FORWARD THINKING: a TOD Concept Plan for the Pinecrest Foster Farm Community

Total Page:16

File Type:pdf, Size:1020Kb

FORWARD THINKING: a TOD Concept Plan for the Pinecrest Foster Farm Community FORWARD THINKING: A TOD Concept Plan for the Pinecrest Foster Farm Community 21 December 2018 FORWARD THINKING | SURP 824 This page was intentionally left blank. P A G E ii FORWARD THINKING | SURP 824 EXECUTIVE SUMMARY The Pinecrest Foster Farm community, located in the City of Ottawa’s west end, is anticipating the arrival of the Pinecrest light rail transit (LRT) station in 2023. Ottawa Community Housing (OCH), as a major affordable housing provider in the City, and as a major property owner in the area, has a key interest in ensuring that affordable housing is provided near the LRT station. OCH, with support from the City of Ottawa, has retained the Project Team to create a concept plan of what Ottawa’s Pinecrest Foster Farm community might look like if it were redeveloped according to transit-oriented development (TOD) principles. The Concept Plan is looking to a final build-out in 2035. The vision for Pinecrest Foster Farm is to create an inclusive, mixed-use, and transit-oriented community that is a safe and liveable environment for residents and visitors. The geographic scope for this project is differentiated by the Study Area, the site, and OCH-owned property (Figure 1). The Study Area defines a broad area of interest surrounding the future Pinecrest LRT Station, with a focus on lands north of the Highway 417 and west of Pinecrest Road. The site, which is comprised of key lands to be considered for redevelopment, is the focus of the Concept Plan. The site itself is comprised of nineteen hectares of land, which include OCH, municipal, and provincial properties, as well as a few key non-residential private properties. The OCH lands have a mixture of affordable housing units in the form of two-storey townhomes and a fourteen-storey apartment building. Figure 1: Map showing the Study Area, site, and OCH property. Pinecrest Foster Farm currently functions as an isolated bedroom community that is heavily reliant on automobiles. Based on analysis of Duany and Talen’s Urban to Rural transect, the community fell between a Rural (T2) and Suburban (T3) Zone in the 1970s; whereas, today the area falls within the category of Suburban (T3) or General Urban Zone (T4), which is comprised of many single- or semi-detached low-rise residential units (Figure 2). The introduction of the LRT station, and subsequent redevelopment, has the potential to bring Pinecrest Foster Farm into an Urban Centre (T5) or an Urban Core Zone (T6) on the transect. P A G E iii FORWARD THINKING | SURP 824 Figure 2: Duany & Talen’s Urban to Rural transect1. Strengths, Weaknesses, Opportunities, Challenges (SWOC) Analysis A SWOC analysis was conducted for the Pinecrest Foster Farm community (Figure 3). The Study Area’s proximity to major transportation corridors positions the community well for a transit-oriented redevelopment. OCH and the City’s commitment to providing affordable housing near LRT stations is another strength of the site. However, the Study Area has several weaknesses, including a large brownfield, a discontinuous road network, inadequate infrastructure for pedestrians and cyclists, and a major physical barrier in the form of the highway and its associated sound wall. As such, while there are substantial opportunities for transit-oriented, affordable, mixed-use and mixed-density redevelopment, significant financial investment will be needed from the City, property owners, and developers to remediate the brownfield, construct new roads and connections to neighbouring communities, and support a safe and active public realm. Strengths Weaknesses • Pinecrest LRT station • Former landfill site • Located on prominent corridors • Grading • Good access to public transit • Highway sound barrier • Land owned by OCH and City • Stigmatization of the area • Existing apartment building • Non-pedestrian friendly • Site’s potential S W • Lack of amenities Opportunities Challenges • Improve connectivity • Highway acts as a barrier • Establish a community centre • Difficult to access external • Support from main stakeholders amenities • Surplus of recreational land • Rigidity of road network • Partnerships O C • Hesitation to welcome higher densities • Leverage of funding Figure 3: SWOC Analysis summary. P A G E iv FORWARD THINKING | SURP 824 Concept Plan The Concept Plan developed introduces a modified gridiron street network that supports multi-modal connections to the LRT station and throughout the community. The plan substantially increases the number of residential units onsite from 417 to over 3,800, a third of which are RGI or affordable units. It also provides equitably distributed green and open spaces for a diverse population, while setting aside spaces for institutional, retail, and office uses. A figure showing the site at