FDOT Broward County Traffic Impact Report August 21, 2020 through August 28, 2020

Fort Lauderdale – Construction and maintenance-related closures on state highways in Broward County are expected during the week of August 21 – August 28. Weather permitting, work will be done at the following locations throughout the county. For updated lane closure information, please refer to www.d4fdot.com. Follow us on Twitter @MyFDOT_SEFL.

CONSTRUCTION PROJECTS

Interstates

1. I-95 from south of Hollywood Boulevard in the City of Hollywood to south of in the City of Fort Lauderdale and I-595 from I-95 to SR-7 in the Town of Davie (95 Express Phase 3C) Description: Work on this 9-mile 95 Express project includes extending the existing Express north from just south of Hollywood Boulevard to just south of Broward Boulevard in Broward County. One lane will be added and the High Occupancy Vehicle (HOV) lane will be converted to create two Express Lanes in each direction. The number of General Use lanes will remain the same. Other project improvements include construction of I-95/I-595 Direct Connectors between 95 Express Lanes and I-595, as well as reconstruction, milling, resurfacing and widening of I-595 from SR-7 to I-95 and along I-95 from south of Hollywood Boulevard to south of Broward Boulevard. Additional work includes bridge widening along I-95 at several locations, painting of 17 bridges within project limits, I-95/SR 84 modifications, Integrated Intelligent Transportation System (ITS) Installation, including cameras, detectors and dynamic message signs to optimize traffic operations, tolling/gantry construction, ramp signalization implementation at the interchanges, lighting, signage and drainage installation and construction of shoulder–mounted sound walls and retaining walls. For more information, please contact I-95 Community Outreach Specialist Daniela Silva at (786) 441-3088 or [email protected]. Cost/Completion: $457 million / spring 2025 I-95 Traffic Impact: • I-95 northbound, from the SR 84 exit ramp to just north of SR 84, has a new traffic pattern to allow for roadway and bridge construction. This pattern is anticipated to be in place through summer 2021, weather permitting. • I-95 in each direction, from Pembroke Road to south of Davie Boulevard, will have three lanes closed, nightly as needed, Sunday through Thursday. The first lane will close at 9:30 p.m., the second lane will close at 10 p.m. and the third lane will close at 11 p.m. All lanes will be open by 5:30 a.m. • I-95 in each direction, from Griffin Road to South of Davie Boulevard, will have shoulder closures, daily and nightly, as needed. I-595 Traffic Impact: • I-595 eastbound over Pond Apple Slough will have up to three lanes closed Friday night, Aug. 21. The first lane will close at 9:30 p.m., the second lane will close at 10 p.m. and the third lane will close at 11 p.m. All lanes will be open by 5:30 a.m. • I-595 in each direction, from east of SR-7 to Anglers Avenue, will have three lanes closed nightly as needed, Sunday through Thursday. The first lane will close at 9:30 p.m., the second lane will close at 10 p.m. the third lane will close at 11 p.m. All lanes will be open by 5:30 a.m. • I-595 in each direction, from SR-7 to I-95, will have shoulder closures, daily and nightly, as needed. • Advanced Notice: I-595 westbound over Pond Apple Slough will have up to three lanes closed Friday night, Aug. 28. The first lane will close at 9:30 p.m., the second lane will close at 10 p.m. and the third lane will close at 11 p.m. All lanes will be open by 5:30 a.m. Ramp Impact:

• The I-595 eastbound and westbound entrance ramp from I-95 southbound will have one lane closed nightly as needed, 10 p.m. until 5 a.m., Sunday through Thursday. • The I-95 northbound entrance ramp from I-595 westbound will have one lane closed nightly as needed, 10 p.m. until 5 a.m., Sunday through Thursday. • The I-595 westbound entrance ramp from I-95 southbound will have one lane closed nightly as needed, 10 p.m. until 5 a.m., Sunday through Thursday. • The SR-84 ramp from south of Marina Mile to Anglers Avenue will have one lane closed in each direction nightly as needed, 10 p.m. until 5 a.m. Sunday through Thursday. • The I-595 eastbound entrance ramp from I-95 northbound will have one lane closed nightly as needed, 10 p.m. until 5 a.m., Sunday through Thursday. • The I-595 westbound entrance ramp from I-95 northbound will have one lane closed nightly as needed, 10 p.m. until 5 a.m., Sunday through Thursday. • The I-95 southbound entrance ramp from I-595 westbound will have one lane closed nightly as needed, 10 p.m. until 5 a.m., Sunday through Thursday. • The I-95 southbound entrance ramp from I-595 eastbound will have one lane closed nightly as needed, 10 p.m. until 5 a.m., Sunday through Thursday. • The I-95 northbound entrance ramp from Stirling Road will have one lane closed nightly as needed, 10 p.m. until 5 a.m., Sunday through Thursday. Arterial Traffic Impact: • SW 30th Avenue to Marina Mile will have one lane closed in each direction daily, 9:30 a.m. until 4 p.m. and nightly, 10 p.m. until 5 a.m., Sunday through Thursday.

2. I-95 from south of Broward Boulevard to north of Commercial Boulevard in Fort Lauderdale (95 Express Phase 3A-1) Description: Work on this 6.7-mile 95 Express project includes widening and converting the existing I-95 HOV Lanes to Managed Lanes which will result in two tolled Express Lanes in each direction; the number of General Use lanes will remain the same. Other work includes: widening bridges, sound wall construction, installation of Intelligent Transportation System (ITS) and tolling equipment and ramp signaling at the I-95 entrance ramps at Davie Road, Broward Boulevard, Sunrise Boulevard, and Commercial Boulevard. For more information, please contact I-95 Community Outreach Specialist Andrea Pacini (954) 299-6561 or [email protected]. Cost/Completion: $150 million / fall 2021 Traffic Impacts: • I-95 will have three lanes closed in each direction, 9 p.m. until 5:30 a.m., Sunday through Thursday. The first lane will close at 9 p.m., the second lane will close at 9:30 p.m. and the third lane will close at 10 p.m. • I-95 northbound, from south of Davie Boulevard to south of Oakland Park Boulevard, has a new traffic pattern with traffic shifted to the outside to allow for median construction. This configuration is expected to be in place through summer 2021. • I-95 in both directions, from south of Davie Boulevard to north of Commercial Boulevard, will have intermittent shoulder and ramp shoulder closures, as needed, daily and nightly. Arterial Road Traffic Impact: • Prospect Road at I-95 will have one lane closed daily, 7 a.m. until 4 p.m., Tuesday through Friday. • NW 6th Street at I-95 will undergo a full nightly closure 10 p.m. until 6 a.m., Sunday through Thursday night. Traffic will be detoured via NW 27th Avenue, NW 15th Avenue and Broward Boulevard. FHP will be on site to assist motorists. • Prospect Road at I-95 will undergo a full closure for bridge construction, 10 p.m. until 6 a.m., Sunday through Thursday night. Traffic will be detoured via Powerline Rd, Commercial Boulevard and Andrews Avenue, FHP will be on site to assist motorists. • Powerline Road at I-95 will undergo a full nightly closure, 10 p.m. until 6 a.m., Sunday through Thursday night. Traffic will be detoured via Commercial Boulevard, N. and Oakland Park Boulevard. • Commercial Boulevard will undergo a full nightly closure, 10 p.m. until 6 a.m., Sunday through Thursday night. Traffic will be detoured via North Dixie Highway, Oakland Park Boulevard and Powerline Road. • Oakland Park Boulevard at I-95 will undergo a full nightly closure for bridge construction, 10 p.m. until 6 a.m., Sunday through Thursday night. Traffic will be detoured via Powerline Road, NW19th Street, Sunrise Boulevard and NW 21st Avenue. FHP will be on site to assist motorists. • NW 38th Street at I-95 will undergo a full nightly closure, 10 p.m. until 6 a.m., Sunday through Thursday night. Traffic will be detoured via NW 10th Ave and Powerline Road. FHP will be on site to assist motorists. • NW19th Street at I-95 will undergo a full closure, 10 p.m. until 6 a.m., Sunday through Thursday night. Traffic will be detoured via Powerline Road, Oakland Park Boulevard and NW 21st Avenue. FHP will be on site to assist motorists. • Powerline Road at the I-95 overpass will have one lane closed daily, 9 a.m. until 3 p.m., Monday through Friday. • NW 19th Street at the I-95 overpass will have one lane closed, daily, 9 a.m. until 3 p.m., Monday through Friday. • NW 6th Street at the I-95 overpass will have one lane closed, daily, 9 a.m. until 4 p.m., Monday through Friday. • Oakland Park Boulevard at the I-95 overpass will have one lane closed, daily, 9 a.m. until 3 p.m., Monday through Friday. Ramp Impact: • The I-95 northbound entrance ramp from Oakland Park Boulevard will be closed, nightly, as needed, 9 p.m. until 5:30 a.m., Sunday through Thursday. Traffic will be detoured via Commercial Boulevard and Powerline Road. FHP will be on site to assist motorists. • The I-95 northbound exit ramps to Oakland Park Boulevard will be closed as needed 9 p.m. until 5:30 a.m., Sunday through Thursday. Traffic will be detoured via I-95 and Commercial Boulevard. FHP will be on site to assist motorists. • The I-95 northbound exit ramp to Commercial Boulevard will be closed as needed, 9 p.m. until 5:30 a.m., Sunday through Thursday. Traffic will be detoured via I-95 and Cypress Creek Road. FHP will be on site to assist motorists. • The I-95 northbound entrance ramp from Commercial Boulevard will be closed, 9 p.m. until 5:30 a.m., Sunday through Thursday. Traffic will be detoured via Powerline Road and Cypress Creek Road. FHP will be on site to assist motorists. • The I-95 southbound exit ramp to Commercial Boulevard will be closed nightly, 9 p.m. until 5:30 a.m., Sunday through Thursday. Traffic will be detoured via Oakland Park Boulevard and I-95. FHP will be on site to assist motorists. • The I-95 southbound entrance ramps from Commercial Boulevard will be closed, 9 p.m. until 5:30 a.m., Sunday through Thursday. Traffic will be detoured via Powerline Road, Oakland Park Boulevard and I-95. FHP will be on site to assist motorists. • The I-95 southbound entrance ramps from Oakland Park Boulevard will be closed, as needed, 9 p.m. until 5:30 a.m., Sunday through Thursday. Traffic will be detoured via Powerline Road and Sunrise Boulevard. FHP will be on site to assist motorists. • The I-95 southbound exit ramp to Oakland Park Boulevard will be closed, as needed, 9 p.m. until 5:30 a.m., Sunday through Thursday. Traffic will be detoured via I-95 and Sunrise Boulevard. FHP will be on site to assist motorists. • The I-95 northbound exit ramps Sunrise Boulevard will be closed, 9 p.m. until 5:30 a.m., Sunday through Thursday. Traffic will be detoured via Oakland Park Boulevard and I-95. FHP will be on site to assist motorists. • The I-95 northbound entrance ramp from Sunrise Boulevard will be closed, 9 p.m. until 5:30 a.m., Sunday through Thursday. Traffic will be detoured via Oakland Park Boulevard and Powerline Road. FHP will be on site to assist motorists. • The I-95 southbound entrance ramps from Sunrise Boulevard will be closed nightly, 9 p.m. until 5:30 a.m., Sunday through Thursday. Traffic will be detoured via Powerline Road, Oakland Park Boulevard and I-95. FHP will be on site to assist motorists. • The I-95 southbound exit ramp to Sunrise Boulevard will be closed nightly, 9 p.m. until 5:30 a.m., Sunday through Thursday. Traffic will be detoured via Broward Boulevard and I-95. FHP will be on site to assist motorists; consecutive ramps will not be closed at the same time. • The I-95 southbound entrance ramps from Cypress Creek Road will be closed nightly, 9 p.m. until 5:30 a.m., Sunday through Thursday. Traffic will be detoured via Andrews Avenue, Commercial Boulevard and I-95. • The I-95 northbound entrance ramps from Broward Boulevard will be closed nightly, 9 p.m. until 5:30 a.m., Sunday through Thursday. Traffic will be detoured via the Broward Boulevard Park & Ride lot and I-95. • The I-95 northbound entrance ramp from Davie Boulevard will be closed nightly, 9 p.m. until 5:30 a.m., Sunday through Thursday. Traffic will be detoured via State Road 7 and Broward Boulevard. • The I-95 northbound exit ramp to Broward Boulevard will be closed nightly, 9 p.m. until 5:30 a.m., Sunday through Thursday. Traffic will be detoured via I-95 and the Broward Park & Ride. • The I-95 southbound entrance ramp from Broward Boulevard will undergo a full nightly closure, 9 p.m. until 5:30 a.m., Sunday through Thursday nights. Traffic will be detoured via US 441 and Davie Boulevard • The I-95 southbound exit ramp to Davie Boulevard will be closed nightly as needed, 9 p.m. until 5:30 a.m., Sunday through Thursday nights. Traffic will be detoured via Davie Boulevard and US 441. • TheI-95 southbound exit ramp to Broward Boulevard will be closed nightly as needed, 9 p.m. until 5:30 a.m., Sunday through Thursday nights. Traffic will be detoured via Broward Park & Ride and Broward Boulevard. • The I-95 northbound exit ramp to eastbound Oakland Park Boulevard will have one inside lane closed daily, 9 a.m. until 3 p.m., Monday through Friday. • The I-95 northbound exit ramp to Commercial Boulevard will have one lane closed daily, 9 a.m. until 3 p.m., Monday through Friday. • The I-595 to I-95 northbound entrance ramp will have one lane closed nightly 9 p.m. until 5:30 a.m., Sunday through Thursday. • The I-95 southbound entrance ramp from Broward Boulevard to I-595 will have one outside lane closed nightly 9 p.m. until 5:30 a.m., Sunday through Thursday. • The I-95 southbound entrance ramp from Broward Boulevard to I-595 will have one outside lane closed nightly 9 p.m. until 5:30 a.m., Sunday through Thursday.

