ROUTE #538 Carleton Place / Ottawa, Gatineau TEMPORARY EMERGENCY SCHEDULE - in Effect October 1St 2020 Please Arrive at the Bus Stop at Least 5 Minutes in Advance

Total Page:16

File Type:pdf, Size:1020Kb

ROUTE #538 Carleton Place / Ottawa, Gatineau TEMPORARY EMERGENCY SCHEDULE - in Effect October 1St 2020 Please Arrive at the Bus Stop at Least 5 Minutes in Advance ROUTE #538 Carleton Place / Ottawa, Gatineau TEMPORARY EMERGENCY SCHEDULE - In effect October 1st 2020 Please arrive at the bus stop at least 5 minutes in advance. The bus may arrive earlier than scheduled. Veuillez arriver à votre arrêt au moins 5 minutes avant l'heure prévue. L'autobus peut arriver plus tôt que prévu. AM Service Circuit 101B Carleton Place to/à Ottawa Almonte - Shopper's Drug Mart 7:15 Almonte - Arena 7:18 Bridge St / Townline Rd 7:30 Lake Ave / Bridge St 7:32 Lake Ave / Prince St 7:33 Carleton Place Arena 7:34 Coleman St / Franktown Rd 7:36 ARRIVAL/ARRIVÉE Eagleson Park n' Ride (by request/sur demande) 8:05 Hwy 417 / Moodie Dr. (Carling Campus) 8:09 Bayshore Station 8:11 Pinecrest Station 8:12 Queensway Station 8:14 Lincoln Fields Station 8:16 Westboro Station 8:20 Scott St. (Holland Cross) 8:21 Bayview Station 8:22 Lebreton Station 8:23 Slater St / Kent St 8:26 Slater St / Bank St 8:27 Slater St / Metcalfe St 8:29 MacKenzie King Bridge 8:30 Ottawa to/à Carleton Place (AM) Circuit 201B Bayshore Station (West end of station) 8:39 ARRIVAL/ARRIVÉE Bridge St / Townline Rd 9:20 Lake Ave / Bridge St 9:23 Lake Ave / Prince St 9:24 Carleton Place Arena 9:25 Coleman St / Franktown Rd 9:30 For more information / Plus plus d'information www.classicalliancemotorcoach.com | 613 253-3443 | facebook.com/classicalliance ROUTE #538 Carleton Place / Ottawa, Gatineau EMERGENCY TEMPORARY SCHEDULE In effect October 1st 2020 Please arrive at the bus stop at least 5 minutes in advance. The bus may arrive earlier than scheduled. Veuillez arriver à votre arrêt au moins 5 minutes avant l'heure prévue. L'autobus peut arriver plus tôt que prévu. PM Service Circuit 301B Carleton Place to/à Ottawa Carleton Place Arena 16:05 ARRIVAL/ARRIVÉE Bayshore Station 16:35 Lebreton Station ---- Ottawa to/à Carleton Place (PM) Circuit 401A Albert St / Metcalfe St 17:15 Albert St / Bank St 17:15 Lebreton Station 17:21 Bayview Station 17:21 Tunney's Pasture (arrêt "Regional Partner" stop) 17:25 Westboro Station 17:28 Lincoln Fields Station 17:32 Pinecrest Station 17:35 Bayshore Station 17:38 Hwy 417 / Moodie Dr (Carling Campus) 17:40 ARRIVAL/ARRIVÉE Almonte - Shopper's Drug Mart 18:00 Almonte - Arena 18:05 Coleman St / Franktown Rd 18:20 Lake Ave / Bridge St 18:22 Lake Ave / Prince St 18:23 Carleton Place Arena 18:25 Bridge St / Townline Rd 18:28 For more information / Plus plus d'information www.classicalliancemotorcoach.com | 613 253-3443 | facebook.com/classicalliance.
Recommended publications
  • Appendix 5 Station Descriptions And
    Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint.