full build-out with proposed building heights can be seen in Figure 4. A breakdown of key statistics for the proposed site, including dwelling units and density numbers, can be seen in Table 1. Table 1: Summary of proposed statistics in Concept Plan. Specifications Existing Site Proposed Site Number of dwelling units 417 3,821 Number of residents 1,373 9,017 Office (GFA in sq.m.) 0 61,895 Retail (GFA in sq.m.) 1,660 14,924 Number of employees 95 4,187 Number of people and jobs per hectare 77 695 Institutional (GFA in sq.m.) 8,900 61,371 Average Net Floor Space Index (FSI) 0.50 4.44 Figure 4: Concept Plan with proposed building heights in storeys. P A G E v FORWARD THINKING | SURP 824 Implementation Prior to beginning construction of new buildings in the Pinecrest Foster Farm community, many infrastructure projects and other activities will need to be undertaken. Table 2 below provides an overview of these projects. Table 2: Pre-construction infrastructure projects. Approx. Stage Project Timeline Form community engagement task force, work on master plans, secure 0-3 Research I financing, develop P3 strategies, conclude Pinecrest and Queensview Planning years Study Conduct public engagement, construct LRT station, relocate softball diamonds, 2-6 II realign highway on/off-ramp, submit OPA and ZBLA applications years Conduct public engagement, begin brownfield remediation, submit other 6-9 Implementation III planning applications, upgrade parks years 10-20 IV Construct internal road network, re-house tenants, begin redevelopment years In Stage IV, redevelopment of the site can begin. The Project Team recommends that development be carried out in a manner consistent with Figure 6. This Phasing Plan prioritizes lands closest to the future Pinecrest LRT Station as well as substantial upgrades to Ruth Wildgen Park. Figure 5: How the comm unity might look in 2035. Figure 6: Phasing plan for redevelopment. P A G E vi FORWARD THINKING | SURP 824 ACKNOWLEDGEMENTS This report is the result of the Land Use Planning Project Course at Queen’s University’s School of Urban and Regional Planning. Retained by Ottawa Community Housing (OCH), the Project Team presented the results of their work to OCH and City of Ottawa staff on December 10, 2018. The Project Team would like to thank: Robert MacNeil, Cliff Youdale, Dan Dicaire and Joanie Mitchell from Ottawa Community Housing for their engagement and assistance throughout the duration of this project. Professor David Gordon, for his tireless dedication to this project and to our team’s professional development. The various stakeholders and experts who helped guide the project by meeting with the Project Team, attending our mid-term design charrette and final presentations, and providing invaluable feedback and assistance over the course of the semester: Ajay Agarwal, Carl Bray, Mary Dickinson, Adam Fobert, John Henderson, Paul Landry, Gavin Luymes, Marc Magierowicz, Alain Miguelez, Dhaneshwar Neermul, Christine Ono, Mike Sahidy, Mike Schmidt, Ian Semple, Robin Souchen, Patricia Streich, Chris Swail, Kyla Tanner, Miguel Tremblay, Chris Wicke, and Mark Young. Angela Balesdent and Jo-Anne Tinlin at Queen’s University for their administrative and logistical support. Finally, our friends, family, and colleagues at the School of Urban and Regional Planning, for their kind words and encouragement these past four months. The lands covered in this report are the traditional, unceded territory of the Algonquin people. PROJECT TEAM BR: Vincent Desforges, Gabrielle Snow, Professor David Gordon, Zoë Acton, Cameron Hodgins FR: Dmitry Kurylovich, Stephanie Magnanelli, Solé Carvajal, Leah Weiler, Colleen Ivits, Charlie Smith P A G E v i i FORWARD THINKING | SURP 824 TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................................................................................ III STRENGTHS, WEAKNESSES, OPPORTUNITIES, CHALLENGES (SWOC) ANALYSIS .................................................IV CONCEPT PLAN .................................................................................................................................................... V IMPLEMENTATION ..................................................................................................................................................VI ACKNOWLEDGEMENTS .................................................................................................................................................... VII PROJECT TEAM .................................................................................................................................................................. VII INTRODUTION ..................................................................................................................................................................1-1
Recommended publications
  • Appendix 5 Station Descriptions And
    Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint.
