AGRICULTURE DEVELOPMENT FOUND

SECOND COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT

COMPONENT 2: STRENGTHENING PUBLIC SECTOR INSTITUTIONS

ENVIRONMENTAL AND SOCIAL MANAGEMENT AND MONITORING PLAN

CONSTRUCTION OF VETERINARY SERVICE CENTRE IN COMMUNITY OF THE RA MARZ

A. GENERAL PROJECT AND SITE INFORMATION

INSTITUTIONAL AND ADMINISTRATIVE Country Republic of Second Community Agricultural Resource Management and Name of the Project Competitiveness Second Project (CARMAC II) Construction of veterinary service center in Kotayk marz, Subproject Title Hrazdan community Institutional Task Team Leader Safeguard Specialists Arrangements (co-TTL if applicable) (env., soc.)

(Name and contacts) Bekzod Shamsiev Darejan Kapanadze Arusyak Alaverdyan Sophia Georgieva Institutional/implementation Implementing entity Safeguards Works provider arrangements supervisor (World Bank) Agriculture Development (if external to (to be selected) Fund Implementing Entity) N/A SITE DESCRIPTION Name of the institution whose The Hrazdan Veterinary Service Center (VSC) will be owned premises are to be by the Ministry of Agriculture. The Operator of the Hrazdan construction/rehabilitated VSC will be defined at a later stage. Address/location of premises RA Kotyak marz, Hrazdan town, Southern district, Hrazdan- to be constructed/rehabilitated Highway, number 15 land plot Project description/scope of The veterinary service center (VSC) will provide services not activity only to Hrazdan community, but also its nearby communities, particularly: Solak, Kaghsi, Lernansit, , , Jrarat, Aghavnadzor, , , Kakavadzor; Several Sevan region communities, such as Zovaber, Ddmashen, Gagarin and Tsaghkunk, are also potential beneficiaries of the VSC. It will provide veterinary services, counseling, and serve as a point of sale of medications, as well as a training facility.

The Center is located in such an area of the town, where the

livestock market is organized, due to which more people will be informed about the Center and there will be greater number of beneficiaries. Total area of the structure (storage and one floor building) will comprise 400 m2, and will include a meeting room/demonstration room with the area of 22,8 m2, a corridor, three working rooms, of which one with the area of 22, 8 m2, and another two with the area of 13,6 m2, a kitchen – 7,80 m2, a storage room 28,8 m2, bathroom/toilet – 2,40 m2 and a

balcony – 12,8 m2.

The following construction activities will be implemented under the proposed sub-project: Establishment of the construction site and mobilization of construction works

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan

2  Earth works / excavation, backfilling, leveling  Construction works  foundation,  external walls, internal partition,  concrete floors  installation of steel doors and windows  installation of steel roof  Internal renovation works  Internal and external water supply and sanitation  Internal and external water supply facility installation  Installation of 1 septic chamber,  internal and external power facility construction,  solar water heating system installation  Landscaping and final restoration of construction site  Fencing with metallic fence and illumination of FSC territory The works also include arrangements for water and electricity supply. For connection to the municipal water supply system, an agreement with technical conditions has been obtained from Veolia Djur. The municipal sewerage system does not exist in the area. The flash toilet with 1 concrete septic chamber (length – 2.80 cm width – 1.90 cm, bottom depth - 20 cm) will be constructed inside of VSC building. Septic chamber will be regularly cleaned by cesspool truck during construction as well as during operation of the VSC based on an agreement to be concluded with Veolia Djur. The building will be heated with electric heaters. The design for construction of the VSC in Hrazdan community of the RA Kotayk marz was developed by the Kve Nakhagits LLC under the contract dated on 10.10.2017 (Hrazdan VSC Design) concluded with AADF. Project site location The site allocated for the construction fo VSC premises is located within the administrative area of Hrazdan community of the RA Kotayk marz, at a distance of about 40 km from the city of Yerevan. The site is at the altitude of 1750 under the sea level. The relief of the area has elevation variations of 1,8 m. The building will be located at the edge of Hrazdan-Lernanist road, leaving some free area (9 m) in front of the building. The construction is planned to be located in the eastern part of the land plot, and the rest of the area that is not used under construction will be improved and landscaped. The site is mainly surrounded by agricultural lands. There are some semi-build constructions not close to it, and the nearest private house is at about 100 m distance from the construction area. As the construction site is located at about 9 m distance from the edge of the Hrazdan-Lernanist road, which is among other things, is not a very busy road, the construction works will not impede the traffic on the road, therefore no closure of and/or

