14-09-14 CP Fourniture Wagons 2015 Version 2 Anglais

Total Page:16

File Type:pdf, Size:1020Kb

14-09-14 CP Fourniture Wagons 2015 Version 2 Anglais Special Conditions Supply of wagons by SNCF as keeper Contents Article 1 Rules and principles Article 2 Wagon ordering conditions Article 3 Provision of ordered wagons Article 4 Handover of empty or loaded wagons to contractual consignee Article 5 Return of empty wagons Article 6 Use of wagons Article 7 Loading and unloading periods Appendix List of Keeper Railway Undertakings that have signed an agreement with SNCF 1 Commercial Conditions - Fret SNCF – 1 January 2015 Special Conditions Supply of wagons by SNCF as keeper In its capacity as a Railway Undertaking and Keeper, SNCF is a signatory to the General Contract for the Use of wagons (GCU). The entity in charge of maintenance (ECM) for its wagons is ERMEWA SAS, a certified ECM registered with ERA. The present Special Conditions set the supply conditions and rules of use for wagons supplied by SNCF. They are also in force when the wagons supplied by SNCF have been provided by other Keeper Railway Undertakings with whom SNCF has concluded an agreement (list included as an appendix). SNCF acts as Operator of these wagons throughout their time in France or when they have been leased to SNCF by other keepers. 1 Rules and principles 1.1 SNCF may supply wagons to its customers for the execution of domestic or international, wagonload or block train freight services with which they have entrusted SNCF (or one of its substitute or consecutive carriers) in its capacity as Railway Undertaking. 1.2 The customer shall only use the supplied rolling stock for the transport services thus covered. 1.3 These wagons shall be returned empty at the request of the shipper-customer, where necessary along with a user and instruction manual for these wagons that the Customer undertakes to comply with. 1.4 The keepers of these wagons are either SNCF, keepers from whom SNCF has leased wagons, or Keeper Railway Undertakings who have contractually provided wagons to SNCF (list included as an appendix). They shall all be in working condition, in accordance with the principles set by their certified entities in charge of maintenance (ECMs). 1.5 These wagons shall be supplied up to date in terms of repair work and in suitable condition for conveying the goods due to be loaded onto them. The shipper-customer shall assume responsibility for the wagons as of the moment of provision, and is held liable for any damage to the rolling stock it has been provided with . 1.6 The UIC Loading Guidelines must be complied with during loading. 1.7 It is incumbent upon the shipper-customer to inform its consignee of precautions for use of the wagons. 1.8 The customer undertakes to inform all parties concerned by the use of the wagon (consignor, consignee, private siding owner, etc.) of the stipulations in the present Special Conditions for the Supply of Wagons relevant to them. 2 Commercial Conditions - Fret SNCF – 1 January 2015 1.9 Any handover of the wagons to another user Railway Undertaking (uRU) signatory to the GCU at the initiative of the customer is subject to the prior consent of SNCF. 1.10 The provision of wagons for uses other that the carriage of goods (e.g. storage) shall be subject to special conditions. 1.11 SNCF may lease its wagons to its customers for renewable terms of up to twelve months in accordance with conditions set in a contract. 1.12 The Special Conditions for the Use of Wagons apply. 2 Wagon ordering conditions 2.1 The number and type of wagons to be supplied shall be agreed on by SNCF and the customer. The customer is accountable for the accuracy and exhaustiveness of the information it provides. 2.2 SNCF shall supply the appropriate number of wagons within the bounds of available capacity. 2.3 Wagons shall be ordered by means of a paper or electronic form completed by the customer and sent to the relevant Customer Services within the agreed order period ahead of the date on which the rolling stock is to be provided as requested. The order period shall be determined on a contractual basis with the customer. The order form shall include: − the wagon categories and the number of wagons requested for each category, − the date of provision, − the station and loading site, stated precisely. This information shall be supplemented, where possible, with the name of the destination station(s) of the wagons as well as the designation of the goods to be carried and their conditioning. The order shall be approved by way of a response from SNCF mentioning the supply conditions. 