    [Show full text]
  • 2. Faqs__Transit Service During Confed Line
    Transit Service During Confederation Line Construction – Updates for 2016 REPORT TRANSIT SERVICES DEPARTMENT REPORT FAQs REPORT Transit Service During Confederation Line Construction – Updates for 2016 TITLE DIVISION: Customer Systems and Planning BRANCH Service Planning REPORT Pat Scrimgeour, Assistant General Manager, Customer Date: January 26, 2016 AUTHOR Systems and Planning SCHEDULED DATES FOR REPORT GM’s REVIEW OF REPORT TRANSIT COMMISSION COUNCIL January 19, 2016 February 17, 2016 N/A Q1. How long will the Confederation Line construction service adjustments last for? What are the next phases for service adjustments? A1. The O-Train Confederation Line is scheduled to open in 2018. Service adjustments will take place in sequential phases as sections of the Transitway undergo construction work. Each section of Transitway that closes for conversion to light rail will never reopen for bus operations. The remaining Transitway closures are: • April 2016 – Laurier Station to Lees Station; and • June 2016 – Tunney's Pasture Station to Merton Street. Timelines will be updated as information becomes available. Service adjustment plans will be implemented as these closures take effect. Stations will remain open during the construction period, with the exceptions of Cyrville Station, which was closed in June 2015, and Campus Station, which will close in April 2016. Q2. What are the main highlights of upcoming transit service adjustments during Confederation Line Construction? A2. The following are the main highlights of upcoming transit service adjustments during O- Train Confederation Line Construction: • On April 24, 2016, the Transitway will close between Laurier Station and Lees Station. Most transit service along this section of the Transitway will be relocated to Nicholas Street and Highway 417, using the bus-only lanes that have been built for this purpose.
    [Show full text]
  • Pl180670-Apr-06-2021
    Local Planning Appeal Tribunal Tribunal d’appel de l’aménagement local ISSUE DATE: April 06, 2021 CASE NO(S).: PL180670 The Ontario Municipal Board (the “OMB”) is continued under the name Local Planning Appeal Tribunal (the “Tribunal”), and any reference to the Ontario Municipal Board or Board in any publication of the Tribunal is deemed to be a reference to the Tribunal. PROCEEDING COMMENCED UNDER subsection 34(19) of the Planning Act, R.S.O. 1990, c. P.13, as amended Appellant: Ross Meredith Appellant: Michael Olsen Appellant: Daniel Spence Appellant: Westboro Community Association Subject: By-law No. BL 2018-193 Municipality: City of Ottawa OMB Case No.: PL180670 OMB File No.: PL180670 OMB Case Name: Meredith v. Ottawa (City) HearD: Written Hearing APPEARANCES: Parties Counsel City of Ottawa (the “City”) Timothy Marc Domicile Development Inc. Alan Cohen (the “Applicant”) Meagan Brodie Ross Meredith, Michael Olsen, Kristi Ross Daniel Spencer and Westboro Community Association (the “Appellants”) 2 PL180670 DECISION OF THE TRIBUNAL DELIVERED BY DAVID L. LANTHIER AND ORDER OF THE TRIBUNAL [1] This Decision follows a written hearing of the Tribunal undertaken to determine the Appeals brought by the Appellants pursuant to s. 34(19) of the Planning Act (“Act”) as it was amended by Bill 139. [2] The Applicant made application to the City for a Zoning By-law Amendment to permit the development of what is ultimately now proposed as a 6-storey mixed use building containing 35 condominium units, some commercial space with both in-ground and surface parking (“DeVelopment”) on an assembly of three lots located at 398, 402 and 406 Roosevelt AVe (“Site”) in the City of Ottawa.
