Bradford Bypass Project Proponent: Ontario Ministry of Transportation

Total Page:16

File Type:pdf, Size:1020Kb

Bradford Bypass Project Proponent: Ontario Ministry of Transportation Enclosure 2 - Federal Authority Advice Record: Designation Request under IAA Response due by March 5, 2021 Project: Bradford Bypass Project Proponent: Ontario Ministry of Transportation Department/Agency: Health Canada Primary Contact Details: Kitty Ma 416-954-2206 Contact Name: Telephone: 180 Queen Street West, 10th floor Address: Fax: Toronto, Ontario, M5V 1Z4 [email protected] Email: Alternate Contact Details (if applicable): Umme Akhtar 416-278-1757 Contact Name: Telephone: 180 Queen Street West, 10th floor Address: Fax: Toronto, Ontario, M5V 1Z4 [email protected] Email: Has your department or agency considered w hether it has an interest in the Project; exercised a pow er or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that w ould allow the Project to proceed in w hole or in part? Specify as appropriate. Not applicable. Is it probable that your department or agency may be required to exercise a pow er or perform a duty or function related to the Project to enable it to proceed? If yes, specify that pow er, duty or function and its legislative source. Not applicable. If your department or agency w ill exercise a pow er or perform a duty or function under any Act of Parliament in relation to the Project, w ill it involve public and Indigenous consultation? Specify as appropriate. Not applicable. Is your department or agency in possession of specialis t or expert information or know ledge that may be relevant to any potential adverse effects w ithin federal jurisdiction caused by the Project or adverse direct or incidental effects stemming from the Project? Specify as appropriate. 9e S XWVWdS^ SgfZad[fk' @WS^fZ ;S`SVS i [^^ bdah[VW ebWU[S^[ef ad WjbWdf [`Xad_Sf[a` S`V ]`ai ^WVYW [` fZW <WbSdf_W`fqe baeeWee ion (expertise) to support the assessment of impacts on human health from projects considered individually or cumulatively under the Impact Assessment Act (IAA). It should also be noted that expertise related to assessing human health that is relevant to impact assessment (IA) may be held by other federal, provincial, and municipal partners, reflecting the shared jurisdiction for environmental and human health w ithin Canada. For example, the Public Health Agency of Canada (PHAC) has expertise in the social determinants of health approach and health equity, and may provide that expertise through Health Canada, upon request from the Page 1 of 4 review ing body(ies). How the expertise provided by Health Canada and PHAC w ill be used in a potential IA process w ill ultimately be determined by the review ing body(ies). Health Canada can provide human health expertise in the follow ing areas: Air quality; Recreational and drinking w ater quality; Country foods; Noise; Methodological expertise in human health risk assessment; Methodological expertise in conducting health impact assessment; Electromagnetic fields; Radiological emissions; and Public health emergency management of toxic exposure events Has your department or agency had previous contact or involvement w ith the proponent or other parties in relation to the Project? Provide an overview of the information or advice exchanged. No. From the perspective of the mandate and area(s) of expertise of your department or agency, does the Project have the potential to cause adverse effects w ithin federal jurisdiction or adverse direct or incidental effects as described in section 2 of IAA? Could any of those effects be managed through legislativ e or regulatory mechanis ms administered by your department or agency? If a licence, permit, authorization or approval may be issued, could it include conditions in relation to those effects? Specify as appropriate. Health Canada is not a regulatory body and does not issue any approvals or make any regulatory decisions with respect to development projects. According to the Highway 400 - Highway 404 Extension Link (the Bradford Bypass Project) Route Planning and Environmental Assessment Study- Environmental Assessment Report (December, 1997) 1 (the EAR), the Project study area does not include any First Nations reserves and land tracts. However, it is not clear whether any Indigenous groups us e the Projec t Study A rea for tr aditional purposes (e.g. used for fishing, ceremonial or other uses). The report does not mention about any consultation activities with any Indigenous communities. In response to I99;qe [`Xad_Sf[a` dWcgWefe %JWcgWef -' I-' >WTdgSdk -+-,&' fZW Hdaba`W`fqe _W`f[a`e 2 that the Bradford Bypass Project Team is engaging and consg^f[`Y i [fZ eWhWdS^ A`V[YW`age ;a__g`[f[We pfa ^[efW` fa S`V Ua`e[VWd S`k [fW_e ad concerns raised regarding negative impacts to the health, social or economic conditions of their communities, or adverse impacts to Aboriginal and treaty rights, by the activities of the project during the Transportation Environmental Study Report (TESR) phase, Tgf