2.4 Orders passed within a shorter period than the agreed order period shall be processed without a commitment as to their execution date. 2.5 Any order for additional wagons shall be considered as a new order. 2.6 Any amendment or cancellation of an order leading to a reduction in the number of wagons shall be requested by way of a written order sent to Customer Services under the same conditions as the initial order, at the latest before 12 noon on the working day before the planned day of provision. 2.7 Any change or cancellation announced beyond this deadline or after the wagons have been provided shall require the payment of penalties as stipulated in the Tariffs ( available on the Fret SNCF website at the following address: http://www.sncf.com/en/freight/regulations-tariffs-terms ), 3 Commercial Conditions - Fret SNCF – 1 January 2015 and oblige the customer, where applicable, to comply with the return periods stipulated under point 5.3 hereafter. 3 Provision of ordered wagons 3.1 Ordered wagons shall be provided by SNCF to the customer at the site stated in the order. 3.2 The customer must check that the rolling stock thus provided presents no apparent defects. The customer shall communicate in writing any reserves he has to SNCF before any wagons are loaded, and in any event within 8 working hours of the handover of rolling stock. Should the wagon(s) have been handed over after the closure time of the delivery site, any reserves on the part of the customer must be expressed within 8 hours of the site's reopening time. In the absence of any reserves, the wagons shall be deemed as having been delivered to the customer in sound technical and cleanliness conditions for use. 4 Handover of empty or loaded wagons to contractual consignee 4.1 Ordered wagons shall be provided by SNCF to the consignee at the site stated in the contract (CUV WN or CIM CN). 4.2 The consignee must check that the wagons handed over present no visible defects. The consignee shall communicate in writing any reserves he has to SNCF before any wagons are loaded or unloaded, and in any event within 8 working hours of the handover of rolling stock. Should the wagon(s) have been handed over after the closure time of the handover site, any reserves on the part of the customer must be expressed within 8 hours of the site's reopening time. In the absence of any reserves, the wagons shall be considered as having been handed over to the consignee in good condition. 5 Return of empty wagons 5.1 Wagons shall be returned to SNCF empty, clean, in working condition and equipped with all the detachable accessories they were supplied with. Stanchions and collapsible boards shall be raised prior to return. The customer is responsible for all these measures. 5.2 In the event of non-compliance identified by SNCF with any of the aforementioned stipulations, the customer shall be required to pay repair costs as specified in the GCU, replacement costs for the missing accessories or cleaning expenses for the wagons as specified in the Tariffs. 6 Use of wagons 6.1 When it is not being used by a Railway Undertaking and provided that SNCF is not at fault, a wagon is under the responsibility of the manager of the infrastructure on which it is 4 Commercial Conditions - Fret SNCF – 1 January 2015 located; the infrastructure manager must use it reasonably. 6.2 In the event of damage to a wagon, the infrastructure manager must notify SNCF as soon as possible. It is SNCF's responsibility to take measures as soon as possible to handle the damage affecting a wagon. 6.3 In the event that the wagon requires lifting, the infrastructure manager must execute or commission the execution of the lifting operation, under its responsibility and in strict compliance with standard practice, and document it. 7 Loading and unloading periods 7.1 With regard to the use of wagons supplied in accordance with the present Special Conditions , the consignor and consignee shall each be granted a period as described hereafter for loading and unloading the wagons. Beyond that period, wagon immobilisation shall be invoiced. 7.2 Loading or unloading take effect on a day designated as D: ° at the time when the empty or loaded wagon is provided in a station (accessible tracks), on private sidings in terminals, on combined transport sites, on secondary railway tracks or in a port; ° in the event of circumstances preventing delivery or handover not attributable to SNCF, at the time when the wagon(s) would have been available had these circumstances not arisen. 7.3 The period ends on D+1 at 24:00, D being the day of provision as per point 7.2, Saturdays and non-business days excluded. 7.4 A fixed extension period of 24 hours shall be granted when unloading and loading take place.