3. I-95 from south of SW 10th Street in the City of Deerfield Beach to south of Glades Road in the City of Boca Raton (95 Express Phase 3B-1) Description: Work on this 4.8-mile 95 Express project includes widening and converting the existing I-95 HOV Lanes to Managed Lanes which will result in two tolled Express Lanes in each direction; the number of General Use lanes will remain the same. Other project improvements include bridge widenings at Palmetto Park Road and Camino Real, complete bridge replacement at the Hillsboro Canal, noise wall construction, portable traffic monitoring sites, toll gantry installation, Intelligent Transportation System (ITS) installation, ramp signaling at the I-95 entrance ramps from Palmetto Park Road, Express Lane markers and landscape relocation. For more information, please contact I-95 Community Outreach Specialist Andrea Pacini at (561) 214-3358 or [email protected]. Cost/Completion: $102 million / spring 2022 Traffic Impact: • I-95 will have three lanes closed in each direction nightly as needed, Sunday through Thursday nights, with the first lane closing at 9:30 p.m., the second lane closing at 10:30 p.m., and the third lane closing at 11:30 p.m. until 5:30 a.m. • I-95 northbound from SW 18th Street to south of Glades Road has a new traffic pattern which is anticipated to be in place until Spring 2021. • I-95 Northbound Full Closure Notice: I-95 northbound lanes at Hillsboro Boulevard will be closed to traffic overnight, Monday night, Aug. 24 for overhead sign structure installation. The first lane will close at 9:30 p.m., the second lane will close at 10:30 p.m., and all lanes will be closed by 11:30 p.m., reopening by 5:30 a.m. each morning. Traffic will be detoured via the I-95 northbound exit ramp to Hillsboro Boulevard West, Military Trail and Palmetto Park Road. FHP will be on site to assist motorists. Please see detour flyer attached. • I-95 Southbound Full Closure Notice: I-95 southbound lanes at Glades Road will be closed to traffic overnight, Monday night, Aug. 31 for overhead sign structure installation. The first lane will close at 9:30 p.m., the second lane will close at 10:30 p.m., and all lanes will be closed by 11:30 p.m., reopening by 5:30 a.m. each morning. Traffic will be detoured via the southbound exit ramp to Glades Road, St. Andrew’s Boulevard and Palmetto Park Road. FHP will be on site to assist motorists. Please see detour flyer attached. • I-95 Southbound Full Closure Advanced Notice: I-95 southbound lanes at Palmetto Park Road will be closed to traffic overnight, Thursday night, Sept. 3 for overhead sign structure installation. The first lane will close at 9:30 p.m., the second lane will close at 10:30 p.m., and all lanes will be closed by 11:30 p.m., reopening by 5:30 a.m. each morning. Traffic will be detoured via the I-95 southbound exit ramp to Palmetto Park Road, Military Trail and Hillsboro Boulevard. FHP will be on site to assist motorists. Please see detour flyer attached. Arterial Road Traffic Impact: • Full Sidewalk Closure Notice: Palmetto Park Road, between SW 12th Avenue and Military Trail, will have the south sidewalk closed completely for reconstruction of the Shared Use Path, through Wednesday morning, Sept. 9. Pedestrians and cyclists will be detoured to Camino Real via S. Military Trail and SW 12th Avenue. Please see detour flyer attached. • Palmetto Park Road at I-95 will have two lanes closed in each direction nightly, as needed, Sunday through Thursday. The first lane will close at 9 p.m., and the second lane will close at 10:30 p.m. All lanes will be opened by 5:30 a.m. • Palmetto Park Road at I-95 will have one lane closed in each direction daily, as needed, 9:30 a.m. until 3:30 p.m., Monday through Friday. • Camino Real at I-95 will have one lane closed in each direction daily, as needed, 9:30 a.m. until 4 p.m., Monday through Friday. Ramp Impact: • The I-95 northbound exit ramp to Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via I-95 northbound, Hillsboro Boulevard, and Military Trail. FHP will be on site to assist motorists. • The I-95 southbound entrance ramp from westbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Hillsboro Boulevard. FHP will be on site to assist motorists. • The I-95 southbound entrance ramp from eastbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Hillsboro Boulevard. FHP will be on site to assist motorists. • The northbound entrance ramp from eastbound and westbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via I-95 southbound to Hillsboro Boulevard to I-95 northbound. • The I-95 southbound entrance ramp from eastbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and SW 10th Street. FHP will be on site to assist motorists. • The I-95 northbound entrance ramp from eastbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Palmetto Park Road. FHP will be on site to assist motorists. • The I-95 northbound entrance ramp from westbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Palmetto Park Road. FHP will be on site to assist motorists. • The I-95 northbound exit ramp to eastbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Palmetto Park Road and South Dixie Highway. FHP will be on site to assist motorists. Please note that ramp closures will be performed as needed per nighttime construction operations; consecutive ramps will not be closed at the same time.

4. 595 Express Traffic Impact: • All lanes are open.

5. All Electronic Tolling (AET) Phase 5A from I-595 to s/o Lantana Road Description: Work consists of providing all labor, materials, equipment, and incidentals necessary to continue with the complete conversion of the Turnpike Mainline to an All Electronic Toll (AET) collection system. The overall AET conversion scope includes: milling and resurfacing, drainage improvements, curb & gutter, lighting, highway signing, guardrail, MSE walls, toll facilities and other construction activities on the Florida’s Turnpike from I-595 (milepost 54) to south of Lantana Toll Plaza (milepost 88) for 34 miles in Broward and Palm Beach Counties. It is anticipated that the project will cost $20.4 million and work will continue through summer 2020. For more information, contact Community Outreach Specialist Fiorella Teodista at (954) 934-1130 or [email protected]. Cost/Completion: $20.4 million / summer 2020 Traffic Impact: • Northbound Florida’s Turnpike/SR 91 entrance ramp from Commercial Boulevard/SR 870, overnight full ramp closures, 9 p.m. to 6 a.m., Sunday, August 23, and nightly through Thursday, August 27. o Detour: Commercial Boulevard/SR 870 traffic wishing to access northbound Florida’s Turnpike/SR 91 will be directed to US 441/SR 7, travel north on US 441 to Coconut Creek Parkway and travel east on Coconut Creek Parkway to access northbound Florida’s Turnpike. • Northbound Florida’s Turnpike/SR 91 exit ramp to Commercial Boulevard/SR 870 (Exit 62), overnight full ramp closures, 9 p.m. to 6 a.m., Sunday, August 23, and nightly through Thursday, August 27. o Detour: Northbound Florida’s Turnpike/SR 91 traffic wishing to access Commercial Boulevard/SR 870 (Exit 62) will be directed to exit Sunrise Boulevard/SR 838 (Exit 58A), travel east on Sunrise Boulevard to US 441/SR 7 and travel north on US 441 to access Commercial Boulevard. • Southbound Florida’s Turnpike/SR 91 entrance ramp from Commercial Boulevard/SR 870, overnight full ramp closures, 9 p.m. to 6 a.m., Sunday, August 23, and nightly through Thursday, August 27. *Please note, entrance and exit ramps will not be closed at the same time. o Detour: o Commercial Boulevard/SR 870 traffic wishing to access southbound Florida’s Turnpike/SR 91 will be directed to US 441/SR 7, travel south on US 441 to Sunrise Boulevard/SR 838 and travel west on Sunrise Boulevard to access southbound Florida’s Turnpike. o Eastbound Commercial Boulevard/SR 870 traffic wishing to access southbound Florida’s Turnpike/SR 91 will be directed to continue east on Commercial Boulevard to the signalized intersection to access southbound Florida’s Turnpike. • Southbound Florida’s Turnpike/SR 91 exit ramp to Commercial Boulevard/SR 870 (Exit 62), overnight full ramp closures, 9 p.m. to 6 a.m., Sunday, August 23, and nightly through Thursday, August 27. *Please note, entrance and exit ramps will not be closed at the same time. o Detour: Southbound Florida’s Turnpike/SR 91 traffic wishing to access Commercial Boulevard/SR 870 (Exit 62) will be directed to exit Coconut Creek Parkway (Exit 67), travel west on Coconut Creek Parkway to US 441/SR 7 and travel south on US 441 to access Commercial Boulevard. • Northbound and southbound Florida’s Turnpike/SR 91 between south of Commercial Boulevard/SR 870 and south of Sawgrass Expressway/SR 869, overnight single and double lane closures, 9 p.m. to 6 a.m., Sunday, August 23, and daily through Thursday, August 27. • Eastbound and westbound Commercial Boulevard/SR 870 between SR 7/US 441 and the toll plaza, daytime single lane closures, 9 a.m. to 3:30 p.m., Monday, August 24, and daily through Friday, August 28. • Eastbound and westbound Coconut Creek Parkway between Coconut Creek Boulevard and NW 27th Avenue, daytime single lane closures, 9 a.m. to 3:30 p.m., Monday, August 24, and daily through Friday, August 28. • Eastbound and westbound Sample Road/SR 834 between Tradewinds Park Road and NW 27th Avenue, daytime single lane closures, 9 a.m. to 3:30 p.m., Monday, August 24, and daily through Friday, August 28. • Eastbound and westbound Atlantic Boulevard/SR 814 in the vicinity of Florida’s Turnpike/SR 91, daytime single lane closures, 9 a.m. to 3:30 p.m., Monday, August 24, and daily through Friday, August 28.

