.1 Hectares and Open spaces of 487.7 Hectares. Both Public and Private Provision share Sector Level Facilities with Public provision of 459.26 Hectares and Private provision of 402.36 hectares. Table 49: Provision of social infrastructure – Sector level (UDPFI Guidelines) Population Nature of Utility Land Area Total Land Gross Public Private Threshold and Social facility / Required Land Provision Provision Facility (Sq.M) Required (Ha) (Ha) (sq.m) (in Ha.) No. of Facilities - 108 SECTOR Sub Post-Office 150 16257.10 1.6 1.63 40000- School for 5000 541903.20 54.2 54.19 50000 Handicapped Health Centre 3000 325141.92 32.5 16.26 16.26 (Nursery, Child Welfare, Maternity Centre) Police Post 1600 173409.02 17.3 17.34 Religious building 750 81285.48 8.1 4.06 4.06 Communication 1500 162570.96 16.3 16.26 Centre ( with STD, ISD, Data transmission, ISDN ) 12 Retail Commercial ( 22500 2438564.4 243.9 121.93 121.93 2 500sq.m/1000) 1 Open Spaces ( @ 1 45000 4877128.8 487.7 243.86 243.86 sq.m / capita ) 1 Sub Total 10500 1137996.7 113.8 215.41 158.51 (Amenities) 2 Sub Total 24000 2601135.3 260.1 (Commercial) 7 Sub Total (Open 45000 4877128.8 487.7 243.86 243.86 Space) 13 Total @ Sector 79500 8616260.9 861.6 459.26 402.36 Level 0

CEPT UNIVERSITY I AHMEDABAD 122 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

5.8.4 Node Level Facilities The Node level facilities are provided as per the UDPFI Guidelines are as follows, One Electric Sub Station of 3500 Sq.m (0.35 Hectares) area with the overall requirement of 13.7 Hectares. There are few other facilities have to be provided, such as Integrated school without hostels, LPG Godown, Petrol Pump, Bus Terminal, College, Community Centre with PHC, Library and Hall, Polyclinic, Intermediate Hospital, Meditation and Spiritual Centre, Music, Dance and Drama Centre, Recreational Club, Police Station, Post and Telegraph, Overhead Reservoirs, Cineplex, Retail, Commercial and Open Spaces.

The total land area provided at Node level is 1038.2 hectare, which includes Amenities of 560.3 Hectares, Commercial of 302.4 Hectares and Open spaces of 175.6 Hectares. Both Public and Private Provision share Node Level Facilities with Public provision of 467.23 Hectares and Private provision of 333.01 hectares.

Table 50: Provision of social infrastructure – Node level (UDPFI Guidelines) Population Land Nature of Utility Public Private Threshold Area / Total Land Gross Land and Social Provision Provision Facility Required Required (in facility (Ha) (Ha) (sq.m) (Sq.M) Ha.) No. of Facilities - 39 NODE Electric Sub- 3500 136559.61 13.7 13.66 100000- Station (11KV) 150000 Integrated 35000 1365596.07 136.6 68.28 68.28 school without hostel LPG Godown 600 23410.22 2.3 2.34 Petrol Pump 2000 78034.06 7.8 7.80 Bus Terminal 2500 97542.58 9.8 9.75 College 40000 1560681.22 156.1 156.07 Community 2500 97542.58 9.8 4.88 4.88 12 Centre ( with 3 PHC, Library, Hall ) Polyclinic ( 20 3000 117051.09 11.7 5.85 5.85 beded ) Intermediate 10000 390170.31 39.0 19.51 19.51 Hospital (Category-B : 100 beds) Meditation and 5000 195085.15 19.5 19.51 Spiritual centre Music, Dance 1000 39017.03 3.9 3.90

CEPT UNIVERSITY I AHMEDABAD 123 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

and Drama Centre Recreational 10000 390170.31 39.0 39.02 Club Police Station 15000 585255.46 58.5 58.53 Post and 3500 136559.61 13.7 13.66 Telegraph Over head 10000 390170.31 39.0 39.02 reservoirs Cineplex 15000 585255.4576 58.52554576 58.53 Retail 62500 2438564.41 243.9 121.93 121.93 Commercial ( 500sq.m/1000) Open Spaces ( @ 45000 1755766.37 175.6 43.89 131.68 1 sq.m / capita ) Sub Total 143600 5602845.58 560.3 423.33 201.33 (Amenities) Sub Total 77500 3023819.86 302.4 (Commercial) Sub Total (Open 45000 1755766.373 175.6 43.89 131.68 Space) Total @ Node 266100 10382431.82 1038.2 467.23 333.01 Level

5.8.5 Zone Level Facilities

The Zone level facilities are provided as per the UDPFI Guidelines are as follows, One Electric Sub Station with captive power of 8000 Sq.m (0.8 Hectares) area with the overall requirement of 8.67 Hectares. One fire station of 16000 Sq.m of area have to be provided at zone level with the overall requirement of 17.34 Hectares. There are few other facilities have to be provided, such as 12 4 Intermediate Hospital, Bus Terminal, Electric receiving Substation, Hotel with convention facilities, Water treatment plant, Electric substation, Telephone exchange, Retail, Commercial, Super market and Open Spaces.

The total land area provided at zone level is 1088.1 hectare, which includes Amenities of 121.4 Hectares, Commercial of 479 Hectares and Open spaces of 487.71 Hectares. Both Public and Private Provision share zone Level Facilities with Public provision of 802.02 Hectares and Private provision of 286.12 hectares.

CEPT UNIVERSITY I AHMEDABAD 124 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 51: Provision of social infrastructure – Zone level (UDPFI Guidelines)

Populati Land Area Gross Public Private on Nature of Utility and / Total Land Land Provision Provision Threshol Social facility Facility Required Required (Ha) (Ha) d (sq.m) (Sq.M) (in Ha.) No. of Facilities - 11 ZONE 33 KV Electric sub- 8000 86705 8.7 8.67 400000- station + Captive 500000 Power Fire Station 16000 173409 17.3 17.34 Intermediate Hospital 37000 401008 40.1 40.10 (Category-A : 200 beds) Bus Terminal 15000 162571 16.3 16.26 Electric receiving sub- 20000 216761 21.7 21.68 station ( 220 / 660 KV ) Hotel with 40000 433523 43.4 43.35 Convention Facilities Water treatment 10000 108381 10.8 10.84 plant Electric Sub-Station 3500 37933 3.8 3.79 (11KV) Telephone Exchange 2500 27095 2.7 2.71 Retail Commercial 396000 4291873 429.2 214.59 214.59 (880sq.m/1000) Super Market 6000 65028 6.5 6.50 Open Space ( @ 1 450000 4877129 487.7 487.71

Sqm / capita ) 12 Sub Total (Amenities) 112000 1213863 121.4 314.30 286.12 5 Sub Total 442000 4790424 479.0 (Commercial) Sub Total (Open 450000 4877129 487.7 487.71 0.00 Space) Total @ Zone Level 1004000 10881416 1088.1 802.02 286.12

CEPT UNIVERSITY I AHMEDABAD 125 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

5.8.6 CBD Level Facilities

The CBD level facilities are provided as per the UDPFI Guidelines are as follows, One Museum with Art Gallery of 5000 Sq.m (0.5 Hectares) area with the overall requirement of 2 Hectares. One Hotel with Convention facilities of 40,000 Sq.m of area have to be provided at CBD level with the overall requirement of 15.6 Hectares. There are few other facilities for amenities have to be provided, such as for Institutional like Polytechnic College, Engineering College, Medical College, University Campus area, Socio-Cultural Centre, Library and International School with Hostel.

There are few other facilities for common amenities have to be provided, such as Regional Hospital , Health Resort , Hotel with convention facilities, Transport Nagar, Telephone exchange, Police Station with accommodation, Head Post Office, Bus Terminal with Depot, Electric receiving Substation, Fire Station, Central Sewage treatment Plant with zonal treatment plant, Crematorium & Burial Ground and Water reservoirs and distribution systems. There are few other facilities also to be provided, Such as Communication centre (with STD, IDD, Data Transmission, ISDN), Retail, Commercial, Zonal Shopping centre and Open Spaces.

The total land area provided at CBD level is 1960.6 hectare, which includes Amenities of 1024.19 Hectares, Commercial of 448.7 Hectares and Open spaces of 487.7 Hectares. Both Public and Private Provision share zone Level Facilities with Public provision of 1600.58 Hectares and Private provision of 360.03 Hectares.

12 6

CEPT UNIVERSITY I AHMEDABAD 126 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Table 52: Provision of social infrastructure – CBD level (UDPFI Guidelines) Populatio Land Area Gross Public Private n Nature of Utility / Total Land Land Provision Provision Threshold and Social facility Facility Required Required (Ha) (Ha) (sq.m) (Sq.M) (in Ha.) No. of Facilities - 4 CBD Museum & Art 5000 19508.52 2.0 0.49 1.46 1200000 - Gallery 1500000 Hotel with 40000 156068.12 15.6 15.61 Convention facilities Regional Hospital 60000 234102.18 23.4 23.41 Polytechnic College 40000 156068.12 15.6 15.61 Engineering 600000 2341021.83 234.1 234.10 College Medical College 150000 585255.46 58.5 58.53 University Campus 600000 2341021.83 234.1 234.10 Area Health Resort 30000 117051.09 11.7 11.71 Socio-Cultural 150000 585255.46 58.5 58.53 Centre Library 5000 19508.52 2.0 1.95 International 40000 156068.12 15.6 6.24 9.36 school with hostel Transport Nagar 50000 195085.15 19.5 19.51 Telephone 10000 39017.03 3.9 3.90 Exchange Police Station with 10000 39017.03 3.9 3.90 accommodation Head Post Office 10000 39017.03 3.9 3.90 12 7 Bus Terminal with 30000 117051.09 11.7 11.71 Depot Electric Receiving 50000 195085.15 19.5 19.51 Substation (220/660KV) Fire Station 10000 39017.03 3.9 3.90 Central Sewage 700000 2731192.14 273.1 273.12 treatment plant + zonal treatment plants Crematorium & 45000 175576.64 17.6 17.56 Burial Ground

CEPT UNIVERSITY I AHMEDABAD 127 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Water reservoirs 30000 117051.09 11.7 11.71 and distribution systems Communication 10000 39017.03 3.9 3.90 centre(with STD, IDD, Data Transmission, ISDN) Retail Commercial / 1100000 4291873.36 429.2 107.30 321.89 Zonal Shopping centre (880sq,m/1000) Open Space (@ 1250000 4877128.81 487.7 487.71 1sqm/ cap) (Golf course, Exhibition, Trade fairs) Sub Total 2625000 10241970.5 1024.1970 1112.86 360.03 (Amenities) 1 51 Sub Total 1150000 4486958.50 448.7 (Commercial) 8 Sub Total (Open 1250000 4877128.81 487.7 487.71 0.00 Space) 3 5025000 19606057.8 1960.6 1600.58 360.03 Total @ CBD Level 3

12 8

CEPT UNIVERSITY I AHMEDABAD 128 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

6 CHAPTER: IMPLEMENTATION MECHANISM OF TOWN PLANNING/ AREA PLANNING SCHEME

12 9

Chapter Contents • Legislative Framework • Implementation Mechanism of Area Planning Scheme

CEPT UNIVERSITY I AHMEDABAD 129 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

6.1 Legislative Framework To make provision for promotion of planned growth and development of urban areas and such rural areas having potential of urbanization and regulation there of including land use in these areas of State of Bihar, Bihar Urban Regional Planning & Development Act 2012 is enacted in 2012. Following are the important provision provided in the Act, to initiate the planning process.

6.1.1 Formation of Urban Planning & Development Board Formation of Urban Planning & Development Board after the commencement of this Act Section(3), the Government shall, by notification in the official gazette, constitute and appoint the Bihar Urban Planning and Development Board for carrying out the functions assigned to it under this Act. Functions and Powers of the Board are as follows • Board shall be to advise the Government in matters relating to planning and development and use of rural and urban land in the State,

• To guide, direct and assist the Metropolitan Planning Committee or any other Planning Authority/(ies) constituted under the Act and to perform such other functions as the Government may, from time to time assign to the Board.

• Advise on the delineation of the Planning Area(s) for purposes of planned development and direct the preparation of Development Plan by the Planning Authorities

• Direct the preparation of one or more Development Plan(s) by the Planning Authorities or Metropolitan Planning Committees undertake, assist and advise on the coordination of planning and implementation of physical development programmes

• Direct the preparations of one or more regional development plan, regional transportation plans, town development plans.

• Direct the preparations of one or more regional natural resources and environmental conservation Plans.

• Perform any other functions which is incidental, supplemental or consequential to any of the 13 functions aforesaid or which may be prescribed. 0

The Bihar Urban Planning & Development Board constituted in 2014. 6.1.2 Declaration of Planning Area/s The Government may, for the purpose of securing planned development of regions or areas within the State, on advice of the Board, declare by notification, and in such other manner as may be prescribed, any such region or area or regions or areas, including a or area for development of new towns in the State to be a Planning Area under the section nine (9) of the Act.

6.1.3 Constitution of Planning Authority Any time after the declaration of a Planning Area under Section-9, the Government shall, by notification, constitute an authority for such area to be called the Planning Authority of that

CEPT UNIVERSITY I AHMEDABAD 130 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Planning Area and it shall be known by such name as the Government may determine under section Elevan(11) of the Act. Functions and Powers of the Planning Authorities • Subject to the provisions of this Act, a Planning Authority shall carry out such functions and exercise such powers as may be prescribed by the Rules.

• For the performance of its functions mentioned in sub-section (1), a PlanningAuthority may carry out or cause to be carried out surveys of its Planning Area and to prepare report or reports of such surveys, and to perform any other function which is supplemental, incidental, or consequential to any of the functions which may be prescribed.

• A Planning Authority may, with the previous sanction of the Government, associate with itself such persons whose assistance or advice it may desire for the purpose of performing any of its functions under this Act and such persons may be paid by the Planning Authority such remuneration or fees as may be sanctioned by the Government.

• The person so assisting or advising the Planning Authority may take part in the meetings of the authority relevant to the purpose for which he is associated or consulted but shall not have the right to vote at a meeting or take part in the meeting of the authority relating to matters concerned with any other purpose.

• The Planning Authority may consult the offices of Revenue Department for performance of its functioning.

6.1.4 Preparation of Land Use Map Under section Eighteen (18) of the Act, Every Planning Authority, after its formation, shall in consultation with the offices of the Revenue Department within two (2) years or such reasonable time as Government may by an order determine, prepare a present Land Use Map and a Land Use Register in the form to be prescribed, indicating the present use of every piece of land in the Planning Area. 13 1 6.1.5 Preparation of the Development Plan Under section Twenty One (21) of the Act, As soon as may be, after the declaration of a Planning Area, the Planning Authority shall, but not later than two years after such declaration or within such time as the Government may from time to time determine, prepare and submit to the Government through Board a plan (hereinafter called “Development Plan”) for the Planning Area or any of its parts with a time frame of twenty years or such extended period as may be specified by the Government.

6.1.6 Area Development Scheme Under section Forty-Six (46) of this Act, or any other law for the time being in force, the Planning Authority may, not later than six months after the Development Plan/s has been approved by the Government, invite Area Development Scheme(s) the purpose of implementing the proposals

CEPT UNIVERSITY I AHMEDABAD 131 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

contained in the Development Plan from eligible developers for the area or areas within its jurisdiction or any part thereof.

6.2 Implementation Mechanism of Area Planning Scheme Below is the illustration to prepare the Area Development Schemes for the purpose of implementing the proposals contained in the Development Plan.

Illustration Site (case study site) is the TPS No. 90 Vinzol, Ahmedabad. The planning process in Gujarat follows the Development Plan – Town Planning Scheme mechanism, as mentioned in the Gujarat Town Planning and Urban Development Act (GTPUDA), 1976. In the GTPUDA, 1976, Town Planning Schemes are known as the ‘Land Pooling Schemes’.

6.2.1 Development Plan (DP) The DP is a macro strategic plan document that defines the direction of growth and envisions the citywide infrastructure for the entire development area. The Development Plan includes the following: • Land development—land use zoning, areas to be opened up for new growth, development control regulations (which determine the built form), and allocation for public uses

• Road network and transportation

• Water supply

• Sewerage

• Storm water drainage

• Open spaces, green areas

• Environment and pollution control 13 • Reclamation of areas 2

• Any other

The DP is revised every 10 years and is updated in the interim whenever a need arises to respond to the changing context. The State Government may suggest modifications, keeping the overall public good in view if required, before approving the DP.

6.2.2 Town Planning Schemes (TPS) The DP is a broad-brush development vision for the city—a dynamic document which then is detailed gradually. Most importantly, the new areas for growth to be opened up for development are clearly marked and divided into smaller areas of about 100 to 200 hectares. Each such area is

CEPT UNIVERSITY I AHMEDABAD 132 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

called a TPS. The TPS are micro plans prepared for about 100 to 200 hectares typically involving 100 to 250 landowners. The TPS are numbered starting from one, two, three, etc., and are usually named after the “village” they fall in. A complex system is used to simultaneously reorganize land parcels or plots, provide access to each land parcel or plot, set aside land for public uses by taking a portion from each landholding, and appropriate increments in land values for infrastructure development. Detailed infrastructure is designed and cost estimates are prepared. The process involves intensive public participation and consultation at several stages.

6.2.3 Implementation history in Ahmedabad Most of Ahmedabad has been developed using the TPS mechanism. The process began as early as 1915. TPSs were prepared continuously under the various planning acts. Figure 10.1 shows the total number of TPSs built over a period of time under different legislation. There is a long history of implementation of the TPSs, which has made the process acceptable to the people. There have been continuous improvements in the content of the proposals over the years.

13 3

CEPT UNIVERSITY I AHMEDABAD 133 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Figure 4: Town planning schemes in Ahmedabad over years

13 4

CEPT UNIVERSITY I AHMEDABAD 134 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

6.2.4 TPS preparation in Vinzol (TPS no. 90 Vinzol 2), Ahmedabad: Introduction to the case study area:

The TPS No. 90 Vinzol 2 is taken as a case study to explain the process. The TPS area is located in the southern portion of the city of Ahmedabad very close to the junction of Ahmedabad Mehmedabad Highway and the 60-meter-wide Sardar Patel Ring Road. This is one of the most rapidly developing corridors and is predominantly an industrial area. It falls in the village of Vinzol (see figure 10.2). The TPS falls within the jurisdiction of Ahmedabad Municipal Corporation. River Khari abuts the entire northern portion and passes through the TPS. To the west is the Mumbai Ahmedabad Railway line. To the east is the TPS No. 91Vinzol 3. To the south are TPS Nos. 71 Vinzol Hathijan and 72 Vinzol 1. Most the area is vacant and includes the village settlement of Vinzol. The total area of the TPS is approximately 82 hectares and it has 80 land parcels. The case study is interesting because in this TPS, there is a village settlement that needed to be integrated, a large water body that needed to be responded to, and a non-perennial river that passes through the area.

Figure 5: Location Map of TPS 90 Vinzol 2

13 5

CEPT UNIVERSITY I AHMEDABAD 135 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

6.2.5 The TPS preparation process The process for preparing a TPS is prescribed in GTPUDA, 1976, and its Rules. It is quite a complex and long process involving over 50 steps that can take a maximum of four years and one month as provided by the act, but in practice takes much longer. Each stage of the TPS mechanism is illustrated by relevant drawings and documents.

6.2.5.1 Survey of the area A very detailed and accurate topographical survey of the entire area for which the TPS is being prepared is undertaken using high-accuracy equipment called the Total Station Survey, which records all physical features on the ground—structures, trees, fences, compound walls, electric poles, water bodies, drains, etc. Figure 10.3 shows the physical features surveyed.

Figure 6: Survey of the area for preparing TPS

13 6

CEPT UNIVERSITY I AHMEDABAD 136 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

6.2.5.2 Establishing the ownership details for each land parcel All cadastral records are collected to reflect the ownership details, extent (area), tenures and encumbrances for every land parcel and are compiled in a prescribed format. The type of tenure for each land parcel is noted; this is crucial as it has a direct implication on the change of use and transfer of ownership, and usually the same tenure is retained while giving back the newly shaped land parcel. This process is extremely tedious and time consuming, as the land records are of several types, are spread across various agencies, are non-computerized, and are in different formats. Figure 10.4 illustrates some of these types of records.

Figure 7: Various types of records collected to establish ownership details

13 7

CEPT UNIVERSITY I AHMEDABAD 137 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

6.2.5.3 Reconciling the survey and landownership records to prepare a base map Along with the cadastral records, all types of spatial records (maps) are also collected. As in the case of cadastral (area) records, these are of several types, spread across agencies, and non- computerized, using not-to-scale drawings and in different formats. The spatial records are vectorised and reconciled with the physical survey of the area. At this point, the area from the maps and records are compared and finalized. This is called the “melavni” in the local and literally translated means “to match.” This process is a major bottleneck, as it must be certified by the Land Records Department. This department has limited staff and is unable to cope with the pace. The base map of the area is now ready for undertaking planning. Figure 7 shows the base map.

Figure 8: Base Map for preparation the TPS

13 8

CEPT UNIVERSITY I AHMEDABAD 138 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

6.2.5.4 Defining the boundary of the area: On the final base map of the area that shows the survey, the boundary of the TPS area is clearly marked. At this stage, the intention to prepare a TPS for the area is publicized in a clear fashion in local newspapers. Figure 10.6 shows the area with the TPS boundary. At this point, the information pertaining to the land prices is collected from the register of land transactions. Based on the information on relevant sales of land, a sales map is prepared. Obviously, sales are not available for all parcels and hence, based on the available transactions and valuation principles, land values are attributed to each plot. This is called the original plot (OP) value; it is the value of the land parcel before any kind of planning intervention.

Figure 9: Defining the boundary of the TPS

13 9

CEPT UNIVERSITY I AHMEDABAD 139 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

6.2.5.5 Marking Original Plots on the base map All the OPs are marked on the base map. If more than one land parcel or plot belongs to one owner or group of owners with exactly the same tenure status, then such land parcels or plots are consolidated and given one OP number. The land parcels need to be contiguous. Thus, at this stage landholdings within a TPS are also consolidated as far as possible. Figure 10.7 shows the OPs within the TPS.

Figure 10: Marking original plots on survey

14 0

CEPT UNIVERSITY I AHMEDABAD 140 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

6.2.5.6 Tabulating ownership details and plot size The task of tabulating the information is commenced in a format prescribed in the GTPUDA Rules called the F Form. The first few columns are filled—name of the owners, land tenure, revenue survey numbers, OP number, OP area, and OP value. Figure 10.8 shows the F Form at this stage.

Figure 11: F Form for the TPS indicating ownership details and original plot sizes

14 1

CEPT UNIVERSITY I AHMEDABAD 141 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

6.2.5.7 Laying out the roads in the area The planning of the TPS area begins and at this stage the TPS is called a draft TPS. The first major step is laying out the roads. If a road that is shown in the DP passes through the TPS area, it is usually respected. It may be slightly modified, keeping in view the findings of the survey. While designing the road network, the transportation planning principles are followed, a planning pattern (e.g., a grid or a radial pattern) is devised, and appropriate connectivity with the arterial road network identified in the DP, and the DP roads passing through the TPS is established, if a natural feature such as a water body is present, it is addressed and, most importantly, care is taken to ensure that each OP gets access to it. The GTPUDA indicates a tentative percentage of areas under roads to the total scheme area of about 15 to 17 percent. Figure 10.9 shows the road network within the TPS.

Figure 12: Road network in the TPS

14 2

CEPT UNIVERSITY I AHMEDABAD 142 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

6.2.5.8 Carving out plots for amenities in the area Plots providing adequate social infrastructure such as schools, hospitals, dispensaries, clinics, open spaces, housing for the poor, etc., are marked on the base map along with the roads. The areas to be allocated for such uses are indicated in the GTPUDA as tentative percentage to the total area of the TPS is about 20 percent. Figure 10.10 shows the road network and amenity plots within the TPS.

Figure 13: Road network and amenity plots in the TPS

14 3

CEPT UNIVERSITY I AHMEDABAD 143 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

6.2.5.9 Tabulating deduction and Final Plot size The total percentage of area that goes under roads and amenities is about 35 to 40 percent. The GTPUDA allows this to go up to 50 percent. The F Form is continued to be filled further. From each OP this percentage is deducted and a final plot (FP) size is arrived at.

At this stage, the process of valuation is continued further. A semifinal (SF) value to the OP is also assigned. Usually, this is the same as the OP value. In some instances, however, there can be a change in the value of the OP before the provision of infrastructure—it may increase or decrease owing to the planning proposals such as zone changes, changes in plot shape, changes in the plot size that are impacted certain development control regulation, a substantial shift in plots, and proximity to features that may negatively impact development, such as a high tension lines, eroded lands, etc. Figure 10.11 shows the F Form at this stage.