    [Show full text]
  • The Ottawa Coalition of Community Houses: a Community Report, 2004
    The Ottawa Coalition of Community Houses: A Community Report, 2004 1 The Ottawa Coalition of Community Houses: A Community Report, 2004 Project Advisory Committee: Barbara Carroll, Chair, Coalition of Community Houses; Director, Debra Dynes Family House Andrea Fox, Ottawa Community Housing Corporation Sylvie Manser, Director, Banff Ave. Community House Desiree Rapoch, Coordinator, Morrison Gardens Community House Research Coordinator: Christine Culham Research Assistant: Beth Gibeault We would also like to thank all of the House Coordinators and Directors for their participation, advice and assistance, the communities in which we serve, Ottawa Community Housing Corporation and Tiffaney Zapotochny for her administrative assistance This project was made possible by the United Way of Ottawa 2 Table of Contents Executive Summary p.4 Recommendations p. 5 Methodology p.7 Definitions p.8 Ottawa Coalition of Community Houses p.10 Demographics p.11 History p.17 Governance p.22 Functions of the Community House Coordinator/Director Operations p.28 Programs and Services p.32 Community House Usage p.35 Ottawa Coalition of Community Houses: p.36 Ottawa 20/20 Conclusion p.39 Appendices p.44 Endnotes p.60 3 EXECUTIVE SUMMARY The Ottawa Coalition of Community Houses, through a partnership grant provided by the United Way of Ottawa, undertook a study to determine the impact of Community Houses on the communities that they serve; a survey of programming and services provided by the Community Houses; identify gaps in service; define the model, governance structure, mission and mandate; identify patterns of usage by members of the community; and identify the demographics of the communities served by the Community Houses and to make recommendations to the Coalition, funding agencies, existing partners, the City of Ottawa, and provincial and federal levels of government.
    [Show full text]
  • Ottawa Transportation Report.Pdf
    OTTAWA THE IMPACT OF TRANSPORTATION IMPROVEMENTS ON HOUSING VALUES IN THE OTTAWA REGION Don R Campbell, Senior Analyst Melanie Reuter, Director of Research Allyssa Epp, Research Analyst WWW.REINCANADA.COM AUTHORS Don R. Campbell, Senior Analyst, REIN Ltd Melanie Reuter, Director of Research, REIN Ltd Allyssa Fischer, Research Analyst, REIN Ltd © The Real Estate Investment Network Ltd. 6 – 27250 58 Cr Langley, BC V4W 3W7 Tel (604) 856-2825 Fax (604) 856-0091 E-Mail: [email protected] Web Page: www.reincanada.com Important Disclaimer: This Report, or any seminars or updates given in relation thereto, is sold, or otherwise provided, on the understanding that the authors – Don R. Campbell, Melanie Reuter, Allyssa Fischer, and The Real Estate Investment Network Ltd and their instructors, are not responsible for any results or results of any actions taken in reliance upon any information contained in this report, or conveyed by way of the said seminars, nor for any errors contained therein or presented thereat or omissions in relation thereto. It is further understood that the said authors and instructors do not purport to render legal, accounting, tax, investment, financial planning or other professional advice. The said authors and instructors hereby disclaim all and any liability to any person, whether a purchaser of this Report, a student of the said seminars, or otherwise, arising in respect of this Report, or the said seminars, and of the consequences of anything done or purported to be done by any such person in reliance, whether in whole or part, upon the whole or any part of the contents of this Report or the said seminars.