6. Florida’s Turnpike Widening of The Homestead Extension of (SR 821) from I-75 to Turnpike Mainline (SR 91) Description: The Turnpike will be widened from four to eight lanes. Work includes intersection improvements at /NW 57th Avenue and University Drive/ NW 27th Avenue. Additionally, sound barrier walls will be constructed along qualifying residential areas. Bridge widening, road milling and resurfacing, signage and traffic signal improvements are planned. Construction began in September 2018 will continue through summer 2022. For more information, contact Community Outreach Specialist Yasir Mercado at (954) 934-1138 or [email protected]. Cost/Completion: $143 million / summer 2022 Traffic Impact: • Northbound and southbound Florida’s Turnpike Extension/SR 821 between I-75 and University Drive/NW 27th Avenue/SR 817, overnight single lane closures, 8 p.m. to 6 a.m., Sunday, August 23, and nightly through Thursday, August 27. • Northbound Florida’s Turnpike Extension/SR 821 at Red Road/NW 57th Avenue/SR 823 (Exit 43), overnight full road closures, 10 p.m. to 5 a.m., Tuesday August 25, and nightly through Thursday, August 27. o Detour: Northbound Florida’s Turnpike Extension/SR 821 traffic wishing to continue north will be directed to exit at Red Road/NW 57th Avenue/SR 823 (Exit 43), travel north on Red Road to Miramar Parkway/SR 858, travel east on Miramar Parkway to University Drive/NW 27th Avenue/SR 817, travel south on University Drive County Line Road/NW 215th Street/SR 852 and travel east on County Line Road to access northbound Florida’s Turnpike. • Southbound Florida’s Turnpike/SR 91 exit ramp to University Drive/NW 27th Avenue/SR 817 (Exit 47), overnight full ramp closures, 11:59 p.m. to 5 a.m., Sunday, August 23, and nightly through Thursday, August 27. o Detour: Southbound Florida’s Turnpike/SR 91 traffic wishing to access University Drive/NW 27th Avenue/SR 817 (Exit 47) will be directed to exit at NW 199th Street/Stadium (Exit 2X) and travel west on NW 199th Street to access NW 27th Avenue/SR 817.

• Northbound and southbound Flamingo Road/NW 67th Avenue underneath Florida’s Turnpike Extension/SR 821, long-term single lane closure through September 2020. One lane in each direction will remain open. • Northbound and southbound Flamingo Road/NW 67th Avenue underneath Florida’s Turnpike Extension/SR 821, overnight full road closures, 11 p.m. to 5 a.m., Sunday, August 23, and nightly through Thursday, August 27. o Detour: o Northbound Flamingo Road/NW 67th Avenue traffic wishing to continue north will be directed to NW 202nd Street, travel east on NW 202nd Street to Red Road/NW 57th Avenue, travel north on Red Road to Miramar Parkway and travel west on Miramar Parkway to access Flamingo Road. o Southbound Flamingo Road/NW 67th Avenue traffic wishing to continue south will be directed to Miramar Parkway, travel east on Miramar Parkway to Red Road/NW 57th Avenue, travel south on Red Road to NW 202nd Street and travel west on NW 202nd Street to access Flamingo Road. • Northbound and southbound Palm Avenue/NW 47th Avenue underneath Florida’s Turnpike Extension/ SR 821, daytime single lane closures, 9 a.m. to 4 p.m., Monday, August 24, and daily through Friday, August 28. • Northbound and southbound Palm Avenue/NW 47th Avenue underneath Florida’s Turnpike Extension/SR 821, overnight full road closures, 8 p.m. to 5 a.m., Sunday, August 23, and nightly through Thursday, August 27. o Detour: o Northbound Palm Avenue/NW 47th Avenue traffic wishing to continue north will be directed to NW 199th Street, travel west on NW 199th Street to Red Road/NW 57th Avenue/SR 823, travel north on Red Road to Miramar Parkway/SR 858 and travel east on Miramar Parkway to access Palm Avenue. o Southbound Palm Avenue/NW 47th Avenue traffic wishing to continue south will be directed to Miramar Parkway/SR 858, travel west on Miramar Parkway to Red Road/NW 57th Avenue/SR 823, travel south on Red Road to NW 199th Street and travel east on NW 199th Street to access Palm Avenue. • Northbound and southbound /NW 37th Avenue underneath Florida’s Turnpike Extension/SR 821, daytime single lane closures, 7 a.m. to 5 p.m., Monday, August 24, and daily through Friday, August 28. • Northbound and southbound Douglas Road/NW 37th Avenue underneath Florida’s Turnpike Extension/SR 821, overnight full road closures, 8 p.m. to 5 a.m., Sunday, August 23, and nightly through Thursday, August 27. o Detour: o Northbound Douglas Road/NW 37th Avenue traffic wishing to continue north will be directed to NW 199th Street, travel east on NW 199th Street to University Drive/NW 27th Avenue/SR 817, travel north on University Drive to Miramar Parkway/SR 858 and travel west on Miramar Parkway to access Douglas Road. o Southbound Douglas Road/NW 37th Avenue traffic wishing to continue south will be directed to Miramar Parkway/SR 858, travel west on Miramar Parkway to Palm Avenue/NW 47th Avenue, travel south on Palm Avenue to NW 199th Street and travel east on NW 199th Street to access Douglas Road. • Northbound University Drive/NW 27th Avenue/SR 817 underneath Florida’s Turnpike Extension/SR 821, overnight single lane closures, 8 p.m. Monday, August 24, to 5 a.m. Tuesday, August 25; and 8 p.m. Tuesday, August 25, to 5 a.m. Wednesday, August 26.

7. Miramar Parkway Pedestrian Enclosure Replacement Project Over Florida’s Turnpike Description: Florida’s Turnpike is improving the Miramar Parkway bridge over Florida’s Turnpike. Crews are replacing the pedestrian bridge fence. For more information, contact Community Outreach Specialist Fiorella Teodista at (954) 934-1130 or [email protected]. Cost/Completion: $1 million / fall 2020 Traffic Impact: • Northbound and southbound Florida’s Turnpike/SR 91 at Miramar Parkway (Milepost 48), overnight single lane closures, 8 p.m. to 5 a.m., Sunday, August 23, and nightly through Thursday, August 27. Overnight double lane closures, 11 p.m. to 5 a.m., Sunday, August 23, and nightly through Thursday, August 27.

Northeast Broward

8. Federal Highway/US 1 Mobility Improvement Project from Sample Road to the Broward/Palm Beach County Line in Lighthouse Point and Deerfield Beach Description: The project improvements consist of widening the roadway to accommodate 5-foot bike lanes, reconstructing medians, portions of the roadway and sidewalks, milling and resurfacing. Other improvements include installing drainage, curb and gutter, signalization, lighting, signage and pavement markings. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected]. Cost/Completion: $8.2 million / spring 2021 Traffic Impact: • One inside lane in each direction will be closed, 7 a.m. to 5 p.m., Tuesday through Thursday, for roadway widening operations. • One inside lane in each direction will be permanently closed intermittently at various locations on US 1/Federal Highway from Sample Road to the Broward/Palm Beach County Line for roadway widening.

9. Sunrise Boulevard Pedestrian Safety Enhancement Project from NW 15th Avenue to North Flagler Drive in Fort Lauderdale Description: This project will address pedestrian safety by constructing a signalized mid-block pedestrian crossing and new light poles to increase visibility. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected]. Cost/Completion: $602,297 / spring 2020 Traffic Impact: • One lane in each direction of SR 838/Sunrise Boulevard between NW 15th Avenue and North Flagler Drive will be closed, 9 a.m. to 3:30 p.m., Monday through Friday, for signalization and lighting work.

10. Oakland Park Mobility Improvement Project from NW 136th Avenue to North Atlantic Boulevard in Sunrise, Lauderhill and Fort Lauderdale Description: This project will address mobility improvement on various roadways that intersect with SR 816/Oakland Park Boulevard from NW 136th Avenue to North Atlantic Boulevard in the cities of Sunrise, Lauderhill, and Fort Lauderdale. The project improvements consist of widening the roadway to accommodate bike lanes, milling and resurfacing, providing shared lanes (sharrows) and adding signage and pavement markings. Other improvements include installing traffic signal priority from NW 136th Avenue to Pine Island Road, new drainage structures, sidewalks, and ADA upgrades to curb ramps. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected]. Cost/Completion: $3.5 million / fall 2021 Traffic Impact: • The northbound lane along NW 55th Avenue from Oakland Park Boulevard to NW 19th Street will be closed 9 a.m. to 4 p.m., Monday through Friday, for swale regrading. • The northbound lane along Inverrary Boulevard West from Oakland Park Boulevard to NW 42nd Street will be closed 9 a.m. to 4 p.m., Monday through Friday, for roadway widening operations and sidewalk construction. • The Oakland Park Boulevard Access Road from the north side of NE 32nd Avenue to the south side of NE 32nd Avenue may have intermittent closures, 9 a.m. to 4 p.m., Monday through Friday, for bulkhead wall installation and drainage operations. Detour Route: Oakland Park Boulevard Access Road traffic: o Go south on NE 32nd Avenue to NE 30th Street o Go east on NE 30th Street to SR A1A/North Ocean Boulevard o Go north on SR A1A/North Ocean Boulevard to SR 816/Oakland Park Boulevard o Go west on SR 816/Oakland Park Boulevard to Oakland Park Boulevard Access Road o Turn right onto Oakland Park Boulevard Access Road NE 32nd Avenue traffic: o Go east on Oakland Park Boulevard Access Road o Go south on NE 33rd Street to NE 30th Street o Go east on NE 30th Street to SR A1A/North Ocean Boulevard o Go north on SR A1A/North Ocean Boulevard to SR 816/Oakland Park Boulevard o Go west on SR 816/Oakland Park Boulevard to Oakland Park Boulevard Access Road o Turn right onto Oakland Park Boulevard Access Road

11. Atlantic Boulevard Bridge Maintenance Project in Pompano Beach Description: The project improvements include the removal and replacement of the existing pile cap protection system. The new system will extend the life of the piles by reducing the corrosion of the steel reinforcement bars over time. Construction will begin April 13, 2020. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected]. Cost/Completion: $387,073 / late summer 2020 Traffic Impact: • All lanes are open. Marine Impact: • The navigable channel/waterway under the bridge will remain open.

