Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Expansion 2020 West 401 Tilbury to London, 0.55 km east of Essex Four to six-lane widening, Median Underway 2022 11.2 $40 – $100M Design Design-Build Rd. 42 to 1.8 km west Chatham-Kent Rd. barriers, Bridge rehabilitation Complete 7 (Merlin Rd.), County of Essex, Contract 1 Expansion 2020 West 3 Ellis Side Rd. to Essex Rd. 23, County of Two to four-lane widening Underway 2023 4.9 $40 – $100M Design Design-Build Essex, Contract 1 Complete Expansion 2020 West 401 Waterloo Reg. Rd. 24 (Hespeler Rd.) to Six to ten-lane widening (HOV) Underway 2023 6.5 Over $80M Design Design-Bid- Waterloo Reg. Rd. 33 (Townline Rd.), Complete Build Cambridge Expansion 2022 West 3 Essex Rd. 23 to Essex Rd. 34, Essex Two to four-lane widening Planned 15.6 Over $80M Planning/EA Public Private County, Contract 2 Underway Partnership

Expansion 2022 West 401 Hwy 4 (Colonel Talbot Rd.), Hwy 4 Bridge replacement, Planned 0 $40 – $100M Planning/EA Design-Build underpass and Glanworth Dr. underpass, improvements Underway County of Middlesex Expansion 2023-2024 West 401 1 km west of Hwy 4 to 0.7 km east of Four to six-lane widening Planned 10.1 $40 – $100M Planning/EA To be Wellington Rd., London to Tilbury, Underway determined Contract 2 Expansion 2023-2024 West 401 1.4 km west of Elgin Rd. 20 (Union Rd.) to Four to six-lane widening Planned 9.7 $40 – $100M Planning/EA To be 1.0 km west of Hwy 4 (Colonel Talbot Underway determined Rd.), London to Tilbury, Contract 2

Expansion Upcoming West 6 North of Freelton to Maltby Rd., Guelph New four-lane highway, Six to ten-lane Planned 16.2 Over $80M Planning/EA To be expansion (Morriston ) widening Underway determined Expansion Upcoming West 7, 85 Kitchener to Guelph, Phase 2, 3 New four-lane highway, New bridge Planned 17.8 Over $80M Planning/EA To be expansion Underway determined Expansion 2017 Central 427 Finch Ave. to Major Mackenzie Dr., New highway, HOV expansion Underway 2021 10.6 Over $80M Design Public Private Vaughan Complete Partnership Expansion 2017 Central 400 Major Mackenzie Dr. to King Rd., HOV expansion Underway 2021 10 Over $80M Design Design-Bid- Vaughan Complete Build Expansion 2018 Central 401 Hwy 412 to Brock St., Whitby Resurfacing, Interchange Underway 2021 2.3 $40 – $100M Design Design-Bid- improvements, Bridge replacement Complete Build Expansion 2018 Central 404 Major Mackenzie Dr. to Stouffville Rd., HOV expansion, Culvert rehabilitation Underway 2021 8.2 $40 – $100M Design Design-Bid- Markham, Whitchurch-Stouffville Complete Build Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Expansion 2019 Central 401 Regional Rd. 25 to Credit River Bridge, HOV expansion, Bridge replacement, Underway 2023 17.6 Over $80M Design Public Private Milton, Mississauga Bridge widening, Six to ten-lane Complete Partnership widening (HOV), Six to twelve-lane widening Expansion 2019 Central 404 Hwy 407 to Major Mackenzie Dr., HOV expansion, Bridge replacement Underway 2022 12.9 Over $80M Design Design-Bid- Markham Complete Build Expansion 2022 Central 427, QEW Cawthra Rd. to Dixie Rd., Mississauga New interchange, Bridge rehabilitation, Planned 0 Over $80M Design Design-Bid- Bridge replacement, Culvert Underway Build rehabilitation Expansion 2022 Central 400 King Rd. to Lloydtown-Aurora Rd.,York HOV expansion Planned 12.3 Over $80M Design To be Underway determined Expansion 2023-2024 Central QEW Garden City Skyway, St. Catharines New bridge, Bridge rehabilitation Planned 0 Over $80M Design To be Underway determined Expansion 2023-2024 Central 400 Langstaff Rd. to King Rd., York HOV expansion Planned 14.5 Over $80M Design To be Upcoming determined Expansion Upcoming Central TBD Bradford Bypass, Bradford New highway Planned 16.2 Over $80M Design To be expansion Upcoming determined Expansion 2017 Eastern 417 Maitland Ave. to Island Park Dr., Ottawa Bridge rehabilitation, Six to eight-lane Underway 2021 4.9 $40 – $100M Design Design-Bid- widening, Bridge widening Complete Build Expansion 2021 Eastern 417 Carling Ave. Kirkwood Ave. and Saigon Safety improvements Planned 2022 1.2 $0 – $10M Design Design-Bid- Crt., Ottawa Complete Build Expansion 2021 Eastern 17 Calabogie Rd., Renfrew Intersection improvements Underway 2023 0 $15 – $50M Design Design-Build Complete Expansion 2023-2024 Eastern 17 Scheel Dr. to 3 km west of Bruce St., Two to four-lane widening, New Planned 22.5 Over $80M Planning/EA Public Private Renfrew interchange, New bridge, Bridge Underway Partnership replacement, Bridge widening

Rehab 2019 West 401 Patrol yard on Hwy 401 at Regional Rd. New facility Underway 2021 0 $15 – $50M Design Design-Bid- 97, Ayr Complete Build Rehab 2019 West 21 Bayfield River Bridge, Bayfield Bridge replacement Underway 2021 0 $15 – $50M Design Design-Bid- Complete Build Rehab 2019 West 6 Caledonia bypass, Haldimand County Reconstruction Underway 2021 7 $15 – $50M Design Design-Bid- Complete Build Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2019 West 401 Old Victoria Rd., London to Middlesex Rd. Bridge replacement, Resurfacing, Underway 2022 6 $15 – $50M Design Design-Bid- 32 (Dorchester Rd.), Middlesex Rd. 74 Interchange improvements Complete Build (Westchester Borne) underpass,Thames Centre Rehab 2020 West 21 Lambton Rd. 7 (Lakeshore Rd.) to Grand Resurfacing Underway 2021 22.8 $8 – $20M Design Design-Bid- Bend south limits, Lambton Complete Build Rehab 2020 West 6 Lindsay Rd. 20, Miller Lake to Tobermory, Resurfacing Underway 2021 30 $8 – $20M Design Design-Bid- Bruce Complete Build Rehab 2020 West 402 Lambton Rd. 79 (Nauvoo Rd.) to Resurfacing, Bridge rehabilitation Underway 2021 22 $15 – $50M Design Design-Bid- Middlesex Rd. 39 (Hickory Dr.) and Airport Complete Build Rd. Interchange Rehab 2020 West 3, 6 Various locations, Haldimand County Bridge rehabilitation Underway 2021 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2020 West 21, 402 Hwy 402 to Forest, Lambton Resurfacing Underway 2021 10.4 $8 – $20M Design Design-Bid- Complete Build Rehab 2020 West 4 Saintsbury Line, Lucan Intersection improvements Underway 2021 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2020 West 6 Kenilworth to Mount Forest, County of Resurfacing Underway 2021 11.7 $0 – $10M Design Design-Bid- Wellington Complete Build Rehab 2020 West 402 Various locations, Lambton Intelligent transportation systems Underway 2021 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2020 West 21 Gully Creek Culvert, Bayfield Culvert replacement Underway 2021 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2020 West 402 Truck rest area at the former north truck Facility improvements Underway 2021 0 $0 – $10M Design Design-Bid- inspection facility, Lambton County Complete Build

