02 April, 2013 Autonomous Ground Vehicles Demonstration. Menangle

Total Page:16

File Type:pdf, Size:1020Kb

02 April, 2013 Autonomous Ground Vehicles Demonstration. Menangle 02 April, 2013 Autonomous Ground Vehicles Demonstration. Menangle NSW Dear Sir/Madam Re: Invitation to the Autonomous Ground Vehicles Demo in Menangle We will be holding a demonstration of Autonomous vehicles in Menangle New South Wales, on 8 April 2013. The actual field demonstration will take place at 11 am and will last about an hour. After lunch, there will be some presentations about field robotics in general. If you are interested, you can attend the whole meeting from 9.30 am onwards. The topic of the meeting is "Building Autonomous Agricultural Machines". See attachment for "How to get there". Thank you. Yours sincerely, Associate Professor Jay Katupitiya Deputy Head of the School of Mechanical and Manufacturing Engineering. THE UNIVERSITY OF NEW SOUTH WALES | UNSW SYDNEY NSW 2052 AUSTRALIA T +61(2) 9385 4096 | F +61 (2) 9663 1222 | ABN 57 195 873 179 | CRICOS Provider Code 00098G SYDNEY | CANBERRA | AUSTRALIA Page 1 Start address: Sydney Airport (SYD), Airport Dr, Mascot NSW 2020, Australia End address: Menangle Rd/State Route 56 Distance: 56.4 km (about 45 mins) Map data ©2013 Google Head south on Departure Plaza - go 600 m Continue onto Cooks River Ave - go 150 m Google Earth:Directions 27/03/2013 Page 2 Slight left onto the ramp to Sydney Suburbs S/Sydney Suburbs W/City/Airport - go 280 m Merge onto Marsh St - go 900 m Turn right to merge onto Metroad 5 toward Liverpool/Canberra/M5 Motorway Partial toll road - go 41.8 km Take exit Narellan Road to merge onto Narellan Rd/State Route 69 toward Campbelltown/Bulli - go 2.9 km Turn right onto Kellicar Rd/State Route 56 - go 1.0 km Google Earth:Directions 27/03/2013 Page 3 At the roundabout, take the 3rd exit onto Geary St/State Route 56 - go 250 m Turn left onto Menangle Rd/State Route 56 Go through 3 roundabouts Destination will be on the right - go 8.6 km Arrive at: Menangle Rd/State Route 56 - Farm Square of Elizabeth MacArthur Agricultural Institute. Google Earth:Directions 27/03/2013.
Recommended publications
  • Draft Draft Draft Draft Draft Draft
    M4 Motorway from Mays Hill to Prospect DRAFTBefore andDRAFT after opening ofDRAF the T M4 Motorway from Mays Hill to Prospect Sydney case studies in induced traffic growth Michelle E Zeibots Doctoral Candidate Institute for Sustainable Futures University of Technology, Sydney PO Box 123 Broadway NSW 2007 Australia [email protected] www.isf.uts.edu.au tel. +61-2-9209-4350 fax. +61-2-9209-4351 DRAFT WorkingDRAFT Paper DRAFT Sydney case studies in induced traffic growth 1 M4 Motorway from Mays Hill to Prospect The original version of this data set and commentary was completed in May 1997 and presented in two parts. These DRAFTwere: DRAFT DRAFT 1. Road traffic data for western Sydney sector arterials: Great Western Highway and M4 Motorway 1985 – 1995 2. Rail ticketing data and passenger journey estimates for the Western Sydney Rail Line 1985 – 1995 These have now been combined and are presented here as part of an ongoing series of case studies in induced traffic growth from the Sydney Metropolitan Region. In the first, report which focussed on road traffic volumes, an error was made. The location points of road traffic counting stations were incorrect. Although this error does not affect the general conclusions, details of some of the analysis presented in this version are different to that presented in the original papers listed above. Some data additions have also been made, and so the accompanying commentary has been expanded. Acknowledgements During the collation of this data Mr Barry Armstrong from the NSW Roads & Traffic Authority provided invaluable information on road data collection methods as well as problems with data integrity.
