Chantiers De Construction En Cours

Total Page:16

File Type:pdf, Size:1020Kb

Chantiers De Construction En Cours Chantiers de construction en cours Agglomération de Montréal Décembre 2012 Une publication de Montréal en statistiques Nombre de Valeur Division de la planification urbaine chantiers (M $) Direction de l’urbanisme et du développement économique Agglomération de Montréal 120 14 781,3 Service de la mise en valeur du territoire Montréal 111 14 242,1 Ahuntsic-Cartierville 7 318,2 120 chantiers en cours Anjou 1 86,0 14,8 milliards de dollars d’investissements Côte-des-Neiges–Notre-Dame-de-Grâce 9 2 768,4 Lachine 0 0,0 La Commission de la construction du Québec a récemment publié la liste des LaSalle 4 354,3 chantiers en cours en décembre dernier sur le territoire de l’agglomération de Le Plateau-Mont-Royal 3 52,0 Montréal. Nos compilations spéciales révèlent que : Le Sud-Ouest 12 2 110,0 • parmi les chantiers en cours sur l’île de Montréal, on compte 65 projets L'Île-Bizard–Sainte-Geneviève - - résidentiels, 37 projets institutionnels et commerciaux, 16 projets de génie Mercier–Hochelaga-Maisonneuve 7 832,5 civil et de voirie ainsi que 2 projets industriels Montréal-Nord 5 115,3 Outremont 1 120,0 • l’institutionnel et le commercial comptent pour 46 % de la valeur totale des Pierrefonds-Roxboro 3 96,8 chantiers, soit 6,7 G$ et la valeur des projets industriels s’élève à 184 M$, soit Rivière-des-Prairies–Pointe-aux-Trembles 4 210,0 1,2 % des investissements totaux Rosemont-La Petite-Patrie 3 39,0 Saint-Laurent 8 617,0 • les trois arrondissements qui bénéficient le plus des sommes investies dans Saint-Léonard 1 183,9 l’agglomération sont Ville-Marie (29 %), Côte-des-Neiges–Notre-Dame-de- Verdun 6 1 099,5 Grâce (19 %) et Le Sud-Ouest (14 %) Ville-Marie 31 4 295,2 Villeray–Saint-Michel–Parc-Extension 3 106,0 Répartition de la valeur des investissements selon la catégorie Divers arrondissements 3 838,0 Baie d'Urfé - - Génie civil et voirie Beaconsfield - - Institutionnel 2 361,1 M$ Côte-Saint-Luc 1 11,6 et commercial 16,0 % 6 729,6 M$ Dollard Des-Ormeaux 1 5,5 45,5 % Dorval 2 415,0 Hampstead - - Kirkland - - Montréal-Est - - Montréal-Ouest - - Résidentiel 5 506,6 M$ Mont-Royal 2 24,1 37,3 % Pointe-Claire - - Sainte-Anne-de-Bellevue - - Industriel 184,0 M$ Senneville 1 15,0 1,2% Westmount 2 68,0 Source : Commission de la construction du Québec, compilation spéciale, Montréal en statistiques. en spéciale, Montréal compilation du Québec, : Commission de la construction Source Chantiers de construction en cours - Agglomération de Montréal Décembre 2012 Répartition du nombre et de la valeur des chantiers selon le territoire et le type de construction Résidentiel Industriel Institutionnel et commercial Génie civil et voirie Total Nombre Valeur (M $) Nombre Valeur (M $) Nombre Valeur (M $) Nombre Valeur (M $) Nombre Valeur (M $) Agglomération de Montréal 65 5 506,6 2 184,0 37 6 729,6 16 2 361,1 120 14 781,3 Montréal 60 5 373,1 2 184,0 34 6 673,9 15 2 011,1 111 14 242,1 Ahuntsic-Cartierville 3 160,0 - - 3 148,3 1 9,9 7 318,2 Anjou - - - - 1 86,0 - - 1 86,0 Côte-des-Neiges–Notre-Dame-de-Grâce 3 167,9 - - 5 2 530,5 1 70,0 9 2 768,4 Lachine - - - - - - - - 0 0,0 LaSalle 2 207,5 - - 1 29,8 1 117,0 4 354,3 Le Plateau Mont-Royal 3 52,0 - - - - - - 3 52,0 Le Sud-Ouest 9 1 852,0 - - 1 30,0 2 228,0 12 2 110,0 L'Île-Bizard–Sainte-Geneviève - - - - - - - - 0 0,0 Mercier–Hochelaga-Maisonneuve 