Figure 14: Form for the TPS indicating land values and final plot sizes

14 4

CEPT UNIVERSITY I AHMEDABAD 144 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

6.2.5.10 Delineation of Final Plots After the roads and amenity plots are worked out, each OP is reconstituted or redrawn. At this stage, the irregular shapes of the OPs give way to regularly shaped FPs with the new areas. Figure 14 & Figure 15 shows the proposed road network, amenity plots, and FPs. Figure 15: Proposed road network, amenity plots and FPs

Figure 16: Delineation of final plots in the TPS

14 5

CEPT UNIVERSITY I AHMEDABAD 145 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

6.2.5.11 Tabulating infrastructure and Betterment Charges • At this stage, costs for a TPS are worked out. These include the following:

• Costs of key infrastructure—roads, water supply, drainage, and streetlights—are calculated

• Compensation to be paid to each landowner for the land is appropriated based on the SF value

• Administrative costs of implementing the TPS are accounted for

• The final value for each plot is systematically assessed

• A portion of this increase in land value is taken as betterment charges

• A “G Form” summing up the inflows and outflows for a TPS is prepared summarizing the overall financial strategy of the TPS

• The “F Form” is completed—each landowner is given compensation for the land taken and a portion of the land value is taken as betterment; based on the two, the net demand is computed for each owner.

Figure 17: G Form for the TPS indicating financials

14 6

CEPT UNIVERSITY I AHMEDABAD 146 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Figure 18: F Form for the TPS indicating betterment charges

6.2.5.12 Owners’ meeting Landowners are consulted and heard at this stage for the first time when the work on the draft schemes is completed. A well-publicized landowner’s meeting is prescribed in the GTPUDA. Based on the suggestions and objections received from each landowner, the draft TPS is modified and published. It is again thrown open for objections and suggestions from the landowners. Based on the second round of objections and suggestions, it is modified and then submitted to the State Government for approval. Once approved, the draft TPS is now called the sanctioned draft TPS. The proposals for roads can be implemented. 14 6.2.5.13 Appointment of the Town Planning Officer (TPO) 7 After approval of the draft TPS, a quasi-judicial officer called the town planning officer (TPO) is appointed. The TPO’s task is to deal with each landowner both on the physical planning proposal— the shape and location of the FP and the financial proposal—the compensation and betterment issues, and eventually demarcate the FP on ground and hand it over to the owner. The TPO divides the sanctioned draft TPS in two parts to facilitate his or her functioning: a preliminary TPS to deal with the physical planning proposal and a final TPS to deal with the financial proposal.

6.2.5.14 Individual hearings to each landowner on the preliminary TPS The TPO gives individual hearings to each landowner and revises the preliminary TPS if required. Inputs from the State Government and local authority and development authority are sought. The

CEPT UNIVERSITY I AHMEDABAD 147 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

preliminary TPS may be modified if required, and the TPO gives a second round of hearings. These hearings, as mentioned above are on the physical planning proposals.

6.2.5.15 Finalization of the preliminary TPS and its approval The preliminary TPS is again modified based on the second hearing. At this stage, demarcation of FPs commences. The TPO finalizes the preliminary TPS by writing his or her decisions with regard to every plot. This is referred to as the award of the preliminary TPS and is published in the local newspapers. At this stage, the preliminary TPS is sent to the State Government for approval. It must be approved within two months. The preliminary TPS comes into effect from the date of sanction and all plots appropriated for public purpose vest with the local authority or development authority.

6.2.5.16 Individual hearings to each landowner on the final TPS At this stage, the financial proposals are taken up with each owner. These pertain to the compensation and betterment charges. The TPS at this stage is called the final TPS.

6.2.5.17 Finalization of the final TPS, its approval and implementation Once the hearings are completed, the financial proposals will be modified and sent to the State Government for opinion. There may be some modifications. The TPO then finalizes the TPS and publishes it in the local newspapers. This is referred to as the “Award of the Final TPS”. A Board of Appeals for further issues on financials is constituted. Once all appeals are resolved and the final TPS is modified, it is sent to the State Government for approval. The State Government is required to sanction it within three months, but it usually takes longer. Once approved, the drawings and documents are sent to the State’s Revenue Department to update the records.

Table 53: List of survey number with their original plots

Sr.No Survey no. Owner’s name OP area 1 190 Bhupenbhai 19000 2 192 Bipinbhai 10600 3 193 Ramabhai 4950 4 213 Vadibhai 6700

5 216 Krishnubhai 5450 14 6 217 Govindbhai 5150 8 7 218 Chandubhai 14150 TOTAL 66000

CEPT UNIVERSITY I AHMEDABAD 148 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Figure 19: Original irregular land

Table 54: List of survey number with plots after deducting area for roads and amenity

Sr.No Survey no. Owner’s name OP area

1 190 Bhupenbhai 19000 14 2 192 Bipinbhai 10600 9 3 193 Ramabhai 4950 4 213 Vadibhai 6700 5 216 Krishnubhai 5450 6 217 Govindbhai 5150 7 218 Chandubhai 14150 TOTAL 66000 8 Road 5400 9 Amenity 7800 Total 8+9 (About 20%) 13200

CEPT UNIVERSITY I AHMEDABAD 149 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Figure 20: Original and final parcels with proposed roads and amenities

6.2.6 The financial aspects of the TPS This section briefly explains the financial aspects involved in the process of preparing a TPS. This process essentially consist of reconstituting original plots into a more organized pattern of final plots after deductions for various purposes like roads, open spaces, social infrastructure, EWS housing, etc. which means that the land owner gets back lesser land than he originally has. This deduction is between 40-50% and the owner is eligible to get compensation for this deducted land at the prevailing market price of undeveloped land.

On the other hand, when the Development Authority makes investment in infrastructure such as roads, water supply and sewerage lines, street lights, etc. above all makes the effort of preparing the 15 0 scheme the value of the final plot is enhanced. Since this value enhancement is as a result of investment made by the Development Authority, the owner has to contribute a share of the increment in land value which is known as ‘Incremental Contribution’. The difference between Incremental Contribution and compensation for a plot is due to be paid by the owner to the Development Authority or vice versa.

But the history of TPS in Gujarat has revealed that the above system was insufficient to cover all the capital costs including the cost of preparing and implementing the scheme and the cost of building infrastructure. Therefore, on Ahmedabad Urban Development Authority’s initiative, the GTPUDA, 1976 was modified to enable the authorities to deduct additional land (upto 15%) to be sold after development of the scheme to recover the cost of infrastructure development. This land bank generated forms a part of the real estate assets portfolio of the Development Authority. The timing

CEPT UNIVERSITY I AHMEDABAD 150 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

of the sale of this land and the proceeds from it may not be directly linked to the particular scheme within which it is located.

The development costs to the authority include costs of construction of roads, providing water supply and sewer lines with treatment plant, providing street lights and other such street furniture. Other costs include compensation to be paid to owners, the cost of making and publishing the Scheme, etc. The revenue due to the authority is generated from incremental contribution to be paid by each owner and from the sale of reserved resale plots.

6.2.7 Key Advantages, Limitations and Potentials of the TPS 6.2.7.1 Advantages • Long history: The process has a long history—it was introduced in 1915 by legislation, and since then the legislation has been continuously improved to make the process more responsive to the changing context of development. • Democratic and participatory: The process is democratic and participatory, with a built-in mechanism for dispute resolution—the landowners are involved in the process of planning and have ample opportunity to present their views on the proposals and place on record their objections. • Fair: The process is fair, as all owners loose the same proportion of land. • Equitable and inclusive development: The process facilitates equitable and inclusive development; a portion of land is appropriated for accommodating urban poor. Respects property rights and is nondisruptive: The process respects property rights and is nondisruptive; the landowners are not thrown off their lands and are given a better-shaped land parcel, usually very close to the original land parcel. • Noncoercive and nonauthoritarian: The process is noncoercive and nonauthoritarian; the proposals are reviewed at several stages that are formally prescribed in the act. • Win-win proposition: The process has been a “win-win” proposition for both the landowners and the planning agencies—both gain from the appreciation in the land values • Transparent: The process is transparent: it is very clearly described in legislation, planners have mastered it, and people understand and accept it. 15 • Tested in law courts: It is tested in law courts; it has been challenged in law courts and has 1 withstood the challenges successfully. • Making development pay for the cost of infrastructure: The cost of infrastructure is in a sense paid for by the owners directly, and the planning agency and development authority is not required to make huge investments up-front.

6.2.7.2 Limitations Despite the TPS mechanism being well articulated in the GTPUDA, prepared by the planners in the State Government since 1915, and widely accepted, there are a few shortcomings, which result in the growth not being managed in time, renewal of areas, although possible, becomes difficult and development occurs before the provision of infrastructure in some instances. The following are a few of the limitations:

CEPT UNIVERSITY I AHMEDABAD 151 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

• Lengthy time frames: The timelines proposed in the regulatory framework— four years—are far too long. The State Government actually takes much longer to approve the various stages. The TPSs thus take far too long to prepare and implement. These time frames were determined when computerization was nonexistent, communication technologies were cumbersome, and there was virtually no private sector in place to assist the public sector. In view of changes in technology, the timelines can be easily reduced. • Inadequate attention to substantial issues: Substantial issues are dealt with in an inadequate manner. These need to be supported by preparing manuals and guidelines. • No asset management framework is in place: The significant land assets generated by the local authority are not managed in an appropriate manner. Most local authorities or development authorities do not even have a comprehensive list of all such land assets created. • Centralized processes: The processes are far too centralized—too much power is vested in the State Government to approve and sanction the DPs and TPS. The State Government is responsible for undertaking both substantial reviews and procedural reviews of each and every DP (there are about 150 urban areas) and for innumerable TPSs. There are no limits on the time it takes for this and there is a tremendous amount of corruption that takes place at this stage. Inadequate capacities in terms of lack of staff and qualified planners add to the problem. • Disconnected with the city budgeting process: At the moment, there is no clear linkage of the DPs and TPS with the city budgeting process.

6.2.7.3 Potentials The TPS has tremendous potential that needs to be demonstrated effectively to the planners practicing in the public sector. This will considerably reinvigorate the urban planning system that is so critically required at this stage to transform Indian cities. • TPS as an infrastructure financing tool: Although several TPSs have been done and a land bank is being built up with the planning authorities, there is no systematic asset management framework in place. As a consequence, valuable land parcels created are not efficiently leveraged to finance infrastructure in cities. The present manner in which land 15 2 valuation is done needs to be overhauled and made more systematic and rational so that it is realistic and in sync with the market prices. At present, land valuation is dictated by the concern to match the revenue in the form of betterment charges to the expenditure incurred by the Development Authority to develop the infrastructure and compensation. • TPS as a tool to introduce innovative planning concepts: Until now, the task of preparation of DPs has been restricted to land use zoning and the arterial road network structure. The TPSs have until now been treated as mechanical exercises in reconstituting land parcels, and not enough attention has been paid to planning concerns, be it in terms of the road network or responding to special site features. Three dimensional aspects are not addressed. Although the GTPUDA has a provision for introducing special regulations and urban design guidelines to regulate development, these are never exercised. Further, the manner in which the land for public uses is appropriated is highly fragmented. The TPS tool offers and

CEPT UNIVERSITY I AHMEDABAD 152 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

opportunity to consolidate public lands. This has happened partly because this potential has never been demonstrated and partly because, the technical capacities of the town planning staff are severely constrained. • TPS as a tool to build accurate maps and land records for the city: The city of Ahmedabad does not have an accurate surveyed map of the city after 60 years of independence. While a DP is prepared, the first task is to prepare a base map. When the TPSs are prepared, very accurate cadastral maps and landownership details are developed. The cadastral maps and records are now maintained by the Revenue Department, and these are then procured by the planning agencies to prepare maps and databases. Both of these function separately, however, and they maintain and update their own records, resulting in considerable confusion and duplication of efforts. Again, the spatial records are not linked with the databases. The planning department itself has not collated individual TPSs and created accurate maps and databases. The lack of maps and the absence of databases has hindered planning and management functions by different line departments. Hence, while the DPs and TPSs are prepared, there is an opportunity created to build a fairly accurate GIS-based base map and land record system that can be used by both the planning and revenue departments.

All of the above issues can be addressed via a process of systematic reform. The urban planning system in Gujarat can be easily reinvigorated and has significant lessons for other states in India. A series of reforms in the form of amendments to the act have already taken place, but a lot more needs to be done.

15 3

CEPT UNIVERSITY I AHMEDABAD 153 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Annexure 1: CD Block & their Share in PPA

District CD blocks Project area Patna 1 Maner Partial 2 Danapur-cum-Khagaul Full 3 Patna rural Full 4 Sampatchak Full 5 Phulwari Full 6 Bihta Partial 7 Naubatpur Partial 8 Masaurhi Partial 9 Dhanuara Partial 10 Punpun Full 11 Fatwah Partial 12 Daniawan Partial 13 Khusrupur Partial Source: Prepared by CRDC-CEPT

15 4

CEPT UNIVERSITY I AHMEDABAD 154 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Annexure 2: List of Administrative units coming under PPA

SR.NO. VILLAGE NAME C.D.BLOCK ADMINISTRATIVE STATUS AREA AREA

(IN SQ.M.) (IN SQ.KM.) 1 Anandpur BIHTA RURAL 10683101.66 10.68 2 Hasan Chak BIHTA RURAL 1379283.68 1.38 3 Aminabad BIHTA RURAL 4991480.07 4.99 4 Daulatpur Semri BIHTA RURAL 2033485.48 2.03 5 Mohiuddin Chak BIHTA RURAL 394973.57 0.39 6 Munsepur BIHTA RURAL 1129533.54 1.13 7 Mustafapur BIHTA RURAL 1020944.25 1.02 8 Mustafapur BIHTA RURAL 576485.62 0.58 9 Narainpur BIHTA RURAL 1538101.01 1.54 10 Rampur Ismail BIHTA RURAL 2688289.79 2.69 11 Adlipur BIHTA RURAL 397504.39 0.40 12 Baghpura BIHTA RURAL 819611.65 0.82 13 Basaurha BIHTA RURAL 905892.18 0.91 14 Bedauli BIHTA RURAL 1185220.65 1.19 15 Bisambharpur BIHTA RURAL 1048793.36 1.05 16 Bishunpura BIHTA RURAL 2377838.56 2.38 17 Dumri BIHTA RURAL 2928256.16 2.93 18 Jaintipur BIHTA RURAL 1885183.99 1.89 19 Khedarpura BIHTA RURAL 1000959.33 1.00 20 Maddhupur BIHTA RURAL 467031.38 0.47 21 Madhopur BIHTA RURAL 778503.00 0.78 22 Mahadeopur Phulari BIHTA RURAL 2651643.91 2.65 23 Neuri BIHTA RURAL 1566012.03 1.57 24 Patsa BIHTA RURAL 1217682.55 1.22 25 Purania BIHTA RURAL 1821423.14 1.82 26 Ramnagar BIHTA RURAL 472390.77 0.47 27 Samsara BIHTA RURAL 929174.64 0.93 15 28 Sirichandpur BIHTA RURAL 912147.68 0.91 5 29 Sirirampur BIHTA RURAL 1422668.53 1.42 30 Amhara BIHTA RURAL 5961555.31 5.96 31 Raghopur BIHTA RURAL 1850705.70 1.85 32 Dealpur Daulat BIHTA RURAL 4405419.46 4.41 33 Doghra BIHTA RURAL 749843.64 0.75 34 Gokhulpur Kurhar BIHTA RURAL 1555930.05 1.56 35 Gorhana BIHTA RURAL 2985230.61 2.99 36 Hirmanpur BIHTA RURAL 836088.86 0.84 37 Ibrahimpur BIHTA RURAL 625838.09 0.63 38 Kanhauli BIHTA RURAL 1597684.39 1.60 39 Katesar BIHTA RURAL 3295406.55 3.30 40 Kutlupur BIHTA RURAL 3339833.98 3.34

CEPT UNIVERSITY I AHMEDABAD 155 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

41 Lohmanpur BIHTA RURAL 1360585.91 1.36 42 Neura BIHTA RURAL 2404067.27 2.40 43 Painal BIHTA RURAL 8452222.56 8.45 44 Pali BIHTA RURAL 2471181.89 2.47 45 Sadisopur BIHTA RURAL 923146.20 0.92 46 Sikandarpur BIHTA RURAL 4817220.25 4.82 47 Tikaitpur BIHTA RURAL 2069809.20 2.07 48 Til Bikrampur BIHTA RURAL 389643.69 0.39 49 Alhanpur BIHTA RURAL 5845296.65 5.85 50 Bela BIHTA RURAL 1773810.99 1.77 51 Bihta BIHTA RURAL 3547463.41 3.55 52 Chaura Gopalpur BIHTA RURAL 506439.58 0.51 53 Bazidpur BIHTA RURAL 1548096.84 1.55 54 Makhdumpur BIHTA RURAL 3018580.56 3.02 55 Panrepur BIHTA RURAL 2438329.31 2.44 56 Banwaripur BIHTA RURAL 3026704.46 3.03 57 Bahpura BIHTA RURAL 1996400.81 2.00 58 Parkhotimpur Painathi BIHTA RURAL 2916013.34 2.92 59 Dekauli BIHTA RURAL 2975681.01 2.98 60 Amahra BIHTA RURAL 643606.71 0.64 61 Bilap BIHTA RURAL 2612304.02 2.61 62 Chauki BIHTA RURAL 93769.35 0.09 63 Hiramanpur BIHTA RURAL 463652.51 0.46 64 Jamnapur BIHTA RURAL 1254239.16 1.25 65 Kaliganj BIHTA RURAL 191489.96 0.19 66 Kamalpur BIHTA RURAL 431442.91 0.43 67 Kauria BIHTA RURAL 2186696.09 2.19 68 Kharagpur BIHTA RURAL 3902249.93 3.90 69 Kujawan BIHTA RURAL 2409416.67 2.41 70 Pur BIHTA RURAL 392270.33 0.39 71 Mithapur BIHTA RURAL 1529977.68 1.53 15 72 Monije Chak BIHTA RURAL 392471.92 0.39 6 73 Nagarbihta BIHTA RURAL 1129678.85 1.13 74 Nathupur BIHTA RURAL 1654944.69 1.65 75 Pakri BIHTA RURAL 675946.21 0.68 76 Parri BIHTA RURAL 2395840.28 2.40 77 Raghopur Jolahawa BIHTA RURAL 495877.76 0.50 78 Rambad BIHTA RURAL 409425.78 0.41 79 Ramtari BIHTA RURAL 2055724.55 2.06 80 Tarvan BIHTA RURAL 938912.84 0.94 81 Jamsaut DANAPUR RURAL 2762989.28 2.76 82 Mainpura DANAPUR RURAL 1269752.33 1.27 83 Rukunpura DANAPUR RURAL 1213218.42 1.21 84 Adampur DANAPUR RURAL 708566.42 0.71

CEPT UNIVERSITY I AHMEDABAD 156 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

85 Bari Khagaul DANAPUR RURAL 1669787.10 1.67 86 Dariapur DANAPUR RURAL 1620248.57 1.62 87 Gorgawan DANAPUR RURAL 935850.01 0.94 88 Hadaspura DANAPUR RURAL 710049.44 0.71 89 Khedarpura DANAPUR RURAL 279289.37 0.28 90 Kothia DANAPUR RURAL 611550.28 0.61 91 Usri Khurd DANAPUR RURAL 437975.55 0.44 92 Asopur DANAPUR RURAL 741325.16 0.74 93 Hathiakan DANAPUR RURAL 5092871.25 5.09 94 Jalalpur DANAPUR RURAL 1936626.42 1.94 95 Lakhani Bhiga DANAPUR RURAL 1971634.15 1.97 96 Usri DANAPUR RURAL 1022060.93 1.02 97 Siddikpur DANAPUR RURAL 356243.30 0.36 98 Sandalpur DANAPUR RURAL 354132.02 0.35 99 Nasirpur DANAPUR RURAL 267014.07 0.27 100 Dhibra DANAPUR RURAL 522928.96 0.52 101 Babakkarpur DANAPUR RURAL 622139.03 0.62 102 Kothawan DANAPUR RURAL 1004251.77 1.00 103 Mustafapur DANAPUR RURAL 1721420.88 1.72 104 Sanrari DANAPUR RURAL 2492342.34 2.49 105 Dhanaut DANAPUR RURAL 3765588.99 3.77 106 Faridanpur DANAPUR RURAL 76857.99 0.08 107 Lodipur DANAPUR RURAL 2046788.03 2.05 108 Mobarakpura DANAPUR RURAL 1680130.49 1.68 109 Danapur Nagar Parishad DANAPUR URBAN 13552093.46 13.55 110 Khagaul Nagar Parishad DANAPUR URBAN 5895992.75 5.90 111 Diara Taufir Mangapal DANAPUR RURAL 2439939.83 2.44 112 Ghanghara DANAPUR RURAL 15160760.89 15.16 113 Dalip Chak DANAPUR RURAL 10883825.31 10.88 114 Aurangpur DANAURA RURAL 1136978.74 1.14 115 Bhagwanpur DANAURA RURAL 385259.89 0.39 15 116 Deokali DANAURA RURAL 3002889.92 3.00 7 117 Jamalpur DANAURA RURAL 666488.25 0.67 118 Kashi Nagar DANAURA RURAL 2142490.89 2.14 119 Khurrampur DANAURA RURAL 797658.82 0.80 120 Mian Chak DANAURA RURAL 703194.16 0.70 121 Mohammadpur DANAURA RURAL 1216583.37 1.22 122 Safipur DANAURA RURAL 633108.64 0.63 123 Seoti DANAURA RURAL 2452118.24 2.45 124 Sonmai DANAURA RURAL 3489760.81 3.49 125 Paranpura DANAURA RURAL 605571.77 0.61 126 Sisauna DANAURA RURAL 889841.84 0.89 127 Oiara DANAURA RURAL 3027000.51 3.03 128 Bir DANAURA RURAL 2989330.89 2.99

CEPT UNIVERSITY I AHMEDABAD 157 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

129 Dost Muhammadpur DANIYAWAN RURAL 1530226.29 1.53 130 Kanchanpur DANIYAWAN RURAL 2402806.47 2.40 131 Kashmiriya DANIYAWAN RURAL 690543.40 0.69 132 Bankipur Baoriwan DANIYAWAN RURAL 8760405.32 8.76 133 Aiman Bigha DANIYAWAN RURAL 1261206.95 1.26 134 Abdalpur FATWAH RURAL 485551.84 0.49 135 Alawalpur FATWAH RURAL 5453387.94 5.45 136 Baria Kala FATWAH RURAL 1782803.73 1.78 137 Baria Khurd FATWAH RURAL 1031621.59 1.03 138 Bhagawanpur FATWAH RURAL 524763.76 0.52 139 Bhikua FATWAH RURAL 601953.93 0.60 140 Bikrampur FATWAH RURAL 427838.62 0.43 141 Bikrampur Aima FATWAH RURAL 485201.49 0.49 142 BikrampurZabti FATWAH RURAL 358329.34 0.36 143 Dalanpur FATWAH RURAL 213863.26 0.21 144 Daulatpur FATWAH RURAL 2549106.41 2.55 145 Dumri FATWAH RURAL 2526459.77 2.53 146 Gangapur FATWAH RURAL 1350697.85 1.35 147 Jethuli FATWAH RURAL 2699660.35 2.70 148 Kharpar E FATWAH RURAL 508611.54 0.51 149 Kharphar FATWAH RURAL 586098.27 0.59 150 Khizirpur FATWAH RURAL 566722.55 0.57 151 Kiamuddin Chak FATWAH RURAL 381189.81 0.38 152 Kutubpur FATWAH RURAL 566426.70 0.57 153 Maujipur FATWAH RURAL 1963095.21 1.96 154 Muhammadpur FATWAH RURAL 565777.67 0.57 155 Murajpur FATWAH RURAL 603934.75 0.60 156 Narima FATWAH RURAL 1429247.16 1.43 157 Nathupur FATWAH RURAL 1689444.90 1.69 158 Parsa FATWAH RURAL 1288909.87 1.29 159 Parsarampur FATWAH RURAL 1124991.13 1.12 15 160 Pitambar pur FATWAH RURAL 1582894.84 1.58 8 161 Raipura FATWAH RURAL 3073290.47 3.07 162 Rukunpur FATWAH RURAL 514520.39 0.51 163 Sonaru FATWAH RURAL 3015357.16 3.02 164 Sultanpur FATWAH RURAL 2336426.86 2.34 165 Akharia FATWAH RURAL 767621.46 0.77 166 Akhariya FATWAH RURAL 733624.75 0.73 167 Dariapur FATWAH RURAL 3410957.36 3.41 168 Daulatpur FATWAH RURAL 1391436.37 1.39 169 Jamalpur FATWAH RURAL 1767374.21 1.77 170 Janarjanpur FATWAH RURAL 1243843.03 1.24 171 Kolhar FATWAH RURAL 3183657.77 3.18 172 Lashkari Chak FATWAH RURAL 985954.74 0.99

