Draft Limerick | Shannon METROPOLITAN AREA TRANSPORT STRATEGY 2040 ACKNOWLEDGEMENTS

Total Page:16

File Type:pdf, Size:1020Kb

Draft Limerick | Shannon METROPOLITAN AREA TRANSPORT STRATEGY 2040 ACKNOWLEDGEMENTS Bonneagar Iompair Eireann Transport Infrastructure Ireland Draft Limerick | Shannon METROPOLITAN AREA TRANSPORT STRATEGY 2040 ACKNOWLEDGEMENTS National Transport Authority: Limerick City and County Council: Jacobs: Hugh Creegan Brian Kennedy John Paul FitzGerald David Clements Dan Slavin Kevin Burke Michael MacAree Maria Woods Marjely Caneva Jari Howard Jennifer Egan Transport Infrastructure Ireland: Robert Gallagher Sarah Cooper Martin Bourke Dara McGuigan Stephen Johnson Michael McCormack Tim Fitzgerald Colm Kelly Tara Spain Clare County Council Systra: Carmel Kirby Ian Byrne Liam Conneally Allanah Murphy Sean Lenihan Paul Hussey Ann Cronin Andrew Archer Brian McCarthy Sinead Canny John Leahy Tadgh McNamara Dolphin 3D Photomontages: Philip Watkin Date of publication: June 2020 Draft Limerick | Shannon METROPOLITAN AREA TRANSPORT STRATEGY The Strategy will deliver a high-quality, accessible, integrated and more sustainable transport network that supports the role of the Limerick-Shannon Metropolitan Area as the major growth engine of the Mid-West Region, an internationally competitive European city region and main international entry to the Atlantic Corridor. CONTENTS 01 Introduction 03 02 Policy Context 09 03 Study Area & Transport Context 19 04 Land Use 25 05 Strategy Development 29 06 Walking 33 07 Cycling 43 08 BusConnects 51 09 Rail 59 10 Roads and Streets 65 11 Parking 73 12 Freight, Delivery and Servicing 79 13 Supporting Measures 83 14 Implementation 91 15 Strategy Outcomes 95 2 LIMERICK SHANNON | METROPOLITAN AREA TRANSPORT STRATEGY 01 INTRODUCTION The Limerick-Shannon Metropolitan To mitigate this, land use and transport planning A flexible strategy with the ability to scale up Area Transport Strategy will be will be far more closely aligned. This will public transport capacity and frequencies as instrumental in the regeneration discourage the use of the private car, particularly necessary in response to changing for short trips, in order to fundamentally change circumstances; and and transformation of Limerick City how people move around the LSMA. This requires A framework plan with which other agencies and the wider Limerick-Shannon a more efficient use of valuable street and road involved in land-use planning, environmental Metropolitan Area. space and a prioritisation of walking, cycling and protection and the delivery of other infrastructure Regional Spatial and Economic Strategy for the Southern Region public transport. and services such as water, housing and community facilities can align their plans and The National Planning Framework 2040 (NPF) The Limerick-Shannon Metropolitan Area Transport investment priorities. envisages that the Limerick-Shannon Metropolitan Strategy 2040 (LSMATS or the ‘Strategy’) has been Area (LSMA) will become the growth engine of the developed by the National Transport Authority CURRENT CHALLENGES in collaboration with Limerick City and County Mid-West Region with projected growth of at least There are several challenges across the wider Council, Clare County Council and Transport 50% during the period up to 2040. This projected LSMA that were considered in the preparation of Infrastructure Ireland (TII). It has also been informed population, employment and education growth this Strategy. In summary, planning and transport by pre-consultation submissions from a number brings with it opportunities for the development of policy and investment in the LSMA will need to: the LSMA. of stakeholders. Support a vibrant and accessible Limerick City Centre and identified regeneration areas, This projected population and associated economic LSMATS represents: metropolitan urban centres; growth will also result in a significant increase in The transport sector’s response to the LSMA’s Support a vibrant and accessible Shannon Town, the demand for travel. This demand needs to be requirements in relation to climate change; Airport and Freezone; managed and planned for carefully in order to An integrated transport strategy for walking, safeguard and enhance the LSMA’s attractiveness cycling, bus, rail and road to support planned Better integrate land use, and transport planning to live, work, visit and invest in. growth up to 2040; and investment; A