4 687,0 - - 3 145,5 - - 7 832,5 Montréal-Nord 4 59,0 - - - - 1 56,3 5 115,3 Outremont - - - - - - 1 120,0 1 120,0 Pierrefonds-Roxboro 1 25,0 - - 1 5,8 1 66,0 3 96,8 Rivière-des-Prairies–Pointe-aux-Trembles 3 201,0 1 9,0 - - - - 4 210,0 Rosemont-La Petite-Patrie 1 20,0 - - 2 19,0 - - 3 39,0 Saint-Laurent 4 227,0 1 175,0 2 105,0 1 110,0 8 617,0 Saint-Léonard - - - - - - 1 183,9 1 183,9 Verdun 6 1 099,5 - - - - - - 6 1 099,5 Ville-Marie 15 520,2 - - 14 3 563,0 2 212,0 31 4 295,2 Villeray–Saint-Michel–Parc-Extension 2 95,0 - - 1 11,0 - - 3 106,0 Divers arrondissements - - - - - - 3 838,0 3 838,0 Baie d'Urfé - - - - - - - - 0 0,0 Beaconsfield - - - - - - - - 0 0,0 Côte-Saint-Luc - - - - 1 11,6 - - 1 11,6 Dollard Des-Ormeaux 1 5,5 - - - - - - 1 5,5 Dorval 1 65,0 - - - - 1 350,0 2 415,0 Hampstead - - - - - - - - 0 0,0 Kirkland - - - - - - - - 0 0,0 Montréal-Est - - - - - - - - 0 0,0 Montréal-Ouest - - - - - - - - 0 0,0 Mont-Royal 1 18,0 - - 1 6,1 - - 2 24,1 Pointe-Claire - - - - - - - - 0 0,0 Sainte-Anne-de-Bellevue - - - - - - - - 0 0,0 Senneville 1 15,0 - - - - - - 1 15,0 Westmount 1 30,0 - - 1 38,0 - - 2 68,0 Chantiers de construction en cours - Agglomération de Montréal Décembre 2012 Catégorie : GCV - Génie civil et voirie R - Résidentiel Liste des chantiers de 5 M$ et plus IC - Institutionnel et commercial Note : Les nouveaux projets (depuis mars 2012) apparaissent en jaune IND - Industriel Ville Emplacement Propriétaire Description Valeur Début du Fin du Catégorie (M $) chantier chantier Côte-Saint-Luc Édifice Mackle et McMurray Commission scolaire Marguerite-Bourgeoys Agrandissement de l'école de la Mosaïque, édifices Mackle et 11,6 2011/11 2012/12 IC McMurray Dollard-Des Ormeaux 4425, Saint-Jean Développement Pennino Condominiums « Les Jardins West Park Garden » 5,5 2012/02 2013/06 R Dorval Échangeur Dorval Ministère des Transports - Ville de Dorval - Aéroports de Montréal Réaménagement de l'échangeur Dorval 350,0 2009/06 2017/12 GCV Dorval À l'ouest du projet Espace MV Espace MV3 inc. Immeuble à condos « Espace MV3 » 65,0 2012/04 2013 R Montréal/Ahuntsic-Cartierville 8845, Saint-Laurent Société de transports de Montréal (STM) Modification de l'atelier de petite révision Youville 124,3 2011/12 2013/12 IC Montréal/Ahuntsic-Cartierville Lajeunesse et Crémazie (Monastère des Pères Groupe immobliler Van Houte (GIVH) Condominiums « Le Liguori » et coopérative d'habitations 80,0 2011/05 2013/07 R rédemptoristes) (Quartier V) Montréal/Ahuntsic-Cartierville 10800, avenue Millen Le Groupe Maurice Complexe « Les Jardins de Millen » 60,0 2010/11 2012/10 R Montréal/Ahuntsic-Cartierville 125, rue Chabanel Groupe Dayan et SHDM Transformation en condominiums « La Fabrique 125 » 20,0 2012/01 2013/03 R Montréal/Ahuntsic-Cartierville 1350, boul. Crémazie Commission scolaire de Montréal (CSDM) Agrandissement de l'école Victor-Doré 16,0 2012/07 2013/12 IC Montréal/Ahuntsic-Cartierville 10373, Berri Ville de Montréal Construction poste de distribution d'énergie 9,9 2011/11 2013/07 GCV Montréal/Ahuntsic-Cartierville 10560, rue Saint-Hubert Ville de Montréal Rénovation de l'aréna Ahuntsic 8,0 2012/09 2012/12 IC Montréal/Anjou 7999, boul. Les Galeries d'Anjou Cadillac Fairview et Ivanhoé Cambridge Agrandissement centre commercial « Les Galeries d'Anjou » 86,0 2011/08 2013/10 IC Montréal/Côte-des-Neiges–Notre-Dame-de-Grâce 1075, boul. Décarie CUSM / Groupe immobilier santé McGill (PPP) Construction d'hôpital CUSM, site Glen 1 343,0 2010/06 2014/12 IC Montréal/Côte-des-Neiges–Notre-Dame-de-Grâce 3175, chemin de la Côte-Sainte-Catherine CHU Sainte-Justine Construction et modernisation d'hôpital, projet « Grandir en 995,0 2006/03 2018/12 IC santé » Montréal/Côte-des-Neiges–Notre-Dame-de-Grâce Avenue Victoria - Jean-Talon - De la Savane Le groupe Devmont Projet immobilier « Rouge Condominiums » 120,0 2010/08 2014 R Montréal/Côte-des-Neiges–Notre-Dame-de-Grâce 3755, chemin de la Côte-Sainte-Catherine Hôpital général juif de Montréal Construction «Pavillon des soins critiques», phase 1. 120,0 2010/12 2013/03 IC Montréal/Côte-des-Neiges–Notre-Dame-de-Grâce Site du CUSM Ville de Montréal / Ministère des transports Infrastructures municipales et routières 70,0 2010/12 2012/12 GCV Montréal/Côte-des-Neiges–Notre-Dame-de-Grâce 3800, chemin Queen-Mary L'Oratoire Saint-Joseph du Mont-Royal Centre d'observation 50,0 2010/07 2013/12 IC Montréal/Côte-des-Neiges–Notre-Dame-de-Grâce 5055 - 5059, rue Paré Cardinal Hardy Beinhaker et HUMÀ Design Condominiums « ma Condos » 40,0 2011/12 2013/09 R Montréal/Côte-des-Neiges–Notre-Dame-de-Grâce Îlot Benny Farm angle Monkland et Cavendish CSSS Cavendish Construction d'un CLSC 22,5 2012/03 2013/04 IC Montréal/Côte-des-Neiges–Notre-Dame-de-Grâce 5355 - 5358, rue Sherbrooke Ouest Les Propriétés Belcourt Construction de condominiums 7,9 2011/09 2013/09 R Montréal/Divers arrondissements Montréal - Repentigny - Charlemagne - Terrebonne AMT «Train de l'Est» Prolongement et aménagement de voie ferrée 671,0 2010/03 2014/02 GCV - Mascouche et gares Montréal/Divers arrondissements Autoroute Bonaventure Les Ponts Jacques-Cartier et Champlain Réfection de l'autoroute Bonaventure 90,0 2011/05 2016 GCV Montréal/Divers arrondissements Pont Champlain Transports Canada, Société des ponts Jacques-Cartier et Champlain Réfection du Pont Champlain 77,0 2011/01 2012/12 GCV Montréal/LaSalle En bordure du Bois des Cayers, près du parc La société du Bois des Caryers Développement résidentiel « Bois des Caryers » 200,0 2010/07 2015 R Angrignon Montréal/LaSalle 8585, boul. de Lavérendrye Ville de Montréal Réno. d'usine de filtration (Ch.-J. Des Baillets) 117,0 2009/01 2012/12 GCV Montréal/Lasalle 8585, Terrasse Champlain Hôpital LaSalle Agrandissement et rénovation salle d'urgence 29,8 2012/04 2013/11 IC Montréal/LaSalle 7000, rue Allard Les Développements Dubelle Ltée Construction « Opus Condominium » 7,5 2010/12 2012/12 R Montréal/Le Plateau-Mont-Royal Avenue Mont-Royal, entre Fullum et Messier Développement du plateau Projet résidentiel « Platopolis » 30,0 2009/06 2013/05 R Montréal/Le Plateau-Mont-Royal 74-76, rue Roy Jutras Développement Immobilier Immeubles de copropriétés « Le Waldman », phases 1 et 2 15,0 2012/05 2013/06 R Montréal/Le Plateau-Mont-Royal 5363, Saint-Denis 6727689
Recommended publications
  • 2019-2020 SCHOOL GROUP GUIDE Winter Or Summer, 7 TOURIST ATTRACTIONS Day Or Night, Montréal Is Always Bustling with Activity