    [Show full text]
  • 2019 City Wide Development Charges Background Study
    2019 City-Wide Development Charges Background Study Version for Public Consultation HEMSON C o n s u l t i n g L t d. March 15, 2019 Table of Contents List of Acronyms .......................................................................................... 1 Executive Summary ...................................................................................... 2 A. Purpose of 2019 Development Charges (DC) Background Study .. 2 B. City-Wide and Area-Specific DCs Have Been Calculated ............... 3 C. Development Forecast .................................................................... 4 D. Public Transit Ridership Forecast ................................................... 5 E. Calculated Development Charges .................................................. 5 F. Cost of Growth Analysis .................................................................. 6 G. Development Charges Administration & Policy Considerations ...... 7 I Purpose of 2019 Development Charges Background Study ............. 8 A. Introduction and Background .......................................................... 8 B. Legislative Context .......................................................................... 9 C. The 2019 DC Study is Intended to be an Interim Update ................ 9 D. Consultation And Approval Process ................................................ 9 E. Key Steps In Determining DCs for Future Development-Related Projects ......................................................................................... 10 F. Long-Term Capital
    [Show full text]
  • No. 48, Port Lands Flood Protection and Enabling Infrastructure, Page 54 Credit: Waterfront Toronto/Vid Ingelevics/Ryan Walker
    2021 No. 48, Port Lands Flood Protection and Enabling Infrastructure, Page 54 Credit: Waterfront Toronto/Vid Ingelevics/Ryan Walker Top100 Projects 2021 Changing the Language of Top100 Projects — 2021 An annual report inserted in Infrastructure ReNew Canada’s had an interesting encounter following the release of last January/February 2021 issue year’s report, and I wanted to share in an effort to get I feedback from the rest of the industry. MANAGING Andrew Macklin We had released the 2020 Top100 Projects report and were EDITOR [email protected] getting set for the Key Players and Owners Dinner, which we host every February in Toronto as a celebration of the accomplishments GROUP Todd Latham PUBLISHER of the industry in developing infrastructure megaprojects. I had heard through one of my colleagues that a couple of well-respected PUBLISHER Nick Krukowski members of the industry wanted to chat with me at the event and I should seek them out. So I did. ART DIRECTOR AND Donna Endacott SENIOR DESIGN My first thought was that, not having nearly the expertise as many of you, that I had somehow managed to royally screw something ASSOCIATE Simran Chattha up. Or perhaps they wanted to tell me that I should try a different EDITOR tact to the report? Maybe a new idea for adding a complementary DIGITAL MARKETING Becky Umweni piece for this report? But as it turned out, they wanted to have a COORDINATOR conversation with me about… language. DIGITAL The language of this report has become, to some, quite convoluted. Connie Vitello EDITOR As different jurisdictions use the language familiar to them, it can often mean that, from one project to the next, different words are EVENT Natasha Mawji MANAGER used to describe the same thing.
    [Show full text]
  • Recommended Plan.Pdf
    Blair Station 9-34 Maintenance and Storage Facility Track redundancy within the facility will be provided to ensure The proposed Maintenance and Storage Facility is an integral the ability to move LRVs under vehicle or system failure part of the project, as it will: conditions. • House and service all of the trains needed to operate the The preferred site for the Maintenance and Storage Facility has line been determined based on the following criteria: • Service vehicles to be used on future LRT lines • Site Characteristics (topography, grade, land use compatibility, expansion capability and environmental • House the operations control centre (signalling, considerations) communications) for the line • Facility Operations (turnaround loops, track redundancy, • Be the primary heavy maintenance facility for the LRT layout efficiency and municipal services) network Maintenance of the LRVs is crucial to maintain vehicle • System Operations (connectivity to the line, efficiency and manufacturer's warranties, minimize long term operating costs access to freight rail), and and provide for system safety and reliability. The Maintenance • Relative Costs (capital, operating, maintenance and and Storage Facility will accommodate the following elements property ownership and acquisition) on-site: The proposed Maintenance and Storage Facility for the DOTT 9-35 • Main facility building housing offices, roster areas, meeting project will be located on lands to the west of the existing OC rooms and control equipment Transpo headquarters and bus maintenance facility located on • Storage yard for regular cleaning and minor maintenance the north side of Belfast Road, west of St. Laurent Boulevard and south of the VIA rail corridor. In order to access this • Repair areas for heavy and light maintenance areas for location, a connecting track is required between the DOTT vehicles alignment and the Maintenance and Storage Facility.
    [Show full text]
  • FORWARD THINKING: a TOD Concept Plan for the Pinecrest Foster Farm Community
    FORWARD THINKING: A TOD Concept Plan for the Pinecrest Foster Farm Community 21 December 2018 FORWARD THINKING | SURP 824 This page was intentionally left blank. P A G E ii FORWARD THINKING | SURP 824 EXECUTIVE SUMMARY The Pinecrest Foster Farm community, located in the City of Ottawa’s west end, is anticipating the arrival of the Pinecrest light rail transit (LRT) station in 2023. Ottawa Community Housing (OCH), as a major affordable housing provider in the City, and as a major property owner in the area, has a key interest in ensuring that affordable housing is provided near the LRT station. OCH, with support from the City of Ottawa, has retained the Project Team to create a concept plan of what Ottawa’s Pinecrest Foster Farm community might look like if it were redeveloped according to transit-oriented development (TOD) principles. The Concept Plan is looking to a final build-out in 2035. The vision for Pinecrest Foster Farm is to create an inclusive, mixed-use, and transit-oriented community that is a safe and liveable environment for residents and visitors. The geographic scope for this project is differentiated by the Study Area, the site, and OCH-owned property (Figure 1). The Study Area defines a broad area of interest surrounding the future Pinecrest LRT Station, with a focus on lands north of the Highway 417 and west of Pinecrest Road. The site, which is comprised of key lands to be considered for redevelopment, is the focus of the Concept Plan. The site itself is comprised of nineteen hectares of land, which include OCH, municipal, and provincial properties, as well as a few key non-residential private properties.