CEPT UNIVERSITY I AHMEDABAD 158 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

173 Niyazipur FATWAH RURAL 921955.80 0.92 174 Ramjichak FATWAH RURAL 401851.62 0.40 175 Sahora FATWAH RURAL 1734380.99 1.73 176 Saidanpur FATWAH RURAL 2059092.59 2.06 177 Sarbahanpur FATWAH RURAL 1450160.03 1.45 178 Sirampur FATWAH RURAL 590387.77 0.59 179 Soti Chak FATWAH RURAL 711894.99 0.71 180 Usfa FATWAH RURAL 5437086.35 5.44 181 Warispur FATWAH RURAL 948848.36 0.95 182 Bazidpur FATWAH RURAL 518771.34 0.52 183 Bendauli FATWAH RURAL 1488069.54 1.49 184 Bergawanpur FATWAH RURAL 2648248.03 2.65 185 Bibipur FATWAH RURAL 1939828.63 1.94 186 Masarhi FATWAH RURAL 3730257.51 3.73 187 Nanda Chak FATWAH RURAL 544776.37 0.54 188 Satauli Buzurg FATWAH RURAL 382110.11 0.38 189 Satauli Khurd FATWAH RURAL 521271.92 0.52 190 Abdullah Chak FATWAH RURAL 1197113.78 1.20 191 Buzurg FATWAH RURAL 1065993.77 1.07 192 Khanpura FATWAH RURAL 714726.71 0.71 193 Mansingpur FATWAH RURAL 1121359.19 1.12 194 Mohiuddinpur FATWAH RURAL 3397426.38 3.40 195 Narwan FATWAH RURAL 646384.08 0.65 196 Rabia Chak FATWAH RURAL 1908584.70 1.91 197 Mominpur FATWAH RURAL 2887742.03 2.89 198 Bali FATWAH RURAL 1548697.37 1.55 199 Usfan FATWAH RURAL 1096572.65 1.10 200 Sirpatpur FATWAH RURAL 292612.53 0.29 201 Pachrukhiyan FATWAH RURAL 924746.37 0.92 202 Turkdiha FATWAH RURAL 1366032.98 1.37 203 Ranipur FATWAH RURAL 1409677.50 1.41 15 204 Shahpur FATWAH RURAL 639435.67 0.64 9 205 Jaitya FATWAH RURAL 6904235.31 6.90 206 Chamar Dir FATWAH RURAL 2934509.46 2.93 207 Nazibullah chak FATWAH RURAL 1312436.83 1.31 208 Daulatpur FATWAH RURAL 298030.96 0.30 209 Rasulpur Kurtha FATWAH RURAL 1370783.61 1.37 210 Fatwah Nagar Panchayat FATWAH URBAN 6753659.32 6.75 211 Kurtha KHUSRUPUR RURAL 1615930.67 1.62 212 Khirodharpur KHUSRUPUR RURAL 1624430.59 1.62 213 Ahiyapur Maner MANER RURAL 4400029.06 4.40 214 Bag Aga MANER RURAL 409180.57 0.41 215 Balua MANER RURAL 7532285.34 7.53 216 Chak Daud MANER RURAL 626473.71 0.63

CEPT UNIVERSITY I AHMEDABAD 159 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

217 Chittanawan MANER RURAL 2627708.11 2.63 218 Darwesharpur Diara MANER RURAL 5803811.11 5.80 219 Dhakarpos MANER RURAL 579669.72 0.58 220 Katautia MANER RURAL 757492.20 0.76 221 Khaspur MANER RURAL 1068695.59 1.07 222 Kita Chauhattar MANER RURAL 23871018.05 23.87 223 Lodipur MANER RURAL 1136652.86 1.14 224 Madhorpur MANER RURAL 1621412.10 1.62 225 Nagwan MANER RURAL 2333926.36 2.33 226 Pandepur Tilhari MANER RURAL 533218.28 0.53 227 Rampur Diara MANER RURAL 4659289.57 4.66 228 Rampur Diara Taufir MANER RURAL 1607714.26 1.61 229 Rambad MANER RURAL 2840970.55 2.84 230 Sadiqpur MANER RURAL 642912.89 0.64 231 Sarnagpur Tilhari MANER RURAL 584273.90 0.58 232 Sherpur MANER RURAL 5816758.76 5.82 233 Singhara MANER RURAL 1727651.93 1.73 234 Wajidpur MANER RURAL 897226.25 0.90 235 Chhitrauli MANER RURAL 1244051.38 1.24 236 Chintanmanipur Maula MANER RURAL 1414233.94 1.41 237 Gyaspur MANER RURAL 1294622.05 1.29 238 Lodipur MANER RURAL 1268200.67 1.27 239 Mustafapur Mauli MANER RURAL 381742.63 0.38 240 Rasulupur Bijgopal Milki MANER RURAL 310954.84 0.31 241 Rasulupur Bijgopal MANER RURAL 2296208.97 2.30 242 Rewa MANER RURAL 2143772.35 2.14 243 Sarai MANER RURAL 2524330.78 2.52 244 Sattar MANER RURAL 2411023.29 2.41 245 Bank MANER RURAL 1824659.13 1.82 246 Patila MANER RURAL 286480.82 0.29 247 Sadiqpur MANER RURAL 287356.80 0.29 16 248 Sikandarpur MANER RURAL 1080481.37 1.08 0 249 Darweshpur Uparwar MANER RURAL 2359412.07 2.36 250 Sadiqpur MANER RURAL 94983.80 0.09 251 Harshankarpur Narhanna MANER RURAL 1228801.55 1.23 252 Beapur MANER RURAL 3286897.17 3.29 253 Maner Nagar Panchayat MANER URBAN 9811015.76 9.81 254 Mangarpal MANER RURAL 37625964.84 37.63 255 Kararia MASAURHI RURAL 1827069.19 1.83 256 Poawan MASAURHI RURAL 2641484.81 2.64 257 Sarbadahi MASAURHI RURAL 1419298.33 1.42 258 Supahuli MASAURHI RURAL 1196656.21 1.20 259 Karai MASAURHI RURAL 5230489.94 5.23 260 Garihara MASAURHI RURAL 1720416.70 1.72

CEPT UNIVERSITY I AHMEDABAD 160 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

261 Abgilla NAUBATPUR RURAL 1094792.05 1.09 262 Adla NAUBATPUR RURAL 1585175.35 1.59 263 Ahuara NAUBATPUR RURAL 1411370.79 1.41 264 Ajawan NAUBATPUR RURAL 4437340.96 4.44 265 Alawalpur NAUBATPUR RURAL 1085426.51 1.09 266 Amarpura NAUBATPUR RURAL 635658.46 0.64 267 Aropur NAUBATPUR RURAL 288632.52 0.29 268 Babupur NAUBATPUR RURAL 1105652.63 1.11 269 Bahuara NAUBATPUR RURAL 1040875.19 1.04 270 Bajan Chak NAUBATPUR RURAL 784125.33 0.78 271 Bakua NAUBATPUR RURAL 776370.26 0.78 272 Bara NAUBATPUR RURAL 1808314.34 1.81 273 Barkhurdar Chak NAUBATPUR RURAL 1033870.28 1.03 274 Baruna NAUBATPUR RURAL 1245189.02 1.25 275 Bedauli NAUBATPUR RURAL 726332.44 0.73 276 Bela NAUBATPUR RURAL 1203065.12 1.20 277 Bhagwanpur NAUBATPUR RURAL 1319282.33 1.32 278 Bichhedi NAUBATPUR RURAL 2375261.77 2.38 279 NAUBATPUR RURAL 1448950.53 1.45 280 Bisarpur NAUBATPUR RURAL 1303280.31 1.30 281 Chak Chichaul NAUBATPUR RURAL 39422.02 0.04 282 Chara NAUBATPUR RURAL 1426697.71 1.43 283 Chechaul NAUBATPUR RURAL 2272571.74 2.27 284 Chesi NAUBATPUR RURAL 4695445.94 4.70 285 Danagunj NAUBATPUR RURAL 525388.45 0.53 286 Dariapur NAUBATPUR RURAL 782146.08 0.78 287 Deora NAUBATPUR RURAL 2335036.08 2.34 288 Dhobiakalapur NAUBATPUR RURAL 969654.73 0.97 289 Dihra NAUBATPUR RURAL 1934445.30 1.93 290 Gadaipur NAUBATPUR RURAL 713034.72 0.71 291 Gahra NAUBATPUR RURAL 736453.23 0.74 16 292 Ghanshampur NAUBATPUR RURAL 564262.91 0.56 1 293 Gonawan NAUBATPUR RURAL 3058468.20 3.06 294 Goraila NAUBATPUR RURAL 970099.73 0.97 295 Haibatpur NAUBATPUR RURAL 521845.23 0.52 296 Ibrahimpur NAUBATPUR RURAL 3690766.37 3.69 297 Jaitipur NAUBATPUR RURAL 2252408.33 2.25 298 Jamalpura NAUBATPUR RURAL 715962.55 0.72 299 Jittu Chak NAUBATPUR RURAL 846948.06 0.85 300 Kalapur NAUBATPUR RURAL 773292.73 0.77 301 Karanpura NAUBATPUR RURAL 783098.50 0.78 302 Kardaha NAUBATPUR RURAL 643648.47 0.64 303 Khaira NAUBATPUR RURAL 1284790.70 1.28 304 Khajuri NAUBATPUR RURAL 2986052.99 2.99

CEPT UNIVERSITY I AHMEDABAD 161 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

305 Kharauna NAUBATPUR RURAL 1077938.66 1.08 306 Khaspur NAUBATPUR RURAL 580429.56 0.58 307 Khatun Chak NAUBATPUR RURAL 372259.06 0.37 308 Kopa Khurd NAUBATPUR RURAL 1267710.28 1.27 309 Kopakalan NAUBATPUR RURAL 3149623.31 3.15 310 Korawan NAUBATPUR RURAL 2382451.17 2.38 311 Kothia NAUBATPUR RURAL 202819.76 0.20 312 Lodipur NAUBATPUR RURAL 603483.01 0.60 313 Maharajganj NAUBATPUR RURAL 255922.03 0.26 314 Malahi Khandha NAUBATPUR RURAL 436545.24 0.44 315 Mamrezpur NAUBATPUR RURAL 553142.88 0.55 316 Mitan Chak NAUBATPUR RURAL 760831.83 0.76 317 Motipur NAUBATPUR RURAL 809718.98 0.81 318 Nagwan Khas NAUBATPUR RURAL 631675.96 0.63 319 Naubatpur NAUBATPUR RURAL 1534278.61 1.53 320 Nauhi NAUBATPUR RURAL 2471883.28 2.47 321 Nisarpura NAUBATPUR RURAL 2424312.12 2.42 322 Nizampur NAUBATPUR RURAL 1119213.13 1.12 323 Painapur NAUBATPUR RURAL 1864798.49 1.86 324 Pali NAUBATPUR RURAL 2203361.46 2.20 325 Paltu Chhitni NAUBATPUR RURAL 1776712.55 1.78 326 Panhara NAUBATPUR RURAL 1978840.46 1.98 327 Parsotimpur NAUBATPUR RURAL 242887.73 0.24 328 Rampur NAUBATPUR RURAL 599502.02 0.60 329 Raunian NAUBATPUR RURAL 2756321.08 2.76 330 Sabar Chak NAUBATPUR RURAL 747517.96 0.75 331 Salarpur NAUBATPUR RURAL 2523008.77 2.52 332 Shekhpura NAUBATPUR RURAL 3002508.89 3.00 333 Shirwar NAUBATPUR RURAL 1381526.17 1.38 334 Sihora NAUBATPUR RURAL 1495051.27 1.50 335 Sona NAUBATPUR RURAL 1964599.67 1.96 16 336 Tarari NAUBATPUR RURAL 1587424.38 1.59 2 337 Taret NAUBATPUR RURAL 2254062.90 2.25 338 Tegraila Barka NAUBATPUR RURAL 2561814.37 2.56 339 Tegraila Chottaka NAUBATPUR RURAL 2620201.63 2.62 340 Tilakpura NAUBATPUR RURAL 891771.38 0.89 341 Tiskhora NAUBATPUR RURAL 2433990.41 2.43 342 Udaipura NAUBATPUR RURAL 373730.09 0.37 343 Karai NAUBATPUR RURAL 2221329.65 2.22 344 Tilhawan NAUBATPUR RURAL 424734.65 0.42 345 Chiraura NAUBATPUR RURAL 3542544.23 3.54 346 Badipur NAUBATPUR RURAL 1551404.96 1.55 347 Gopalpur NAUBATPUR RURAL 3866261.67 3.87 348 Dariapur NAUBATPUR RURAL 698806.86 0.70

CEPT UNIVERSITY I AHMEDABAD 162 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

349 Sharishtabad NAUBATPUR RURAL 631023.66 0.63 350 Akbarpur NAUBATPUR RURAL 2081544.30 2.08 351 Sarasat NAUBATPUR RURAL 2890313.80 2.89 352 Nondia NAUBATPUR RURAL 1329198.97 1.33 353 Raghunathpur Bhelura NAUBATPUR RURAL 1457266.25 1.46 354 Abdul rehmanpur PATNA RURAL RURAL 356952.36 0.36 355 Chhitman PATNA RURAL RURAL 975147.41 0.98 356 Fatehpur PATNA RURAL RURAL 9563585.09 9.56 357 Gauharpur PATNA RURAL RURAL 1023885.72 1.02 358 Gyan Chak PATNA RURAL RURAL 389757.48 0.39 359 Khaspur PATNA RURAL RURAL 927320.78 0.93 360 Mahuli PATNA RURAL RURAL 2264724.11 2.26 361 Mircha PATNA RURAL RURAL 1462063.72 1.46 362 Mirchak Kothiya PATNA RURAL RURAL 290905.95 0.29 363 Mirchi PATNA RURAL RURAL 2434735.35 2.43 364 Mirzapur PATNA RURAL RURAL 396556.38 0.40 365 Muhammadpur Baratpur PATNA RURAL RURAL 2073561.09 2.07 366 Nagala PATNA RURAL RURAL 500214.72 0.50 367 Nazirpur Tajpur PATNA RURAL RURAL 1013013.35 1.01 368 Pumadih PATNA RURAL RURAL 1835641.09 1.84 369 Ranipur Milki Chak PATNA RURAL RURAL 775017.58 0.78 370 Sabalpur PATNA RURAL RURAL 3546211.53 3.55 371 PATNA RURAL RURAL 476081.71 0.48 372 Salehpur Kasara PATNA RURAL RURAL 465563.84 0.47 373 Simli Murarpur PATNA RURAL RURAL 2170469.51 2.17 374 Sonawan PATNA RURAL RURAL 1856273.29 1.86 375 mirchi bagiwan PATNA RURAL RURAL 611333.86 0.61 376 Hiranandpur PATNA RURAL RURAL 1075841.37 1.08 377 Patna Municipal Corporation PATNA RURAL URBAN 96798929.55 96.80 378 Dhaulpura PATNA RURAL RURAL 2861541.02 2.86 379 Alipur PHULWARI RURAL 235691.87 0.24 16 380 Bitaura PHULWARI RURAL 1700466.03 1.70 3 381 Chhatna PHULWARI RURAL 2708704.92 2.71 382 Chilbili PHULWARI RURAL 1348356.47 1.35 383 Hasanpura PHULWARI RURAL 1231667.33 1.23 384 Khaprail Chak PHULWARI RURAL 796735.32 0.80 385 Kurkuri PHULWARI RURAL 3123432.57 3.12 386 Kuthaur PHULWARI RURAL 2018686.34 2.02 387 Nadiawan PHULWARI RURAL 633397.70 0.63 388 Nasirpura PHULWARI RURAL 1392112.00 1.39 389 Nathupur PHULWARI RURAL 3080959.30 3.08 390 Pakri PHULWARI RURAL 2056459.57 2.06 391 Parsa PHULWARI RURAL 1801786.95 1.80 392 Rahimpur PHULWARI RURAL 897264.77 0.90

CEPT UNIVERSITY I AHMEDABAD 163 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

393 Sain Chak PHULWARI RURAL 974564.30 0.97 394 Simra PHULWARI RURAL 2509368.19 2.51 395 Chihut PHULWARI RURAL 1213362.81 1.21 396 Mahuli PHULWARI RURAL 1872413.16 1.87 397 Mohiuddinpur PHULWARI RURAL 1081557.10 1.08 398 Mokimpur PHULWARI RURAL 668711.82 0.67 399 Suitha PHULWARI RURAL 3850188.83 3.85 400 Tarwan PHULWARI RURAL 1318659.25 1.32 401 Dhanuki PHULWARI RURAL 500170.60 0.50 402 Fatehpur Dhibra PHULWARI RURAL 1390563.64 1.39 403 Madhopur PHULWARI RURAL 646740.35 0.65 404 Mahbano PHULWARI RURAL 402287.94 0.40 405 Nihura PHULWARI RURAL 783506.98 0.78 406 PHULWARI RURAL 2524008.35 2.52 407 PHULWARI RURAL 1184967.24 1.18 408 Janipur PHULWARI RURAL 1041311.05 1.04 409 Anda PHULWARI RURAL 741130.49 0.74 410 Bhdhgawan PHULWARI RURAL 1159411.05 1.16 411 Faridpur PHULWARI RURAL 457449.99 0.46 412 Kharag Chak PHULWARI RURAL 438653.32 0.44 413 Koriawan PHULWARI RURAL 1631885.87 1.63 414 Korra PHULWARI RURAL 1418490.63 1.42 415 Mainpura PHULWARI RURAL 720074.33 0.72 416 Majhauli PHULWARI RURAL 1658046.88 1.66 417 Manghpur PHULWARI RURAL 829806.29 0.83 418 Naharpura PHULWARI RURAL 1835270.25 1.84 419 Pakauli PHULWARI RURAL 765723.90 0.77 420 Pashi PHULWARI RURAL 2442025.63 2.44 421 Hinduni PHULWARI RURAL 1893701.02 1.89 422 Abupur Lodipur PHULWARI RURAL 1434063.02 1.43 423 Adhpa PHULWARI RURAL 2866316.51 2.87 16 424 Alampur Gonpura PHULWARI RURAL 7276728.33 7.28 4 425 Az Rakbe Janipur PHULWARI RURAL 323653.00 0.32 426 Bhusaula Danapur PHULWARI RURAL 3362063.10 3.36 427 Ganja Chak Muhammadpur PHULWARI RURAL 1354130.22 1.35 428 Hasanpura PHULWARI RURAL 1088831.52 1.09 429 PHULWARI RURAL 1536398.05 1.54 430 Korji PHULWARI RURAL 2233880.61 2.23 431 Muhammadpur Korji PHULWARI RURAL 2498701.01 2.50 432 Muradpur PHULWARI RURAL 912637.28 0.91 433 Murgia Chak PHULWARI RURAL 650512.46 0.65 434 Nizampur PHULWARI RURAL 1351969.47 1.35 435 Palanga PHULWARI RURAL 1850137.76 1.85 436 Sakraicha PHULWARI RURAL 2836772.43 2.84

CEPT UNIVERSITY I AHMEDABAD 164 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

437 Simra PHULWARI RURAL 1608544.22 1.61 438 Sorampur PHULWARI RURAL 1200343.66 1.20 439 Yakubpur Nagwan PHULWARI RURAL 2327553.76 2.33 440 Phulwarisharif Nagar Parishad PHULWARI URBAN 9602584.47 9.60 441 Raghunathpur Bhelura PHULWARI RURAL 1713142.29 1.71 442 Dhibra PHULWARI RURAL 2037283.38 2.04 443 Ismailpur Dhibra PHULWARI RURAL 313.30 0.00 444 Abdalpur Pipla PUNPUN RURAL 586904.74 0.59 445 Alawalpur PUNPUN RURAL 1241039.45 1.24 446 Baisa PUNPUN RURAL 1378325.78 1.38 447 Bakarpur PUNPUN RURAL 1591439.78 1.59 448 Barawan PUNPUN RURAL 3997100.64 4.00 449 Barepur PUNPUN RURAL 1223511.56 1.22 450 Barhaiya Kol PUNPUN RURAL 670182.31 0.67 451 Basuhar PUNPUN RURAL 2182575.80 2.18 452 Behrawan PUNPUN RURAL 2300827.42 2.30 453 Bela PUNPUN RURAL 728740.42 0.73 454 Chak Kaliyanpur PUNPUN RURAL 464890.27 0.46 455 Chak Rafi PUNPUN RURAL 140699.44 0.14 456 Chamu Chak Majhauli PUNPUN RURAL 1947479.00 1.95 457 Chande Dih PUNPUN RURAL 697432.90 0.70 458 Chhappan PUNPUN RURAL 528536.87 0.53 459 Dariapur PUNPUN RURAL 927007.40 0.93 460 Daud Chak PUNPUN RURAL 527508.62 0.53 461 Dharahra PUNPUN RURAL 2368803.16 2.37 462 Dumri PUNPUN RURAL 8642911.48 8.64 463 Fahim Chak PUNPUN RURAL 699732.84 0.70 464 Ganj PUNPUN RURAL 741428.69 0.74 465 Gulam Muhammad PUNPUN RURAL 292356.30 0.29 466 Jalalpur PUNPUN RURAL 741470.49 0.74 467 Jaunpuri PUNPUN RURAL 204483.23 0.20 16 468 Jol Bigha PUNPUN RURAL 674202.55 0.67 5 469 Kalianpur Basiawan PUNPUN RURAL 1728587.11 1.73 470 Kansari PUNPUN RURAL 3897445.75 3.90 471 Keora PUNPUN RURAL 7429257.70 7.43 472 Kutubpur PUNPUN RURAL 618372.51 0.62 473 Lahladpur PUNPUN RURAL 609105.91 0.61 474 Mahamda PUNPUN RURAL 1047243.63 1.05 475 Makhdumpur PUNPUN RURAL 764199.53 0.76 476 Maksudpur PUNPUN RURAL 1466718.74 1.47 477 Manora PUNPUN RURAL 2341931.12 2.34 478 Maranchi PUNPUN RURAL 1496099.55 1.50 479 Milki PUNPUN RURAL 329611.18 0.33 480 Mir Haji Chak PUNPUN RURAL 734014.48 0.73

CEPT UNIVERSITY I AHMEDABAD 165 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

481 Mohanpur PUNPUN RURAL 870077.73 0.87 482 Mohiudinpur PUNPUN RURAL 558436.50 0.56 483 Muhammadpur PUNPUN RURAL 472894.91 0.47 484 Mundi Chak PUNPUN RURAL 242421.85 0.24 485 Mustaffapur PUNPUN RURAL 1195863.54 1.20 486 Nadpur PUNPUN RURAL 1320969.19 1.32 487 Nawada PUNPUN RURAL 906891.58 0.91 488 Nima PUNPUN RURAL 2123149.41 2.12 489 Nuri Chak PUNPUN RURAL 815632.35 0.82 490 Nuruddinpur PUNPUN RURAL 239788.59 0.24 491 Pachasa PUNPUN RURAL 174678.66 0.17 492 Pakari PUNPUN RURAL 258727.76 0.26 493 Parthu PUNPUN RURAL 3528479.81 3.53 494 Pipra PUNPUN RURAL 380074.37 0.38 495 Pipra Chak PUNPUN RURAL 444869.12 0.44 496 Rampur PUNPUN RURAL 854988.11 0.85 497 Saheb Nagar PUNPUN RURAL 851417.56 0.85 498 Saidpur PUNPUN RURAL 1282372.97 1.28 499 Sapahua PUNPUN RURAL 1223549.42 1.22 500 Shekhpura PUNPUN RURAL 1365113.73 1.37 501 Sikandarpur PUNPUN RURAL 882079.82 0.88 502 Sonbarsa PUNPUN RURAL 139725.98 0.14 503 Zahidpur PUNPUN RURAL 400040.75 0.40 504 Pothi PUNPUN RURAL 3738799.73 3.74 505 sirpalpur PUNPUN RURAL 1635361.26 1.64 506 Lakhanpur PUNPUN RURAL 5932059.13 5.93 507 Rasulpur PUNPUN RURAL 671779.85 0.67 508 Ghordaur PUNPUN RURAL 1191768.57 1.19 509 Lakhna PUNPUN RURAL 14354234.56 14.35 510 Paikaui PUNPUN RURAL 1031366.84 1.03 511 Ekauna PUNPUN RURAL 2193621.42 2.19 16 512 Palaki PUNPUN RURAL 947930.45 0.95 6 513 Bazidpur PUNPUN RURAL 1448693.21 1.45 514 Khairi PUNPUN RURAL 381455.17 0.38 515 Panwar PUNPUN RURAL 2986546.96 2.99 516 Khapura PUNPUN RURAL 942019.80 0.94 517 Barah PUNPUN RURAL 1868373.40 1.87 518 Dekuli PUNPUN RURAL 1295813.74 1.30 519 Shahbazpur PUNPUN RURAL 1680725.06 1.68 520 Tulshi Chak PUNPUN RURAL 388494.08 0.39 521 Ufraul PUNPUN RURAL 550226.92 0.55 522 bhabhaui PUNPUN RURAL 931944.12 0.93 523 PUNPUN RURAL 1654258.85 1.65 524 Purainan PUNPUN RURAL 706393.82 0.71

