Bridge (Shalalth) – Seton (Lillooet) Capital Investment Update

Total Page:16

File Type:pdf, Size:1020Kb

Bridge (Shalalth) – Seton (Lillooet) Capital Investment Update Bridge (Shalalth) – Seton (Lillooet) Capital Investment Update June 2020 Agenda 1. Bridge River System Overview 2. Capital Plan Update (2019 – 2031) 3. Covid-19 Response 4. Workforce 5. Accommodation 6. Safety 7. Recreation Sites 8. Community Investment 9. Communications 2 Overview Bridge River System 3 Capital Plan Update Bridge River • Generating Station 1 o Units 1- 4 – planning currently underway, targeted completion in 2028 o Units 1- 4 Penstock Internal Recoating, planning currently underway, targeted Above: Bridge River 2 Unit 6 – Unit completed and completion in 2028 generating power • Generating Station 2: o Units 7&8 – pre-assembly work underway, targeted completion in 2021 o Concurrent Penstock Internal Recoating projects start this summer – targeted completion for both penstocks in 2021 Above: stator frame sits ready to be shipped to Bridge River 2 for work on Units 7&8. 4 Capital Plan Update La Joie Dam • La Joie Dam construction is targeted to begin in 2026 with targeted completion in 2031 • Currently reviewing schedule – still early stages • Construction will require low water levels in Downton Reservoir to enable the work 5 Capital Plan Update Seton Dam • Planning for Seton Generator Upgrade is currently underway, targeted completion in 2026 Dam Safety • Early planning stages for Surge Spill Hazard Mitigation project (Mission Mountain). Targeted completion in 2021. 6 Capital Plan Update Transmission • Transformer replacement work at Bridge River 1 and Bridge River Terminal, currently underway, targeted completion in 2020 and 2023, respectively Above and right: Crews install structures for the • Preliminary planning underway for 60L021 re-alignment transmission line work in the region, work between Lillooet and Shalalth targeted completion in 2025 completed in 2018. 7 COVID-19 Response Pandemic Response Plan: outlines our response to various stages of an outbreak and our plans for critical and supporting functions. • Employees and contractors are following all Provincial and Federal requirements around social distancing and self-isolation. • Station Operation crews have been scaled back, essential work continues at La Joie Dam and Bridge River Generation Station for capital projects and maintenance work that is important to the safety and reliability of our system. • Site specific measures have been put in place to reduce the risk of exposure to other workers and the public. Eg. “Pods,” more frequent cleaning, social distancing • Transmission and Distribution line related work was scaled back to focus on emergency and priority. • Ongoing monitoring. 8 Workforce • BC Hydro anticipates the workforce (primarily contractors) associated with our current capital plans for Bridge River to be between 75-125 workers in 2020. • Most of the construction activity would be concentrated between August 2020 and February 2021. • BC Hydro Boat Operator – anticipate operators needed for fall/winter 2020 to transport workers from the boat dock at Seton Lake to the plant 9 Accommodation • Local accommodation is the priority, wherever possible. o For projects at Bridge 1, Bridge 2 and the Bridge River Terminal substation, spaces in Tsal’álh and Seton Portage will be prioritized. o For projects at Seton (2023/2025), we will look to accommodate workers in Lillooet. o In Lillooet, local hotels or local private houses will be used. 10 Accommodation 2020 (~75-125 workers) o Projects at Bridge River, most workers expected to be accommodated in Tsal’álh/Seton Portage with some in Lillooet. Forecast • 2021 (~25 workers) o ~25 workers at Bridge River mostly accommodated in Tsal’álh/Seton Portage. • 2022 (~10 workers) o ~10 workers on various projects throughout the region accommodated close to the work sites 11 Safety • A BC Hydro Management Plan includes all aspects of safety and emergency response such as: • Travel • Working alone procedures • Code of Conduct • Evacuation • Policies and procedures • No lost time incidents reported last year. 12 Recreation Sites • We’ve begun reopening day- use recreation sites and facilities that allow for physical distancing. • Some recreation sites and campgrounds that attract larger crowds remain closed for the time being. • Bridge River area sites remain closed. These include: o Muddy Clay picnic area o Gun Creek o Seton Beach o Naxwit Picnic Area o Seton Dam campground 13 Community Investment • Post-Secondary Scholarships • 2, $500 scholarships offered to students pursuing post-secondary studies in STEM or trades training • Open to all students graduating from Lillooet Secondary School. • Applications accepted April15 - May 22, 2020. • Community grants • $5,000 • Sk’il Mountain School bike park 14 Communications • Open house • Local ads • Bi-annual newsletter • Project one-pagers • Delegations to local governments • www.bchydro.com/bridgeriver 15 16 .
