Brochure Prepared August 2019

Total Page:16

File Type:pdf, Size:1020Kb

Brochure Prepared August 2019 UNIT 153 SHANNON FREE ZONE, SHANNON, CO. CLARE FOR SALE WWW.UNIT153.COM OPPORTUNITY Excellent opportunity to acquire a highly specified and well maintained facility within an established industrial location. The highly successful estate is home to many large occupiers including Zimmer, Magellan, EMC, GE Sensing, Intel, Irish Aviation Authority, Lufthansa Technik Turbine Shannon, and Symantec. The estate benefits from excellent accessibility to the Airport, Ports and National Road network. The subject facility and estate also benefit from excellent services including ESB, Natural Gas, Water and Fibre allowing for various industrial uses to be catered for. Belfast R468 M18 R472 UNIT 153 N19 L O U T H N5 R471 N17 Shannon N2 N3 N4 Galway N6 Dublin R452 N18 M7 N9 Shannon UNIT 153 N18 M7 R463 N10 Limerick N11 N8 N24 Limerick N20 R455 N21 N25 N20 Rosslare N22 R509 N25 R510 Cork N24 M7 R512 R511 N69 LOCATION Shannon is the second largest town in Co. Clare and occupies a strategic position along the Atlantic corridor and has excellent road connectivity to the Gateway cities of Limerick, Cork and Galway. It is situated in the Southwest region of Ireland and is a major pro-business community and a base for over 200 overseas companies in ICT, life sciences, financial services, engineering, publishing, software, aviation and logistics. The Shannon Free Zone where the subject property is located is of strategic importance and is home to the largest agglomeration of American companies in Ireland outside of Dublin. The Shannon Free Zone (SFZ) is a 243 hectare (600 acres) industrial area with more than 7,000 people working in over 100 companies. The subject site is ideally located between the N19 & Shannon International Airport with excellent access to the major motorway connections such as the M18, M7, & M20. N19 Shannon Airport UNIT 153 Travel Distances: Shannon Free Zone > Dublin City 220km > Galway City 90km > Limerick City 28km > Cork City 123km > Dublin Port 241km > Dublin International Airport 235km FACILITY SUMMARY Services: The building benefits from full access to ESB (500kva), natural gas, fibre and water. There is significant potential to increase or amend the services due to the excellent services infrastructure that is available within the estate. Tenure: The site is held under a 999 year leasehold interested from Shannon Development from 1998. Zoning: Zoned, ‘Light Industry’ under the Shannon Town and Environs Local Area Plan 2012-2022. The use of the land shall be taken to include the use of land for industry/manufacturing, distribution, open storage, transport operating centres and the treatment and recovery of waste materials. A mix of uses such as, ‘office based development’ and or ‘retail development’ is not considered appropriate in areas zoned for ‘Light Industry’. BER Details: BER C3 BER No. 800695157 Energy Performance Indicator: 636.02 kgCO2 /m²/yr 1.38 Site Address: Unit 153, Shannon Industrial Estate, Co Clare Total Floor Area: 12,474 sq m (134,170 sq ft) Land Area: approx. 7.3 acres (2.95 hectares) Built: 1998 OFFICE Size 7,346 sq m (79,073 sq ft) Specification • Predominantly open plan over two large floor plates. • Corporate style feature glazed reception. • Fully fitted large canteen. • High quality finish with suspended ceilings incorporating recessed lights and carpeted throughout. • Bright offices with integrated atria allowing additional light into main office areas. • Fully air conditioned throughout. • Fully sprinklered throughout. WAREHOUSE Size 3,442 sq m (37,050 sq ft) Specification • Clear height of 7.7m. • Constructed by means of steel truss frame construction with 18m span. • ‘Trocal’ type roof construction. • Loading via 1x Standard grade loading door. • Fully air conditioned/heated throughout. • Fully sprinklered throughout. SHIPPING AREA Size 1,575 sq m (16,953 sq ft) Specification • 3 dock level doors. • 2 platformed loading doors. • Clear height of 7.7m. OVERALL SITE Size (approx.) 7.3 acres (2.95 hectares) Specification • 380 car spaces. • Fully flood lit. • ESB sub station. • Fully landscaped. SCHEDULE OF ACCOMODATION Description SQ M SQ FT Office - Ground Floor 3,751 40,376 Office - First Floor 3,595 38,697 Ground Floor Warehouse 3,442 37,050 Shipping Area 1,575 16,953 Mezzanine 111 1,195 Substation (Exclusive) 28 301 Total GEA 12,474 134,170 Site Area: 7.3 acres 2.95 hectares First Floor CONTACT Jarlath Lynn Seanna Gill +353 1 618 5728 +353 1 618 5776 [email protected] [email protected] Disclaimer: CBRE U.C., (CBRE Ireland) These particulars are issued by CBRE U.C., registered in Ireland, no. 316570. PSRA Licence No. 001528 on the understanding that any negotiations relating to the property are conducted through them. While every care has been taken in preparing them, CBRE U.C., for themselves and for the vendor/ lessor whose agents they are, give notice that that: (i) The particulars are set out as a general outline for guiding potential purchasers/tenants and do not constitute any part of an offer or contract. (ii)Any representation including descriptions, dimensions, references to condition, permissions or licenses for uses or occupation, access and any other details are given in good faith and are believed to be correct, but any intending purchaser or tenant should not rely on them as statements or representations of fact but must satisfy themselves (at their own expense) as to their correctness. (iii) Neither CBRE U.C., nor any of their employees have any authority to make any or give any representation or warranty in relation to the property. Brochure prepared August 2019. Brochure created by fourwalls-group.ie. WWW.UNIT153.COM.