    [Show full text]
  • Palliative Care Home Care Services, Montreal Region CLSC Postal Code # of MD's # of Nurses Allied Health Professionals Hospice/H
    Palliative Care Home Care Services, Montreal region CLSC Postal Code # of MD's # of nurses allied health professionals Hospice/Hospital Prognosis for palliative profile Contact # Lac St Louis H9K – H9T – H9W – H9X 3 2 OT, PT, SW, PAB West Island Palliative Care flexible 514 697-4110 X 3877 H8Y – H8Z – H9A – H9B – Pierrefonds H9C – H9E –H9G –H9H –H9K 2 2 OT, SW, PAB, nutritionist West Island Palliative Care < 1 year Dorval - Lachine H8S-H8T 1 2 OT, SW, PAB Hopital Lachine flexible 514 – 639-0063 X 14254 H4Y-H9P-H9S - H8N-H8P- flexible for RN's, but some MD's only accept < 3 Lasalle Ouest de l'ile H8R 3 2 OT, PT, SW, PAB, nutritionist Champlain, Lachine, WI PCU months 514 - 364 - 2572 X 25100 Mount Sinai, St Raphael, Glen, Jewish René-Cassin H3X- H4V- H4W 4 (Mount Sinai program) 2 PT, OT, SW, psychologist, General < 6 months 514-484-7878 X 61330 OT, PT, SW, psychologist, Mount Sinai, Glen, St Raphael, Jewish NDG/Benny Farm Cavendish H4A-H4B-H4V-H4X 5 (4 from Mount Sinai) 2 spiritual care General flexible 514) 484-7878 ext 61242 Cote-des-neiges H2V-H3P-H3R-H3S-H3T-H3V-H3W-H4P3 1 PT, OT, SW, psychologist St Raphael, Mount Sinai < 6 months 514-731-1386 X 8035 Parc Extension H3N 3 1 PT, OT, SW, psychologist St Raphael, Mount Sinai < 6 months De la Montagne Metro H3A-H3G-H3H-H3Y-H3Z 3 1 PT, OT, SW, psychologist St Raphael, Mount Sinai < 6 months (514)-934-0505 X 7290 Pointe St. Charles H3K Verdun H3E-H4E-H4G-H4H 10 3 SW, OT CHSLD Champlain < 6 months (514) 766-0546 X 53503 Sud-Ouest Verdun St Henri H3C-H3J-H4C-H4Z-H5A 10 1 OT, PT, SW CHSLD Champlain flexible 514 933-7541 X 58445 St-Louis du Parc H2T-H2W Des Faubourgs H2K-H2L-H2X-H2Z-H3R-H5B 2 2 OT, PT, SW, nutritionist Notre Dame, Marie Clarac flexible 514-527-9565 X 3624 Jeanne-Mance Plateau Mont Royal H2H-H2J 2 1 SW, OT, PT, spiritual care CHUM, Hopital Notre Dame < 6 months 514-521-1320 X 6521 Bordeaux-Cartierville H3M-H4J-H4K 3 2 SW CHSLD des Batisseurs flexible (514) 331-2572 X 4169 Bordeaux-Cartierville-St Laurent St.
    [Show full text]
  • Alexandra Bridge Replacement Project
    Alexandra Bridge Replacement Project PUBLIC CONSULTATION REPORT OCTOBER TO DECEMBE R , 2 0 2 0 Table of Contents I. Project description .................................................................................................................................... 3 A. Background ........................................................................................................................................ 3 B. Project requirements ..................................................................................................................... 3 C. Project timeline ................................................................................................................................ 4 D. Project impacts ............................................................................................................................. 4 II. Public consultation process............................................................................................................ 5 A. Overview .............................................................................................................................................. 5 a. Consultation objectives ............................................................................................................ 5 b. Dates and times ............................................................................................................................ 5 B. Consultation procedure and tools ..........................................................................................