CEPT UNIVERSITY I AHMEDABAD 166 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

525 Newa PUNPUN RURAL 1692691.67 1.69 526 Sabalpur PUNPUN RURAL 929989.79 0.93 527 Dariapur SAMPAT RURAL 1316376.91 1.32 528 Naya Chak SAMPAT RURAL 514748.87 0.51 529 Lanka Kachhuara SAMPAT RURAL 2513996.71 2.51 530 Bhelaura SAMPAT RURAL 1253785.83 1.25 531 Bhogipur SAMPAT RURAL 611499.69 0.61 532 Chainpura SAMPAT RURAL 1171113.99 1.17 533 Chakpaul SAMPAT RURAL 358621.06 0.36 534 Chipra SAMPAT RURAL 2607206.68 2.61 535 Fazalabad SAMPAT RURAL 1255480.17 1.26 536 Kamta Chak SAMPAT RURAL 388546.45 0.39 537 Kanta Chak SAMPAT RURAL 328670.66 0.33 538 Nehpura SAMPAT RURAL 281075.08 0.28 539 Udaini SAMPAT RURAL 1318524.28 1.32 540 Gauri Chak SAMPAT RURAL 402350.35 0.40 541 Kamraji SAMPAT RURAL 1406247.34 1.41 542 Karanpura SAMPAT RURAL 1492710.52 1.49 543 Rupaspur SAMPAT RURAL 1184757.18 1.18 544 Sitjain Chak SAMPAT RURAL 177377.74 0.18 545 Abdullah Chak SAMPAT RURAL 1125771.37 1.13 546 Alabakshpur SAMPAT RURAL 2442173.30 2.44 547 Bahuwara SAMPAT RURAL 2788909.26 2.79 548 Baria SAMPAT RURAL 7163061.89 7.16 549 Baruna SAMPAT RURAL 972446.68 0.97 550 Gopalpur SAMPAT RURAL 3436862.33 3.44 551 ILahi Bag SAMPAT RURAL 477602.00 0.48 552 Juharpur SAMPAT RURAL 3134965.42 3.13 553 Koli SAMPAT RURAL 1503945.46 1.50 554 Kura SAMPAT RURAL 1863820.81 1.86 555 Manoharpur Kachhuara SAMPAT RURAL 2845834.94 2.85 16 556 Pipra SAMPAT RURAL 580871.52 0.58 7 557 Raman Chak SAMPAT RURAL 203250.40 0.20 558 Saidani Chak SAMPAT RURAL 266303.98 0.27 559 Shahpur SAMPAT RURAL 1501321.03 1.50 560 Sheikpur SAMPAT RURAL 2176426.94 2.18 561 Sohgi SAMPAT RURAL 4989139.31 4.99 562 Taranpur SAMPAT RURAL 2400220.15 2.40 563 Saraiya SAMPAT RURAL 515866.82 0.52 564 Kandap SAMPAT RURAL 6360076.98 6.36

CEPT UNIVERSITY I AHMEDABAD 167 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Annexure 3: Total Population, Growth, Density, and sex ratio 2001 at District level

Population 2001 Population 1991 Den_ SR Names Total Urban Rural Total Urban Rural DGR 2001 2001

Bihar state 82998509 8681800 74316709 67530624 6711785 60818839 28.6 880 933

Patna district 3427029 1883842 1543187 3618211 1376701 2241510 30.7 2017 865

PPA 2874576 1766730 1107846 2054714 1195111 859603 47.83 2510 874 Source: Census of India, 2001

Annexure 4: Total Population, Growth, Density, and sex ratio 2001, CD Block Level, PPA

Area(in Total pop. 1991 Total Pop.2001 Decadal Pop. Sex

CD Sq.km) Growth Density Ratio blocks Rate U R U R U R U R U R U R District

Maner 12 147.4 24343 122742 30082 166567 23.6 35.7 2507 1130 878 866

Danapur- 1040 20.4 102.8 148560 103229 212316 113141 42.9 9.6 1101 872 864 cum-Khagaul 8

1322 Patna Rural 108.3 49.5 956417 51741 1432209 66409 49.7 28.3 1342 833 842 4

Sampatchak 0 65.3 0 54687 0 76154 0 39.3 0 1166 0 910

Phulwari 6.5 100 35123 100357 53451 137554 52.2 37.1 8223 1376 889 897 Sharif

Bihta 0 156.4 0 144019 0 174390 0 21.1 0 1115 0 896

Naubatpur 0 137.6 0 113590 0 138741 0 22.1 0 1008 0 899 PATNA Masauhri 9.4 107.5 33049 74287 45248 86869 36.9 16.9 4814 808 894 927 16 Dhanarua 0 109.4 0 82809 0 100695 0 21.6 0 920 0 907 8

Punpun 0 128.8 0 94315 0 116394 0 23.4 0 904 0 899

Fatwah 4.9 120.2 30668 91712 38672 114120 26.1 24.4 7892 949 865 890

Daniawan 0 59.3 0 39145 0 52950 0 35.3 0 893 0 910

Khusrupur 4.2 54.8 10258 47686 12204 65050 19 36.4 2906 1187 891 881

123841 111203 PPA 165.7 1339 1824182 1409034 19 27.0 7139 1069 874 891 8 19

Source: Census of India, 2001

CEPT UNIVERSITY I AHMEDABAD 168 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Annexure 5: District wise Schedule Tribe- Schedule Caste population in PPA

Names Total Population SC % SC ST % ST Bihar state 82998509 13,048,608 15.7 758,351 0.9 Patna district 3427029 729,988 15.5 9,236 0.2 PPA 2846342 342317 12 2822 0.1 Source: Census of India, 2001

Annexure 6: CD Block wise Schedule Tribe- Schedule Caste population in PPA

Name of CD blocks District Total Pop.2001 SC % SC ST % ST under PMR

Patna Maner 195,467 30,935 15.8% 1,928 0.56 Danapur-cum-Khagaul 251,817 19,736 7.8% 39 0.43

Patna Rural 1,490,809 13,561 0.9% 27 0.35

Sampatchak 76,810 22,985 29.9% 47 0.04

Phulwari 191,005 48,981 25.6% 160 0.11

Bihta 179,676 45,030 25.1% 165 0.06

Naubatpur 145,513 42,068 28.9% 284 0.13

Masauhri 9,828 5,381 54.8% - 0.04

Dhanarua 21,156 8,232 38.9% 7 0.01

Punpun 118,134 58,893 49.9% - 0.00

Fatwah 147,341 38,653 26.2% 164 0.10

Daniawan 13,933 6,183 44.4% 1 0.20

Khusrupur 4,853 1,679 34.6% - 0.01

Total PMA 2846342 342317 12 2822 0.1

Source: Census of India,2001

16 9 Annexure 7: District wise Literacy rate and Female literacy, PPA

Names Total Population 2001 Literacy Rate (%) Bihar state 82998509 33.7 Patna district 3427029 63 PPA 2846342 58.4 Source: Census of India, 2001

CEPT UNIVERSITY I AHMEDABAD 169 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Annexure 8: CD Block wise Literacy rate and Female literacy, PPA

District Name of CD blocks Total Population Literacy Rate (%) under PPA

Patna Maner 195,467 38.5% Danapur-cum-Khagaul 251,817 56.3% Patna Rural 1,490,809 69.0% Sampatchak 76,810 46.3% Phulwari 191,005 52.8% Bihta 179,676 47.8% Naubatpur 145,513 44.1% Masauhri 9,828 37.3% Dhanarua 21,156 37.5% Punpun 118,134 42.7% Fatwah 147,341 41.3% Daniawan 13,933 32.7% Khusrupur 4,853 41.0% Total PPA 2846342 58.4 Source: Census of India,2001

Annexure 9: Occupational Structure, CD block level

Name of CD blocks Total Workforce % Main % marginal District under PPA po.2001 2001 workers workers Patna Maner 195,467 60,076 75% 25% Danapur-cum-khagaul 251,817 64,069 85% 15%

Patna rural 1,490,809 381,114 93% 7%

Sampatchak 76,810 23,338 82% 18%

Phulwari 191,005 53,013 73% 27%

Bihta 179,676 54,172 83% 17%

Naubatpur 145,513 47,150 74% 26% 17 Masaurhi 9,828 3,968 69% 31% 0

Dhanarua 21,156 7,776 85% 15%

Punpun 118,134 44,334 75% 25%

Fatwah 147,341 47,339 81% 19%

Daniawan 13,933 5,828 78% 22%

Khusrupur 4,853 1,347 80% 20%

Total PPA 2846342 793,524 85% 15%

CEPT UNIVERSITY I AHMEDABAD 170 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Annexure 10: Employment structure, CD block wise

Name of CD % Total Pop. Workforce % % Non- District blocks under WFP 2001 2001 Primary Primary PPA R Patna Maner 195,467 60,076 30.7 65% 35% Danapur-cum- 251,817 64,069 25.4 27% 73% Khagaul Patna Rural 1,490,809 381,114 25.6 8% 92%

Sampatchak 76,810 23,338 30.4 76% 24%

Phulwari 191,005 53,013 27.8 50% 50%

Bihta 179,676 54,172 30.1 71% 29%

Naubatpur 145,513 47,150 32.4 78% 22%

Masauhri 9,828 3,968 40.4 94% 6%

Dhanarua 21,156 7,776 36.8 87% 13%

Punpun 118,134 44,334 37.5 86% 14%

Fatwah 147,341 47,339 32.1 65% 35%

Daniawan 13,933 5,828 41.8 83% 17%

Khusrupur 4,853 1,347 27.8 71% 29%

Total PPA 2846342 793,524 27.9 37% 63%

17 1

CEPT UNIVERSITY I AHMEDABAD 171 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Annexure 11: Main workers, Marginal workers, Non-workers and those marginal workers, non-workers seeking/available for work classified by age and sex

Name Total/ Age Main workers Marginal workers Non-workers

Rural/ group Urban Population Main workers Total Seeking/available for work Total Seeking/availabe for work Persons Males Females Persons Males Females Persons Males Females Persons Males Females Persons Males Females Persons Males Females 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

BIHAR Total Total 82998509 43243795 39754714 21052875 17511018 3541857 6921731 2971985 3949746 1473509 1117512 355997 55023903 22760792 32263111 2194397 1374551 819846 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 BIHAR Total 0 -4 11183897 5727185 5456712 33602 26198 7404 9977 4897 5080 1209 876 333 11140318 5696090 5444228 2087 1244 843 13.47 13.24 13.73 0.16 0.15 0.21 0.14 0.16 0.13 0.08 0.08 0.09 20.25 25.03 16.87 0.10 0.09 0.10 BIHAR Total 5 -14 23868079 12675464 11192615 539760 405049 134711 577740 305794 271946 61083 44508 16575 22750579 11964621 10785958 235184 151091 84093 28.76 29.31 28.15 2.56 2.31 3.80 8.35 10.29 6.89 4.15 3.98 4.66 41.35 52.57 33.43 10.72 10.99 10.26 BIHAR Total 15 -59 42445259 21919141 20526118 18417164 15260620 3156544 5846658 2409980 3436678 1366755 1038757 327998 18181437 4248541 13932896 1922483 1207617 714866 51.14 50.69 51.63 87.48 87.15 89.12 84.47 81.09 87.01 92.76 92.95 92.14 33.04 18.67 43.19 87.61 87.86 87.20 BIHAR Total 60 + 5501274 2922005 2579269 2062349 1819151 243198 487356 251314 236042 44462 33371 11091 2951569 851540 2100029 34643 14599 20044 6.63 6.76 6.49 9.80 10.39 6.87 7.04 8.46 5.98 3.02 2.99 3.12 5.36 3.74 6.51 1.58 1.06 2.44

BIHAR Rural Total 74316709 38594996 35721713 19112829 15760425 3352404 6639740 2784397 3855343 1375700 1034029 341671 48564140 20050174 28513966 1625910 1008020 617890 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 BIHAR Rural 0 -4 10246564 5241522 5005042 30898 23966 6932 9616 4651 4965 1121 812 309 10206050 5212905 4993145 1645 967 678 13.79 13.58 14.01 0.16 0.15 0.21 0.14 0.17 0.13 0.08 0.08 0.09 21.02 26.00 17.51 0.10 0.10 0.11 BIHAR Rural 5 -14 21542192 11442566 10099626 507585 379924 127661 559737 294537 265200 58361 42478 15883 20474870 10768105 9706765 197621 127190 70431 28.99 29.65 28.27 2.66 2.41 3.81 8.43 10.58 6.88 4.24 4.11 4.65 42.16 53.71 34.04 12.15 12.62 11.40 BIHAR Rural 15 -59 37562029 19270589 18291440 16664369 13676787 2987582 5603252 2247930 3355322 1274634 959732 314902 15294408 3345872 11948536 1398402 868675 529727 50.54 49.93 51.21 87.19 86.78 89.12 84.39 80.73 87.03 92.65 92.81 92.17 31.49 16.69 41.90 86.01 86.18 85.73 BIHAR Rural 60 + 4965924 2640319 2325605 1909977 1679748 230229 467135 237279 229856 41584 31007 10577 2588812 723292 1865520 28242 11188 17054 6.68 6.84 6.51 9.99 10.66 6.87 7.04 8.52 5.96 3.02 3.00 3.10 5.33 3.61 6.54 1.74 1.11 2.76

BIHAR Urban Total 8681800 4648799 4033001 1940046 1750593 189453 281991 187588 94403 97809 83483 14326 6459763 2710618 3749145 568487 366531 201956 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 BIHAR Urban 0 -4 937333 485663 451670 2704 2232 472 361 246 115 88 64 24 934268 483185 451083 442 277 165 10.80 10.45 11.20 0.14 0.13 0.25 0.13 0.13 0.12 0.09 0.08 0.17 14.46 17.83 12.03 0.08 0.08 0.08 17 BIHAR Urban 5 -14 2325887 1232898 1092989 32175 25125 7050 18003 11257 6746 2722 2030 692 2275709 1196516 1079193 37563 23901 13662 2 26.79 26.52 27.10 1.66 1.44 3.72 6.38 6.00 7.15 2.78 2.43 4.83 35.23 44.14 28.79 6.61 6.52 6.76 BIHAR Urban 15 -59 4883230 2648552 2234678 1752795 1583833 168962 243406 162050 81356 92121 79025 13096 2887029 902669 1984360 524081 338942 185139 56.25 56.97 55.41 90.35 90.47 89.18 86.32 86.39 86.18 94.18 94.66 91.41 44.69 33.30 52.93 92.19 92.47 91.67 BIHAR Urban 60 + 535350 281686 253664 152372 139403 12969 20221 14035 6186 2878 2364 514 362757 128248 234509 6401 3411 2990 6.17 6.06 6.29 7.85 7.96 6.85 7.17 7.48 6.55 2.94 2.83 3.59 5.62 4.73 6.25 1.13 0.93 1.48

Patna Total Total 4718592 2519942 2198650 1161984 996560 165424 263663 135950 127713 71554 55775 15779 3292945 1387432 1905513 231904 148252 83652 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 Patna Total 0 -4 536437 277170 259267 1353 1073 280 371 202 169 45 32 13 534713 275895 258818 111 68 43 11.37 11.00 11.79 0.12 0.11 0.17 0.14 0.15 0.13 0.06 0.06 0.08 16.24 19.89 13.58 0.05 0.05 0.05 Patna Total 5 -14 1269888 678192 591696 21931 16709 5222 17884 10331 7553 2100 1540 560 1230073 651152 578921 14724 9325 5399 26.91 26.91 26.91 1.89 1.68 3.16 6.78 7.60 5.91 2.93 2.76 3.55 37.35 46.93 30.38 6.35 6.29 6.45 Patna Total 15-59 2598155 1393296 1204859 1035362 886745 148617 226048 114122 111926 67304 52534 14770 1336745 392429 944316 214291 137459 76832 55.06 55.29 54.80 89.10 88.98 89.84 85.73 83.94 87.64 94.06 94.19 93.61 40.59 28.28 49.56 92.41 92.72 91.85

CEPT UNIVERSITY I AHMEDABAD 172 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Name Total/ Age Main workers Marginal workers Non-workers

Rural/ group Urban Population Main workers Total Seeking/available for work Total Seeking/availabe for work Persons Males Females Persons Males Females Persons Males Females Persons Males Females Persons Males Females Persons Males Females 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Patna Total 60 + 314112 171284 142828 103338 92033 11305 19360 11295 8065 2105 1669 436 191414 67956 123458 2778 1400 1378 6.66 6.80 6.50 8.89 9.24 6.83 7.34 8.31 6.31 2.94 2.99 2.76 5.81 4.90 6.48 1.20 0.94 1.65 58.43 Patna Rural Total 2757060 1456408 1300652 707355 585539 121816 222451 105686 116765 55492 41664 13828 1827254 765183 1062071 79658 49964 29694 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 Patna Rural 0 -4 353876 181320 172556 971 759 212 331 172 159 35 24 11 352574 180389 172185 44 29 15 12.84 12.45 13.27 0.14 0.13 0.17 0.15 0.16 0.14 0.06 0.06 0.08 19.30 23.57 16.21 0.06 0.06 0.05 Patna Rural 5-14 779294 417667 361627 14979 11148 3831 15492 8672 6820 1766 1277 489 748823 397847 350976 7267 4626 2641 28.27 28.68 27.80 2.12 1.90 3.14 6.96 8.21 5.84 3.18 3.06 3.54 40.98 51.99 33.05 9.12 9.26 8.89 Patna Rural 15 -59 1431374 751355 680019 618677 509569 109108 189928 87542 102386 51964 39023 12941 622769 154244 468525 71104 44793 26311 51.92 51.59 52.28 87.46 87.03 89.57 85.38 82.83 87.69 93.64 93.66 93.59 34.08 20.16 44.11 89.26 89.65 88.61 Patna Rural 60 + 192516 106066 86450 72728 64063 8665 16700 9300 7400 1727 1340 387 103088 32703 70385 1243 516 727 6.98 7.28 6.65 10.28 10.94 7.11 7.51 8.80 6.34 3.11 3.22 2.80 5.64 4.27 6.63 1.56 1.03 2.45

Patna Urban Total 1961532 1063534 897998 454629 411021 43608 41212 30264 10948 16062 14111 1951 1465691 622249 843442 152246 98288 53958 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 Patna Urban 0 -4 182561 95850 86711 382 314 68 40 30 10 10 8 2 182139 95506 86633 67 39 28 9.31 9.01 9.66 0.08 0.08 0.16 0.10 0.10 0.09 0.06 0.06 0.10 12.43 15.35 10.27 0.04 0.04 0.05 Patna Urban 5-14 490594 260525 230069 6952 5561 1391 2392 1659 733 334 263 71 481250 253305 227945 7457 4699 2758 25.01 24.50 25.62 1.53 1.35 3.19 5.80 5.48 6.70 2.08 1.86 3.64 32.83 40.71 27.03 4.90 4.78 5.11 Patna Urban 15 -59 1166781 641941 524840 416685 377176 39509 36120 26580 9540 15340 13511 1829 713976 238185 475791 143187 92666 50521 59.48 60.36 58.45 91.65 91.77 90.60 87.64 87.83 87.14 95.50 95.75 93.75 48.71 38.28 56.41 94.05 94.28 93.63 Patna Urban 60 + 121596 65218 56378 30610 27970 2640 2660 1995 665 378 329 49 88326 35253 53073 1535 884 651 6.20 6.13 6.28 6.73 6.81 6.05 6.45 6.59 6.07 2.35 2.33 2.51 6.03 5.67 6.29 1.01 0.90 1.21

Dinapur Nizamat (M) Urban Total 131176 69419 61757 28740 25960 2780 3719 2679 1040 1640 1332 308 98717 40780 57937 8432 5275 3157 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Dinapur Nizamat (M) Urban 0-4 13957 7304 6653 24 17 7 3 17 2 1 1 1 0 13930 7285 6645 0 0 0 10.64 10.52 10.77 0.08 0.07 0.25 0.08 30.07 0.10 0.06 0.08 0.00 14.11 17.86 11.47 0.00 0.00 0.00 Dinapur Nizamat (M) Urban 5 -14 36800 19180 17620 498 407 91 252 179 73 54 34 20 36050 18594 17456 555 344 211 28.05 27.63 28.53 1.73 1.57 3.27 6.78 6.68 7.02 3.29 2.55 6.49 36.52 45.60 30.13 6.58 6.52 6.68 Dinapur Nizamat (M) Urban 15 -59 72648 38808 33840 26031 23552 2479 3204 2308 896 1529 1250 279 43413 12948 30465 7737 4851 2886 55.38 55.90 54.80 90.57 90.72 89.17 86.15 86.15 86.15 93.23 93.84 90.58 43.98 31.75 52.58 91.76 91.96 91.42 Dinapur Nizamat (M) Urban 60 + 7771 4127 3644 2187 1984 203 260 190 70 56 47 9 5324 1953 3371 140 80 60 5.92 5.95 5.90 7.61 7.64 7.30 6.99 7.09 6.73 3.41 3.53 2.92 5.39 4.79 5.82 1.66 1.52 1.90

Patna (M Corp.) Urban Total 1366444 746344 620100 323405 292434 30971 23230 17822 5408 9184 8225 959 1019809 436088 583721 112052 72785 39267 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 Patna (M Corp.) Urban 0 -4 119729 63102 56627 260 213 47 28 20 8 5 3 2 119441 62869 56572 48 30 18 8.76 8.45 9.13 0.08 0.07 0.15 0.12 0.11 0.15 0.05 0.04 0.21 11.71 14.42 9.69 0.04 0.04 0.05 Patna (M Corp.) Urban 5 -14 327483 174421 153062 5103 4091 1012 1340 968 372 183 147 36 321040 169362 151678 5185 3261 1924 23.97 23.37 24.68 1.58 1.40 3.27 5.77 5.43 6.88 1.99 1.79 3.75 31.48 38.84 25.98 4.63 4.48 4.90 Patna (M Corp.) Urban 15 -59 833438 462553 370885 297367 269249 28118 20427 15700 4727 8800 7895 905 515644 177604 338040 105729 68879 36850

CEPT UNIVERSITY I AHMEDABAD 173 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Name Total/ Age Main workers Marginal workers Non-workers

Rural/ group Urban Population Main workers Total Seeking/available for work Total Seeking/availabe for work Persons Males Females Persons Males Females Persons Males Females Persons Males Females Persons Males Females Persons Males Females 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 60.99 61.98 59.81 91.95 92.07 90.79 87.93 88.09 87.41 95.82 95.99 94.37 50.56 40.73 57.91 94.36 94.63 93.84 Patna (M Corp.) Urban 60 + 85794 46268 39526 20675 18881 1794 1435 1134 301 196 180 16 63684 26253 37431 1090 615 475 6.28 6.20 6.37 6.39 6.46 5.79 6.18 6.36 5.57 2.13 2.19 1.67 6.24 6.02 6.41 0.97 0.84 1.21

Patna UA Urban Total 1497620 815763 681857 352145 318394 33751 26949 20501 6448 10824 9557 1267 1118526 476868 641658 120484 78060 42424 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 Patna UA Urban 0 -4 133686 70406 63280 284 230 54 31 22 9 6 4 2 133371 70154 63217 48 30 18 8.93 8.63 9.28 0.08 0.07 0.16 0.12 0.11 0.14 0.06 0.04 0.16 11.92 14.71 9.85 0.04 0.04 0.04 Patna UA Urban 5 -14 364283 193601 170682 5601 4498 1103 1592 1147 445 237 181 56 357090 187956 169134 5740 3605 2135 24.32 23.73 25.03 1.59 1.41 3.27 5.91 5.59 6.90 2.19 1.89 4.42 31.93 39.41 26.36 4.76 4.62 5.03 Patna UA Urban 15 -59 906086 501361 404725 323398 292801 30597 23631 18008 5623 10329 9145 1184 559057 190552 368505 113466 73730 39736 60.50 61.46 59.36 91.84 91.96 90.66 87.69 87.84 87.21 95.43 95.69 93.45 49.98 39.96 57.43 94.18 94.45 93.66 Patna UA Urban 60 + 93565 50395 43170 22862 20865 1997 1695 1324 371 252 227 25 69008 28206 40802 1230 695 535 6.25 6.18 6.33 6.49 6.55 5.92 6.29 6.46 5.75 2.33 2.38 1.97 6.17 5.91 6.36 1.02 0.89 1.26