Recommended publications
  • An Bord Pleanála
    An Bord Pleanála ROADS ACTS 1993 to 2007 PLANNING AND DEVELOPMENT ACTS 2000 to 2011 Cork County Council APPLICATION by the National Roads Authority of St Martin’s House, Ballsbridge, Dublin for approval under section 51 of the Roads Act, 1993, as amended, in accordance with documentation, including an environmental impact statement and a Natura impact statement, lodged with An Bord Pleanála on the 19 th day of July, 2012. PROPOSED ROAD DEVELOPMENT: An improved interchange at the location of the existing Dunkettle Interchange at the intersection of the N8 National Primary Road, the N25 National Primary Road and the N40 National Primary Road in the townlands of Lota, Dunkettle, Inchera, Kilcoolishal and Wallingstown, County Cork comprising: (i) a series of direct road links between the N8 National Primary Road, the N25 National Primary Road and the N40 National Primary Road and links to the R623 Regional Road in Wallingstown and to Burys Bridge in Dunkettle and Kilcoolishal, (ii) one number grade separated junction arrangement at the existing N25 National Primary Road approximately 650 metres to the east of the existing Dunkettle Interchange, (iii) four number roundabouts – two number at the grade separated junction, one number at the tie-in with the existing road network in Dunkettle and Kilcoolishal and one number at the tie-in with the existing road network in Wallingstown, ______________________________________________________________ 04.HA0039 An Bord Pleanála Page 1 of 5 (iv) 43 number major structures of various forms comprising: - one number overbridge, - seven number underbridges, - two number railway bridges, - one number footbridge, - modification of the northern approach structure to the Jack Lynch Tunnel, - seven number retaining walls, and - 24 number gantries, (v) several culverts where the scheme crosses watercourses or intertidal areas, and (vi) pedestrian and cyclist facilities, together with all ancillary and consequential works associated therewith.
    [Show full text]
  • Interim Review and Update of the Limerick 2030 Plan Ce
    Interim Review and Update of the Limerick 2030 Plan Ce Prepared for Limerick City and County Council 26 June 2021 © 2021 KPMG, an Irish partnership and a member firm of the KPMG global organisation of independent member firms affiliated with KPMG International Limited, a private English company limited by 0 guarantee. All rights reserved. Disclaimer If you are a party other than Limerick City and County Council: KPMG owes you no duty (whether in contract or in tort or under statute or otherwise) with respect to or in connection with the attached report or any part thereof; and will have no liability to you for any loss or damage suffered or costs incurred by you or any other person arising out of or in connection with the provision to you of the attached report or any part thereof, however the loss or damage is caused, including, but not limited to, as a result of negligence. If you are a party other than the Limerick City and County Council and you choose to rely upon the attached report or any part thereof, you do so entirely at your own risk. This document is an initial draft report. Our final report and any other deliverables will take precedence over this document. © 2021 KPMG, an Irish partnership and a member firm of the KPMG global organisation of independent member firms affiliated with KPMG International Limited, a private English company limited by 1 guarantee. All rights reserved. Introduction 2 Contents The contacts at KPMG in connection Page with this report are: Introduction 2 Executive summary 8 A.
