Derbyshire Dales and High Peak Joint Core Strategy 29

Total Page:16

File Type:pdf, Size:1020Kb

Derbyshire Dales and High Peak Joint Core Strategy 29 Contents Non-Technical Summary 1 Introduction 4 2 Methodology 6 3 The Core Strategy and Key Sustainability Issues 8 4 Reasonable Alternatives Considered 12 5 Choice of Preferred Options 13 6 Likely Significant Effects of the Core Strategy 14 7 Recommendations 16 8 Implementation, Mitigation and Maximising Benefits 17 9 Monitoring 18 Introduction 10 Objectives and Structure of the SA Report 20 11 Compliance with the SEA Directive & Regulations 22 12 The Local Development Framework 25 13 Derbyshire Dales and High Peak Joint Core Strategy 29 Appraisal Methodology 14 How the Appraisal was carried out 31 15 Appraisal Timetable 35 Sustainability Issues 16 Review of Relevant Plans, Programmes and Policy Objectives 37 17 Baseline Data and Indicators 39 18 Difficulties and Limitations 40 19 The Core Strategy Area and Sustainability Issues 42 20 The SA Framework 50 Derbyshire Dales and High Peak Joint Core Strategy - Sustainability Appraisal Contents 21 Consultation 58 Reasonable Alternatives Considered and Choice of Preferred Options 22 Testing the Core Strategy Objectives 60 23 Appraisal of Alternative Options and Choice of Preferred Options 68 24 Choice of the Preferred Options 70 Sustainability Appraisal of Preferred Options 25 Predicting the Effects of the Preferred Options 80 26 Evaluating the Effects of the Preferred Options 81 27 Cumulative Effects 86 28 Implementation, Mitigation Measures and Maximising Benefits 87 29 Uncertainties and Risks 88 Monitoring Proposals 30 Monitoring Proposals 89 Appendices 1 Review of Relevant Plans, Programmes and Policy Objectives 94 2 Baseline Data and Indicators 107 3 Scoping Report Consultation Responses 113 4 Appraisal of Issues and Options 129 5 Appraisal of Growth Options 143 6 Appraisal of Preferred Options 156 7 Contribution of Sustainability Appraisal Recommendations 597 Derbyshire Dales and High Peak Joint Core Strategy - Sustainability Appraisal Non-Technical Summary Derbyshire Dales and High Peak Joint Core Strategy - Sustainability Appraisal 3 1 Introduction 1.1 Derbyshire Dales District Council and High Peak Borough Council are reviewing their Local Plans, which are to be replaced by two Local Development Frameworks (LDFs), incorporating Development Plan Documents (DPDs) and Supplementary Planning Documents (SPDs). The DPDs and SPDs included in each LDF need to be subject to sustainability appraisal (SA), under the Planning and Compulsory Purchase Act 2004. The SAs conducted must also meet the requirements for Strategic Environmental Assessment (SEA) in accordance with European Directive 2001/42/EC (also known as the SEA Directive). 1.2 This report constitutes the draft SA Report for the Joint Derbyshire Dales and High Peak Core Strategy DPD. It has been produced alongside the emerging Core Strategy DPD, and is being published for consultation at the same time as the Preferred Options for the Core Strategy DPD to provide the public and statutory bodies with an opportunity to express their opinions on the SA Report and to use it as a reference point in commenting on the Core Strategy DPD. The Core Strategy DPD will set out the overall strategy for the two LDFs and key policies against which development proposals will be assessed. 1.3 This SA, incorporating SEA, has been undertaken in line with ODPM Guidance(1)and the relevant sections of the CLG Plan making Manual (2). The objective of the SEA Directive is ‘to provide for a high level of protection of the environment and contribute to the integration of environmental considerations into the preparation and adoption of plans ... with a view to promoting sustainable development’. According to the Government’s guidance, SA includes a wider range of considerations, extending to social and economic impacts of plans, whereas SEA is more focused on environmental impacts. A key output of the SA process is this SA Report which describes the plan being appraised, how the appraisal has been conducted, and the likely significant sustainability effects of implementing the plan. 1.4 Throughout this report the term ‘SA’ refers to Sustainability Appraisal incorporating the requirements of Strategic Environmental Assessment. 1.5 If you, or someone you know, is unable to read any Council publication, these can be provided on request in a range of alternative formats (e.g. large print, audiotape, Braille) and in other languages. This may take a few days notice to arrange. For information on this or other issues, please contact either of the Planning Policy teams at the addresses given below. 