Annexure 12: Main workers, marginal workers, non-workers and those marginal workers, non-workers seeking/ available for work classified by educational level and sex

Total/ Area Educational level Population Main workers Marginal workers Non-workers Rural/ Name Total Seeking/available for work Total Seeking/availabe for work Urban Persons Persons Persons Persons Persons Persons District - Patna 28 Total Total 4718592 1161984 263663 71554 3292945 231904 District - Patna 28 Total Illiterate 48.0035358 2265091 415756 159948 33810 1689387 40140 District - Patna 28 Total Literate 51.9964642 2453501 746228 103715 37744 1603558 191764 District - Patna 28 Total Literate but below matric/secondary 1306387 265586 51705 15040 989096 42892 District - Patna 28 Total Matric/secondary but below graduate 487981 156873 18387 8172 312721 69776 District - Patna 28 Total Technical diploma or certificate not equal to degree 16178 8828 1132 407 6218 1399 District - Patna 28 Total Graduate and above other than technical degree 304093 159186 10266 5463 134641 47873 District - Patna 28 Total Technical degree or diploma equal to degree or post-graduate degree 1744371 25824 1254 669 17293 6410 4 District - Patna 28 Rural Total 2757060 707355 222451 55492 1827254 79658 District - Patna 28 Rural Illiterate 58.6870797 1618038 325046 143184 28584 1149808 21921 District - Patna 28 Rural Literate 41.3129203 1139022 382309 79267 26908 677446 57737 District - Patna 28 Rural Literate but below matric/secondary 703008 165430 41232 10877 496346 17364 District - Patna 28 Rural Matric/secondary but below graduate 146226 64980 12109 5299 69137 16648 District - Patna 28 Rural Technical diploma or certificate not equal to degree 8791 4948 951 315 2892 505 District - Patna 28 Rural Graduate and above other than technical degree 66757 41939 5582 3043 19236 7639 District - Patna 28 Rural Technical degree or diploma equal to degree or post-graduate degree 8231 5125 745 412 2361 945 District - Patna 28 Urban Total 1961532 454629 41212 16062 1465691 152246 District - Patna 28 Urban Illiterate 32.9871243 647053 90710 16764 5226 539579 18219 District - Patna 28 Urban Literate 67.0128757 1314479 363919 24448 10836 926112 134027 District - Patna 28 Urban Literate but below matric/secondary 603379 100156 10473 4163 492750 25528 District - Patna 28 Urban Matric/secondary but below graduate 341755 91893 6278 2873 243584 53128 District - Patna 28 Urban Technical diploma or certificate not equal to degree 7387 3880 181 92 3326 894

CEPT UNIVERSITY I AHMEDABAD 174 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

District - Patna 28 Urban Graduate and above other than technical degree 237336 117247 4684 2420 115405 40234 District - Patna 28 Urban Technical degree or diploma equal to degree or post-graduate degree 36140 20699 509 257 14932 5465 Urban Dinapur Nizamat (M) Total 131176 28740 3719 1640 98717 8432 Urban Dinapur Nizamat (M) Illiterate 57648 8772 1931 798 46945 1759 Urban Dinapur Nizamat (M) Literate 73528 19968 1788 842 51772 6673 Urban Dinapur Nizamat (M) Literate but below matric/secondary 40835 7564 891 359 32380 1711 Urban Dinapur Nizamat (M) Matric/secondary but below graduate 12302 3460 279 140 8563 2049 Urban Dinapur Nizamat (M) Technical diploma or certificate not equal to degree 451 232 23 14 196 46 Urban Dinapur Nizamat (M) Graduate and above other than technical degree 8074 4221 224 115 3629 1436 Urban Dinapur Nizamat (M) Technical degree or diploma equal to degree or post-graduate degree 1168 644 30 16 494 215 Urban Patna (M Corp.) Total 1366444 323405 23230 9184 1019809 112052 Urban Patna (M Corp.) Illiterate 404763 57024 7803 2483 339936 11497 Urban Patna (M Corp.) Literate 961681 266381 15427 6701 679873 100555 Urban Patna (M Corp.) Literate but below matric/secondary 416479 67653 6178 2429 342648 17287 Urban Patna (M Corp.) Matric/secondary but below graduate 263339 67454 4280 1905 191605 40279 Urban Patna (M Corp.) Technical diploma or certificate not equal to degree 5492 2882 104 53 2506 681 Urban Patna (M Corp.) Graduate and above other than technical degree 195978 95199 3456 1730 97323 33036 Urban Patna (M Corp.) Technical degree or diploma equal to degree or post-graduate degree 30785 17492 382 182 12911 4673

Annexure 13: Main workers, Marginal workers, Non-workers and those marginal workers, non-workers seeking/available for work classified by age and sex

Name Total/ Age Marginal workers Non-workers

Population Main workers Total Seeking/available for work Total Seeking/availabe for work

Rural/ Urban Persons Persons Persons Persons Persons Persons 1 2 5 8 11 14 17 BIHAR Total Total 82998509 21052875 6921731 1473509 55023903 2194397 100 100 100 100 100 100

BIHAR Total 0-4 11183897 33602 9977 1209 11140318 2087 13.47 0.16 0.14 0.08 20.25 0.10

BIHAR Total 5-14 23868079 539760 577740 61083 22750579 235184 28.76 2.56 8.35 4.15 41.35 10.72

BIHAR Total 15-59 42445259 18417164 5846658 1366755 18181437 1922483 51.14 87.48 84.47 92.76 33.04 87.61

BIHAR Total 60 + 5501274 2062349 487356 44462 2951569 34643 6.63 9.80 17 7.04 3.02 5.36 1.58

5 BIHAR Rural Total 74316709 19112829 6639740 1375700 48564140 1625910 100 100 100 100 100 100

BIHAR Rural 0-4 10246564 30898 9616 1121 10206050 1645 13.79 0.16 0.14 0.08 21.02 0.10

BIHAR Rural 5-14 21542192 507585 559737 58361 20474870 197621 28.99 2.66 8.43 4.24 42.16 12.15

BIHAR Rural 15-59 37562029 16664369 5603252 1274634 15294408 1398402 50.54 87.19 84.39 92.65 31.49 86.01

BIHAR Rural 60 + 4965924 1909977 467135 41584 2588812 28242 6.68 9.99 7.04 3.02 5.33 1.74

BIHAR Urban Total 8681800 1940046 281991 97809 6459763 568487 100 100 100 100 100 100

BIHAR Urban 0-4 937333 2704 361 88 934268 442

CEPT UNIVERSITY I AHMEDABAD 175 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Name Total/ Age Marginal workers Non-workers

Population Main workers Total Seeking/available for work Total Seeking/availabe for work

10.80 0.14 0.13 0.09 14.46 0.08

BIHAR Urban 5-14 2325887 32175 18003 2722 2275709 37563 26.79 1.66 6.38 2.78 35.23 6.61

BIHAR Urban 15-59 4883230 1752795 243406 92121 2887029 524081 56.25 90.35 86.32 94.18 44.69 92.19

BIHAR Urban 60 + 535350 152372 20221 2878 362757 6401 6.17 7.85 7.17 2.94 5.62 1.13

Patna Total Total 4718592 1161984 263663 71554 3292945 231904 100 100 100 100 100 100

Patna Total 0-4 536437 1353 371 45 534713 111 11.37 0.12 0.14 0.06 16.24 0.05

Patna Total 5-14 1269888 21931 17884 2100 1230073 14724 26.91 1.89 6.78 2.93 37.35 6.35

Patna Total 15-59 2598155 1035362 226048 67304 1336745 214291 55.06 89.10 85.73 94.06 40.59 92.41

Patna Total 60 + 314112 103338 19360 2105 191414 2778 6.66 8.89 7.34 2.94 5.81 1.20

58.43 Patna Rural Total 2757060 707355 222451 55492 1827254 79658 100 100 100 100 100 100

Patna Rural 0-4 353876 971 331 35 352574 44 12.84 0.14 0.15 0.06 19.30 0.06

Patna Rural 5-14 779294 14979 15492 1766 748823 7267 28.27 2.12 6.96 3.18 40.98 9.12

Patna Rural 15-59 1431374 618677 189928 51964 622769 71104 51.92 87.46 85.38 93.64 34.08 89.26

Patna Rural 60 + 192516 72728 16700 1727 103088 1243 6.98 10.28 7.51 3.11 5.64 1.56

Patna Urban Total 1961532 454629 41212 16062 1465691 152246 100 100 100 100 100 100

Patna Urban 0-4 182561 382 40 10 182139 67 9.31 0.08 0.10 0.06 12.43 0.04

Patna Urban 5-14 490594 6952 17 2392 334 481250 7457 6 25.01 1.53 5.80 2.08 32.83 4.90

Patna Urban 15-59 1166781 416685 36120 15340 713976 143187 59.48 91.65 87.64 95.50 48.71 94.05

Patna Urban 60 + 121596 30610 2660 378 88326 1535 6.20 6.73 6.45 2.35 6.03 1.01

Dinapur Nizamat (M) Urban Total 131176 28740 3719 1640 98717 8432 100 100 100 100 100 100

Dinapur Nizamat (M) Urban 0-4 13957 24 3 1 13930 0 10.64 0.08 0.08 0.06 14.11 0.00

Dinapur Nizamat (M) Urban 5-14 36800 498 252 54 36050 555 28.05 1.73 6.78 3.29 36.52 6.58

Dinapur Nizamat (M) Urban 15-59 72648 26031 3204 1529 43413 7737 55.38 90.57 86.15 93.23 43.98 91.76

CEPT UNIVERSITY I AHMEDABAD 176 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Name Total/ Age Marginal workers Non-workers

Population Main workers Total Seeking/available for work Total Seeking/availabe for work

Dinapur Nizamat (M) Urban 60 + 7771 2187 260 56 5324 140 5.92 7.61 6.99 3.41 5.39 1.66

Patna (M Corp.) Urban Total 1366444 323405 23230 9184 1019809 112052 100 100 100 100 100 100

Patna (M Corp.) Urban 0-4 119729 260 28 5 119441 48 8.76 0.08 0.12 0.05 11.71 0.04

Patna (M Corp.) Urban 5-14 327483 5103 1340 183 321040 5185 23.97 1.58 5.77 1.99 31.48 4.63

Patna (M Corp.) Urban 15-59 833438 297367 20427 8800 515644 105729 60.99 91.95 87.93 95.82 50.56 94.36

Patna (M Corp.) Urban 60 + 85794 20675 1435 196 63684 1090 6.28 6.39 6.18 2.13 6.24 0.97

Patna UA Urban Total 1497620 352145 26949 10824 1118526 120484 100 100 100 100 100 100

Patna UA Urban 0-4 133686 284 31 6 133371 48 8.93 0.08 0.12 0.06 11.92 0.04

Patna UA Urban 5-14 364283 5601 1592 237 357090 5740 24.32 1.59 5.91 2.19 31.93 4.76

Patna UA Urban 15-59 906086 323398 23631 10329 559057 113466 60.50 91.84 87.69 95.43 49.98 94.18

Patna UA Urban 60 + 93565 22862 1695 252 69008 1230 6.25 6.49 6.29 2.33 6.17 1.02

17 7

CEPT UNIVERSITY I AHMEDABAD 177 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Annexure 14: Statewise details of IEMs implemented

FROM AUGUST 1991 T0 MAY 2011 BASED ON PART B OF IEM FORM FILED BY ENTREPRENEURS Investment Employment State/UT No.of IEMs (Rs.Crore) (Numbers) Andaman & Nicobar Islands 1 0 165 Andhra Pradesh 936 23298 185290 Arunachal Pradesh 4 9 474 Assam 124 1630 12083 Bihar 14 168 2660 4 258 1165 Chhattisgarh 81 3126 14749 Dadra & Nagar Haveli 113 1812 11350 Daman & Diu 109 2426 7790 Delhi 51 646 4880 Goa 117 890 14526 Gujarat 1581 86653 227482 Haryana 458 17422 74893 Himachal Pradesh 91 1870 13720 & Kashmir 23 2117 30035 Jharkhand 68 2061 10765 260 12438 46204 81 1019 11764 Lakshadweep 0 0 0 Madhya Pradesh 389 22513 91247 1588 38593 261612 Manipur 1 13 385 Meghalaya 26 73 2083 Mizoram 0 0 0 17 Nagaland 0 0 0 8 Orissa 82 1985 13127 54 359 5711 Punjab 324 6879 77543 446 15198 96103 Sikkim 22 15 4173 569 15316 93279 Tripura 6 253 507 Uttar Pradesh 619 25911 97682 Uttaranchal 355 4838 92933 728 31973 134164 Total 9325 321762 1640544

CEPT UNIVERSITY I AHMEDABAD 178 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Annexure 15: Road Sections

Central Spine Road – 80 m

All proposed contiguous urban area are well connected by providing dedicated corridor for public transportation system ( for eg. BRTS).

17 9

CEPT UNIVERSITY I AHMEDABAD 179 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Regional Road and Growth Pocket Road– 60 m –

Proposed Peripheral Radial Road provides regional connectivity to urban contiguous area and urban nodes. It can be act as another bypass road for Patna.

18 0

Peripheral radial road with / without dedicated corridor for public transport

CEPT UNIVERSITY I AHMEDABAD 180 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sub-divisional roads 45 m -

Above section shows sub-divisional road without dedicated corridor for public transport in continuous urban area and rest of PMR All the NHs, SHs and the proposed regional roads acts as link road for the rest of PPA.

Minor roads

18 1

CEPT UNIVERSITY I AHMEDABAD 181 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Annexure 16: Salient features of different wasterwater treatment technologies

Intermittent Rotating Cyclic Anaerobic Aerobic Densadeg & Fluidized Activated Facultative SI Decanted Biological Extended Trickling Activated Waste Waste Features Biofiltration UASB EASB Aerobic Sludge SBR Aerated No Extended Contractor Aeration Filters Sludge Stabilization Stabilization Technology Bioreactor Process Lagoon Aeration System Technology Pond Pond

Suitability of 1 Technology in Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Indian conditions. Whether Primary 2 treatment is No Yes Yes No Yes No No Yes Yes Yes Yes Yes Yes Yes required? Ability to take 3 Yes Yes Yes No No Yes Yes Yes No Yes Yes Yes Yes Yes shock loading Large Scale Small Scale Pilot Plant Plants are Plants are of 250 Cum very few in Proven few in per day is numbers in Performance (if No Yes No No No Yes Yes Yes numbers Yes Yes Yes set up by India One any Sewage and are Thermax at each and are 4 Treatment Plant effectively .. effectively is constructed operational operational based on the 10MLD- 2 Nos Technology) STP for Delhi

Jal Board -By Degremont. Ability to meet 5 Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes Yes disposal norms Land 6 Requirement in NA 1 4.5 2.25 2 1.05 6 5 5 3 3 5 10 10 18 Acres (10 MLD) 2 Capital Cost of 7 Treatment (Rs. N.A 60 35 28 22 40 45 50 30 50 75 15 15 15 Lakhs per MLD) Power requirement for 8 N.A 2500 3500 1200 1200 3000 4500 2520 1800 2000 1300 100 100 3000 10 MLD (KWH/day ) 9 Type of Process Aerobic Aerobic Aerobic Anaerobic Anaerobic Aerobic Aerobic Aerobic Aerobic Aerobic Aerobic

CEPT UNIVERSITY I AHMEDABAD 182 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Annexure 17: Technical note on solid waste landfill site

Municipal solid waste is disposed on landfill with an objective of maintaining health and hygienic condition in the city. Landfill site is designed, constructed with the objective of minimum impact to the environment. Selection of a landfill site is dependent on locational criteria mentioned below.

The landfill site shall be large enough to last for 20-25 years and preferably within 5 km from present city limits.

The site shall be at least 500 mt. away from habitation clusters, forest areas, monuments, National Parks, Wetlands and places of important cultural, historical or religious interest.

No landfill should be constructed within 200 mt of any lake or pond.

No landfill should be constructed within 100mt. of a navigable river.

No landfill should be constructed within 200mt. of the right of way of any state or national highway.

A site should be at least 500mt. away from a notified habitated area. A buffer zone of 500mt. around a landfill boundary should be declared as a No development zone after the landfill location is finalized. No landfill site should be constructed within critical habitat areas.

A landfill should not be constructed in areas where water table is less than 2 mt. below ground surface.

No landfill should be constructed within 500 mt. of any water supply.

Topographical and geographical features (contour, slope, soil type) of the site should be carefully analyzed in order to prevent soil contamination and disturbance of drainage pattern.

Transportation and linkages will be clearly defined for waste movement from the city. The influence of increased heavy vehicle traffic due to land filling should be taken care in order to avoid nuisance.

For HMR area required for landfill site is calculated as mentioned below. Number of options is worked out based on certain assumptions. It may subject to vary depending on the existing situation prevailing on the site. Assumptions are carried out after referring Manual on Municipal Solid Waste 18 3 Management, CPHEEO, and Ministry of Urban Development.

CEPT UNIVERSITY I AHMEDABAD 183 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Annexure 18: Scalogram Analysis - Study Area

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy Kita 3rd Maner 1 Patna Chauhattar 26017 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 3.27 order 2nd 2 vaishali Hajipur Sherpur 24116 1 1 1 0 0 1 0 0 1 1 0 0 1 0 0 0 0 0 1 1 0 0 0 0 0 0 0 9 22.37 order 3rd Punpun 3 Patna Sabalpur 23499 1 1 1 0 1 1 1 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 5.96 order 3rd Bihta 4 Patna Raghopur 18817 1 1 1 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 3.42 order Dinapur- Cum- 3rd 5 Patna Khagaul 18696 1 1 1 0 1 1 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 7 5.19 order Darweshpur 3rd Maner 6 Patna Uparwar 16357 1 1 1 1 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 4.81 order 2nd 7 vaishali Hajipur Dighi Kalan 16191 1 1 1 1 1 1 1 1 1 0 1 0 0 0 1 0 1 1 0 0 0 1 0 0 0 0 0 14 33.47 order 3rd Naubatpur 8 Patna Birpur 15365 1 1 1 0 1 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 5.17 order 3rd Sonepur 9 Saran Sabalpur 14250 1 1 1 0 0 1 0 0 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 7 6.22 order 3rd Punpun 10 Patna Lakhna 14142 1 1 1 0 1 1 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 7 11.50 order 3rd Raghopur 11 vaishali Paharpur 13719 1 1 1 1 1 1 1 0 0 0 0 0 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 2.30 order 4 3rd Khusrupur 12 Patna Baikatpur 12818 1 1 1 0 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.52 order 3rd Raghopur 13 vaishali Rustampur 12215 1 0 1 1 1 1 1 1 0 1 0 0 0 0 1 0 0 0 0 0 0 0 1 0 0 0 0 10 17.79 order Juramanpur 3rd Raghopur 14 vaishali Karari 11828 1 1 1 1 1 1 0 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 6.03 order Ramnagar Diara(Part in Bakhtiarpur ) 3rd 15 Patna * 11683 1 1 1 0 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 3.22 order 3rd Raghopur 16 vaishali Terahrasia 11587 1 1 1 1 1 0 1 0 0 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 8.32 order 17 Patna Daniawan Shahpur 11571 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 2.30 3rd

CEPT UNIVERSITY I AHMEDABAD 184 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order Patna Rural (a) Patna 2nd 18 Patna Rural (b) Fatehpur 10060 1 1 1 0 1 1 1 1 1 1 0 0 1 0 0 0 1 1 0 1 0 0 0 0 0 0 0 13 31.22 order 3rd Khusrupur 19 Patna Shahabad 9941 1 1 1 0 1 1 0 1 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 6.35 order Rampur 3rd Raghopur 20 vaishali Shamchand 9801 1 0 1 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 3.32 order Sampatcha 3rd 21 Patna k 9771 1 1 1 1 1 1 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 8.65 order Alampur 3rd Phulwari 22 Patna Gonpura 9611 1 1 1 1 1 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 3.81 order 3rd Phulwari 23 Patna Nohsa 9509 1 1 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 6 11.95 order 1st Bihta 24 Patna Bihta 9029 1 0 1 0 1 1 0 0 1 1 1 0 0 0 1 0 1 1 0 0 0 1 1 1 0 0 0 13 53.73 order Bidupur Motaluke 3rd 25 vaishali Damaipatti 8921 1 1 1 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.98 order 2nd Raghopur 26 vaishali Jethuli 8767 1 1 1 1 0 1 0 1 0 0 1 0 0 0 1 1 0 0 1 0 0 0 1 0 1 0 0 12 43.11 order Fatehpur 3rd Raghopur 27 vaishali Shahbaz 8697 1 1 1 1 1 1 0 0 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 9.04 order Dinapur- 18 Cum- 3rd 5 28 Patna Khagaul Jamsaut 8696 1 1 1 0 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 3.22 order 3rd Bidupur 29 vaishali Biddupur 8613 1 1 1 0 1 1 1 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 8 6.33 order Rupas 3rd Bakhtiarpur 30 Patna Mahagi 8529 1 1 1 0 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 3.10 order Bankipur Daniawan Machhariaw 3rd 31 Patna an 8219 1 1 1 0 0 1 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 4.20 order 3rd Dighwara 32 Saran Sitalpur 8167 1 1 1 0 1 1 0 1 0 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 9 9.88 order 3rd Bakhtiarpur 33 Patna Kala Diara 8072 1 1 1 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.98 order 34 Patna Athmalgola Sabnima 8036 0 1 1 0 1 1 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 5.28 3rd

CEPT UNIVERSITY I AHMEDABAD 185 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order 3rd Bakhtiarpur 35 Patna Ghoswari 8023 1 1 1 0 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 4.34 order Patna Rural (a) Patna Panapur 3rd 36 Patna Rural (b) Taufir 7809 1 1 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.44 order Hardas 3rd Khusrupur 37 Patna Bigha 7641 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Bihta 38 Patna Painal 7560 1 1 1 0 1 1 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 7 5.19 order 2nd Fatwah 39 Patna Dumri 7553 1 1 1 0 1 1 0 1 1 1 0 1 0 0 0 0 1 1 0 0 0 0 0 0 1 0 0 12 34.93 order 3rd Dhanarua 40 Patna Barni 7511 1 1 1 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 7 12.10 order 3rd Masaurhi 41 Patna Pakri 7400 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.09 order Halalpur 3rd 42 vaishali Hajipur Madarpur 7257 1 1 1 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.10 order 3rd Naubatpur 43 Patna Khaspur 7224 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 44 Patna Mohanpur 7129 1 0 1 1 1 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 3.57 order 3rd Bihta 45 Patna Anandpur 7023 1 1 1 1 1 1 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 10 16.00 order 18 3rd Sonepur 6 46 Saran Kharika 6979 1 1 1 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.98 order 3rd Punpun 47 Patna Keora 6705 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 order Bhusaula 3rd Phulwari 48 Patna Danapur 6653 1 1 1 1 1 1 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 4.46 order Dinapur- Cum- 3rd 49 Patna Khagaul Hathiakan 6530 1 1 1 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6 11.74 order 3rd Daniawan 50 Patna Kanchanpur 6528 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Masaurhi 51 Patna Saidabad 6526 1 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.97 order 52 Patna Dinapur- Ganghara 6418 1 1 1 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.25 3rd

CEPT UNIVERSITY I AHMEDABAD 186 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy Cum- order Khagaul 3rd Bidupur 53 vaishali Khilwat 6412 1 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.67 order 3rd Khusrupur 54 Patna Ismailpur 6330 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bakhtiarpur 55 Patna Alipur Bihta 6310 1 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.29 order Patna Rural (a) Patna 3rd 56 Patna Rural (b) Punadih 6268 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.09 order Dumari 3rd Sonepur 57 Saran Buzurg 6266 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 order 2nd Raghopur 58 vaishali Raghopur 6232 1 1 1 1 1 1 0 1 0 0 1 0 0 0 1 0 0 0 1 1 0 0 0 0 0 1 0 12 40.59 order 3rd Sonepur 59 Saran Jaitiya 6190 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order 3rd Maner 60 Patna Sadiqpur 6115 1 1 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 2.42 order 3rd Sonepur 61 Saran Nazarmira 6096 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Dighwara 62 Saran Basti Jalal 6032 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 order 3rd Bakhtiarpur 18 63 Patna 6024 1 1 1 0 1 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 3.87 order 7 Juramanpur 3rd Raghopur 64 vaishali Barari 6008 1 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.97 order 3rd Phulwari 65 Patna Kurthaur 5964 0 1 1 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 3.81 order 3rd Bihta 66 Patna Madhopur 5946 1 1 1 0 0 1 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 5.03 order 3rd Punpun 67 Patna ALawalpur 5930 1 1 1 0 1 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 6.29 order 3rd Fatwah 68 Patna Saidpur 5922 1 1 1 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 5 4.65 order Chandpur 3rd Raghopur 69 vaishali Idark 5902 1 1 1 0 0 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 5 4.00 order 70 Patna Bakhtiarpur Dedur 5868 1 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 1.17 3rd