S^ea fZdagYZagf fZW ^[XW aX fZW bda\WUfq)The local First Nation Georgina Island First Nation has expressed primary interest about fZW Hda\WUfqe bafW`f[S^ [_bSUf a` archaeological resources3. It is not know n w hether any other groups have expressed their Ua`UWd`e STagf fZW Hda\WUfqe bafW`f[S^ [_bSUf a` health or areas of Indigenous importance w ithin the Study Area. The information provided by the Proponent is not sufficient to definitively confirm whether there exists a potential to cause adverse effects on human health in federal jurisdiction i.e., effects to Indigenous peoples. How ever, should a decision be taken to designate this project under the IAA, Health Canada offers the following human-health related comments: The information on environmental (e.g., air quality, noise, soil, surface and ground water quality) and socio-economic conditions provided in the EAR1 has not been updated since 1997. The adjacent area to the Bradford Bypass Project (the Project) has grown in terms of population and development over the years. For example, the population of Bradford West Gwillimbury has increased almost 2.5 times in 23 years1,4. The EAR summarizes the potential impacts of the Project on noise, surface and ground water and proposed mitigation measures (Exhibit 5-11). However, the human health effects of these impacts are not well identified and described. 1 Available at: https://www.bradfordbypass.ca/wp-content/uploads/2020/09/BBP-RoutePlanningEA-1997.pdf 2 Available at: Bradford Bypass Initial Response to IAAC Requests 1 and 2 3 Available at: https://iaac-aeic.gc.ca/050/documents/p81382/138111E.pdf 4 Available at: https://www150.statcan.gc.ca/t1/tbl1/en/tv.action?pid=1710014201 Page 2 of 4 The potential for human health risks from exposure to air pollution Diesel exhaust emissions from heavy equipment, power generators and vehicle traffic are likely to be significant contaminant sources for the Project during construction and operation. It is important to identify a complete inventory of all potential air pollutants (including but not limited to polycyclic organic compounds, fine particulate matter (PM2.5), diesel particulate matter, ozone, volatile organic compounds, nitrogen dioxide and sulphur dioxide). Health Canada anticipates that the proponent would provide assessments of the project-associated changes to the contaminant levels and associated mitigation measures if an assessment under IAA is required. The potential for human health risks from changes in noise The EAR identifies highway construction noise as an issue but does not assess in details potential Project related nois e impac ts . Giv en the Projec t w ill be in c lose pr oximity of the c ommunity of the Tow n of Bradford West Gw illimbury, a `a[eW SeeWee_W`f aX fZW Hda\WUf [e dWUa__W`VWV [` SUUadVS`UW i[fZ @WS^fZ ;S`SVSqe Yg[VS`UW VaUg_W`f a` `a[eW %Se outlined in Question 9 below). The noise assessment is also recommended to identify and describe human receptors that may have a heightened sensitivity to noise exposure (e.g., schools, child care centres, places of worship, etc.). As w ell, human receptors in rural areas can be considered to have a greater expectat[a` aX nbWSUW S`V cg[Wfo, particular attention should be given to the potential for sleep disturbance to local residents given this Project is located in the rural area. As part of the provincial EA process, the proponent is anticipated to explore mitigat ion measures to reduce potential project impacts on natural environments in consultation with relevant authorities (Bradford Bypass Preliminary Design Environmental Assessment Study Update Terms of Reference, 2019) 5. Health Canada recommends that the proponent VWhW^ab _[f[YSf[a`e _WSegdWe Se bWd fWUZ`[US^ Yg[VS`UW bdah[VWV [` @WS^fZ ;S`SVSqe Yg[VS`UW VaUg_W`fe %dWXWd fa fZW response to Question #9). Does your department or agency have a program or additional authority that may be relevant and could be considered as a potential solution to concerns expressed about the Project? If yes, please specify the program or authority. In particular, the follow ing issues have been raised by the requestor: Potential impacts to fish and fish habitat, including in the Holland Marsh w etland, the Holland River and Lake Simcoe, as w ell as any implic ations to the effective implementation of the Lake Simcoe Protection Act, 2008, S.O. 2008, c. 23 and the Lake Simcoe Protection Plan; Potential impacts on terrestrial and aquatic species at risk and their habitat, including changes to w etlands, w oodlands and natural corridors; Potential impacts to migratory birds, including potential for direct effects (e.g., mortality due to vehicle collisions, poisoning, habitat loss and fragmentation), and indirect effects (e.g., noise, artificial light, barriers to movement, and edges associated w ith roads); Potential impacts to human health, particular ly from changes in air quality, and noise and vibration levels, during project construction and operations, and from potential impacts to w ater quality (e.g.