    2019-2020 SCHOOL GROUP GUIDE Winter or summer, 7 TOURIST ATTRACTIONS day or night, Montréal is always bustling with activity. 21 ACTIVITIES Known for its many festivals, captivating arts and culture 33 GUIDED TOURS scene and abundant green spaces, Montréal is an exciting metropolis that’s both sophisticated and laid-back. Every year, it hosts a diverse array of events, exhibitions 39 PERFORMANCE VENUES and gatherings that attract bright minds and business leaders from around the world. While masterful chefs 45 RESTAURANTS continue to elevate the city’s reputation as a gourmet destination, creative artists and artisans draw admirers in droves to the haute couture ateliers and art galleries that 57 CHARTERED BUS SERVICES line the streets. Often the best way to get to know a place is on foot: walk through any one of Montréal’s colourful and 61 EDUCATIONAL INSTITUTIONS vibrant neighbourhoods and you’ll discover an abundance of markets, boutiques, restaurants and local cafés—diverse expressions of Montréal’s signature joie de vivre. The energy 65 ACCOMMODATIONS is palpable on the streets, in the metro and throughout the underground pedestrian network, all of which are remarkably safe and easy to navigate. But what about the people? Montréalers are naturally charming and typically bilingual, which means connecting with locals is easy. Maybe that’s why Montréal has earned a spot as a leading international host city. From friendly conversations to world-class dining, entertainment and events, there are a lot of reasons to love Montréal. All email and website addresses are clickable in this document. Click on this icon anywhere in the document to return to the table of contents.
    [Show full text]
  • Palliative Care Home Care Services, Montreal Region CLSC Postal Code # of MD's # of Nurses Allied Health Professionals Hospice/H
    Palliative Care Home Care Services, Montreal region CLSC Postal Code # of MD's # of nurses allied health professionals Hospice/Hospital Prognosis for palliative profile Contact # Lac St Louis H9K – H9T – H9W – H9X 3 2 OT, PT, SW, PAB West Island Palliative Care flexible 514 697-4110 X 3877 H8Y – H8Z – H9A – H9B – Pierrefonds H9C – H9E –H9G –H9H –H9K 2 2 OT, SW, PAB, nutritionist West Island Palliative Care < 1 year Dorval - Lachine H8S-H8T 1 2 OT, SW, PAB Hopital Lachine flexible 514 – 639-0063 X 14254 H4Y-H9P-H9S - H8N-H8P- flexible for RN's, but some MD's only accept < 3 Lasalle Ouest de l'ile H8R 3 2 OT, PT, SW, PAB, nutritionist Champlain, Lachine, WI PCU months 514 - 364 - 2572 X 25100 Mount Sinai, St Raphael, Glen, Jewish René-Cassin H3X- H4V- H4W 4 (Mount Sinai program) 2 PT, OT, SW, psychologist, General < 6 months 514-484-7878 X 61330 OT, PT, SW, psychologist, Mount Sinai, Glen, St Raphael, Jewish NDG/Benny Farm Cavendish H4A-H4B-H4V-H4X 5 (4 from Mount Sinai) 2 spiritual care General flexible 514) 484-7878 ext 61242 Cote-des-neiges H2V-H3P-H3R-H3S-H3T-H3V-H3W-H4P3 1 PT, OT, SW, psychologist St Raphael, Mount Sinai < 6 months 514-731-1386 X 8035 Parc Extension H3N 3 1 PT, OT, SW, psychologist St Raphael, Mount Sinai < 6 months De la Montagne Metro H3A-H3G-H3H-H3Y-H3Z 3 1 PT, OT, SW, psychologist St Raphael, Mount Sinai < 6 months (514)-934-0505 X 7290 Pointe St. Charles H3K Verdun H3E-H4E-H4G-H4H 10 3 SW, OT CHSLD Champlain < 6 months (514) 766-0546 X 53503 Sud-Ouest Verdun St Henri H3C-H3J-H4C-H4Z-H5A 10 1 OT, PT, SW CHSLD Champlain flexible 514 933-7541 X 58445 St-Louis du Parc H2T-H2W Des Faubourgs H2K-H2L-H2X-H2Z-H3R-H5B 2 2 OT, PT, SW, nutritionist Notre Dame, Marie Clarac flexible 514-527-9565 X 3624 Jeanne-Mance Plateau Mont Royal H2H-H2J 2 1 SW, OT, PT, spiritual care CHUM, Hopital Notre Dame < 6 months 514-521-1320 X 6521 Bordeaux-Cartierville H3M-H4J-H4K 3 2 SW CHSLD des Batisseurs flexible (514) 331-2572 X 4169 Bordeaux-Cartierville-St Laurent St.