1.6 You are invited to respond to this consultation by Thursday 15 July 2010 by using one of the following methods: Online at http://highpeak-consult.limehouse.co.uk/portal/planning/jointcorestrategy Email to an email address given below Post to either postal address given below 1.7 The Councils are particularly interested in comments on the following questions: 1 Sustainability Appraisal of Regional Spatial Strategies and Local Development Documents, Office of the Deputy Prime Minister, November 2005 2 Communities and Local Government Plan Making Manual, Planning Advisory Service, www.pas.gov.uk 4 Derbyshire Dales and High Peak Joint Core Strategy - Sustainability Appraisal Introduction 1 Question 1 Have the sustainability impacts of policy options been correctly predicted and evaluated? Question 2 Are there sustainability impacts of policy options that have not been predicted? Question 3 Are there improvements to preferred policy options, or further mitigation measures that should be considered? Question 4 Will the proposals for monitoring the sustainability effects of implementing the Core Strategy DPD be effective? 1.8 Please note that all representations submitted online, by email or by post, will be made available to view on the consultation website. In the interests of data protection, personal contact detail will not be published on the website. High Peak Borough Council Derbyshire Dales District Council Planning Policy and Design Planning and Development Services Regeneration Service Planning Policy Municipal Buildings Town Hall Glossop Matlock Derbyshire SK13 8AF Derbyshire DE4 3NN Tel: 0845 129 7777 Tel: 01629 761241 E-mail: [email protected] E-mail: [email protected] Derbyshire Dales and High Peak Joint Core Strategy - Sustainability Appraisal 5 2 Methodology 2.1 The ODPM’s SA guidance specifies a number of stages of work that have to be undertaken to comply with the SEA Directive. The first three stages have been completed and are documented in this SA Report. Stage A – Setting the context and scope 2.2 This stage was completed in March 2009. It involved conducting a review of other plans, strategies and studies relevant to the preparation of the Core Strategy DPD, the development of an appraisal framework including sustainability objectives, the collection of a wide range of data characterising the area and identification of key sustainability issues. The information was published as a series of Topic Papers accompanied by a covering Report. Together, these documents made up the SA Scoping Report. 2.3 The Scoping Report was sent to the SEA ‘Consultation Bodies’ (i.e. English Heritage, Natural England, and The Environment Agency), as well as notifications sent to all those on the two authorities consultation databases for a five week consultation. Changes were then made to the document, including to the objectives of the SA framework, to incorporate stakeholder feedback. Stage B: Developing and Refining Options 2.4 Strategic options for the Core Strategy DPD were identified and appraised against the SA Framework early in the SA process. The findings of this process were included in the Issues and Options paper consulted on alongside the SA Scoping Report. Subsequently, the two Councils identified further growth options for the Core Strategy DPD. These options were appraised in parallel with their preparation and the results are included in a separate report: the accompanying Growth Options to 2026 SA report. Stage C: Appraising the Effects of the Preferred Options 2.5 This stage involved identifying the Preferred Options for the Core Strategy by predicting and assessing the likely significant effects of the reasonable alternatives available, including the potential mitigation measures and measures for maximising beneficial effects. This stage also involved developing proposals for monitoring to establish the means by which the sustainability performance of the plan can be assessed over time. The output from Stages A to C is this SA Report. Stage D: Consultation on preferred options and final SA 2.6 Derbyshire Dales District Council and High Peak Borough Council are seeking views on this SA Report alongside consultation on the Preferred Options Draft Plan, between 3rd June and 15th July 2010. This consultation is designed to comply with the Statement of Community Involvement and requirements of the SEA Directive. Should any significant changes be made to the DPD as a result of public consultation, additional appraisal work will need to be carried out and a revised SA Report prepared to reflect the results. The draft Core Strategy DPD and revised SA Report will then be subject to further consultation in October 2010 before being submitted to the Secretary of State in March 2011. 6 Derbyshire Dales and High Peak Joint Core Strategy - Sustainability Appraisal Methodology 2 Stage E: Monitoring Implementation of the DPD 2.7 This draft SA Report sets out recommendations for monitoring the sustainability effects of the Core Strategy DPD. Recommendations for a process for dealing with adverse or unexpected effects will be included in the final SA Report. Derbyshire Dales and High Peak Joint Core Strategy - Sustainability Appraisal 7 3 The Core Strategy and Key Sustainability Issues Overview 3.1 The Derbyshire Dales and High Peak Joint Core Strategy covers two distinct areas of land on the edge of the Peak District National Park, shown in pink in the map below. The areas covered by the Core Strategy are split into two; to the north the area within High Peak, and to the south the area within Derbyshire Dales.