Recommended publications
  • The Regional Municipality of York at Its Meeting on September 24, 2009
    Clause No. 5 in Report No. 6 of the Planning and Economic Development Committee was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting on September 24, 2009. 5 PLACES TO GROW - SIMCOE AREA: A STRATEGIC VISION FOR GROWTH - ENVIRONMENTAL BILL OF RIGHTS REGISTRY POSTING 010-6860 REGIONAL COMMENTS The Planning and Economic Development Committee recommends adoption of the recommendations contained in the following report dated July 29, 2009, from the Commissioner of Planning and Development Services with the following additional Recommendation No. 10: 10. The Commissioner of Planning and Development Services respond further to the Ministry of Energy and Infrastructure regarding the Environmental Bill of Rights Registry Posting 010-6860 to specifically address the Ontario Municipal Board resolution regarding Official Plan Amendment No. 15 in the Town of Bradford West Gwillimbury, and report back to Committee. 1. RECOMMENDATIONS It is recommended that: 1. Council endorse staff comments made in response to the Environmental Bill of Rights Registry posting 010-6860 on Places to Grow – Simcoe Area: A Strategic Vision for Growth, June 2009. 2. The Province implement the Growth Plan equitably and ensure that all upper- and lower-tier municipalities in the Greater Golden Horseshoe are subject to the same policies and regulations as contained in the Growth Plan and the Places to Grow Act. 3. The Province assess the impact on the GTA regions including York Region, resulting from the two strategic employment area provincial designations in Bradford West Gwillimbury and Innisfil. Council requests that the Province undertake this assessment and circulate to York Region and the other GTA regions prior to the approval and finalization of the Simcoe area-specific amendment to the Growth Plan.
    [Show full text]
  • Bradford Bypass
    Ministry of Transportation Bradford Bypass York Region Council Meeting March 18, 2021 Purpose of Presentation To provide an update on the status of the Bradford Bypass Preliminary Design and Environmental Assessment Update. 2 Project Rationale & Benefits • Advancing the Bradford Bypass project will help address current and future transportation needs in Simcoe County and York Region. • Even with the historic public transit expansion plan and significant investments in transit, road Location of Bradford congestion will continue to increase across the GGH. Bypass • The Regional Municipality of York is expected to grow to 1.79 million residents by 2041. • Ontario needs new infrastructure to help move people and goods or the region will quickly become overwhelmed. • Transportation-related construction is vital to Ontario’s economic recovery especially in the years following the COVID-19 pandemic. • Investment in highway infrastructure supports an estimated seven jobs per million dollars of spending, and $0.71 of GDP per dollar spent. The Bradford Bypass project will generate direct and indirect economic benefits through creation of jobs and markets. 3 Transportation Benefits The Bradford Bypass, a new proposed freeway connecting Hwy 400 and Hwy 404 is a way to manage the expected population growth and travel demand in the area. • It will: • relieve congestion on existing local roads between Highway 400 and Highway 404 • address the expected travel demand and support goods movement in the area to help support urban development in York Region. • provide a northern freeway connection between Highway 400 and Highway 404 saving motorists and trucks approximately 66% savings in travel time as compared to existing routes Travellers are expected to save up to 35 minutes a trip (an average travel time savings of 66 percent.) 4 Project Location / Background • The Ministry of Transportation (MTO) is building on the approved 2002 Environmental Assessment (EA) that identified a new 16.2-km freeway connecting Hwy 400 and Hwy 404.