CEPT UNIVERSITY I AHMEDABAD 187 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order Sampatcha 3rd 71 Patna k Sohgi 5752 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Naubatpur 72 Patna Chesi 5741 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 order 3rd Khusrupur 73 Patna Rasulpur 5699 1 1 1 0 1 1 0 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 5.53 order 3rd Bihta 74 Patna Sanda 5630 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.45 order 3rd Sonepur 75 Saran Naya Ganw 5563 1 1 1 0 0 1 0 0 1 1 1 0 0 0 0 1 0 0 0 0 0 1 0 0 0 0 0 9 19.67 order 3rd Naubatpur 76 Patna Haibatpur 5546 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 2nd Bihta 77 Patna Neura 5499 1 1 1 0 0 1 0 1 1 1 0 0 1 1 0 1 0 0 1 0 0 0 0 1 0 0 0 12 32.65 order Sadullahpur 3rd 78 vaishali Hajipur Satan 5448 1 1 1 0 1 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 3.49 order 3rd Sonepur 79 Saran Kasmar 5440 1 1 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.53 order 3rd Masaurhi 80 Patna Bhadaura 5414 1 1 1 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.98 order 1st Naubatpur 81 Patna Naubatpur 5378 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 1 0 0 1 1 1 1 0 0 0 20 66.41 order 3rd Bidupur 18 82 vaishali Rahimapur 5305 1 1 1 0 0 1 0 0 0 0 0 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order 3rd Sonepur 83 Saran Shikarpur 5287 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 order 3rd Bihta 84 Patna Amahra 5286 1 1 1 0 1 1 1 0 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 12 14.55 order 3rd Dighwara 85 Saran Barua 5282 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bihta 86 Patna Katesar 5273 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 2.30 order Jahangirpur 3rd Raghopur 87 vaishali Pirthi 5232 1 0 1 1 1 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 4.24 order 3rd Punpun 88 Patna Lakhanpur 5212 1 1 1 0 0 1 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 7 6.94 order 89 vaishali Bidupur Mayil 5073 1 1 1 0 1 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 6 7.07 3rd

CEPT UNIVERSITY I AHMEDABAD 188 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order 2nd Phulwari 90 Patna Mahuli 5063 1 1 1 1 0 0 1 0 1 0 0 1 0 1 0 0 0 0 1 0 0 0 0 0 1 0 0 10 29.20 order 3rd Maner 91 Patna Chhitnawan 5062 1 1 1 0 1 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 4.51 order 3rd Raghopur 92 vaishali Malikpur 4998 1 0 1 1 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 3.61 order 3rd Dhanarua 93 Patna Kosut 4916 1 1 1 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.10 order Daulatpur 3rd Bihta 94 Patna semri 4882 1 1 1 1 1 1 0 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 8 5.80 order 1st Naubatpur 95 Patna Ajawan 4860 1 1 1 1 1 1 0 0 1 1 0 0 0 1 0 0 1 1 0 0 0 0 0 0 1 0 1 13 60.00 order Dealpur 3rd Bihta 96 Patna Daulat 4835 1 1 1 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 2.72 order Ghauspur 3rd 97 vaishali Hajipur Ijra 4748 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order 3rd Dariapur 98 Saran Mujauna 4742 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order Bishunpur Basant urf 3rd 99 vaishali Hajipur Suhai 4736 1 1 1 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.74 order Parmanandp 3rd Sonepur 100 Saran ur 4712 1 1 1 1 0 1 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 7 6.29 order 18 3rd Naubatpur 9 101 Patna Gopalpur 4700 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order 3rd Dighwara 102 Saran Manupur 4648 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.01 order 3rd Raghopur 103 vaishali Bahrampur 4606 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 1st Dhanarua 104 Patna Nadwan 4598 1 1 1 0 1 1 0 0 1 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 1 0 1 11 49.32 order 3rd Raghopur 105 vaishali Chaunkia 4584 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Sampatcha 3rd 106 Patna k Gopalpur 4575 1 1 1 1 1 1 0 1 0 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 10 12.99 order Rampur 3rd Maner 107 Patna Diara Taufir 4567 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order

CEPT UNIVERSITY I AHMEDABAD 189 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd Bihta 108 Patna Nathupur 4521 1 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.61 order 3rd Dhanarua 109 Patna Deodaha 4431 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.45 order 1st Naubatpur 110 Patna Nisarpura 4431 1 1 1 1 1 1 0 0 1 1 1 0 0 0 0 0 1 0 1 1 1 0 0 1 0 1 0 15 65.77 order 3rd Bakhtiarpur 111 Patna Hedaiatpur 4334 1 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.29 order Patna Rural (a) Patna 3rd 112 Patna Rural (b) Mirchi 4326 1 1 1 1 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 3.06 order 3rd Sonepur 113 Saran Bharanpura 4288 1 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.94 order 3rd Fatwah 114 Patna Usfa 4277 1 1 1 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.25 order 3rd Naubatpur 115 Patna Ibrahimpur 4267 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order 3rd Maner 116 Patna Balua 4263 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.45 order 3rd Bakhtiarpur 117 Patna Bariarpur 4263 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bihta 118 Patna Aminabad 4259 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Fatwah 19 119 Patna Gauri Punda 4221 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 order 0 3rd Bihta 120 Patna Bishunpura 4212 1 1 1 1 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 2.97 order 2nd Bihta 121 Patna Kharagpur 4127 1 1 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 7 21.73 order Sampatcha 3rd 122 Patna k Kandap 4120 1 1 1 1 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 4.66 order Yakubpur 3rd Phulwari 123 Patna Nagwan 4109 1 1 1 1 1 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 4.43 order 3rd Dhanarua 124 Patna Patharhat 4089 1 1 1 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 2.95 order 3rd Bidupur 125 vaishali Rajasan 4085 1 1 1 0 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.52 order 126 vaishali Bidupur Saidpur 4081 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 3rd

CEPT UNIVERSITY I AHMEDABAD 190 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy Ganesh order Dinapur- Cum- 3rd 127 Patna Khagaul Bari Khagaul 4067 0 1 1 0 1 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 4 3.81 order Bishunpur Basant urf 3rd 128 vaishali Hajipur Suhai 4060 1 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.29 order Dinapur- Cum- 3rd 129 Patna Khagaul Habaspur 4050 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order Kashipur 3rd 130 vaishali Hajipur Chak Bibi 4049 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order Chak Singar 3rd Raghopur 131 vaishali Barari 3960 1 1 1 1 1 0 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 5.04 order Dinapur- Cum- 3rd 132 Patna Khagaul Hetanpur 3957 1 1 1 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4 3.26 order 3rd Punpun 133 Patna Kansari 3902 1 1 1 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.59 order 3rd Sonepur 134 Saran Chaturpur 3868 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Bishunpur 3rd Bidupur 135 vaishali Said Ali 3846 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Sonepur 19 136 Saran Badurahi 3808 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 1 3rd Bidupur 137 vaishali Amer 3789 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Bidupur 138 vaishali Ramdauli 3778 1 1 1 0 1 0 0 1 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 7 9.71 order 3rd Raghopur 139 vaishali Sirirampur 3769 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.49 order Dinapur- Cum- 3rd 140 Patna Khagaul Dhanaut 3712 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order 3rd Daniawan 141 Patna Daniawan 3701 1 1 1 0 1 1 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 6.65 order 3rd Phulwari 142 Patna Simra 3651 1 1 1 1 1 0 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 5.04 order

CEPT UNIVERSITY I AHMEDABAD 191 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd Naubatpur 143 Patna Karai 3647 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.17 order 3rd Punpun 144 Patna Pothi 3640 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 6 7.97 order 3rd Phulwari 145 Patna Kurkuri 3616 1 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.97 order 3rd Daniawan 146 Patna Sikandarpur 3612 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 147 Patna Saidpur 3607 1 1 1 1 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.73 order 3rd Dhanarua 148 Patna Moriawan 3588 1 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.61 order 3rd Sonepur 149 Saran Dudhaila 3549 1 1 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.53 order 3rd Daniawan 150 Patna Salarpur 3544 1 1 1 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.74 order 3rd Phulwari 151 Patna Chhatna 3525 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order Gokhulpur 3rd Bihta 152 Patna Kurhar 3522 1 1 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 2.68 order Sajnupur 3rd 153 vaishali Hajipur Mathihan 3522 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Bishunpur Bala Dhari 3rd 19 154 vaishali Hajipur urf Balwa 3521 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 2 3rd 155 vaishali Raghopur sukwarpur 3521 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Khusrupur 156 Patna Mohsinpur 3482 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Bihta 157 Patna Pakri 3472 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 158 Patna Manora 3438 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 4.67 order Rampur 3rd Maner 159 Patna Diara 3437 1 1 1 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.25 order Yusufpur 3rd 160 vaishali Hajipur Dighikhurd 3433 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 161 Patna Dhanarua Sonmai 3412 1 1 1 1 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 3.96 3rd

CEPT UNIVERSITY I AHMEDABAD 192 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order Dinapur- Cum- 2nd 162 Patna Khagaul Rukanpura 3386 1 1 1 0 0 0 0 1 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 0 7 22.29 order Gayaspur 3rd Bakhtiarpur 163 Patna Mahazi 3380 1 1 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 2.54 order 3rd Fatwah 164 Patna Jamalpur 3348 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 2nd Bihta 165 Patna Sadisopur 3345 1 1 1 1 1 1 1 0 1 1 0 1 1 1 1 1 1 0 1 0 0 0 0 0 0 0 0 16 34.22 order Daulatpur Deoria urf 2nd 166 vaishali Hajipur Daulatpur 3341 1 1 1 1 1 1 1 0 0 0 1 0 1 1 1 0 1 0 1 1 0 0 0 0 0 0 0 14 36.27 order 3rd Bakhtiarpur 167 Patna Karanauti 3330 1 1 1 0 1 0 1 1 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 8 8.24 order 3rd Bihta 168 Patna Bahpura 3329 1 1 1 1 1 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 7 4.68 order 3rd Punpun 169 Patna Zahidpur 3329 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Dariapur 170 Saran Sakraicha 3311 1 1 1 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.10 order 3rd Daniawan 171 Patna Hasanpur 3287 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dighwara 19 172 Saran Kuraia 3286 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.17 order 3 3rd Fatwah 173 Patna Masarhi 3266 1 1 1 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.25 order 3rd 174 vaishali Hajipur Saim Chak 3265 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 175 Patna Barawan 3242 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Maner 176 Patna Nagwan 3241 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.17 order 3rd Naubatpur 177 Patna Nauhi 3239 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Naubatpur 178 Patna Chiraura 3220 1 1 1 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 3.42 order 179 Patna Phulwari Suitha 3209 1 1 1 1 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 4.31 3rd

CEPT UNIVERSITY I AHMEDABAD 193 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order Dinapur- Cum- 3rd 180 Patna Khagaul Madhopur 3198 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order 3rd Sonepur 181 Saran Gobind Chak 3184 1 1 1 1 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 4.81 order Khirodharpu 3rd Khusrupur 182 Patna r 3180 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bakhtiarpur 183 Patna Mogalpura 3176 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Masaurhi 184 Patna Nisiawan 3155 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Bakhtiarpur 185 Patna Doman 3153 1 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.71 order Parkhotimpu 3rd Bihta 186 Patna r Painathi 3147 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 2.30 order 3rd Bihta 187 Patna Parri 3139 1 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 2.36 order 3rd Punpun 188 Patna Panwar 3128 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 order 3rd Bakhtiarpur 189 Patna Mulrajpur 3123 1 1 1 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 6 11.74 order 3rd Sonepur 190 Saran Gopalpur 3111 1 1 1 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 3.42 order 19 3rd Fatwah 4 191 Patna Daulatpur 3108 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 2nd Phulwari 192 Patna Janipur 3069 1 1 1 0 1 0 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 8 21.63 order 3rd Maner 193 Patna Sarasat 3053 1 1 1 1 1 1 1 0 0 1 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 10 15.00 order Rasulpur 3rd Fatwah 194 Patna Kurtha 3030 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.17 order Muhammad 3rd Phulwari 195 Patna pur Korji 3018 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.09 order 3rd Sonepur 196 Saran Chausia 3012 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.17 order 3rd Dighwara 197 Saran Salimpur 3007 1 1 1 0 1 1 0 1 1 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 9 8.96 order

CEPT UNIVERSITY I AHMEDABAD 194 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd 198 Patna Athmalgola Chanda 2996 0 1 1 0 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 3.89 order 3rd Dhanarua 199 Patna Oiara 2995 1 1 1 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 2.84 order 3rd Dighwara 200 Saran Tilok Chak 2990 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Masaurhi 201 Patna Sanrari 2979 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order 3rd Bihta 202 Patna Kanhauli 2960 1 1 1 1 1 0 1 0 0 0 1 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 9 17.70 order 3rd Fatwah 203 Patna Mominpur 2958 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Baijalpur 3rd Sonepur 204 Saran Kesho 2948 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd 205 vaishali Hajipur Kuari Bazurg 2945 1 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.29 order Makhdumpu 3rd Punpun 206 Patna r 2945 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Tegharaila 3rd Naubatpur 207 Patna Chhotka 2943 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order Sampatcha 3rd 208 Patna k Bahuwara 2931 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order 3rd Bihta 209 Patna Dumri 2916 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 19 3rd Phulwari 5 210 Patna Sain 2908 1 1 1 0 1 1 0 0 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 7 9.39 order 3rd Bihta 211 Patna Pali 2907 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Dinapur- Cum- 3rd 212 Patna Khagaul Patlapur 2902 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Sampatcha Lanka 3rd 213 Patna k Kachhuara 2861 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 3.27 order Dinapur- Cum- 3rd 214 Patna Khagaul Kasim chak 2853 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dighwara 215 Saran Malkha Chak 2851 1 1 1 0 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 3.99 order

CEPT UNIVERSITY I AHMEDABAD 195 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy Patna Rural (a) Patna Simli 3rd 216 Patna Rural (b) Murarpur 2833 1 1 1 0 0 1 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 6 4.83 order 3rd Bihta 217 Patna Dekuli 2830 1 1 1 1 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 3.53 order 3rd Sonepur 218 Saran Sultanpur 2825 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 4 10.67 order Shahjahanp 3rd Punpun 219 Patna ur 2823 1 1 1 0 1 1 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 4.61 order 3rd Daniawan 220 Patna Singriawan 2817 1 1 1 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 2.68 order 3rd Phulwari 221 Patna Pakauli 2806 1 1 1 0 1 0 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 4.04 order Patna Rural (a) Patna 3rd 222 Patna Rural (b) Sonawan 2790 1 1 1 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 2.83 order 3rd Dhanarua 223 Patna Sattar 2780 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dighwara 224 Saran Kanakpur 2779 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Sonepur 225 Saran Jahangirpur 2778 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Daniawan 226 Patna Singriawan 2765 1 1 0 0 0 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 3.86 order 19 3rd Dhanarua 6 227 Patna Baurihi 2755 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order Bhawani Raghopur Prasad urf 3rd 228 vaishali Madho 2751 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.54 order 3rd Khusrupur 229 Patna Chaunra 2730 1 1 1 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.98 order 3rd Sonepur 230 Saran Kaleanpur 2726 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bakhtiarpur 231 Patna Shahpur 2720 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Dighwara 232 Saran Ami 2710 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.65 order 233 Patna Punpun Mohiuddinp 2709 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 3rd

CEPT UNIVERSITY I AHMEDABAD 196 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy ur order Dinapur- Cum- 3rd 234 Patna Khagaul Kothawan 2693 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 235 Patna Parthu 2687 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order 3rd Phulwari 236 Patna Pasihi 2679 1 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.61 order 3rd Bihta 237 Patna Kujawan 2673 1 1 1 1 0 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 4.16 order 3rd Bihta 238 Patna Kauria 2661 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order 3rd Raghopur 239 vaishali Nagargawan 2651 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Phulwari 240 Patna Majhauli 2649 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Sonepur 241 Saran Gangajal 2626 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order 3rd Bihta 242 Patna Alhanpura 2622 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order 3rd Fatwah 243 Patna Sarwan 2617 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order 3rd Dighwara 244 Saran Rampur Ami 2613 1 1 1 0 1 0 1 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 7 7.33 order 19 Dinapur- 7 Cum- 3rd 245 Patna Khagaul Usri 2613 1 1 1 1 0 0 0 1 0 1 1 0 0 1 0 0 0 0 0 0 0 0 1 0 0 0 0 9 17.98 order 3rd Masaurhi 246 Patna Chapaur 2605 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order 3rd Sonepur 247 Saran Murthan 2605 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Daniawan 248 Patna Taraura 2599 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 249 Patna Kopakalan 2598 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.09 order 3rd Dhanarua 250 Patna Niman 2598 1 1 1 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.80 order 251 Patna Maner Darweshpur 2594 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 3rd

CEPT UNIVERSITY I AHMEDABAD 197 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy Diara order Shekh 3rd Sonepur 252 Saran Duman 2588 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dhanarua 253 Patna Bir 2585 1 1 1 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.25 order 3rd Sonepur 254 Saran Sobhepur 2585 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 255 Patna Ekauna 2570 1 1 1 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.80 order 3rd Fatwah 256 Patna Raipura 2554 1 1 1 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.80 order 3rd Dhanarua 257 Patna Bhakhri 2545 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd 258 vaishali Hajipur Asdharpur 2540 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Punpun 259 Patna Dumri 2540 1 1 1 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.10 order Sampatcha 3rd 260 Patna k Jujharpur 2535 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Sampatcha 3rd 261 Patna k Dariapur 2509 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Gangapur 3rd Bakhtiarpur 262 Patna Narauli 2506 1 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.97 order 3rd 19 263 vaishali Hajipur Gadai Sarae 2500 1 1 1 0 0 1 0 1 0 1 0 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 3.13 order Sampatcha Manoharpur 3rd 264 Patna k Kachhuara 2497 1 1 1 1 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 4.03 order 3rd Phulwari 265 Patna Hinduni 2492 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Fatwah 266 Patna Sonaru 2481 1 1 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.44 order 3rd Bihta 267 Patna Tikaitpur 2472 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bidupur 268 vaishali Kanchanpur 2459 1 1 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.53 order 3rd Phulwari 269 Patna Adhpa 2458 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 6 17.67 order 270 Saran Dighwara Akilpur 2454 1 1 1 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.98 3rd

CEPT UNIVERSITY I AHMEDABAD 198 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order 3rd Sonepur 271 Saran Chitarsenpur 2443 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Daniawan 272 Patna Pir Barhauna 2441 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.01 order Sampatcha 3rd 273 Patna k Chainpura 2419 1 1 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.12 order Patna Rural (a) Patna 3rd 274 Patna Rural (b) Mirzapur 2404 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order Sampatcha 3rd 275 Patna k Shahpur 2404 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order 3rd Naubatpur 276 Patna Khajuri 2402 1 1 1 1 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 7 4.39 order Dighwa Masaurhi Mahadeopu 3rd 277 Patna r 2401 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dhanarua 278 Patna Lawaich 2400 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 279 Patna Gonawan 2397 1 1 1 1 1 0 1 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 8 7.65 order 3rd Sonepur 280 Saran Nawada 2388 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.49 order Rampur 3rd Bihta 19 281 Patna Ismail 2380 1 1 1 1 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 5 3.87 order 9 3rd Phulwari 282 Patna Nathupur 2371 1 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.29 order 3rd Fatwah 283 Patna Bali 2370 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Sampatcha 3rd 284 Patna k Saidanpur 2362 1 1 1 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.25 order 3rd Daniawan 285 Patna Nimi 2357 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Phulwari 286 Patna Bitaura 2352 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.52 order 3rd Phulwari 287 Patna Hasanpura 2352 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 order 288 Patna Fatwah Pitambarpur 2351 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 3rd

CEPT UNIVERSITY I AHMEDABAD 199 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order 3rd Masaurhi 289 Patna Kharant 2347 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dighwara 290 Saran Yusufpur 2346 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bakhtiarpur 291 Patna Ranisarai 2339 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Sampatcha 3rd 292 Patna k Chipra 2331 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.09 order 3rd Masaurhi 293 Patna Bhalua 2330 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order 3rd Bihta 294 Patna Sirirampur 2313 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order Ghorahuwa 3rd Masaurhi 295 Patna n 2299 1 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.62 order 3rd Dhanarua 296 Patna Shafipur 2295 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 4 11.43 order Tegharaila 3rd Naubatpur 297 Patna Barka 2289 1 1 1 1 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 5.72 order 3rd Bakhtiarpur 298 Patna Rukunpura 2286 1 1 1 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 2.07 order 1st Dhanarua 299 Patna Dhanruwa 2269 1 1 1 0 1 1 0 0 0 1 1 0 1 1 0 0 0 0 1 1 1 0 1 0 0 0 0 13 45.68 order 3rd Sonepur 20 300 Saran Lodipur 2268 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order Sampatcha Alabakhshpu 3rd 301 Patna k r 2265 1 1 1 1 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 2.91 order 3rd Bidupur 302 vaishali Bhairopur 2265 1 1 1 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.10 order 3rd 303 vaishali Hajipur 2264 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd 304 vaishali Hajipur Karanpur 2264 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Khusrupur 305 Patna Katauna 2263 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order Dinapur- Cum- 3rd 306 Patna Khagaul Dariapur 2260 1 1 1 1 1 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 4.07 order

CEPT UNIVERSITY I AHMEDABAD 200 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd Khusrupur 307 Patna Netar 2254 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order Bodha 3rd Dighwara 308 Saran 2242 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.09 order Chak 3rd Naubatpur 309 Patna Chichaul 2239 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Khusrupur 310 Patna Shekhpura 2235 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Sampatcha 3rd 311 Patna k Kura 2218 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Maner 312 Patna Rewa 2216 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 313 Patna Behrawan 2205 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Phulhara 3rd 314 vaishali Hajipur Banu 2200 1 1 1 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.65 order Nawada 3rd Bidupur 315 vaishali Khurd 2187 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Daniawan 316 Patna Top 2186 1 1 1 0 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 3.10 order 3rd Masaurhi 317 Patna Lahsuna 2183 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 order 3rd Naubatpur 318 Patna Adla 2178 1 1 1 1 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 2.97 order 20 3rd Phulwari 1 319 Patna Korji 2178 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Naubatpur 320 Patna Paltu Chhitni 2170 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Dighwara 321 Saran Jaitipur 2165 1 1 1 0 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 5 3.71 order Patna Rural (a) Patna 3rd 322 Patna Rural (b) Gyan Chak 2163 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Fatwah 323 Patna Daulatpur 2161 1 1 1 0 1 1 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 4.84 order Bishunpur Bidupur KishunDas 3rd 324 vaishali Majlishpur 2159 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order

CEPT UNIVERSITY I AHMEDABAD 201 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy Sampatcha 3rd 325 Patna k Gauri Chak 2137 1 1 1 1 0 0 0 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 6.29 order 3rd Dhanarua 326 Patna Atarpura 2127 1 1 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 2.86 order 3rd Fatwah 327 Patna Kolhar 2112 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Sampatcha 3rd 328 Patna k Taranpur 2111 1 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.85 order 2nd Fatwah 329 Patna Maujipur 2090 1 1 1 1 0 0 0 0 1 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 1 0 0 8 21.32 order 3rd Bihta 330 Patna Bela 2083 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order Mahmud 3rd Sonepur 331 Saran Chak 2079 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Phulwari 332 Patna Palanga 2073 1 1 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.12 order 3rd Masaurhi 333 Patna Koriawan 2072 1 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.97 order 3rd Bakhtiarpur 334 Patna Chak Daulat 2070 1 1 1 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 5 6.89 order 3rd Maner 335 Patna Singhara 2070 1 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.29 order 3rd Masaurhi 336 Patna Karai 2065 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order 20 Mohammad 3rd Sonepur 2 337 Saran pur 2059 1 1 1 0 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.77 order Chamuchak 3rd Punpun 338 Patna Majhauli 2058 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order Sampatcha 3rd 339 Patna k Karanpura 2055 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Dighwara 340 Saran Dudhia 2046 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 341 Patna Basuhar 2038 1 1 1 1 1 1 0 1 0 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 10 10.44 order 3rd Bakhtiarpur 342 Patna Karauta 2033 1 1 1 0 0 0 0 0 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 5 6.06 order 3rd Masaurhi 343 Patna Jagpura 2028 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order