Recommended publications
  • Peak Sub Region
    Peak Sub Region Strategic Housing Land Availability Assessment Final Report to Derbyshire Dales District Council, High Peak Borough Council and the Peak District National Park Authority June 2009 ekosgen Lawrence Buildings 2 Mount Street Manchester M2 5WQ TABLE OF CONTENTS 1 INTRODUCTION................................................................................................................ 5 STUDY INTRODUCTION.............................................................................................................. 5 OVERVIEW OF THE STUDY AREA ............................................................................................... 5 ROLE OF THE STUDY ................................................................................................................ 8 REPORT STRUCTURE.............................................................................................................. 10 2 SHLAA GUIDANCE AND STUDY METHODOLOGY..................................................... 12 SHLAA GUIDANCE................................................................................................................. 12 STUDY METHODOLOGY........................................................................................................... 13 3 POLICY CONTEXT.......................................................................................................... 18 INTRODUCTION ....................................................................................................................... 18 NATIONAL, REGIONAL AND
    [Show full text]
  • Pharmaceutical Needs Assessment 2018-2021 2018-2021
    Pharmaceutical Needs Assessment 2018-2021 2018-2021 Produced by Derby City Public Health Department Knowledge, Intelligence & Strategic Planning This Pharmaceutical Needs Assessment has been produced for both Derby City Council and Derbyshire County Council Health & Wellbeing Boards. Pharmaceutical Needs Assessment 2018-2021 Acknowledgements The PNA Steering Group wishes to thank all the members of the public and wider stakeholders who participated in the consultation of this needs assessment. In addition, the Group would like to thank Charlotte Moore, Chris McManus, Leila Whiteley, Nicola Richmond and Sereena Raju for their valued contribution to the content of this PNA. It also wishes to acknowledge Derby City, Derbyshire County and District Local Authority Planning Departments for contributing the detail on future housing plans, to support the assessment of future need for community pharmacy across the area. A particular thank-you must be given to Andy Muirhead who has produced much of the content whilst also overseeing the production of the document as a whole, ensuring its timely and effective delivery. Finally, we would like to give special thanks to Graham Archer, Chief Officer, Derbyshire Local Pharmaceutical Committee (LPC), for his support in producing this and the previous two PNAs. This will be Graham’s last as he retires as Chief Officer. We wish you all the very best in your retirement Graham. Version Control Title Derby and Derbyshire Pharmaceutical Needs Assessment 2018-2021 Status Final document approved by Derby and
    [Show full text]
  • An Archaeological Desk Based Assessment at Dinting Vale Business Park, Glossop, Derbyshire
    An Archaeological Desk Based Assessment at Dinting Vale Business Park, Glossop, Derbyshire ARS Ltd Report 2018/100 June 2018 Compiled By: Michelle Burpoe Archaeological Research Services Ltd Angel House Portland Square Bakewell Derbyshire DE45 1HB Checked By: Clive Waddington MCIfA Tel: 01629 814540 [email protected] www.archaeologicalresearchservices.com An Archaeological Desk-Based Assessment at Dinting Vale Business Park, Glossop, Derbyshire An Archaeological Desk-Based Assessment at Dinting Vale Business Park, Glossop, Derbyshire Archaeological Research Services Ltd Report 2018/100 June 2018 © Archaeological Research Services Ltd 2018 Angel House, Portland Square, Bakewell, Derbyshire, DE45 1HB www.archaeologicalresearchservices.com Prepared on behalf of: Amdec Industrial Products Ltd Date of compilation: June 2018 Compiled by: Michelle Burpoe Checked by: Clive Waddington MCIfA Planning Reference: HPK/2017/0693 Local Authority: High Peak Borough Council Site central NGR: SK 01674 94571 i An Archaeological Desk-Based Assessment at Dinting Vale Business Park, Glossop, Derbyshire EXECUTIVE SUMMARY Archaeological Research Services Ltd was commissioned by Amdec Industrial Products Ltd to produce an archaeological desk-based assessment at Dinting Vale Business Park, Glossop, Derbyshire. This desk-based assessment was commissioned to support a planning application that has been submitted to High Peak Borough Council for the regeneration of the Business Park to provide offices, industrial/commercial premises, a showroom, and associated access and landscaping. The Derbyshire HER and NRHE record the entire site as being the southern-most extent of Edmund Potter’s Dinting Vale Print Works, at one point the largest calico-printing works in the world. The majority of the structures within the site were largely demolished by 2000, though one partial structure, in addition to several partial upstanding remains and boundaries of the works still survive in situ.