Recommended publications
  • Upper Bridge River Valley Official Community Plan Bylaw No. Bylaw 608, 1996
    Upper Bridge River Valley Official Community Plan Bylaw No. Bylaw 608, 1996 CONSOLIDATED COPY May 2016 IMPORTANT NOTICE THIS IS AN UNOFFICIAL CONSOLIDATION OF BYLAW NO. 608 WHICH HAS BEEN PREPARED FOR CONVENIENCE ONLY. Although the Squamish-Lillooet Regional District is careful to assure the accuracy of all information presented in this consolidation, you should confirm all information before making any decisions based on it. Information can be confirmed through the SLRD Planning Department. Bylaw 608 ( Consolidated for Convenience Only) May 2016 SUMMARY OF AMENDMENTS CONSOLIDATED FOR CONVENIENCE ONLY Consolidated bylaws are consolidated for convenience only and are merely representative. Each consolidated bylaw consists of the original bylaw text and maps, together with current amendments which have been made to the original version. Copies of all bylaws (original and amendments) may be obtained from the SLRD Planning and Development Department. BY-LAW NO. DATE OF ADOPTION 1022 – 2006 Major Review of Upper Bridge River Valley OCP January 28, 2008 Rezoning a parcel of unsurveyed Crown land from Resource 1094 – 2008 October 26, 2009 Management to Industrial Tyax Real Estate Ltd. text and map amendments plus 1305 - 2014 housekeeping amendment July 28, 2014 PID 024-877-638 (Lot 5, DL 4931, Plan KAP67637, LLD) Creating a Medical Marihuana Production Facility 1309 - 2014 February 25, 2015 Development Permit Area 1440 - 2016 OCP amendments to the Tyax Staff Housing May 25, 2016 Official Community Plan Bylaw No. 608 Page 2 Bylaw 608 ( Consolidated for Convenience Only) May 2016 SQUAMISH LILLOOET REGIONAL DISTRICT BYLAW NO. 1022, 2006 A bylaw of the Squamish Lillooet Regional District to amend the Upper Bridge River Valley Official Community Plan Bylaw No.
    [Show full text]
  • Horseshoe Bend Trail Rails & Trails Made Upofdeepsandand Es
    Code: GC3QN7Z Rails & Trails Written and Researched by Wayne Robinson Horseshoe Bend Trail Site Identification Nearest Community: Lillooet, B.C. Geocache Location: N 50°51.608' W 122°09.318' Ownership: Crown Land Accuracy: 4 meters Photo: Wayne Robinson Overall Difficulty: 2.5 Overall Terrain: 3 The Horseshoe Bend is located on Highway 40, along the Bridge River just south of the confluence of the Bridge Access Information and and Yalakom Rivers. This is an interesting feature marked Restrictions: by a dramatic bend within the river. The canyon walls From the Mile 0 Cairn go north 2 km and turn left on Hwy 40 and follow for are laced with hoodoos and made up of deep sand and 28 km approximately to Horseshoe Bend gravel deposits left behind by retreating glaciers. At pull off. Do not drive down old road. first glance the Horseshoe Bend looks to be a marvel of Beware of cliff edge. Watch for falling geological forces, but it is a human made feature. This rock. Caution if with children and pets. Do not walk on upper rim of Horseshoe feature is sometimes called Horseshoe Wash; this helps Bend. describe the way in which the feature was created, through hydraulic mining for gold. It is amazing that this is a mine. Parking Advice: Operations began here in the 1908 and continued off and Between trees off the road at a natural on until relatively recent times. Between 1908 and 1914 view point. over a million dollars’ worth of gold was extracted from this area (using the historic gold value of $32 per ounce).