12. Pompano Beach Sidewalk Improvement Project in Pompano Beach: Description: The project improvements include the installation of sidewalks on NE 6th Street and SW 6th Street to improve connectivity and the addition of high emphasis pavement markings at railroad crossings to warn drivers and pedestrians to stay clear of the railroad tracks. Construction will begin on April 25, 2020. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected]. Cost/Completion: $277,929 / fall 2020 Traffic Impact: • The northbound outside lane along North Dixie Highway will be closed at the SW 6th Street intersection, 8 a.m. to 5 p.m., Monday through Friday, for the reconstruction of the northwest and southwest curb ramps at the intersection.

13. Turtle Creek Drive/NW 62nd Avenue Mobility Improvement Project: Description: The project improvements include widening the roadway to accommodate 4.5-foot bikes lanes in each direction along Turtle Creek Drive/NW 62nd Avenue. There will also be installation of new asphalt pavement, sidewalk reconstruction to meet current American Disabilities Act (ADA) requirements. Construction will begin on July 15, 2020. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482- 4190 or [email protected]. Cost/Completion: $1.2 million/Early Winter 2021 Traffic Impact: • The northbound outside lane will be closed along Turtle Creek Drive/NW 62nd Avenue between North Bay Drive and State Road 7/US 441, 9 a.m. to 4 p.m., Monday through Friday, for sidewalk installation.

Northwest Broward

14. University Drive/Oakland Park Boulevard Mobility Improvements in Lauderhill, Lauderdale Lakes, Wilton Manors, Oakland Park, Fort Lauderdale, Tamarac and Sunrise Description: Project improvements include widening, milling and resurfacing, drainage improvements, bicycle lanes, sidewalks, signalization, signage and pavement marking improvements. There will also be pedestrian lighting and drainage upgrades. Oakland Park Boulevard from University Drive to US 1 will include bus shelters and signalization improvements to provide traffic signal priority for buses. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected]. Cost/Completion: $6.8 million / early 2021 Traffic Impact: • Intermittent single lane closures will occur in each direction on University Drive between Sunrise Lakes Boulevard and NW 57th Street on University Drive, 9:30 a.m. to 2:30 p.m., Monday through Friday, for road widening work and electrical, drainage, concrete and landscaping operations. • Intermittent single lane closures will occur in each direction on University Drive between Sunrise Lakes Boulevard and NW 57th Street on University Drive, 7 p.m. to 6 a.m., Monday through Friday, for roadway and drainage work.

15. North Broward Mobility Improvements Project in Deerfield Beach and Pompano Beach Description: Project improvements in Pompano Beach include adding pavement markings and missing sidewalk on NE 11th Avenue. Project improvements in Deerfield Beach include milling and resurfacing NE 48th Street/NE 49th Street with minor widening to accommodate bike lanes in both directions, adding pavement markings on SE 2nd Avenue, and milling and resurfacing and adding pedestrian lighting on SW 3rd Avenue. Other improvements include curb and gutter, pavers and reconstructed driveways. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482- 4190 or [email protected]. Cost/Completion: $4.1 million / fall 2020 Traffic Impact: • One lane in each direction of SE 3rd Avenue between Hillsboro Boulevard and SE 10th Street will be closed 9 a.m. to 4 p.m., Monday through Friday, for sidewalk improvements, manhole and valve adjustments, curb and gutter. Flagmen will maintain traffic in each direction.

16. Interstate 95 at Davie Boulevard Interchange Safety Improvement Project in Fort Lauderdale Description: Project improvements will include upgrading the existing signalization and lighting along Davie Boulevard, at the I-95 northbound entrance ramp and the northbound and southbound exit ramps. Other improvements include new I-95 overhead signs and milling and resurfacing Davie Boulevard west and east of the I-95 Interchange and the northbound and southbound I-95 exit ramps. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected] Cost/Completion: $3.3 million / winter 2020 Traffic Impact: • One lane in each direction will be closed along Davie Boulevard at the I-95 Interchange, 8:30 p.m. to 7:30 a.m., Monday through Friday, for the installation of new light poles. • Two northbound inside lanes along the Collector Distributor road at Davie Boulevard will be closed, 11:30 p.m. to 6 a.m., Sunday through Thursday, for the installation of a mast arm structure. • The off-ramp inside lanes in each direction from I-95 to Davie Boulevard will be closed, 9 p.m. to 6 a.m., Sunday through Thursday, for installation of overhead sign structures.

17. NE 23rd Avenue Bridge Replacement Project in Lighthouse Point Description: This project consists of replacing the existing two-lane bridge over the Ibis Waterway on NE 23rd Avenue from NE 29th Street to NE 30th Street. Improvements will also include signage, paving, restriping, irrigation, lighting, curb and gutter, and new pedestrian facilities to meet Americans with Disabilities Act (ADA) standards. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or justina@Valerin- Group.com. Cost/Completion: $2.4 million / fall 2020 Traffic Impact: • NE 23rd Avenue from NE 29th Street to NE 30th Street, over the Ibis Waterway, will be closed until project completion, for the reconstruction of the NE 23rd Avenue Bridge. o Detour Route: Traveling north from North Federal Highway o Proceed east along NE 24th Street until NE 24th Street turns into NE 22nd Avenue o Proceed north along NE 22nd Avenue and turn west onto NE 27th Court o Proceed west along NE 27th Court and turn north onto NE 20th Avenue o Proceed north along NE 20th Avenue and turn north onto NE 21st Avenue o Proceed north along NE 21st Avenue to Sample Road (end of detour) Traveling south from Sample Road o Proceed south along NE 21st Avenue and turn west onto NE 20th Avenue o Proceed south along NE 20th Avenue and turn east onto NE 27th Court o Proceed east along NE 27th Court and turn south onto NE 22nd Avenue o Proceed south along NE 22nd Avenue and proceed west along NE 24th Street o Proceed west along NE 24th Street to North Federal Highway (end of detour) Marine Impact: • During working hours, Monday through Friday, 8 a.m. to 5 p.m., the navigable channel/waterway under the bridge will closed to accommodate construction activity.

18. Lighting Improvements Project in Coral Springs, Margate, Pompano Beach, Deerfield Beach and Fort Lauderdale Description: This project will take place along four major state roads: SR 817/University Drive, SR 834/Sample Road, SR 845/Powerline Road and SR 814/Atlantic Boulevard. The improvements will upgrade the illumination at signalized intersections with new light poles, new light fixtures and retrofit existing lighting fixtures with LED lights. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or justina@Valerin- Group.com. Cost/Completion: $1.4 million / spring 2021 Traffic Impact: • Intermittent single lane closures in each direction along Powerline Road from McNab Road to West Drive will occur from 9 a.m. to 3:30 p.m., Monday through Friday, to build lighting structures, install conduits and restore the affected areas. • Intermittent single lane closures in each direction along Atlantic Boulevard from NW 27th Avenue to SR A1A will occur from 9 a.m. to 4 p.m., Monday through Friday, to build lighting structures, install conduits and restore the affected areas. • Intermittent single lane closures will occur along University Drive from Riverside Drive to Sample Road from 9 a.m. to 3:30 p.m., Monday through Friday, to build new lighting infrastructure and install new conduits. 19. Lighting Improvements in Tamarac, Lauderhill, Fort Lauderdale, Oakland Park, Lauderdale-by-the-Sea, Lauderdale Lakes, Sunrise and Wilton Manors Description: This project will take place along two major state roads: SR 870/Commercial Boulevard and SR 816/Oakland Park Boulevard. The improvements will upgrade the illumination at signalized intersections with new light poles, new light fixtures and retrofit existing lighting fixtures with LED lights. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected] Cost/Completion: $1.8 million / fall 2020 Traffic Impact: • Intermittent single lane closures in each direction along Commercial Boulevard from NW 70th Avenue to State Road A1A will occur from 9 a.m. to 3:30 p.m., Monday through Friday, to build lighting structures, install conduits and restore the affected areas. • Intermittent single lane closures in each direction will occur along Oakland Park Boulevard from Atrium West to State Road A1A from 9 a.m. to 3:30 p.m., Monday through Friday, to build new lighting infrastructure and install new conduits.

20. NW 21st Avenue Mobility Improvement/Bridge Replacement Project in Oakland Park, Tamarac and Fort Lauderdale Description: This project will take place along NW 21st Avenue from SR 870/Commercial Boulevard to SR 816/Oakland Park Boulevard. The project consists of adding 5-foot buffered bike lanes in each direction and replacing the existing bridge over the South Florida Water Management District C-13 Canal. Improvements will also include upgrading signalization at NW 39th Street and NW 44th Street, installation of sidewalks and curb ramps with Americans with Disabilities Act (ADA) improvements, milling and resurfacing, and upgrading signing and pavement markings. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected]. Cost/Completion: $7.2 million / winter 2021 Traffic Impact: • One lane in each direction will be closed intermittently along NW 21st Avenue from Commercial Boulevard to Oakland Park Boulevard, 9:30 p.m. to 6 a.m., Sunday through Thursday, for bridge work, roadway widening and reconstruction and milling and resurfacing.

21. Lyons Road Mobility Improvement Project from the C-14 Canal to the Sawgrass Expressway in the city of Coconut Creek Description: This project consists of widening the roadway to accommodate new bike lanes. Improvements will also include signalization upgrades, sidewalks, miscellaneous signage, paving, restriping, drainage, lighting, bus shelters, curb and gutter, and driveways to meet Americans with Disabilities Act (ADA) standards. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected] Cost/Completion: $11,069,050 / early 2022 Traffic Impact: • One lane in each direction will be closed continuously along Lyons Road from Copans Road to the C-14 Canal for roadway widening and drainage operations. • The outside lane along Lyons Road will be closed at NW 6th Manor, Lyons Plaza and Wynmoor Way, 9 p.m. to 5 a.m., beginning on Monday, August 24th to Wednesday, August 26th, for signalization improvement operations. A flagging operation will be in place.

22. SR 7/US 441 Pedestrian Safety Enhancement Project from NW 36th Street to NW 41st Street in the city of Lauderdale Lakes Description: This project will address pedestrian safety by constructing a signalized mid-block pedestrian crossing. The mid-block crossing will serve as a connector to the Middle River Trail on the west and east side of SR 7/US 441 between NW 37th Street and NW 41st Street. Improvements will also include eighteen new 15-foot decorative pedestrian light poles primarily on the east side of the roadway to increase visibility between NW 36th Street and NW 41st Street along SR 7/US 441. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or [email protected]. Cost/Completion: $500,000 / summer 2020 Traffic Impact: • One lane in each direction may be closed intermittently along SR 7/US 441 from NW 36th Street to 41st Street, 9 a.m. to 3 p.m., Monday through Friday, to build lighting structures, install conduits and restore the affected areas. • One lane in each direction may be closed intermittently along SR 7/US 441 from NW 36th Street to 41st Street, 9 p.m. to 7:30 a.m., Monday through Friday, to build lighting structures, install conduits and restore the affected areas.