    [Show full text]
  • Organization and Management of Benny Fram Site Public, Private and Semi-Private Spaces September 25 , 2003
    Organization and Management of Benny Fram Site Public, Private and Semi-private Spaces th September 25 , 2003 ORGANIZATION AND MANAGEMENT OF BENNY FARM SITE INTRODUCTION This report is organized into four sections as follows: 1. Public, Private and Semi-Private Spaces 2. Legal Tools 3. Examples of Residential Projects 4. Recommendations and Next Steps In the first section, we analyze the Benny Farm site in terms of the different property regimes, namely, public, private and semi-private land. We also identify the issues of overall site integration and management. In the second part, we provide two possible legal tools that may be used to ensure that the whole project is integrated in terms of overall architectural style and landscaping quality and that the different areas are properly maintained. In the third part, we provide examples of other residential projects in the Montreal area. Finally, we provide our preliminary recommendations as to which legal regime is best suited for Benny Farm and how you may proceed. 1. PUBLIC, PRIVATE AND SEMI-PRIVATE SPACES With reference to the site plan prepared by Saia et Barbarese/Claude Cormier in August 2003 (the “Site Plan”), the site may be organized into three property regimes: public, private and semi-private. 1.1 Public Spaces (a) Definition In the event that the City acquires a portion of the northeast corner of the site for a community recreation center, such area will become a public space. The Benny Farm site plan includes a new road west of Cavendish. This road is an extension of Prince of Wales Avenue, which will be transferred to the City and become public.
    [Show full text]
  • 5.0. Community Architecture in Montreal
    5.0. Community Architecture In Montreal The main focus of the last chapter was to present the evolution of community participation in architecture at a global scale. However, since the case study project of this research report is situated in the city of Montréal, Canada, it is also important to present a more local perspective of community-based architecture. The following text accounts the significant events in the history of Montréal that fortified the concept of community participation in architecture in the city. 5.1. The Milton-Park Project At the beginning of this research, one of the main reasons for selecting a project based in Montréal was the feasibility factor due to my location in this city. However, what I did not know at that time was how Montréal has had an active history of community-based initiatives in architecture. One such example and probably the most successful is that of my very neighborhood, popularly known as the McGill Ghetto, located next to the McGill University. The neighborhood is formally known as the Milton-Park area and comprises about eight blocks, which were the “battleground” between the community members residing in this area and a private developer from 1968 to 1983 (Helman 9, 13). Claire Helman in her book, The Milton-Park Affair: Canada’s Largest Citizen-Developer Confrontation, gives a step- by-step account of the efforts of the residents who were involved in a fight to protect their houses and neighborhood from the fate of destruction. In 1860s, the 53 development of the Milton-Park area began with the construction of a new Hotel- Dieu.
    [Show full text]
  • Light Blue Cross Sky Photo Simple Church Newsletter
    Catholic Action March 2021 - Newsletter Sharing the Good News A NOTE to Members We hope you are enjoying the community stories about different people in our faith community. Do you have a story to share? Tell us about your parish or maybe a project you are working on. Do you know a good Samaritan? Drop us a line and we will gladly include it in our newsletter. Stay safe and God Bless! Meet Father Scott Two Parishes, Two Languages, One Pastor On September 1, Father Timothy Scott, CSB officially assumed responsibility as pastor of the English-language St. Gabriel’s Catholic Church and of the French-language Église St Charles. Serving as pastor of more than one community comes with its challenges, but this appointment has the added layer of being conducted in two languages. “I had an upcoming funeral that I thought would be in French, but when I checked I realized it was for a member of the English community. When the parishes are sharing the same space and there is one secretary, I need to check in which language the service is to be held. It keeps me on my toes,” he said. The two parishes stand side-by-side in Montreal, Auxiliary Bishop Alain Faubert approached him about serving as pastor of both communities; he was appointed with a four-year mandate. In September, parishioners of St. Gabriel’s were notified that their church would need to close due to structural issues with renovations to be undertaken in the spring. In the meantime, both parishes are celebrating Mass at St-Charles.