Recommended publications
  • “Bulgarian State Railways - Cargo Freights” Ltd
    Journal of Advanced Management Science Vol. 7, No. 2, June 2019 The Necessity to Improve the Competitive Power of “Bulgarian State Railways - Cargo Freights” Ltd. S Tzvetkova and E Savova University of National and World Economy, Sofia, Bulgaria Email: [email protected], [email protected] Abstract—“Bulgarian State Railways - Cargo Freights” Ltd. replacement services in cargo railway transport can be is the leading association on the Bulgarian market for evaluated as HIGH, which has a negative reflection on carrying out railway cargo freights. In recent years, freight volumes in the sector, with it reaching up 10% in however, the freight volume has decreased and the comparison to other types of transport. The traction- company has reported negative financial indicators. The changes that have occurred in Bulgarian economy, the rolling stock is growing old, which leads to operative market’s liberalization, the impossibility for making problems, increased repair costs and deteriorated quality investments, the obsolete rolling stock, the deteriorating of services, which respectively reduces the competitive quality of transport services and the reduced competitive power. power are among the main reasons for that. The The financial situation of “BSR – Cargo Freights” Ltd. substantiated necessity for increasing the freight volume, is serious. In its short 10-year history, the association has improving the financial indicators and retaining the market registered negative financial indicators which result from share is the main motive for writing this paper. To that end, the external environ ment and from ineffective internal factors from the internal and external environments have activities and processes. The total amount of losses for been analyzed through the implementation of PESTEL, 5 FORCES and SWOT analyses.
    [Show full text]
  • A Massive Restoration in Bulgaria
    Eastern Star Journal of the New Europe MarchRailway 2014 Heritage Trust, helping railway preservation in the New Europe Number 56 December 2014 A Massive Restoration in Bulgaria One of the Bulgarian State Railways’ 46 Class locomotives, reputed to be Europe’s largest tank engines, is shown here under restoration in the Sofia locomotive depot. This 2-12-4T should be ready for operation in 2015. Tsanko Simeonov writes: The development of railways is closely related to many records. Many of us want to ride on the TGV in France or Shinkansen in Japan, or to reach Gornegrat by the remarkable rack railway of the Swiss Railways. Bulgarian Railways also offer unique experiences for railway enthusiasts – rides through the picturesque narrow-gauge line Septemvri – Dobrinishte or through the Iskar Gorge near Sofia on trains hauled by several restored steam locomotives – 609.76, 01.23, 03.12 and 05.01. The rides will be far more exciting, as completion of restoration work on one of the two preserved steam 2-12-4T locomotives, No.46.03, is scheduled for the first half of 2015. The locomotives of the class 46 are well known as the most powerful steam locomotives of BDZ and the largest tank locomotives in Europe. How it all began Several tourist operators showed quite a strong interest in the restoration of the locomotive 46.03. BDZ agreed to check the possibility for the restoration and sent a team of experts to pre-evaluate the technical condition of the locomotive at the Asenovo depot during the autumn of 2013. The results were satisfactory - the locomotive was almost fully equipped and with minor defects.
    [Show full text]
  • Basic Agreement
    Translation ® European Company for the Financing of Railroad Rolling Stock BASIC AGREEMENT Edition 2007 / 1 Basic Agreement In order to determine the general principles of operation of "EUROFIMA", European Company for the Financing of Railroad Rolling Stock, the undersigned railway administrations (hereinafter called the "administrations") have agreed as follows: Part 1 - Field of the Company's activity For the first two years of its existence, the Company's activities shall be limited to administrations of states which are signatories of the international Convention relat- ing to the establishment of this Company on the one hand, and to wagons of stan- dard type or performance to be incorporated into the EUROP wagon pool, on the other. Part 2 - Ordering of stock The administrations shall be bound: - to inform the Company, upon request, of their general requirements in railway rolling stock of standard type or performance; - to indicate the portion of these requirements which could possibly be met by the Company, with the understanding that the administrations shall remain free at all times to meet all or part of their requirements by other means. EUROFIMA shall endeavor, according to its financial possibilities, to coordinate portions of these requirements into annual programs comprising comparable stock. It shall invite tenders from manufacturers in an attempt to obtain the best possible conditions from them. These tenders shall be from as wide a field as possible in order to encourage international competition. Before finally contracting the loans necessary for the purchase of stock and placing the corresponding orders, the Company shall seek the agreement of the admin- istrations concerned.