    [Show full text]
  • NOTICE of POLL Election of a Borough Councillor
    NOTICE OF POLL High Peak Election of a Borough Councillor for Barms Notice is hereby given that: 1. A poll for the election of a Borough Councillor for Barms will be held on Thursday 2 May 2019, between the hours of 7:00 am and 10:00 pm. 2. The number of Borough Councillors to be elected is one. 3. The names, home addresses and descriptions of the Candidates remaining validly nominated for election and the names of all persons signing the Candidates nomination paper are as follows: Names of Signatories Name of Candidate Home Address Description (if any) Proposers(+), Seconders(++) & Assentors BROOKE (Address in High Peak) The Conservative Party Christopher J Seddon Sandra M J Seddon Seb Candidate (+) (++) Faye Warren Alec H R Warren Patricia A Barnsley Elaine J Bonsell Roger Parker Elizabeth J Hill Robert L Mosley Edward A Hill MAYERS Flat 6, 2 Crescent The Green Party Rennie F. Leech (+) Francesca J Gregory Daniel David View, Hall Bank, Clare M Foster (++) Buxton, Derbyshire, Zoie-Echo Campbell Stacey N Mayer SK17 6EN Lenora Kaye Allan Smith Deborah R Walker John G. Walker Rachael Hodgkinson QUINN 45 Nunsfield Road, Labour Party Lisa J. Donnelly (+) David S. Donnelly (++) Rachael Buxton, Derbyshire, Collette Solibun Matthew A Sale SK17 7BW Pamela J Smart David J Jones Natasha Braithwaite Anita A Harwood Isobel G R Harwood Martin S Quinn 4. The situation of Polling Stations and the description of persons entitled to vote there are as follows: Station Ranges of electoral register numbers of Situation of Polling Station Number persons entitled to vote thereat Fairfield Methodist Church, Off Fairfield Road, Buxton 1 BA1-1 to BA1-652 Fairfield Methodist Church, Off Fairfield Road, Buxton 2 BA2-1 to BA2-751 5.
    [Show full text]
  • East Midlands
    East Midlands Initial proposals Contents Initial proposals summary .............................................................................. 3 1. What is the Boundary Commission for England? ........... 5 2. Background to the 2013 Review ...................................................... 6 3. Initial proposals for the East Midlands region ................... 9 Initial proposals for the Lincolnshire sub-region .................................................................. 9 Initial proposals for the Derbyshire sub-region ..................................................................... 10 Initial proposals for the Northamptonshire, Leicestershire, and Nottinghamshire sub-region ............................................................................................................................................ 11 4. How to have your say ................................................................................. 14 Annex: Initial proposals for constituencies, including wards and electorates ........................................................................................ 17 Glossary ............................................................................................................................ 33 Initial proposals summary Who we are and what we do of constituencies allocated to each sub- region is determined by the electorate of the The Boundary Commission for England is an combined local authorities. independent and impartial non-departmental public body which is responsible for reviewing
    [Show full text]
  • Health and Well Being
    Contents 1 How the sustainability appraisal framework will be used 3 2 Purpose of this document 4 3 Stage 1A: Identifying other relevant policies, plans and programmes 5 National 5 Regional 5 Local 5 Key Messages 5 4 Stage A2: Collecting baseline information 7 National Overview 7 Regional Overview 7 Derbyshire Dales & High Peak 8 5 Stage A3:Identifying sustainability issues and problems 29 6 Stage A4: Developing the Sustainable Appraisal Framework 30 Sustainable development objectives 30 Indicators and monitoring data 30 Health and Well-Being Topic Paper April 2009 How the sustainability appraisal framework will be 1 used 1.1 The purpose of a Sustainability Appraisal is to appraise the social, environmental and economic effects of the proposed strategy and policy options of the Core Strategy. This must be done at the beginning to ensure that Derbyshire Dales District Council and High Peak Borough Council can make informed decisions that accord with sustainable development. 1.2 Sustainability objectives are used to test and ask questions for each strategy and policy option considered in the Core Strategy. The Sustainability Appraisal process has a number of set stages that must be followed, but can be reconsidered when new information is collected. 1.3 The development of the Sustainability Appraisal for the Derbyshire Dales and High Peak Core Strategy will follow guidance as set out in “Sustainability Appraisal of Regional Spatial Strategies and Local development Documents (2005)” published by the Department of Communities and Local Government. 1.4 This topic paper follows Stage A (Pre Production – Evidence Gathering) of the guidance which is undertaken during the pre-production stage of the joint Core Strategy.