Rehab 2021 West 3 Essex Rd. 34 (Union Ave.) to Hwy 77, Resurfacing Underway 2021 6 $0 – $10M Design Design-Bid- Leamington Complete Build Rehab 2021 West 40 Wallaceburg to Stanley Line, Lambton Resurfacing Underway 2021 17.5 $8 – $20M Design Design-Bid- Complete Build Rehab 2021 West 401, 77 Essex Rd. 46, Comber to Hwy 401, Reconstruction Underway 2021 1.6 $0 – $10M Design Design-Bid- County of Essex Complete Build Rehab 2021 West 401 Grand River Bridges, Kitchener Bridge replacement Underway 2025 5.7 Over $80M Design Construction Complete Manager General Contractor Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2021 West 401 Dingman Dr. underpass, London Bridge replacement Underway 2022 0 $8 – $20M Design Design-Bid- Complete Build Rehab 2021 West 403 West Quarter Townline Rd. to Bridge rehabilitation, Resurfacing Underway 2022 11.8 $8 – $20M Design Design-Bid- Bishopsgate Rd., County of Brant Complete Build Rehab 2021 West 7 Alder Creek Culvert, west of Kitchener Culvert rehabilitation Underway 2021 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2021 West 402 Various locations, London to Sarnia Signage Planned 2021 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2021 West 7, 85 Various locations, Waterloo Signage Planned 2022 0 $0 – $10M Design Design-Build Complete Rehab 2021 West 3 Norfolk Rd. 59 north (Big Creek Dr.), Delhi Intersection improvements Planned 2021 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2021 West 3 1.0 km west of Walker Rd. (Essex Rd. 11) Road works Planned 2021 12 $0 – $10M Design Design-Bid- to Essex Rd. 8 Complete Build Rehab 2021 West 7 0.4 km west of Waterloo Regional Rd. 1 Resurfacing Planned 2021 5 $0 – $10M Design Design-Bid- to 0.5 km east of Waterloo Regional Rd. 4 Underway Build (Bleams Rd.), Regional Municipality of Waterloo Rehab 2021 West 401 Victoria Rd. to Furnival Rd., eastbound Resurfacing Planned 2021 12.9 $8 – $20M Design Design-Bid- lanes, Chatham-Kent and Elgin County Underway Build

Rehab 2016 Central 400 Willow Creek, Bridge rehabilitation Underway 2021 0 $15 – $50M Design Design-Bid- Complete Build Rehab 2017 Central 401 Leslie St. eastbound off-ramp CNR Interchange improvements Underway 2021 0 $15 – $50M Design Design-Bid- overhead at Leslie St., Complete Build Rehab 2017 Central 400 King Rd. to Hwy 9, 16th Side Rd., Aurora Bridge replacement Underway 2022 0 $40 – $100M Design Design-Bid- Side Rd., King Complete Build Rehab 2017 Central QEW QEW south end Burlington Bay Skyway to Bridge rehabilitation Underway 2021 0 $15 – $50M Design Design-Bid- North Shore Blvd. East, Hamilton Complete Build

Rehab 2018 Central QEW QEW/403/Ford Dr. interchange, Upper Bridge rehabilitation, Resurfacing Underway 2021 9.1 $40 – $100M Design Design-Bid- Middle Rd., Phase 3, Oakville Complete Build Rehab 2018 Central 401 Hwy 401/403/410 interchange, Phase 2, Bridge rehabilitation, Culvert Underway 2021 0 $15 – $50M Design Design-Bid- Mississauga rehabilitation Complete Build Rehab 2018 Central 401 Dufferin St., Allen Rd. interchange, Bridge rehabilitation, Resurfacing Underway 2021 4.9 $40 – $100M Design Design-Bid- Toronto Complete Build Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2018 Central 58 Thorold Tunnel, Thorold Tunnel rehabilitation Underway 2021 0 $15 – $50M Design Design-Bid- Complete Build Rehab 2018 Central QEW Etobicoke Creek to The East Mall, Phase Bridge rehabilitation, Bridge Underway 2021 2.2 $40 – $100M Design Design-Bid- 1, Toronto replacement, Resurfacing Complete Build Rehab 2018 Central 406 Westchester Ave., Twelve Mile Creek, Bridge rehabilitation Underway 2021 0 $15 – $50M Design Design-Bid- Phase 1, St. Catharines Complete Build Rehab 2019 Central 401 Renforth Dr., Carlingview Dr., Eglinton Bridge rehabilitation, Resurfacing Underway 2021 3.6 $15 – $50M Design Design-Bid- Ave., Hwy 427 interchange, Phase 1, Complete Build Toronto Rehab 2019 Central QEW CNR/Conrail overhead, Frenchman's Bridge rehabilitation, Culvert Underway 2021 0 $40 – $100M Design Design-Bid- Creek, QEW ramps at Gilmore Rd, Fort rehabilitation Complete Build Erie Rehab 2019 Central QEW North Shore Blvd., Phase 2, Burlington Bridge rehabilitation Underway 2022 0 $15 – $50M Design Design-Bid- Complete Build Rehab 2019 Central 401 Westbound express/collector lanes Bridge rehabilitation, Resurfacing Underway 2024 15 Over $80M Design Design-Bid- Neilson Rd. to Warden Ave., Markham Complete Build Rd., twenty bridges, Birchmount Rd. to Rehab 2019 Central 427 Bloor St., Burnhamthorpe Rd., Rathburn Bridge rehabilitation Underway 2022 0 $15 – $50M Design Design-Bid- Rd., Toronto Complete Build Rehab 2019 Central 410 Courtneypark Dr. to Queen St., Brampton Bridge rehabilitation, Culvert Underway 2022 0 $40 – $100M Design Design-Bid- rehabilitation, Interchange Complete Build improvements Rehab 2019 Central 401 Neilson Rd. to Whites Rd., eastbound Bridge rehabilitation, Bridge Underway 2023 18 Over $80M Design Design-Bid- express/collector lanes, Neilson Rd. to replacement, Culvert rehabilitation, Complete Build Rougemount Dr., Petticoat Creek, Resurfacing Toronto, Pickering Rehab 2019 Central QEW Ussher's Creek, Welland River CPR Bridge replacement, Culvert Underway 2022 0 $40 – $100M Design Design-Bid- overhead, south of McLeod Rd., Niagara rehabilitation Complete Build Falls Rehab 2019 Central 400 Hwy 89, Cookstown, Bridge replacement Underway 2022 0 $15 – $50M Design Design-Bid- Complete Build Rehab 2020 Central 400, 401 Hwy 400, Jane St., Blackcreek Dr. Bridge replacement, Bridge Underway 2022 0 $15 – $50M Design Design-Bid- interchange, Toronto rehabilitation Complete Build Rehab 2020 Central QEW Dorval Rd., Kerr St. interchange, Oakville Intersection improvements Underway 2022 0 $0 – $10M Design Design-Bid- Complete Build Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2020 Central 401 Hwy 401 eastbound express, Islington Resurfacing Underway 2021 7 $8 – $20M Design Design-Bid- Ave. to Keele St., Toronto Complete Build Rehab 2020 Central 140, 3, 58 Various locations on Hwy 3, CNR/CPR Culvert rehabilitation, Bridge Underway 2021 0 $0 – $10M Design Design-Bid- overhead, Biederman Drain on Hwy 58, rehabilitation Complete Build various locations on Hwy 140, Townline Rd. to East Main St., Welland

Rehab 2020 Central QEW Hwy 405 to east end of Garden City Bridge replacement, Resurfacing Underway 2023 6.4 $40 – $100M Design Design-Build Skyway, Glendale Ave., St. Catharines Complete