strategy to facilitate compact growth; Support increased population, employment and In common with the other regional metropolitan educational densities in accessible centres and A framework for the planning, investment and areas of Cork, Galway and Waterford, there is along public transport corridors; delivery of transport infrastructure and services a legacy of car dependency in the LSMA. This to guide the LSMA’s development up to 2040 in Re-allocate road space to support more walking, has contributed to a wide range of economic, line with the National Planning Framework 2040, cycling and public transport; environmental and social issues including longer National Development Plan 2018-2027 and the Improve public transport through increased commutes, declining urban centres, poor public Regional Spatial and Economic Strategy for the priority and higher frequency services operating health, reduced air quality and noise pollution. Southern Region; with greater speed and journey time reliability with complementary facilities such as Park and Ride; LIMERICK SHANNON | METROPOLITAN AREA TRANSPORT STRATEGY 3 Minimise severance created by the River VISION AND PRINCIPLES These are as follows: Shannon, railway infrastructure and road network; The proposed Vision for LSMATS is as follows: Baseline Conditions & Policy Review Report; Reduce the impact of transport on the The Strategy will deliver a high-quality, Demand Analysis Report; environment, health, wellbeing and safety of accessible, integrated and more sustainable Transport Options Development Report; residents; transport network that supports the role of the Limerick-Shannon Metropolitan Area as Transport Modelling Report; Maintain and enhance the strategic function of the the major growth engine of the Mid-West National road network to cater for the movement Advance Consultation Report; and Region, an internationally competitive European Supporting Measures Report. of strategic traffic and discourage sprawl; city region and main international entry to the Maximise the potential of the existing transport Atlantic Corridor. infrastructure including the InterCity rail network, The strategy is also subject to the provisions Shannon Airport, the Port of Foynes and Ennis as STRATEGY DEVELOPMENT of the SEA and AA Directives, and associated national legislation. As such, it is accompanied a connecting hub; and Extensive technical analysis has been by an Environmental Report and a Natura Impact The need to achieve efficiency and resilience undertaken to inform the development of Statement. within Limerick-Shannon Metropolitan Area’s LSMATS. A number of supporting technical transport network across all modes. documents have been prepared which present Further information on the development process is the work undertaken and the evidence base for its outlined in the ‘Strategy Development’ chapter. Chapter 3 ‘Study Area and Transport Context’ proposed networks and measures. provides further detail on the existing transport LSMATS is considered to be a ‘live’ document and infrastructure and services in the LSMA. will be subject to a periodic review every 6 years. To achieve this vision, the guiding principles upon which LSMATS is based are: RINCILE RINCILE RINCILE RINCILE RINCILE RINCILE RINCILE 01 02 03 04 05 06 07 T T T T o vel T tify To enhance the To increase at gro f LSMA transport to reduce car of public transport protect key strategic public realm through transport capacity by thr o dependency; connectivity to key rout or traffic management wher velopmen of an efficient destina movemen f achieve the Strategy tr twork; high demand corridors; freight traffic; interven outcomes. 4 LIMERICK SHANNON | METROPOLITAN AREA TRANSPORT STRATEGY STRATEGIC ENVIRONMENTAL The SEA has evaluated the provisions of the ASSESSMENT (SEA) AND APPROPRIATE Strategy for potential significant effects against ten ASSESSMENT (AA). strategic environmental objectives (SEOs) set out in the table below . LSMATS will provide a framework for future projects which are likely to have a significant effect on the SEO LINKED SEA TOPICS environment, and therefore falls under the scope of the European Directive 2001/42/EC “on the Protect and enhance quality of life in relation to transport • Population, Socio-economics, Access, and Human Health. • Tourism and Recreation. assessment of the effects of certain plans and while increasing accessibility to economic, employment and community