23. Lighting Improvements in Fort Lauderdale, Lauderdale-by-the-Sea, Plantation, Sunrise and Lauderhill Description: This project will take place along two major state roads: State Road A1A and Sunrise Boulevard. The improvements will upgrade illuminations at signalized intersections with new light poles and new light fixtures and retrofit existing lighting. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or justina@Valerin- Group.com. Cost/Completion: $1,550,074 / winter 2020 Traffic Impact: • Intermittent single lane closures will occur in each direction along Sunrise Boulevard from Magic Leap Entrance to Andrews Avenue from 9 a.m. to 3:30 p.m., Monday through Friday, to build new lighting infrastructure and install new conduits. • Intermittent single lane closures will occur in each direction along SR A1A from Road to Harbor Drive from 8:30 p.m. to 7:00 a.m., Monday through Friday, to build new lighting infrastructure and install new conduits. • Intermittent single lane closures will occur in each direction along SR A1A from Sebastian Street to SE 13th Street from 8:30 p.m. to 7:00 a.m., Monday through Friday, to build new lighting infrastructure and install new conduits. • Intermittent single lane and shoulder closures will occur in each direction along SR A1A from Miami Road to Harbor Drive and from Sebastian Street to SE 13th Street from 9 a.m. to 3:30 p.m., Monday through Friday, to build new lighting infrastructure and install new conduits.

24. Prospect Road Mobility Improvement Project from SR 870/Commercial Boulevard to SR 811/North Dixie Highway in Tamarac, Oakland Park and Fort Lauderdale Description: This project consists of widening Prospect Road from Commercial Boulevard to Powerline Road to accommodate 5-foot bike lanes in each direction and repurposing the outside travel lanes from Powerline Road to Dixie Highway to accommodate 7-foot buffered bike lanes in each direction. Improvements also include upgrading the existing roadway lighting to LED fixtures at the Powerline Road intersection, installing curb ramps to meet Americans with Disabilities Act (ADA) standards, performing minor drainage improvements, upgrading signage and pavement markings, and milling and resurfacing. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or justina@Valerin- Group.com. Cost/Completion: $4.6 million / late spring 2021 Traffic Impact: • One lane in each direction will be closed intermittently on Prospect Road from SR 870/Commercial Boulevard to NW 10th Avenue, 8:30 a.m. to 7:30 p.m., Monday through Saturday, for concrete work, signalization, drainage operations, roadway widening and paving. • One lane in each direction will be closed intermittently on Prospect Road from SR 870/Commercial Boulevard to NW 10th Avenue, 9 p.m. to 6 a.m., Monday through Saturday, for paving operations. • Two lanes in each direction may be closed on Prospect Road from NW 10th Avenue to Dixie Highway, 8:30 a.m. to 7:30 p.m., Monday through Saturday, for concrete work, signalization and lighting, irrigation, manhole and valve adjustments. • One lane in each direction will be closed continuously on Prospect Road from NW 10th Avenue to Dixie Highway for concrete work, signalization and lighting, irrigation, manhole and valve adjustments. • Two lanes in each direction may be closed along Prospect Road from NW 10th Avenue to Dixie Highway, 9 p.m. to 6 a.m., Monday through Saturday, for paving operations.

25. State Road 7/US 441 over SR 834/Sample Road Bridge Maintenance Project in Coconut Creek, Coral Springs and Margate Description: This project will begin on June 9, 2020. Project improvements consist of cleaning and painting the steel and concrete portions of the SR 7/US 441 northbound and southbound bridges over SR 834/Sample Road. For more information, please contact Community Outreach Specialist Angel Streeter Gardner at (561) 886-8773 or [email protected]. Cost/Completion: $886,144 / spring 2021 Traffic Impact: • All lanes are open. 26. Rock Island Mobility Improvements Project Description: Improvements under this project include milling, resurfacing and widening to accommodate 5-foot bike lanes in each direction, upgrading the existing asphalt sidewalk with concrete sidewalk along the corridor, and upgrading the existing school crossing at NW 38th Court. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/ Completion: $1,247,198 / fall 2020 Traffic Impact: • One outside lane in northbound direction will be closed along Rock Island Road from W Sample Road to Wiles Road, Monday through Friday between 9 a.m. and 3:30 p.m. • One outside lane along Rock Island Road from W Sample Road to Wiles Road may be closed overnight, Monday through Friday between 3:30 p.m. and 9 a.m. • One left turn lane in eastbound direction will be closed along W Sample Road at Rock Island Road intersection, Monday through Friday between 9 a.m. and 3:30 p.m. • One left turn lane in eastbound direction will be closed along W Sample Road at Rock Island Road intersection, Monday through Friday between 3:30 p.m. and 9 a.m.

Southeast Broward

27. South Florida Rail Corridor (SFRC) Safety Improvements Project Description: Improvements under this project include installing high emphasis pavement markings to warn drivers and pedestrians to stay clear of the railroad tracks and enhancing the railroad crossing advanced signage at Hallandale Beach Boulevard, Pembroke Road, Griffin Road, Oakland Park Boulevard, Powerline Road, Commercial Boulevard and Hillsboro Boulevard in Broward County. Yamato Road, Linton Boulevard, Forest Hill Boulevard, Summit Boulevard, and Okeechobee Boulevard in Palm Beach County. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/ Completion: $600,420 / fall 2020 Traffic Impact: • One to two lanes will be closed in each direction along Commercial Boulevard 450 feet east and west from the centerline of the SFRC railroad, Sunday, August 23 through Monday, August 24 between 10 p.m. and 6 a.m. • One to two lanes will be closed in each direction along Powerline Road 450 feet east and west from the centerline of the SFRC railroad, Tuesday, August 25 through Wednesday, August 26 between 10 p.m. and 6 a.m. • One to two lanes will be closed in each direction along Forest Hill Boulevard 450 feet east and west from the centerline of the SFRC railroad, Sunday, August 23 through Monday, August 24 between 10 p.m. and 6 a.m. • One to two lanes will be closed in each direction along Okeechobee Boulevard 450 feet east and west from the centerline of the SFRC railroad, Monday, August 24 through Tuesday, August 25 between 10 p.m. and 6 a.m.

28. A1A Improvements Project from Sheridan Street to Monroe Street in Hollywood Description: Improvements under this project include removing old asphalt and resurfacing the roadway, widening sidewalks and upgrading ramps to meet ADA requirements, replacing drainage structures and installing flap gates, removing, narrowing, and /or upgrading medians and curb and gutter, adding 4-foot bike lanes from Monroe Street to Arizona Street, adding sharrows (share the road pavement markings) from Arizona Street to Sheridan Street, upgrading and installing new pedestrian signals, and minor signalization and street light improvements. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. For more information about the project and monthly updates, please click the following link: http://d4fdot.com/bcfdot/a1a_improvements_from_sheridan_st_monroe_st_hollywood.asp Cost: $9,366,292.09 Completed: July 28, 2020

29. A1A Lighting Improvements Project from Hallandale Beach Boulevard to Bouganvilla Terrace in Hollywood Description: Improvements under this project include replacing the aging wires with new conductors within the existing lighting system to minimize lighting. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $399,288 / fall 2020 Traffic Impact: • The outside lane in the southbound direction of SR A1A will be closed Monday through Friday in segments of 1,000 linear feet, between 9 a.m. and 4 p.m. • The outside lane in the northbound direction of SR A1A will be closed Monday through Friday in segments of 450 linear feet, between 9 a.m. and 4 p.m.

30. 14th Avenue Mobility Improvements Project in Hollywood Description: The improvements under this contract include widening the roadway to accommodate bike lanes on 14th Avenue, Arthur Street, and Harding Street; adding shared lane pavement markings along 14th Avenue and Harding Street, to enhance the safe travel of bicycles and motor vehicles in the same traffic lane; and installing a shared-use path (off-road path) on Polk Street and 14th Avenue. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $2,099,354 / spring 2021 Traffic Impact: • North 14th Avenue from Liberty Street to Harding Street will be closed as needed, Monday, August 24, beginning at 7 a.m. until Tuesday, September 15, at 4 p.m., for widening and paving operations along North 14th Avenue. Northbound traffic will be detoured through North 15th Avenue between Liberty Street and Harding Street. Please see attached detour flyer.

Southwest Broward

31. Hurricane Irma Repair Improvements Project Description: Project Improvements include replacing a high mast light pole along westbound SR 93/I-75 at Exit 49 to Snake Road and replacing the overhead sign structures at southbound SR 93/ I-75 at Exit 19 and eastbound SR 852/ I-595 at Exit 12B to northbound US-1. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $189,999 / fall 2020 Traffic Impact: • All lanes are open.

32. NW 136 Avenue and SR-84 Intersection Improvements Project in Davie, Plantation, and Sunrise Description: Project Improvements include: replacing and widening the existing bridge over the North New River Canal, resulting in an additional southbound through lane and designated bike lanes; adding a designated right-turn lane from westbound SR 84 to northbound NW 136th Avenue; upgrading existing lighting to LED; and milling and resurfacing the roadway. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $6.4 million / winter 2020 Traffic Impact: • All traffic lanes along NW 136th Avenue will be shifted west onto the newly constructed southbound bridge to begin work on the northbound bridge. Traffic will be in this configuration until late 2020. • Westbound SR 84 approaching NW 136th Avenue will have one right turn lane closed, through August 2020, for the installation of drill shafts and widening of SR 84.

33. I-75 Landscaping Improvements Project in Miramar and Pembroke Pines Description: Project Improvements include installing plants throughout the project limits, including several species of palms and shade trees and a temporary irrigation system. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $2.5 million/ summer 2020 Traffic Impact: • All lanes are open.

34. City of Hollywood Mobility Improvements Project Description: Project improvements installing bike lanes along Hollywood Boulevard and Park Road; adding shared lane pavement markings along 35th Avenue, Polk Street, Rainbow Drive, Circle Drive, and Van Buren Street to enhance the safe travel of bicycles and motor vehicles in the same traffic lane; installing sidewalks along Fillmore Street, Hollywood Boulevard, and the intersections of Polk Street and Van Buren Street at 24th Avenue; adding a mid-block crossing on Hollywood Boulevard, east of 28th Avenue; relocating the existing water main on the north side of Hollywood Boulevard; and adding french drains on Hollywood Boulevard between Academy Circle and 35th Street, and on Park Road between Washington Street and Johnson Street. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $3,049,774 / fall 2020 Traffic Impact: • The inside lane will be closed in each direction along Park Road, from Washington Street to Johnson Street, during construction. • The outside westbound lane of Hollywood Boulevard from N 35th Avenue to South Academy Circle will be temporarily closed through September 2020, for water main and drainage installations. • The middle and inside southbound lane will be closed along N Park Road, from Fillmore Street to Hollywood Boulevard through September 2020, for widening, concrete, milling & resurfacing, signing and pavement markings.

35. I-75 Resurfacing Project in Miramar and Pembroke Pines Description: Project improvements include milling and resurfacing along SR 93/I-75 from the Miami-Dade/Broward County Line to north of Sheridan Street and installing double-face guardrail between the General Use Lanes and Managed Lanes. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost: $8.5 million Complete: August 11, 2020

36. Southwest Broward Mobility Improvements Project in Hollywood and Miramar Description: Project improvements include widening the roadway to accommodate 7-foot buffered bicycle lanes and adding sidewalks to create a continuous facility in each direction of SW 56th Avenue; adding shared lane pavement markings in each direction along SW 62nd Avenue and North 64th Avenue to enhance the safe travel of bicycles and motor vehicles in the same traffic lane; and adding sidewalks to create a continuous facility in each direction of SW 62nd Avenue. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $4,993,116 / summer 2021 Traffic Impact: • One lane in each direction of N 56th Avenue from Sheridan Street to Taft Street will be closed 9 a.m. to 4 p.m., Monday through Friday, for widening operations. Detours might be implemented through adjacent roads if necessary, to improve safety. Flaggers will be present and detour signs will be in place to direct motorists around the work zone. • Pedestrian signal improvements will take place at the intersections of S 56th Avenue/N 56th Avenue with Pembroke Road, Washington Street, Hollywood Boulevard, Johnson Street, Taft Street, Sheridan Street, and Stirling Road from 9 a.m. to 4 p.m., Monday through Friday. Workers will be present and lane closures will be place in the vicinity to direct motorists around the work zone.