    [Show full text]
  • Planning for the Bradford Bypass Project Began in the 1990'S
    The Regional Municipality of York Regional Council Transportation Services February 25, 2021 Report of the Commissioner of Transportation Services Bradford Bypass Project Regional Response to the Impact Assessment Agency of Canada 1. Recommendations 1. Council endorse the proposed response (Attachment 1) to the Impact Assessment Agency of Canada as the Region’s input to inform the Impact Assessment Agency of Canada’s analysis of the designation request for the Bradford Bypass Project under the federal Impact Assessment Act. 2. The Regional Clerk circulate this report to the Ontario Minister of Transportation, Simcoe County and the local municipalities. 2. Summary On February 3, 2021, Ecojustice, on behalf of Rescue Lake Simcoe Coalition and Simcoe County Greenbelt Coalition, submitted a request to the Minister of the Environment and Climate Change Canada to designate the Bradford Bypass Project under the federal Impact Assessment Act (IAA) (Attachment 2). On February 12, 2021, the Impact Assessment Agency of Canada (Agency) requested input from municipalities on the Bradford Bypass Project to inform the Agency’s analysis of the designation request (Attachment 3). The Agency has requested municipal input by March 3, 2021. Key Points: The Bradford Bypass (also known as the Highway 400-404 Link) supports the Region’s Official Plan and Transportation Master Plan (2016) and is an important component of servicing planned growth in the Region The Region has long supported the Bradford Bypass Project and has been consulted by the Ontario Ministry of Transportation since the original Individual Environmental Assessment (EA) approved in 2002, the Simcoe Area Multimodal Transportation Study undertaken in support of Growth Plan Amendment 1 (Simcoe Sub-Area Amendment – January 2012), to the current ongoing preliminary design and Class EA process 1 3.
    [Show full text]
  • The Regional Municipality of York
    Report No. 3 of the Planning and Economic Development Committee Regional Council Meeting of March 27, 2008 2 NEED FOR BRADFORD BYPASS The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following report dated February 20, 2008, from the Commissioner of Planning and Development Services: 1. RECOMMENDATIONS It is recommended that: 1. Regional Council request the Regional Chair to present a brief to the Ministers of Public Infrastructure Renewal, Transportation and Municipal Affairs and Housing on the urgent need for action on the Bradford Bypass, including adding the Bradford Bypass into the Provincial Growth Plan and committing to develop an implementation schedule with York Region. 2. The Regional Chair send letters with this report as an attachment to the Clerks of the Towns of East Gwillimbury, Newmarket and Bradford-West Gwillimbury, Simcoe County, and the Ministers of Public Infrastructure Renewal, Transportation and Municipal Affairs and Housing. 2. PURPOSE Bradford Bypass Urgently Required to Support Forecasted Growth This report presents the rationale and need for the Bradford Bypass based on forecasted growth, current planning context at the Regional and local municipal levels and the approved route environmental assessment. Further, this report requests the Regional Chair to present a brief to the appropriate Provincial officials and commence discussions to have the Bradford Bypass included within Provincial Plans as a necessary infrastructure investment within the horizon of 2031. 3. BACKGROUND Regional Council Directed that Bradford Bypass be Shown in the ROP Regional Planning and Economic Development Committee at its meeting of June 13, 2007, during discussion on Proposed Regional Amendment 54 - the technical update amendment, resolved that “the approved alignment for the Highway 404 Extension north from Green Lane and the Bradford Bypass be shown on Map 9 through modification”.
