Download the Southern Highways Program In
Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km) Expansion 2020 West 401 Tilbury to London, 0.55 km east of Essex Four to six-lane widening, Median Underway 2022 11.2 $40 – $100M Design Design-Build Rd. 42 to 1.8 km west Chatham-Kent Rd. barriers, Bridge rehabilitation Complete 7 (Merlin Rd.), County of Essex, Contract 1 Expansion 2020 West 3 Ellis Side Rd. to Essex Rd. 23, County of Two to four-lane widening Underway 2023 4.9 $40 – $100M Design Design-Build Essex, Contract 1 Complete Expansion 2020 West 401 Waterloo Reg. Rd. 24 (Hespeler Rd.) to Six to ten-lane widening (HOV) Underway 2023 6.5 Over $80M Design Design-Bid- Waterloo Reg. Rd. 33 (Townline Rd.), Complete Build Cambridge Expansion 2022 West 3 Essex Rd. 23 to Essex Rd. 34, Essex Two to four-lane widening Planned 15.6 Over $80M Planning/EA Public Private County, Contract 2 Underway Partnership Expansion 2022 West 401 Hwy 4 (Colonel Talbot Rd.), Hwy 4 Bridge replacement, Interchange Planned 0 $40 – $100M Planning/EA Design-Build underpass and Glanworth Dr. underpass, improvements Underway County of Middlesex Expansion 2023-2024 West 401 1 km west of Hwy 4 to 0.7 km east of Four to six-lane widening Planned 10.1 $40 – $100M Planning/EA To be Wellington Rd., London to Tilbury, Underway determined Contract 2 Expansion 2023-2024 West 401 1.4 km west of Elgin Rd. 20 (Union Rd.) to Four to six-lane widening Planned 9.7 $40 – $100M Planning/EA To be 1.0 km west of Hwy 4 (Colonel Talbot Underway determined Rd.), London to Tilbury, Contract 2 Expansion Upcoming West 6 North of Freelton to Maltby Rd., Guelph New four-lane highway, Six to ten-lane Planned 16.2 Over $80M Planning/EA To be expansion (Morriston Bypass) widening Underway determined Expansion Upcoming West 7, 85 Kitchener to Guelph, Phase 2, 3 New four-lane highway, New bridge Planned 17.8 Over $80M Planning/EA To be expansion Underway determined Expansion 2017 Central 427 Finch Ave.
[Show full text]