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan

3 restriction of traffic on the road can occur due, as well as no need to provide alternative routes. Considering that there are no private houses close to the construction area, during construction works, there is a very minimal risk, if any, of disturbance to local residents (even temporary) related to noise and dust, as well as no restriction of access to any building/land is expected. No tree removal is expected. The natural relief and landscape will be recovered after construction works. As for water pipelines passing through 0.02 ha community lands, no private lands or lands used by illegal users will be used for the purpose also. Overall duration of construction works is estimated to be four months, and one month will be required for preparatory works prior to construction. Land title and user right The site allocated for the construction of VSC building, 0.4 ha holder(s) public construction lands, belongs to the Ministry of Agriculture (donated by the Hrazdan Community to the RA Ministry of Agriculture according to the RA Government Decree № 564-A of April 26, 2018). In addition to the abovementioned land used for the VSC, water pipelines will pass through 0.02 ha of community lands. No private lands or lands used by illegal users will be used. This was checked and verified via the community cadastral map and field surveys. The Land Ownership Rights Certificate of the RA Ministry of Agriculture (Certificate No26062018-07-0040, dated June 26.2018), is attached. Description of geographic, Project area is located in the Kotayk marz of Armenia in the physical, biological, geological, administrative area of Hrazdan community. The Hrazdan hydrographic and socio- River flows through the city, and rivers economic context are flow into the Hrazdan. The average annual air temperature is 5.5-60 ° C. The annual precipitation is 715-730 mm. Natural landscape is dry mountainous. Hrazdan town is the marz center of Kotayk marz, which is divided into three regions: Nairi, Kotayk and Hrazdan. Hrazdan town is situated in North-Eastern part of Armenia. Its administrative area is 15,343 ha and the population is 59502 of whom 33124 men and 26378 women, overall 3500 households. 11.6 % of the overall population of the Republic involved in the migration processes is from Kotayk marz. Of the overall population of the Republic not returning and returning to the Republic, Kotayk marz population is 7,9% and 17.2% respectively. Poverty rate of Kotayk marz is 10.5 % within the overall poverty rate of the Republic. In Hrazdan town there are 2145 families in the family benefit system, 12307 pensioners and persons with disability. In the past, the town was developed industrial centre. Now the Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan

4 major part of industrial enterpizes is not functioning. There are about 24 enterprises functioning in the community, and also entities engaged in bakery production. The activity sectors are energy, cement, semiconductors, radio technical equipment, clothes, knitted goods, bread, bakery.

In Kotayk marz, there are 27845 heads of cattle, of which 11587 are cows, and 21003 are sheep and goats. Also, there are 9267 pigs, 77630 poultry, 283 horses and 11222 hives of bees.

Overall there are 46 veterinarians operating in the Marz, who provide services to 70 communities.

In the marz, there are also a number of large livestock complexes that are provided services by the hired specialists. Besides, there are a number of big villages, the headcount of livestock of which is so big, that it is serviced by more than one specialist. On the other hand, there are small villages, mainly in Hrazdan region, which are provided services by one specialist only.