    [Show full text]
  • $400000 to $450000 Condos in Downtown Montreal for Sale.Pdf
    Alexander Kay, Real Estate Broker RE/MAX ACTION INC. Real Estate Agency 1314, av. Greene 514-979-1976 / 514-312-4233 Westmount (QC) H3Z 2B1 Office : 514-933-6781 http://www.downtownmontreal-realestate.com [email protected] $419,000 Centris® No. 21725693 (Active) 3564 Rue Aylmer, apt. C, Le Plateau-Mont-Royal (Montréal), H2X 2B8 (Prince Arthur) Seller’s Declaration Yes Property Type Apartment (Div.) Occupancy 30 days PP/PR Accepted Style Split-level Deed of Sale Signature 30 days PP/PR Accepted Floor 3 Lot Eval. $83,900 (2014) Building Type Attached Building Eval. $348,600 (2014) Year Built 1870 Mun. Taxes $3,432 (2014) Plan Priv. Portion Area 89.40 sqm School Taxes $800 (2014) Lot Area Condominium Fees $ 0 ($ 0/month) Expected Delivery Date Cert. of Location Yes (2014) Body of Water Rooms 5 Bedrooms 2+0 Bathrooms and Powder Rooms 1+0 Level Room Size Floor Covering 3 Living room 18.5 X 12 ft irr Laminate floor 3 Dining room 12.9 X 11 ft irr Laminate floor 3 Kitchen 10 X 8.3 ft Ceramic 4 Master bedroom 14.4 X 11 ft Laminate floor 3 Bedroom 14.3 X 10.9 ft Laminate floor Inclusions Exclusions Fridge, stove, washer, dryer in "as is condition". Sewage System Municipality Heating System Electric baseboard Equip./Serv. Water Supply Municipality units Pool Water (access) Cadastre Parking Fireplace-Stove Yes Renovations Parking Driveway (1) Beautiful, functional, top floor condo in a tasefully renovated turn of the century, stone Bldg. unique multi-tiered layout. Sun filled with ample windows and 2 skylights.
    [Show full text]
  • Laneway House
    building affordable homes and communities BACKGROUND adverse economic reality demographic transformation new lifestyles archaic technologies still dominate depleting natural resources ignorance of do-it-yourself skills rampant urban sprawl inadequate zoning HOMES the grow home • Narrow-front (14 feet – 16 feet) • Unfinished basement and attic • Choice of interior components and finishes by occupants • Built as condominiums (shared maintenance costs) Plan Wall Area Energy Monthly Component Heat Loss (Watts) Component Heat Loss (Watts) Configuration (m2) Required Heating Cost (KWh) ($) Bungalow Two story Detached Semi-det Rowhouse Roof 558 279 Roof 279 279 279 Plan A (H) 160 2856 134 Walls 1005 1643 Walls 1643 1005 367 Plan B (T) 140 2501 117 Doors and Windows 1598 1598 Doors and Windows 1598 1598 1598 Basement 1560 1249 Basement 1249 780 311 Plan C (L) 123 2198 103 Infiltration 1547 1413 Infiltration 1413 1250 1087 Plan D 112 2001 94 Total 6267 6182 Total 6182 4912 3642 (rectangle) Annual Energy Consumed 9154 9029 Annual Energy 9029 7174 5320 Plan E 106 1894 89 (KWh) Consumed (KWh) (square) Associated Heating Costs $429 $423 Heating Costs $423 $336 $249 Plan F 94 1679 79 (Montreal) (Montreal) (circle) six months later the adoption of innovation curve First Floor Basement First Floor Basement small builders / medium-sized projects previous ownership household type new spaces in basements homeowners’ work the next home • Narrow-front (20 feet – 25 feet) • Buyers select the number of levels • Adaptable and flexible interiors • Optional unfinished basement and attic • Choice of interior components and finishes by occupants • Built as condominiums (shared maintenance costs) • Common outdoor parking X buyer choice: size buyer choice: components buyer choice: layout D a y 2 D a y 3 D a y 4 D a y 5 D a y 6 D a y 7 D a y 8 D a y 9 D a y 12 interior panels 1 2 3 4 5 6 7 exterior panels 14’ x 8’ 16’ x 8’ 18’ x 8’ 20’ x 8’ 22’ x 8’ 28’ x 8’ 32’ x 8’ exterior features BALCONY PORCH ENTRY bradford, u.k.
