Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km) Expansion 2020 West 401 Tilbury to London, 0.55 km east of Essex Four to six-lane widening, Median Underway 2022 11.2 $40 – $100M Design Design-Build Rd. 42 to 1.8 km west Chatham-Kent Rd. barriers, Bridge rehabilitation Complete 7 (Merlin Rd.), County of Essex, Contract 1 Expansion 2020 West 3 Ellis Side Rd. to Essex Rd. 23, County of Two to four-lane widening Underway 2023 4.9 $40 – $100M Design Design-Build Essex, Contract 1 Complete Expansion 2020 West 401 Waterloo Reg. Rd. 24 (Hespeler Rd.) to Six to ten-lane widening (HOV) Underway 2023 6.5 Over $80M Design Design-Bid- Waterloo Reg. Rd. 33 (Townline Rd.), Complete Build Cambridge Expansion 2022 West 3 Essex Rd. 23 to Essex Rd. 34, Essex Two to four-lane widening Planned 15.6 Over $80M Planning/EA Public Private County, Contract 2 Underway Partnership Expansion 2022 West 401 Hwy 4 (Colonel Talbot Rd.), Hwy 4 Bridge replacement, Interchange Planned 0 $40 – $100M Planning/EA Design-Build underpass and Glanworth Dr. underpass, improvements Underway County of Middlesex Expansion 2023-2024 West 401 1 km west of Hwy 4 to 0.7 km east of Four to six-lane widening Planned 10.1 $40 – $100M Planning/EA To be Wellington Rd., London to Tilbury, Underway determined Contract 2 Expansion 2023-2024 West 401 1.4 km west of Elgin Rd. 20 (Union Rd.) to Four to six-lane widening Planned 9.7 $40 – $100M Planning/EA To be 1.0 km west of Hwy 4 (Colonel Talbot Underway determined Rd.), London to Tilbury, Contract 2 Expansion Upcoming West 6 North of Freelton to Maltby Rd., Guelph New four-lane highway, Six to ten-lane Planned 16.2 Over $80M Planning/EA To be expansion (Morriston Bypass) widening Underway determined Expansion Upcoming West 7, 85 Kitchener to Guelph, Phase 2, 3 New four-lane highway, New bridge Planned 17.8 Over $80M Planning/EA To be expansion Underway determined Expansion 2017 Central 427 Finch Ave. to Major Mackenzie Dr., New highway, HOV expansion Underway 2021 10.6 Over $80M Design Public Private Vaughan Complete Partnership Expansion 2017 Central 400 Major Mackenzie Dr. to King Rd., HOV expansion Underway 2021 10 Over $80M Design Design-Bid- Vaughan Complete Build Expansion 2018 Central 401 Hwy 412 to Brock St., Whitby Resurfacing, Interchange Underway 2021 2.3 $40 – $100M Design Design-Bid- improvements, Bridge replacement Complete Build Expansion 2018 Central 404 Major Mackenzie Dr. to Stouffville Rd., HOV expansion, Culvert rehabilitation Underway 2021 8.2 $40 – $100M Design Design-Bid- Markham, Whitchurch-Stouffville Complete Build Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km) Expansion 2019 Central 401 Regional Rd. 25 to Credit River Bridge, HOV expansion, Bridge replacement, Underway 2023 17.6 Over $80M Design Public Private Milton, Mississauga Bridge widening, Six to ten-lane Complete Partnership widening (HOV), Six to twelve-lane widening Expansion 2019 Central 404 Hwy 407 to Major Mackenzie Dr., HOV expansion, Bridge replacement Underway 2022 12.9 Over $80M Design Design-Bid- Markham Complete Build Expansion 2022 Central 427, QEW Cawthra Rd. to Dixie Rd., Mississauga New interchange, Bridge rehabilitation, Planned 0 Over $80M Design Design-Bid- Bridge replacement, Culvert Underway Build rehabilitation Expansion 2022 Central 400 King Rd. to Lloydtown-Aurora Rd.,York HOV expansion Planned 12.3 Over $80M Design To be Underway determined Expansion 2023-2024 Central QEW Garden City Skyway, St. Catharines New bridge, Bridge rehabilitation Planned 0 Over $80M Design To be Underway determined Expansion 2023-2024 Central 400 Langstaff Rd. to King Rd., York HOV expansion Planned 14.5 Over $80M Design To be Upcoming determined Expansion Upcoming Central TBD Bradford Bypass, Bradford New highway Planned 16.2 Over $80M Design To be expansion Upcoming determined Expansion 2017 Eastern 417 Maitland Ave. to Island Park Dr., Ottawa Bridge rehabilitation, Six to eight-lane Underway 2021 4.9 $40 – $100M Design Design-Bid- widening, Bridge widening Complete Build Expansion 2021 Eastern 417 Carling Ave. Kirkwood Ave. and Saigon Safety improvements Planned 2022 1.2 $0 – $10M Design Design-Bid- Crt., Ottawa Complete Build Expansion 2021 Eastern 17 Calabogie Rd., Renfrew Intersection improvements Underway 2023 0 $15 – $50M Design Design-Build Complete Expansion 2023-2024 Eastern 17 Scheel Dr. to 3 km west of Bruce St., Two to four-lane widening, New Planned 22.5 Over $80M Planning/EA Public Private Renfrew interchange, New bridge, Bridge Underway Partnership replacement, Bridge widening Rehab 2019 West 401 Patrol yard on Hwy 401 at Regional Rd. New facility Underway 2021 0 $15 – $50M Design Design-Bid- 97, Ayr Complete Build Rehab 2019 West 21 Bayfield River Bridge, Bayfield Bridge