CEPT UNIVERSITY I AHMEDABAD 202 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd Dighwara 344 Saran Nizama Chak 2028 1 1 1 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.65 order 3rd Naubatpur 345 Patna Badipur 2026 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order 3rd Punpun 346 Patna Nuruddinpur 2019 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bihta 347 Patna Rambad 2015 1 1 1 0 1 1 1 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 5.32 order Dinapur- Cum- Lakhni 3rd 348 Patna Khagaul Bigha 1996 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order JafrabadTok- Raghopur araziBeshiNa 3rd 349 vaishali oBarar 1991 1 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.99 order Lachhmanpu 3rd Bihta 350 Patna r 1980 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order Mohiuddinp 3rd Fatwah 351 Patna ur 1969 1 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 2.36 order 3rd Punpun 352 Patna Sirpalpur 1968 1 1 1 0 1 1 0 0 1 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 8 16.06 order 3rd Bihta 353 Patna GOrhna 1965 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Bishambhar 3rd Bihta 354 Patna pur 1961 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.49 order 20 3rd Fatwah 3 355 Patna Jaitiya 1961 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Naubatpur 356 Patna Raunian 1957 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Dariapur 357 Saran Akbarpur II 1955 1 1 1 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 5 6.71 order 3rd Fatwah 358 Patna Bhergawan 1949 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Phulwari 359 Patna Nasirpura 1947 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.09 order 3rd Bidupur 360 vaishali Gokhulpur 1943 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order Dinapur- 3rd 361 Patna Cum- Gorgawan 1941 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order

CEPT UNIVERSITY I AHMEDABAD 203 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy Khagaul 3rd Phulwari 362 Patna Budhgawan 1930 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Phulwari 363 Patna Rahimpur 1930 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.09 order 3rd Dhanarua 364 Patna Nadpura 1917 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Fatwah 365 Patna Parsa 1915 1 1 1 1 1 1 0 0 1 1 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 10 11.54 order 3rd Masaurhi 366 Patna Charma 1913 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order Dinapur- Cum- Harsham 3rd 367 Patna Khagaul chak 1913 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 368 Patna Taret 1905 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order 2nd Naubatpur 369 Patna Tiskhora 1904 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 8 35.54 order 3rd Dhanarua 370 Patna Keorha 1898 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Sonepur 371 Saran Chhitar Chak 1893 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Sonepur 372 Saran Gheghta 1890 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 20 Lachhumanp 3rd Bakhtiarpur 4 373 Patna ur 1888 1 1 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 2.54 order 3rd Bihta 374 Patna Munsepur 1880 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.45 order 3rd Masaurhi 375 Patna Dahibhatta 1878 1 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.62 order Patna Rural (a) Patna 3rd 376 Patna Rural (b) Sabalpur 1878 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.17 order 3rd Bihta 377 Patna Ramtari 1875 1 1 1 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 3.39 order Chhotki 3rd Masaurhi 378 Patna Masaurhi 1874 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order 379 vaishali Hajipur Sultanpur 1874 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 3rd

CEPT UNIVERSITY I AHMEDABAD 204 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order Nawada 3rd 380 vaishali Hajipur Kalan 1870 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Masaurhi 381 Patna Basaur 1868 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.17 order 2nd Bihta 382 Patna Banwaripur 1860 1 1 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 8 22.66 order Dinapur- Cum- 3rd 383 Patna Khagaul Mobarakpur 1856 0 0 1 1 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 5 18.68 order 3rd Bihta 384 Patna Dilawarpur 1849 1 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 2.36 order Patna Rural (a) Patna 2nd 385 Patna Rural (b) Mahuli 1842 1 1 1 1 1 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 1 0 0 1 0 0 0 9 25.40 order Dinapur- Cum- 3rd 386 Patna Khagaul Khedarpura 1839 1 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.85 order Rampur 3rd 387 vaishali Hajipur Nausahan 1838 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order 3rd Bihta 388 Patna Mustafapur 1836 1 1 1 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.80 order 3rd Masaurhi 389 Patna Bhakhra 1834 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 20 3rd Sonepur 5 390 Saran Chhapra 1834 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 1.59 order 3rd Daniawan 391 Patna Masudpur 1831 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Jagdishpur Raghopur Idrakarai 3rd 392 vaishali Barari 1828 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order Patna Rural (a) Patna 3rd 393 Patna Rural (b) Gauharpur 1823 1 1 1 1 1 0 1 0 0 0 0 1 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 9 14.15 order 3rd Dariapur 394 Saran Akbarpur I 1821 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Sonepur 395 Saran Rahimpur 1820 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 4.89 order

CEPT UNIVERSITY I AHMEDABAD 205 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd Naubatpur 396 Patna Nondiha 1811 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.49 order 3rd Naubatpur 397 Patna Motipur 1806 1 1 1 1 1 0 0 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 7 5.35 order 3rd Bihta 398 Patna Neuri 1803 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bihta 399 Patna Kutlupur 1800 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Bihta 400 Patna Bilap 1791 1 1 1 1 1 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 5.26 order 3rd Khusrupur 401 Patna Kohawan 1786 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 order 3rd Raghopur 402 vaishali Saifpur 1770 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Chintamanip 3rd Maner 403 Patna ur Maula 1767 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order Sampatcha 3rd 404 Patna k Fazlabad 1765 1 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.85 order Patna Rural (a) Patna 3rd 405 Patna Rural (b) Mircha 1763 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.09 order 3rd Naubatpur 406 Patna Pali 1762 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order 3rd Dighwara 20 407 Saran Bishunpur 1759 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.17 order 6 3rd Sonepur 408 Saran Makra 1757 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Jethui 3rd 409 vaishali Hajipur Nizamat 1751 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.42 order 3rd 410 vaishali Hajipur Chandaleh 1737 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 411 Patna sona 1733 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Bihta 412 Patna 1731 1 1 1 1 1 0 0 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 7 5.35 order 3rd Fatwah 413 Patna Janarjanpur 1726 1 1 1 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 3.18 order 414 Patna Bakhtiarpur Simri 1721 1 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.29 3rd

CEPT UNIVERSITY I AHMEDABAD 206 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order Ashpatpur Raghopur Singhia urf 3rd 415 vaishali Latiahi 1719 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Bihta 416 Patna Panrepur 1715 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dhanarua 417 Patna Rarha 1704 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order 3rd Dhanarua 418 Patna Kashinagar 1700 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.45 order 3rd Raghopur 419 vaishali Ibrahimabad 1691 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order Sampatcha 3rd 420 Patna k Ilahi Bag 1691 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Phulwari 421 Patna Sorampur 1689 1 1 1 0 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 4.07 order Dinapur- Cum- 3rd 422 Patna Khagaul Maksudpur 1683 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Khusrupur 423 Patna Kurtha 1673 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Fatehpur 3rd Phulwari 424 Patna Dhibra 1670 1 1 1 1 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 4.31 order 3rd Punpun 20 425 Patna Pakri 1669 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 7 3rd Naubatpur 426 Patna Alawalpur 1663 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Khusrupur 427 Patna Malpur 1663 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Dinapur- Cum- 3rd 428 Patna Khagaul Hadaspura 1660 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order Sukar Beg 3rd Khusrupur 429 Patna Chak 1658 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 430 Patna Lahladpur 1652 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Kamalpur 3rd Bidupur 431 vaishali Singhia 1646 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order

CEPT UNIVERSITY I AHMEDABAD 207 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd Bakhtiarpur 432 Patna Samsara 1644 1 1 1 1 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 6 8.22 order 3rd Sonepur 433 Saran Hasanpur 1619 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd 434 vaishali Hajipur Kuari Khurd 1617 1 1 1 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.80 order 3rd Dhanarua 435 Patna Chistipur 1609 1 1 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 2.86 order 3rd Punpun 436 Patna Maranchi 1607 1 1 1 1 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 8 7.25 order 3rd Phulwari 437 Patna Salarpur 1607 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.58 order Chandpur Bidupur Chak 3rd 438 vaishali Makrand 1590 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Raghopur 439 vaishali Hajpurwa 1583 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Naubatpur 440 Patna Amarpura 1570 1 1 1 1 1 1 0 0 1 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 9 8.37 order Sampatcha 3rd 441 Patna k Kamta Chak 1570 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.09 order 3rd Naubatpur 442 Patna Babupur 1563 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Maner 20 443 Patna Mangarpal 1556 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.45 order 8 3rd Masaurhi 444 Patna Poawan 1555 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 order 3rd Masaurhi 445 Patna Sarbahanpur 1550 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.10 order 3rd Sonepur 446 Saran Dariyapur 1547 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.17 order 3rd Daniawan 447 Patna Barki Kewai 1545 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Sampatcha 3rd 448 Patna k Shekhpura 1545 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bihta 449 Patna Sirichandpur 1541 1 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.94 order 450 Patna Fatwah Bibipur 1538 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 3rd

CEPT UNIVERSITY I AHMEDABAD 208 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order 3rd Dhanarua 451 Patna Jalalpur 1531 1 1 1 1 1 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 3.51 order 3rd Phulwari 452 Patna Muradpur 1528 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Masaurhi 453 Patna Nura 1528 1 1 1 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 2.83 order 3rd Fatwah 454 Patna Rukunpur 1528 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order Nagwan 3rd Naubatpur 455 Patna Khas 1527 1 1 1 1 1 1 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 4.88 order 3rd Sonepur 456 Saran Baqarpur 1523 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 457 Patna Sikandarpur 1514 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Khusrupur 458 Patna Lodipur 1513 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Naubatpur 459 Patna Bisarpur 1505 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Dinapur- Cum- Shankarpur 3rd 460 Patna Khagaul khas 1502 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Babhangawa 3rd Dighwara 461 Saran n 1501 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 20 Patna Rural 9 (a) Patna 3rd 462 Patna Rural (b) Khaspur 1499 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.56 order 3rd Sonepur 463 Saran Seoti 1497 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Masaurhi 464 Patna Nahwan 1494 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Dhanarua 465 Patna Mirzapur 1484 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Salimpur 3rd Bakhtiarpur 466 Patna Milik 1483 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.10 order 3rd Bihta 467 Patna Khedarpura 1482 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 468 Patna Naubatpur Akbarpur 1481 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 3rd

CEPT UNIVERSITY I AHMEDABAD 209 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order 3rd Naubatpur 469 Patna Sabar Chak 1480 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 470 Patna Deora 1479 1 1 1 0 0 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 6 13.12 order 3rd Bihta 471 Patna Jamnapur 1478 1 1 1 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 2.72 order 3rd Sonepur 472 Saran Kasturi Chak 1477 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Fatwah 473 Patna Murajpur 1477 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Ismailpur 3rd Phulwari 474 Patna Dhibra 1475 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Naubatpur 475 Patna Chechaul 1473 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order 3rd Phulwari 476 Patna Korra 1473 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.09 order 3rd 477 vaishali Hajipur 1470 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Sonepur 478 Saran Ismail Chak 1470 1 1 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 2.68 order 3rd Dariapur 479 Saran Hewantpur 1464 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Abdullah 3rd Fatwah 21 480 Patna Chak 1459 1 1 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 2.68 order Himatpur 3rd Raghopur 481 vaishali Diara 1459 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dhanarua 482 Patna Bhergawan 1455 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 6 14.45 order 3rd Masaurhi 483 Patna Dhanauti 1455 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order 3rd Naubatpur 484 Patna Shirwar 1455 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Sonepur 485 Saran Hasanpur 1453 1 1 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 4 3.55 order 3rd Masaurhi 486 Patna Garihara 1451 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 order 487 Patna Masaurhi Kararia 1449 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 3rd

CEPT UNIVERSITY I AHMEDABAD 210 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order 3rd Dighwara 488 Saran Una Chak 1446 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order 3rd Phulwari 489 Patna Tarwan 1443 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 490 Patna Dariapur 1428 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Sampatcha 3rd 491 Patna k Udaini 1422 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.49 order Patna Rural (a) Patna 3rd 492 Patna Rural (b) Hiranandpur 1421 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bihta 493 Patna Baghpur 1420 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Naubatpur 494 Patna Bara 1420 0 1 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 1.58 order Sampatcha 3rd 495 Patna k Kamarji 1419 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Dhanarua 496 Patna Aurangpur 1414 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order 3rd Naubatpur 497 Patna Jamalpura 1407 1 1 1 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 3.22 order 3rd Phulwari 498 Patna Parsa 1407 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 order 21 3rd Raghopur 1 499 vaishali 1402 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Dhobiakalap 3rd Naubatpur 500 Patna ur 1401 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.09 order Sampatcha 3rd 501 Patna k Bhelaura 1400 1 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.97 order 3rd Khusrupur 502 Patna Erai Benipur 1399 1 1 1 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.74 order 3rd Sonepur 503 Saran Faqrabad 1399 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bihta 504 Patna Doghra 1394 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Phulwari 505 Patna Anda 1392 1 1 0 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.94 order

CEPT UNIVERSITY I AHMEDABAD 211 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd 506 Patna Athmalgola Fatehpur 1392 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dighwara 507 Saran Batrauli 1380 1 1 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 4 3.55 order Raghopur 3rd Bihta 508 Patna Jalahwa 1377 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Naubatpur 509 Patna Kalapur 1370 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order Kutubpur 3rd 510 vaishali Hajipur Dumri 1368 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 511 Patna Bhabhaul 1367 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Dost Daniawan Muhammad 3rd 512 Patna pur 1362 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Fatwah 513 Patna Naraina 1362 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Sonepur 514 Saran Parvezabad 1361 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Phulwari 515 Patna Chihut 1360 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Naubatpur 516 Patna Sarbadahi 1357 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Muhammad 3rd Dhanarua 21 517 Patna pur 1349 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 2 3rd Naubatpur 518 Patna Korawan 1347 1 1 1 1 1 1 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 4.64 order 3rd Phulwari 519 Patna Pakri 1340 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Dhanarua 520 Patna Deokali 1333 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order 3rd Bakhtiarpur 521 Patna Majhauli 1330 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Fatwah 522 Patna Niyazipur 1308 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 4 7.46 order 3rd Maner 523 Patna Katautia 1305 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 524 Patna Naubatpur Lodipur 1301 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 3rd

CEPT UNIVERSITY I AHMEDABAD 212 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order 3rd Naubatpur 525 Patna Kharauna 1300 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Sonepur 526 Saran Hasilpur 1295 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Dhanarua 527 Patna Saguni 1292 1 1 1 0 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.77 order 3rd Phulwari 528 Patna Simra 1290 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Naubatpur 529 Patna Chara 1286 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 5 7.78 order Kalianpur 3rd Punpun 530 Patna Basiawan 1282 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Phulwari 531 Patna Koriawan 1278 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Mansinghpu 3rd Fatwah 532 Patna r 1278 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Masaurhi 533 Patna Baliari 1277 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Phulwari 534 Patna Manhgupur 1274 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order 3rd Daniawan 535 Patna Aiman Bigha 1257 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order Muhammad 3rd Fatwah 21 536 Patna pur 1256 1 1 1 1 1 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order Ghurhu 3rd Dariapur 537 Saran Kothia 1254 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 538 Patna Nadpur 1252 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Dinapur- Cum- 3rd 539 Patna Khagaul Sapahua 1251 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 540 Patna Shekhpura 1250 1 1 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.44 order 3rd Fatwah 541 Patna Ranipur 1246 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 2nd Punpun 542 Patna Jalalpur 1241 1 1 1 0 1 0 0 0 0 0 1 0 1 1 0 0 0 0 0 1 0 0 0 1 0 0 0 9 28.72 order

CEPT UNIVERSITY I AHMEDABAD 213 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy Khaprail 3rd Phulwari 543 Patna Chak 1228 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 5 4.99 order Dinapur- Cum- 3rd 544 Patna Khagaul Kothia 1226 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Fatwah 545 Patna Raipur Balua 1222 1 1 1 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.80 order 3rd Punpun 546 Patna Mahamda 1220 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Sonepur 547 Saran ChakDaria 1216 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.52 order 3rd Punpun 548 Patna Saraia 1216 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bakhtiarpur 549 Patna Lakhipur 1214 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.67 order 3rd Fatwah 550 Patna Bazidpur 1212 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order 3rd Masaurhi 551 Patna Sukhathia 1211 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Fatwah 552 Patna Khizirpur 1209 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Panapur 3rd Bidupur 553 vaishali Dharampur 1206 1 1 1 0 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.52 order 3rd Khusrupur 21 554 Patna Phulwaria 1206 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 4 3rd Naubatpur 555 Patna Dihra 1205 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order Gauspur 3rd Dhanarua 556 Patna Dubhara 1205 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dighwara 557 Saran Kesarpur 1204 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 558 Patna Aropur 1203 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd 559 vaishali Hajipur Sherpur 1201 1 1 1 1 1 0 1 1 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 9 14.31 order 3rd Punpun 560 Patna Pipra 1200 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 561 Saran Sonepur Saidpur 1198 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 3rd

CEPT UNIVERSITY I AHMEDABAD 214 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy Deochand order 3rd Phulwari 562 Patna Hasanpura 1193 1 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.29 order Sampatcha 3rd 563 Patna k Koli 1193 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Dhanarua 564 Patna Chanaki 1190 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Raghopur 565 vaishali Shakarpura 1187 1 1 1 0 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.50 order Shampur Dayal Deo Dhanarua Narayan 3rd 566 Patna Sing 1187 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bidupur 567 vaishali Pakri 1186 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Phulwari 568 Patna Faridpur 1184 1 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 2.36 order 3rd Maner 569 Patna Patila 1182 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order 3rd Khusrupur 570 Patna Tilhar 1182 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Phulwari 571 Patna Chilbili 1179 1 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.97 order Dinapur- 21 Cum- 3rd 5 572 Patna Khagaul Dhibra 1179 1 1 1 1 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 5 3.87 order 3rd Sonepur 573 Saran Apsaid 1178 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd 574 vaishali Hajipur Mohabatpur 1178 1 1 1 0 0 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 4.03 order Chhittu 3rd Sonepur 575 Saran Pakar 1176 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.52 order 3rd Fatwah 576 Patna Dariapur 1175 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Punpun 577 Patna Dharahra 1173 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 578 Patna Sihora 1172 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 6 10.18 order

CEPT UNIVERSITY I AHMEDABAD 215 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd 579 vaishali Hajipur Bahadurpur 1170 1 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.29 order 3rd Naubatpur 580 Patna Painapur 1169 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dhanarua 581 Patna Khardiha 1164 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Bihta 582 Patna Narainpur 1161 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Punpun 583 Patna Nima 1158 1 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.62 order 3rd Sonepur 584 Saran Damodarpur 1155 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Mirdaha 3rd Bakhtiarpur 585 Patna Chak 1153 1 1 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 2.54 order 3rd Dighwara 586 Saran Ahiman Patti 1148 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bakhtiarpur 587 Patna Lakhanpura 1147 1 1 1 0 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 3.10 order Salehpur 3rd Sonepur 588 Saran Kasara 1147 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bihta 589 Patna Basaurha 1139 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.49 order 3rd Bihta 590 Patna Bedauli 1137 1 1 1 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.80 order 21 Abupur 3rd Phulwari 6 591 Patna Lodipur 1136 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Sonepur 592 Saran Bariar Chak 1135 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.52 order 3rd Punpun 593 Patna Dehri 1135 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order 3rd Masaurhi 594 Patna Chananpur 1133 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.58 order 3rd Khusrupur 595 Patna Hemzapur 1133 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Masaurhi 596 Patna Hasanpura 1132 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Fatwah 597 Patna Bikrampur 1130 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order

CEPT UNIVERSITY I AHMEDABAD 216 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy Dinapur- Cum- 3rd 598 Patna Khagaul Usri Khurd 1130 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bakhtiarpur 599 Patna Hatia 1129 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bakhtiarpur 600 Patna Rampur 1127 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Naubatpur 601 Patna Rampur 1127 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Naubatpur 602 Patna Gadaipur 1124 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Masaurhi 603 Patna Shahbazpur 1124 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Dinapur- Cum- 3rd 604 Patna Khagaul Mainpura 1122 1 1 1 0 0 1 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 6 6.04 order Dinapur- Cum- 3rd 605 Patna Khagaul Kedalpura 1120 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.17 order 3rd Naubatpur 606 Patna Ahuara 1118 1 1 1 0 1 0 1 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 7 7.33 order 3rd Punpun 607 Patna Barepur 1116 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Maner 21 608 Patna Wajidpur 1116 1 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.29 order 7 3rd Punpun 609 Patna Maksudpur 1112 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Sonepur 610 Saran Lahlad Chak 1108 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Maner 611 Patna Lodipur 1108 1 1 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 2.86 order Raghunathp 3rd Naubatpur 612 Patna ur Bhelura 1106 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Dhanarua 613 Patna Sheodaha 1103 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 614 Patna Khapura 1097 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 615 Patna Masaurhi Akauna 1096 1 0 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.52 3rd

CEPT UNIVERSITY I AHMEDABAD 217 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order Rampur 3rd Phulwari 616 Patna Bhilora 1094 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Mohan 3rd Dariapur 617 Saran Kothia 1089 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Sonepur 618 Saran Shaistapur 1089 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order 3rd Naubatpur 619 Patna Baruna 1078 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Naubatpur 620 Patna Parsotimpur 1078 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Babhanganw 3rd Sonepur 621 Saran an 1077 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order Nasirpur 3rd Fatwah 622 Patna Balwa 1075 1 1 1 0 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.65 order 3rd Fatwah 623 Patna Baria Kalan 1068 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bihta 624 Patna Bazidpur 1067 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.09 order Pandepur 3rd Maner 625 Patna Tilhari 1067 1 1 1 1 1 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 4.52 order 3rd Fatwah 626 Patna Khanpura 1065 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order Chak 21 Mahmud 8 3rd 627 vaishali Hajipur Chisti 1063 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Dhanarua 628 Patna Telhara 1061 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 629 Patna Panhara 1055 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Bihta 630 Patna Adlipur 1054 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dhanarua 631 Patna Sisauna 1054 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order 3rd Naubatpur 632 Patna Mamrezpur 1052 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd 633 vaishali Hajipur Mangurahi 1050 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order

CEPT UNIVERSITY I AHMEDABAD 218 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd Naubatpur 634 Patna Bhagwanpur 1046 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd 635 vaishali Hajipur Ismailpur 1045 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Dilawarpur 3rd Bidupur 636 vaishali Hemti 1043 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bakhtiarpur 637 Patna Goiaspur 1043 1 1 0 1 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 3.21 order 3rd Fatwah 638 Patna Nathupur 1043 1 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.61 order 3rd Fatwah 639 Patna Chamardih 1042 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Saidpur Parsuram 3rd 640 vaishali Hajipur urf Jagdispur 1042 1 1 1 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.65 order 3rd Dhanarua 641 Patna Bhagwanpur 1038 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Bakhtiarpur 642 Patna Majhauli 1033 1 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 2.36 order 3rd Daniawan 643 Patna Madari Chak 1030 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dighwara 644 Saran Parsotimpur 1029 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Dariapur 21 645 Saran Manupur 1019 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 9 3rd Daniawan 646 Patna Masnapur 1014 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Ghanshamp 3rd Naubatpur 647 Patna ur 1011 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Raghopur 648 vaishali Karmupur 1011 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.42 order 3rd Sonepur 649 Saran Ramsapur 1011 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Sonepur 650 Saran Kapur Chak 1007 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Punpun 651 Patna Rampur 1002 1 1 1 1 1 0 0 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 8 7.44 order 652 Patna Sampatcha Abdullah 997 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 3rd

CEPT UNIVERSITY I AHMEDABAD 219 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy k Chak order Juramanpur 3rd Raghopur 653 vaishali Taufir 993 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Sampatcha 3rd 654 Patna k Baruna 991 0 1 1 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3.16 order 3rd Dhanarua 655 Patna Ashrafganj 989 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 656 Patna Tilakpura 986 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5 9.73 order 3rd Dariapur 657 Saran Bhairopur 985 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 658 Patna Abgilla 974 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Imadpur 3rd 659 vaishali Hajipur Sultan 974 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Raghopur 660 vaishali Birpur 973 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order 3rd Raghopur 661 vaishali Jafrabad Dih 973 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order 3rd Phulwari 662 Patna Khardiha 968 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Masaurhi 663 Patna Gorhna 967 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Sorabpur urf 3rd Raghopur 22 664 vaishali Saraepur 967 1 1 1 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 3.39 order 3rd Phulwari 665 Patna Madhopur 960 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Naubatpur 666 Patna Bela 958 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bihta 667 Patna Patsa 958 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.49 order 3rd Fatwah 668 Patna Ainio 952 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dariapur 669 Saran Mathchelwa 952 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dighwara 670 Saran Baqarpur 951 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.17 order 671 Saran Sonepur Garibpatti 951 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 3rd