Rehab 2020 Central QEW Various locations Fifty Rd. to Centennial Culvert rehabilitation, Culvert Underway 2022 0 $0 – $10M Design Design-Bid- Pkwy, Hamilton replacement Complete Build Rehab 2020 Central 404 Hwy 401 to Hwy 7, Sheppard Ave., CNR, Bridge rehabilitation, Culvert Underway 2023 19 $40 – $100M Design Design-Bid- John St., south of Hwy 407, Toronto, rehabilitation, Resurfacing Complete Build Markham Rehab 2021 Central QEW QEW/Credit River Bridge, Mississauga New bridge, Bridge rehabilitation, Underway 2026 0 Over $80M Design Public Private Resurfacing, Interchange Complete Partnership improvements Rehab 2021 Central 12 Triple Bay Rd. and Rumney Rd., Traffic signals Underway 2021 0 $0 – $10M Design Design-Bid- Township of Tay, Complete Build Rehab 2021 Central 401 Hwy 401 eastbound express, Keele St. to Bridge rehabilitation, Resurfacing Underway 2023 5.2 $15 – $50M Design Design-Bid- Avenue Rd., Kipling Ave. to Hwy 400 Complete Build interchange westbound express, Wilson Ave., Bathurst St., Dufferin St., CNR overhead, Toronto Rehab 2021 Central 401 Hwy 401 westbound, west of Stevenson Bridge rehabilitation, Bridge Underway 2021 9.5 $0 – $10M Design Design-Bid- Rd. to west of Courtice Rd., Oshawa replacement, Resurfacing Complete Build Creek, Oshawa Rehab 2021 Central 400 Various locations, York, Durham, Simcoe Culvert replacement Planned 2021 0 $0 – $10M Design Design-Bid- Underway Build Rehab 2021 Central 26 Hanmer St. to Simcoe Rd. 27, Resurfacing, Centre turn lane Planned 2021 3.5 $8 – $20M Design Design-Bid- Springwater Complete Build Rehab 2021 Central 9 Holland Drainage Canal, Bradford-West Bridge replacement Planned 2023-2024 0 $8 – $20M Design Design-Bid- Gwillimbury Underway Build Rehab 2021 Central 406 Geneva St., Fourth Ave., Dick's Creek, Bridge rehabilitation, Culvert Planned 2022 0 $8 – $20M Design Design-Bid- Phase 2, St. Catharines rehabilitation Complete Build Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2021 Central 400 Anne St., Barrie Bridge replacement Planned 2022 0 $40 – $100M Design Design-Bid- Complete Build Rehab 2019 Northeastern 35 Gull River, Miners Bay, Black Creek, Bridge rehabilitation, Culvert Underway 2021 0 $0 – $10M Design Design-Bid- Moore Falls rehabilitation Complete Build Rehab 2020 Northeastern 17, 400, 69 Replacement of six variable message Overhead signage Underway 2026 0 $0 – $10M Design Design-Bid- signs, north of Horseshoe Lake, south of Complete Build Shawanaga, Grundy Lake, Sudbury, Sault Ste. Marie Rehab 2020 Northeastern 11 Doe Lake Rd. interchange northerly to Resurfacing Underway 2021 6.9 $8 – $20M Design Design-Bid- Hwy 118 interchange, Gravenhurst Complete Build Rehab 2020 Northeastern 60 Hwy 35 easterly to Algonquin Park west Culvert rehabilitation, Resurfacing Underway 2021 20.8 $0 – $10M Design Design-Bid- gate, east of Huntsville Complete Build Rehab 2021 Northeastern 11 Rest area on Ryland, 11.5 km west of Facility improvements Underway 2021 0 $0 – $10M Design Design-Bid- Hearst town limits, Hearst Complete Build Rehab 2021 Northeastern 11 Hwy 11/Muskoka Rd. 117 interchange in Culvert rehabilitation Underway 2022 0 $0 – $10M Design Design-Bid- Bracebridge and Beaver Creek Culvert in Complete Build Gravenhurst Rehab 2021 Northeastern 118 1.3km west of the junction of Hwy 35, Culvert replacement Planned 2021 0 $0 – $10M Planning/EA Design-Build Canarvan Complete Rehab 2021 Northeastern 11 South Mary Lake Rd., south of Huntsville Intersection improvements Planned 2021 2 $0 – $10M Design Design-Bid- Underway Build Rehab 2021 Northeastern 11, 400 2.3km south of the junction of Muskoka Culvert replacement Planned 2021 0 $0 – $10M Design Design-Bid- Rd. 117, Bracebridge and 1.4km north of Complete Build Honey Harbour Rd., Port Severn

Rehab 2021 Northeastern 141 1 km east of Lake Rosseau Rd. 2, Culvert replacement Planned 2021 0 $0 – $10M Design Design-Bid- Rosseau Complete Build Rehab 2021 Northeastern 118 East of County Rd. 21 easterly, east of Resurfacing Planned 2021 4.6 $0 – $10M Design Design-Bid- Haliburton Underway Build Rehab 2021 Northeastern 11 South junction Muskoka Rd. 3 Bridge rehabilitation, Culvert Planned 2022 1.5 $0 – $10M Design Design-Bid- interchange, Muskoka Rd. 2 underpass, replacement Complete Build Huntsville Rehab 2016 Eastern 33 Amherst Island Ferry Service, Millhaven, Dock replacements Underway 2021 0 $40 – $100M Design Design-Build Hwy 33 and Stella, Amherst Island Complete Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2017 Eastern N/A Amherst Island Ferry and Wolfe Island New vessel Underway 2023 0 Over $80M Design Design-Build Ferry, Kingston Complete Rehab 2018 Eastern 49 Bay of Quinte Skyway, Deseronto Bridge rehabilitation Underway 2024 0 $40 – $100M Design Design-Bid- Complete Build Rehab 2018 Eastern 118, 28, 7 Ouse River, Norwood, Haultain / Eels Bridge replacement, Culvert Underway 2022 0 $15 – $50M Design Design-Build Creek, Woodview River, Irondale River, replacement Complete Cardiff Rehab 2019 Eastern 401 County Rd. 2 / 34, Raisin River, Finney Bridge replacement, Culvert Underway 2022 0 $40 – $100M Design Design-Bid- Creek, Lancaster rehabilitation Complete Build Rehab 2019 Eastern 17 Muskrat Creek, Cobden Creek, Barbut Culvert replacement Underway 2021 0 $0 – $10M Design Design-Build Creek, Deux Rivieres Complete Rehab 2019 Eastern 17, 60 Deils Creek, Dochart Creek, Douglas Culvert replacement, Culvert Underway 2021 0 $8 – $20M Design Design-Bid- Creek and Locha Creek, County of rehabilitation Complete Build Renfrew Rehab 2019 Eastern 417 Innes Rd., Ramsayville Rd., Ottawa Culvert replacement, Bridge Underway 2022 0 $15 – $50M Design Design-Bid- replacement, Bridge rehabilitation Complete Build Rehab 2020 Eastern 401 Commercial vehicle inspection facility, Commercial vehicle inspection facility Underway 2021 0 $15 – $50M Design Design-Bid- and truck rest area, Gananoque Complete Build

Rehab 2020 Eastern N/A Ferry services maintenance facility, Facility improvements Underway 2021 0 $15 – $50M Design Design-Bid- Kingston Complete Build Rehab 2020 Eastern 401 County Rd. 30, Brighton Interchange improvements, Culvert Underway 2021 1 $8 – $20M Design Design-Bid- replacement Complete Build Rehab 2020 Eastern 41 Denbigh to Eganville, Hastings Lennox Culvert replacement, Culvert Underway 2021 57.4 $0 – $10M Design Design-Bid- and Addington rehabilitation Complete Build Rehab 2020 Eastern 401 Hwy 416 to Shanly Rd., United Counties Culvert replacement, Culvert Underway 2021 13.1 $0 – $10M Design Design-Bid- of Leeds and Grenville rehabilitation, Paved shoulders Complete Build

Rehab 2020 Eastern N/A Wolfe Island Ferry Service, lowering of Marine services rehab Underway 2021 0 $15 – $50M Design Design-Bid- river bed channel, Kingston Complete Build Rehab 2020 Eastern 401 Mallorytown to County Rd. 2, Brockville Culvert replacement, Culvert Underway 2021 12 $0 – $10M Design Design-Bid- rehabilitation, Paved shoulders Complete Build Rehab 2020 Eastern N/A Wolfe Island Ferry Service, shoreline Dock replacements Underway 2022 0 $40 – $100M Design Design-Bid- infrastructure upgrades, Marysville, Complete Build Township of Frontenac Islands Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2020 Eastern 7 CNR overhead, Pkwy Queensway Bridge rehabilitation Underway 2022 0 $15 – $50M Design Design-Bid- interchange, Bensfort Rd., Ashburnham Complete Build Dr. and Otonabee River, Peterborough

Rehab 2020 Eastern N/A Wolfe Island Ferry Service, shoreline Dock replacements Underway 2023 0 Over $80M Design Design-Bid- infrastructure upgrades, Kingston Complete Build Rehab 2020 Eastern 401 Maintenance patrol garage, Grafton Facility improvements Underway 2022 0 $8 – $20M Design Design-Build Complete Rehab 2020 Eastern 17 Nipissing District boundary to Chalk River, Culvert replacement, Culvert Underway 2021 87.7 $8 – $20M Design Design-Bid- County of Renfrew rehabilitation, Resurfacing Complete Build Rehab 2020 Eastern 15 4 km north of Joyceville, Kingston Culvert replacement Underway 2021 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2021 Eastern 17 Scheel Dr. to Bruce St., Renfrew Culvert rehabilitation, Culvert Underway 2021 23.5 $0 – $10M Design Design-Bid- replacement, Resurfacing Complete Build