37. SR 7/US 441 Landscape Improvements Project in Hallandale Beach, Hollywood, Miramar, West Park and Seminole Tribe of Florida Description: Project improvements include installing plants throughout the project limits, including several species of palms, shade trees, shrubs, and installing an irrigation system. The project limits extend from Hallandale Beach Boulevard to South of Stirling Road. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected]. Cost/Completion: $1,944,667 / fall 2020 Traffic Impact: • All lanes are open.

Maintenance & Permit Projects:

Traffic Impact: American Engineering & Development Corporation: Pompano Crossings Project: One westbound lane will be closed along NE 48th Street from NE 14th Avenue to North Dixie Highway from 9 a.m. to 4 p.m., Monday through Friday, implemented by American Engineering & Development Corporation as part of the Pompano Crossings project. For more information, please contact Broward County Traffic Engineering Division at (954) 847-2600.

Traffic Impact: One northbound along SR 7 / US 441 at Riverland Road will be closed, Monday through Friday between 9 a.m. and 4 p.m. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected].

Traffic Impact: One lane in each direction along Davie Boulevard at SW 17th Avenue will be closed, Monday through Friday between 9 a.m. and 4 p.m. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected].

Traffic Impact: Eastbound right lane along Atlantic Boulevard from 200' west of Oasis Drive will be closed Monday, August 31 through Saturday, October 31, for signal operations. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or [email protected].

Traffic Impact: Northbound SR 7 between Northwest 34th Street and Northwest 37th Street and eastbound from Northwest 36th Terrace and Northwest 31st Avenue, in Lauderdale Lakes, 10 p.m. until 5 a.m., Monday through Friday, through Wednesday, September 30, 1 of 3 lanes closed, for water main and sewer installation. For more information, please contact Marc Woodworth at (954) 818-3587. Traffic Impact: Eastbound Hallandale Boulevard at 27th W. Hallandale Beach Boulevard, in Hollywood Beach, 9 a.m. until 3:30 p.m., Monday through Friday, through Tuesday, September 1, 1 of 2 lanes closed, for façade repairs. For more information, please contact Paula Villabonna (954) 448-2245. Traffic Impact: Eastbound Stirling Road between NW 78th Avenue and N 68th Avenue, in Hollywood Beach, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, September 4, 1 of 3 lanes closed, for directional boring installation. For more information, please contact Juan Carlos (786) 299-1884. Traffic Impact: Southbound University Drive between 5799 University Drive and Stirling Road, in Davie, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, September 4, 1 of 3 lanes closed, directional boring installation. For more information, please contact Juan Carlos (786) 299-1884. Traffic Impact: Westbound Oakland Park Boulevard between NW 50th Avenue and NW 48th Avenue, in Lauderdale Lakes, 9 a.m. until 3:30 p.m., Monday through Friday, through Tuesday, September 15, 1 of 3 lanes closed, for directional boring installation. For more information, please contact Juan Carlos (786) 299-1884. Traffic Impact: Northbound Highway A1A between Old Dixie Highway and Eyeball Avenue, in Jupiter, 9 a.m. until 3:30 p.m., Monday through Friday, through Thursday, September 3, 1 of 3 lanes closed, for directional boring installation. For more information, please contact Miguel Arronte (786) 479-8190 Traffic Impact: Southbound and Northbound SR 7 just North 300’ feet and South 200 ‘ feet of 1400 block, in Lauderhill, 9 p.m. until 5 a.m., Monday through Friday, through Wednesday, September 30, 2 of 6 lanes closed, for drainage structure, stripping, curb and gutter infiltration system. For more information, please contact Rodrigo Arriaga (305) 833-7242. Traffic Impact: Southbound NE 4th Avenue and corner of westbound Sunrise Boulevard, in Fort Lauderdale, 9 a.m. until 3:30 p.m., Monday through Friday, through Wednesday, September 2, 1 of 2 lanes closed, for new driveway construction. For more information, please contact Bryan Chavez (973) 896-4084. Traffic Impact: Southbound US 441 just 320’ feet north and just 200’ feet south of 1400 block, in Lauderhill, 9 p.m. until 5 a.m., Monday through Friday, through Wednesday, September 30, 1 of 3 lanes closed, for drill shaft installation. For more information, please contact Rodrigo Arriaga (305) 833-7242. Traffic Impact: Northbound US 441 just 320’ feet north and just 200’ feet south of 1400 block, in Lauderhill, 9 p.m. until 5 a.m., Monday through Friday, through Wednesday, September 30, 1 of 3 lanes closed, for drill shaft installation. For more information, please contact Rodrigo Arriaga (305) 833-7242. Traffic Impact: Northbound SR 7 between SW 17th Street and SW 11th Street, in North Lauderhill, 9 a.m. until 3:30 p.m., Monday through Friday, Thursday, September 10 through Friday, October 9, 1 of 3 lanes closed, for handholes placements and pole replacements. For more information, please contact Erwin Mosqueda (561) 985-4270. Traffic Impact: Eastbound West Oakland Park Boulevard at intersection of NW 31st Avenue, in Lauderdale Lakes, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, September 28, 1 of 3 lanes closed, for conduits installation. For more information, please contact Antonio Seco (305) 803-9769. Traffic Impact: Eastbound and westbound East Hallandale Boulevard between NE 8th Avenue and NE 14th Avenue, in Hallandale Beach, 9 p.m. until 5 a.m., Monday through Friday, through Friday, September 11, 4 of 8 lanes closed, for water taps, proposed valve and sewer connection installations. For more information, please contact Luis Gonzalez (786) 606-2818. Traffic Impact: Northbound North Federal Highway at intersection of Broward Health Access Road, in Fort Lauderdale, 9 p.m. until 5 a.m., Monday through Friday, through Friday, August 28, 1 of 3 lanes closed, for soil boring. For more information, please contact Juan Valencia (786) 436-6811. Traffic Impact: Southbound South University Drive starting just north of Sterling Road, in Davie, 9 a.m. until 3:30 p.m., Monday through Friday, through Thursday, October 29, 1 of 4 lanes closed, for directional bore and conduit installation. For more information, please contact Juan Carlos (786) 299-1884. Traffic Impact: Southbound 301 SW 3rd Avenue Bus Stop #3319 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Northbound 3750 NE 3rd Avenue Bus Stop #2284 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Eastbound 3658 W. Hillsboro Boulevard Bus Stop #4823 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Eastbound 1208 W. Hillsboro Boulevard Bus Stop #2283 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Eastbound 164 W. Hillsboro Boulevard Bus Stop #818 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Southbound 231 S. Powerline Road Bus Stop #2965 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Northbound 236 S. Powerline Road Bus Stop #5362 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Northbound 592 S. Powerline Road Bus Stop #2980 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Southbound 601 S. Powerline Road Bus Stop #2967 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Northbound 952 S. Powerline Road Bus Stop #2979 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Southbound 1511 S. Powerline Road Bus Stop #2969 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Southbound 531 S. Dixie Highway Bus Stop #3121 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Southbound 1379 S. Dixie Highway Bus Stop #4182 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Southbound 4385 S. Dixie Highway Bus Stop #4408 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Southbound 3675 S. Dixie Highway Bus Stop #4409 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Northbound 240 S. Federal Highway Bus Stop #3095 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Southbound 701 S. Federal Highway Bus Stop #831 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Southbound 901 S. Federal Highway Bus Stop #4214 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Northbound 900 S. Federal Highway Bus Stop #2955 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Northbound 1100 S. Federal Highway Bus Stop #812 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Southbound 1351 S. Federal Highway Bus Stop #833 will be under construction through Wednesday, September 30 between 8 a.m. and 5 p.m. For more information, please contact Ralph Viola at [email protected].

Traffic Impact: Westbound Sterling Road between N 67th Avenue and North University Drive, in Davie, 9 a.m. until 3:30 p.m., Monday through Friday, through Thursday, October 29, 1 of 3 lanes closed, for directional bore and conduit installation. For more information, please contact Juan Carlos Escorcia (786) 299-1884. Traffic Impact: Southbound Highway 441 / SR 7 between Sheridan Street and Taft Street, in Hollywood, 9 a.m. until 4 p.m., Monday through Friday, through Friday, August 28, 1 of 3 lanes closed, for conduits and fiber optic installation. For more information, please contact Juan Herrera (954) 655-4188. Traffic Impact: Northbound University Drive between SW 30th Street and Nova Drive, in Davie, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, September 18, 1 of 3 lanes closed, for directional boring. For more information, please contact Ruben de la Torre (305) 319-9063.