Almost in the center of the Hrazdan town, there is the Sevan- Hrazdan cascade and an important water-reservoir, regulating water supply of the whole system. Yerevan-Sevan interstate highway, Yerevan-Tsaghkadzor and Yerevan-Hankavan roads pass along the Northern part of the town. Infrastructure rehabilitation and development are the main areas of development of Hrazdan town as per the Community Development Program for 2017-2021. Locations and distance for Water for construction works will be provided by water cistern material sourcing, especially track. External toilet facilities/septic chamber during aggregates, water, stones construction works will be temporarily installed by the Contractor or will be used facility, located in nearby houses. Aggregates and machinery will be obtained from the licensed providers within the project area. Contractor may choose to extract equipment himself, in which case contractor must obtain an extraction license prior to commencement of extraction. Metallic and PE pipes for water supply will be purchased from an official supplier. LEGISLATION

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan

5 National & local legislation & Permits required for accomplishing the works envisaged by permits that apply to project the project: activity  Construction license to be possessed by Construction Contractor;  Construction permit to be obtained by the Construction Contractor from Hrazdan municipality;  Certificate of land ownership right to be possessed by the Ministry of Agriculture;  Reference on lands used under the project to be obtained by the designer;  Technical Conditions for connection to municipal water supply to be obtained by Design Company from the Veolia Djur;  Permit to connection to municipal electricity supply to be obtained by Design Company from Electricity Network of Armenia/ ENA CJSC;  Written consent for disposal of construction waste to be obtained by Construction Contractor from the Head of Hrazdan Community;  Agreement for household waste disposal from the VSC during its operation to be concluded between the VSC administration and Hrazdan municipality prior to commissioning of the building;  Agreement for servicing of septic chambers during operation of the VSC to be concluded between the VSC administration and Veolia Djur. PUBLIC CONSULTATION When / where the public Public consultation on the present draft ESMP will be carried consultation process took out in Hrazdan community of the RA Kotayk marz in Mid place October 2018. Minutes of meeting and the list of participants will be attached to the ESMP. ATTACHMENTS 1. Site Cadastral Map; 2. Certificate of Land Ownership Rights to the land plot; 3. Land ownership documentation; 4. Minutes of public consultation meeting (to be provided); 5. Construction permit (to be provided); 6. Technical conditions for water supply connection; 7. Agreement for construction waste disposal; 8. Permit for connection to electricity supply (to be provided).

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan

6 PART 2: SAFEGUARDS SCREENING AND TRIGGERS

ENVIRONMENTAL / SOCIAL SCREENING FOR SAFEGUARDS TRIGGERS Activity/Issue Status Triggered Actions 1. Infrastructure rehabilitation [ ] Yes [x] No If “Yes”, see Section A below 2. New construction of small infrastructure [x] Yes [ ] No If “Yes”, see Section A below 3. Impacts on surface drainage system [ ] Yes [x] No If “Yes”, see Section B below 4. Impacts on historic / cultural heritage [ ] Yes [x] No If “Yes”, see Section C below Will the site activity include/involve any of 5. Handling hazardous / toxic materials1 [ ] Yes [x ] No If “Yes”, see Section D below the following? 6. Impacts on forests, wetlands, protected areas [ ] Yes [x] No If “Yes”, see Section E below 7. Risk of unexploded ordinance (UXO) [ ] Yes [x] No If “Yes”, see Section F below 8. Risks for traffic and pedestrians [ ] Yes [x] No If “Yes”, see Section G below 9. Impacts on land property and use [ ] Yes [x] No If “Yes”, see Section H below 10. Social risk [x] Yes [ ] No If “Yes”, see Section I below

1 Toxic / hazardous material includes but is not limited to asbestos, toxic paints, noxious solvents, removal of lead paint, etc. Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan 7 PART 3: MITIGATION MEASURES

ACTIVITY PARAMETER MITIGATION MEASURES CHECKLIST 0. General conditions Public Awareness and Worker (a) (a) Local authorities and communities have been notified of upcoming Safety activities (b) The public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works) (c) All legally required permits have been acquired (d) The Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighbouring residents and environment. (e) Workers’ Personal Protective Equipment will comply with international good practice (helmets, masks, safety glasses, harnesses and safety boots) Appropriate signposting of the sites will inform workers of key rules and regulations to follow A. General Rehabilitation and / Air Quality (a) Apply dust control measures during earth works and on access/service or Construction Activities earth roads (e.g. spraying and moistening the ground) (b) Keep demolition debris, excavated soil and aggregates in controlled area and spray with water (c) Suppress ongoing pneumatic drilling or breaking of pavement and foundations by water spraying and/or installing dust screen enclosures (d) Kept the area outside construction site free of soil, debris, and construction waste (e) Ban open burning of construction / waste material (f) Ensure standard working condition of all machinery, provide adequate servicing and maintenance, and restrict excessive idling of construction vehicles Noise (a) Limit construction noise to standard working hours inside and in proximity to residential areas (b) During operations, keep the engine covers of generators, air compressors and other powered mechanical equipment closed, and equipment placed as far away from residential areas as possible