    [Show full text]
  • Technical Paper 1 Traffic Report
    Technical Paper 1 Traffic report 1 WestConnex Updated Strategic Business Case Contents List of Tables ..................................................................................................................................................... 3 List of Figures .................................................................................................................................................... 4 Preface .............................................................................................................................................................. 6 Terminology ....................................................................................................................................................... 7 1 Executive summary .................................................................................................................................... 8 1.1 Background to this report ................................................................................................................... 8 1.2 Traffic methodology ........................................................................................................................... 9 1.3 Road network performance without WestConnex ........................................................................... 10 1.4 Traffic effects of WestConnex.......................................................................................................... 12 1.5 Traffic operations and influence on WestConnex design ...............................................................
    [Show full text]
  • Westconnex New M5 5-122 Roads and Maritime Services Environmental Impact Statement
    (blank page) WestConnex New M5 5-122 Roads and Maritime Services Environmental impact statement (blank page) WestConnex New M5 5-124 Roads and Maritime Services Environmental impact statement 5.8.1 Operational management control systems and incident and emergency response The project has been designed to include control systems to ensure safe and efficient operation of the New M5 under normal operating conditions, and to respond to incidents and other emergency events that may occur. These control systems would include: • A central motorway control centre to manage the New M5 when it is operational • Traffic monitoring and management systems along the project • Air quality monitoring and management systems within the main alignment tunnels • Incident and emergency response infrastructure • Maintenance facilities • Motorway tolling infrastructure. Motorway control centre A WestConnex motorway control centre would be provided within the Burrows Road motorway operations complex (MOC5) (refer to Figure 5-42). The motorway control centre would be the central building for all communications and control of the project’s operational management control systems. The motorway control centre would be staffed 24 hours a day, seven days a week, and would require around 26 full time equivalent staff. The motorway control centre would include a video wall and operating interfaces for all monitoring and control systems, an incident control facility, training and incident response room, air conditioning, power supply systems and workforce facilities (ie amenities). An indicative layout of the motorway control centre is shown in Figure 5-42. Urban design principles would be applied to the motorway control centre to integrate the building with St Peters interchange and the surrounding landscape to minimise its visual impact.
    [Show full text]
  • M5 Fact Sheet
    NOVEMBER 2009 M5 corridor expansion – about the project The M5 transport corridor is the main road freight, commercial and commuter route between Port Botany and Sydney Airport, and south west Sydney. In recent years traffic levels and the number of heavy vehicles on this route means the corridor is operating at or near capacity during peak periods. This impacts on Sydney’s economic productivity and competitiveness. This fact sheet provides a summary of the project and provides details on how to find out more information. What is the M5 corridor? Key features of the proposed M5 corridor expansion The M5 Transport Corridor is the main road freight, are: commercial and commuter route between Port • Widening the existing M5 South West Motorway Botany and Sydney Airport, and south west Sydney. from two to three lanes in each direction. It is part of the National Highway Network • Widening the M5 East Freeway east of King connecting Sydney, Canberra and Melbourne. Georges Road to four lanes in each direction. • Four new lanes in tunnel next to the existing M5 The existing M5 Motorway can be divided into two East tunnel. sections: • A new arterial surface road from the M5 East • Section 1: The M5 South West Motorway – A 22 tunnel to the airport and the industrial areas of kilometre tolled road with two lanes in each inner southern Sydney. direction between Camden Valley Way, Prestons and King Georges Road, Beverly Hills, operated What are the benefits? by Interlink Roads. The proposed M5 corridor expansion would deliver • Section 2: The M5 East Freeway – A ten much needed additional road capacity, providing: kilometre road connecting the M5 South West • Improved access to Port Botany and Sydney Motorway with General Holmes Drive/ Eastern Airport.