facilities. programmes on the environment” (known as the Avoid damage to recreation and amenity facilities through • Tourism and Recreation. ‘SEA Directive’). The SEA Directive is implemented construction of new transport infrastructure and support and enhance • Population, Socio-economics, Access, and Human Health. in Ireland via the European Communities (EC) access for tourism recreation. • Land Use and Material Assets. (Environmental Assessment of Certain Plans and Prevent damage to, and where appropriate enhance, terrestrial, • Biodiversity, Flora and Fauna. Programmes) Regulations 2003, as amended by aquatic and soil biodiversity, particularly EU and national designated • Landscape and Visual Amenity. sites and protected species. • Geology and Soils. the EC (Environmental Assessment of Certain Plans • Land Use and
Recommended publications
  • Inspectors Report
    An Bord Pleanála Inspector’s Report PL 07.240206 PROPOSED DEVELOPMENT: Temporary permission to construct six classroom educational building, staff room, office and associated works. LOCATION: Kilcolgan, County Galway. PLANNING APPLICATION Planning Authority (P.A.): Galway County Council P.A. Reg. Ref.: 11/755 Applicants: Thomas and Nancy Neilan Application Type: Permission (Temporary) P.A. Decision: Grant temporary permission, subject to conditions. PLANNING APPEAL Appellant: Alan Kelly Type of Appeal: Third Party – v – Grant Site Inspection: 5 June, 2012 Appendices: Photographs and Key Map; Development Plan Extracts; Site Location Sketch. ___________________________________________________________________________ PL 07.240206 An Bord Pleanála Page 1 of 16 1.0 INTRODUCTION 1.1 This is a third party appeal against the decision of Galway County Council to grant a temporary permission for a six classroom school building including staff room and office. The proposed school would be serviced by an on-site wastewater treatment facility with percolation area etc. 1.2 The Board will be aware that a permission was granted, upheld on appeal for a primary (“Educate Together”) school complex elsewhere in Kilcolgan, earlier this year. Applicants state in correspondence, on the current file, that the current proposal is being put forward separately from any Educate Together proposal. 1.3 The temporary permission conditioned by the Planning Authority is in response to the submission of the applicant seeking only a temporary permission. Clarification on the purpose of the temporary permission was sought and offered in “further information” at planning application stage. 1.4 I have read the file and visited the site and can now report as set down below.
    [Show full text]
  • Curriculum Vitae Simon Barron B
    CURRICULUM VITAE SIMON BARRON B. Sc. (Hons), MCIEEM, CEnv EDUCATION 1991 – 1994 University of Plymouth Grade 2:1, B.Sc. (Hons.) in Geography. Modules studied include Biological Conservation, Environmental Impact Assessment, Vegetation Patterns and Processes and Surveying and Cartography. CAREER HISTORY Director of Ecology, BEC Consultants. July 2004 – Present Project manager and senior ecologist for many projects carried out at national, regional and site specific scales. These include the Pilot Survey and Phases 1-4 of the National Survey of Upland Habitats (2008 – 2014) and the National Survey of Irish Sea Cliffs (2011). I have also been project manager and lead ecologist for a number of rare plant translocation and monitoring projects. I have completed a number of Appropriate Assessments (AA), Ecological Impact Assessments (EcIA), Alien Invasive Species Surveys (AIS) rare plant surveys and habitat restoration projects. I have worked on a number of Local Biodiversity Action Plans and am a proficient habitat surveyor and botanist and have excellent report writing skills. As Director of Ecology I also have responsibility for company development, staff management and recruitment, and sit on the Senior Management Team, Project Management Team and Health and Safety Committee. A selection of projects I have worked on recently with BEC is listed below: Local Biodiversity Action Plans (2020): Project Ecologist. Conducting a review of the existing biodiversity interest of three areas: Omeath, Co. Louth, Navan Co. Meath, Griffeen River and Lucan Co. Dublin. Completing habitat surveys and preparing recommendations which could be implemented by local community groups to improve biodiversity and enhance engagement of local communities with biodiversity.