Rehab 2021 Eastern 417 Mid-Town Bridges, Ottawa Bridge replacement, Interchange Underway 2025 0 Over $80M Design Construction improvements, Noise barriers Complete Manager General Rehab 2021 Eastern 41 Machesney Lake Rd. to Vennachar Resurfacing Underway 2021 16 $0 – $10M Design Design-Bid- junction, County of Lennox and Addington Complete Build

Rehab 2021 Eastern 417 Casselman to east of Hwy 138, Glengarry Reconstruction, Culvert replacement, Underway 2022 13 $40 – $100M Design Design-Bid- Prescott Russell Culvert rehabilitation Complete Build Rehab 2021 Eastern 401 Palace Rd., Napanee Bridge rehabilitation Planned 2021 1 $0 – $10M Design Design-Bid- Complete Build Rehab 2021 Eastern 401 Palace Rd., Napanee Bridge rehabilitation Planned 2021 1 $0 – $10M Design Design-Bid- Complete Build Rehab 2021 Eastern 7 Angeline St. to Hwy 35, Kawartha Lakes Two to four-lane widening, Culvert Planned 2023-2024 2.9 $8 – $20M Design Design-Bid- rehabilitation Underway Build Rehab 2021 Eastern 35 Patrol yard on Glenarm Rd., Haliburton New facility Planned 2023-2024 0 $8 – $20M Planning/EA Design-Build Kawartha Lakes Brock Underway Rehab 2021 Eastern 15 Seeley’s Bay to Smiths Falls, Leeds and Culvert rehabilitation Planned 2021 0 $0 – $10M Design Design-Bid- Grenville Complete Build Rehab 2021 Eastern 41 Griffith to Eganville, County of Renfrew Resurfacing Planned 2022 42.1 $0 – $10M Design Design-Bid- Complete Build Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2021 Eastern 33 Hwy 33 South Fredericksburgh shoreline Erosion control Planned 2022 10.2 $0 – $10M Design Design-Bid- protection, Kingston Underway Build Rehab 2021 Eastern 401 Carman Rd. to Upper Canada Rd., United Resurfacing, Culvert rehabilitation, Planned 2022 20.5 $15 – $50M Design Design-Bid- Counties of Stormont, Dundas and Culvert replacement Complete Build Glengarry Rehab 2021 Eastern 35 Coboconk to Haliburton Boundary, Resurfacing Planned 2022 15.4 $0 – $10M Design Design-Bid- Kawartha Lakes Underway Build Rehab 2021 Eastern 60 Wilno to Golden Lake, Renfrew Resurfacing, Culvert replacement, Planned 2022 46 $8 – $20M Design Design-Bid- Culvert rehabilitation Complete Build Rehab 2021 Eastern 62 L'Amable to Bancroft, County of Hastings Resurfacing Planned 2021 6.3 $0 – $10M Design Design-Bid- Complete Build

Rehab 2022 West 40 London Line, Sarnia Bridge rehabilitation Planned 2022 0 $0 – $10M Design Design-Bid- Underway Build Rehab 2022 West 401 Sweaburg Rd. to Norwich Ave., Resurfacing Planned 2023-2024 3 $0 – $10M Design Design-Bid- Woodstock Underway Build Rehab 2022 West 401 1.1 km east of Oxford Hwy 2 (Dundas St.) Resurfacing Planned 2022 12.2 $15 – $50M Design Design-Bid- to 4.1 km east of Oxford Rd. 29 (Drumbo Upcoming Build Rd.), Oxford County Rehab 2022 West 401 CNR overhead, Pond Mills overpass, Bridge replacement, Interchange Planned 0 Over $80M Planning/EA Design-Build Highbury Ave. underpass, London improvements Underway Rehab 2022 West 21 Hwy 21 Tiverton (McLaren St.) to Port Resurfacing Planned 2022 22 $0 – $10M Design Design-Bid- Elgin Upcoming Build Rehab 2022 West 401 Middlesex Rd. 32 (Dorchester Rd.) Interchange improvements, Planned 2023-2024 1.7 $15 – $50M Planning/EA Design-Build underpass, Thames Centre Resurfacing, Bridge replacement Complete Rehab 2022 West 6 Mckenzie Creek Bridge, Haldimand Bridge replacement Planned 2022 0 $0 – $10M Design Design-Bid- County Underway Build Rehab 2022 West 3 Cayuga to Haldimand Rd. 56, Canfield Resurfacing Planned 2022 6.8 $0 – $10M Design Design-Bid- Underway Build

Rehab 2022 West 401 2.5 km east of Furnival Rd. to 0.7 km west Resurfacing Planned 2022 5.6 $0 – $10M Design Design-Bid- of Currie Rd., eastbound lanes, Dutton Upcoming Build

Rehab 2022 West 40 CNR overhead, Sarnia Bridge replacement Planned 2023-2024 0 $8 – $20M Design Design-Bid- Underway Build Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2022 West 401 2.5 km east of Furnival Rd. to 0.7 km west Resurfacing Planned 2022 4.9 $0 – $10M Design Design-Bid- of Currie Rd., westbound lanes, Dutton Upcoming Build

Rehab 2022 West 403 Wayne Gretzky Pkwy, Brantford Interchange improvements Planned 2022 0 $0 – $10M Design Design-Bid- Underway Build Rehab 2022 West 403 Garden Ave. to Regional Boundary, Brant Resurfacing Planned 2022 4.5 $0 – $10M Design Design-Bid- Underway Build Rehab 2022 West 9 Bruce Rd. 4 to Walkerton, County of Resurfacing Planned 2023-2024 13.4 $0 – $10M Planning/EA Design-Build Bruce In Procurement

Rehab 2022 West 9 Mildmay to Clifford, Bruce and Huron Resurfacing Planned 2023-2024 11.4 $8 – $20M Planning/EA Design-Build County Underway Rehab 2022 West 401 Middlesex Rd. 32 (Putnam Rd.) overpass Bridge rehabilitation, Resurfacing Planned 2023-2024 10 $15 – $50M Planning/EA Design-Build to Hwy 19, Ingersoll Underway Rehab 2022 West 24 Brant Rd. 5/99 (Governor's Rd.) to Brant Resurfacing Planned 2022 3.8 $0 – $10M Design Design-Bid- Rd. 5 (Blue Lake Rd.), County of Brant Underway Build

Rehab 2022 West 403 CNR subway, Brantford Bridge rehabilitation Planned 2022 0 $0 – $10M Design Design-Bid- Underway Build Rehab 2022 West 402 Murphy Rd. to Lambton Rd. 26 Resurfacing Planned 2022 11.9 $0 – $10M Design Design-Bid- (Mandaumin Rd.), Sarnia Underway Build Rehab 2022 West 402 Colonel Talbot Rd. to Hwy 401, London Resurfacing Planned 2022 10.6 $8 – $20M Design Design-Bid- Underway Build Rehab 2022 West 24 Osbourne Corners to Brantford north Reconstruction Planned 2022 2.1 $0 – $10M Design Design-Bid- limits, County of Brant Underway Build Rehab 2022 West 401 Roseville Rd. underpass, Regional Bridge rehabilitation, Culvert Planned 2023-2024 0 $8 – $20M Design Design-Bid- Municipality of Waterloo rehabilitation Underway Build Rehab 2022 West 403 Hwy 401 to west of West Quarter Reconstruction, Bridge rehabilitation Planned 2023-2024 12 $15 – $50M Planning/EA Design-Build Townline Rd., County of Brant Underway Rehab 2022 West 402 Middlesex Rd. 39 (Hickory Dr.) to Resurfacing Planned 2022 16.5 $8 – $20M Design Design-Bid- Middlesex Rd. 2 (Longwoods Rd.), Complete Build Strathroy Caradoc Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2022 West 6 Argyle St. Grand River Bridge, Caledonia Bridge replacement Planned 0 $40 – $100M Design Construction Complete Manager General Contractor Rehab 2022 Central 12, 7 North junction Hwy 7 to south of Durham Resurfacing, Culvert rehabilitation Planned 2022 17.2 $0 – $10M Design Design-Bid- Rd. 13, Scugog Underway Build Rehab 2022 Central 406 North of Port Robinson Rd. to south of Resurfacing, Culvert rehabilitation Planned 2023-2024 2.5 $0 – $10M Design Design-Bid- Beaverdams Rd., Francis Creek, St. Underway Build Catharines Rehab 2022 Central 48 Little Rouge Creek, Whitchurch-Stouffville Culvert replacement Planned 2022 0 $0 – $10M Design Design-Bid- Underway Build Rehab 2022 Central 427 The West Mall over Dundas St., Hwy 427 Bridge rehabilitation Planned 2022 0 $0 – $10M Design Design-Bid- ramps, Toronto Underway Build