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan 8 ACTIVITY PARAMETER MITIGATION MEASURES CHECKLIST Water Quality (a) Establish appropriate erosion and sediment control measures (e.g. hay bales and/or silt fences) to prevent sediment from moving off site and causing excessive turbidity in canalization and nearby streams and rivers Waste management (a) (Identify sites for temporary and permanent disposal of various types of waste as well as routes for waste transportation to the disposal sites before commencement of works, put formal arrangements for waste disposal (site allocation, agreement, contract, etc. as required) in place and enforce adherence to these arrangements (b) Plan for and undertake waste separation on-site; explore opportunities for recycling and/or reuse of particular types of non-toxic waste. (c) Maintain records of waste disposal as a proof of proper management as designed. I. Social Risk Public Relationship (a) Assign local liaison person within Contractor’s team to be in charge of Management communication with and receiving requests/ complaints from local population (b) Consult local communities to identify and proactively manage potential conflicts between an external workforce and local people (c) Raise local community awareness about sexually transmitted disease risks associated with the presence of an external workforce and include local communities in awareness activities (d) Inform the population about construction and work schedules, interruption of services, traffic detour routes and provisional bus routes, blasting and demolition, as appropriate (e) Limit construction activities at night. When necessary ensure that night work is carefully scheduled, and the community is properly informed, so they can take necessary measures (f) At least five days in advance of any service interruption (including water, electricity, telephone, bus routes), advise community through postings at the work site, at bus stops, and in affected homes/businesses (g) Address concerns raised through Grievance Redress Mechanism established by the Employer within the designated timeline within the

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan 9 ACTIVITY PARAMETER MITIGATION MEASURES CHECKLIST scope of Contractor’s liability Labour Management (a) To the extent possible, do not locate work camps proximity to local communities (b) Consult neighbouring communities on siting and operation of worker camps (c) Recruit unskilled or semi-skilled workers from local communities to the extent possible. Where and when feasible, provide worker skills training to enhance participation of local people (d) Provide potable water and adequate lavatory facilities in all work camps. Equip residential labour camps with septic tank systems preventing release of untreated sludge to the natural environment, washing areas, adequate supplies of hot and cold running water, and soap Raise awareness of workers on overall relationship management with local population, establish the code of conduct in line with international practice and strictly enforce them, including the dismissal of workers and financial penalties of adequate scale

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan 10 PART 4: MONITORING PLAN

What Where How When Why Who (is the parameter (define the Activity (is the parameter to be (is the parameter (is the parameter (is responsible to be frequency or monitored?) to be monitored?) to be monitored?) for monitoring?) monitored?) continuous?)

CONSTRUCTION PHASE Community Community has been notified Hrazdan Interviews with First month of Ensure ADF notification on upcoming activities communtiy local residents construction works community awareness and consent Clearly established grievance Hrazdan Interviews with Monthly Ensure that local ADF redress mechanism is in place community municipal community can and accessible for local authorities and voice concerns community local residents and ask questions Legal All required permits and Hrazdan Review of files Before and during Comply with legal ADF compliance agreements are acquired municipality and first month of requirements Contractor’s construction works administration Provision of Personal safety gear is Construction site Inspection monthly Prevent trauma ADF workers’ health provided to and used by and casualty and safety workers among workers Consistency with the rules of exploitation of the construction equipment. Operation of The surrounding environment is Construction site Inspection monthly visits Minimize dust ADF construction kept free of debris to minimize during construction emission machinery dust

