TMS-MC-015 Revision 30 Page 2 of 104 01 April 2016 * REVISED ** ADDED ______
Total Page:16
File Type:pdf, Size:1020Kb
Lockheed Martin Aeronautics Company Supplier Tooling Manual (Tool Manufacturing Specification - Material Control - 015) TMS-MC -015 Applicable to FORT WORTH – MARIETTA - PALMDALE Sites To the extent specified herein REVISION 30 CONTROLLED AND APPROVED BY: Lockheed Martin Aeronautics Company Supplier Quality Management May 2016 IMPORTANT NOTICE: A hard copy of this document may not be the document currently in effect. The current version is ALWAYS the version on the LOCKHEED MARTIN network. TMS-MC-015 Revision 30 Page 2 of 104 01 April 2016 * REVISED ** ADDED _____________________________________________________________________________ TABLE OF CONTENTS PART I. AIRCRAFT ITEMS AND TOOLING - SELLER REQUIREMENTS *1.0 SCOPE Page 5 *2.0 TOOLING DEFINITIONS Page 6 *3.0 INTERCHANGEABLE-REPLACEABLE (I/R) Page 10 4.0 “TO MATCH” HOLE PATTERNS AND OTHER I/R FEATURES Page 10 *5.0 CONTROL OF RECORDS FOR BUYER FURNISHED TOOLING Page 10 *6.0 REPORTING REQUIREMENTS Page 11 *7.0 CONTROL OF BUYER-FURNISHED TOOLS Page 12 8.0 TOOL QUALITY CODE CATEGORIES Page 13 9.0 TOOL PROTECTION AND STORAGE REQUIREMENTS Page 14 *10.0 SHIPPING AND RECEIVING INSTRUCTIONS Page 14 *11.0 TOOLING PERIODIC INSPECTION AND RE-VERIFICATION Page 16 (PI/V) *12.0 TOOLING PERIODIC INSPECTION AND RE-VERIFICATION Page 18 (PI/V) RECORDS 13.0 BUYER FURNISHED AND SELLER TO SELLER TRANSFER OF TOOLS Page 19 14.0 LOCKHEED MARTIN SUBCONTRACT SOURCE BOOKS Page 19 *15.0 BASIC PRINCIPLES FOR PRODUCTION USE OF TOOLING Page 19 PART II. MANUFACTURED SPECIAL TOOLING ONLY – SELLER REQUIREMENTS 1.0 GENERAL Page 20 *2.0 NON-RECURRING TOOL MANUFACTURING Page 20 3.0 SPECIAL TOOLING INSPECTION AND QUALITY REQUIREMENTS Page 21 *4.0 TOOL IDENTIFICATION AND SHIPPING REQUIREMENTS Page 23 5.0 PROCESS FOR TRANSFER OF TOOL DESIGNS FROM SELLER Page 24 TO BUYER 6.0 SEALING CRITICAL LOCATORS Page 24 *7.0 DUPLICATE TOOL MANUFACTURING Page 24 8.0 INTERCHANGEABLE- REPLACEABLE (I/R) DESIGN AND MANUFACTURING Page 24 9.0 NON (I/R) DESIGN AND MANUFACTURING Page 25 PART III. INTERNATIONAL SELLER REQUIREMENTS 1.0 GENERAL Page 26 2.0 CONTROL OF SUPPORT EQUIPMENT (SE), MANUFACTURING TEST EQUIPMENT (MTE) AND SPECIAL TEST EQUIPMENT (STE) Page 26 3.0 CHANGE AUTHORIZATION Page 27 *4.0 TOOLING PRACTICES FOR BUYER FURNISHED TOOLS Page 27 5.0 LISTINGS OF SELLER-FABRICATED/PROCURED ST OR STE Page 27 6.0 DRAWINGS, SKETCHES, TOOL DESIGNS, ETC. Page 27 7.0 CALIBRATION AND RE-CALIBRATION OF BUYER-FURNISHED Page 28 OR SELLER-FABRICATED STE 8.0 TOOLING USE AND TOLERANCE REQUIREMENTS Page 28 IMPORTANT NOTICE: A hard copy of this document may not be the document currently in effect. The current version is ALWAYS the version on the LOCKHEED MARTIN network. TMS-MC-015 Revision 30 Page 3 of 104 01 April 2016 *9.0 QUALITY ASSURANCE REQUIREMENTS OF SELLER-OWNED Page 28 OR SELLER-FABRICATED PRODUCTION TOOLING PART IV. APPENDICES APPENDIX A – REWORK, REPAIR AND COORDINATION GUIDE Page 29 APPENDIX A TABLE OF CONTENTS *1.0 SCOPE Page 29 2.0 TOOLING PRECEDENCE OVER ENGINEERING STATEMENTS Page 29 *3.0 PRESERVATION OF BUYER FURNISHED TOOLS Page 33 4.0 STANDARD REPAIR TOLERANCES AND COORDINATION Page 36 5.0 STANDARD I/R IDENTIFICATION AND REWORK Page 39 6.0 “TO MATCH” HOLE PATTERNS AND