Rehab 2022 Central 401 Courtice Rd. overpass, Tooley Creek Bridge rehabilitation, Culvert Planned 2023-2024 0 $0 – $10M Design Design-Bid- culvert, Clarington rehabilitation Underway Build Rehab 2022 Central 400 Various locations, Toronto, Muskoka, Culvert rehabilitation Planned 2022 0 $0 – $10M Design In Design-Bid- Simcoe, York, Durham Procurement Build

Rehab 2022 Central 401 Eastbound collector lanes Avenue Rd. to Bridge rehabilitation, Bridge Planned 10.5 Over $80M Design Design-Bid- Warden Ave., Leslie St. interchange, replacement, Resurfacing Underway Build ramp to southbound Don Valley Pkwy, Phase 2, Toronto Rehab 2022 Central 11 West St., Orillia Bridge replacement Planned 2023-2024 0 $15 – $50M Design Design-Bid- Underway Build Rehab 2022 Central 401 Westney Rd., Duffins Creek, Ajax Bridge replacement, Bridge Planned 2022 0 $0 – $10M Design Design-Bid- rehabilitation Underway Build Rehab 2022 Central 401 Waverly Rd., Bowmanville Creek, Liberty Bridge rehabilitation, Bridge Planned 2023-2024 0 $8 – $20M Design Design-Bid- St., Soper Creek, Bowmanville replacement Underway Build

Rehab 2022 Central 401 Simcoe St., Albert St., Durham Bridge replacement Planned 0 $40 – $100M Design Design-Bid- Underway Build Rehab 2022 Central 401 Carruthers Creek, Thickson Rd., MTO Bridge rehabilitation, Culvert Planned 2023-2024 0 $0 – $10M Design Design-Bid- Inspection Facility, Corbett Creek, rehabilitation Underway Build Oshawa Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2022 Central 403 QEW/403/407 interchange Guelph Rd. to Resurfacing Planned 2022 7.6 $8 – $20M Design Design-Bid- Hwy 6, Hamilton Underway Build Rehab 2022 Central QEW Various locations, Peel, Halton, Hamilton, Culvert rehabilitation Planned 2023-2024 0 $8 – $20M Design Design-Bid- Niagara Underway Build Rehab 2022 Central 403 Brant County boundary easterly to Wilson Resurfacing Planned 2023-2024 16.8 $8 – $20M Design Design-Bid- St., Hamilton Underway Build Rehab 2022 Central 5, 6, 8 Hwy 6/Plains Rd., Hwy 5, Middletown Rd., Intersection improvements Planned 2023-2024 0 $0 – $10M Design Design-Bid- Hwy 8, Woodhill Rd., Peter's Corners Underway Build

Rehab 2022 Central 400 Innisfil 6th Line, Innisfil Culvert rehabilitation Planned 2022 0 $0 – $10M Design Design-Bid- Upcoming Build Rehab 2022 Central 401, 403 Hwy 401/403/410 interchange, Eglinton Bridge rehabilitation, Culvert Planned 0 $15 – $50M Design Design-Bid- Ave., Phase 4A Mississauga rehabilitation Underway Build Rehab 2022 Central 401 Hwy 427 to Kipling Ave., Hwy 401 west to Bridge rehabilitation, Resurfacing Planned 2023-2024 3.6 $40 – $100M Design Design-Bid- Dixon Rd., Toronto Underway Build Rehab 2022 Central 7A Scugog Rd., Scucog Line 6, Scugog Culvert rehabilitation Planned 2022 0 $0 – $10M Design Design-Bid- Underway Build Rehab 2022 Central 11 Memorial Ave., Sundial Dr., Orillia Bridge rehabilitation, Bridge Planned 2023-2024 0 $15 – $50M Design Design-Bid- Township Rd., Muskoka Rd., Simcoe Rd. replacement Underway Build 169, Canal Rd., Orillia, Severn Rehab 2022 Central 89 Industrial Pkwy to west of Simcoe Rd. 50, Resurfacing Planned 2023-2024 8.8 $0 – $10M Design Design-Bid- Adjala-Tosorontio Underway Build Rehab 2022 Central 400 Southbound lanes Steeles Ave. to Hwy 7, Bridge rehabilitation, Resurfacing Planned 2023-2024 7 $15 – $50M Design Design-Bid- north/southbound lanes Hwy 7 to Underway Build Langstaff Rd., Steeles Ave., Vaughan Twp. CNR, Vaughan Rehab 2022 Central 400 Essa Rd. overpass, Barrie Bridge replacement, Interchange Planned 0 Over $80M Design Design-Bid- improvements Underway Build Rehab 2022 Central 115, 35 Main St. north junction (Durham Rd. 17) to Bridge rehabilitation, Resurfacing Planned 2023-2024 21 $15 – $50M Design Design-Bid- Hwy 115, Regional Rd. 4, 7th Line, 8th Underway Build Line, Hwy 35 connection, Durham Boundary Rd., Clarington Rehab 2022 Central 404 Stouffville Rd. to Mulock Dr., Whitchurch - Bridge replacement, Culvert Planned 2023-2024 16.5 $40 – $100M Design Design-Bid- Stouffville rehabilitation, Bridge rehabilitation, Underway Build Resurfacing, Median barriers Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2022 Central 400 Innisfil Beach Rd., CNR overhead, Innisfil Bridge rehabilitation, Bridge Planned 0 $40 – $100M Design Design-Bid- replacement Underway Build Rehab 2022 Northeastern 118 East of Hwy 11 easterly to Haliburton Paved shoulders, Resurfacing Planned 2023-2024 26.6 $8 – $20M Design Design-Bid- County and Muskoka District boundary, Underway Build Bracebridge Rehab 2022 Northeastern 17 West of North Bay Environmental cleanup Planned 2023-2024 0 $0 – $10M Design Design-Bid- Underway Build Rehab 2022 Northeastern 118 Hwy 35 easterly, Carnarvon to Haliburton Resurfacing, Paved shoulders, Centre Planned 2023-2024 23.1 $15 – $50M Design Design-Bid- turn lane Complete Build Rehab 2022 Eastern 148 Pembroke to Greenwood Rd., County of Reconstruction, Intersection Planned 2023-2024 3.8 $8 – $20M Design Design-Bid- Renfrew improvements Underway Build Rehab 2022 Eastern 28 Apsley to Bancroft, Peterborough Culvert replacement, Culvert Planned 2023-2024 42 $0 – $10M Planning/EA Design-Build rehabilitation Underway Rehab 2022 Eastern 28 Hwy 7 to Apsley culverts, Kawartha Culvert replacement, Culvert Planned 2022 49.5 $0 – $10M Design Design-Bid- rehabilitation Underway Build Rehab 2022 Eastern 115 Durham Peterborough County boundary Culvert replacement, Culvert Planned 2023-2024 19 $0 – $10M Planning/EA Design-Build Rd. to Hwy 7A, Peterborough rehabilitation Underway

Rehab 2022 Eastern 62 Moira River Keller Bridge, Hastings Bridge rehabilitation Planned 2022 1 $0 – $10M Design Design-Bid- County Complete Build