    [Show full text]
  • An Bord Pleanála
    An Bord Pleanála ROADS ACTS 1993 to 2007 PLANNING AND DEVELOPMENT ACTS 2000 to 2011 Cork County Council APPLICATION by the National Roads Authority of St Martin’s House, Ballsbridge, Dublin for approval under section 51 of the Roads Act, 1993, as amended, in accordance with documentation, including an environmental impact statement and a Natura impact statement, lodged with An Bord Pleanála on the 19 th day of July, 2012. PROPOSED ROAD DEVELOPMENT: An improved interchange at the location of the existing Dunkettle Interchange at the intersection of the N8 National Primary Road, the N25 National Primary Road and the N40 National Primary Road in the townlands of Lota, Dunkettle, Inchera, Kilcoolishal and Wallingstown, County Cork comprising: (i) a series of direct road links between the N8 National Primary Road, the N25 National Primary Road and the N40 National Primary Road and links to the R623 Regional Road in Wallingstown and to Burys Bridge in Dunkettle and Kilcoolishal, (ii) one number grade separated junction arrangement at the existing N25 National Primary Road approximately 650 metres to the east of the existing Dunkettle Interchange, (iii) four number roundabouts – two number at the grade separated junction, one number at the tie-in with the existing road network in Dunkettle and Kilcoolishal and one number at the tie-in with the existing road network in Wallingstown, ______________________________________________________________ 04.HA0039 An Bord Pleanála Page 1 of 5 (iv) 43 number major structures of various forms comprising: - one number overbridge, - seven number underbridges, - two number railway bridges, - one number footbridge, - modification of the northern approach structure to the Jack Lynch Tunnel, - seven number retaining walls, and - 24 number gantries, (v) several culverts where the scheme crosses watercourses or intertidal areas, and (vi) pedestrian and cyclist facilities, together with all ancillary and consequential works associated therewith.
    [Show full text]
  • Limerick Northern Distributor Road
    Need for the Scheme Your Comments are Important The need for the scheme was identified in the ‘Mid-West Regional Planning Guidelines 2010 - 2022’, Submissions and observations, in writing, are invited from interested groups or individuals regarding prepared by the Mid-West Regional Authority which consists of Clare County Council, Tipperary North the scheme. All submissions should be clearly endorsed with the project’s name, Limerick Northern County Council and Limerick City and County Councils. The guidelines identified many strategic issues Distributor Road - Phase 2, and emailed to [email protected] or posted to the undersigned on or that required consideration in the future planning of the region including the need for the provision of before Thursday, 16th February 2012. a northern distributor road around Limerick City to support the development of the region. Administrative Officer, The Fitzgerald Report ‘Addressing the issues of Social Exclusion in Moyross and other disadvantaged Transportation Section, Limerick Northern Distributor Road - Phase 2 areas of Limerick City’ (April 2007) has recommended that a distributor road to the north of Limerick Clare County Council, City be progressed to develop economic activity and end the isolation of this deprived area. Áras Contae an Chláir, Public Consultation No. 2 New Road, The various local and county development plans published by Clare County Council and Limerick City Preferred Route Corridor Stage Ennis, and County Councils make provision for the delivery of the proposed road scheme. Co. Clare. Scheme Objectives What Happens Next? The proposed scheme will provide a northern distributor road around Limerick City, improving Following this Public Consultation period, an analysis of all views expressed and submissions received accessibility to the city from County Clare and relieving pressure on the existing river crossings in Limerick on the emerging Preferred Route Corridor will be undertaken.