    [Show full text]
  • Draft Limerick | Shannon METROPOLITAN AREA TRANSPORT STRATEGY 2040 ACKNOWLEDGEMENTS
    Bonneagar Iompair Eireann Transport Infrastructure Ireland Draft Limerick | Shannon METROPOLITAN AREA TRANSPORT STRATEGY 2040 ACKNOWLEDGEMENTS National Transport Authority: Limerick City and County Council: Jacobs: Hugh Creegan Brian Kennedy John Paul FitzGerald David Clements Dan Slavin Kevin Burke Michael MacAree Maria Woods Marjely Caneva Jari Howard Jennifer Egan Transport Infrastructure Ireland: Robert Gallagher Sarah Cooper Martin Bourke Dara McGuigan Stephen Johnson Michael McCormack Tim Fitzgerald Colm Kelly Tara Spain Clare County Council Systra: Carmel Kirby Ian Byrne Liam Conneally Allanah Murphy Sean Lenihan Paul Hussey Ann Cronin Andrew Archer Brian McCarthy Sinead Canny John Leahy Tadgh McNamara Dolphin 3D Photomontages: Philip Watkin Date of publication: June 2020 Draft Limerick | Shannon METROPOLITAN AREA TRANSPORT STRATEGY The Strategy will deliver a high-quality, accessible, integrated and more sustainable transport network that supports the role of the Limerick-Shannon Metropolitan Area as the major growth engine of the Mid-West Region, an internationally competitive European city region and main international entry to the Atlantic Corridor. CONTENTS 01 Introduction 03 02 Policy Context 09 03 Study Area & Transport Context 19 04 Land Use 25 05 Strategy Development 29 06 Walking 33 07 Cycling 43 08 BusConnects 51 09 Rail 59 10 Roads and Streets 65 11 Parking 73 12 Freight, Delivery and Servicing 79 13 Supporting Measures 83 14 Implementation 91 15 Strategy Outcomes 95 2 LIMERICK SHANNON | METROPOLITAN AREA TRANSPORT STRATEGY 01 INTRODUCTION The Limerick-Shannon Metropolitan To mitigate this, land use and transport planning A flexible strategy with the ability to scale up Area Transport Strategy will be will be far more closely aligned.
    [Show full text]
  • Dunkettle Interchange Improvement Scheme
    An Bord Pleanála Board Reference: MA0011/HA0039 Dunkettle Interchange Improvement Scheme REPORT OF MR. D. O’CONNOR ON THE FOLLOWING ASPECTS OF THE SCHEME: - • Transportation issues, including alternatives, prediction of traffic impacts and interaction of car base travel with public transport, cycling and walking. • Drainage issues and associated impacts. • Noise impacts including air quality associated with the construction and operational phases. • Construction issues and impacts. • Interactions of the above with other environmental issues. _____________________________________________________________________ PL.MA0011 An Bord Pleanála Page 1 of 43 1.0 INTRODUCTION AND SCOPE OF REPORT This report examines the aspects of the scheme listed above. Section 2.0 contains a description of parts of the Oral Hearing which are relevant to traffic, noise, construction and drainage. In Section 3.0 there are lists of questions posed which require to be examined in the assessment of the scheme. Section 4.0 is the assessment of the issues and Section 5.0 contains conclusions and recommendations. _____________________________________________________________________ PL.MA0011 An Bord Pleanála Page 2 of 43 2.0 ORAL HEARING BRIEFS OF EVIDENCE AS RELATING TO THE ISSUES TO BE COVERED BY THIS REPORT 2.1 The oral hearing took place on the 14 th and 15 th December, 2012 and on 9 th January 2013 and five briefs of evidence were presented. On Day 1 of the hearing, following an introduction (pages 1-8, transcript) the brief of Mr. Alan McGinley was the first to be read into evidence. Mr. McGinley’s brief of evidence also covered the evidence prepared by Mr. Euan Barr in relation to traffic issues.
