Office of Head of Network Safety Level 15, 700 Collins St

Issued on behalf of Metro Trains and V/Line

Page 1 of 30 Weekly Operational Notice No. 02/2021

THE WEEKLY OPERATIONAL NOTICE

THE WEEKLY OPERATIONAL NOTICE is issued every Tuesday. An acknowledgement of its receipt is not necessary. Every person whose duty requires them to have a copy is held responsible for obtaining one of each issue, and for communicating to their staff any instructions applicable to them. If not received at the usual time or in doubt as to your obligations, contact your Supervisor.

TEMPORARY REDUCTIONS OF SPEED OF TRAINS Notice to Drivers, Second Persons, Track Force Protection Coordinators and others.

a) (i) Repairs and renewals are being affected at the following places and, until further notice, the speed of trains must, if required, be reduced as shown. Each location will be protected when necessary, either hand signals, or by special permanent way signals. Train Crews must keep a good look-out at these locations for such signals, which must be exhibited in accordance with these rules.

(ii) In the absence of such signals, trains may be run at the ordinary rate of speed.

b) Drivers are reminded that repairs of lines necessitating reductions of speed, of which it has not been able to give notice, may be necessary at other places beside those mentioned in this notice. They must, therefore, be always on the lookout and be prepared to stop or to run at reduced speed whenever and wherever hand signal are exhibited.

c) Work Group Supervisors and others in charge of works at the following places where the requirements render it necessary that the speed of train be reduced, must understand that this information does not in any way relieve them of the responsibility of seeing that Competent hand signallers, furnished with the necessary Hand Signals and Audible Track Warners are stationed at the places named for the purpose of signalling in accordance with these rules, or that the special way Warning and Caution signals are exhibited, as each case may require. Special permanent way warning and Caution signals are exhibited at the locations contained in the following tables. For instructions regarding the use of these signals see Rule 7, Section 15 of the Rules and Operating Procedures 1994.

d) Unless otherwise specified, all reductions of speed shown in this notice apply until the issue of the next Weekly Operational Notice. Any temporary reduction of speed which appeared in the last issue of the Weekly Operational Notice, and which is not included in this edition, may be regarded as cancelled.

e) Subject to any temporary modifications in the foregoing or other current instructions, the permanent way reductions of speed and the speed limitations shown in the Working Time-tables, and all additions to and amendments thereof, must be carefully observed. Signallers, Train crews, Work Group Supervisors, Gangers and others must promptly report their Supervisors, any case in which they observe trains running in excess of the speed laid down at or between any of the points where speed is appointed to be reduced. These reports must be forwarded to the Safety Manager of the relevant company.

Page 2 of 30 Weekly Operational Notice No. 02/2021

r METROPOLITAN RAIL NETWORK TEMPORARY SPEED RESTRICTIONS

KM KM TSR AS FROM STATIONS BETWEEN CIRCULAR REASON START END SPEED

INNER AREA

N/A

WESTERN LINES

24/04/19 South Kensington – Footscray 3.600 3.700 60* TS.009/19 Track Geometry. (Up Through Suburban Line) * Circular TS.109/2018 Is cancelled and replaced by TS.009/2019 a/c alteration to speed restriction.

P60 SPAD mitigation for the inadequate 22/08/19 Spotswood – Seddon 7.930 6.735 TS.109/19 signal spacing between W292 and (Up Line) G35 W286.

NOTE: As the speed reduction is for SPAD mitigation only, the ‘N’ and ‘NS’ boards are placed at the same point.

Operational requirements, reduced Werribee warning times for Cherry Street and *03/12/20 (East & West Lines) 31.590 34.442 60 TS.077/20 Browns Road level crossings, (Down Trains) unconsolidated ballast for new track construction.

Operational requirements, reduced Werribee warning times for Cherry Street and *03/12/20 (East & West Lines) 3 4 .442 31.590 60 TS.076/20 Browns Road level crossings, (Up Trains) unconsolidated ballast for new track construction.

* Circular TS.039/2020 is cancelled and replaced by TS.042/2020 a/c Under track bore for City West Water realignment.

* Circular TS.042/2020 is cancelled and replaced by TS.057/2020 a/c issue of TS.058/20.

* Circular TS.057/2020 is cancelled and replaced by TS.076/2020 & TS.077/2020

NORTHERN LINES

26/11/19 Pascoe Vale - Broadmeadows 11.949 15.887 G55 TS.142/19 Deficient signal spacing and overlap (Down line) for Goods

26/11/19 Oak Park – Broadmeadows 15.567 13.065 P65 TS.140/19 Signal Spacing and Overlap (Up line) deficiencies

26/11/19 Broadmeadows - Oak Park 16.735 13.065 G40 TS.141/19 Deficient signal spacing and overlap (Up line) for Goods

05/07/19 Broadmeadows - Roxburgh Park 17.512 18.325 80 TS.084/19 Smeaton Avenue warning times (Down Line)

26/11/19 Coolaroo - Broadmeadows 18.228 17.432 P100 TS.139/19 Signal Spacing and Overlap deficient (Up line) for N-Class Passenger Trains

*29/07/19 Roxburgh Park - Broadmeadows 21.246 18.325 110 TS.103/19 Operational requirements a/c (Up Line) Signalling (28/05/2007) and warning times for Dunkeld St & Smeaton Ave.

Page 3 of 30 Weekly Operational Notice No. 02/2021

* Circular TS.036/2017 Is Cancelled And Replaced A/C Speed Reduced To 80 Kph. Circular TS.001/2017 Is Cancelled And Replaced a/c Area Of Speed Restriction Reduced And Speed Increased To 100 Kph. TS.011/2019 is cancelled and replaced by TS.036/2019 a/c area of restriction increased. TS.036/2019 is cancelled and replaced by TS.037/2019 a/c area of restriction reduced.

TS.037/2019 is cancelled and replaced by TS.047/2019 a/c speed reduction. TS. 047/2019 is cancelled and replace by TS.096/2019 a/c adjacent speed restriction. TS.096/2019 is cancelled and replaced by TS.103/2019 a/c area reduced and speed increased.

#01/11/17 Craigieburn 25.296 25.545 80 TS.108/17 Signalling issue (28/03/2011). (Down line) # Circular TS.077/2017 Is Cancelled And Replaced TS.108/17 a/c Area Of Restriction Reduced And Reverts To Area Of TS.023/2011.

TS.023/2011 Cancelled and Replaced by TS.077/17 a/c Area Of Restriction Extended And Speed Reduced. TS.018/11 amended by TS.023/2011 on 15/05/11

11/11/20 Flemington Bridge – Royal Park 4.409 5.334 65 TS.074/20 Level crossing warning time deficieny

*05/07/18 Thornbury - Croxton 10.551 10.151 50 TS.083/19 Normanby Ave & Woolton Ave Level (Up Line) crossing approach.

* TS.003/18 cancelled and replaced by TS.008/18 a/c provision of reminder ‘C’ Board at Up end of Thornbury Station. TS.121/17 cancelled & replaced by TS.003/18, reverting to TS.051/2015. TS.051/2015 cancelled and replaced by TS.111/17 a/c condition of sleepers in Thornbury pit. TS.111/17 cancelled and replaced by TS.112/17 reverting to TS.051/15. Circular TS.112/2017 cancelled and replaced by TS.121/17 a/c RFD fault. *TS.008/18 is cancelled and replaced by TS.083/19 a/c speed and area of restriction reduced.

01/09/20 Eltham (Single Line) 26.895 27.091 40P TS.059/20 Condition of bridge structure

20G

EASTERN LINES

#19/02/20 Ringwood 25.950 26.000 G20 TS.014/20 Condition of Warrandyte Road Rail (Up & Down Lilydale Lines) Bridge (Up & Down Belgrave Lines)

#20/07/20 Ringwood – Ringwood East 26.940 27.260 70 TS.044/20 Operational Requirement, approach to (Down Line) Level crossing.

# Circular TS.028/2020 is cancelled and the restriction a/c condition of Warrandyte road bridge is now deleted and the original restriction per TS.082/2008 is now applicable.

28/11/16 Croydon - Ringwood East 28.080 27.465 70 TS.101/16 Dublin Road Level Crossing warning (Up Line) time.

