Presentation to Chartered Institution of Highways & Transportation

National Roads Authority Outlook

Fred Barry

Chief Executive,

17 th February 2011

Outlook - Budgets

 Budgets greatly reduced

 Capital Budget €1.8bn → €0.24bn per year

 New PPP’s to be funded from Capital Budget (previously from separate PPP Budget)

1 Outlook –

 Targets for 2006-2010 all achieved Five Inter-Urban Routes M3 Clonee to Kells M50 Upgrade Port Tunnel Freeflow tolling on M50 N11 Dublin-Rosslare (sections) M18 - (sections) Almost 1,000 safety specific improvements Hundreds of kilometres of pavement improvements to the legacy network & many other schemes

Outlook – Transport 21 cont.

 Transport 21 Post 2010 Focus on balance of national primary routes, especially National Secondaries

2 Outlook - Traffic

 Grew very strongly 2002-2008, with decline in 2008 & 2009

 2010 traffic figures mixed – M50, DPT strong growth

 Typical of previous recessions, with traffic dipping, then recovering with the economy

Traffic Growth 2002-2010 (All Roads AADT)

135

130

125

120

115

110

Traffic Growth (2002 = 100) = (2002 Growth Traffic 105

100

2002 TRL Forecast ATC Data 95

90 2002 2003 2004 2005 2006 2007 2008 2009 2010

3 NRA Priorities

 Manage the modernised network safely & efficiently  Ensure that the public’s investment is protected through adequate rehabilitation & maintenance  Obtain the proper financial return on our commercial activities  Improve, and make safer, the legacy network as financial circumstances permit

Network Management & Operations Public Private Partnerships

 Ten Public Private Partnerships in operation - 330km motorway - nine toll points - six service areas / three locations

 Level of service obligations

 Revenue Sharing

4 Network Management & Operations I.T.S.

 Weather stations & on-line forecasts

 V.M.S. network on M1, Dublin area

 900 emergency telephones

 Control centre in DPT

 M50 fitted for future managed motorway operation

5 Network Management & Operations Tolling Operations

 Tag provider interoperability

 West Link freeflow tolling

 Tunnel tolling

Network Management & Operations Tunnel Operations-EU Tunnel Directive



 Lee Tunnel

 Limerick Tunnel

6 Improvements Programme for Next Few Years

 Budgets shrinking

 Will continue safety, rehabilitation & minor works programme

 Few major schemes from 2012 on

(Depending, of course, on economic developments & on the new Government priorities)

2011 Improvements Programme

 Network improvements planned for 2011 include:

- Construction start on six medium-sized design build schemes

- Over 500 smaller improvement and rehabilitation schemes

- Contract closure and construction start on two PPP schemes

7 Strategic Planning Current Initiatives

 National Secondary Roads Needs Study - entire national secondary network assessed for quality & performance - appropriate improvements identified, considering environmental issues, traffic, spatial strategy, condition, costs - improvements incorporate existing road in so far as possible - assessed using Department of Finance / Transport guidelines - formal appraisal guidelines developed for walking / cycling

8 Strategic Planning Current Initiatives cont.

 Strategic Development Plans / Initiatives

e.g. M50 / N11, Dun Laoghaire-Rathdown N6 Pedestrian / Cycling, Galway City M50 / M3, Fingal & Meath

Strategic Planning Current Initiatives cont

 Traffic Management Study

- Detailed modelling for possible demand management measures in Greater Dublin Area

- Management of traffic flow to maximise safety and improve journey time reliability

- Broaden toll strategy on the M50 and Dublin radials from a single high value toll on one section of the M50 to an effective distributed solution

9 National Roads Authority Outlook

Presented By

Fred Barry Chief Executive National Roads Authority

THANK YOU

10