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan 11 There is no open burning of Construction site Inspection monthly visits Prevent air ADF construction / waste material at during construction pollution with the site hazardous emissions There is no excessive idling of Construction site Inspection monthly visits Minimize exhaust ADF construction vehicles at site during construction

Noise Construction noise is limited to Construction site Inspection Monthly during Minimize ADF generation day-time hours construction nuisance to local community

Waste Temporary storage of waste Construction site Inspection Monthly during Prevent pollution ADF generation within demarcated and fenced construction of work site and work site, at a designated nuisance to local location community Construction waste is regularly Construction site Inspection Monthly during Prevent ADF collected and disposed at an construction environment Waste disposal agreed site pollution site

Servicing Construction vehicles and Construction site Inspection Monthly during Prevent pollution ADF machinery machinery are serviced and construction of surface and fueled away from water body or ground water at a service center.

Earth works Separation and stockpiling of Construction site Inspection Monthly during Ensure ADF excavated material and topsoil construction successful for backfilling and site reinstatement of reinstatement purposes. site

Suspension of earth works and Hrazdan Review of In case of chance Prevent loss of ADF contacting national authority for municipality communication finds physical cultural Ministry of cultural heritage preservation in and resources Construction Culture case of chance finds; archaeological Contractor’s resumption of works upon reports administration formal consent from the authority for preservation of cultural heritage.

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan 12 OPERATION PHASE Maintenance of Operational waste is collected VSC Inspection Recurrent Keep the VSC Hrazdan VSC and timely removed from the administration and its municipality VSC area. surrounding area clean and

comfortable for the staff and clients Regular maintenance and VSC Inspection Recurrent Keep VSC Hrazdan operational repair works are administration facilities in good municipality undertaken as required to keep operational roof, piping and other condition communications in good technical condition. Septic chambers are cleaned VEOLIA DJUR, Inspection Recurrent Keep VSC VSC on regular basis based on facilities in good administration agreement with operational VSC condition administration Maintenance of Maintenance and operational Hrazdan Inspection Recurrent Keep water Veolia Jur water system repair works are undertaken as Municipality system in good CJSC required to keep observation operational VSC chamber and pipeline in good condition Administration technical condition

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan 13 ANNEX 1. SITE CADASTRAL MAP AND PHOTOS

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan 14

Area for construction of Veterinarian Service Centre in Hrazdan community

Implementation of geology work during design of VSC

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan 15 ANNEX 2. CERTIFICATE OF OWNERSHIP RIGHT TO THE LAND PLOT

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan

16 Unofficial Translation from Armenian REPUBLIC OF ARMENIA

CERTIFICATE of REGISTRATION of OWNERSHIP RIGHT TO REAL PROPERTY № 26062018-07-0040 Password: IKCHIZKZ5VUG The Certificate is issued to: THE REPUBLIC OF ARMENIA with the ownership right to the NUMBER 15 LAND PLOT, HRAZDAN-LERNANIST HIGHWAY, SOUTHERN DISTRICT, COMMUNITY HRAZDAN TOWN, KOTAYK MARZ on the basis of Land Exchange Certificate N sm-1335 of 21.06.2018 signed at Kotayk Marz Notary Public. THE CERTIFICATE IS REGISTERED WITH THE RA STATE COMMITTEE OF THE REAL PROPERTY CADASTRE AT THE REPUBLIC OF ARMENIA GOVERNMENT IN THE UNIFIED REGISTRATION-BOOK.

INFORMATION ON LAND PLOT: CADASTRAL CODE: 07-001-0077-0026 SIZE OF AREA (ha): 0.04 DESTINATION: RESIDENTIAL PURPOSE OF USE OR TYPE OF LAND: PUBLIC CONSTRUCTION TYPE OF REGISTERED RIGHT: OWNERSHIP

ADDITIONAL NOTES AND INFORMATION The Property is allotted to the “Staff of the Ministry of Agriculture of the Republic of Armenia” State Administration Institution.