CEPT UNIVERSITY I AHMEDABAD 220 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order Haibatpur 3rd Raghopur 672 vaishali Karari 949 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd 673 vaishali Hajipur Chaknur 948 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Mirdaha 3rd Bakhtiarpur 674 Patna Chak 947 1 1 1 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.65 order 3rd Masaurhi 675 Patna Chithaul 946 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Maner 676 Patna Gaiaspur 945 1 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.94 order Sampatcha 3rd 677 Patna k Mokimpur 944 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Daniawan 678 Patna Danara 940 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Fatwah 679 Patna Bendauli 939 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order 3rd Punpun 680 Patna Chande Dih 939 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.10 order 3rd 681 vaishali Hajipur Bakarpur 933 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd 682 vaishali Hajipur Shiurampur 931 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Ganja Chak 22 Phulwari Muhammad 1 3rd 683 Patna pur 930 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 684 Patna Nuri Chak 929 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Daniawan 685 Patna Ghoranpura 926 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 686 Patna Nizampur 924 1 1 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.49 order 3rd Bakhtiarpur 687 Patna Chak Chhitu 921 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.52 order 3rd Dariapur 688 Saran Sumerpatti 921 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 689 Patna Barah 917 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order

CEPT UNIVERSITY I AHMEDABAD 221 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd Naubatpur 690 Patna Kopa Khurd 917 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Bazidpur 3rd 691 vaishali Hajipur Malahi 916 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Bidupur 692 vaishali Ismail Chak 916 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 4 6.99 order 3rd Maner 693 Patna Semara 916 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 694 Patna Tarari 908 1 1 1 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4 3.26 order 3rd Fatwah 695 Patna Abdalpur 907 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Phulwari 696 Patna Naharpura 906 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Masaurhi 697 Patna Niyamatpur 905 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Fatwah 698 Patna Sirpatpur 905 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order 3rd Naubatpur 699 Patna Bichhedi 904 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Fatwah 700 Patna Gangapur 899 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Daniawan 701 Patna Munrera 898 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 22 3rd Punpun 2 702 Patna Palaki 898 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 703 Patna Ghordaur 894 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Chotka 3rd Khusrupur 704 Patna Nawada 889 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 5 14.97 order 3rd Bidupur 705 vaishali Harbanspur 888 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order Sampatcha 3rd 706 Patna k Naya Chak 888 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Fatwah 707 Patna Pachrukhia 888 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Maner 708 Patna Khaspur 885 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.49 order

CEPT UNIVERSITY I AHMEDABAD 222 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd Khusrupur 709 Patna Hasanpura 874 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.49 order 3rd Naubatpur 710 Patna Bedauli 873 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Daniawan 711 Patna Faridpur 873 1 1 1 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 2.84 order 3rd Punpun 712 Patna Purainian 865 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Dinapur- Cum- 3rd 713 Patna Khagaul Kafarpur 855 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Fatwah 714 Patna Kharphar 853 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Fatwah 715 Patna Satparsa 851 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Imadpur Bidupur Kapur Urf 3rd 716 vaishali Mohim Chak 847 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Punpun 717 Patna Ganj 846 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Masaurhi 718 Patna Thalpura 846 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd 719 vaishali Hajipur Purwa 843 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 22 3rd Fatwah 3 720 Patna Sultanpur 842 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Punpun 721 Patna Mustafapur 841 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 722 Patna Dekuli 839 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dhanarua 723 Patna Kewali 839 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bihta 724 Patna Sikandarpur 837 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Naubatpur 725 Patna Jittu Chak 825 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Khusrupur 726 Patna Kasimpur 825 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order

CEPT UNIVERSITY I AHMEDABAD 223 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd Sonepur 727 Saran Murgia Chak 824 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order 3rd Bihta 728 Patna Hiramanpur 823 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Sonepur 729 Saran Rajapur 823 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Abdalpur 3rd Punpun 730 Patna Pipra 821 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Fatwah 731 Patna Turk Diha 820 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Dinapur- Cum- 3rd 732 Patna Khagaul Mustafapur 818 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Khusrupur 733 Patna Marwa 817 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 734 Patna Newa 816 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd 735 vaishali Hajipur Kila Larui 811 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Phulwari 736 Patna Nihura 810 1 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.29 order 3rd Fatwah 737 Patna Parsarampur 806 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Fatwah 22 738 Patna Buzurg 803 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 4 Saidpur 3rd Bidupur 739 vaishali Hulas 802 1 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.99 order 2nd Raghopur 740 vaishali Mohanpur 788 1 1 1 1 1 1 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 9 31.61 order 3rd Fatwah 741 Patna Narwan 782 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Khusrupur 742 Patna Mustafapur 778 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Fatwah 743 Patna Bhikhua 759 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dighwara 744 Saran Pakaulia 759 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 order 745 vaishali Hajipur Phul Chak 758 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 3rd

CEPT UNIVERSITY I AHMEDABAD 224 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order Dinapur- Cum- 3rd 746 Patna Khagaul Adampur 756 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Raghopur 747 vaishali Parsotimpur 754 1 1 1 1 0 0 0 0 1 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 7 10.47 order Dilawarpur 3rd Bidupur 748 vaishali Hemti 753 1 1 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 4 3.55 order 3rd Dhanarua 749 Patna Mustafapur 753 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 750 Patna Sahora 751 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 751 Patna Karanpura 744 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Phulwari 752 Patna Nizampur 743 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Makhdumpu 3rd Bihta 753 Patna r 741 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 4 6.99 order 3rd Daniawan 754 Patna Nabi Chak 739 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Masaurhi 755 Patna Bilaunti 738 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 756 Patna Kardaha 735 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 22 3rd Naubatpur 5 757 Patna Bahuara 731 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bihta 758 Patna Mustafapur 729 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Dhanarua 759 Patna Jamalpur 725 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Panapur 3rd 760 vaishali Hajipur Gobrahi 724 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Masaurhi 761 Patna Bhimpura 722 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dhanarua 762 Patna Paranpura 722 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.45 order 3rd Masaurhi 763 Patna Islampur 721 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order

CEPT UNIVERSITY I AHMEDABAD 225 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd Bihta 764 Patna Ramnagar 720 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 765 Patna Dariapur 713 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Chhotki 3rd Daniawan 766 Patna Kewai 710 0 1 1 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 4 6.39 order 3rd Phulwari 767 Patna Mainpura 703 1 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.61 order Kalianpur 3rd Punpun 768 Patna Basiawan 697 1 1 1 0 1 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 7 4.92 order Jamalpur Chak Raghopur ShankerGan 3rd 769 vaishali ga Pra 694 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Ramdas 3rd Dighwara 770 Saran Chak 694 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd 771 vaishali Hajipur Chak Sakra 693 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Sampatcha 3rd 772 Patna k Sitjain Chak 683 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Patna Rural (a) Patna 3rd 773 Patna Rural (b) Chhitman 680 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Raghopur 22 774 vaishali Saidani Chak 678 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 6 3rd Punpun 775 Patna Baisa 677 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Chak Bigha 3rd 776 vaishali Hajipur Jani 675 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Masaurhi 777 Patna Jagdishpur 674 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Sonepur 778 Saran Rasulpur 672 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bidupur 779 vaishali Gobindpur 669 1 1 1 1 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 9 13.96 order Dinapur- Cum- 3rd 780 Patna Khagaul Dalip chak 667 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order

CEPT UNIVERSITY I AHMEDABAD 226 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd Naubatpur 781 Patna Bakua 665 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Sampatcha 3rd 782 Patna k Rupaspur 656 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 783 Patna Danaganj 654 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.00 order 3rd Fatwah 784 Patna Daulatpur 654 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 order 3rd Punpun 785 Patna Nawada 653 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bihta 786 Patna Kaliganj 650 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.52 order Molrajpur 3rd Bakhtiarpur 787 Patna Diara 650 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dhanarua 788 Patna Anjni 640 1 1 1 0 1 0 1 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 7 11.53 order Naurangaba 3rd 789 vaishali Hajipur d 637 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Daniawan 790 Patna Kashmiriya 636 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 791 Patna Udaipura 635 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Dinapur- Cum- 3rd 22 792 Patna Khagaul Babakkarpur 633 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 7 3rd Sonepur 793 Saran Barbatta 632 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dhanarua 794 Patna Daualatpur 632 1 1 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 2.86 order 3rd Fatwah 795 Patna Said Alipur 632 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Bihta 796 Patna Tarvan 630 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Masaurhi 797 Patna Sahebnagar 627 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Chak Daria 3rd Sonepur 798 Saran Sultanpur 626 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 799 Patna Naubatpur Goraila 626 1 1 1 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 3.39 3rd

CEPT UNIVERSITY I AHMEDABAD 227 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order 3rd Masaurhi 800 Patna Bhagwanpur 623 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Bihta 801 Patna Nagabihta 619 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Majirabad 3rd 802 vaishali Hajipur Suhai 618 1 1 1 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 2.72 order Chak 3rd 803 vaishali Hajipur Ataullah 617 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Gurpati 3rd Masaurhi 804 Patna Chak 616 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.58 order 3rd Bihta 805 Patna Hiramanpur 616 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Phulwari 806 Patna Mahbano 615 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd 807 vaishali Hajipur Chak Yeari 614 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 808 Patna Khaira 614 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bakhtiarpur 809 Patna Saidpur 609 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Ahiapur 3rd Maner 810 Patna Maner 608 1 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.94 order 3rd Maner 22 811 Patna Bank 608 1 1 1 0 0 0 1 0 0 0 0 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.17 order 3rd Maner 812 Patna Beapur 608 1 1 1 1 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 9 13.05 order 3rd Maner 813 Patna Chhitrauli 608 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Maner 814 Patna Dhakarpos 608 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.09 order Harshankarp 3rd Maner 815 Patna ur Narhanna 608 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Maner 816 Patna Lodipur 608 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Bihta 817 Patna Mithapur 608 1 1 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 2.86 order 818 Patna Maner Rasulpur 608 1 1 1 0 1 1 0 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 6.50 3rd

CEPT UNIVERSITY I AHMEDABAD 228 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy Bijaigopal order Rasulpur Maner Bijaigopal 3rd 819 Patna Milki 608 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 order 3rd Naubatpur 820 Patna Gahra 607 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dhanarua 821 Patna Raipura 602 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1.45 order Dinapur- Cum- 3rd 822 Patna Khagaul 600 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Sampatcha 3rd 823 Patna k Chakpul 595 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.52 order 3rd Dhanarua 824 Patna Mianchak 594 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd Fatwah 825 Patna Soti Chak 585 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bakhtiarpur 826 Patna Ghansurpur 580 1 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.61 order 3rd Punpun 827 Patna Tulsi Chak 579 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Baijalpur 3rd Sonepur 828 Saran Jamuni 575 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Mohiuddinp 3rd Phulwari 22 829 Patna ur 573 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 9 3rd Naubatpur 830 Patna Dariapur 570 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Bidupur 831 vaishali Pakauli 561 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Mir Haji 3rd Punpun 832 Patna Chak 559 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.77 order 3rd Masaurhi 833 Patna Tarpura 558 1 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.29 order Ziauddin 3rd Dhanarua 834 Patna Chak 556 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Masaurhi 835 Patna Chakia 552 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 836 Patna Fatwah Alawalpur 548 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 3rd

CEPT UNIVERSITY I AHMEDABAD 229 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy order Mohiuddin 3rd Bihta 837 Patna Chak 546 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Larui 3rd 838 vaishali Hajipur Husainabad 543 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Sonepur 839 Saran Pahleza 542 1 1 1 1 0 1 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 7 5.71 order Satauli 3rd Masaurhi 840 Patna Buzurg 540 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Fatwah 841 Patna Bariakhurd 539 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Sharishtaba 3rd Naubatpur 842 Patna d 532 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order Najibullah 3rd Fatwah 843 Patna Chak 529 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd 844 vaishali Hajipur Madarpur 528 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Fatwah 845 Patna Bhagwanpur 526 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Dinapur- Cum- 3rd 846 Patna Khagaul Jalalpur 526 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Chaura 3rd Bihta 847 Patna Gopalpur 523 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 23 3rd Dighwara 0 848 Saran Milki 520 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Phulwari 849 Patna Dhanuki 515 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.52 order 3rd Phulwari 850 Patna Nadiawan 515 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bihta 851 Patna Maddhupur 513 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Phulwari 852 Patna Alipur 510 1 1 1 1 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 3.00 order Arazi Chak 3rd Bidupur 853 vaishali Kanchanpur 501 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Sonepur 854 Saran Mirzapur 501 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 5 7.78 order

CEPT UNIVERSITY I AHMEDABAD 230 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy Dinapur- Cum- 3rd 855 Patna Khagaul Nasirpur 501 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.56 order Chak Bhoj urf 3rd 856 vaishali Hajipur Sahabuddin 498 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Mohiuddinp 3rd Masaurhi 857 Patna ur 495 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Chak 3rd 858 vaishali Hajipur Baladhari 494 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Punpun 859 Patna Khairi 491 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Muhammad 3rd Khusrupur 860 Patna pur 491 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Khusrupur 861 Patna Mustafapur 491 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dhanarua 862 Patna Larha 484 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 863 Patna Jol Bigha 482 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Naubatpur 864 Patna Maharajganj 479 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd 865 vaishali Hajipur Salhadi 468 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 23 3rd Masaurhi 1 866 Patna Hunrari 462 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Raghopur 867 vaishali Parsotimpur 456 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order 3rd Maner 868 Patna Sikandarpur 455 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Bihta 869 Patna Ibrahimpur 454 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.52 order 3rd Sonepur 870 Saran Sabalpur 450 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd 871 vaishali Hajipur Chak Aima 444 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Punpun 872 Patna Bela 443 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order

CEPT UNIVERSITY I AHMEDABAD 231 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy Malahi 3rd Naubatpur 873 Patna Khandha 442 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd 874 vaishali Hajipur Jagdishpur 438 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Fatwah 875 Patna Nanda Chak 436 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.10 order 3rd Bihta 876 Patna Jaintipur 432 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 877 Patna Fahim Chak 428 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Masaurhi 878 Patna Bairi Chak 427 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Barkhurdar 3rd Naubatpur 879 Patna Chak 421 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Punpun 880 Patna Paikauli 418 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Lashkari 3rd Fatwah 881 Patna Chak 417 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Maner 882 Patna Madhopur 417 1 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.29 order 3rd Khusrupur 883 Patna Nuruddinpur 409 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.52 order Til 3rd Bihta 884 Patna Bikrampur 409 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.52 order 23 3rd Fatwah 2 885 Patna Kutubpur 408 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 order 3rd Masaurhi 886 Patna Muzaffarpur 404 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Naubatpur 887 Patna Tilhwan 399 1 1 1 1 1 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 8 15.89 order Sampatcha Sarangpur 3rd 888 Patna k Tilhari 397 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.49 order 3rd Sonepur 889 Saran Rasulpur 395 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Punpun 890 Patna Ufraul 395 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Masaurhi 891 Patna Kansra 389 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order

CEPT UNIVERSITY I AHMEDABAD 232 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd Punpun 892 Patna Mundi Chak 385 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Sonepur 893 Saran Sighinpur 384 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.52 order 3rd Naubatpur 894 Patna Mitan Chak 377 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Sampatcha 3rd 895 Patna k Bhogipur 376 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Fatwah 896 Patna Dalanpur 374 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd 897 vaishali Hajipur Minapur Rae 374 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.56 order 3rd Masaurhi 898 Patna Supahuli 369 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order Mohanpur 3rd Bidupur 899 vaishali Ishar 367 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bihta 900 Patna Kamalpur 362 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd 901 vaishali Hajipur Khalaf Bag 356 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Sonepur 902 Saran Mirzapur 355 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Chak 3rd 903 vaishali Hajipur Faizullah 347 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 3 3.43 order 23 3 3rd 904 vaishali Hajipur Wahidpur 347 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.52 order Gandhu 3rd Masaurhi 905 Patna Garh 345 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dhanarua 906 Patna Thubha 339 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Chak Said 3rd 907 vaishali Hajipur Kari 337 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Mahadeopu 3rd Bihta 908 Patna r Phulari 337 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Fatwah 909 Patna Akharia 335 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Dhanarua 910 Patna Khurrampur 335 1 1 1 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 2.84 order

CEPT UNIVERSITY I AHMEDABAD 233 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy Pirmohamm 3rd Raghopur 911 vaishali adpur 330 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Punpun 912 Patna Khatka 318 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Dinapur- Cum- 3rd 913 Patna Khagaul Shankarpatti 318 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.10 order 3rd Sonepur 914 Saran Baijalpur 309 1 1 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 2.04 order 3rd Bihta 915 Patna Mathura Pur 308 1 1 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 2.54 order 3rd Masaurhi 916 Patna Kazi Chak 303 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Dhanarua 917 Patna Sikoha 298 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Sonepur 918 Saran Siktia 298 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd 919 vaishali Hajipur Moazampur 294 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Mohanpur Ishar Chak 3rd 920 vaishali Hajipur Khusro 283 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Dariapur 921 Saran Manoharpur 282 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 23 Mahammad 3rd Sonepur 4 922 Saran ali Chak 280 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 order 3rd Maner 923 Patna Sherpur 279 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd Bihta 924 Patna Monije Chak 278 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Fatwah 925 Patna Ramji Chak 277 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Dhanarua 926 Patna Manpur 271 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Makhdumpu 3rd Sonepur 927 Saran r 270 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Mohammad 3rd Bakhtiarpur 928 Patna pur 261 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order

CEPT UNIVERSITY I AHMEDABAD 234 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd Dhanarua 929 Patna Sair Chak 261 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Dinapur- Cum- 3rd 930 Patna Khagaul Faridanpur 255 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Punpun 931 Patna Barhaiya Kol 252 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.13 order Dinapur- Cum- 3rd 932 Patna Khagaul Bishunpur 252 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Chak 3rd 933 vaishali Hajipur Nayamat 247 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Chak 3rd Bidupur 934 vaishali Gangadhar 237 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Chak 3rd 935 vaishali Hajipur Chandaleh 230 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Naubatpur 936 Patna Shekhpura 229 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.56 order Muhammad 3rd Punpun 937 Patna pur 228 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Daniawan 938 Patna Warispur 223 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Jethui 3rd 939 vaishali Hajipur Nizamat 214 1 1 1 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 7 11.98 order 23 Banwari 3rd Sonepur 5 940 Saran Chak 213 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Masaurhi 941 Patna Harbanspur 213 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Arazi 3rd Bidupur 942 vaishali Kanchanpur 200 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd 943 vaishali Hajipur Kuari Khurd 199 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd 944 vaishali Hajipur Rae Dih 194 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Az Rakbe 3rd Bidupur 945 vaishali Chaklatif 191 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Chak 3rd Bidupur 946 vaishali Mahbub 191 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 3 10.20 order

CEPT UNIVERSITY I AHMEDABAD 235 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 3rd Dhanarua 947 Patna Rasula 188 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.68 order 3rd 948 vaishali Hajipur Jhirua Mal 186 1 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 2.24 order Haibatpur 3rd Raghopur 949 vaishali Barari 185 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.52 order Salimpur 2nd Bakhtiarpur 950 Patna Milik 183 1 1 1 0 1 1 0 1 0 1 0 0 0 0 0 1 0 0 0 0 0 1 1 0 0 0 0 10 27.84 order Musapur 3rd 951 vaishali Hajipur Suboch 179 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Punpun 952 Patna Pipra Chak 175 1 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.17 order 3rd Phulwari 953 Patna Kharag Chak 174 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.64 order 3rd Fatwah 954 Patna Jethuli 166 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.52 order Mirzapur 3rd Raghopur 955 vaishali Lachhu 165 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Satauli 3rd Fatwah 956 Patna Khurd 154 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order 3rd Fatwah 957 Patna Sirampur 152 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order 3rd 958 vaishali Hajipur Bakarpur 150 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 23 3rd Bidupur 6 959 vaishali Chak Kashi 148 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Saidpur 3rd Bidupur 960 vaishali Ganesh 142 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Maner 961 Patna Rambad 136 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.10 order Saidpur 3rd Raghopur 962 vaishali Jhirua 136 1 1 0 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 5.42 order Chak Hafiz 3rd 963 vaishali Hajipur Amanullah 134 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Dhanarua 964 Patna Gobindpur 133 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 2nd 965 vaishali Hajipur Sharifabad 120 1 1 0 1 0 0 0 0 1 0 1 0 1 1 1 0 0 0 1 1 0 0 0 0 0 0 0 10 28.94 order

CEPT UNIVERSITY I AHMEDABAD 236 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy Arazi Chak 3rd 966 vaishali Hajipur Basdeo 114 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd 967 vaishali Hajipur Minapur Rae 109 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.56 order 3rd Punpun 968 Patna Jaunpuri 108 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Gulam 3rd Punpun 969 Patna Muhammad 107 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Bakhtiarpur 970 Patna Sherpur 103 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd 971 vaishali Hajipur Jhirua Dih 99 1 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 2.24 order 3rd 972 vaishali Hajipur Chak Akila 98 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Chandni Sadullahpur 3rd 973 vaishali Hajipur Satan 98 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order 3rd 974 vaishali Hajipur Chak Jalal 97 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Chak 3rd Bidupur 975 vaishali Dharampur 92 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 1.59 order 3rd Raghopur 976 vaishali Saifabad 90 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.10 order Panapur 3rd Bidupur 23 977 vaishali Dharampur 83 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.10 order 7 3rd Bidupur 978 vaishali Chak Shama 82 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Bihta 979 Patna 76 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.10 order Mirampur 3rd Raghopur 980 vaishali Alakh Deori 70 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Saidpur 3rd 981 vaishali Hajipur Singhia 68 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Arazi 3rd Bidupur 982 vaishali Bhairopur 65 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.22 order Panapur 3rd Bidupur 983 vaishali Dharampur 62 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 984 vaishali Raghopur Bishunpur 57 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 3rd

CEPT UNIVERSITY I AHMEDABAD 237 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy Maniari order Zakipur Urf Dharampur 3rd 985 vaishali Bidupur Motaluke 55 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Raghopur 986 vaishali Mokrampur 52 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 2 3.33 order 3rd 987 vaishali Hajipur Chak Sultani 51 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Raghopur 988 vaishali Gorari 48 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order 3rd Sonepur 990 Saran Khemi Chak 41 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.10 order 3rd Naubatpur 991 Patna Bajan chak 37 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.32 order Bagh Asdullah Arazi 3rd 992 vaishali Hajipur AzRakbe 32 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Panapur 3rd Bidupur 993 vaishali Dharmpur 29 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Arazi 3rd Bidupur 994 vaishali Dharampur 28 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Gobardhanp 3rd Raghopur 995 vaishali ur 28 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.42 order 23 3rd Raghopur 8 996 vaishali Bahrampur 21 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.54 order 3rd Dhanarua 997 Patna Sandalpur 18 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.56 order Rampur 3rd 998 vaishali Hajipur Dumri 16 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.20 order Imadpur 3rd 999 vaishali Hajipur Sultan 7 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.58 order 100 3rd Raghopur 0 vaishali Chak Thakru 5 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.42 order 100 3rd Sonepur 1 Saran Abdul Hai 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 order 9 95 85 31 28 22 11 8 1 Total no of settlements with service 6 5 3 6 1 2 8 103 9 72 49 45 35 34 31 23 15 14 4 11 11 10 10 9 7 6 4

CEPT UNIVERSITY I AHMEDABAD 238 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

Sr.No District C.D. Block Village Population pump Hand Well School Primary Tube well School Middle Post office Subcentre Health Primaty Credit Agricultural Societies School Secondary Bank Commercial Bus Facilities Health Community Workers Centre Health Primary Centre Health Tap services Railways College School Secondary Senior Dispensary Homepathic Dispensary Ayurvedic Centre Welfare Child office Telegraph Bank operative Co Home Maternity Hospital Homeopathic Home Nursing Hospital Ayuverdic Total number of facilities Index Centrality Total settlments of Hierarchy 8 1 1 1 0 10 10 10 10 10 10 0 10 10 10 10 10 10 10 10 0 10 10 10 Weight 0 0 0 0 0 0 0 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 . 1. 7. 10 1 0.1 0. 0.3 0.3 0.4 0.8 1 1. 2.0 2.8 2.9 3.2 4.3 6.6 7.1 1 9.0 9.0 .0 10.0 11.1 14.2 16.6 25.0 Centrality Index 0 0 12 2 6 5 5 0.97 2 39 4 2.22 6 4 3 5 7 4 4 9 9 0 0 1 9 7 0

23 9

CEPT UNIVERSITY I AHMEDABAD 239 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031

24 0

CEPT UNIVERSITY I AHMEDABAD 240