    [Show full text]
  • British Columbia Geological Survey Geological Fieldwork 1989
    GEOLOGY AND MINERAL OCCURRENCES OF THE YALAKOM RIVER AREA* (920/1, 2, 92J/15, 16) By P. Schiarizza and R.G. Gaba, M. Coleman, Carleton University J.I. Garver, University of Washington and J.K. Glover, Consulting Geologist KEYWORDS:Regional mapping, Shulaps ophiolite, Bridge REGIONAL GEOLOGY River complex, Cadwallader Group Yalakom fault, Mission Ridge fault, Marshall Creek fault. The regional geologic setting of the Taseko-Bridge River projectarea is described by Glover et al. (1988a) and Schiarizza et al. (1989a). The distributicn and relatio~uhips of themajor tectonostratigraphic assemblages are !;urn- INTRODUCTION marized in Figures 1-6-1 ;and 1-6-2. The Yalakom River area covers about 700 square kilo- The Yalakom River area, comprisinl: the southwertem metres of mountainous terrain along the northeastern margin segment of the project area, encompasses the whole OF the of the Coast Mountains. It is centred 200 kilometres north of Shubdps ultramafic complex which is interpreted by hagel Vancouver and 35 kilometresnorthwest of Lillooet.Our (1979), Potter and Calon et a1.(19901 as a 1989 mapping provides more detailed coverageof the north- (1983, 1986) dismembered ophiolite. 'The areasouth and west (of the em and western ShulapsRange, partly mapped in 1987 Shulaps complex is underlain mainly by Cjceanic rocks cf the (Glover et al., 1988a, 1988b) and 1988 (Schiarizza et al., Permian(?)to Jurassic €!ridge Rivercomplex, and arc- 1989d, 1989b). and extends the mapping eastward to include derived volcanic and sedimentary rocksof the UpperTri %sic the eastem part of the ShulapsRange, the Yalakom and Cadwallader Group. These two assemhkgesare struclurally Bridge River valleys and the adjacent Camelsfoot Range.
    [Show full text]
  • Preliminary Calibration of a Numerical Runout Model for Debris Flows in Southwestern British Columbia
    7th International Conference on Debris-Flow Hazards Mitigation Preliminary calibration of a numerical runout model for debris flows in Southwestern British Columbia Sophia Zubryckya,*, Andrew Mitchella, Jordan Aaronb, Scott McDougalla a Department of Earth, Ocean and Atmospheric Sciences – University of British Columbia, Vancouver, British Columbia, Canada bDepartment of Engineering Geology – ETH Zürich, Zürich, Switzerland Abstract Debris-flow hazard and risk assessments require reliable estimates of inundation area, velocity and flow depth to evaluate spatial impact and impact intensity. Semi-empirical numerical runout models that simulate bulk flow behavior with simple rheological models are useful in forecasting these parameters, however, they require calibration by back-analyzing past events. This paper presents the back-analysis of six debris flows in southwestern British Columbia using a novel automated calibration approach that systematically optimizes the Dan3D runout model to fit field observations. The calibration method yielded good simulations of runout length, but under-predicted flow depths in some cases, and over-predicted velocities in all cases. The best-fit Voellmy rheology parameters for the studied cases ranged from 46 to 531 m/s2 for the turbulence coefficient and 0.08 to 0.18 for the friction coefficient. There is a potential inverse correlation between friction coefficient and event volume. Calibrated parameters were compared to morphometric parameters for the study sites, which may be useful for guiding parameter selection once a larger dataset is calibrated. Ongoing work is focused on refining the calibration technique, including standardization of input parameters more relevant to debris flows. The long-term goal is to apply the technique to a larger dataset of debris-flow cases and provide practitioners with better guidance on the selection of model input parameters for forecasting purposes.
    [Show full text]
  • Aesthetic Impact Informational Services, LLC Remote Viewing
    Aesthetic Impact Informational Services, LLC Remote Viewing Educational Example Remote Viewing Target 130703 Long Freight Train – Canadian Pacific Railway, Seton Lake, British Columbia Coordinates: 130703 Blind Tasking: The target is a location. Describe the location. Online Discussion: https://www.youtube.com/watch?v=pHplxCMHmJc CRV Session Sketches, Summary & Topology Information contributed by Ronald Kuhn, Ohio, USA ----------- Seton Lake is a freshwater fjord draining east via the Seton River into the Fraser River at the town of Lillooet, British Columbia, about 22 km long and 243 m in elevation and 26.2 square kilometres in area.[1] Its depth is 1500 feet. The lake is natural in origin but was raised slightly as part of the Bridge River Power Project, the two main powerhouses of which are on the north shore of the upper end of the lake near Shalalth. At the uppermost end of the lake is the community of Seton Portage and the 1 mouth of the short Seton Portage River, which connects Anderson Lake on the farther side of the Portage to Seton Lake. Retrieved Mar. 1, 2015. http://en.wikipedia.org/wiki/Seton_Lake Image courtesy of Larry Bourne Sketch courtesy of Ronald Kuhn, CRV Intermediate Level Student The Bridge River hydroelectric complex consists of three dams and stores water for four generating stations. The system uses Bridge River water three times in succession to generate 492 megawatts, or 6 to 8 per cent of British Columbia's electrical supply. Hydroelectric development of the system began in 1927 and was completed in 1960. Its waters (Downton Reservoir) initially pass through the Lajoie Dam and powerhouse and are then diverted through tunnels and penstocks from Carpenter Reservoir to the two powerhouses on Seton Lake Reservoir.