Name and family name of the registering official: ARTAK MELIKYAN Position: Registrar of Marz Unified Subdivision of Real Estate Cadaster

/Official Seal (OF THE APPARATUS OF THE TERRITORIAL SUBDIVISION OF THE STATE COMMITTEE OF THE REAL PROPERTY CADASTRE AT THE RA GOVERNMENT, SERVICE AREA *2*)/

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan

17 1. Letter from Hrazdan Community Mayor on the Ownership of Lands Used for the Project (non-official translation is attached)

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan

18 HRAZDAN COMMUNITY OF KOTAYK MARZ OF THE REPUBLIC OF ARMENIA

REFERENCE

This is to certify that based on the cadastral map and field surveys of the area intended for the construction of the Veterinary Service Center under the Second Community Agricultural Resource Management and Competitiveness Project in Hrazdan Community of Kotayk Marz of the Republic of Armenia, it’s been revealed, that the construction works of the Structure (VSC Building, water pipelines constructed by Veolia Jur CJCS) will be implemented in the following lands:  0.04 ha public construction lands belonging to the RA Ministry of Agriculture;  0.02 ha non-cultivated community lands (for pipelines), not belonging to any other physical or legal entity. Find attached the cadastral map of Hrazdan community.

Hrazdan Community Acting Mayor /signed/ L. STEPANYAN

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan

19 ANNEX 4. Minutes of Public Consultation Meeting

List of participants

Announcment on public consultation in Expected area for VSC construction Hrazdan Municipality

Public consultation meeting in Hrazdan

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan

20 ANNEX 5. Construction Permit

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan

21 ANNEX 6. Technical Conditions for Connection to Centralized Water Supply Network

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan

22 Translated from Armenian

VEOLIA DJUR

TECHNICAL CONDITIONS ԵՀ 3228

APPROVED BY DIRECTOR OF EASTERN BRANCH OF VEOLIA DJUR A. SAHAKYAN

For Connection to the Water Supply and Sewerage Systems Operated by Veolia Djur

For VSC, constructed on Hrazdan-Lernanaist road section 15 of South District of Hrazdan town, Kotayk marz, phone # 022322345

CONNECTION TYPE, WATER PIPELINE SEWERAGE PIPELINE DESCRIPTION Diameter, D=63mm P=1,5 atm polietilen pressure, type Water supply 06.00-24.00 schedule Connection point Water pipeline of southern district Water meter Sewerage system is not existing in diameter, class the area and type According to design Water metering point Other conditions Installation of observation chamber on the point of metering

For implementation of construction works detailed design and cost estimation document have to be ordered to the licenced company and approved by Veolia Djur.

Technical supervision has to be provided by a licensed organization, and payment is to be made by applier.

Water supply have to be provided by Veolia Djur. According to the agreement.

The Technical Specifications are issued for a period of 1 year, starting from signing date, otherwise it have to be revised.

For earth work implementation written consent have to be obtained from the community administration.

Arevmutq Branch Deputy Director – E. Hayrapetyan (signature)

Coordinator of Engeneering work - V. Badalyan (signature)

Chief specialist – G. Epremyan (signature)

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan

23 ANNEX 7. Agreement for Construction Waste Disposal

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan

24 Translated from Armenian

REPUBLIC OF ARMENIA LORI MARZ HRAZDAN COMMUNITY

21.08.2018 # 876 Phone # (0223) 2 23 45

Address: 377010 To RA Ministry of Agricultural, ADF Hrazdan Center, Sq of Constitution Projects and Development Director [email protected] Mr. Georgi Khachatryan

Dear Mr. Khachatryan

According to your official letter # 105 dated on 10.08.2018, I would like to inform you that construction waste, which will be generated during construction of veterinarian service centre, located on the land plot of Hrazdan-Lernanaist road section 15 of South District of Hrazdan town will be transferred to the community landfill, located on the distance of 3,5 km from the construction site.

Hrazdan community acting Mayor: (signed) L. Stepanyan

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan

25

ANNEX 8. Permit for Connection to Electricity Supply

Community Agricultural Resource Management and Competitiveness Project II Environmental and Social Management Plan

26