    [Show full text]
  • Appendix a Bankstown Council__Agency
    Respondent: Bankstown Council (James Carey, Manager Sustainable Development) Aspect Issue Clarification / Response EA Section/ Specialist Study reference Cumulative The proposal does not consider the cumulative capacity of the future The Freight Demand Modelling report and the Transport and Sections 3.3.2, impacts Moorebank Intermodal Terminal currently being proposed by the Accessibility Impact Assessment report have been prepared based on 3.3.3 and 5.3.4 Commonwealth Government. The combined capacity of an estimated a total freight catchment for intrastate freight, which would be shared 2.2 million TEU per year should underpin the assessment of impacts. between the two intermodal facilities (SIMTA and MICL IMTs), should Appendix G both developments proceed. TfNSW’s submission to the Concept Freight Demand Plan EA (CD 13/21056) notes that TfNSW is satisfied that SIMTA has Modelling – adequately addressed the intermodal and capacity demands for the Transitional Part intermodal terminal, including the identification of the freight 3A Concept Plan catchment area and freight catchment split. Section 3.3.2 of the EA Application includes a discussion of the relationship between the MICL proposal (Hyder and the SIMTA proposal and notes that the intrastate freight Consulting, catchment identified in the Freight Demand Modelling report would be 2013a) shared between two proposals. Appendix F The Freight Demand Modelling Report report identifies the catchment Transport and demand for statistical local areas (SLA). The SIMTA proposal and the Accessibility MICL proposal are located within the same SLA, hence the freight Impact catchment would be shared between the two facilities (should both Assessment – proceed). This is clearly stated in Section 3.3.2 of the EA: Part 3A Concept Plan Application The SIMTA proposal has been designed to service the freight (Hyder catchment demand in its entirety, however, it is recognised that the Consulting, SIMTA proposal may not be the sole facility provided within August 2013a) Moorebank.
    [Show full text]
  • Business Mastery 2017
    Sydney Showgrounds Tuesday 24th – Friday 27th July 2018 VENUE Sydney Showgrounds Corner of Showground Road and Grand Parade Sydney Olympic Park, Sydney, 2127 CLICK HERE for more information about the venue Event Room: Hall 2 CLICK HERE to view map REGISTRATION Location: Hall 2 Tuesday, 24th July 2018 7:30am – 8:45am EVENT TIMES Tuesday 24th July – Friday 27th July 2018 9:00am – 8:30pm *Please note times for the event are approximate only & are subject to change RECORDING/TAPING No taping or recording of any sessions is allowed. TRANSPORT BY CAR From Sydney Airport: Depart from the Sydney Domestic Airport Head west towards Shiers Ave Slight left onto Ninth St, Qantas Drive and continue onto Airport Drive. Take the ramp to Rockdale/Metroad 5 Sydney/Metroad 3 and merge onto Marsh St. Turn right to merge onto M5 East Freeway towards Liverpool/Canberra/M5 Motorway. Exit at King Georges Rd for Metroad 3 and slight right to stay on King Georges Rd. Continue onto Wiley Ave, slight right onto Roberts Rd and continue onto Centenary Drive and Homebush Bay Drive. Exit at Australia Ave and follow signs for Olympic Park. Once merge onto Australia Ave, turn left onto Dawn Fraser Ave and take the 2nd right onto Showground Rd and the next right onto Grand Parade. Exhibition Halls are on your left. Journey takes 32 minutes. BY BUS Sydney Buses operates bus services to and from Sydney Olympic Park to the following locations: Burwood Westfield Strathfield Station Newington Rydalmere University of Western Sydney (UWS), Nepean Campus Rydalmere Parramatta Station Lidcombe Station Sydney Olympic Park Ferry Wharf *For timetable information visit www.transportnsw.info BY TRAIN Olympic Park train station is on Sydney Showground's doorstep.
    [Show full text]
  • Chapter 4 – Strategic Context and Project Need
    Chapter 4 – Strategic context and project need 4 Strategic context and project need 4.1 Current issues with the road network 4.1.1 Traffic congestion across Greater Sydney Traffic growth is forecast across NSW and will include around one million extra road users in Sydney within the next decade and nearly twice the freight movements by 2031. Congestion across metropolitan Sydney is estimated to cost up to $6.1 billion per annum, rising to $12.6 billion by 2030 if nothing is done1. Travel by road is the dominant transport mode in Sydney. Even with high growth in rail freight and public transport, road travel is predicted to continue to be the most dominant travel choice for at least the next 20 years2. Traffic congestion impacts communities and businesses by: • Affecting Sydney’s large and significant freight, service and business operations • Reducing the reliability of, and accessibility to, public transport • Constraining the movement of pedestrians and cyclists • Reducing amenity for nearby residents, pedestrians, cyclists and sensitive land uses (educational and health facilities). 4.1.2 Missing regional motorway link In Sydney’s South District (which includes the Canterbury-Bankstown, Georges River and Sutherland LGAs), over 50 per cent of journeys are undertaken by car. There is currently no motorway between the existing M1 Princes Motorway south of Waterfall and the Sydney motorway network. All local and through traffic, including heavy vehicle traffic, is currently required to use the arterial road network to travel between Waterfall and Sydney, principally the A1 Princes Highway, the A3 King Georges Road and / or the A6 Heathcote Road / New Illawarra Road.