replacement Underway 2021 0 $15 – $50M Design Design-Bid- Complete Build Rehab 2019 West 6 Caledonia bypass, Haldimand County Reconstruction Underway 2021 7 $15 – $50M Design Design-Bid- Complete Build Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km) Rehab 2019 West 401 Old Victoria Rd., London to Middlesex Rd. Bridge replacement, Resurfacing, Underway 2022 6 $15 – $50M Design Design-Bid- 32 (Dorchester Rd.), Middlesex Rd. 74 Interchange improvements Complete Build (Westchester Borne) underpass,Thames Centre Rehab 2020 West 21 Lambton Rd. 7 (Lakeshore Rd.) to Grand Resurfacing Underway 2021 22.8 $8 – $20M Design Design-Bid- Bend south limits, Lambton Complete Build Rehab 2020 West 6 Lindsay Rd. 20, Miller Lake to Tobermory, Resurfacing Underway 2021 30 $8 – $20M Design Design-Bid- Bruce Complete Build Rehab 2020 West 402 Lambton Rd. 79 (Nauvoo Rd.) to Resurfacing, Bridge rehabilitation Underway 2021 22 $15 – $50M Design Design-Bid- Middlesex Rd. 39 (Hickory Dr.) and Airport Complete Build Rd. Interchange Rehab 2020 West 3, 6 Various locations, Haldimand County Bridge rehabilitation Underway 2021 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2020 West 21, 402 Hwy 402 to Forest, Lambton Resurfacing Underway 2021 10.4 $8 – $20M Design Design-Bid- Complete Build Rehab 2020 West 4 Saintsbury Line, Lucan Intersection improvements Underway 2021 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2020 West 6 Kenilworth to Mount Forest, County of Resurfacing Underway 2021 11.7 $0 – $10M Design Design-Bid- Wellington Complete Build Rehab 2020 West 402 Various locations, Lambton Intelligent transportation systems Underway 2021 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2020 West 21 Gully Creek Culvert, Bayfield Culvert replacement Underway 2021 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2020 West 402 Truck rest area at the former north truck Facility improvements Underway 2021 0 $0 – $10M Design Design-Bid- inspection facility, Lambton County Complete Build Rehab 2021 West 3 Essex Rd. 34 (Union Ave.) to Hwy 77, Resurfacing Underway 2021 6 $0 – $10M Design Design-Bid- Leamington Complete Build Rehab 2021 West 40 Wallaceburg to Stanley Line, Lambton Resurfacing Underway 2021 17.5 $8 – $20M Design Design-Bid- Complete Build Rehab 2021 West 401, 77 Essex Rd. 46, Comber to Hwy 401, Reconstruction Underway 2021 1.6 $0 – $10M Design Design-Bid- County of Essex Complete Build Rehab 2021 West 401 Grand River Bridges, Kitchener Bridge replacement Underway 2025 5.7 Over $80M Design Construction Complete Manager General Contractor Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km) Rehab 2021 West 401 Dingman Dr. underpass, London Bridge replacement Underway 2022 0 $8 – $20M Design Design-Bid- Complete Build Rehab 2021 West 403 West Quarter Townline Rd. to Bridge rehabilitation, Resurfacing Underway 2022 11.8 $8 – $20M Design Design-Bid- Bishopsgate Rd., County of Brant Complete Build Rehab 2021 West 7 Alder Creek Culvert, west of Kitchener Culvert rehabilitation Underway 2021 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2021 West 402 Various locations, London to Sarnia Signage Planned 2021 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2021 West 7, 85 Various locations, Waterloo Signage Planned 2022 0 $0 – $10M Design Design-Build Complete Rehab 2021 West 3 Norfolk Rd. 59 north (Big Creek Dr.), Delhi Intersection improvements Planned 2021 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2021 West 3 1.0 km west of Walker Rd. (Essex Rd. 11) Road works Planned 2021 12 $0 – $10M Design Design-Bid- to Essex Rd. 8 Complete Build Rehab 2021 West 7 0.4 km west of Waterloo Regional Rd. 1 Resurfacing Planned 2021 5 $0 – $10M Design Design-Bid- to 0.5 km east of Waterloo Regional Rd. 4 Underway Build (Bleams Rd.), Regional Municipality of Waterloo Rehab 2021 West 401 Victoria Rd. to Furnival Rd., eastbound Resurfacing Planned 2021 12.9 $8 – $20M Design Design-Bid- lanes, Chatham-Kent and Elgin County Underway Build Rehab 2016 Central 400 Willow Creek, Barrie Bridge rehabilitation Underway 2021 0 $15 – $50M Design Design-Bid- Complete Build Rehab 2017 Central 401 Leslie St. eastbound off-ramp CNR Interchange improvements Underway 2021 0 $15 – $50M Design Design-Bid- overhead at Leslie St., Toronto Complete Build Rehab 2017 Central 400 King Rd. to Hwy 9, 16th Side Rd., Aurora Bridge replacement Underway 2022 0 $40 – $100M Design Design-Bid- Side Rd., King Complete Build Rehab 2017 Central QEW QEW south end Burlington Bay Skyway to Bridge rehabilitation Underway 2021 0 $15 – $50M Design Design-Bid- North Shore Blvd. East, Hamilton Complete Build Rehab 2018 Central QEW QEW/403/Ford Dr.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages22 Page
-
File Size-