    [Show full text]
  • British Columbia Geological Survey Geological Fieldwork 1987
    GEOLOGY OF THE NOAXE CREEK MAP AREA* (920/02) By J. K. Glover, P. Schiarizza and J. I. Garver KEYWORDS: Regional geology, Noaxe Creek, Warner Pass, The '&aughton 'kough: Marine sedimentary strata of he BridgeRiver terrane, Cadwallader terrane, Tyaughton Middle Jurassic to Lower Cretaceous Relay Mountain GrrNugl trough. Yalakom fault, Shulaps ultramafic complex, wrench and the mid-Cretaceous Taqlor Creek and Jackass Mountain faults. groups (Jeletzky and Tipper, 1968). An Upper Cretaceous succession, which comprises her- INTRODUCTION ally discontinuous, nonmarine basinal deposits that grade up into continental volcanicarcrelated rocks, overlies theo13e: The Noaxe Creek map area lies 200 kilometres north of marine strata of the the Tyaughton trough with local pro- Vancouver on the eastern margin of the Coast Mountains, nounced angular unconformity (Glover and Schiarizra, and covers an area of 1000 squarekilometres within the 1987). Chilcotin Range. The topography and vegetation vary from The BridgeRiver terraneand Tyaughton trough are alpine tosubalpine in thewest, southeast and northeast, thought to have been offset from their correlatives to thc: where elevations range up to 2850 metres, to rolling tree- south, the tiozameen Group andMethow basin, by at leas170 covered ridges with intervening broad river valleys in the kilometres of right-lateral strike-slip movement along the central part of the area. north-trending Fraser - Straight Creek fanlt system during Approximately 70 per cent of the area, mostly north of Late Cretaceous (?) and Early Tertiary time (Monger, 19U). Tyaughton and Noaxe creeks, was mapped at ascale of Earlier, post-Albian fragmentation of the Tyaughton-Methow 120 000 by a four-person field crew duringthe 1987 season.
    [Show full text]
  • 10:30 AM Tsal'alh Elders Complex 600 Skiel Mountain Road, Shalalth, BC
    Squamish-Lillooet Regional District Board Minutes June 28 and 29, 2017; 10:30 AM Tsal'alh Elders Complex 600 Skiel Mountain Road, Shalalth, BC In Attendance: Board: J. Crompton, Chair (Whistler); T. Rainbow, Vice-Chair (Area D); D. Demare (Area A); M. Macri (Area B); R. Mack (Area C); M. Lampman (Lillooet); P. Heintzman (Squamish) Absent: District of Squamish (One Director); Village of Pemberton Staff: L. Flynn, CAO (Deputy Corporate Officer); J. Nadon, Communications & Grant Coordinator Delegations: Tsal’alh Chief and Council; D. Wolfin, President & CEO, C. Daley, Corporate Social Responsibility Manager, Fred Sveinson, Senior Mining Advisor, Avino Silver & Gold Mines Ltd.; R. Joubert, General Manager, Tsal'alh Development Corporation; J. Coles, Area Manager, Bridge River Generation, J. Shepherd, Project Manager, M. DeHaan, Technical Principal, Planning & Water Licencing, J. Muir, Community Relations Regional Manager, R. Turner, Construction Manager, Lower Mainland, BC Hydro Others: P. Dahle (Area A - Alternate); D. DeYagher (Area B - Alternate); B. Baker of Britannia Oceanfront Development Corporation; members of the public 1. Call to Order The meeting was called to order at 10:30 AM. The Chair recognized that this meeting is being held on Tsal'alh Traditional Territory. In remembrance of Andrée Janyk 2. Approval of Agenda It was moved and seconded: THAT the following item be moved to immediately after Approval of Agenda: 7.3.2. Request for Decision - Britannia Oceanfront Developments Corporation - Rezoning and OCP Amendment Application Page 2 of 23 of the minutes of the Squamish-Lillooet Regional District Board meeting, held on Wednesday, June 28 and Thursday, June 29, 2017 in the Tsal'alh Elders Complex 600 Skiel Mountain Road, Shalalth, BC.