    [Show full text]
  • Southern Highways Program
    Southern Highways Program 2017-2021 Ministry of Transportation TABLE OF CONTENTS SOUTHERN REGIONAL MAP ..................................................................................... 1 INTRODUCTION........................................................................................................ 2 SOUTHERN EXPANSION 2017 – 2021 ....................................................................... 3 SOUTHERN REHABILITATION 2017 – 2021 ............................................................... 8 PLANNING FOR THE FUTURE .................................................................................. 49 SOUTHERN REGIONAL MAP 1 SOUTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario In 2017/18, the Ontario government will be investing more than $2.5 billion to repair and expand provincial highways and bridges. This includes almost $1.9 billion for Southern Ontario creating or sustaining approximately 13,300 direct and indirect jobs. Improving Ontario's transportation network is part of the government’s plan to strengthen the economy. 2017/18 Planned Accomplishments Southern Ontario 407 East Other Projects Total (Phase 2A) New highways (lane kms) 29 21 50 New bridges 10 10 Highways rehabilitated 317 317 (centreline kms) Bridges 121 121 rehabilitated The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition, and construction requirements. 2 SOUTHERN EXPANSION 2017 – 2021 WEST ONTARIO EXPANSION 2017-2021†
    [Show full text]
  • Analysis Report
    Analysis Report WHETHER TO DESIGNATE THE BRADFORD BYPASS PROJECT IN ONTARIO PURSUANT TO THE IMPACT ASSESSMENT ACT May 2021 IMPACT ASSESSMENT AGENCY OF CANADA Contents Purpose ................................................................................................................... 2 Context of Request ................................................................................................. 2 Project ..................................................................................................................... 4 Project Overview ........................................................................................................................ 4 Project components and activities .............................................................................................. 4 Analysis of Designation Request ............................................................................ 7 Authority to designate the Project ................................................................................................. 7 Potential adverse effects within federal jurisdiction ....................................................................... 8 Potential adverse direct or incidental effects ................................................................................. 8 Public concerns ............................................................................................................................ 8 Potential adverse impacts on the rights of Indigenous peoples of Canada ..................................
    [Show full text]
  • April 1, 2021 Council Information Package
    Town of Newmarket Council Information Package Index of Attachments Date: April 1, 2021 Pages General Correspondence Items 1. Municipal Insurance Rates 1 Municipality of West Grey February 26, 2021 2. Federal Funding for Yonge North Subway Extension 3 City of Richmond Hill March 1, 2021 3. Tile Drainage Act 12 Township of Adjala-Tosorontio March 5, 2021 4. Provincial Vaccine Rollout 13 Township of South Glengarry March 15, 2021 5. Open Letter to ORFA Members and Industry Employers 14 Ontario Recreation Facilities Association March 19, 2021 6. Colour Coded Capacity Limits 17 Town of Plympton-Wyoming March 19, 2021 7. Carbon Tax 20 2 Town of Plympton-Wyoming March 19, 2021 8. Closure of the Ontario Fire College Campus in Gravenhurst, Ontario 24 Town of Plympton-Wyoming March 19, 2021 9. Foodservice Industry Capacity Limits 29 Town of Whitchurch-Stouffville March 19, 2021 10. Closure of the Ontario Fire College Campus in Gravenhurst, Ontario 32 Municipality of Grey Highlands March 22, 2021 11. McNally House Hospice’s Life in Every Moment Campaign 35 Town of Fort Erie March 23, 2021 12. Cannabis Licencing and Enforcement 38 Town of Fort Erie March 23, 2021 13. Advocate the Province of Ontario to Adjust the Capacity Limits as 41 part of the COVID-19 Colour Coded System Town of Fort Erie March 23, 2021 14. Municipal Insurance Rates 44 City of Owen Sound March 24, 2021 15. Closure of the Ontario Fire College Campus in Gravenhurst, Ontario 46 Township of Edwardsburgh Cardinal March 24, 2021 16. Bradford Bypass Project - Regional Response to the Impact 48 Assessment Agency of Canada York Region 3 March 24, 2021 17.