    [Show full text]
  • Hard Shoulder Running E40 and Weaving Segments E314
    Arc Atlantique Traffic Management Corridor Annex 1 Evaluation reports www.easyway-its.eu TABLE OF CONTENTS 1. FL-01: Hard shoulder running E40 and weaving segments E314 2. FL-02: Hard shoulder running E19 Kleine Bareel – St.-Job-in-‘t-Goor 3. WL-03: Management and transit traffic on Walloon motorways 4. FR-05: Intelligent Truck Parking 5. FR-16: Traffic Management Plans 6. IE-01: MIU ITS Deployment 7. NL-01: Field test Amsterdam 8. PT-..: Monitoring Enhancement on critical segments – to be delivered 9. PT-03: System Enhancements 10. E01: AG-64 Traffic Control and Traffic Management ITS deployment 11. E02: AG-55 Traffic Control and Traffic Management ITS deployment 12. ES-20: Floating Car Data use 13. ES-21: Analysis and evaluation of different traffic management strategies in order to reduce the congestions in Bilbao peri-urban area 14. UK 02: M25 J 5 – 7 Variable Speed Limit, All lane Running / Hard Shoulder Running 15. UK 03: M25 J 23 – 27 Variable Speed Limit, All lane Running / Hard Shoulder Running 16. UK ..: Welsh National Traffic Data System – to be delivered Arc Atlantique Evaluation report – Annex 1 2/2 Hard Shoulder Running and Weaving Segments Belgium –E40/E314 – Brussel - Aken Project Reference: FL-01 Project Name: Hard shoulder running E40 and weaving segments E314 ITS Corridor: E40/E314 Brussel - Aken Project Location: Belgium – E40/E314 Leuven Area 1. DESCRIPTION OF THE PROBLEM ADDRESSED BY THE PROJECT 1.1 Nature of the Site The R0, E40 and E314 in this report are part of a highway connection between the cities of Brussels-Lummen (E314), and Brussels-Luik (E40).
    [Show full text]
  • Limerick Metropolitan District Movement Framework
    Limerick City and County Council Limerick Metropolitan District Movement Framework Study 2 The following people and organisations contributed Mr David Clements to the development of the Movement Framework Organisations/Individuals consulted as part of Study: the development of the study: Limerick City and County Council: Ultan Gogarty – Limerick Institute of Technology Paul Crowe Orlaith Borthwick, Gary Rowan – Limerick Chamber Vincent Murray Miriam Flynn – Bus Éireann Rory McDermott Joe Hoare – University Hospital Limerick Carmel Lynch Insp. Paul Reidy, Sgt. Peter Kelly – An Garda Neal Boyle Síochána John J. Ryan Helen O’Donnell, Philip Danaher – Limerick City Kieran Reeves Business Association Mairead Corrigan Brian Kirby – Mary Immaculate College Robert Reidy, John Moroney – University of Limerick Smarter Travel Office: Limerick Pat O’Neill Michael Curtin – Eurobus Limerick Lise-Ann Sheehan Consultant Members of the Project Team for National Transport Authority: delivery of the Movement Framework Study: Mr Hugh Creegan Tiago Oliveira, Arup Consulting Engineers David O’Keeffe, Arup Consulting Engineers Clifford Killeen, Arup Consulting Engineers Images Photography for this report was provided by Limerick City & County Council and Arup Consulting Engineers. Graphics for this report were provided by Arup Consulting Engineers. 3 Limerick Metropolitan District Movement Framework Study 1 Executive Summary and Introduction 7 1.1 Executive Summary 8 1.2 Introduction - The Limerick Metropolitan District Movement Framework Study 9 2 Literature
    [Show full text]
  • Project Ireland 2040 National Development Plan 2018—2027
    Project Ireland 2040 National Development Plan 2018—2027 gov.ie/2040 Project Ireland 2040 | National Development Plan 2018-2027 Foreword 2 Chapter 1: Overview 3 1.1 Context 3 1.2 Introduction 4 1.3 The National Planning Framework and the National Development Plan 7 1.4 The National Development Plan in Context 7 1.5 Cross-Border and Brexit 8 1.6 Housing Challenge 8 1.7 Transitioning to a Low-Carbon and Climate-Resilient Society 9 1.8 Sustainable Employment Challenge 9 1.9 Preparing Ireland for the Knowledge Economy 9 1.10 Role of Public Investment 9 1.11 Expenditure Management Framework 12 1.12 Investment Priorities and the Planning Process 12 Chapter 2: Foundations 13 2.1 Introduction 13 2.2 Review of Existing Capital Plan 14 2.3 Infrastructure Demand and Capacity Analysis 14 2.4 IMF Public Investment Management Assessment 14 2.5 Shareholder Management Framework 16 2.6 Public Private Partnership Review 16 2.7 Conclusion 16 Chapter 3: Resourcing and Funding Reform 17 3.1 Overview 17 3.2 Public Investment Target 18 3.3 Exchequer Resources 2018-27 18 3.4 Total Resources: Exchequer and State-backed investment 19 3.5 Funding Linked to the Achievement of Strategic Outcomes under the NPF 19 3.6 Reform of the Capital Funding Model 19 3.7 Rural, Urban, Technology and Climate Action Funds 23 Chapter 4: A Connected Island 25 4.1 Brexit - Investing for Peace and Prosperity 25 4.2 A Strong All-Island Partnership 28 4.3 Investing in the Border Region 29 4.4 Advancing North-South Co-operation 29 Project Ireland 2040 | National Development Plan 2018-2027 Chapter 5: National Strategic Outcomes and Public Investment Priorities 31 5.1 National Planning Framework: National Strategic Outcomes 31 5.2 Alignment with the National Development Plan 32 National Strategic Outcome 1.
