Dipl. Ing. Carsten Wiese Ingenieurbüro

Business Information

Engineering Office Graduate Engineer Carsten Wiese

The Engineering Office of CW provides all services according to the HOAI

• Structural Planning

Contact: Ingenieurbüro CW Dipl. Ing. Carsten Wiese Ritterplan 4a 37073 Göttingen

Tel. 0551 / 54717-0 Fax 0551 / 54717-27

E-Mail : [email protected] Internet: www.statik-cw.de

Dipl. Ing. Carsten Wiese Ingenieurbüro

page 2

RÉSUMÉ

Dipl. Ing. Carsten Wiese

Certified Member of the Chamber of Engineers Niedersachsen (Nr. 4993) Certified Member of the List of Architects (Nr. 7162) Certified Member of the List of Structural Engineers (Nr. 14993)

Personal Data: Date of Birth: 1966 Nationality: German Profession: Graduate Engineer (FH) Degree: 1991 Fachhochschule Hildesheim / Holzminden Major in Structural Engineering Qualifications: Project Management for Structural Planning Development of structural designed plans Development of design and approval planning Creating structural and architectural reports Construction Supervision

Career: 1991 - 1992: Ingenieurbüro Götz, Hildesheim 1992 - 2006: Ingenieurgruppe Wiese GmbH (IGW), Göttingen / Berlin • Partner of IGW since 01.01.1995 • Authorised Signatory of IGW / Göttingen since 21.07.1997 • Authorised Signatoryt of IGW / Berlin since 30.09.1997 since 2006: Business Manager Ingenieur- & Architekturbüro CW

E-Mail: [email protected] Internet: www.statik-cw.de

Dipl. Ing. Carsten Wiese Ingenieurbüro

page 3

Projects (abstract)

The office CW supervised the structural and architectural planning for the following:

• Reconstruction of the District Court Berlin-Mitte • Extension and remodelling of the Vocational School III in Göttingen • Extension and reconstruction of a social building in • New construction of a service centre in Bodenfelde • New construction of a seven floor hotel in Berlin • Statical investigations of several gyms in Göttingen • New Construction of the townhouse O7, Berlin-Friedrichswerder • Reconstruction of a mansion into a Savings Bank-branch in Bodenfelde • Inventory taking and evaluation of a hall roof construction of the Kodak co. • inventory taking of 120 flats of the Kreiswohnungsbau-Gesellschaft Northeim • Sheet-pile wall calculations for the Moroccan Embassy in Berlin • Statement for reconstruction of a multi-storey car park in Köln • New construction of halls in Ludwigsfelde and Göttingen • New construction of a daycare facility for children in Salzgitter • New construction of a hall with distribution centre in Nörten-Hardenberg • Redevelopment of 86 residential units in Göttingen • Extension (new construction refectory) Hainberg-Gymnasium Göttingen • Modification and extension of a nursery in Göttingen • Rebuilding of a hall in Nörten-Hardenberg after an impact of fire • New construction of a service building in Kunduz, Afghanistan

Projects before 2006

The staff of the CW office was also involved in the structural planning of the following projects:

• Statical calculations for the construction site clearance, Friedrichswerder-West • New construction of the Jewish Museum (architect Daniel Libeskind) • New construction of the Exhibition Halls in Berlin (architect Prof. O.M. Ungers & partners) • Modification of the National University Library in Göttingen • New construction of the Family Court (architect Prof. O.M. Ungers & partners) • New construction of the music hall in Berlin (architect Hans Scharoun) • New construction of the City Centre in Wolfsburg • New construction of the Marketplace Centre in Neubrandenburg

E-Mail: [email protected] Internet: www.statik-cw.de

Dipl. Ing. Carsten Wiese Ingenieurbüro

page 4

Projects (extract)

The staff of the CW office was also involved in the following projects.