Rehab 2022 Eastern 137 Hwy 137 and Hwy 401, United Counties of Culvert replacement Planned 2023-2024 0 $0 – $10M Design Design-Bid- Leeds and Grenville Underway Build Rehab 2022 Eastern 2, 401 ONroute Odessa to Scott Rd., Kingston Safety improvements Planned 2022 20 $0 – $10M Design Design-Bid- Underway Build Rehab 2022 Eastern 33 Bath to County Rd. 4, County of Lennox Resurfacing Planned 2022 2 $0 – $10M Design Design-Bid- and Addington Underway Build Rehab 2022 Eastern 401 Napanee to Kingston, County of Lennox Culvert replacement, Culvert Planned 2022 22.3 $0 – $10M Design Design-Bid- and Addington rehabilitation Complete Build Rehab 2022 Eastern 401 Hallecks Rd., Leeds Grenville Thousand Bridge replacement Planned 2023-2024 0 $0 – $10M Design Design-Bid- Islands and Rideau Lakes Underway Build

Rehab 2022 Eastern 417 CPR and CNR Walkley Bridges, Ottawa Bridge rehabilitation Planned 2023-2024 1 $15 – $50M Design Design-Bid- Underway Build Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2022 Eastern 401 Lancaster to Quebec border, United Resurfacing Planned 2023-2024 14.4 $8 – $20M Design Design-Bid- Counties of Stormont, Dundas and Underway Build Glengarry Rehab 2022 Eastern 401 Moulinette to Cornwall, Stormont Dundas Resurfacing, Culvert rehabilitation Planned 2023-2024 18.2 $40 – $100M Design Design-Bid- South Glengarry Underway Build Rehab 2022 Eastern 17 County Rd. 40 to County Rd. 24, Renfrew Resurfacing Planned 2022 5.6 $0 – $10M Design Design-Bid- Underway Build Rehab 2022 Eastern 17 Haley Station and Forester Falls Rd., Culvert replacement Planned 2023-2024 0 $0 – $10M Planning/EA Design-Build Cobden Underway Rehab 2022 Eastern 28 Snake River and Hardwood Lake, County Culvert replacement, Bridge Planned 2022 0 $0 – $10M Design In Design-Bid- of Renfrew rehabilitation Procurement Build

Rehab 2022 Eastern 417 Scheel Dr. to Hwy 7, Ottawa Culvert replacement, Culvert Planned 2022 45.1 $0 – $10M Design Design-Bid- rehabilitation Complete Build Rehab 2022 Eastern 28 Eels Creek Bridge depot, Woodview Bridge replacement Planned 2023-2024 0 $0 – $10M Design Design-Bid- Underway Build Rehab 2022 Eastern 401 Lyn Rd. overpass, Brockville Bridge rehabilitation Planned 2022 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2022 Eastern 34 Hawkesbury Creek and CNR Bridge, Bridge replacement Planned 2023-2024 0 $15 – $50M Design Design-Bid- Hawkesbury Complete Build Rehab 2022 Eastern 15 Hwy 15/County Rd. 42, United Counties of Intersection improvements Planned 2022 1 $0 – $10M Design Design-Bid- Leeds and Grenville Underway Build Rehab 2022 Eastern 138 Hwy 138 and Headline Rd., United Roundabout Planned 2023-2024 0.5 $0 – $10M Design To be Counties of Stormont, Dundas and Underway determined Glengarry

Rehab 2023-2024 West 3 St. Thomas to Aylmer, Elgin County Resurfacing, Bridge rehabilitation Planned 2023-2024 12.2 $0 – $10M Design To be Upcoming determined Rehab 2023-2024 West 6 Durham to Dornoch, Grey County Resurfacing, Bridge rehabilitation, Planned 2023-2024 14.4 $0 – $10M Design To be Culvert replacement Upcoming determined Rehab 2023-2024 West 85, 86 Lancaster St. to Waterloo Regional Rd. 8 Resurfacing, Culvert replacement Planned 2.4 $15 – $50M Planning/EA To be (King St. N), Waterloo Upcoming determined Rehab 2023-2024 West 403 Brant County Rd. 2 (Paris Rd.) to Garden Resurfacing Planned 2023-2024 6.6 $8 – $20M Design To be Ave., Brantford Underway determined Rehab 2023-2024 West 10, 26 Boyne River Bridge (Flesherton), and Culvert replacement Planned 2023-2024 0 $0 – $10M Planning/EA To be Culvert 473, Grey County Upcoming determined Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2023-2024 West 401 Tremblay Creek Culvert, Lakeshore Culvert replacement Planned 2023-2024 0 $0 – $10M Design To be Upcoming determined Rehab 2023-2024 West 7 Trussler Rd., Kitchener Resurfacing Planned 2023-2024 3.9 $0 – $10M Design To be Upcoming determined Rehab 2023-2024 West 401 0.1 km east of Victoria Rd. to 1.8 km west Resurfacing Planned 2023-2024 6 $0 – $10M Design To be of Orford Rd., westbound lane, Chatham- Upcoming determined Kent Rehab 2023-2024 West 401 1.8 km west of Orford Rd. to 2.5 km east Resurfacing Planned 2023-2024 17.2 $0 – $10M Design To be of Furnival Rd., westbound lanes, Upcoming determined Chatham-Kent Rehab 2023-2024 West 21 Forest north limit to 0.5 km south of Resurfacing Planned 2023-2024 6.5 $0 – $10M Design To be Lambton Rd. 7 (Lakeshore Rd.), Lambton Upcoming determined Shores Rehab 2023-2024 West 23 Newry to Listowel, County of Perth Resurfacing Planned 2023-2024 9.2 $8 – $20M Design To be Upcoming determined Rehab 2023-2024 West 401 Gracey Side Rd. underpass, Lakeshore Bridge rehabilitation Planned 2023-2024 0 $0 – $10M Design To be Upcoming determined Rehab 2023-2024 West 402 Former CNR overhead (east of Murphy Bridge rehabilitation Planned 2023-2024 0 $0 – $10M Design To be Rd.), Sarnia Upcoming determined Rehab 2023-2024 West 40, 402 Wellington St. to Hwy 40 north limits, Bridge rehabilitation Planned 2023-2024 0 $0 – $10M Design To be Sarnia Upcoming determined Rehab 2023-2024 West 402 Middlesex Rd. 2 (Longwoods Dr.) to Resurfacing Planned 2023-2024 7.7 $15 – $50M Design To be Colonel Talbot Rd., Middlesex County Underway determined

Rehab 2023-2024 West 6 Guelph north limits to Wellington Rd. 7, Resurfacing Planned 2023-2024 4 $0 – $10M Design To be Guelph Upcoming determined Rehab 2023-2024 West 401 Chatham-Kent Rd. 27 (Bloomfield Rd.) Bridge replacement Planned 0 $15 – $50M Planning/EA To be underpass, Chatham Underway determined Rehab 2023-2024 West 3 Dunnville east limits to west region Reconstruction Planned 2023-2024 10.1 $0 – $10M Design To be boundary, Haldimand County Upcoming determined Rehab 2023-2024 West 3 Haldimand Rd. 56 to Dunnville west limits, Reconstruction Planned 2023-2024 5.1 $0 – $10M Design To be Haldimand County Upcoming determined Rehab 2023-2024 West 6 Lindsay Rd. 20 to Ferndale, Bruce Resurfacing Planned 2023-2024 15.8 $0 – $10M Design To be Peninsula Upcoming determined Rehab 2023-2024 Central 400 Hwy 9 to North Canal Rd., Holland River, Bridge replacement Planned 0 $15 – $50M Design To be Bradford-West Gwillimbury Underway determined Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2023-2024 Central 401 Robinson Creek, Clarington Culvert rehabilitation Planned 2023-2024 0 $0 – $10M Design To be Underway determined Rehab 2023-2024 Central 403 Guelph Rd., Macklin St., QEW/403/407 Bridge rehabilitation Planned 2023-2024 0 $0 – $10M Design To be (Freeman interchange) Guelph Rd. to Underway determined Hwy 6, Hamilton

Rehab 2023-2024 Central 401 Hwy 35/115 overpass, Clarington Bridge rehabilitation Planned 2023-2024 0 $0 – $10M Design To be Underway determined Rehab 2023-2024 Central 140, 20, 58 Regional Rd. 3 to Regional Rd. 23 (Forks Resurfacing Planned 2023-2024 11.4 $0 – $10M Design To be Rd.), Biederman Drain, Port Colborne Underway determined