    [Show full text]
  • The Proposed Dredging of the Navigation Channel at Sligo Harbour Vol
    The Proposed Dredging of the Navigation Channel at Sligo Harbour Vol. 1: Environmental Appraisal Report rpsgroup.com Sligo Harbour Dredging Environmental Appraisal Report Contents CONTENTS VOLUME 1 – ENVIRONMENTAL APPRAISAL REPORT 1.0 INTRODUCTION .................................................................................................... 1-1 1.1 PROJECT SUMMARY ................................................................................ 1-1 1.2 EXISTING PORT FACILITIES ..................................................................... 1-2 1.3 STRATEGIC POLICY DRIVERS ................................................................. 1-4 1.3.1 National Policy ..................................................................................1-4 1.3.2 Regional/Local Policy........................................................................1-9 1.3.3 Other Relevant Policies ..................................................................1-15 1.4 PROJECT JUSTIFICATION ...................................................................... 1-17 1.4.1 Background ....................................................................................1-17 1.4.2 Sligo Port ........................................................................................1-19 1.4.3 Customers ......................................................................................1-22 1.4.4 Economic Impact ............................................................................1-24 1.4.5 The Economic Impact arising from Construction .............................1-27
    [Show full text]
  • CORK STORY Our Path to Future Growth CASP Area
    THE CORK STORY Our Path to Future Growth CASP Area TO LIMERICK Rail to Dublin TO DUBLIN MALLOW FERMOY NAGLE MOUNTAINS BLACKWATER VALLEY BOGGERAGH Northern Regeneration MOUNTAINS & Expansion Monard / Rathpeacon TO WATERFORD Blarney Ballyvolane & Glanmire Carrigtwohill MACROOM Western YOUGHAL LEE VALLEY Knowledge Zone Midleton TO TRALEE CITY CENTRE Ballincollig Tech Cobh Corridor East & Harbour Carrigaline BANDON BANDON TO WEST CORK VALLEY KINSALE Map and Areas Shown Not To Scale / Contents Contents Introduction 05 Chapter 1 East & Harbour 06 Chapter 2 Tech Corridor 08 Chapter 3 City Centre 10 Chapter 4 Western Knowledge Zone 12 Chapter 5 Northern Regeneration and Expansion 14 Chapter 6 Water Infrastructure 16 Chapter 7 Connectivity 17 Chapter 8 Tourism 18 Chapter 9 Food 20 Chapter 10 Partnership & Collaboration 21 Conclusion 22 4 /Cork at a glance EMPLOYMENT IN ALL AGENCY ASSISTED COMPANIES 2010 – 2013 Cork at a Glance SOUTH STATE WEST REGION Employment & Unemployment 144 IDA assisted companies in Cork, employing 27,354 people UNEMPLOYMENT RATE 8.8% 13.9% 4.90% Q2 2014 6.90% TE GION ICT TA RE FALL IN NUMBER ON LIVE REGISTER S T S Bio/Pharma E OCT 2011 – OCT 2014 W 37.80% Medical Tech 12.80% H T Content, consumer U & business services O 13.40% 11.8 S 11.1 STATE CORK Engineering 24.20% CITY + CO Financial services EMPLOYMENT IN FDI COMPANIES 17.5% 16.7% 22.2% Higher Education – R&D OF TOTAL GVA PER SECTOR R&D in Cork consistently outperforms EU averages: IS PRODUCED EMPLOYMENT IN IRISH-OWNED AGENCY • Largest amount of EU funding per capita
    [Show full text]
  • ECONOMIC Atlantic Corridor ECONOMIC Corridor
    Atlantic ECONOMIC Corridor Paul Hogan Senior Advisor – Forward Planning Department of Housing, Planning and Local Government Custom House Dublin D01 W6XO Dear Paul, We have taken the opportunity to review the current draft of the National Planning Framework (NPF) document and, in doing so, acknowledge the efforts made by your Department to include the concept and objectives of the Atlantic Economic Corridor (AEC). Unfortunately, the substance of the document remains as originally cast in the first draft. We understand the frustration and disappointment expressed by many other NPF stakeholders. The AEC Chambers’ response is set out in this letter and the attached document. Our focus is less about the detail and more about the key points of principle. We offer suggestions on how the final draft of the NPF could focus on the opportunity to realise the hidden, untapped potential of the AEC, with the strategic objective of contributing to national growth. Clearly, we agree with the analysis that suggests a change to a regionally balanced approach to economic development. However, the planning framework is based on current economic patterns of employment and population density and therefore, ignores the fundamental economic challenge of depopulation of the West, North West and Border regions and the underutilised capacity and assets across the corridor at a time of increasing congestion in the Greater Dublin Area. The AEC strategy (published last year and presented by the Chambers group in our submission to the NPF) proposes that we move towards a more balanced economic model within the Atlantic regions. The new economic model must be built on the sustainable development of our natural resource base and should create a unique inter-dependence between FDI and a new base of existing and innovation-led SMEs.