NOTE: As the speed reduction is for signal approach speed only, the ‘N’ and ‘NS’ boards are placed at the same point.

SOUTHERN LINES

*12/06/20 Richmond – South Yarra 5.096 5.316 60 TS.036/20 Signalling overlap deficiency (Down Caulfield Local line)

*12/06/20 Richmond – South Yarra 4.479 5.316 60 TS.036/20 Signalling overlap deficiency, Track (Down Caulfield Through line) Geometry issues and Mud spots.

* Circular TS.016/20 Is Cancelled And Replaced by TS.036/20 a/c Poor track geometry and mud spots on Down Caulfield Through line.

08/12/20 Chelsea – Bonbeach 33.500 34.550 40 TS.078/20 SPA project piling works

Note: The Temporary Speed Restriction will apply between 09:30 hours and 16:30 hours Monday to Friday while the piling works are being conducted. Outside these times the Warning and Caution Boards will be obscured.

26/03/15 Frankston 43.669 43.869 30 TS.026/15 Frankston mechanical interlocking (Up & Down lines and Nos. 1, 2, 3 conflicting short overlap and no signal & 4 Rds) enforcement overlap protection.

08/07/19 Somerville 55.781 55.781 70 TS.087/19 Passive Pedestrian crossing non- (Up Trains) compliant sighting distance.

08/07/19 Somerville 55.781 55.781 50 TS.086/19 Passive Pedestrian crossing non- (Down Trains) compliant sighting distance.

31/12/20 Tyabb – Hastings 61.162 62.298 50 TS.081/20 Occupation Crossing Approaches

Page 4 of 30 Weekly Operational Notice No. 02/2021

INFRASTRUCTURE BOOKED OUT OF SERVICE

LOCATION CIRCULAR EQUIPMENT CAUSE

Newport (‘E’ Siding) - 615 Points Condition of Siding

Brighton Beach (25/07/10) SW.170/2010 No. 1 track Track not returned to service after UBU Project.

Newport Workshops SW.168/2018 No. 2Track Clearance requirements in Garden Platform No. 2 Rd 2.

Circular SW.453/2018 & SW.060/2019 are cancelled and replaced by SW.196/2019 A/C No. 3 track restored to service.

TS.196/2019 Cancelled A/c No. 1 Garden Platform Track Restored to Service.

Flinders Street SW.301/2014 Parcels Dock Siding and points Nos. 38, 40U & Signalling 40D, 41, 43 & 48, Points Nos. 227 & 471 (in lead Strategy/Junction between City Circle & Burnley Loop Viaducts and Rationalisation Project tracks Nos. 6 – 9A inclusive). Flinders Street (22/10/18) SW.625/2019 No. 1A track and Points Nos. 052, 053 & 055. Unavailable for rail traffic (Disarrangement of Interlocking) *Circular SW.399/2018 is cancelled and replaced by SW.625/2019 A/C Fouling point deficiencies has been rectified.

Flinders Street (17/06/13) SW.279/2013 ^No. 1 West Track Track condition

^ A water hydrant line installed a/c urgent works is foul of the Booked Out portion of line & a deficient fouling point between track

numbers 136T & 45T has been identified and MUST not be booked back into service without the permission of the Chief Engineer

and the Track Delivery Manager. No impact to operational lines.

Pakenham (25/11/13) - Siding A (Previously known as “Works Siding”) Condition of rail (rust)

Stony Point SW.528/2019 Down End WSA Hand Points Condition of turnout

Southern Cross (Spencer SW.301/2014 Points No. 14U & 14D. (Between No. 8 South Track Signalling Street) and the City Circle Loop Viaduct line). Strategy/Junction Rationalisation Project

Ashburton (26/11/14) SW.720/2020 Siding Track condition suitable for track machines only

*Circular SW.153/2015 is cancelled and replaced by SW.720/2020 a/c siding now available for track machine movements.

Footscray TBA Emergency Crossover Condition of Points

Broadmeadows SW.400/2018 Points Nos. 424D & 424U Fouling Point Deficiencies

Flemington Racecourse SW.413/2018 Nos. 2 & 3 Tracks Insufficient track centres Points No.438 & Derail No. 436 for train preparation.

Lilydale SW.196/2018 Points No. 207D Track Condition.

SW.445/2018 Siding ‘C’ Track Condition suitable for Tamping and Grinding Upper Ferntree Gully consists only. SW.484/2018 Points No. 19 Fouling Point Deficiencies

Keon Park SW.560/2019 Points No. 001 Route Locking Issues

Carrum SW.089/2020 Points No. 622 Not Commissioned.

Pakenham East SW.337/2020 Points No. 661 Safeworking Deficiencies

Enquiries concerning the above should be directed to 9610 3673.

Page 5 of 30 Weekly Operational Notice No. 02/2021

SAFEWORKING NOTICES

WTT NETWORK CONFIGURATION [NC] – CHANGE NOTICE COMMENCING FORTHWITH The following alterations and corrections are to be made to the WTT Network Configuration document according to the referenced change vehicle: MANAGEMENT OF CHANGE REFERENCED: N/A (Governance)

ENGINEERING CHANGE (EC) REFERENCED: IF-20-030-PC (EC-12) (System Requirements/Network Boundaries/Line Description/Line Speeds/Ruling Grade Load/Metro Rolling Stock)

THIRD PARTY ROLLING STOCK REGISTRATION REFERENCED: N/A (Third Party Rolling Stock)

WTT Network Configuration section: L1-CHE-MAN-013 - Line Description Change Installation of 2 RRV access pads at Evans Rd and Camms Rd description: Page Page 30 altered:

Summary insert:

3.8.2 Dandenong to Cranbourne LYNBROOK 39.585 129 B2 NA 1Up 160 - - - Signalling 2Dn 160 remotely controlled from Dandenong Box – Cranbourne Panel Crossing 39.679 129 B2 - - - UL - Foot only Aylmer Road 39.695 129 B3 ------LYNDBROOK LOOP 40.982 129 C6 ------Down end Evans Road 41.593 129 D7 - - - - BB + Upside PG Road Rail Vehicle 41.797 129 E7 - - - - - Upside Access Pad MERINDA PARK 42.350 129 E9 NA 1 160 - - - - Down end of platform 42.425 129 E9 - - - - PG Foot only Thompsons Road 42.526 129 F9 - - - OL - - Electrical Transmission 43.446 129 G11 - - - - OL - Line Road Rail Vehicle 44.536 133 H1 - - - - - Downside Access Pad Camms Road 44.679 133 H1 - - - - BB + - PG

Page 6 of 30 Weekly Operational Notice No. 02/2021

CRANBOURNE [P] 45.122 133 J2 First train to 1 ┐ 160 3 176 - - Sidings located last train 4 176 on Down side 2 ┘ 167 5 176 of mainline. 6 176 Signalling remotely 7 176 controlled from 8 176 Dandenong Box – Cranbourne Panel

MTM SW.114/2021 ______GLENROY TEMPORARY CLOSURE OF LEVEL CROSSING PLATFORM ALTERATION Commencing 21:00 hours on Saturday 16th January 2021, as part of the Glenroy Road grade separation works, the following alterations will apply: • The Glenroy Road level crossing will be temporarily closed until further notice. The level crossing protection equipment on the up side and the boom barrier and mast on the down side will be removed, • The pedestrian crossing on the northern side of Glenroy Road will be temporarily closed until further notice, • The up platform will be reduced by 30 metres at the up end and extended by 33 metres at the down end, • The whistle board applying to up trains at 14.727km will be relocated 117 metres in the up direction to 14.610km, • A banner indicator no. E532BI will be provided at 14.735km to indicate the aspects displayed on up Automatic Signal no. E532. Insert reference of Signal Diagram no. 53/20 (Glenbervie to Somerton). A new Signalling Diagram will be issued at a later date. MTM SW.116/2021 ______

Page 7 of 30 Weekly Operational Notice No. 02/2021

WTT NETWORK CONFIGURATION [NC] – CHANGE NOTICE COMMENCING FORTHWITH The following alterations and corrections are to be made to the WTT Network Configuration document according to the referenced change vehicle: MANAGEMENT OF CHANGE REFERENCED: 15159 (Governance)

ENGINEERING CHANGE (EC) REFERENCED: RS-18-114-PC (EC-1) (System Requirements/Network Boundaries/Line Description/Line Speeds/Ruling Grade Load/Metro Rolling Stock)

THIRD PARTY ROLLING STOCK REGISTRATION REFERENCED: N/A (Third Party Rolling Stock)

WTT Network Configuration section: L1-CHE-MAN-016 - Metro Rolling Stock Change description: Update to section 6.7 to remove specific line approvals and outline that routes permitted for testing are as per Testing Plan and agreed by Network Operations. Page altered: 14 & 15

Summary insert:

6.7 METRO ROLLING STOCK [PASSENGER VEHICLES] – SIEMENS, X’TRAPOLIS & HCMT TRAINS REVENUE RUNNING LINES

Comeng Trains are permitted to operate for Revenue and Non-revenue services in all areas of Metropolitan train network unless otherwise stated.