    [Show full text]
  • European Commission Directorate-General for Mobility and Transport
    EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT Rhine-Danube Core Network Corridor STAKEHOLDER LIST Austria Federal Ministry of Transport, Innovation and Technology (BMVIT) ÖBB-Infrastruktur AG (Austrian Federal Railways Infrastructure Company) Federal Ministry for Transport, Innovation and Technology via donau - Austrian Waterway Management Company Interessensgemeinschaft der österreichischen Binnenhäfen (IGÖD) Wiener Hafen und Lager Ausbau- und Vermögensverwaltung GmbH & Co KG Ennshafen ASFINAG - Motorway Operator Vienna International Airport Container Terminal Salzburg GmbH (mit Enns) Terminal Enns Linz AG (Stadthafen Linz) common liaison department of Austrias nine regions: Verbindungsstelle der Bundesländer beim Amt der NÖ Landesregierung France Ministry for Environment, sustainable Development and Energy Réseau Ferré de France (RFF) Ministry for environment, sustainable development and energy Independent port of Strasbourg La Maison de la Région Alsace Ville et Communauté urbaine de Strasbourg Germany Federal Ministry of Transport and Digital Infrastructure (BMVI) DB Netz AG Bayernhafen GmbH & Co. KG Bundesverband öffentlicher Binnenhäfen DE Bundesministerium für Verkehr und digitale Infrastruktur German Airports Association (ADV) Aiport Stuttgart Airport Nuremberg Fraport AG Frankfurt Airport Services Worldwide Airport Munich Deutsche Umschlaggesellschaft Schiene–Straße (DUSS) mbH (German Rail Road Transshipment Company) Contargo GmbH & Co. KG KTL Kombi-Terminal Ludwigshafen GmbH
    [Show full text]
  • Euro-Asian Transport Linkages Development
    Informal document No. 1 Distr.: General 20 January 2017 English only Economic Commission for Europe Inland Transport Committee Working Party on Transport Trends and Economics Group of Experts on Euro-Asian Transport Links Fifteenth session Yerevan, 31 January and 1 February 2017 Item 2 of the provisional agenda Identification of cargo flows on the Euro-Asian transport links Draft report of the phase III of the Euro-Asian Transport Links project Prepared by the "Scientific and Research Institute of Motor Transport" (NIIAT) Introduction 1. This document contains the draft final report of the phase III of the Euro-Asian Transport Links (EATL) project. It presents the results of the project’s phase III whose aim was to identify measures to make the overland EATL operational. 2. In particular, the report offers an overview and analysis of the existing situation in transport and trade along EATL routes, it reviews existing studies, programmes and initiatives on the development of EATL in the period 2013-2016, it identifies main transportation and trade obstacles in transport, trade, border-crossing, customs and transit along the EATL routes, and it formulates recommendations to overcome the identified obstacles as well as to further develop the trade across the EATL area. 3. This document is submitted to the fifteenth session of the Group of Experts on EATL for discussion and review. Informal document No. 1 TABLE OF CONTENTS I. EURO-ASIAN TRADE ROUTES AND FREIGHT FLOWS I.1. Economics and trade current situation in EATL Region I.1.1. General overview: world trade and economics I.1.2.