Rehab 2023-2024 Central QEW QEW/403/407, Fairview St. interchanges, Bridge rehabilitation Planned 0 $40 – $100M Design To be Phase 2 & 3, Burlington Upcoming determined

Rehab 2023-2024 Central 403 Glen Erin Dr., Hurontario St., Mavis Rd., Bridge rehabilitation, Culvert Planned 21.8 $15 – $50M Design To be Central Pkwy to Winston Churchill Blvd., rehabilitation, Resurfacing Underway determined Mississauga Rehab 2023-2024 Central 9 The Gore Rd., Caledon Traffic signals Planned 2023-2024 0 $0 – $10M Design To be Underway determined Rehab 2023-2024 Central 140 Netherby Rd., Fort Erie Intersection improvements Planned 2023-2024 0 $0 – $10M Design To be Underway determined Rehab 2023-2024 Central 400 Gwillimbury Line 12, Gwillimbury 13th Bridge rehabilitation, Culvert Planned 0 $0 – $10M Design To be Line, Bradford-West Gwillimbury rehabilitation Underway determined Rehab 2023-2024 Central 12 Ramara Rd. 6W, Simcoe Rd. 169, Roundabout Planned 2023-2024 0 $0 – $10M Design To be Ramara Underway determined Rehab 2023-2024 Central 401 Westbound express lanes Avenue Rd. to Reconstruction, Bridge rehabilitation, Planned 7.4 $15 – $50M Design To be Jane St., Wilson Ave., Bathurst St., Resurfacing Underway determined Dufferin St., CNR overhead, Toronto

Rehab 2023-2024 Central 26 Nottawasaga 27/28 Side Rd., Clearview Traffic signals Planned 2023-2024 0 $0 – $10M Design To be (Stayner) Underway determined Rehab 2023-2024 Central 401 Bloor St., Oshawa Bridge replacement Planned 0 $40 – $100M Design To be Underway determined Rehab 2023-2024 Central 405 QEW interchange and 600m east of Resurfacing Planned 2023-2024 8.4 $0 – $10M Design To be Concession Rd. 6, Niagara Falls Underway determined Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2023-2024 Central 48 Little Rouge Creek overpass, York Bridge rehabilitation Planned 2023-2024 0 $0 – $10M Design To be Underway determined Rehab 2023-2024 Central QEW QEW/Hwy 403 (Freeman interchange), Bridge rehabilitation Planned 2023-2024 0 $0 – $10M Design To be Burlington Underway determined Rehab 2023-2024 Central 401 Mill St. underpass, Foster Creek, Bridge rehabilitation, Culvert Planned 2023-2024 0 $0 – $10M Design In To be Clarington rehabilitation Procurement determined

Rehab 2023-2024 Central 3 Various locations, Niagara Region Culvert rehabilitation Planned 0 $0 – $10M Design To be Underway determined Rehab 2023-2024 Central 11 Grouse Creek, Oro-Medonte, Hunstville Culvert replacement Planned 0 $0 – $10M Design To be Underway determined Rehab 2023-2024 Central 401 CNR overhead at Brock Rd., Pickering Bridge rehabilitation Planned 2023-2024 0 $0 – $10M Design To be Underway determined Rehab 2023-2024 Central TBD East Main Tunnel, Welland Tunnel rehabilitation Planned 0 $8 – $20M Design To be Underway determined Rehab 2023-2024 Central QEW Lyons Creek Rd., Niagara Falls Bridge rehabilitation Planned 2023-2024 0 $0 – $10M Design To be Underway determined Rehab 2023-2024 Central QEW Niagara St. to Seventh St., St. Catharines Resurfacing Planned 16.6 $15 – $50M Design To be Upcoming determined Rehab 2023-2024 Central 400 Dunlop St. underpass, Barrie Bridge replacement, Interchange Planned 0 $15 – $50M Design To be improvements Underway determined Rehab 2023-2024 Central 12 Tributary crossing to Talbot River, Trent Bridge rehabilitation, Culvert Planned 2023-2024 0 $0 – $10M Design To be Canal, Talbot River, Ramara rehabilitation Underway determined Rehab 2023-2024 Central 48 Mount Albert Rd. CNR , Black Bridge rehabilitation, Culvert Planned 0 $8 – $20M Design To be River/Baldwin River, Pefferlaw Brook, rehabilitation Underway determined CNR at Hwy 48, tributary crossing to Perfferlaw Brook, Georgina Rehab 2023-2024 Central 401 Wilson Rd. overpass, Oshawa, Clarington Bridge replacement Planned 0 $15 – $50M Design To be Underway determined Rehab 2023-2024 Central 9 Hwy 27 to Tottenham Rd., west of Resurfacing, Culvert rehabilitation, Planned 18.6 $8 – $20M Design To be Regional Rd. 50 to west of Airport Rd., Bridge rehabilitation, Intersection Underway determined CNR, CPR overhead, Humber River, New improvements, Traffic signals Tecumseth, Caledon Rehab 2023-2024 Central 93 Regional Rd. 27 to Hwy 12/Simcoe Rd. Resurfacing, Bridge rehabilitation Planned 2023-2024 11.2 $0 – $10M Design To be 93, Tay Underway determined Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2023-2024 Central 7 Silver Creek, Credit River, Georgetown Bridge rehabilitation Planned 2023-2024 0 $0 – $10M Design To be Underway determined Rehab 2023-2024 Central 401 Eastbound express lanes, Warden Ave. to Resurfacing Planned 7.5 $0 – $10M Design To be Neilson Rd., Toronto Upcoming determined Rehab 2023-2024 Central 405 Queenston/Lewiston Bridge to QEW, Resurfacing Planned 2023-2024 16.7 $8 – $20M Design To be Niagara Falls Underway determined Rehab 2023-2024 Central 400 West Gwillimbury 9th Line, Bradford West Bridge rehabilitation, Bridge Planned 0 $15 – $50M Design To be Gwillimbury replacement Underway determined Rehab 2023-2024 Central 427 Dixon Rd., Campus Rd., Renforth Dr., Bridge rehabilitation Planned 0 $8 – $20M Design To be overpass west of Hwy 27, Toronto Underway determined

Rehab 2023-2024 Central 400 Hwy 400/88 interchange, Bradford-West Bridge replacement Planned 0 $40 – $100M Design To be Gwillimbury Underway determined Rehab 2023-2024 Central 10 Etobicoke Creek, Snelgrove Creek, Culvert rehabilitation Planned 2023-2024 0 $0 – $10M Design To be Brampton Underway determined Rehab 2023-2024 Central 403, 5, 6 Various on Hwy 6, Clappison's Corners to Culvert rehabilitation Planned 0 $0 – $10M Design To be Hamilton Rd. west, Hwy 403, Underway determined QEW/403/407 (Freeman interchange), Burlington Rehab 2023-2024 Central 410 Derry Rd., Mississauga Bridge rehabilitation, Culvert Planned 0 $8 – $20M Design To be rehabilitation Underway determined Rehab 2023-2024 Central QEW Burlington Bay Skyway, Niagara bound, Bridge rehabilitation Planned 0 $15 – $50M Design In To be Hamilton Procurement determined

Rehab 2023-2024 Central QEW Martindale Rd. to Baker Rd., 40 Mile Culvert rehabilitation, Bridge Planned 2023-2024 0 $0 – $10M Design To be Creek, Grimsby rehabilitation Underway determined Rehab 2023-2024 Central 400 Sunnidale Rd. and Sunnidale Rd. Bridge replacement, Resurfacing Planned 2.8 $15 – $50M Design To be underpass, Barrie Underway determined Rehab 2023-2024 Central 12, 400 Fesserton Rd., Hwy 12 overpass, CNR Bridge rehabilitation Planned 0 $15 – $50M Design To be overhead Waubaushene, Matchedash Underway determined Bay, Quarry Rd., Port Severn Rd., Severn