    [Show full text]
  • Appendix to Report DPW-98-35
    APPENDIXI OF REPORTDPW.98.35 .,, :1r.. ,ji : : I t: .' . " TOWNOF GEORGINA REPORTDPW-98.35 FORCONSIDERATION OF COUNCIL JULY13, 1998 SUBJECT: HIGHWAY404 EXTENSION INFORMATION REPORT RECOMMENDATION: ' THATREPORT DPW.98-35 BE RECEIVEDFOR INFORMATION. REPORT: Councilpassed the following motion at its meetingof June1 , 1998. THATCORRESPONDENCE FROM DR. A. FRIESNERRESPECTING THE RECONSIDERATIONMOTION REGARDING THE PROPOSED HIGHWAY 404 EXTENSIONBE RECEIVEDAND REFERREDTO THE CHIEF ADMINISTRATIVEOFFICER TO CONVERSEWITH THE MINISTRIES INVOLVED,REGION OF YORKAND TOWN STAFF TO SOLICITTHEIR COMMENTSIN REFERENCE TO THEPUBLIC SUBMISSIONS MADE AT THETWO PUBLIC MEETINGS, AS WELL AS. A LISTINGOF THE FORMER RESOLUTIONSPASSED BY COUNCIL ON THIS MATTER, IN ORDER TO PREPAREAN INFORMATIONREPORT FOR COUNCIL ON JULY 13. 1998. Thefollowing information is appendedfor counci|sinformation: Appendix | - Minutesof the CouncilMeeting of April21 andMay 25, 1998wherein Mr. Jacobs,Projecl Manager for the Ministryof Transportation,has insertedthe Ministry's responseto the issuesraised. The responsesare shownin a ditferentfont and alsohave beenhighlighted by a barin the right-handmargin. Also included are written comments receivedfrom the publicarising out of thesetwo meetings. Appendlxll - Responsefrom the RegionalMunicipality of Yorkto pertinentissues arising fromthe Councilminutes and written submissions as theyapply to Regionaljurisdiction. .....t2 PageTwo of ReportDpW-gB-3S Appendlx lll - Responsesdated May 29, 1998and June 29, 1998from the Directorof DevelopmentServices
    [Show full text]
  • Ontario's Action Plan: Protect, Support, Recover – 2020 Ontario Budget
    Ontario’s Action Plan Protect • Support • Recover The Honourable Rod Phillips Minister of Finance 2020 Ontario Budget Download the COVID Alert mobile app at Ontario.ca/COVIDAlert For general inquiries regarding Ontario’s Action Plan: Protect, Support, Recover please call: Toll-free English and French inquiries: 1-800-337-7222 Teletypewriter (TTY): 1-800-263-7776 For electronic copies of this document, visit our website at www.ontario.ca/budget The Fiscal Sustainability, Transparency and Accountability Act, 2019 (FSTAA) sets out the requirement for the Ontario Minister of Finance to release a budget and a mid-year review for each fiscal year. The fall 2020 Budget represents, in compliance with FSTAA as proposed to be amended, the government’s Budget and mid-year review for 2020–21. © Queen’s Printer for Ontario, 2020 ISBN 978-1-4868-4818-8 (PRINT) ISBN 978-1-4868-4819-5 (HTML) ISBN 978-1-4868-4820-1 (PDF) Ce document est disponible en français sous le titre : Plan d’action de l’Ontario pour la protection, le soutien et la relance Introduction Introduction Around the world, COVID-19 has had devastating health consequences and caused a global recession. Beyond its impacts on our health and the economy, it has affected education, mental health, community safety and everyone’s quality of life. The impact of the global pandemic on our families, jobs, communities and province is still evolving in ways that are unknown. Since the outset of the first wave, Premier Ford has made it clear that nothing is more important to our government than protecting the health and safety of the people of Ontario.
    [Show full text]
  • Notice of Study Commencement Highway 400 - Highway 404 Link (The Bradford Bypass) Assignment No
    ONTARIO GOVERNMENT NOTICE NOTICE OF STUDY COMMENCEMENT HIGHWAY 400 - HIGHWAY 404 LINK (THE BRADFORD BYPASS) ASSIGNMENT NO. 2019-E-0048 PRELIMINARY DESIGN & CLASS ENVIRONMENTAL ASSESSMENT STUDY THE STUDY The Ontario Ministry of Transportation (MTO) has retained AECOM Canada Ltd. (AECOM) to undertake a Preliminary Design and Class Environmental Assessment (EA) Study for the proposed Highway 400 – Highway 404 Link (Bradford Bypass). MTO previously completed a route planning study for the Bradford Bypass in 1997 and a subsequent EA and Recommended Plan were approved in 2002. The proposed Bradford Bypass is a new 16.2 km rural controlled access freeway. The proposed highway will extend from Highway 400 between Lines 8 and 9 in Bradford West Gwillimbury, will cross a small portion of King Township and will connect to Highway 404 between Queensville Sideroad and Holborn Road in East Gwillimbury. There are proposed full and partial interchanges, as well as grade separated crossings at intersecting municipal roads and watercourses, including the Holland River and Holland River East Branch. This project will also include the Preliminary Design for the replacement of the 9th Line structure on Highway 400. The study area within Simcoe County (Town of Bradford West Gwillimbury) and the Regional Municipality of York (Township of King and Town of East Gwillimbury) is shown in the key map. THE PROCESS This Study will follow the approved planning process for a Group ‘A’ project under the MTO Class Environmental Assessment for Provincial Transportation Facilities (2000) (Class EA). General improvements/enhancements to the approved 2002 route of the Bradford Bypass will be considered as part of this EA Study.