    [Show full text]
  • FORWARD THINKING: a TOD Concept Plan for the Pinecrest Foster Farm Community
    FORWARD THINKING: A TOD Concept Plan for the Pinecrest Foster Farm Community 21 December 2018 FORWARD THINKING | SURP 824 This page was intentionally left blank. P A G E ii FORWARD THINKING | SURP 824 EXECUTIVE SUMMARY The Pinecrest Foster Farm community, located in the City of Ottawa’s west end, is anticipating the arrival of the Pinecrest light rail transit (LRT) station in 2023. Ottawa Community Housing (OCH), as a major affordable housing provider in the City, and as a major property owner in the area, has a key interest in ensuring that affordable housing is provided near the LRT station. OCH, with support from the City of Ottawa, has retained the Project Team to create a concept plan of what Ottawa’s Pinecrest Foster Farm community might look like if it were redeveloped according to transit-oriented development (TOD) principles. The Concept Plan is looking to a final build-out in 2035. The vision for Pinecrest Foster Farm is to create an inclusive, mixed-use, and transit-oriented community that is a safe and liveable environment for residents and visitors. The geographic scope for this project is differentiated by the Study Area, the site, and OCH-owned property (Figure 1). The Study Area defines a broad area of interest surrounding the future Pinecrest LRT Station, with a focus on lands north of the Highway 417 and west of Pinecrest Road. The site, which is comprised of key lands to be considered for redevelopment, is the focus of the Concept Plan. The site itself is comprised of nineteen hectares of land, which include OCH, municipal, and provincial properties, as well as a few key non-residential private properties.
    [Show full text]
  • 2115-2125 De La Montagne Street Montréal, Québec
    2115-2125 De La Montagne Street Montréal, Québec Investment opportunity 2115-2125 De La Montagne Street Montréal, Québec Investment opportunity The Opportunity Avison Young is proud to present this exceptional 2115-2125 De La Montagne Street is located in opportunity to purchase and own a one-of-a- the Ville-Marie Borough of Montreal, on the east kind, historic property located in the heart of side of De La Montagne Street. The property is in Golden Square Mile in Downtown Montréal, steps proximity of the Ritz-Carlton Hotel, the Montreal from Sainte-Catherine Street West and high-end Museum of Fine Arts, both Concordia and retailers such as Ogilvy Holt Renfew and Escada. McGill Universities, along with several office and residential towers. It is also located at a walking Built in 1892, 2115-2125 De La Montagne Street is distance of the Peel and Guy-Concordia metro a historical gem with exceptional cachet. Carefully stations. The property is also easily accessible from maintained over the years, the property offers Highways 720, 15 and 20. three floors of office space, a retail unit in the basement and a rooftop terrace. With a total leasable area of 8,972 square feet, this property represents an outstanding opportunity for an owner/occupant investor as the top three floors of the building can be delivered unencumbered by leases for a total of approximately 7,000 square feet. Conversely, as an investment, the property can be sold with the top three floors leased back to current ownership for a five-year period (see leaseback scenario on page 11).