Rehab 2023-2024 Central 11 Coldwater Rd. underpass, Orillia Bridge replacement Planned 0 $15 – $50M Design To be Underway determined Rehab 2023-2024 Northeastern 11 Rest area at Hwy 655 and 11, Driftwood New facility Planned 2023-2024 0 $0 – $10M Planning/EA To be Underway determined Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2023-2024 Northeastern 17 Rest area at 2.5km east of Hwy 683, Facility improvements Planned 2023-2024 0 $0 – $10M Planning/EA To be Batchewana Underway determined Rehab 2023-2024 Northeastern 64 Rest area at Hwy 11 and 64, Marten River New facility Planned 2023-2024 0 $0 – $10M Planning/EA To be Underway determined Rehab 2023-2024 Northeastern 11 Rest area at Hwy 11 and 631, east of New facility Planned 2023-2024 0 $0 – $10M Planning/EA To be Nagagami Underway determined Rehab 2023-2024 Northeastern 141 Rosseau to Bent River Culvert replacement, Resurfacing Planned 2023-2024 12.2 $8 – $20M Design To be Complete determined Rehab 2023-2024 Northeastern 35 South of south junction Haliburton Rd. Resurfacing Planned 2023-2024 18.6 $8 – $20M Design To be 121 southerly, Moore Falls Upcoming determined Rehab 2023-2024 Northeastern 11 South Kashe Lake Rd. to Muskoka Rd. Resurfacing Planned 13.1 $15 – $50M Design To be 141/6 interchange, Gravenhurst Underway determined Rehab 2023-2024 Northeastern 400 Severn River Bridge northerly, Port Resurfacing, Bridge rehabilitation Planned 6.1 $8 – $20M Design To be Severn northerly Underway determined Rehab 2023-2024 Northeastern 118, 35 South of Hwy 118 northerly, Carnarvon Bridge rehabilitation, Resurfacing Planned 10.6 $15 – $50M Design To be Underway determined Rehab 2023-2024 Northeastern 11 Severn River Bridge to South Kashe Lake Resurfacing Planned 2023-2024 7.8 $15 – $50M Design To be Rd., Severn River Underway determined Rehab 2023-2024 Eastern 417 Glengarry County Rd. to Paxton Creek, Bridge rehabilitation, Culvert Planned 2023-2024 0.8 $0 – $10M Design To be Township of North Glengarry replacement Underway determined Rehab 2023-2024 Eastern 17 Rolphton to 7 km west of Brent Rd., Culvert rehabilitation Planned 2023-2024 0 $0 – $10M Design To be Renfrew Underway determined Rehab 2023-2024 Eastern 115 Tapley Larmer, Peterborough Bridge rehabilitation Planned 0 $8 – $20M Design To be Upcoming determined Rehab 2023-2024 Eastern 416 McKenna Casey / CNR (Strandherd) and Bridge rehabilitation Planned 0 $8 – $20M Design To be Jock River, Ottawa Complete determined Rehab 2023-2024 Eastern 60 Mintha St. to Aylen Lake Rd., Renfrew Resurfacing Planned 2023-2024 14.5 $0 – $10M Design To be Underway determined Rehab 2023-2024 Eastern 401 Commercial vehicle inspection facility, Commercial vehicle inspection facility Planned 0 $15 – $50M Planning/EA To be Port Hope Underway determined Rehab 2023-2024 Eastern 401 County Rd. 2 to Maitland Rd., Brockville Resurfacing Planned 5.9 $8 – $20M Design To be Upcoming determined Rehab 2023-2024 Eastern 401 Choate Rd. and Ganaraska Bridge, Bridge replacement Planned 0 $15 – $50M Planning/EA To be Northumberland Underway determined Rehab 2023-2024 Eastern 7 Black River and Skootamata River, Bridge replacement Planned 0 $8 – $20M Planning/EA To be Actinolite, Hastings County Underway determined Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2023-2024 Eastern 35 Gull River Bridges, Coboconk Bridge rehabilitation Planned 2023-2024 0 $0 – $10M Design To be Upcoming determined Rehab 2023-2024 Eastern 401 Kingston Rd. 38 to Sydenham Rd., Resurfacing Planned 2023-2024 5.9 $0 – $10M Design To be Kingston Upcoming determined Rehab 2023-2024 Eastern 7 Hwy 15 to McNeely Ave., Carleton Place Intersection improvements, Planned 2023-2024 1.6 $0 – $10M Planning/EA To be Resurfacing Complete determined Rehab 2023-2024 Eastern 17 Chalk River to Point Alexander, Renfrew Resurfacing Planned 2023-2024 19.2 $0 – $10M Design To be Upcoming determined Rehab 2023-2024 Eastern 417 East of Hwy 138 to Dunvegan, Glengarry Reconstruction Planned 2023-2024 9.6 $40 – $100M Design To be Complete determined Rehab 2023-2024 Eastern 401 Carman Rd. to Upper Canada Rd., Resurfacing Planned 2023-2024 21 $8 – $20M Design To be Stormont, Dundas and Glengarry Underway determined Rehab 2023-2024 Eastern 41 Kaladar to Cloyne, Hastings Lennox and Resurfacing Planned 2023-2024 11.3 $0 – $10M Design To be Addington Upcoming determined Rehab 2023-2024 Eastern 417 Ottawa Rd. 29 to Panmure Rd., Ottawa Resurfacing Planned 2023-2024 15.9 $0 – $10M Design To be Upcoming determined Rehab 2023-2024 Eastern 17 Harvey Creek to Stonecliffe, County of Resurfacing Planned 2023-2024 13.3 $0 – $10M Design To be Renfrew Upcoming determined Rehab 2023-2024 Eastern 138 Cornwall to Monkland, Stormont Dundas Resurfacing Planned 2023-2024 18.1 $0 – $10M Design To be South Glengarry Upcoming determined Rehab 2023-2024 Eastern 28 Hwy 7 to Strickland St., Lakefield Resurfacing Planned 2023-2024 13.7 $0 – $10M Design To be Upcoming determined Rehab 2023-2024 Eastern 7 County Rd. 36 to Omemee, Haliburton Resurfacing Planned 2023-2024 15.1 $0 – $10M Design To be Kawartha Lakes Brock Upcoming determined Rehab 2023-2024 Eastern 7 Wemyss to Perth, County of Lanark Resurfacing Planned 2023-2024 9.4 $8 – $20M Design To be Underway determined Rehab 2023-2024 Eastern 60 Wilno to Nipissing District boundary, Resurfacing Planned 7.8 $8 – $20M Design To be County of Renfrew Upcoming determined Rehab 2023-2024 Eastern 417 Woodroffe Ave. and Maitland Ave., Bridge replacement Planned 2023-2024 0 $15 – $50M Design In To be Ottawa Procurement determined

Rehab 2023-2024 Eastern 416 Leeds and Grenville Rd. 43, Kemptville Intersection improvements, Bridge Planned 0 $0 – $10M Design To be rehabilitation Underway determined Rehab 2023-2024 Eastern 417 Limoges to Casselman and Rockdale Rd. Resurfacing, Bridge rehabilitation Planned 14 $8 – $20M Design To be underpass, Prescott and Russell, Ottawa Upcoming determined Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km)

Rehab 2023-2024 Eastern 7 Airport Rd. to Lansdowne St., Pkwy Bridge rehabilitation Planned 4.5 $8 – $20M Design To be interchange and Bensfort Rd., Upcoming determined Peterborough Rehab 2023-2024 Eastern 7 Hwy 28 to Norwood, Northumberland- Resurfacing Planned 2023-2024 19.6 $0 – $10M Design To be Peterborough South Upcoming determined Rehab 2023-2024 Eastern 62 Ivanhoe to Madoc, County of Hastings Resurfacing Planned 2023-2024 11.6 $0 – $10M Design To be Upcoming determined Rehab 2023-2024 Eastern 401 Farran Point Rd., west of Ingleside, Bridge replacement Planned 0 $0 – $10M Planning/EA To be United Counties of Stormont, Dundas and Underway determined Glengarry Rehab 2023-2024 Eastern 401 Fraser Rd., United Counties of Stormont, Bridge replacement Planned 2023-2024 0 $0 – $10M Design To be Dundas and Glengarry Underway determined Rehab 2023-2024 Eastern 62 Bloomfield to Crofton, Bay of Quinte Resurfacing, Culvert rehabilitation Planned 2023-2024 26.4 $0 – $10M Design To be Complete determined Rehab 2023-2024 Eastern 7 Paul's Rd. to Carleton Place Resurfacing, Culvert replacement, Planned 2023-2024 19.1 $8 – $20M Design To be Culvert rehabilitation Underway determined