    [Show full text]
  • Illumination Lebreton, by Rendezvous Lebreton Group, All Incomes, All Abilities
    LEBRETON BY RENDEZVOUS LEBRETON GROUP A Powerful Expression of Capital City Building and National Identity BY RENDEZVOUS LEBRETON GROUP Linking, Connecting, Completing. IllumiNATION LeBreton, by RendezVous LeBreton Group, all incomes, all abilities. As it once was, it will be a will be many things. It will be a place that celebrates its past nexus point through which people, ideas and creativity while inspiring a bright future. It will be a place where First will move—both physically via multi-modal means and Nations culture and spirituality are key—embraced, shared creatively through innovative experiences, businesses and and celebrated. It will be a place where the traditions of places. It will once again take its place among the diverse innovation that once energized LeBreton Flats will once neighbourhoods of the National Capital—the final piece of a again fuel the future of Canada. Like the LeBreton Flats of great puzzle, linking, connecting, completing. old, it will be a place where all are welcome—all peoples, IllumiNATION LeBreton design Our vision, harkening back to LeBreton Flats’ entrepreneurial spirit, introduces and manages a world-class anchor institution in principles the form of a Major Event Centre, which will be the new home of the Ottawa Senators of the National Hockey League. The massive IllumiNATION LeBreton is poised to become a signature roundhouse, which was located on the western edge of the destination for visitors to Canada’s Capital and a point of civic Option Lands, partly inspires the form and scale of the proposed pride for its residents. In striving to fulfill this potential, RLG is Major Event Centre as does its prominent location.
    [Show full text]
  • Lebreton Flats MASTER CONCEPT PLAN Lebreton Flats Master Concept Plan
    Federal Land Use, Design, and Transaction Public document Approval Submission No. 2020-P202 To Board of Directors For DECISION Date 2020-01-23 Subject/Title Federal Land Use Approval for the LeBreton Flats Preliminary Master Concept Plan Purpose of the Submission • To obtain approval of the Board of Directors for the preliminary version of the LeBreton Flats Preliminary Master Concept Plan. Recommendations • That the Federal Land Use Approval for the LeBreton Flats Preliminary Master Concept Plan be granted, pursuant to Section 12 of the National Capital Act, subject to the following condition: o That the subsequent phases of planning, transaction and development be subject to separate level 3 processes of federal review and approval. • That the preparation and signature of the Federal Land Use Approval document for the LeBreton Flats Preliminary Master Concept Plan and associated components be delegated to the Vice President, Capital Planning Branch. Submitted by: Submitted by: Pierre Vaillancourt, A/Vice president, Capital Planning__ Katie Paris, Director, Building LeBreton___________ Name Name ____________________________________________ ___________________________________________ Signature Signature Submission: 2020-P202 Page 1 of 7 Federal Land Use, Design, and Transaction Public document Approval Submission 1. Authority National Capital Act, sections 11 and 12 2. Project Description Background The LeBreton Flats Preliminary Master Concept Plan is a 30-year plan for the future of LeBreton Flats. The site is a 29-hectare (over 71-acre) property owned by the National Capital Commission (NCC). The development area is bounded by the Sir John A. Macdonald Parkway and Wellington Street to the north; Albert Street and the escarpment to the south; the rail tracks north of the Trillium O-Train line to the west; and Booth Street, Lett Street and the future Ottawa Public Library and Library and Archives Canada joint facility site to the east.