    [Show full text]
  • Economic Profiling Report for Limerick City and County
    Economic Data Profiling Report for Limerick Final Report to Limerick City & County Council May 2018 Economic Data Profile for Limerick TABLE OF CONTENTS EXECUTIVE SUMMARY…………………………………………………………………………….……………3 INTRODUCTION………………………………………………………………………………………….……….21 SECTION A: LIMERICK ECONOMIC PROFILLING……………………………………………………24 SECTION B: PREDICTIVE ANALYSIS………………………………………………………………….…103 LIMERICK SWOT ANALYSIS………………………………………………………….………………………………….……104 LESSONS LEARNT FROM CASE STUDIES…………………………………………………………………………………….145 MEGATRENDS – IMPLICATIONS FOR LIMERICK…………………………………………………………………………..159 SECTION C: INTERNATIONAL BENCHMARKING….………………………………………………159 SECTION D: ASSESSMENT OF INVESTMENT……………………………………………………….176 1 Executive Summary & Introduction Executive Summary EXECUTIVE SUMMARY Over the last two decades there has been an increasing understanding of the importance of cities and city regions as economic, social and cultural focuses, which can drive regional and national economies. In today’s environment of mobile, financial and human capital, the focus of economic competition is increasingly on city regions. This trend is particularly significant for an open economy such as Ireland which is competing in a global market for investment and talent. In 2014 Limerick City Council and Limerick County Council amalgamated into one body - Limerick City & County Council. As outlined in the Limerick 2030 Vision: An Economic and Spatial Plan for Limerick report, the objective of this merger was to extend the city boundary to include urbanised parts of the county and was seen as a ‘once in a generation opportunity’ to drive new levels of employment and economic growth. In May 2017 Limerick City & County Council (LC&CC) appointed EY-DKM Economic Advisory Services (formerly DKM Economic Consultants) with MCJ Lemagnen Associates Ltd. (MCJ Lemagnen) to undertake an Economic Profile report of Limerick city (including suburbs as defined by the CSO) and county.
    [Show full text]
  • N18 Ennis Bypass and N85 Western Relief Road Site AR126, Cahircalla Beg, Co
    N18 Ennis Bypass and N85 Western Relief Road Site AR126, Cahircalla Beg, Co. Clare Final Archaeological Excavation Report for Clare County Council Licence No: 04E0024 by Graham Hull Job J04/02 (NGR 132803 175465) 14th August 2006 N18 Ennis Bypass and N85 Western Relief Road Site AR126, Cahircalla Beg, Co. Clare Final Archaeological Excavation Report for Clare County Council Licence No: 04E0024 by Graham Hull TVAS Ireland Ltd Job J04/02 14th August 2006 Summary Site name: N18 Ennis Bypass and N85 Western Relief Road, Site AR126, Cahircalla Beg, Co. Clare Townland: Cahircalla Beg Parish: Drumcliff Barony: Islands County: Clare SMR/RMP Number: N/A Planning Ref. No: N/A Client: Clare County Council, New Road, Ennis, Co. Clare Landowner: Clare County Council, New Road, Ennis, Co. Clare Grid reference: 132803 175465 (OSI Discovery Series, 1:50,000, Sheet 58. OS 6” Clare Sheet 33) Naturally occurring geology: Limestone bedrock overlain by riverine peat TVAS Ireland Job No: J04/02 Licence No: 04E0024 Licence Holder: Graham Hull Report author: Graham Hull Site activity: Excavation Site area: 950m2 Sample percentage: 100% Date of fieldwork: 29th January to 25th February 2004 Date of report: 14th August 2006 Summary of results: A fulacht fiadh with a stone-lined trough was excavated. The mound was composed of laminated deposits of burnt stone. Charcoal and animal bone was recovered from the monument. Radiocarbon dating shows that the fulacht fiadh had its origin in two burnt stone spreads deposited in the late Neolithic/early Bronze Age. After a hiatus of c. 1000 years, the body of the mound developed in the 12th to 9th centuries BC.
    [Show full text]
  • Report on the Accounts of the Public Services 2012
    Comptroller and Auditor General Report on the Accounts of the Public Services 2012 September 2013 2 Report on the Accounts of the Public Services 2012 © Government Copyright Report of the Comptroller and Auditor General Report on the Accounts of the Public Services 2012 I am required under Section 3 of the Comptroller and Auditor General (Amendment) Act 1993 to report to Dáil Éireann on my audit of the appropriation accounts of departments and offices and the account of the receipt of revenue of the State. I have certified each appropriation account for the year ended 31 December 2012 and am submitting those accounts, together with my audit certificates, to Dáil Éireann. I hereby present my report on matters arising out of my audits of the accounts of the public services for 2012 to Dáil Éireann in accordance with Section 3 (11) of the Comptroller and Auditor General (Amendment) Act 1993. I am required under other statutes to report on certain matters along with my report on the appropriation accounts. The report is set out in four parts. Part 1 deals with matters relating to the Central Fund of the Exchequer and government debt. Part 2 outlines certain matters related to voted expenditure in 2012. Part 3 deals with matters arising out of the audit of the Revenue account and the examination of Revenue systems. Part 4 comprises my statutory report on the audits of the accounts of the National Treasury Management Agency and a report on the Clinical Indemnity Scheme. This report was prepared on the basis of audited information, where available, and other information, documentation and explanations obtained from the relevant Government departments and agencies.