    [Show full text]
  • Space For: the Well–Connected
    Space for: the well–connected SILVERWATER DISTRIBUTION CENTRE 4 NEWINGTON ROAD, SILVERWATER, NSW OVERVIEW 2 Opportunity Silverwater Distribution Centre is a premium warehouse facility located only 18 kilometres from the CBD in the sought after industrial hub of Silverwater. Ideal for logistics, distribution and e-retail users, the site boasts fully refurbished warehouse and office spaces, huge undercover loading areas. Close proximity to Silverwater Road provides users with easy access to Sydney’s major road network and beyond. 3 VIEW FROM ABOVE Victoria Road d a o R r e t a w r e v l i S Silverwater Distribution Centre e v i r D y a B h s u b e M4 m M o O H TO RW AY LOCATION 4 Smart move Users benefit from significant logistical advantages with convenient access to major arterial roads including the nearby M4 Motorway and Parramatta Road, while the Hume Highway and Cumberland Highway are located less than 10 kilometres from the site. A number of bus routes also service the area and ferry and train services are located within close proximity providing access in all directions. CENTR ALLY CONNECTED 1.4KM 7KM 18KM to M4 to Parramatta to Sydney 750M Motorway 2.3KM Town Centre 13.2KM CBD to Newington to Parramatta to M5 Motorway Marketplace Road ACCESS Rosehill Silverwater Distribution Centre HAMPSTEAD RD Rawson Street Rawson ADDERLEY ST WEST ST ADDERLEY AUBURN P A HALL STREET HALL R R MACQUARIE RD A M STUBBS ST CARNARVON ST CARNARVON A T Silverwater T A STATION STREET R O A D V ORE STREET SILVERWATER ROAD FARIOLA STREET FARIOLA Parramatta
    [Show full text]
  • Westconnex New M5 1-1 Roads and Maritime Services Environmental Impact Statement
    1 Introduction This chapter provides a brief overview of the proposed New M5 project, including its location and key features, and outlines the benefits of the project. This chapter also describes the purpose and structure of this environmental impact statement (EIS). 1.1 Project overview NSW Roads and Maritime Services (Roads and Maritime), is seeking approval to construct and operate the New M5 (the project), which would comprise a new, tolled multi-lane road link between the existing M5 East Motorway, east of King Georges Road, and St Peters. The project would also include an interchange at St Peters and connections to the existing road network. The regional context of the project is shown in Figure 1-1. Approval is being sought under Part 5.1 of the NSW Environmental Planning and Assessment Act 1979 (EP&A Act). The project is declared to be State significant infrastructure (SSI) under section 115U(2) of the EP&A Act by reason of the operation of clause 14 and Schedule 3 of the State Environmental Planning Policy (State and Regional Development) 2011. Accordingly, the project is subject to assessment under Part 5.1 of the EP&A Act and requires the approval of the Minister for Planning. An EIS is therefore required. For the purpose of this planning application for the project, Roads and Maritime is the proponent. Roads and Maritime is seeking the project to be declared by the Minister for Planning as State significant infrastructure and critical State significant infrastructure under sections 115U(4) and 115V of the EP&A Act.