    [Show full text]
  • Organization and Management of Benny Fram Site Public, Private and Semi-Private Spaces September 25 , 2003
    Organization and Management of Benny Fram Site Public, Private and Semi-private Spaces th September 25 , 2003 ORGANIZATION AND MANAGEMENT OF BENNY FARM SITE INTRODUCTION This report is organized into four sections as follows: 1. Public, Private and Semi-Private Spaces 2. Legal Tools 3. Examples of Residential Projects 4. Recommendations and Next Steps In the first section, we analyze the Benny Farm site in terms of the different property regimes, namely, public, private and semi-private land. We also identify the issues of overall site integration and management. In the second part, we provide two possible legal tools that may be used to ensure that the whole project is integrated in terms of overall architectural style and landscaping quality and that the different areas are properly maintained. In the third part, we provide examples of other residential projects in the Montreal area. Finally, we provide our preliminary recommendations as to which legal regime is best suited for Benny Farm and how you may proceed. 1. PUBLIC, PRIVATE AND SEMI-PRIVATE SPACES With reference to the site plan prepared by Saia et Barbarese/Claude Cormier in August 2003 (the “Site Plan”), the site may be organized into three property regimes: public, private and semi-private. 1.1 Public Spaces (a) Definition In the event that the City acquires a portion of the northeast corner of the site for a community recreation center, such area will become a public space. The Benny Farm site plan includes a new road west of Cavendish. This road is an extension of Prince of Wales Avenue, which will be transferred to the City and become public.
    [Show full text]
  • 5.0. Community Architecture in Montreal
    5.0. Community Architecture In Montreal The main focus of the last chapter was to present the evolution of community participation in architecture at a global scale. However, since the case study project of this research report is situated in the city of Montréal, Canada, it is also important to present a more local perspective of community-based architecture. The following text accounts the significant events in the history of Montréal that fortified the concept of community participation in architecture in the city. 5.1. The Milton-Park Project At the beginning of this research, one of the main reasons for selecting a project based in Montréal was the feasibility factor due to my location in this city. However, what I did not know at that time was how Montréal has had an active history of community-based initiatives in architecture. One such example and probably the most successful is that of my very neighborhood, popularly known as the McGill Ghetto, located next to the McGill University. The neighborhood is formally known as the Milton-Park area and comprises about eight blocks, which were the “battleground” between the community members residing in this area and a private developer from 1968 to 1983 (Helman 9, 13). Claire Helman in her book, The Milton-Park Affair: Canada’s Largest Citizen-Developer Confrontation, gives a step- by-step account of the efforts of the residents who were involved in a fight to protect their houses and neighborhood from the fate of destruction. In 1860s, the 53 development of the Milton-Park area began with the construction of a new Hotel- Dieu.
    [Show full text]
  • 1 Report to Rapport Au
    1 Report to Rapport au: Transit Commission Commission du transport en commun 19 June 2019 / 19 juin 2019 Submitted on June 10, 2019 Soumis le 10 juin 2019 Submitted by Soumis par: John Manconi, General Manager / Directeur général, Transportation Services Department / Direction générale des transports Contact Person Personne ressource: John Manconi, General Manager / Directeur général Transportation Services Department / Direction générale des transports 613-580-2424 ext./poste 52111, [email protected] Ward: CITY WIDE / À L'ÉCHELLE DE LA File Number: ACS2019-TSD-TS-0002 VILLE SUBJECT: Confederation Line: Customer Service Operational Readiness OBJET: Ligne de la Confédération : Préparation opérationnelle du service à la clientèle REPORT RECOMMENDATION That the Transit Commission receive this report for information. RECOMMANDATION DU RAPPORT Que la Commission du transport en commun prenne connaissance de ce rapport. 2 EXECUTIVE SUMMARY The opening of O-Train Line 1, the Confederation Line, will mark an exciting and historic transformation in the way transit service is delivered in the city of Ottawa. OC Transpo has been working with the Rideau Transit Group (RTG) and partners from across the city to transform the current transit service into a world-class multimodal transit system and ensure a positive end-to-end customer experience starting on day one. The opening of Line 1 and the major changes to the bus route network that will follow, will be the largest service change ever for OC Transpo customers. Because our customers are our priority and their experience through and beyond this transitional period is important to us, OC Transpo staff are committed to ensuring that customers are prepared, comfortable and knowledgeable about these changes and the transition period in which they will occur.