    [Show full text]
  • Annual Report 2018 Annual Report 2018
    ANNUAL REPORT 2018 Annual Report 2018 European Company for the Financing of Railroad Rolling Stock CONTENTS 4 KEY FIGURES 5 REPORT OF THE BOARD OF DIRECTORS TO THE GENERAL ASSEMBLY 11 MESSAGE FROM THE CHAIRMAN 15 CORPORATE GOVERNANCE 16 Governing bodies 18 Controlling bodies 20 Organizational chart as at January 1, 2019 21 Members of governing and controlling bodies as at January 1, 2019 23 ACTIVITY REPORT 24 2018 activities 28 2018 results and outlook for 2019 31 FINANCIAL STATEMENTS 32 Income statement 33 Statement of comprehensive income 34 Balance sheet 35 Statement of changes in equity 36 Statement of cash flows 37 Notes to the financial statements 70 Auditor’s report 77 MILESTONES IN DEVELOPMENT EUROFIMA’s annual report covers the period from January 1 to December 31. It is also available at www.eurofima.org 3 Annual Report 2018 Annual Report 2018 KEY FIGURES REPORT OF THE BOARD OF DIRECTORS TO THE GENERAL ASSEMBLY Financial data: amounts in million CHF EUROFIMA European Company for the Financing of Railroad for the entire duration of EUROFIMA’s existence and can only Railway equipment: in units Rolling Stock is a supranational organization located in Basel, be altered with the consent of all the railways and EUROFIMA. 2018 2017 2016 2015 2014 Switzerland. EUROFIMA fulfils a non-profit maximizing mission EUROFIMA’s equity (paid in share capital and reserves) is primarily Balance sheet to support the development of public service passenger rail used for investments in liquid assets and, to a limited extent, for Total 17 817 19 897 20 900 22 801 26 089 transportation in its Contracting States.
    [Show full text]
  • Finished Vehicle Logistics by Rail in Europe
    Finished Vehicle Logistics by Rail in Europe Version 3 December 2017 This publication was prepared by Oleh Shchuryk, Research & Projects Manager, ECG – the Association of European Vehicle Logistics. Foreword The project to produce this book on ‘Finished Vehicle Logistics by Rail in Europe’ was initiated during the ECG Land Transport Working Group meeting in January 2014, Frankfurt am Main. Initially, it was suggested by the members of the group that Oleh Shchuryk prepares a short briefing paper about the current status quo of rail transport and FVLs by rail in Europe. It was to be a concise document explaining the complex nature of rail, its difficulties and challenges, main players, and their roles and responsibilities to be used by ECG’s members. However, it rapidly grew way beyond these simple objectives as you will see. The first draft of the project was presented at the following Land Transport WG meeting which took place in May 2014, Frankfurt am Main. It received further support from the group and in order to gain more knowledge on specific rail technical issues it was decided that ECG should organise site visits with rail technical experts of ECG member companies at their railway operations sites. These were held with DB Schenker Rail Automotive in Frankfurt am Main, BLG Automotive in Bremerhaven, ARS Altmann in Wolnzach, and STVA in Valenton and Paris. As a result of these collaborations, and continuous research on various rail issues, the document was extensively enlarged. The document consists of several parts, namely a historical section that covers railway development in Europe and specific EU countries; a technical section that discusses the different technical issues of the railway (gauges, electrification, controlling and signalling systems, etc.); a section on the liberalisation process in Europe; a section on the key rail players, and a section on logistics services provided by rail.
    [Show full text]
  • 1St Edition, Dezember 2010
    EUROPEAN RAILWAY AGENCY INTEROPERABILITY UNIT DIRECTORY OF PASSENGER CODE LISTS FOR THE ERA TECHNICAL DOCUMENTS USED IN TAP TSI REFERENCE: ERA/TD/2009-14/INT DOCUMENT REFERENCE FILE TYPE: VERSION: 1.1.1 FINAL TAP TSI DATE: 08.03.2012 PAGE 1 OF 77 European Railway Agency ERA/TD/2009-14/INT: PASSENGER CODE LIST TO TAP TSI AMENDMENT RECORD Version Date Section Modification/description number 1.1 05.05.2011 All sections First release 1.1.1 27.09.2011 Code list New values added B.4.7009, code list B.5.308 ERA_TAP_Passenger_Code_List.doc Version 1.1.1 FINAL Page 2/77 European Railway Agency ERA/TD/2009-14/INT: PASSENGER CODE LIST TO TAP TSI Introduction The present document belongs to the set of Technical Documents described in Annex III „List of Technical Documents referenced in this TSI‟ of the COMMISSION REGULATION (EU) No 454/2011. ERA_TAP_Passenger_Code_List.doc Version 1.1.1 FINAL Page 3/77 European Railway Agency ERA/TD/2009-14/INT: PASSENGER CODE LIST TO TAP TSI Code List ERA_TAP_Passenger_Code_List.doc Version 1.1.1 FINAL Page 4/77 European Railway Agency ERA/TD/2009-14/INT: PASSENGER CODE LIST TO TAP TSI Application : With effect from 08 March 2012. All actors of the European Union falling under the provisions of the TAP TSI. ERA_TAP_Passenger_Code_List.doc Version 1.1.1 FINAL Page 5/77 European Railway Agency ERA/TD/2009-14/INT: PASSENGER CODE LIST TO TAP TSI Contents AMENDMENT RECORD .......................................................................................................................................................