OTHER I/R FEATURES Page 45 7.0 SHIPPING AND STORAGE CONTAINERS FOR BUYER FURNISHED TOOLS Page 46 8.0 BUYER FURNISHED TOOLING AND SELLER TO SELLER TRANSFER OF TOOLS Page 48 9.0 SET – UP PROCEDURE FOR FLOOR BASED ASSEMBLY JIGS Page 48 APPENDIX B – AIR FRAME TOOL CODES AND DEFINITION Page 51 LIST OF FIGURES 1. I/R TOOL DESIGN REQUIREMENTS Page 26 LIST OF FIGURES (Appendix A) 1. TYPICAL DS228 COMMON TOOL IDENTIFICATION PLAQUE Page 37 2. DOUBLE RAIL (INTERCHANGEABLE) Page 37 3. DOUBLE RAIL (REPLACEABLE, AND NON I/R, NET OR WITH EXCESS) Page 38 4. SINGLE RAIL SET-BACK TYPE (NON-I/R, NET OR WITH EXCESS) Page 38 5. PLUGGED TOOL HOLE EXAMPLE Page 39 6. TYPICAL TOOLING HOLE AND IDENTIFICATION OF TOOLING HOLES Page 39 7. TYPICAL PIN HOLE AND IDENTIFICATION OF PIN HOLES Page 39 8. DS-1017 I/R IDENTIFICATION LABEL Page 40 9. EXAMPLE OF I/R WEAR GROOVE INDICATORS Page 41 10. I/R HOLE IDENTIFICATION OPTIONS Page 41 11. I/R HOLE IDENTIFICATION EXAMPLE Page 42 12. PRODUCTION TOOL TO CONTROL TOOL Page 46 13. EXAMPLE OF “TO MATCH” HOLE PATTERNS AS DEFINED ON ENG. DRAWING Page 47 14. EXAMPLE OF TYPE I CONTAINER Page 48 15. EXAMPLE OF TYPE II-3 CONTAINER Page 48 16. EXAMPLE OF TYPE I-4 CONTAINER FOR LARGE TOOLS Page 49 TABLES (Appendix A) IMPORTANT NOTICE: A hard copy of this document may not be the document currently in effect. The current version is ALWAYS the version on the LOCKHEED MARTIN network. TMS-MC-015 Revision 30 Page 4 of 104 01 April 2016 UNPAINTED SURFACE COATING - Table 1.0 Page 35 COORDINATION PIN TOLERANCE – Table 2.0 Page 43 PRODUCTION ITEM TO PRODUCTION TOOL – Table 3.0 Page 44 APPLICABLE DOCUMENTS PM-4053 TOOLING MANUAL – Access limited due to Protected Data contained therein. Sellers contracted to fabricate or rework Special Tooling shall contact Buyer to submit access request. PM-4053 contains complete Buyer’s design, manufacturing and preservation requirements that are only briefly described or illustrated in this Manual. Seller shall refer to PM-4053 for complete specifications when this TMS Manual is imposed on a Purchase Order. See Part I, section 1.0. PURCHASE ORDER QUALITY APPENDIX “QX” – Supplier Quality Requirements PURCHASE ORDER QUALITY APPENDIX “QI” – Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements applicable to specific Lockheed Martin sites. FEDERAL AQUISITION REGULATION – FAR Subpart 2.101 Definitions “Special Tooling” FEDERAL AQUISITION REGULATION – FAR 52.245-1 Government Property FEDERAL AQUSITION REGULATION - DFAR 252.211-7003 IUID / RFID PART/DOCUMENT NUMBER POLICY (F-35 Program Standard) – 2YZA00996 IMPORTANT NOTICE: A hard copy of this document may not be the document currently in effect. The current version is ALWAYS the version on the LOCKHEED MARTIN network. TMS-MC-015 Revision 30 Page 5 of 104 01 April 2016 PART I AIRCRAFT ITEMS AND TOOLING - SELLER REQUIREMENTS 1.0 SCOPE *1.1 This Tooling Manual “Manual” is applicable in its entirety when Quality Appendix QX or QI is specified by this Purchase Order (PO). Any deviations from the requirements contained herein shall only be authorized by Buyer, in writing. This Manual contains the contractual requirements to properly control and maintain Seller Owned and Buyer Furnished Tooling in conjunction with all applicable documents listed or referenced in this Manual. The term Buyer Furnished Tooling comprises