    [Show full text]
  • F6 Extension Stage 1 New M5 Motorway at Arnclife to President Avenue at Kogarah
    Roads and Maritime Services F6 Extension Stage 1 New M5 Motorway at Arnclife to President Avenue at Kogarah Preferred infrastructure report Roads and Maritime Services F6 Extension Stage 1 New M5 Motorway at Arnclife to President Avenue at Kogarah Preferred infrastructure report Publication number: RMS.19.1209 ISBN: 978-1-925891-34-8 Preferred infrastructure report Executive Summary Roads and Maritime Services (Roads and Maritime) is seeking approval to construct and operate the F6 Extension Stage 1 from the New M5 Motorway at Arncliffe to President Avenue at Kogarah (the project). Once complete, the project would improve connections and travel times between the A1 Princes Highway and other arterial roads, south of President Avenue, and commercial areas in Sydney. It would also improve connections for residents and businesses within the broader regional area, promoting and supporting economic development in areas to the south such as Sutherland and the Illawarra. The project would comprise a new twin motorway tunnel (around four kilometres in length) between the New M5 Motorway at Arncliffe and President Avenue at Kogarah with a tunnel portal and entry and exit ramps connecting the tunnels to the surface. Works would include connection to the New M5 Motorway, line marking of additional travel lanes between the St Peters interchange to the F6 Extension Stage 1 tunnels, an intersection with President Avenue (including widening and raising of President Avenue), and intersection improvements at the President Avenue/Princes Highway intersection. Mainline tunnel stubs would be constructed to allow for connections to future stages of the F6 Extension. The project would also provide shared cycle and pedestrian pathways connecting Bestic Avenue, Rockdale to Civic Avenue, Kogarah via Rockdale Bicentennial Park (including an on-road cycleway) and extending this pathway to the southeast to Chuter Avenue/O’Connell Street, around Robinson Street.
    [Show full text]
  • Road Directions Syd Cbr
    Road Directions from Sydney International Airport to Canberra Driving: In Australia We Drive on the LEFT SIDE of the Road. Distance: 280 Km Driving Time: 3 Hours without stops Toll Charges: $AUD 3.80 for car or small van Speed Limits (Km/Hr): 40 in Some School Zone areas (none on this route), 50, 60 or 80 in main town roads, 100 or 110 on highways Some roads have variable speed limits depending on conditions Highways: M5 Motorway leaving Sydney 31 for the Hume Highway heading south towards Canberra (at 43 Km) 23 for the Federal Highway to Canberra (at 194 Km) On exiting the International parking at Sydney Airport, keep in the left lane and follow the blue sign to the South West exit, marked as going to South and West Sydney. After about 1.5 Km you will see a large green sign in the centre of the road indicating the intersection of the M5 Motorway. Prepare to turn right. Turn right at the traffic lights onto the M5 Motorway to start the trip to Canberra. This turn is distance 0 in these directions. You immediately enter a tunnel for about 4 Km and then come out onto the surface for the remainder of the trip to Canberra. Follow the road signs to Canberra and the M5 Motorway “5”. At 18 Km you will need to pay a toll of $3.80 on the M5 Motorway. Keep to the left for the cash toll booths. At 25 Km, there is an intersection with the M7 Motorway. Do not take this exit.
    [Show full text]
  • F6 Extension Stage 1 New M5 Motorway at Arncliffe to President Avenue at Kogarah Community Update
    June 2018 F6 Extension Stage 1 New M5 Motorway at Arncliffe to President Avenue at Kogarah Community update As NSW continues to grow so the New M5 Motorway at Arncliffe does our transport challenge. and President Avenue at Kogarah. Improving The NSW Government is trac flow The project includes: fewer vehicles and less stopping investing $41.5 billion on roads on surface roads and public transport projects • Twin underground tunnels over the next four years alone, to around four kilometres in deliver an integrated transport length linking the New M5 solution to make it easier, faster Motorway at Arncliffe to and safer to get around. The F6 President Avenue at Kogarah up to Extension Stage 1 is a key element • Ramps between the motorway trac lights of the NSW Government’s tunnel and the surface 23 bypassed transport vision for the state. intersection at President Avenue over • Tunnel stubs for a future Project overview connection south to extend 2,000 The NSW Government is the F6 Extension proceeding with plans for the F6 • Provision of new shared cycle Extension Stage 1 to provide a new and pedestrian pathways. Trucks per day motorway connection between removed from nearby surface roads F6 Extension Stage 1 The F6 Extension Stage 1 will give communities It’s an integral part of the Future Transport Strategy and businesses new levels of accessTurrella across the 2056 and will keep our city moving as we continue transport network. WOLLI to grow. CREEK Bardwell Park M4 WestConnex International Airport City West Parramatta Marsh Street South
    [Show full text]