Siemens Trains X’Trapolis Trains HCMT Non-Revenue, Non-Revenue, Non-Revenue, Line Maintenance, Revenue Service Maintenance, Testing & Revenue Service Maintenance, Testing & Revenue Service Testing & Driver Training Driver Training Driver Training FLINDERS STREET Platform 1 to 4 YES YES YES YES NO Platform 5 YES YES YES YES NO Vehicle to Platform 6 YES YES YES YES YES operate on routes Platform 7 East End YES YES YES YES YES specified in Platform 7 West End YES YES YES YES YES the Testing Plan and as Platform 8 East End YES YES YES YES NO agreed by Platform 8 West End YES YES YES YES NO Network Platform 9 East End YES YES YES YES NO Operations.

Platform 9 West End YES YES YES YES NO Platform 10 East End YES YES YES YES NO Platform 10 West End YES YES YES YES NO Platform 12 & 13 YES YES YES YES NO Platform 14 YES YES - YES NO CITY CIRCLE LOOP YES YES YES YES NO BURNLEY LOOP YES YES YES YES NO NORTHERN LOOP YES YES YES# YES NO # All revenue services via the Northern Loop must operate as six (6) carriage sets.

Page 8 of 30 Weekly Operational Notice No. 02/2021

YES – CAULFIELD LOOP YES YES YES# YES Anticlockwise only # All revenue services via the Northern Loop must operate as six (6) carriage sets. Yard Sidings Yes Yes NO North Melbourne Sidings Yes Yes NO Macaulay Sidings Yes Yes - Sidings 5-7 only NO Lay-By Sidings No Yes NO WERRIBEE YES YES YES# Yes NO # All revenue services on the Werribee line must operate as six (6) carriage sets. NEWPORT WORKSHOPS* YES Yes - * Includes the Newport Workshops, underfloor wheel lathe and Newport Suburban Stabling Sidings NEWPORT –WILLIAMSTOWN YES YES YES# YES NO Newport – Altona Car Yes Yes Sidings # All revenue services on the Williamstown line must operate as six (6) carriage sets. SUNBURY YES YES NO NO NO Sunbury Sidings Yes No Calder Park Sidings Yes No Sydenham Sidings Yes No CRAIGIEBURN YES YES NO YES NO Craigieburn Sidings Yes Yes Broadmeadows Sidings Yes No FLEMINGTON RACECOURSE YES YES YES YES NO Flemington Racecourse Yes Yes Sidings UPFIELD YES YES NO NO NO Upfield Sidings Yes No MERNDA NO YES YES YES NO Epping Sidings Yes Yes - Wash o NO Plant HURSTBRIDGE NO NO YES YES NO Hurstbridge Sidings No Yes - Eltham Sidings No Yes - Macleod Sidings - No - Yes - BELGRAVE NO YES (Testing only) YES YES NO Belgrave Siding No Yes - Upper Ferntree Gully - No Yes Sidings Bayswater Siding No Yes - Ringwood Sidings No Yes - Camberwell Sidings No Yes - RINGWOOD – LILYDALE NO NO YES YES NO Lilydale Sidings No Yes - CAMBERWELL – ALAMEIN NO NO YES YES NO Ashburton Siding No Yes - GLEN WAVERLEY NO YES (Testing only) YES YES NO Glen Waverly Sidings No Yes Burnley Sidings No Yes Burnley “A” Siding No Not tested - PAKENHAM YES YES NO YES YES** Pakenham East Sidings NO* NO* - Pakenham Sidings Yes Yes - Dandenong Sidings Yes Yes - Westall Sidings Yes Yes - Oakleigh Sidings Yes No Caulfield Sidings No -

Page 9 of 30 Weekly Operational Notice No. 02/2021

*, Siemens & X’Trapolis trains are permitted to operate from signals PKM752 or PKM754 to Pakenham East Depot Train gates for purpose of HCMT recovery. **HCMT is not permitted to stop at Hawksburn, Toorak, Armadale and Malvern. DANDENONG – NO YES YES NO YES CRANBOURNE Cranbourne Sidings Yes Yes - FRANKSTON YES YES YES# YES NO Frankston Sidings Yes Yes - Kananook Sidings Yes Yes - Mordialloc Sidings Yes Yes - # All revenue services on the Frankston line must operate as six (6) carriage sets. SANDRINGHAM YES YES NO YES NO Sandringham Sidings Yes Yes - Brighton Beach Sidings Yes Yes -

MTM SW.115/2021 ______

Page 10 of 30 Weekly Operational Notice No. 02/2021

______

VICTORIAN COUNTRY RAIL NETWORK TEMPORARY SPEED RESTRICTIONS

ESTIMATED STATIONS KM KM TSR AS FROM CIRCULAR REASON REMOVAL BETWEEN START END SPEED DATE

SOUTH WESTERN LINES

Geelong - Warrnambool Line

Waurn Ponds – IEV100 Track Geometry fault as 29/11/2020 Moriac Block 96.300 96.500 80 TS0334/20 18/12/20 per NIST-2706 Point

Overhead Bridge Works / Princes Marshall - Hwy signage issues due to 11/11/2018 139.710 140.250 80 TS0321/18 31/01/2019 Warrnambool VicRoads changing road approach to LX.

Warncoort Loop – Poor Track Quality. TSR altered 23/10/2020 167.000 168.000 60 TS0309/20 20/03/2021 Camperdown to 60 km/h

Colac - Inadequate sighting distance at 21/01/2019 176.200 176.650 60 TS0037/19 30/06/2020 Camperdown Occo crossing. Down direction

Warncoort Loop – IEV100 Track Geometry fault as 29/11/2020 193.250 193.400 80 TS0335/20 18/12/2020 Camperdown per NIST-2706

Inadequate sighting distance at Camperdown - 09/11/2020 213.035 213.435 60 TS0319/20 Occo crossing 213.435 DOWN Terang trains only

Due to recent IEV100 run as per Camperdown – 01/12/2020 239.700 240.100 80 TS0337/20 standard NIST-2706 TSR 80 is 18//12/2020 Warnambool required until fault is removed

Werribee - Geelong Line

North Geelong - Track condition at 133 points 15/02/2019 Geelong (East 72.200 72.250 30 TS0126/19 31/03/2019 Geelong & Heat mitigation. Track)

WESTERN LINES (STANDARD GAUGE)

Dimboola - Rainbow Line

Dimboola - Sleeper condition - decayed and 31/03/2020 363.151 426.500 25 TS0120/20 01/06/2022 Rainbow termite damanged.

Maryborough - Ararat Line

Maryborough - 24/06/2019 198.600 198.800 40 TS0231/19 Vertical curve radius 30/12/2020 Avoca

Line of Sight restricted at 3 13/09/2019 Avoca - Ararat 240.760 243.920 25 TS0294/19 occupation crossings, 240.960, 01/04/2020 241.506, 243.720

Line of Sight restricted at 2 09/09/2019 Avoca - Ararat 252.157 254.590 25 TS0292/19 occupation crossings: 252.357, 01/04/2020 254.390

Page 11 of 30 Weekly Operational Notice No. 02/2021

Line of sight restricted at 2 07/12/2018 Ararat - Avoca 257.902 259.065 25 TS0372/18 occupation crossings: 258.102, 30/12/2019 258.456.