    [Show full text]
  • HICL Infrastructure PLC Annual Report 2020 Delivering Real Value
    HICL Infrastructure PLC Annual Report 2020 Delivering Real Value. Bangor and Nendrum Schools, UK Contents 2020 Highlights 2 Overview 01 1.1 Chairman’s Statement 6 Strategic Report 02 2.1 The Infrastructure Market 12 2.2 Investment Proposition 17 2.3 HICL’s Business Model & Strategy 18 2.4 Key Performance & Quality Indicators 20 2.5 Investment Manager’s Report 22 Strategic Report: Performance & Risk 03 3.1 Operating Review 30 3.2 Sustainability Report 34 3.3 Financial Review 50 3.4 Valuation of the Portfolio 55 3.5 The Investment Portfolio 68 3.6 Portfolio Analysis 70 3.7 Risk & Risk Management 72 3.8 Viability Statement 84 3.9 Risk Committee Report 85 3.10 Strategic Report Disclosures 89 Directors’ Report 04 4.1 Board and Governance 94 4.2 Board of Directors 96 4.3 The Investment Manager 98 4.4 Corporate Governance Statement 99 4.5 Audit Committee Report 113 4.6 Directors’ Remuneration Report 118 4.7 Report of the Directors 122 4.8 Statement of Directors’ Responsibilities 126 Financial Statements 05 5.1 Independent Auditor’s Report 130 5.2 Financial Statements 136 5.3 Notes to the Financial Statements 140 Glossary 180 Directors & Advisers 182 Front cover image: Salford Hospital, UK HICL Infrastructure Company Limited (or “HICL Guernsey”) announced on 21 November 2018 that, following consultation with investors, the Board was of the view that it would be in the best interests of shareholders as a whole to move the domicile of the investment business from Guernsey to the United Kingdom.
    [Show full text]
  • Strategic Environmental Assessment Report-Incorporation of the Limerick 2030 Economic and Spatial Plan
    Strategic Environmental Assessment of Proposed Variation No. 4 to the Limerick City Development Plan 2010 – 2016 - Incorporation of the Limerick 2030 Economic and Spatial Plan Public Display Period: Saturday 22nd November 2014 to Monday 22nd December 2014 inclusive. Forward Planning Limerick City and County Council, Economic Development and Planning Department, 7/8 Patrick Street, Limerick. Contents 1.0 Non Technical Summary ........................................................................... 5 1.1 Introduction ................................................................................................ 5 1.2 Contents and Main Objectives of the Limerick Economic and Spatial . Plan 2030 ............................................................................................................ 5 1.3 Current State of the Environment ............................................................. 5 1.3.1 Biodiversity, Flora and Fauna………………………………………5 1.3.2 Population and Human Health…………………….………………7 1.3.3 Geology and Soils………………………………………………...…8 1.3.4 Cultural Heritage…………………………………………………….8 1.3.5 Landcscape…………………………………………………………10 1.4 Existing Environmental Issues ................................................................. 12 1.5 Consideration of Alternative Strategies ................................................... 12 1.6 Environmental Protection Objectives ....................................................... 13 1.6.1 Biodiversity, Flora and Fauna……………..................................13 1.6.2 Population and Human Health…………………………………..13
    [Show full text]
  • Strategic Flood Risk Assessment of Variation No
    Strategic Flood Risk Assessment Of Variation No. 1 to Galway County Development Plan 2015 - 2021 Report No. HEL204506_v1.1 Galway County Council 27th April 2017 2 Strategic Flood Risk Assessment Of Variation No. 1 to the Galway County Development Plan 2015 - 2021 Hydro Environmental Ltd No. 4 Caiseal Riada, Clarinbridge, Galway, Ireland. Tel/Fax: 091 796734 Job No.: 204506 Report No.: HEL204506_v1.1 Prepared by: Anthony Cawley BE, M.EngSc, CEng MIEI Report Status Issue 1 Date: 27th April 2017 Strategic Flood Risk Assessment Study of Variation No. 1 to Galway County Development Plan 2015-2021 Table of Contents ................................................................................................................................................................ 1 1. Introduction ......................................................................................................................................... 1 2 Flood Risk Management Policy....................................................................................................... 2 2.1 EU Floods Directive ................................................................................................................ 2 2.2 National Flood Policy review ................................................................................................... 2 2.3 National CFRAM ..................................................................................................................... 4 2.4 Planning Guidelines Concerning Flood Risk Management ...................................................