    [Show full text]
  • E. R. B UCKELL Dominion Entomological Laboratory, Kamloops, B
    ENTOMOLOGICAL SOC. OF BRITISH COLUMBIA, PROC. (1949), VOL. 46, MAY 15, 1950 33 THE SOCIAL WASPS (VESPIDAE) OF BRITISH COLUMBIAl' E. R. B UCKELL Dominion Entomological Laboratory, Kamloops, B. C. AND G. J. SPENCER University of British Columbia, Vancouver, B. C. This paper on the social wasps of etts. for their determination. Frequent British Columbia has been prepared use has been made of Dr. Bequaert's from the collections in the Field Crop publications on the Vespidae (1931- Insect Laboratory, Kamloops, and the 1942), and many points of int,erest University of British Columbia, Van­ therein have been included in this paper. couver. The majority of the specimens were collected by the authors who are The localities from which material greatly indebted to Dr. J. Bequaert, has been recorded have been listed and Museum of Comparative Zoology, Har­ marked by a number on the accompany­ vard College, Cambridge, Massachus- ing map. Family VESPIDAE Vespa alascensis Packard, 1870, Trans. Chi­ cago Ac. Sci .• II. p. 27, PI. II. fig. 10 (I'; Subfamily VESPINAE (Lower Yukon, Alaska). Genus VESPULA C. G. Thomson Vespa westwoodii Shipp, 1893, Psyche, VI. The genus Vespula, with its two sub­ p. 450 (Boreal America). LOCALITIES - Vernon, Salmon Arm, Celista, genera, Vespula and Dolichovespula, in­ Squilax. Adams Lake, Chase, Kamloops, cludes the well known and pugnacious Douglas Lake, Minnie Lake, Bridge Lake, yellow-jackets and hornets. 100 Mile House, Canim Lake, Chilcotin, Alexandria, Quesnel. Barkerville, Prince The paper nests of yellow -jackets and George, Burns Lake, Yale, Skidegate. those of the large black and white, bald­ MATERIAL EXAMINED-24I' • 6 7 ~, 5 o.
    [Show full text]
  • Ghost Towns and Abandoned Settlements
    Ghost Towns and Abandoned Settlements Rumored to be under the waters of Perry Lake.) Padonia Palermo (A small population remains) Paradise (2008 estimated population of 59.) Pardee (Only the Pardee Cemetery remains. Used to be a major stop for the Pony Express.) Harlan (Small population, ruins of Main Street, and a high school gymnasium remains.) Lindsey Havana (Ruins of the Havana Stage Station and hotel remain) Hawkeye (Little remains of the townsite.) Hewins (A small population remains.) Hickory Point Hitschmann (Some old buildings still remain. Named for Pardee Butler, a farmer and preacher who was sent adrift on a raft in the Missouri River by pro-slavery men.) Pawnee Penokee (Small population remains. Route 66 Balaklava Hill Ballarat Bennettville Blue Mountain Bodie Calico Carson Hill Cerro Gordo Chambless Cherokee Chinese Camp Chloride City Coloma Darwin Deadwood (Placer County) Denny Dogtown Drawbridge Drytown Dunmovin Eagle Mountain Essex Freeman Junction Garlock Gibsonville Goffs Goler Heights Greenwater Grub Gulch Hamilton Hart Holy City Ivanpah Iowa Hill Keeler Kelso Kingston Leadfield Lexington Llano Del Rio Lookout City Ludlow Manchester (Monterey County) Mammoth City Masonic Mentryville Midland Mount Ophir New Almaden New Idria North Shore Nortonville Panamint City Picacho Pinacate Port Chicago Port Wine Providence Purissima Red Mountain Randsburg Rice Shasta Siberia Silver Lake Skidoo St. Second-smallest incorporated town in the state.) Freeport (2008 estimated population of 7) Galatia (2000 estimated population of 61.) Geary City (Only foundations remain Gem (2008 estimated population of 87.) Geneva (Little remains of the townsite.) Geuda Springs (2008 estimated population of 191.) Granada (Some ruins and abandoned building remain on what used to be Main Street.) Guilford (Few ruins and structures remains) Guittard Station (Some abandoned buildings remain.