    [Show full text]
  • September 2020 Update
    September 2020 Update Transportation Services Department FEDCo September 1, 20201 2 O-Train South Design Progress • The following submissions have been Issued-For- Construction: – Structures throughout the alignment including Rail Bridges at Airport Parkway, Uplands, Leitrim, Bowesville, Earl Armstrong and Lester; and, – Utility Relocations throughout the alignment. 3 O-Train South Design Progress • The City has received construction drawings of the following project elements: – Airport Station; – Guideway for the Airport Link; and, – Structures throughout the alignment including High Road MUP Bridge, Limebank Road Elevated Guideway, Airport Elevated Guideway, VIA Grade Separation, Rideau River Pedestrian Bridge. 4 O-Train South Design Progress • The City has received final design drawings of the following project elements: – Guideway for the South Extension to Limebank; – Guideway for the existing portion of the line; – Landscape design for the existing line and Airport Link; – Dow’s Lake Tunnel, including Tunnel Ventilation; and – Vehicle elements, including the driver’s cab, interior layout and HVAC System. 5 O-Train South Design Progress • The City has received pre-final design drawings of the following project elements: – Walkley Yard Maintenance and Storage Facility (MSF); – Operational Modelling for the Overall System and the MSF; – Signaling and Train Control System; – Greenboro, Carleton, Mooney’s Bay, Gladstone and Walkley Stations; and, – Communication Systems designs for Greenboro and Carleton Stations and interface control documents for several subsystems on the project. 6 O-Train South Construction Progress • Rock excavation started on Gladstone Station; • Walkley Maintenance and Storage Facility structure construction has commenced; • Work has commenced at Ellwood Diamond grade separation. Caisson construction is underway; • Work has begun on Carleton south MUP; and, • Commenced work at South Keys and Bowesville Stations.
    [Show full text]
  • June 2018: Public Presentation of the Preliminary Project and Request for Financial Commitments
    Gatineau at a glance • 284,557 inhabitants (4th largest city in Quebec) • Growing population: + 23% since the 2002 merger (53,200 more people) • Part of the Gatineau-Ottawa metropolitan area (1.2 million inhabitants – 5th largest in Canada) • Close to 60,000 vehicles during peak periods between the two cities • Growing need in terms of moving people • Growing need for public transit (constantly growing ridership since 2014) • Saturation of the road network and few opportunities to increase road capacity • 45,000 Gatineau residents (37.8%) working in Ottawa 2 Bird’s-eye view of Gatineau 3 Bird’s-eye view of Gatineau’s west end, the project focus 4 A rail project for a modern network • 26 km rail system project linking Gatineau’s west end with downtown Gatineau and Ottawa • Links on two bridges for optimal connection to the light train and downtown Ottawa • A high frequency, reliable and comfortable system • 100% electric and environmentally friendly 5 Purpose of the project • Meet the demand for mobility for residents in Gatineau’s west end • Provide a reliable, efficient and ecological link between Gatineau’s west end and the major employment and entertainment poles in downtown Gatineau and Ottawa • Structure urban development and densification in Gatineau’s west end around a high frequency public rail transportation system • Support Gatineau’s economic development by promoting sustainable mobility for employees in current and future businesses and for the tourism sector • Contribute to the government’s greenhouse gas and sustainable mobility
    [Show full text]
  • 10.0 Environmental Effects, Significance and Mitigation
    10.0 ENVIRONMENTAL EFFECTS, SIGNIFICANCE AND MITIGATION To a large degree, environmental effects were avoided or minimized to the extent possible due to the nature of the project (i.e., conversion from BRT to LRT); and during the evaluation of the alternatives and the selection of the preferred alternative. Moreover, many mitigation measures have been directly incorporated into the recommended plan. This section describes the environmental benefits and potential environmental effects of the proposed project and mitigation measures for the effects that cannot be avoided. Sections Include: 10.1 Assessment Approach 10.2 Project Benefits 10.3 Impact Assessment Results, Mitigation, Significance and Residual Effects 10.4 Cumulative Effects 10.5 Accidents and Malfunctions 10.6 Municipal, Provincial, Federal or Other Approvals or Permits 10.7 Future Commitments 10-1 • the magnitude, spatial extent, and duration of the effects; irregularities, but would have no measurable effect on the 10.1 Assessment Approach • the proportion of a species population or the number of population, entity or group as a whole. An assessment was undertaken to describe the potential people affected; environmental effects, both positive and negative of the • direct or indirect effects; Positive (P): An effect that exhibits a beneficial outcome. planning, construction and operational activities associated with • the degree to which the effect responds to mitigation; and the proposed DOTT project. The definitions of significance were adopted for use in this • the level of uncertainty about the possible effect. assessment because many of the impacts cannot be quantified in The assessment of effects involves applying the following steps: absolute terms, although changes and trends can be predicted.