Line of sight restriction at 2 Wiltshire Block 09/09/2019 262.487 264.190 25 TS0293/19 occupation crossings: 262.687, 01/04/2020 Point - Ararat 262.820

Murtoa - Hopetoun Line

Murtoa – 20/11/2020 308.000 309.000 20 TS0327/20 North West Creep Review 20/11/2021 Warracknabeal

Murtoa – 11/01/2021 315.200 319.730 20 TS0003/21 Heat related line during tie cycle 30/06/2021 Warracknabeal

Murtoa – Repair of Minyip Turnouts 05/11/2020 318.930 319.730 20 TS0314/20 30/06/2021 Warracknabeal required

Murtoa – 20/11/2020 325.000 326.000 20 TS0326/20 North West Creep Review 20/11/2021 Warracknabeal

Murtoa – 27/11/2020 330.000 348.289 15 TS0328/20 Creep Defects 01/03/2021 Warracknabeal

Level crossing track circuit Murtoa - 09/10/2016 348.730 349.330 10 TS0147/16 altered (shortened). 18/07/16 31/12/2016 Hopetoun Track geometry fault also.

3 x previous TSR's combined Warracknabeal - (TS0078/10, TS0373/19 and 19/02/2020 350.350 408.397 40 TS0048/20 31/12/2020 Hopetoun TS0374/19). LOS issues at Level Crossings

Henty Block Defective Culvert – MTAHPT-CU- 27/11/2020 Point – 363.000 369.000 20 TS0329/20 27/06/2021 368944 Hopetoun

Henty Block Removal of Turnouts at Galaquil. 09/12/2020 Point – 377.200 377.800 15 TS0353/20 Disturbed track in Summer 09/04/2021 Hopetoun period

INTERSTATE CORRIDOR MELBOURNE - WOLSELEY LINE

Refer to ARTC WebRams Access

WESTERN LINES (BROAD GAUGE)

Ballarat - Ararat Line

Nil

Sunshine - Line

New rolling stock braking Cobblebank – procedure, insufficient overlap 03/01/2021 Melton (Down 35.915 37.189 150 TS0372/20 for a train travelling at 160 Track) km/h to stop and may SPAD MEL706

Signal testing required to validate track for normal line speed. Contact Nathan Agnew Melton No. 1 (Signal Supervisor) prior to 24/02/2020 Road 37.000 37.600 40 TS0053/20 removal. Formation and Rail 30/06/2020 (North Track) through the North track is in Poor Condition, contact Terry Pring (Track Supervisor) prior to removal.

Consolidation – First tonnage Melton – Caroline requirement met. Track 07/01/2021 Springs (Up 39.300 29.000 100 TS0001/21 disturbance from track tamp Track) requires speed restriction until ballast consolidation achieved.

Page 12 of 30 Weekly Operational Notice No. 02/2021

Track disturbance from track Melton – Caroline tamp requires speed restrictions 03/01/2021 Springs (Up 39.300 29.000 80 TS.371/20 06/01/2021 until ballast consolidation is Track) achieved

Engineering Advice increase to 25 km/h for Freight. Ineffective Melton - Parwan Tie Rods. NOTE: Per Section 34- 27/08/2020 39.970 40.545 25 TS0263/20 Loop 135 No 25 Procedure 2, Freight Speed 15 km/h. Refer separate circular for Pass Speed.

Ineffective Tie Rods. NOTE: Per Section 34-135 No 25 Melton – Parwan 10/07/2020 39.970 40.545 90 TS0237/20 Procedure 2, Pass Speed 90 Loop km/h. Refer separate circular for Freight Speed

Track slew through Bacchus Marsh Station, Parwan and Bacchus Marsh - Osborne Road Level Crossing 02/12/2019 50.295 52.500 80 TS0364/19 01/05/2020 Rowsley Loop duplications requires TSR due to ballast disturbance in Summer period.

Ineffective creep monuments, Bungaree East missing reading, Patrolman End - Bungaree details that creep monument 25/01/2020 94.000 99.000 130 TS0025/20 30/04/2020 West End 98KP has been offset from (South Track) original location. Creep readings from 98

Bungaree West 17/06/2020 107.000 113.000 80 TS0224/20 SPAD Mitigation 01/12/2020 End - Ballarat

Ballarat - Maryborough Line

Creswick – 28/08/2020 187.070 187.473 40 TS0264/20 Defective culvert 28/12/2020 Clunes

MBP works have installed a set Talbot - 24/01/2019 223.400 225.000 15 TS0084/19 of gauge splitter points that are 31/12/2019 Maryborough not type approved.

NORTH WESTERN LINES

Bendigo - Echuca Line

Nil

Bendigo - Swan Hill Line

Level Crossing circuitry Nth Bendigo requirements for Thunder St 01/04/2016 Junction - 164.327 166.258 60 TS0042/16 30/06/2017 and Weeroona Ave Level Eaglehawk Crossing approach times.

Eaglehawk - Hopkins St Level crossing, short 27/02/2009 171.300 171.700 30 TS0020/09 31/12/2016 Raywood stacking.

Line of sight for down trains Eaglehawk - 02/05/2017 183.100 183.520 60 TS0171/17 approaching Fitzpatrick Rd Level 31/12/2020 Tandarra Crossing.

Bendigo - Swan Sight distance restricted by 21/01/2019 195.000 195.400 60 TS0017/19 30/06/2020 Hill angles

Bendigo - Swan Sight distrance restricted by 21/01/2019 195.400 195.800 60 TS0019/19 30/06/2020 Hill angles - Greenhills Road

Bendigo - Swan Sight distance restricted by 21/01/2019 205.840 206.250 60 TS0020/19 30/06/2020 Hill angles

Page 13 of 30 Weekly Operational Notice No. 02/2021

Bendigo - Swan Sight distance restricted by 21/01/2019 206.650 206.240 60 TS0021/19 30/06/2020 Hill angles

Rough riding on curve at the Dingee - 13/11/2018 228.300 229.100 60 TS0322/18 transition of curve. Poor riding 15/11/2019 Pyramid Hill at 80kph over turnout.

Bendigo - Swan Sight distance restricted by 21/01/2019 235.850 236.260 60 TS0022/19 30/06/2020 Hill angles - Mologa Durham Ox Rd.

Sight distance restricted by Bendigo - Swan 21/01/2019 236.660 236.250 60 TS0023/19 angles - Mologa Durham Ox 30/06/2020 Hill Road.

Sight distance restricted by Bendigo - Swan 21/01/2019 239.160 246.950 60 TS0024/19 angles - Prices, O'Tools, Griffin & 30/06/2020 Hill Abbattoirs Rd

Sight distance restricted by Bendigo - Swan 21/01/2019 247.350 239.560 60 TS0025/19 angles - Prices, O'Tools, Griffin & 30/06/2020 Hill Abbattoirs Road

Pyramid - Siting distance due to Worsley 21/01/2019 275.560 275.970 60 TS0026/19 30/06/2020 Kerang Rd - Down Trains only

Pyramid - Siting distance due to Worsley 21/01/2019 276.370 275.960 60 TS0027/19 30/06/2020 Kerang Rd - UP trains only.

Pyramid - Siting distance due to McPhail 21/01/2019 280.480 280.890 60 TS0028/19 30/06/2020 Kerang Rd. Down trains only.

Pyramid - Siting distance due to McPhail 21/01/2019 281.290 280.880 60 TS0029/19 30/06/2020 Kerang Rd. Up trains only.

Kerang-Swan Level Crossing Approach 17/09/2018 289.600 291.200 80 TS0288/18 15/10/2018 Hill Warning time.

Kerang - Mystic Siting distance restriction due to 21/01/2019 292.900 293.310 60 TS0030/19 30/06/2020 Park White Lane - DOWN trains ONLY

Kerang - Mystic Sighting distance due to White 10/05/2017 293.710 293.300 60 TS0190/17 31/05/2018 Park lane. UP trains ONLY.

Line of sight issues at Lake Kerang - Lake 21/01/2019 307.890 310.550 60 TS0031/19 Road Crossing. This TSR applies 30/06/2020 Boga to DOWN trains only.