    [Show full text]
  • HWR Chatsworth Paper Vsept07 Unformatted.Doc 28/07/2008
    HWR Chatsworth paper vSept07 unformatted.doc 28/07/2008 REGIONAL EVOLUTION OF A FLUVIODELTAIC CYCLIC SUCCESSION IN THE MARSDENIAN (LATE NAMURIAN STAGE, PENNSYLVANIAN) OF THE CENTRAL PENNINE BASIN, UK. 1 2 3 4 C.N. WATERS , J.I. CHISHOLM , A.C. BENFIELD and A.M. O’BEIRNE 1 British Geological Survey, Keyworth, Nottingham NG12 5GG, UK [email protected] 2 4 Park Street, Loughborough, Leicestershire LE11 2EG, UK 3 24 Gascoigne Avenue, Barwick-in-Elmet, Leeds LS15 4LW, UK 4 32 Hemberton Road, London SW9 9LJ, UK SUMMARY: Basinwide analysis of sedimentary facies, isopachytes and palaeocurrents for two late Marsdenian (Pennsylvanian) sedimentary cycles within part of the Millstone Grit Group, has led to a new sequence-stratigraphic interpretation for the relationships between its constituent sandstone units (currently named Huddersfield White Rock, Chatsworth Grit, Brooksbottoms Grit, Holcombe Brook Grit, Brown Edge Flags and Redmires Flags). The Bilinguites superbilinguis (R2c1) and Verneulites sigma (R2c2) marine bands related to fourth-order marine highstands show faunal variations possibly reflecting fifth-order sea-level fluctuations. The lower R2c1 cycle consists entirely of deep water mudstone. The overlying R2c2 cycle shows an upward regressive passage through pro-delta and delta-slope deposits to mouthbar and channel sandstones. The latter comprises an ‘eastern inflow’ of northerly provenance, the distribution of which was not influenced by the underlying basement configuration, and a ‘southern inflow’ sourced from the Wales-Brabant High. Falling sea-levels resulted in progressive narrowing of the fluvial pathway within the main sandstone body of the ‘eastern inflow’, with a concomitant increase in flow velocities and grainsize.