    [Show full text]
  • Appendix a Consultation Record
    APPENDIX A CONSULTATION RECORD MEETING REPORT Date: July 14, 2014 Project: O-Train Extension EA Date of meeting: June 26, 2014 Project Number: 3414015-000 Location: Honeywell Room, Author: E. Sangster Ottawa City Hall Purpose: Transit Design and Operations Workshop Attendees: Initial E-Mail Steven Boyle, City of Ottawa SB [email protected] Alex Carr, City of Ottawa AC [email protected] Vivi Chi, City of Ottawa VC [email protected] Dennis Gratton, City of Ottawa DG [email protected] Frank McKinney, City of Ottawa FM [email protected] Kornel Mucsi, City of Ottawa KM [email protected] Pat Scrimgeour, City of Ottawa PSC [email protected] Colin Simpson, City of Ottawa CS [email protected] Derek Washnuk, City of Ottawa DW [email protected] Yvon Larochelle, OMCIAA YL [email protected] Alex Stecky-Efantis, OMCIAA AS [email protected] Paul Croft, Parsons Corporation PC [email protected] David Hopper, Parsons Corporation DH [email protected] Scott Bowers, MMM Group SB [email protected] Tim Dickinson, MMM Group TD [email protected] Paul Nimigon, MMM Group PN [email protected] Emily Sangster, MMM Group ES [email protected] Peter Steacy, MMM Group PST [email protected] DISTRIBUTION: All Attendees Item Details Action By 1. Introductions CS and PST provided an introduction to the study team, objectives, process and rationale. 2. Operational Considerations DH provided an overview of the existing OC Transpo network, which the O-Train extension will support. Transit network planning principles to be considered as part of this study include coverage, capacity, reliability, and legibility.
    [Show full text]
  • METROPOLE, Ottawa, Ontario
    íê~åëáíJçêáÉåíÉÇ=ÇÉîÉäçéãÉåí Å~ëÉ=ëíìÇó METROPOLE, Ottawa, Ontario 170 LANARK AVENUE Figure 1—Metropole Tower Project data Project name Metropole at Island Park residential tower and townhouses Developer Minto Developments Inc. Date completed 2004 Site area Approximately 2.8 ha (7 acres) Number, type, size 153 apartments in the residential tower, ranging from 90–240 m2 (970–2,600 sq. ft.); of residential units 68 townhouses approximately 165 m2 (1,800 sq. ft.) Other land uses on the site Semi-public open space and pedestrian path to Transitway (rapid bus network) Gross residential density 79 uph Maximum height 32 storeys Parking Underground parking garage with one space per unit for tower residents; one- and two-car garages for townhouse residents; 24 surface spaces for tower visitors Selling price (2005) Townhouses start at $249,900; condos range from $240,000 to $1.5 million Type of transit Transitway (rapid bus network) Distance to transit station 200 m (650 ft.) Pedestrian connectivity Good Transit-Oriented Development Case Study – METROPOLE, Ottawa, Ontario PROJECT SUMMARY METROPOLE TRANSIT SYSTEM OVERVIEW AND Metropole is a residential development in Ottawa's Westboro PROJECT CONTEXT neighbourhood, about six km (3.7 mi.) west of downtown. Comprised Westboro is a residential neighbourhood of a 32-storey condominium tower and 68 townhouses, Metropole close to Ottawa’s downtown. In the takes full advantage of the site's proximity to and view of the Ottawa past 10 years or so, there has been new River. Ottawa's Transitway (rapid bus network) abuts the south side of residential development, mainly near the site, with the Westboro Station less than 200 metres from the site.
    [Show full text]