Traffic Impact: Northbound Highway A1A at 2000 South Ocean Drive, in Hallandale Beach, 9 a.m. until 3 p.m., Monday through Friday, through Friday, September 11, 1 of 3 lanes closed, for removal and curb installation. For more information, please contact Javier Slaton (305) 890- 6532. Traffic Impact: Northbound Highway A1A at 550 Seabreeze Boulevard, in Fort Lauderdale, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, August 28, 1 of 2 lanes closed, for sidewalk replacement. For more information, please contact Luis Sanchez (786) 405-5444. Traffic Impact: Northbound South Ocean Drive between 3555 South Ocean Drive and 3525 South Ocean Drive, in Hollywood, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, August 28, 1 of 3 lanes closed, for directional drilling and installation. For more information, please contact Otto Elmer (888) 238-6215 ext. 700. Traffic Impact: Northbound and southbound Powerline Road between SW 10th Street and Wiles Road, in Deerfield Beach, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, October 16, 3 of 6 lanes closed, for pipe installation. For more information, please contact Russell Morris (954) 644-9148. Traffic Impact: Northbound Powerline Road between NW 63rd Street and NW 65th Street, in Fort Lauderdale, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, August 28, 1 of 3 lanes closed, for directional bore installation. For more information, please contact Ruben de la Torre (305) 319-9063. Traffic Impact: Northbound University Drive between SW 30th Street and Nova Drive, in Davie, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, September 11, 1 of 3 lanes closed, for directional boring. For more information, please contact Ruben de la Torre (305) 319-9063. Traffic Impact: Eastbound Hillsboro Boulevard between 4000 W Hillsboro Boulevard and Powerline Road, in Deerfield Beach, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, September 11, 1 of 3 lanes closed, for directional boring. For more information, please contact Ruben de la Torre (305) 319-9063. Traffic Impact: Eastbound Broward Boulevard between Andrews Avenue and SE 3rd Avenue, in Fort Lauderdale, 7 a.m. until 6 a.m., three days only, through Sunday, August 23, 3 of 3 lanes closed as needed, for crane placement for equipment hoisting. For more information, please contact Dave Griner 954-973-3030. Traffic Impact: Southbound starting at Sunrise Boulevard, in Fort Lauderdale, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, August 28, 1 of 2 lanes closed, for radio equipment installation. For more information, please contact Joe Antonak (561) 26-2134. Traffic Impact: Southbound Florida State Road A1A starting at Sunrise Boulevard, in Fort Lauderdale, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, August 28, 1 of 2 lanes closed, for radio equipment installation. For more information, please contact Joe Antonak (561) 26-2134. Traffic Impact: Northbound Florida State Road A1A starting at Sunrise Boulevard, in Fort Lauderdale, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, August 28, 1 of 2 lanes closed, for radio equipment installation. For more information, please contact Joe Antonak (561) 26-2134. Traffic Impact: Northbound Highway A1A starting at Sunrise Boulevard, in Fort Lauderdale, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, August 28, 1 of 2 lanes closed, for radio equipment installation. For more information, please contact Joe Antonak (561) 26-2134. Traffic Impact: Full closure on SR-844 / NE 14th Street over Bridge ICW (860060) beginning at 10 p.m., Tuesday, August 25 through 5 a.m., Wednesday, August 26. Detour signage will be provided. For more information, please contact Hernan Garcia at [email protected]. Traffic Impact: Eastbound and westbound Griffin Road between SW 42nd Terrace and SW 38th Avenue, in Dania Beach, 9 a.m. until 4 p.m., Monday through Friday, through Friday, September 25, 1 of 3 lanes closed, for directional boring installation. For more information, please contact Erwin Mosqueda (954) 789-7600. Traffic Impact: Southbound North Ocean Drive at 2201 North Ocean Boulevard, in Fort Lauderdale, 9 a.m. until 3:30 p.m., Monday through Friday, Monday, through Friday, August 28, 1 of 7 lanes closed, for curb and sidewalk removal and replacement. For more information, please contact Chad Restovich (214) 794-2452. Traffic Impact: Northbound University Drive between SW 36th Street and NSU Loop Road, in Davie, 9 a.m. until 3:30 p.m., Monday through Friday, through Wednesday, November 25, 3 of 3 lanes closed as needed, for water main construction. For more information, please contact Humberto Viana (954) 370-1962. Traffic Impact: Northbound Florida State Road A1A between NE 15th Street and NE 15th Court, in Fort Lauderdale, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, September 11, 1 of 1 lane closed as needed, for directional bore installation. For more information, please contact Alexander Perez (786) 300-7928. Traffic Impact: Eastbound Sunrise Boulevard between of NE 2nd Avenue and NE 4th Avenue, in Fort Lauderdale, 9 a.m. until 3:30 p.m., Monday through Friday, Friday, August 21 through Friday, September 11, 1 of 3 lanes closed, for directional bore installation. For more information, please contact Alexander Perez (786) 300-7928. Traffic Impact: Northbound Powerline Road just 400’ feet North of SW 15th Street, in Deerfield Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Friday, August 21 through Friday, September 11, 1 of 3 lanes closed, for directional bore installation. For more information, please contact Alexander Perez (786) 300-7928. Traffic Impact: Eastbound West Sample Road between 7944 West Sample Road and North Rock Island, in Coral Springs, 9 a.m. until 3:30 p.m., Monday through Friday, Friday, August 21 through Friday, September 18, 1 of 3 lanes closed, for directional bore installation. For more information, please contact Alexander Perez (786) 300-7928. Traffic Impact: Eastbound Seville Street between 3021 Seville Street and US Highway A1A, in Fort Lauderdale, 9 a.m. until 3:30 p.m., Monday through Friday, through Wednesday, September 2, 2 of 2 lanes closed as needed, for directional boring installation. For more information, please contact Norma Juarbe (813) 957-2012. Traffic Impact: Northbound and southbound South University Drive North of SW 36th Street, in Davie, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, August 28, 1 of 3 lanes closed, for drainage installation and removal existing median to regrade the green area. For more information, please contact Michael Velez (305) 433-1591. Traffic Impact: Eastbound beginning 201 South Fort Lauderdale Beach Boulevard and continuing Northbound US Highway A1A just 38’ feet, in Fort Lauderdale, 9 a.m. until 3:30 p.m., Monday through Friday, through Tuesday, September 1, 2 of 2 lanes closed as needed, for directional boring installation. For more information, please contact Norma Juarbe (813) 957- 2012. Traffic Impact: Intermittent closures in each direction along SR A1A / Dania Beach Boulevard on bridge 860920 over ICW, Tuesday, September 1 through Thursday, September 3 between 9 a.m. and 3 p.m. For more information, please contact Hernan Garcia at [email protected]. Traffic Impact: Westbound single right lane closure along SR-806 / Atlantic Avenue on bridge over ICW, Friday, September 4 between 9 a.m. and 4 p.m. For more information, please contact Hernan Garcia at [email protected]. Traffic Impact: Intermittent single right lane closure along SR-844 / NE 14th Street on bridge 860060 over ICW, Wednesday, September 9 through Thursday, September 10 between 9 a.m. and 4 p.m. For more information, please contact Hernan Garcia at [email protected]. Traffic Impact: Intermittent closures along West Island Access Road on bridge 890148, Friday, September 11 between 9 a.m. and 4 p.m. Flagger operations will be on site. For more information, please contact Hernan Garcia at [email protected]. Traffic Impact: Intermittent closures along West Island Access Road on bridge 890149, Wednesday, September 16 between 9 a.m. and 4 p.m. Flagger operations will be on site. For more information, please contact Hernan Garcia at [email protected]. Traffic Impact: Intermittent closures along southbound US-1 between Old Dixie Highway and SR-713, Thursday, September 17 through Friday, September 18 between 9 a.m. and 4 p.m. For more information, please contact Hernan Garcia at [email protected]. Traffic Impact: Intermittent closures in each direction along Hillsboro Boulevard (Bridge 860146) over ICWW, Monday, September 7, and Tuesday, September 8, each day between 8 a.m. and 4:30 p.m. For more information, please contact Annette Guidice at [email protected].

Traffic Impact: Intermittent closures in each direction along Atlantic Boulevard (Bridge 860157) over ICWW, Monday, September 14, and Tuesday, September 15, each day between 8 a.m. to 4:30 p.m. For more information, please contact Annette Guidice at [email protected].

Traffic Impact: Northbound and southbound Highway A1A between Roosevelt Street and McKinley Street, in Hollywood, 9 a.m. until 4 p.m., Monday through Friday, through Friday, August 21, for directional bore installation, removal and replace concrete, asphalt and brick pavers. For more information, please contact Dan Pastar (954) 247-4433. Traffic Impact: Northbound Highway A1A at 2000 South Ocean Drive, in Hallandale Beach, 9 a.m. until 3 p.m., Monday through Friday, through Friday, October 23, 1 of 3 lanes closed, for removal and curb installation. For more information, please contact Javier Slaton (305) 890- 6532. Traffic Impact: Westbound Griffin Road between SW 32nd Avenue and SW 38th Street, in Fort Lauderdale, 9 p.m. until 5 a.m., Monday through Friday, through Wednesday, September 30, 1 of 3 lanes closed, for water main installation. For more information, please contact Bobby Bucci (954) 931-2712. Traffic Impact: Northbound and southbound SR 7 between Sandalfoot Boulevard and NW 74th Place, in Coconut Creek, Monday through Friday, Monday, August 24 through Monday, August 31, 1 of 3 lanes closed as needed, for pipe installation and roadway restoration. For more information, please contact Russell Morris (954) 644-9148. Traffic Impact: Southbound I-75 and I-595 interchange at bridge 860512, in Sunrise, 9 p.m. until 5 a.m., two nights only, Monday, August 24 through Wednesday, August 26, 1 of 2 lanes closed as needed, for joint repair. For more information, please contact Miguel Sosa (954) 295- 0125. Traffic Impact: Southbound I-95 to Westbound I-595 at bridge 860537, in Fort Lauderdale, 9 p.m. until 4 a.m., one night only, Wednesday, August 26 through Thursday, August 27, 1 of 2 lanes closed as needed, for joint repair. For more information, please contact Miguel Sosa (954) 295-0125. Traffic Impact: Westbound Davie Boulevard between SE 2nd Avenue and South Andrews Avenue, in Fort Lauderdale, 9 a.m. until 3:30 p.m., Monday, August 24 through Friday, September 4, 1 of 2 lanes closed, for directional boring and conduit installation. For more information, please contact Eddy Perez and/or Catherine Morales (954) 558-2363 and/or (786) 539-8639. Traffic Impact: Southbound SR 7 between 300’ feet north of 1400 block and 200’ feet South of 1400 block, in Lauderhill, Monday through Friday, Monday, August 24 through Monday, August 31, 1 of 3 lanes closed, for drainage structure. For more information, please contact Miguel Arronte (786) 479-8190. Traffic Impact: Eastbound I-595 over I-95 to Ravenswood Road at bridge 860542, in Fort Lauderdale, 9 p.m. until 5 a.m., one night only, Wednesday, August 26 through Thursday, August 27, 1 of 3 lanes closed, for spot painting. For more information, please contact Miguel Sosa (954) 295-0125. Traffic Impact: Westbound I-595 at 1.5 miles north of Exit 19 (Indian Trace), in Weston, 9 a.m. until 3:30 p.m., Monday through Friday, Thursday, August 27 through Wednesday, December 23, 1 of 3 lanes closed, for drilled shafting. For more information, please contact Robert Perez (954) 327-2434. Traffic Impact: Eastbound I-595 at 1.5 miles north of Exit 19 (Indian Trace), in Weston, 9 a.m. until 3:30 p.m., Monday through Friday, Thursday, August 27 through Wednesday, December 23, 1 of 3 lanes closed, for drilled shafting. For more information, please contact Robert Perez (954) 327-2434. Traffic Impact: Northbound North SR 7 at NW 29th Street, in Lauderhill, 9 a.m. until 3:30 p.m., Monday through Friday, Monday, August 24 through Friday, October 23, 1 of 3 lanes closed, for concrete curbing removal and installation. For more information, please contact Javier Slaton (305) 890-6532. Traffic Impact: Southbound SR 7 between Regency Lakes Boulevard and NW 61st Street, in Coconut Creek, 9 a.m. until 3:30 p.m., Monday through Friday, Tuesday, August 25 through Friday, August 28, 1 of 3 lanes closed, for DMS steel structure installation. For more information, please contact Eduardo Estrada (786) 694-9180. Traffic Impact: Eastbound I-595 exit ramp to northbound I-95 at bridge 860538 and bridge 860542, in Fort Lauderdale, 9 p.m. until 5 a.m., Monday through Friday, Sunday, August 23 through Thursday, August 27, 1 of 2 lanes closed as needed, for spot painting. For more information, please contact Miguel Sosa (954) 295-0125. Traffic Impact: Northbound SR 7 between Winston Park Boulevard and Lou Bachrodt Car Dealer, in Coconut Creek, 9 a.m. until 3:30 p.m., Monday through Friday, Tuesday, August 25 through Friday, August 28, 1 of 3 lanes closed, for DMS structure installation. For more information, please contact Eduardo Estrada (786) 694-9180. Traffic Impact: Southbound South Powerline Road and eastbound and westbound intersection of SW 10th Street, in Pompano Beach, 8 p.m. until 5 a.m., Monday through Friday, Sunday, August 30 through Wednesday, September 9, 1 of 3 lanes closed, for water main installation. For more information, please contact Russell Morris (954) 644-9148. Traffic Impact: Northbound and southbound University Drive between South of NW 28th Street and north of NW 31st Court, in Coral Springs, 9 a.m. until 4 p.m., Monday through Friday, Tuesday, August 25 through Wednesday, September 9, 1 of 3 lanes closed, for soil borings. For more information, please contact Larry Colson (813) 944-3464. Traffic Impact: Westbound I-595 exit ramp to northbound I-95 at bridge 860542, in Fort Lauderdale, 9 p.m. until 5 a.m., one night only, Tuesday, August 25 through Wednesday, August 26, 1 of 2 lanes closed as needed, for spot painting. For more information, please contact Miguel Sosa (954) 295-0125. Traffic Impact: Southbound SR 7 intersection southwest corner of Broward Boulevard at 13th South State Road 7, in Plantation, 9 p.m. until 5 a.m., Monday through Friday, Sunday, August 23 through Wednesday, September 9, 1 of 3 lanes closed, for thermoplastic striping. For more information, please contact Adam Hodes (561) 568-2570. Traffic Impact: Eastbound West Sunrise Boulevard between NW 2nd Avenue and North Andrews Avenue, in Fort Lauderdale, 9 a.m. until 3:30 p.m., Monday through Friday, Tuesday, August 25 through Friday, August 28, 1 of 3 lanes closed, for entrance installation and thermoplastic striping. For more information, please contact Jennifer Lang (561) 630-9385.