    [Show full text]
  • Pennine Bridleway, Monk's Road to High Lane, Charlesworth, Derbyshire
    making sense of heritage PENNINE BRIDLEWAY, MONK'S ROAD TO HIGH LANE, CHARLESWORTH, DERBYSHIRE Landscape Survey, Archaeological Watching Brief and Trial Trenching Report Ref: 86440.03 January 2013 PENNINE BRIDLEWAY, MONK’S ROAD TO HIGH LANE, CHARLESWORTH, DERBYSHIRE Archaeological Landscape Survey, Evaluation and Watching Brief Report Prepared for: Derbyshire County Council by Wessex Archaeology Unit 6, Riverside Block Sheaf Bank Business Park Sheffield S2 3EN Report reference: 86440.03 January 2013 © Wessex Archaeology Limited 2013 all rights reserved Wessex Archaeology Limited is a Registered Charity No. 287786 Pennine Bridleway, Monks Road to High Lane, Charlesworth, Derbyshire Archaeological Landscape Survey, Evaluation and Watching Brief Report DISCLAIMER THE MATERIAL CONTAINED IN THIS REPORT WAS DESIGNED AS AN INTEGRAL PART OF A REPORT TO AN INDIVIDUAL CLIENT AND WAS PREPARED SOLELY FOR THE BENEFIT OF THAT CLIENT. THE MATERIAL CONTAINED IN THIS REPORT DOES NOT NECESSARILY STAND ON ITS OWN AND IS NOT INTENDED TO NOR SHOULD IT BE RELIED UPON BY ANY THIRD PARTY. TO THE FULLEST EXTENT PERMITTED BY LAW WESSEX ARCHAEOLOGY WILL NOT BE LIABLE BY REASON OF BREACH OF CONTRACT NEGLIGENCE OR OTHERWISE FOR ANY LOSS OR DAMAGE (WHETHER DIRECT INDIRECT OR CONSEQUENTIAL) OCCASIONED TO ANY PERSON ACTING OR OMITTING TO ACT OR REFRAINING FROM ACTING IN RELIANCE UPON THE MATERIAL CONTAINED IN THIS REPORT ARISING FROM OR CONNECTED WITH ANY ERROR OR OMISSION IN THE MATERIAL CONTAINED IN THE REPORT. LOSS OR DAMAGE AS REFERRED TO ABOVE SHALL BE DEEMED TO INCLUDE, BUT IS NOT LIMITED TO, ANY LOSS OF PROFITS OR ANTICIPATED PROFITS DAMAGE TO REPUTATION OR GOODWILL LOSS OF BUSINESS OR ANTICIPATED BUSINESS DAMAGES COSTS EXPENSES INCURRED OR PAYABLE TO ANY THIRD PARTY (IN ALL CASES WHETHER DIRECT INDIRECT OR CONSEQUENTIAL) OR ANY OTHER DIRECT INDIRECT OR CONSEQUENTIAL LOSS OR DAMAGE COPYRIGHT THIS REPORT MAY CONTAIN MATERIAL THAT IS NON-WESSEX ARCHAEOLOGY COPYRIGHT (E.G.
    [Show full text]
  • Initial Proposals for New Parliamentary Constituency Boundaries in the East Midlands Contents
    Initial proposals for new Parliamentary constituency boundaries in the East Midlands Contents Summary 3 1 What is the Boundary Commission for England? 5 2 Background to the 2018 Review 7 3 Initial proposals for the East Midlands 11 Initial proposals for the Lincolnshire sub‑region 12 Initial proposals for the Derbyshire sub‑region 13 Initial proposals for the Nottinghamshire, Leicestershire, 14 Rutland and Northamptonshire sub‑region 4 How to have your say 19 Annex A: Initial proposals for constituencies, 23 including wards and electorates Glossary 39 Initial proposals for new Parliamentary constituency boundaries in the East Midlands 1 Summary Who we are and what we do What is changing in the East Midlands? The Boundary Commission for England is an independent and impartial The East Midlands has been allocated 44 non‑departmental public body which is constituencies – a reduction of two from responsible for reviewing Parliamentary the current number. constituency boundaries in England. Our proposals leave seven of the 46 The 2018 Review existing constituencies unchanged. We have the task of periodically reviewing As it has not always been possible to the boundaries of all the Parliamentary allocate whole numbers of constituencies constituencies in England. We are currently to individual counties, we have grouped conducting a review on the basis of rules some county and local authority areas set by Parliament in 2011. The rules tell into sub‑regions. The number of us that we must make recommendations constituencies allocated to each sub‑region for new Parliamentary constituency is determined by the electorate of the boundaries in September 2018. They combined local authorities.