New construction of a farm building New construction of a data Center Kunduz / Afghanistan

New construction of a data Center New construction of a high school Northeim / Niedersachsen

New construction of a Hall Rebuilding of a Commercial building Nörten-Hardenberg /Niedersachsen Berlin

New construction of a commercial building New construction of a residential building Wolfsburg (2019) Braunschweig

E-Mail: [email protected] Internet: www.statik-cw.de

Dipl. Ing. Carsten Wiese Ingenieurbüro

page 5

New construction of the city-gallery Extension of a hall Wolfsburg Northeim / Niedersachsen

New construction of the Exhibition Halls New construction of the Jewish Museum Berlin Berlin

New construction of a residential building New construction of the do-it-yourself store Braunschweig Braunschweig

Rebuilding of the district court Rebuilding of an office building Berlin Senatsverwaltung Berlin

E-Mail: [email protected] Internet: www.statik-cw.de

Dipl. Ing. Carsten Wiese Ingenieurbüro

page 6

New construction of a sports hall New construction of a residential building Groß-Schneen / Niedersachsen Northeim / Niedersachsen

Rebuilding of the marketplace New construction of the Music Hall Bad Nenndorf / Niedersachsen Berlin

New construction of a bank building New construction of a commercial building Göttingen Göttingen

New construction of an data center New construction of an office building Berlin

E-Mail: [email protected] Internet: www.statik-cw.de

Dipl. Ing. Carsten Wiese Ingenieurbüro

page 7

New construction of a Kindergarten New construction of an data center / Niedersachsen

New construction of a residential building Extension of a high school Northeim / Niedersachsen Göttingen

New construction of a Hall Rebuilding HTZ Northeim / Niedersachsen Berlin

New construction of the Family Court Rebuilding of a residential building Berlin Northeim / Niedersachsen

E-Mail: [email protected] Internet: www.statik-cw.de

Dipl. Ing. Carsten Wiese Ingenieurbüro

page 8

Some Projects in Detail (extract)

Project New construction of a service building in Kunduz Camp Kunduz, Afghanistan Performance General planning (structural and architectural planning) Client Staatliches Hochbauamt Heidelberg

The approx. 4.900 m² commercial building for the German troops in northern Afghanistan contains a kitchen, catering and storage areas, also social rooms and walk-in freezers. Special design requirements were necessary because of the geographical position (earthquake region). Also the safety (proximity to enemy fire) had been a great challenge. The turnkey planning includes structural elements and built-in units. For the interior of the building most material had to be transported from which took about 3 - 5 weeks.

Planning and construction time was only 12 months.

E-Mail: [email protected] Internet: www.statik-cw.de

Dipl. Ing. Carsten Wiese Ingenieurbüro

page 9

Project New construction of a hall with distribution centre Performance Structural planning Client Fa. Rohde AG, Nörten-Hardenberg

The new building complex with 3.000 m² of selling, dispatching, packing, common rooms and distributing.

E-Mail: [email protected] Internet: www.statik-cw.de

Dipl. Ing. Carsten Wiese Ingenieurbüro

page 10

Project Reconstruction of the District Court, Berlin-Mitte

Performance Structural planning Client Senat Berlin

For the reconstruction of the building a multitude of different floor and roof constructions needed a static proof. Next to statical calculations various loading tests were made on the historical and wide-span dome-shaped roof. The roof constructions of the 12 building units completely had to be replaced or redeveloped.

E-Mail: [email protected] Internet: www.statik-cw.de

Dipl. Ing. Carsten Wiese Ingenieurbüro

page 11

Project Reconstruction and new construction of the former planning department into a housing complex with underground car park in Northeim

Performance Structural planning, building physics Client Kreissparkasse Northeim

The former planning department of Northeim has been modified into a modern, senior-oriented housing complex with 12 residential units. The building consists of a redeveloped historical building, a rebuilt central structure and a new construction. The old building is with cellar and below the new construction is the underground car park. For the statical calculation of the old building and the complex roof construction were no actual statics available. The intention was to maintain most of the existing building fabric.

E-Mail: [email protected] Internet: www.statik-cw.de

Dipl. Ing. Carsten Wiese Ingenieurbüro

page 12

Project Reconstruction of the former “Reichsschuldenverwal- tung“ into an office building of the Senate of Health and Human Services in Berlin – Kreuzberg

Performance Structural planning Client Senat Berlin

Annotation: The building consists of 10 building units. The picture only shows a view of the front face of building unit 3.