Traffic Impact: Northbound Florida’s Turnpike Extension/SR 821 entrance ramp from SW 120th Street, overnight intermittent single lane closure, 11 p.m. Tuesday, August 25, to 5 a.m. Wednesday, August 26. For more information, please contact Louizi Asmide at [email protected].

Traffic Impact: Southbound Florida’s Turnpike Extension/SR 821 entrance ramp from SW 120th Street, overnight intermittent shoulder closure, 10:30 p.m. Tuesday, August 25, to 5 a.m. Wednesday, August 26. For more information, please contact Louizi Asmide at [email protected].

Traffic Impact: Northbound Florida’s Turnpike Extension/SR 821 exit ramp to University Drive/NW 27th Avenue/SR 817 (Exit 47), overnight intermittent single lane closure, 11 p.m. Wednesday, August 26, to 5 a.m. Thursday, August 27. For more information, please contact Louizi Asmide at [email protected].

Traffic Impact: Southbound Florida’s Turnpike Extension/SR 821 entrance ramp from NW 27th Avenue, overnight intermittent single lane closure, 10:30 p.m. Wednesday, August 26, to 5 a.m. Thursday, August 27. For more information, please contact Louizi Asmide at [email protected].

FPL Notifications

Traffic Impact: Florida Power and Light Improvements in Pompano Beach: one southbound lane on Dixie Highway from NE 13th Street to NE 17th Avenue will be closed Monday through Thursday between 9 a.m. and 4 p.m. For more information, please contact Area Wide Protective Field Supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Hollywood: one southbound lane on Pembroke Road from SW 68th Avenue to SW 64th Avenue will be closed Monday – Thursday between 9 a.m. and 4 p.m. For more information please contact Area Protective field Supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Pompano Beach: one southbound lane on US-1 from NE 65th Street to SE 15th Street will be closed Monday through Thursday between 9 a.m. and 4 p.m. For more information, please contact Area Protective field Supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Hollywood: one southbound lane on Pines Boulevard from SW 172nd Avenue to NW 163rd Avenue will be closed Monday through Thursday between 9 a.m. and 4 p.m. For more information, please contact Area Wide Protective Field Supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impacts: Florida Power and Light Improvements in Fort Lauderdale: one northbound lane on US-1 from SE 16th Street to SE 14th Street will be closed Monday through Thursday between 9 a.m. and 5 p.m. For more information, please contact Area Wide Protective Field Supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Fort Lauderdale: one westbound lane on W Sunrise Boulevard from NW 2nd Avenue to N Andrews Avenue will be closed Monday through Thursday between 9 a.m. and 5 p.m. For more information, please contact Area Wide Protective Field Supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Fort Lauderdale: one westbound on West Broward Boulevard from Riverland Road to NW 22nd Avenue will be closed Monday through Thursday between 7 a.m. and 7 p.m. For more information, please contact Area Wide Protective Field Supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Fort Lauderdale: one westbound lane on Wiles Road from Creekside Drive to Banks Road will be closed Monday through Thursday between 7 a.m. and 7 p.m. For more information, please contact Area Wide Protective Field Supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Davie: one westbound lane along Flamingo Road from SR 84 to SW 6th Court will be closed Monday through Thursday between 7 a.m. and 7 p.m. For more information, please contact Area Wide Protective Field Supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Miramar: one southbound lane on University Drive from Miramar Parkway to Pembroke Road will be closed Monday through Thursday between 9 a.m. and 5 p.m. For more information, please contact Area Wide Protective Field Supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Hollywood: one southbound lane on S. State Road 7 from SW 34th Street to SW 37th Street will be closed Monday through Thursday between 9 a.m. and 5 p.m. For more information, please contact Area Wide Protective Field Supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Fort Lauderdale: one northbound lane on NE 4th Avenue from NE 12th Street to Sunrise Boulevard will be closed Monday through Thursday between 9 a.m. and 5 p.m. For more information, please contact Area Wide Protective Field Supervisor Shanika Shorter at (561) 302-0948 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Plantation: one eastbound lane and one westbound lane of W Broward Boulevard from NW 48th Avenue and Holly Lane will be closed Monday through Friday between 9 a.m. and 4 p.m. Two eastbound lanes and two westbound lanes of W Broward Boulevard from NW 48th Avenue and Holly Lane will be closed Monday through Friday between 9 a.m. and 4 p.m. For more information, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Hollywood: one southbound lane of N Ocean Drive from E Dania Beach Boulevard to Thomas Street will be closed Monday through Friday between 9 a.m. and 4 p.m. For more information, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Davie: one southbound lane and one northbound lane of University Drive from Griffin Road to Stirling Road will be closed Monday through Friday between 9 a.m. and 4 p.m. For more information, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Davie: one eastbound lane of Griffin Road from Pine Island Road to University Drive will be closed Monday through Friday between 9 a.m. and 4 p.m. Two eastbound lanes of Griffin Road from Pine Island Road to University Drive will be closed Sunday through Friday between 9 p.m. and 5 a.m. For more information, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Hollywood: one westbound lane of Sheridan Street from N 23rd Avenue to N 26th Avenue will be closed Monday through Friday between 9 a.m. and 4 p.m. For more information, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected]. Traffic Impact: Florida Power and Light Improvements in Miramar/Pembroke Pines: one eastbound lane and one westbound lane of Pembroke Road from SW 69th Avenue to SW 72nd Avenue will be closed Monday through Friday between 9 a.m. and 4 p.m. Two eastbound lanes and two westbound lanes of W Commercial Boulevard from Rock Island Road to State Road 7 will be closed Sunday through Friday between 9 p.m. and 5 a.m. For more information, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected]. Traffic Impact: Florida Power and Light Improvements in Tamarac: one eastbound lane and one westbound lane of W Commercial Boulevard from Rock Island Road to State Road 7 will be closed Monday through Friday between 9 a.m. and 4 p.m. Two eastbound lanes and two westbound lanes of W Commercial Boulevard from Rock Island Road to State Road 7 will be closed Sunday through Friday between 9 p.m. and 5 a.m. For more information, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Lauderdale Lakes: one eastbound lane of W Oakland Park Boulevard from NW 43rd Avenue to NW 36th Terrace will be closed Monday through Friday between 9 a.m. and 4 p.m. Two eastbound lanes of W Oakland Park Boulevard from NW 43rd Avenue to NW 36th Terrace will be closed Sunday through Friday 9 p.m. and 5 a.m. For more information, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Lauderdale Lakes: one northbound lane of State Road 7 from NW 26th Street to NW 36th Street will be closed Monday through Friday between 9 a.m. and 4 p.m. Two northbound lanes of State Road 7 from NW 26th Street to NW 36th Street will be closed Sunday through Friday between 9 p.m. and 5 a.m. For more information about this work, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Fort Lauderdale: one eastbound lane of Davie Boulevard from SW 15th Avenue to SW 9th Avenue will be closed Monday through Friday between 9 a.m. and 4 p.m. One eastbound lanes and one westbound lane of Davie Blvd from SW 15th Avenue to SW 9th Avenue will be closed Sunday through Friday between 9 p.m. and 5 a.m. For more information, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Deerfield Beach: one northbound lane and one southbound lane of Federal Highway from E. Hillsboro Boulevard to SE 5th Court will be closed Monday through Friday between 9 a.m. and 4 p.m. Two northbound lanes and two southbound lanes of Federal Highway from E. Hillsboro Boulevard to SE 5th Court will be closed Sunday through Friday between 9 p.m. and 5 a.m. For more information, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Cooper City: one northbound lane of S. Flamingo Road between Griffin Road and SW 49th Street will be closed Monday through Friday between 9 a.m. and 4 p.m. For more information, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Oakland Park: one eastbound lane and one westbound lane of E Hallandale Beach Boulevard from SE 16th Avenue to Federal Highway will be closed Monday through Friday between 9 a.m. and 4 p.m. Two eastbound lanes and two westbound lanes of E Hallandale Beach Boulevard from SE 16th Avenue to Federal Highway will be closed Sunday through Friday between 9 p.m. and 5 a.m. For more information, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Cooper City/Davie: one northbound lane of S. Flamingo Road from SW 49th Street to SW 45th Street will be closed Monday through Friday between 9 a.m. and 4 p.m. Two northbound lanes and two southbound lanes of Federal Highway from SE 21st Street to NE 17th Street will be closed Sunday through Friday between 9 p.m. and 5 a.m. For more information, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Oakland Park: one eastbound lane and one westbound lane of W Oakland Park Boulevard from NW 31st Avenue to State Highway 9 will be closed Monday through Friday between 9 a.m. and 4 p.m. Two eastbound lanes and two westbound lanes of W Oakland Park Boulevard from NW 31st Avenue to State Highway 9 will be closed Sunday through Friday between 9 p.m. and 5 a.m. For more information, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Cooper City/Davie: westbound along Griffin Road between S Flamingo Road to S Nob Hill Road will be used for a detour route Monday through Friday between 9 a.m. and 4 p.m. For more information about this work, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Dania Beach/Hollywood: one westbound lane of E Dania Beach Boulevard from N Ocean Drive to Fronton Boulevard will be closed Monday through Friday between 9 a.m. and 4 p.m. For more information, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Fort Lauderdale: ne northbound lane and one southbound lane of N Federal Highway from NE 13th Street to NE 16th Street will be closed Monday through Friday between 9 a.m. and 4 p.m. Two northbound lanes and two southbound lanes of N Federal Highway from NE 13th Street to NE 16th Street will be closed Sunday through Friday between 9 p.m. and 5 a.m. For more information, please contact Southeastern Traffic Supply Project Engineer Erwin Mosqueda at (954) 789-7600 or [email protected].

Traffic Impact: Florida Power and Light Improvements in Plantation: one northbound single lane along N. State Road 7 from Broward Boulevard to Sunrise Boulevard will be closed Monday through Friday between 9 a.m. and 4 p.m. For more information, please contact Ted Howard (Zone Protection LLC.) at (954) 907-4011 or Robert Mitchell at (954) 860-4345 or [email protected].