    [Show full text]
  • Residential Development, Woolley Bridge
    Residential Development, Woolley Bridge Transport Statement Report July 2012 Prepared for: Prepared by: Tornillo Homes (Hadfield) Limited Steer Davies Gleave acting by Joe Pitt and Ben Moon, Joint Fixed West Riding House Charge Receivers of the land lying south of 67 Albion Street Woolley Bridge Road, Glossop Leeds LS1 5AA +44 (0)113 389 6400 www.steerdaviesgleave.com Transport Statement CONTENTS 1 RESIDENTIAL DEVELOPMENT, WOOLLEY BRIDGE – TRANSPORT STATEMENT .......... 1 Introduction ........................................................................................... 1 Development Proposals ............................................................................. 2 Existing Conditions ................................................................................... 4 Trip Generation .................................................................................... 11 Site Access .......................................................................................... 12 Conclusions .......................................................................................... 15 FIGURES Figure 1.1 Woolley Bridge – Site Location ............................................. 1 Figure 1.2 Site Location Plan ............................................................ 2 Figure 1.3 Proposed Site Layout ........................................................ 3 Figure 1.4 Local Bus Route Map ......................................................... 5 Figure 1.5 60 Minute Public Transport Accessibility from the Development SIte (AM
    [Show full text]
  • Derbyshire Dales & High Peak Joint Housing Needs Survey
    DERBYSHIRE DALES & HIGH PEAK JOINT HOUSING NEEDS SURVEY COVERING THE PEAK SUB REGION FINAL REPORT MARCH 2007 E-Mail: [email protected] Page 2 TABLE OF CONTENTS Page I. INTRODUCTION: 3 A. Strategic context B. Scope of the report C. Structure of the report 2. SURVEY DESIGN, METHODOLOGY AND VALIDATION 11 3. A PROFILE OF HOUSEHOLDS IN THE SUB-REGION 21 4. PROBLEM HOUSING AND THE REMEDIES FOR IT 36 5. THE COSTS OF HOUSING 47 6. THE CURRENT AFFORDABILITY OF HOUSING 67 7. NEWLY ARISING NEED AND SUPPLY FORECASTS 82 8. THE OVERALL SCALE OF NEED – THE ASSESSMENT MODEL 107 9. THE MIX OF AFFORDABLE HOUSING REQUIRED 117 10. FUTURE DEMAND FOR MARKET HOUSING 134 11. RURAL KEY WORKERS 141 12. STRATEGIC PLANNING IMPLICATIONS 171 APPENDICES 1. Survey Response and Weighting 191 2. Population projections 2006-2016 192 3. The affordability propensity of newly forming households 195 4. Supply-side information 198 5. Additional information about key workers 211 6. Employers Key Worker Postal Survey 218 7. Resident-based Household Survey 222 John Herington Associates Page 3 SECTION 1. INTRODUCTION __________________________________________________ A. STRATEGIC CONTEXT 1.1 The East Midlands Regional Strategy makes clear that access to housing is an acute problem in much of the Peak Sub-Region, especially within the boundaries of the National Park. This arises from high levels of demand from people working outside the area and people moving to the Peak on retirement that push up the price of housing, combined with low levels of local incomes. A limited supply and low turnover of social housing, and a high incidence of second homes exacerbate this.
    [Show full text]
  • Derbyshire Dales Local Plan Pre Submission Draft Statement Of
    Derbyshire Dales Local Plan Pre Submission Draft Statement of Consultation June 2013 Contents 1. Introduction 2 2. Derbyshire Dales Core Strategy Topic Papers – 5 Stakeholder Workshops June 2007 – January 2008 3. Derbyshire Dales and High Peak Joint Core Strategy 9 Issues and Options, March – May 2009 4. Derbyshire Dales and High Peak Joint Core Strategy 1 Growth Options August – October 2009 5. Derbyshire Dales and High Peak Joint Core Strategy 14 Draft Plan June - July 2010 6. Derbyshire Dales and High Peak Joint Core Strategy 17 Community Conversations, June – July 2011 7. Transition from Derbyshire Dales and High Peak Joint Core Strategy to Derbyshire Dales Local Plan 8. Derbyshire Dales Local Plan Housing Issues and 22 Options and Settlement Framework Boundary Review, June - August 2012 9. Derbyshire Dales Local Plan Pre-Submission Draft, 25 June 2013 – July 2013 Appendix 1 – Consultation Leaflets 27 Appendix 2 – Derbyshire Dales Community Conversations 60 Comment Summary Outcomes Appendix 3 – List of Consultees for 2012 and 2013 66 Consultations Appendix 4 – Press Cuttings of Advertisements placed in 72 Local Press to Advertise the Housing Issues and Options/ Settlement Framework Boundary Review Consultations Summer 2012 Appendix 5 - Summary of Comments raised by Housing 84 Issues and Options and Settlement Framework Boundary Review Consultations Summer 2012 1 1. Introduction 1.1 This statement has been prepared to demonstrate how the District Council has involved the public and other stakeholders in the during the preparation of the Derbyshire Dales Local Plan. 1.2 This statement has also been prepared to comply with the requirements of Regulation 22 of The Town and Country Planning (Local Planning) (England) Regulations 2012.
    [Show full text]