For the reconstruction of the building all ceiling constructions had to be investigated on load-bearing capacity. The influence of the World War II and the following redevelopment in the seventies led to several structural systems such as reinforced block floors, ribbed ceilings, coffered ceilings and reinforced concrete ceilings. A lot of the ceiling panels had be renewed for the new requirements. Therefore supporting constructions had to be calculated. In the old building nine new lift shafts were assembled. Significant calculation of supporting constructions had to be made here, too. For the supporting of the bearing walls small supporters were used.

E-Mail: [email protected] Internet: www.statik-cw.de

Dipl. Ing. Carsten Wiese Ingenieurbüro

page 13

Project Energetic investigations und concrete redevelopment of residential units in Göttingen

Performance Building physics, architectural planning Client Eigentümergemeinschaft / Hausverwaltung Dawe

The front face of the residential units in the Hauptstraße 80-86 in Göttingen had significant damages of structure. Missing insulation as well as construction and building failings caused moisture problems and mould formations inside. Minor concrete covers in the area of the balcony slab and the balcony parapet, incorrect dewatering and wrongly made floor construction required additional redevelopment measures.

E-Mail: [email protected] Internet: www.statik-cw.de

Dipl. Ing. Carsten Wiese Ingenieurbüro

page 14

Project Modification of the National University Libary, Göttingen

Performance Architectural and structural planning Client Staatliches Baumanagement Göttingen

Annotation:

The libary consists of 7 building units. The picture only shows a view of the front face of building unit 1.

Due to change of use (installation of heavy trolley containers for archiving) in several floors the existing floor constructions, disk systems and column constructions had to be investigated on load-bearing capacity. Remediation measures were necessary because of the insufficient load-bearing capacity of the floors. For the different construction stages physical safety measures were proved.

E-Mail: [email protected] Internet: www.statik-cw.de

Dipl. Ing. Carsten Wiese Ingenieurbüro

page 15

Project Redevelopment of a bearing reinforced concrete construction after an impact of fire in Langelsheim

Performance Investigation, remedial design, structural planning Client Exner Technology GmbH, Langelsheim

The reinforced concrete walls and columns were heavily damaged by an impact of fire. The company Exner Technology GmbH decided to rebuild the building by using the remained steel structure. CW was contracted to: • investigate the structure • develop a remedial design • structural analysis for stability

E-Mail: [email protected] Internet: www.statik-cw.de

Dipl. Ing. Carsten Wiese Ingenieurbüro

page 16

Project Structural Safety Building Logbook, statical investigations of several gyms Performance Structural planning Client Landkreis Göttingen

After a tragic collapse of a ceiling construction of an ice rink in Bad Reichenhall, the Landkreis Göttingen had decided to check the roof and the ceiling construction of several gyms in Göttingen. CW had been contracted to investigate the stability of the ceiling construction of 5 gyms. 1

E-Mail: [email protected] Internet: www.statik-cw.de

Dipl. Ing. Carsten Wiese Ingenieurbüro

page 17

Technical Equipment / Software

Structural planning LP 1-4

Infograph Finite Elements Calculations 2D Beam and Shell Structures 3D Beam and shell Structures Prestressing of Beam and Shell Structures Carrying Capacity Checks Serviceability Checks

Lochner Finite Elements Calculations Program Building Windloads / Reinforcements Rooftops Foundation Engineering (div. programs) Wooden Structure (div. programs) Steel Construction (div. programs) Reinforced Concrete Construction (div. programs) Composite Construction Continuous Beam Masonry Frameworks Loading Assumption

Structural Planning LP 5+6

DICAD / STRAKON Implementation Planning Reinforcement Planning Construction Planning Detailed Planning Cuts Reinforcing Steel – Quantity Determination (per plan) Reinforcing Steel – Quantity Determination (per project)

E-Mail: [email protected] Internet: www.statik-cw.de