Siting distance restricted by Kerang - Mystic 21/01/2019 310.970 308.280 60 TS0032/19 Lake Rd & Gorton Dr. Up Trains 30/06/2020 Park ONLY

Line of sight restricted Bailey Kerang - Lake 28/10/2019 320.240 322.700 60 TS0336/19 Road and Jeffer Road DOWN 30/06/2021 Boga TRAINS ONLY

Line of sight restricted Bailey Kerang - Lake 13/03/2019 322.900 320.640 60 TS0139/19 Rd,& Jeffer Road. Up trains 30/06/2019 Boga ONLY.

Rough ride report 337.200km Kerang - Swan plus change TSR to not affect 25/02/2020 336.550 337.900 60 TS0061/20 28/02/2020 Hill LX operation Murray Valley Highway.

Siting distance restriction due to Lake Boga - Farm Rd, Maher Rd & Aerodrome 21/01/2019 337.462 341.450 60 TS0035/19 30/06/2020 Swan Hill Extension Rd - DOWN Trains ONLY.

Dunolly – Korong Vale Line

Dunolly – Korong Poor sleeper condition under 20/10/2020 216.000 248.500 40 TS0304/20 10/02/2021 Vale Loop joints

Page 14 of 30 Weekly Operational Notice No. 02/2021

Up end points Inglewood Arnold Block (Eaglehawk) in poor condition. 23/01/2019 Point - 248.700 250.000 20 TS0068/19 Update: 07/12/16: Non 01/01/2021 Inglewood conforming sighting distance at Sullivan St and Calder Highway

Dunolly - Mildura Line

AK Fault. Non conforming short St Arnaud – 02/09/2020 336.00 338.400 20 TS0268/20 closure rail & crossing requires 01/03/2021 Ouyen renewing

Donald – 11/12/2020 351.100 351.200 30 TS0355/20 Top and cant fault 01/04/2021 Watchem Loop

Turnout Decommissioned state. 02/09/2020 Birchip – Ouyen 410.800 410.820 30 TS0271/20 02/02/2021 Curyo

Sighting distance restricted by angles & vegetation affecting, Curyo - Rickards, Adcock, Dorans & 02/09/2020 415.850 422.100 60 TS0269/20 02/09/2021 Woomelang Watchupga-Culgoa Rd Level crossings. Applies to trains in the DOWN direction only.

Patrolman Faults - Geometry (gauge) and sighting distance restricted by angles (Road) & Woomelang - vegetation affectingg Rickards, 02/09/2020 416.250 424.600 40 TS0272/20 02/09/2021 Curyo Adcock, Doran & Watchupga- Culgoa Rd level crossings. Sighting Distance applies to trains in the UP direction only.

Sighting distance restricted by angle of road and vegetation at Woomelang - 02/09/2020 436.200 437.000 60 TS0270/20 Pearce and Barbarys Rd level 02/02/2021 Lascelles crossing. Also geometry fault in level crossing.

Woomelang 11/01/2021 Loop – Gama 439.200 439.440 40 TS0002/21 Sand drift 01/06/2021 Block Point

Echuca - Deniliquin Line

Nil

Gheringhap - Ballarat Line

Non conforming line of sight at Lethbridge - 24/01/2019 101.259 103.100 40 TS0073/19 Quarry Lane and Lower Plains 31/12/2019 Meredith Rd

Gheringhap - Deterioration of track 28/07/2020 111.000 115.000 40 TS0247/20 31/12/2019 Lal Lal conditions.

Gheringhap - Top and Line faults through 23/01/2019 134.700 135.000 30 TS0075/19 31/12/2019 Ballarat turnout

Inglewood - Wycheproof Line

Nil

Korong Vale - Manangatang Line

Korong Vale – Sleeper condition and bridge 17/12/2020 Mysia Block 281.100 282.000 20 TS.0358/20 01/12/2021 condition – nominated for AWP. Point

Korong Vale – Sleepers condition and allowing 23/12/2020 Quambatook 282.000 323.000 30 TS.0364/20 for Consolidation post recent 01/12/2021 Block Point works

Page 15 of 30 Weekly Operational Notice No. 02/2021

Korong Vale – Sleepers condition and allowing 23/12/2020 Quambatook 323.000 334.000 20 TS.365/20 for Consolidation post recent 01/12/2021 Block point works

Quambatook – Sleeper condition and bridge 17/12/2020 342.200 363.000 25 TS0362/20 01/09/2022 Lalbert condition – nominated for AWP.

Korong Vale - Sea Lake Line

Granites Block Point - 21/10/2020 294.500 295.300 30 TS0308/20 Sleeper condition 01/03/2021 Wycheproof Block Point

Granites Block Point - 21/10/2020 308.600 309.300 25 TS0307/20 Sleeper condition 01/03/2021 Wycheproof Block Point

Korong Vale - 05/11/2020 317.400 318.800 10 TS0315/20 Level crossing design deficiency 30/06/2021 Teddywaddy

Granites Block Point – 01/12/2020 331.900 332.900 30 TS0339/20 Sleeper condition – curve 01/02/2021 Wycheproof Block Point

Wycheproof 20/11/2020 Block Point – Sea 368.000 369.000 25 TS0325/20 Creep defect 01/06/2021 Lake

Wycheproof 20/11/2020 Block Point – Sea 380.000 384.000 15 TS0324/20 Sleeper condition 01/06/2020 Lake

Wycheproof 14/12/2020 Block Point – Sea 398.000 400.800 40 TS0356/20 IEV100 gauge faults 01/02/2021 Lake

Swan Hill – 18/12/2020 377.800 387.750 30 TS0363/20 C1 Type Creep Faults 29/01/2021 Piangil

Swan Hill - Piangil Line

Nil.

NORTHERN LINES

Southern Cross - Sunshine Line

South 18/03/2019 Kensington 5.300 6.000 40 TS0143/19 Defective Retaining wall 18/06/2019 (Down Track)

Sunbury - Bendigo Line

Nil.

Sydenham - Bendigo Line

V Xing renewal at 113.400km Elphinstone - completed. TSR is now for 11/12/2019 115.000 116.000 110 TS0371/19 30/06/2020 Castlemaine sleeper fastenings Elphinstone Tunnel.

NORTH EAST BROAD GAUGE LINE

Craigieburn - Seymour

Wallan – 08/12/2020 Donnybrook (Up 47.400 47.000 100 TS0348/20 Geometry faults 31/05/2021 Track)

Page 16 of 30 Weekly Operational Notice No. 02/2021

Wallan – Heathcote 03/12/2020 47.855 48.255 80 TS0344/20 A Fault / Line through crossover 30/06/2021 Junction (Down Track)

Seymour - Shepparton Line

Seymour - Sight distance restricted by 21/01/2019 131.850 132.260 60 TS0038/19 30/06/2020 Shepparton angles

Seymour - Sight distance restricted by 21/01/2019 132.650 132.240 60 TS0039/19 30/06/2020 Shepparton angles

Seymour - Sighting distance restricted by 21/01/2019 141.720 142.130 60 TS0040/19 30/06/2020 Shepparton angles

Seymour - Sight distance restricted by 21/01/2019 142.530 142.120 60 TS0041/19 30/06/2020 Shepparton angles

Nagambie Block A Faults repaired. Line faults 06/09/2020 Point - 146.800 147.200 25 TS0281/20 30/06/2021 through turnout Murchison East

Seymour - Sight distance restricted by 21/01/2019 155.340 155.750 60 TS0042/19 30/06/2020 Shepparton angles

Seymour - sitting distance restricted by 08/05/2017 156.150 155.760 60 TS0180/17 01/01/2018 Shepparton angles

Seymour - Sight distance restricted by 21/01/2019 156.150 155.740 60 TS0043/19 30/06/2020 Shepparton angles

Seymour to Aracadia Road LX - Sight 21/01/2019 158.480 158.890 80 TS0044/19 30/06/2020 Shepparton distance restricted by angles

Seymour to Arcadia Road LX - Sight distance 21/01/2019 159.290 158.880 80 TS0045/19 30/06/2020 Shepparton restricted by angles

Level Crossing sighting issues Toolamba - 01/05/2017 171.280 171.690 60 TS0151/17 for DOWN trains only. (Sighting 02/03/2017 Mooroopna Distance reviewed)

Seymour - Sighting distance restricted by 21/01/2019 173.070 173.480 60 TS0046/19 30/06/2020 Shepparton angles

Seymour - Sight distance restricted by 21/01/2019 173.880 173.470 60 TS0047/19 30/06/2020 Shepparton angles

Shepparton - Reissue of TS.0239/19 - Culvert 01/07/2019 192.833 193.233 30 TS0350/20 31/03/2020 Tocumwal in poor condition

GOULBURN VALLEY LINES

Toolamba - Echuca Line

Toolamba - 12/11/2018 167.400 231.200 30 TS0320/18 Sleeper Condition 30/06/2019 Echuca

INTERSTATE CORRIDOR MELBOURNE - ALBURY LINE

Refer to ARTC WebRams Access

EASTERN LINE

Pakenham - Sale Line

Nar Nar Goon – Track Condition, Exceedence, 26/09/2018 Tynong 70.700 70.900 80 TS0296/18 Geometry Faults and Underlying 20/08/2019 (North Track) issues.