    [Show full text]
  • Seton Portage Motel
    ® Seton Portage Motel Jamie Zroback Jason Zroback [email protected] [email protected] 1 (604) 483-1605 1 (604) 414-5577 ® “The Source” for Oceanfront, Lakefront, Islands, Ranches, Resorts & Land in British Columbia www.landquest.com www.landquest.com Seton Portage Motel PROPERTY DETAILS The separate 1,200 square foot owner’s/managers home includes 3 bedrooms and an office. The residence includes the office for the motel operation Listing Number: 12234 and has a view of the Portage River. It is a two Price: $379,000 storey home with laundry and plenty of storage in the basement. It is surrounded by well-maintained lawns, fruit trees, and garden beds that produce DESCRIPTION very well in this Okanagan-like microclimate. The Seton Portage Motel is located in a beautiful wilderness setting between the pristine Anderson There is a commercially zoned 0.5 acre vacant lot and Seton Lakes. The motel can be run with minimal included in sale, ready for your ideas to expand. staff and is best suited for an owner/operator. This is the only motel is town. It is open year It includes 11 motel units, owner’s residence, round to accommodate summer travelers and laundromat and a 0.5 acre commercially zoned contract personnel working in the area. Contact vacant lot currently kept as a lawn with mature Jason & Jamie for more details including financial cherry tree in the middle. information on the business. It is a well-established turnkey business that has Building Sizes been in operation since 1959 with year round • 1 four-plex - 1,152 square feet business.
    [Show full text]
  • Electoral Area Directors Committee Agenda December 4, 2019; 10:30 AM Pemberton Community Church - Meeting Room 7420 Dogwood St., Pemberton, BC
    Electoral Area Directors Committee Agenda December 4, 2019; 10:30 AM Pemberton Community Church - Meeting Room 7420 Dogwood St., Pemberton, BC Item Item of Business and Page Number Page 1. Call to Order by the Corporate Officer We would like to recognize that this meeting is being held on the Traditional Territory of the Líl’wat Nation. 1.1. Election of 2020 Electoral Area Directors Committee Chair 1.2. Election of 2020 Electoral Area Directors Committee Vice-Chair 2. Approval of Agenda 3. Electoral Area Directors Committee Closed Meeting THAT the Committee close the meeting to the public under the authority of Section 90(1)() of the Community Charter. 4. Rise & Report from the Closed Electoral Area Directors Committee Meeting 5. Consent Agenda (Voting rule on each item may vary; unanimous vote required) Items appearing on the consent agenda which present a conflict of interest for Committee Members must be removed from the Consent Agenda and considered separately. Any items to be debated or voted against must be removed from the Consent Agenda and considered separately. THAT the resolutions set out in the Consent Agenda be approved, and those Consent Agenda items which do not have resolutions related thereto be received. 5.1 Approval and Receipt of Minutes 5.1.1. Electoral Area Directors Committee Meeting Draft 5 - 10 Minutes of November 13, 2019 THAT the Electoral Area Directors Committee Meeting Minutes of November 13, 2019 be approved as circulated. 5.2 Staff Reports & Other Business Item Item of Business and Page Number Page 5.2.1. November 2019 Select Funds Report 11 - 15 6.
    [Show full text]
  • A GUIDE to Aboriginal Organizations and Services in British Columbia (December 2013)
    A GUIDE TO Aboriginal Organizations and Services in British Columbia (December 2013) A GUIDE TO Aboriginal Organizations and Services in British Columbia (December 2013) INTRODUCTORY NOTE A Guide to Aboriginal Organizations and Services in British Columbia is a provincial listing of First Nation, Métis and Aboriginal organizations, communities and community services. The Guide is dependent upon voluntary inclusion and is not a comprehensive listing of all Aboriginal organizations in B.C., nor is it able to offer links to all the services that an organization may offer or that may be of interest to Aboriginal people. Publication of the Guide is coordinated by the Intergovernmental and Community Relations Branch of the Ministry of Aboriginal Relations and Reconciliation (MARR), to support streamlined access to information about Aboriginal programs and services and to support relationship-building with Aboriginal people and their communities. Information in the Guide is based upon data available at the time of publication. The Guide data is also in an Excel format and can be found by searching the DataBC catalogue at: http://www.data.gov.bc.ca. NOTE: While every reasonable effort is made to ensure the accuracy and validity of the information, we have been experiencing some technical challenges while updating the current database. Please contact us if you notice an error in your organization’s listing. We would like to thank you in advance for your patience and understanding as we work towards resolving these challenges. If there have been any changes to your organization’s contact information please send the details to: Intergovernmental and Community Relations Branch Ministry of Aboriginal Relations and Reconciliation PO Box 9100 Stn Prov.
    [Show full text]