    [Show full text]
  • Évolution Historique Du Territoire Du Centre-Ville De Montréal
    1 ÉVOLUTION HISTORIQUE DU TERRITOIRE DU CENTRE-VILLE DE MONTRÉAL ÉVOLUTION HISTORIQUE DU TERRITOIRE DU CENTRE-VILLE DE MONTRÉAL JUIN 2016 2 ÉVOLUTION HISTORIQUE HISTORIQUEDU TERRITOIRE DU CENTRE-VILLE DE MONTRÉAL DU TERRITOIRE DU CENTRE-VILLE DE MONTRÉAL Cette étude a été réalisée pour le Bureau de projets Pour chaque thématique, il s’agissait de faire ressortir du centre-ville, de l’arrondissement de Ville-Marie, dans les grandes périodes et les moments de transition, le cadre de l’élaboration de la Stratégie centre-ville. de même que les moteurs des transformations. Les influences et les interrelations entre chaque thématique L’objectif est de documenter l’évolution historique sont aussi soulignées. du territoire du centre-ville, tel que retenu dans la Stratégie, ce qui correspond à peu près au territoire Une synthèse chronologique a ensuite été réalisée de la Ville de Montréal avant les premières annexions sous la forme de cartes, reprenant les thématiques de villages limitrophes. L’étude couvre ainsi le terri- de l’étude, illustrant cinq grandes périodes de l’histoire toire de l’arrondissement de Ville-Marie, le quartier du territoire: Milton-Parc, Griffintown et le secteur est de Pointe- e e Saint-Charles, jusqu’au pont Victoria. fin 17 – fin 18 : Ville fortifiée, centre de la traite des fourrures, Le parti pris a été de suivre l’évolution urbaine selon fin 18e – mi 19e: Cité commerciale de l’Empire des thématiques ou composantes du territoire, soit: britannique, e e les activités économiques, mi-19 – fin 19 : Métropole industrielle du Canada, e e l’habitat et la population, fin 19 – mi 20 : Centre de la métropole canadienne, les espaces communs et de socialisation, mi 20e – début 21e: Centre-ville moderne, les services à la communauté, dense et multifonctionnel.
    [Show full text]
  • La Communauté Milton Parc Sommaire
    La Communauté Milton Parc Mémoire présenté à la Commission de l'aménagement du Par La Communauté Milton Parc Le 20 octobre 2011 Recherche et rédaction Pierre Houle Administrateur au Conseil d’administration de la CMP Lecture et correction Patricia Garcia, Lucia Kowaluk et Alanna Dow, Administratrices au Conseil d’administration de la CMP Pierre Duclos Gérant de la Communauté Milton Parc La Communauté Milton Parc Présentation La Communauté Milton Parc La Communauté Milton Parc (CMP) est un syndicat de copropriété, unique en son genre, formé pendant les années 1980 et créé officiellement en juin 1987 par l'adoption de la loi 224 de l'Assemblée nationale du Québec (bill privé voté à cet effet). Dès les années 1960 et 1970, les résidants du quartier Milton Parc s'opposent à la destruction massive de leur quartier. Plusieurs maisons victoriennes en pierre grise allaient faire place à un vaste projet de rénovation urbaine dont la première partie, et la seule construite, est le complexe La Cité. Appuyés par Héritage Montréal et l'architecte Phyllis Lambert, directrice et fondatrice du Centre Canadien d'Architecture, et avec l'aide financière de la SCHL, les résidants qui militent depuis les années 1960 créent entre 1979 et 1982 le plus important projet de coopératives d'habitation en Amérique du nord, entraînant la rénovation de rangées entières de bâtiments construits au tournant du siècle. Le 23 septembre 1998, Postes Canada émet un jeu de timbres commémoratifs consacrés à l'histoire de l'habitation. Un de ces timbres, représentant les habitations à logements multiples (maisons en rangée), est tiré d'une photo des duplex à deux étages par logement de la Coopérative Milton Parc sur la rue Jeanne-Mance.
    [Show full text]
  • Financial Statements of Centraide of Greater Montreal March 31, 2014
    LAVAL ISLAND OF MONTREAL SOUTH SHORE Our investments in the heart of the community Financial Statements 2013-2014 Mission To maximize financial and volunteer resources so that Centraide—particularly by funding community agencies and working in partnership with them—can promote caring and social involvement in order to improve the quality of life in our community and empower its most vulnerable members to take charge of their lives. Vision To build caring communities throughout Greater Montreal. Centraide wants to make Greater Montreal into a place where the less fortunate have the means to live in dignity. To achieve this aim, it relies on citizens’ capacity for self-reliance and solidarity. 2 FINANCIAL STATEMENTS 2013-2014 A network that brightens lives In Greater Montreal, nearly one out of six people lives in poverty, a problem that goes hand in hand with social exclusion. Centraide of Greater Montreal is constantly fighting these two social ills, but this fight would not be possible without the volunteers, donors, workplace campaign directors, business leaders and community workers who support us. Everyone—from the people who canvas for donations to the individuals who put these donations to good use— belongs to this vast network of generosity that brightens the lives of those most vulnerable. We thank them all from the bottom of our hearts. In 2013-2014, this collective effort translated into an investment of nearly $47 million in over 360 agencies and projects. In keeping with our goals, we have placed an emphasis on the living conditions of children, youth and families and on the integration of socially excluded people.
    [Show full text]