Cross levels - Tops of Skeleton Bridge and through both Morwell - turnouts of GIFT and APM, 08/08/2019 145.800 147.900 80 TS0263/19 08/09/2020 Maryvale excessive wear on turnouts. Extended 08/08/2019 due to rail condition.

Page 17 of 30 Weekly Operational Notice No. 02/2021

Traralgon to Line of sight issue. VL’s to 13/11/2018 165.000 165.100 70 TS0327/18 25/08/2020 Bairnsdale Bairnsdale ‐ Proposed Mitigation

Traralgon - Line of sight issue. VL’s to 13/11/2018 183.500 183.510 70 TS0328/18 25/08/2020 Bairnsdale Bairnsdale ‐ Proposed Mitigation

Culvert consolidation completed. Traralgon to TSR returned as per TS0329/18. 25/03/2020 213.000 214.000 70 TS0107/20 22/03/2023 Bairnsdale Line of Sight issues for VL’s to Bairnsdale.

Lins of sight issues due to vegetation and short visual 13/11/2018 Sale - Stratford 218.590 218.755 60 TS0330/18 12/05/2019 warning for heavy vehicles crossing occupation crossing.

Consolidation of 1200 metres of 07/12/2020 Sale – Bairnsdale 220.240 222.000 60 TS0347/20 track as part of the new 28/12/2020 constructed Avon Bridge

Sight Distance Restricted by 13/11/2018 Sale - Bairnsdale 224.350 225.800 60 TS0331/18 27/04/2019 angles

Traralgon to Line of sight issue. VL's to 13/11/2018 230.244 230.254 70 TS0332/18 25/08/2020 Bairnsdale Bairnsdale - Proposed Mitigation

Line of sight issues for the up direction only, due to BIO Site Stratford - 13/11/2018 233.985 233.996 70 TS0333/18 vegetation reserve on the curve 12/05/2019 Bairnsdale approach to occupation crossing.

Stratford - 13/11/2018 236.800 236.820 70 TS0334/18 Line of sight issues 31/12/2020 Bairnsdale

Concrete lining of Armco culverts completed. Altered back Traralgon - 28/03/2020 239.990 240.000 70 TS0118/20 to original limits of TS0335/18. 28/03/2022 Bairnsdale Line of Sight issues for VL’s to Bairnsdale

Traralgon to Line of sight issue. VL’s to 13/11/2018 254.500 254.510 40 TS0336/18 25/08/2020 Bairnsdale Bairnsdale - Proposed Mitigation

Page 18 of 30 Weekly Operational Notice No. 02/2021

Speed Restrictions and Track Warnings -

Segment: Somerton Loop - Austrak - Seymour Loop No At or Between Kms Date Pass/Oth Dir Boards Reason Beveridge and Wallan Loop 110/2020 41km to 46.21km 4/06/2020 80/80 Yes Track - Condition (Other) Comment: ** APPLIES TO NE VICTORIAN EAST LINE ONLY **

Twist line Top and cant located Rough Ride call out , Estimated lift date 31/01/2021 Distance Increseddue to partial works complete.Awaiting Tamper., Wandong and Kilmore East South 209/2020 63.1km to 63.52km 15/10/2020 80/80 Yes Worksite Comment: ** APPLIES TO NE VICTORIAN EAST LINE ONLY **

Turnout inspection completed, Turnout worn and requres Build up , Estimated removal date: 20/12/2020.

Segment: Seymour Loop - Benalla Junction No At or Between Kms Date Pass/Oth Dir Boards Reason Longwood Loop and Balmattum 232/2020 140.9km to 141.2km 13/11/2020 40/40 Yes Track - Condition (Other) Comment: ** APPLIES TO NE VICTORIAN WEST LINE ONLY **

Bridge condition. Estimated removal date: 31/01/2021 Longwood Loop and Balmattum 266/2020 151.77km to 151.9km 15/12/2020 60/60 Yes Track - Condition (Other) Comment: ** APPLIES TO NE VICTORIAN WEST LINE ONLY **

Sleepers in poor condition in bridge . Lift date 31/01/2021.

Segment: Sims Street Jct - Tottenham Loop No At or Between Kms Date Pass/Oth Dir Boards Reason Sims Street Jct and West Footscray Jctn 227/2020 4.7km to 5.5km 9/11/2020 20/20 U Yes Ballast - Condition (Mudhole) Comment: Ineffective sleeper ties . Worn rail mud and top issues throughout Bnbury street tunnell .Estimated Lift Date 15/03/2021 Sims Street Jct and West Footscray Jctn 228/2020 4.7km to 5.5km 9/11/2020 20/20 D Yes Ballast - Condition (Mudhole) Comment: Ineffective Sleeper Ties Worn Rail Mud and top issues through out Banbury Street Tunnell . Estmated Lift Dat 15/03/2021.

Segment: Tottenham Yard (Box) - Broadmeadows (Vic) No At or Between Kms Date Pass/Oth Dir Boards Reason Tottenham Yard (Box) and McIntyre 236/2020 10.65km to 14.15km 15/11/2020 60/60 Yes Track - Condition (Other) Comment: Mud Removal Works. Estimated Removal Date: 24/12/2020

4/01/2021 18:06 1 Speed Restrictions and Track Warnings -

Segment: Broadmeadows (Vic) - Somerton Crossover No At or Between Kms Date Pass/Oth Dir Boards Reason Broadmeadows (Vic) and Somerton Crossover 178/2019 21.35km to 22.737km 9/07/2019 60/60 Yes Track geometry - Condition Comment: Line and gauge issues in T/O at 7 points at Somerton also line issues in MGD at Somerton. Estimated removal date: 01/09/2019

Segment: Somerton Crossover - Somerton Loop - Austrak No At or Between Kms Date Pass/Oth Dir Boards Reason Somerton Crossover and Somerton Loop - Austrak 179/2019 22.737km to 23.8km 9/07/2019 60/60 Yes Track geometry - Condition Comment: Line and gauge issues in T/O at 7 points at Somerton also line issues in MGD at Somerton. Estimated removal date: 01/9/2019

Segment: Tullamarine Broad Gauge - Broadmeadows (Vic) No At or Between Kms Date Pass/Oth Dir Boards Reason Tullamarine Broad Gauge and Jacana Jct 156/2010 25.8km to 26.2km 13/05/2010 20/20 Yes Sleeper/fastening assembly - Condition Comment: Poor sleeper condition and bad track geometry.This TSR is on the Broad Gauge Down end PL1. Estimated removal date: 01/07/2019.

Segment: Benalla Junction - Albury No At or Between Kms Date Pass/Oth Dir Boards Reason SCT Barnawartha and Wodonga Loop 118/2020 294.7km to 294.9km 23/06/2020 80/80 Yes Ballast - Condition (Other) Comment: ** APPLIES TO NE VICTORIAN WEST LINE ONLY **

Waiting for design approval for ballast retaining walls on bridge. Estimated removal date: 25/01/2021

Segment: Benalla Junction - Yarrawonga No At or Between Kms Date Pass/Oth Dir Boards Reason Benalla Junction and St James 111/2020 198.4km to 225.2km 4/06/2020 30/30 Yes Track - Condition (Other) Comment: TRACK CONDITION.Esimated Removal Date extended to be in Align with Planned Works . Estimated Removal Date 30/06.2021.