    [Show full text]
  • Organisation for Co-Operation Between Railways (Osjd)
    ORGANISATION FOR CO-OPERATION BETWEEN RAILWAYS (OSJD) Организация сотрудничества железных дорог (ОСЖД) 铁 路 合 作 组 织 (铁 组) Organisation für die Zusammenarbeit der Eisenbahnen (OSShD) R E P O R T ON THE ACTIVITIES OF THE ORGANISATION FOR CO-OPERATION BETWEEN RAILWAYS FOR 2019 Members of OSJD As of 30 September 2019 The Countries and Railways - Members of OSJD Countries Railways/Authorities Republic of Azerbaijan AZD - Azerbaijani Railways CJSC Republic of Albania Islamic Republic of Afghanistan ARA - Afghanistan Railway Authority (ARA) Republic of Belarus BC - Byelorussian Railway Republic of Bulgaria BDZ - Holding “Bulgarian State Railways” Hungary MAV - CJSC “Hungarian State Railways” Socialist Republic of Vietnam VZD - Vietnamese Railway State Company Georgia GR - “Georgian Railway” JSC Islamic Republic of Iran RAI - Railway of the Islamic Republic of Iran Republic of Kazakhstan KZH - JSC “Kazakhstan Temir Zholy National Company” (Railway of Kazakhstan) People’s Republic of China KZD - State Department for Railways / China State Railway Group Со., Ltd. Democratic People’s Republic of Korea (DPRK) ZC - Railways of the People's Democratic Republic of Korea Republic of Korea KORAIL - Korea Railroad Corporation Republic of Cuba Kyrgyz Republic KRG - “Kyrgyz Temir Zholy National Enterprise” State Company (Kyrgyz Railway) Republic of Latvia LDZ - State JSC “Latvian Railway” (Latvijas dzelzceļš) Republic of Lithuania LTG - JSC “Lithuanian Railways” (AB “Lietuvos geležinkeliai“) Republic of Moldova CFM - State Enterprise “Railway of Moldova” Mongolia
    [Show full text]
  • Handbuch CIM/SMGS
    GLV-CIM/SMGS CIM/SMGS Consignment Note Manual (GLV CIM/SMGS) of 1 September 2006 Amendment 28 dated 1st July 2018 This amendment contains: - replacement pages 1/2 - replacement pages 1/2 and 3/4 to Appendix 1 - replacement pages 1/2, 5/6 and 15/16 to Appendix 2 - replacement pages 1/2 and 3/4 to Appendix 3 - replacement page 3 to Appendix 8 - Appendices 4 and 9 are available on www.cit-rail.org Appendix 4 Appendix 9 The CIT General Assembly on 5 November 2009 decided that new documents and amend- ments to existing documents would only be distributed electronically. As a consequence of this decision, we would be grateful if you yourself were to print the copies you require for your inter- nal use. The modifications are marked in the margin. ************************************ Edition 1 July 2018 CIM/SMGS Consignment Note Manual (GLV-CIM/SMGS) Applicable with effect from 1 September 2006 GLV-CIM/SMGS 2018-07-01 This document may be shared with the public In accordance with point 2.5 a) of the CIT Statutes, this document is a recommendation and only binds members to the extent that members adopt it (opting-in principle). © 2006 International Rail Transport Committee (CIT) www.cit-rail.org Organisation for Co-operation between Railways (OSJD) www.osjd.org Amendment No Applicable with effect from Amendment No Applicable with effect from 1 2007-07-01 18 2014-07-01 2 2008-01-01 19 2014-10-24 3/4 2008-07-01 20 2015-07-01 5 2009-01-01 21 2016-01-01 6 2009-07-01 22 2016-07-01 7 2010-01-01 23 2016-07-01 8 2010-02-09 24 2017-01-01 9 2010-05-01 25 2017-05-10 10 2010-07-01 26 2017-07-01 11 2011-07-01 27 2017-08-01 12 2012-01-01 28 2018-07-01 13 2012-07-01 14 2013-02-15 15 2013-03-15 16 2013-07-01 17 2014-02-01 - 2 - 2018-07-01 GLV-CIM/SMGS/Appendix 1 Appendix 1 (see points 4, 25 and 26 of this manual) List of the CIT members and SMGS participants which apply this manual and the traffic axes to which it applies 1 CIT members 2 SMGS participants Azerbaijan Railways CJSCo.