    [Show full text]
  • Gearing up for M20: a Route to Success
    GEARING UP FOR M20: A ROUTE TO SUCCESS Socio-Economic Assessment of M20 Road Scheme Detailed Assessment Report Submitted to Limerick and Cork Chambers Indecon International Economic Consultants and RED-C Research & Marketing www.redcresearch.ie www.indecon.ie June 2017 Executive Summary Introduction and Key Findings from Research This report was undertaken by Indecon International Economic Consultants and assisted by RED C Research on behalf of Limerick and Cork Chambers. The report represents an independent assessment of the socio-economic benefits of completion of the M20 Cork to Limerick motorway scheme. The M20 scheme represents a major strategic infrastructure project that is required to address existing weaknesses and growing constraints on the existing N20 national primary route, linking Ireland’s second and third largest cities respectively. The scheme was withdrawn in 2010 due to budgetary constraints. However, the Minister for Transport has since provided funding to support initial scoping activities to revisit the case for the scheme. Indecon’s assessment is designed to inform decision-making in the context of the Government’s forthcoming Mid-Term Review of the Capital Plan. The assessment re-establishes and re-affirms the economic benefits and wider importance of completion of the scheme. Key Findings The assessment highlights the following key benefits that would arise from completion of the M20 Cork to Limerick Motorway scheme: > The current N20 is under significant capacity constraints due to the recent growth in traffic volumes.Several locations on the current N20 have seen traffic levels at over 120% of capacity in 2017. > Development of the M20 would provide a Blarney to Patrickswell journey time of approximately 47 minutes.
    [Show full text]
  • Fred Barry CIHT Presentation 17022011
    Presentation to Chartered Institution of Highways & Transportation National Roads Authority Outlook Fred Barry Chief Executive, National Roads Authority 17 th February 2011 Outlook - Budgets Budgets greatly reduced Capital Budget €1.8bn → €0.24bn per year New PPP’s to be funded from Capital Budget (previously from separate PPP Budget) 1 Outlook – Transport 21 Targets for 2006-2010 all achieved Five Inter-Urban Routes M3 Clonee to Kells M50 Upgrade Dublin Port Tunnel Freeflow tolling on M50 N11 Dublin-Rosslare (sections) M18 Limerick-Galway (sections) Almost 1,000 safety specific improvements Hundreds of kilometres of pavement improvements to the legacy network & many other schemes Outlook – Transport 21 cont. Transport 21 Post 2010 Focus on balance of national primary routes, especially Atlantic Corridor National Secondaries 2 Outlook - Traffic Grew very strongly 2002-2008, with decline in 2008 & 2009 2010 traffic figures mixed – M50, DPT strong growth Typical of previous recessions, with traffic dipping, then recovering with the economy Traffic Growth 2002-2010 (All Roads AADT) 135 130 125 120 115 110 Traffic Growth (2002 = 100) = (2002 Growth Traffic 105 100 2002 TRL Forecast ATC Data 95 90 2002 2003 2004 2005 2006 2007 2008 2009 2010 3 NRA Priorities Manage the modernised network safely & efficiently Ensure that the public’s investment is protected through adequate rehabilitation & maintenance Obtain the proper financial return on our commercial activities Improve, and make safer, the legacy network as financial circumstances permit Network Management & Operations Public Private Partnerships Ten Public Private Partnerships in operation - 330km motorway - nine toll points - six service areas / three locations Level of service obligations Revenue Sharing 4 Network Management & Operations I.T.S.
    [Show full text]