4/01/2021 18:06 2 Speed Restrictions and Track Warnings -

Segment: Maroona - Portland No At or Between Kms Date Pass/Oth Dir Boards Reason Maroona and Portland 104/2020 232.2km to 405.256km 28/05/2020 40/40 No Track - Condition (Other) Comment: Poor track condition. Estimated removal date: TBA Maroona and Grone Kalari Siding 14/2018 235km to 382.55km 25/01/2018 60/60 Yes Sleeper/fastening assembly - Condition Comment: Poor sleeper condition in hot temperatures. Estimated removal date: 30/06/2020

Segment: Sims Street Jct - Tottenham Loop No At or Between Kms Date Pass/Oth Dir Boards Reason Sims Street Jct and West Footscray Jctn 227/2020 4.7km to 5.5km 9/11/2020 20/20 U Yes Ballast - Condition (Mudhole) Comment: Ineffective sleeper ties . Worn rail mud and top issues throughout Bnbury street tunnell .Estimated Lift Date 15/03/2021 Sims Street Jct and West Footscray Jctn 228/2020 4.7km to 5.5km 9/11/2020 20/20 D Yes Ballast - Condition (Mudhole) Comment: Ineffective Sleeper Ties Worn Rail Mud and top issues through out Banbury Street Tunnell . Estmated Lift Dat 15/03/2021.

Segment: Tottenham Loop - Tottenham Yard (Box) No At or Between Kms Date Pass/Oth Dir Boards Reason Tottenham Loop and Tottenham Yard (Box) 440/2018 9.97km to 10.2km 19/11/2018 20/20 Yes Track - Condition (Other) Comment: Standard gauge Newport bound effectected.. Broad gauge independent crossover at Tottenham Junction have server cross levels through it. All traffic Newport to Melbourne and Melbourne to Newport speed of 20km/hr over crossover. Estimated removal date: 25/03/2019

Segment: Newport - Anakie Loop No At or Between Kms Date Pass/Oth Dir Boards Reason SCT - Laverton and Manor Loop 165/2020 30.738km to 33.21km 29/08/2020 60/60 Yes Track - Condition (Other) Comment: Newly constructed track. Estimated removal date 30/1/2021

Segment: Gheringhap Loop - Maroona No At or Between Kms Date Pass/Oth Dir Boards Reason Barwon Park Loop and Werneth B/Pt. 252/2017 120km to 120.25km 15/08/2017 40/40 Yes Points and crossing - Other Comment: Points defect. boards reverted to original km points due mud removed. Estimated removal date: 30/01/2021

4/01/2021 18:06 1 Speed Restrictions and Track Warnings -

Vite Vite and Fiery Creek Block Point 215/2020 195.9km to 196.35km 22/10/2020 60/60 Yes Track - Condition (Other) Comment: Rough top / Mud. Estimated removal date: 31/01/2021 Tatyoon Loop and Tatyoon Loop 621/2010 231.421km to 231.422km 24/12/2010 0/0 No Track Warning Comment: Tatyoon Loop a speed restriction of 25KMH applies to up trains only and only while a train is stationary in loop track due to sighting distance for road traffic. Notice Boards are erected. Tatyoon Loop and Maroona 626/2010 233.226km to 244.452km 25/12/2010 0/0 No Track Warning Comment: A Speed restriction of 30kmh applies to down trains only while a train is stationary in loop track at Tatyoon due to sighting distance for road traffic, [ This amends T/W 213 1998 ].Notice Boards are erected.

Segment: Maroona - Ararat No At or Between Kms Date Pass/Oth Dir Boards Reason Maroona and Langi Logan 145/2020 244.8km to 244.9km 28/07/2020 60/60 Yes Ballast - Condition (Mudhole) Comment: Track Geometry and Mudhole.Estimated Lift date 31/03/2021 Langi Logan and Ararat 207/2020 263.55km to 263.773km 24/09/2020 0/0 No Track Warning Comment: Level Crossing Warning Time Estmated Lift time TBA. Langi Logan and Ararat 23/2019 265.22km to 265.25km 26/01/2019 60/60 Yes Worksite Comment: Turnout replacement Ararat. Estimated removal date: 31/07/2021

Segment: Pyrenees Loop - Murtoa No At or Between Kms Date Pass/Oth Dir Boards Reason Stawell and Deep Lead Loop 638/2010 241.47km to 241.48km 27/12/2010 0/0 No Track Warning Comment: Stawell siding booked out by V/line. Stawell and Deep Lead Loop 31/2020 242.02km to 242.07km 14/02/2020 60/60 Yes Track geometry - Condition Comment: Rough track.

4/01/2021 18:06 2 Speed Restrictions and Track Warnings -

Deep Lead Loop and Glenorchy 643/2010 254.81km to 256.62km 29/12/2010 0/0 No Track Warning Comment: Effective immediately departure speed for all movements departing the Deep Lead Loop number 2 road are restricted to 40km/h account track geometry.

Segment: Ararat - Pyrenees Loop No At or Between Kms Date Pass/Oth Dir Boards Reason Ararat and Pyrenees Loop 206/2020 266.7km to 267.58km 2/11/2018 0/0 No Track Warning Comment: Short warning times on level crossing due to third part equipment upgrade.Only effects Melbourne bound trains existing Melbourne bound trains existing the loop road at Pyrenees Loop , Estimated Removal Date 31/12/2019. Ararat and Pyrenees Loop 245/2020 266.75km to 267.32km 20/11/2020 40/40 Yes Ballast - Condition (Mudhole) Comment: mud/rough top. Estimated removal date: TBA

Segment: Murtoa - Dimboola No At or Between Kms Date Pass/Oth Dir Boards Reason Murtoa Loop and Dooen 633/2010 308.8km to 309.18km 27/12/2010 0/0 No Track Warning Comment: Jung siding booked out due to turnout and track condition.

Segment: Dimboola - Serviceton No At or Between Kms Date Pass/Oth Dir Boards Reason Dimboola and Gerang Gerung 644/2010 364.545km to 366.365km 29/12/2010 0/0 No Track Warning Comment: Effective immediately departure speed for all movements departing the Dimboola Loop number 2 road are restricted to 40 km/h account track geometry. Kiata and Nhill 645/2010 388.435km to 390.293km 29/12/2010 0/0 No Track Warning Comment: Effective immediately departure speed for all movements departing the Salisbury Loop number 2 road are restricted to 35km/h account track geometry. Tarranginnie and Miram 43/2017 417.575km to 417.595km 17/02/2017 80/80 Yes Track - Condition (Other) Comment: Rough track due to geometry defects in mud holes.

4/01/2021 18:06 3 Speed Restrictions and Track Warnings -

Miram and Kaniva 646/2010 433.292km to 435.106km 29/12/2010 0/0 No Track Warning Comment: Effective immediately the departure speed for all movements departing the Kaniva Loop number 2 road are restricted to 35km/h account track geometry.

4/01/2021 18:06 4 SAFEWORKING NOTICES LARA ISSUE OF TRAIN ORDERS BATESFORD TO BALLARAT EAST Commencing forthwith, until the conclusion of the Vlocity Transfers to Ballarat via Gheringhap vide S.21/6003, the Issue of a Train Order applicable to the Batesford to Ballarat East Train Order Territory by the North Geelong C Signaller at Centrol, is authorised to be issued to the Driver of the Vlocity Transfers at Lara. The suggested wording contained on the Train Order when issued at Lara to read as follows: PROCEED FROM BATESFORD TO ……… The issue of a Train Order applicable to the Batesford to Ballarat East Train Order Territory must be issued in conjunction with Section 18, Train Order System per the 1994 Book of Rules and Operating Procedures as amended and Local Operating Procedure Section 34 – 58 – North Geelong C. V/Line SW.0001/2021 ______

TOTTENHAM – EAST YARD ROADS 3, 4 & 5 NOTICE OF INTENT TO WORK Commencing Monday, 11 January 2021 until Friday, 29th January 2021 between 06:00 Hours and 18:00 Hours (each day as required), Roads 3, 4 & 5 within the Tottenham East Yard will be Booked Out. Rail Infrastructure Alliance (RIA - Project) require access through 3, 4 & 5 Roads in the Tottenham East Yard. Prior to works taking place, communications are to be made with the Train Controller – Room 1 (Weekdays – 9619 4709) or Train Controller – Room 10 (Weekends & P/H – 9619 1722). During this period, if train control requires a train movement through the East Yard, with 30 minutes notice, RIA has the ability to make safe the worksite for train running and issue a certificate of train running to allow for a train movement through the East Yard. These works will be conducted under Section 34 – 135 – Supplementary Infrastructure Procedures 22 – BOOKED OUT OF TRACK NOI # 17847 Contact Details: Vernon Vea 0429 522 269 V/Line TON.0009/2021 ______