Special Tooling (ST), Support Equipment (SE), Manufacturing Support Equipment (MSE), Special Test Equipment (STE) and Manufacturing Test Equipment (MTE) for Buyer; as such terms are hereinafter defined in section 2.0, used to produce Items for Buyer. The term Seller Owned comprises any similar type tooling used in the manufacturing process for an item deliverable to Buyer. “Buyer’s assigned Quality Representative” shall mean the assigned Lockheed Martin Quality Representative responsible for on-site oversight of deliverable items, tool manufacturing, rework, repair, in-process acceptance and final acceptance of authorized tasks. 1.2 This Manual contains general and specific requirements that are applicable to airframe structural components as specified in this PO and other applicable documents. This manual is not applicable to Sellers of aircraft systems components that are subject to Automated Test Procedures (ATP). Tooling Manual PM-4053 takes precedence over all manufacturing and preservation requirements when conflicts exist between this Manual and PM-4053, if any. Right of access to PM-4053 is not necessary for all Sellers. *1.2.1 Seller shall consult with Buyer and Buyer’s assigned Quality representative to determine the need for PM-4053 access based upon PO requirements. Only Sellers contracted to perform airframe tooling task on a continual basis shall be granted access. Buyer may choose to forward hard copies of applicable sections from PM-4053 in lieu of granting access. 1.2.2 Seller shall perform authorized tool manufacturing, rework, alter, or repairs per this PO and this Manual. 1.2.3 The terms “Item” or its plural “Items”, “PO”, “Seller”, and “Buyer” as used herein, have the same meaning as the terms “Work”, “Contract”, “SELLER”, and “LOCKHEED MARTIN”, respectively. *1.3 Seller shall immediately notify Buyer’s assigned Quality representative if and when Buyer authorizes the manufacture, rework or repair of any ST to support delivery of Items as specified in this PO. Buyer’s assigned Quality representative shall determine the level of Buyer oversight required for in-process verification and or final acceptance of any such manufacturing, rework or repair of all tooling utilized in the manufacturing process for any deliverable Item. See Part II for Tool Manufacturing Requirements. *1.4 Intra-Lockheed Martin Work Transfer Agreement (IWTA): The performing business unit (herein referred to as Seller) shall be responsible for establishing and maintaining requirements, procedures and processes that ensure configuration control is maintained throughout the duration of this IWTA. See Part I, section 7.0 for specific Tool Control requirements. *1.5 Seller’s quality management system shall ensure all Seller Owned Tooling, SE, MSE, STE and MTE utilized for acceptance or validation of deliverable items to Buyer are calibrated and evidence of such calibration is maintained. IMPORTANT NOTICE: A hard copy of this document may not be the document currently in effect. The current version is ALWAYS the version on the LOCKHEED MARTIN network. TMS-MC-015 Revision 30 Page 6 of 104 01 April 2016 1.6 For the purpose of this Manual, “Parts Manufacturer” is defined as a Seller that manufactures parts, components, assemblies or items that are deliverable to the Buyer, LM Aero site, or facility.