    [Show full text]
  • Polling Scheme 2016
    COMHAIRLE CONTAE AN CHLÁIR CLARE COUNTY COUNCIL POLLING SCHEME SCÉIM VÓTÁLA Acht Toghcháin 1992 Acht Toghcháin (Leasú) 2001 Na Rialachàin (Scéimeanna Vótàla) 2005 Electoral Act 1992 Electoral (Amendment) Act 2001 Electoral (Polling Schemes) Regulations 2005 th 12 September 2016 THIS POLLING SCHEME WILL APPLY TO DÁIL, PRESIDENTIAL, EUROPEAN, LOCAL ELECTIONS AND ALSO TO REFERENDA All Electoral Areas in County Clare included in this document: Ennis Killaloe Shannon West Clare Constituency of Clare Constituency of Limerick City (Part of) ********************************** 2 Clare County Council Polling Scheme Electoral Act 1992 and Polling Scheme Regulations 2005 Introduction A Polling Scheme divides a County into Electoral Areas and these are further broken down in to Polling Districts, Electoral Divisions, and Townlands. The Scheme sets out a Polling Place or Polling Station for the townlands for electoral purposes. The Register of Electors is then produced in accordance with the districts defined within the Scheme. The making of a Polling Scheme is a reserved function of the Elected Members of the Council. County Clare consists of Two Dàil Constituencies, which are where the voters in County Clare democratically elect members to Dáil Éireann : 1. Constituency of Clare and the 2. Part of the Constituency of Limerick City County Clare now consists of four Electoral Areas which were set up under the Local Electoral areas and Municipal Districts Order 2014 Ennis Killaloe Shannon West Clare. 3 INDEX FOR POLLING SCHEME Constituencies Pages Constituency
    [Show full text]
  • Carrownagowan Wind Farm Dear Homeowner
    Carrownagowan Wind Farm Dear Homeowner, First and foremost, we hope this finds you safe and well in these challenging times, and adjusting as best possible to new ways of going about daily life. As you may be aware, Coillte’s Renewable Energy business has been actively exploring a wind farm development opportunity in the Slieve Bearnagh area since early 2018. The community engagement model which we use within our team has given us an opportunity to meet with a very high proportion of people residing within 2 km of the potential wind farm. The proposed Carrownagowan Wind Farm project is nearing the end of its pre-planning phase and should shortly enter the planning process. Under normal circumstances, we would be holding a public information event now in order to present the enclosed information to the wider public in the area surrounding this project. However, the Covid-19 pandemic and associated restrictions mean that this is not now possible. As an alternative, we are now distributing the attached information very widely. It sets out a detailed overview of all aspects of the proposed Carrownagowan Wind Farm project. We acknowledge that this is by no means ideal, but please be assured that we will continue to make every effort to ensure that we provide you with all the information you need in order to fully understand the details of this proposed project and also make available the necessary resources within our team to support any engagement. Once you have had a chance to read through this brochure, please do make contact with any of the team using the contact details at the back if you have any areas of the project you wish to discuss further.
    [Show full text]