    [Show full text]
  • Cultural Heritage Impact Statement Ottawa Public Library/Library and Archives Canada Joint Facility 555 Albert Street, Ottawa, ON
    Cultural Heritage Impact Statement Ottawa Public Library/Library and Archives Canada Joint Facility 555 Albert Street, Ottawa, ON Prepared for: Ralph Wiesbrock, OAA, FRAIC, LEED AP Partner / Principal KWC Architects Inc. 383 Parkdale Avenue, suite 201 Ottawa, Ontario K1Y 4R4 T: 613-238-2117 ext. 225 C: 613-728-5800 E: [email protected] Submitted by: Julie Harris, CAHP, Principal & Heritage Specialist, Contentworks Inc. E: [email protected] T: 613 730-4059 Date: 17 June 2020 Table of Contents 1 INTRODUCTION ................................................................................................................................... 2 1.1 ABOUT THE CHIS ........................................................................................................................................... 2 1.2 SOURCES .......................................................................................................................................................... 2 1.3 DEVELOPMENT SITE ...................................................................................................................................... 3 2 HERITAGE RESOURCE DESCRIPTIONS AND HISTORIES ........................................................ 9 2.1 FORMAL MUNICIPAL RECOGNITIONS .......................................................................................................... 9 2.2 OTHER HERITAGE ....................................................................................................................................... 18 3 PROPOSED
    [Show full text]
  • Laneway House
    building affordable homes and communities BACKGROUND adverse economic reality demographic transformation new lifestyles archaic technologies still dominate depleting natural resources ignorance of do-it-yourself skills rampant urban sprawl inadequate zoning HOMES the grow home • Narrow-front (14 feet – 16 feet) • Unfinished basement and attic • Choice of interior components and finishes by occupants • Built as condominiums (shared maintenance costs) Plan Wall Area Energy Monthly Component Heat Loss (Watts) Component Heat Loss (Watts) Configuration (m2) Required Heating Cost (KWh) ($) Bungalow Two story Detached Semi-det Rowhouse Roof 558 279 Roof 279 279 279 Plan A (H) 160 2856 134 Walls 1005 1643 Walls 1643 1005 367 Plan B (T) 140 2501 117 Doors and Windows 1598 1598 Doors and Windows 1598 1598 1598 Basement 1560 1249 Basement 1249 780 311 Plan C (L) 123 2198 103 Infiltration 1547 1413 Infiltration 1413 1250 1087 Plan D 112 2001 94 Total 6267 6182 Total 6182 4912 3642 (rectangle) Annual Energy Consumed 9154 9029 Annual Energy 9029 7174 5320 Plan E 106 1894 89 (KWh) Consumed (KWh) (square) Associated Heating Costs $429 $423 Heating Costs $423 $336 $249 Plan F 94 1679 79 (Montreal) (Montreal) (circle) six months later the adoption of innovation curve First Floor Basement First Floor Basement small builders / medium-sized projects previous ownership household type new spaces in basements homeowners’ work the next home • Narrow-front (20 feet – 25 feet) • Buyers select the number of levels • Adaptable and flexible interiors • Optional unfinished basement and attic • Choice of interior components and finishes by occupants • Built as condominiums (shared maintenance costs) • Common outdoor parking X buyer choice: size buyer choice: components buyer choice: layout D a y 2 D a y 3 D a y 4 D a y 5 D a y 6 D a y 7 D a y 8 D a y 9 D a y 12 interior panels 1 2 3 4 5 6 7 exterior panels 14’ x 8’ 16’ x 8’ 18’ x 8’ 20’ x 8’ 22’ x 8’ 28’ x 8’ 32’ x 8’ exterior features BALCONY PORCH ENTRY bradford, u.k.