    [Show full text]
  • Ontario Road Safety Annual Report 2001 (PDF
    Ontario Road Safety Annual Report 2001 Success through partnership ORSAR inside.cra 2/21/03 6:26 AM Page 2 ORSAROntario Road Safety Annual Report 2001 Cette publication hautement spécialisée n’est disponible qu’en anglais en vertu du règlement 411/97, qui en exemple l’application de la Loi sur les services français. Pour obtenir de l’aide en français, veulliez communiquer avec le ministère des Transports au 1-800-268-4686. Copies of this document can be obtained from: Publications Ontario 880 Bay Street Toronto, Ontario M7A 1N8 Telephone: 416-326-5300 Toll-free: 1-800-668-9938 TTY: 1-800-268-7095 If you are seeking information on how to reduce your risk of being in a collision, visit your local Ministry of Transportation (MTO) office for the latest copy of the Official Driver’s Handbook, call General Publishing at 1-800-387-0141 or 416-445-3333, or visit the Ministry of Transportation Web site at http://www.mto.gov.on.ca. For all other driver manuals and leaflets, call 416-235-3473 or, for MTO information, call 1-800-268-4686. In addition, you may wish to borrow a road safety video from the Ontario Safety League at 416-620-1720. Many of the ministry’s publications are available at automotive retail outlets and book stores. For more information on the data in this publication, please contact the Road Safety Program Office at 416-235-3585. Produced by: Road Safety Program Office Road User Safety Branch Ministry of Transportation 1201 Wilson Avenue Building A, Main Floor, Room 212 Toronto, Ontario M3M 1J8 Phone: 416-235-3585 Fax: 416-235-3633
    [Show full text]
  • Download the Southern Highways Program In
    Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km) Expansion 2020 West 401 Tilbury to London, 0.55 km east of Essex Four to six-lane widening, Median Underway 2022 11.2 $40 – $100M Design Design-Build Rd. 42 to 1.8 km west Chatham-Kent Rd. barriers, Bridge rehabilitation Complete 7 (Merlin Rd.), County of Essex, Contract 1 Expansion 2020 West 3 Ellis Side Rd. to Essex Rd. 23, County of Two to four-lane widening Underway 2023 4.9 $40 – $100M Design Design-Build Essex, Contract 1 Complete Expansion 2020 West 401 Waterloo Reg. Rd. 24 (Hespeler Rd.) to Six to ten-lane widening (HOV) Underway 2023 6.5 Over $80M Design Design-Bid- Waterloo Reg. Rd. 33 (Townline Rd.), Complete Build Cambridge Expansion 2022 West 3 Essex Rd. 23 to Essex Rd. 34, Essex Two to four-lane widening Planned 15.6 Over $80M Planning/EA Public Private County, Contract 2 Underway Partnership Expansion 2022 West 401 Hwy 4 (Colonel Talbot Rd.), Hwy 4 Bridge replacement, Interchange Planned 0 $40 – $100M Planning/EA Design-Build underpass and Glanworth Dr. underpass, improvements Underway County of Middlesex Expansion 2023-2024 West 401 1 km west of Hwy 4 to 0.7 km east of Four to six-lane widening Planned 10.1 $40 – $100M Planning/EA To be Wellington Rd., London to Tilbury, Underway determined Contract 2 Expansion 2023-2024 West 401 1.4 km west of Elgin Rd. 20 (Union Rd.) to Four to six-lane widening Planned 9.7 $40 – $100M Planning/EA To be 1.0 km west of Hwy 4 (Colonel Talbot Underway determined Rd.), London to Tilbury, Contract 2 Expansion Upcoming West 6 North of Freelton to Maltby Rd., Guelph New four-lane highway, Six to ten-lane Planned 16.2 Over $80M Planning/EA To be expansion (Morriston Bypass) widening Underway determined Expansion Upcoming West 7, 85 Kitchener to Guelph, Phase 2, 3 New four-lane highway, New bridge Planned 17.8 Over $80M Planning/EA To be expansion Underway determined Expansion 2017 Central 427 Finch Ave.
    [Show full text]