    [Show full text]
  • Annual Report 2013.Pdf
    EUROPEAN UNION REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS COORDINATION OF PROGRAMMES AND PROJECTS DIRECTORATE MANAGING AUTHORITY OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013 ANNUAL REPORT 2013 EUROPEAN UNION TABLE OF CONTENTS ACRONYMS SUMMARY ……………………………………………………………………………………...…4 LIST OF TABLES …………………………………………………………………………………..6 I . IDENTIFICATION ………………………………………………………………………………7 II. OVERVIEW OF THE IMPLEMENTATION OF OPT FOR 2013 ……………………………..8 1. Achievement and analysis of the progress ……………………………………………………...8 1.1 Physical Implementation of OPT as of 31.12.2013 ……………………………………………..8 1.2 Financial implementation of OPT as of 31.12.2013 …………………………………………...13 1.3 Information on Breakdown of use of the Two Funds ………………………………………….21 1.4 Provided assistance by target groups …………………………………………………………..24 1.5 Assistance repaid or reused …………………………………………………………………….24 1.6 Analysis of OPT Physical and Financial Progress, and for the Purposes of the Lisbon Earmarking in Particular …………………………………………………………………………...24 1.7 Analysis of the overall progress under OPT……………………………………………………26 2. Information about Compliance with Community law (Problems and Measures Taken to overcome Them) …………………………………………………………………………………...27 3. Significant Problems Encountered and Measures Taken to Overcome Them ………………….27 4. Changes in the Context of OPT Implementation in 2013 ……………………………………….29 5. Substantial modification pursuant to Article 57 of Regulation (EC) 1083/2006 ……………….30 6. Complementarity with Other Community Instruments
    [Show full text]
  • Bulgarian State Railways from Planned to Market Economy Vladimir Inkov and Stefan Pauntchev
    Feature Transition to Market Economy Bulgarian State Railways from Planned to Market Economy Vladimir Inkov and Stefan Pauntchev Bulgarian Geography and currency reserves to cover all lev in The Railway Network People circulation as well as commercial bank reserves in the central bank. By restricting Bulgaria covers 110,100 km2 extending new borrowing, the International Monetary The Bulgarian State Railways (BDZ) from the west shore of the Black Sea to Fund (IMF) believes that the government network was constructed over a 70-year Serbia, Montenegro and Macedonia in the can make timely payments on its US$9.5 period beginning in 1860. It consists of west. The Danube forms the greater part million international debt. Inflation approximately 4300 route-km (including of Bulgaria’s common northern boundary dropped from 484.2% in the first half of 245 km of narrow-gauge track), 960 km with Romania. Greece is to the south. 1997 to 3.7% in July 1997. Ironically, (22%) of which is double tracked. Electrified The country consists of three parallel high inflation helped to greatly reduce sections (25 kV/50 Hz) account for east–west zones: the Danubian tableland the BGL-denominated domestic debt of 2640␣ km (61%) of the total route-km. The in the north, the Balkan Mountains in the businesses and the government. The network is classified into two categories: centre, and the Thracian Plain and number of bankruptcies has been low, trunk lines, and branch lines. Trunk lines Phodope and Pirin Mountains in the south but weak players have been eliminated. form 2718 km (67%), and the remaining and southwest.
    [Show full text]