Page 25 of 30 Weekly Operational Notice No. 02/2021

TON-0008/2021 IS CANCELLED AND REPLACED BY THIS NOTICE BALLARAT LOCO TRACK NOTICE OF INTENT TO WORK On the follow dates and times: - • Saturday, 9th January 2021 between 07:30 Hours and 19:00 Hours, (the same day) • Sunday, 10th January 2021, Tuesday, 12th January 2021 and Thursday, 14th January 2021, between 07:00 Hours and 19:00 Hours, (the same day - each day) • Saturday, 16th January 2021 and Tuesday, 19th January 2021 between 07:30 Hours and 15:30 Hours, (the same day - each day), the Ballarat Loco Track will be Booked Out between Signal Post BAT42 and BAT34. As part of the protection for this Book Out of Track, 25 points will be secured in the normal position with lockable point clip and independent padlock. VicTrack will carry out Ballarat Bus Interchange activities. These works will be conducted under Section 34 – 135 – Supplementary Infrastructure Procedures 22 – BOOKED OUT OF TRACK Prior to works taking place, communications are to be made with the Train Controller - Room 5 Centrol (9619 1067) and Yard Coordinator. NOI # 17338, 17339, 17341, 17342, 17716 & 17717. Contact Details: Mark Waite 0418 733 958 V/Line TON.0012/2021 ______GEELONG LOCO DEPOT REFUELLING ROAD NOTICE OF INTENT TO WORK On Wednesday, 13th January 2021 and Thursday, 14th January 2021 between 08:00 Hours and 16:00 Hours (each day), V/Line Fleet require access to carry out Mains Water Plumbing Repairs within the Geelong Loco Depot - Locomotive Refuelling Road. These works will be conducted under Section 34 – 135 – Supplementary Infrastructure Procedures 22 – BOOKED OUT OF TRACK The Track Force Protection Coordinator will ensure that communications are made with Geelong Shunter(s) to ensure that train operations within the yard have ceased prior to contacting the Geelong Corridor Train Controller – Room 8 (03 9619-1062) to Book Out Geelong Yard. Per NOI # 17839 Contact: Greg Armstrong 0429 507 060 V/Line TON.0013/2021 ______

Page 26 of 30 Weekly Operational Notice No. 02/2021

TON-0133/2019 IS CANCELLED AND REPLACED BY THIS CIRCULAR AMENDMENTS MADE ARE INDICATED IN YELLOW HIGHLIGHT GTE APPROVED OPERATORS BY LINE SECTION AND REGION In accordance with Section 34-134 ‘Road Rail Operations’ & Section 25, clause (d) ‘Road Rail Weed Spraying Operations on Non-specified sections of the V/Line Network’, the following GTE Trackspray personnel are specifically authorised to operate unaccompanied by a qualified TVO2 V/Line employee on all line sections on the V/Line Network. Kim Evans, Sam Hamilton & Aaron Piggot. In accordance with Section 34-134 – ‘Road Rail Operations’ & Section 25, clause (d) ‘Road Rail Weed Spraying Operations on Non-specified sections of the V/Line Network’, the following GTE Trackspray personnel are specifically authorised to operate unaccompanied by a qualified TVO2 V/Line employee on the line sections specified in the below table. Kevin Baulch & Lee Phillips

Line Section Region

St Arnaud - Yelta North Western

Ouyen - Panitya North Western

Murtoa - Hopetoun North Western

Dimboola - Yaapeet North Western

Korong Vale - Mittyack North Western

Korong Vale - Robinvale North Western

Toolamba - Echuca North Eastern

Shepparton - Dookie North Eastern

Shepparton - Tocumwal North Eastern

Echuca - Deniliquin North Eastern

Seymour – Shepparton North Eastern

Barnes - Moulamein North Eastern

Waurn Ponds - Camperdown South Western

Camperdown - Warrnambool South Western

Warrnambool - Dennington South Western

Traralgon - Bairnsdale Eastern

Gheringhap - Warrenheip Western

Maryborough - Dunolly Western

Dunolly - St Arnaud Western

Dunolly - Inglewood Western

Inglewood - Korong Vale Western

Page 27 of 30 Weekly Operational Notice No. 02/2021

Line Section Region

Maryborough – Ballarat Western

Ballarat – Ararat Western

Nth Bendigo - Swan Hill Northern

Swan Hill - Piangil Northern

Eaglehawk - Inglewood Northern

Nth Bendigo - Echuca Northern

GTE PERSONNEL – USE OF TRACK WARRANTS The following GTE Trackspray personnel have undertaken the necessary training and assessment in the use of Track Warrants on the V/Line Network and are authorised to request Track Warrants on behalf of V/Line Maintenance. Kim Evans, Sam Hamilton, Aaron Piggott & Kevin Baulch V/Line TON.0014/2021 ______HOPETOUN NOTICE OF INTENT TO WORK Commencing Sunday, 10th January 2021 at 07:00 Hours until Tuesday, 12th January 2021 at 17:00 until (Continuous) and again on Thursday, 14th January 2021 between 07:00 Hours and 17:00 Hours, V/Line Delivery – Track & Civil will carry out Tie Renewal activities within the Hopetoun station limits from the Commence / End Train Order Working Board to KP 410.558 (Baulk). The Track Force Protection Coordinator will ensure that communications are made with the Train Controller – Room 1 (Weekdays 03 9619-4709) or Train Controller – Room 2 (Weekends & P/H 03 9619 4702) prior to the works taking place. These works will be conducted under Section 34 – 135 – Supplementary Infrastructure Procedures22 – BOOKED OUT OF TRACK NOI # 16561 Contact Details: Alex Muntean 0409 698 494 V/Line TON.0015/2021 ______

Page 28 of 30 Weekly Operational Notice No. 02/2021

TON-0016/2021 IS CANCELLED AND REPLACED BY THIS NOTICE BALLARAT EAST TO WINDERMERE (WENDOUREE) AND MARYBOROUGH NOTICE OF INTENT TO WORK On the evening of Tuesday, 12th January 2021, in sequence with the Occupation detailed on SWO-0047-2021 being taken out until 21:25 Hours the same day, Ballarat Line Upgrade (BLU) will be carrying out BLU-TCS Updates on all track sections from Ballarat East to Windermere (Wendouree) and Maryborough. As there is no requirement to have resources in the field, these works will be carried out under ‘LOCKING DISARRANGED’. Prior to these works taking place, communications are to be made with Train Controller – Room 5 (9619-1067) and the Train Controller – Room 2 (9619-4702) Per NOI # 17913. Contact: Jacob Tran 0400 751 372 V/Line TON.0017/2021 ______

DEER PARK JUNCTION TO NORTH BALLARAT JUNCTION NOTICE OF INTENT TO WORK On the morning of Wednesday, 13th January 2021, after the passage of 9153 at North Ballarat Junction (approximately 02:18 Hours) until 03:35 Hours the same day, Ballarat Line Upgrade (BLU) will be carrying out Communication Router changeovers on all track sections from Deer Park Junction to North Ballarat Junction. As there is no requirement to have resources within the Danger Zone, these works will be carried out under ‘LOCKING DISARRANGED’. Prior to these works taking place, communications are to be made with Train Controller – Room 5 (9619-1067). Per NOI # 17913. Contact: Jacob Tran 0400 751 372 V/Line TON.0018/2021 ______KATUNGA YARD MAIN LINE POINTS RECORD OF RAIL INFRASTRUCTURE – BOOKED OUT OF SERVICE Effective 14:15 hours on Monday 11th January 2021, the Main Line Turnouts at Katunga have been Booked Out of Service by V/Line Network Maintenance due to Condition of Turnouts, until further notice. The Main Line Turnouts have been secured Normal for Main Line movements only, the keys to which is held by the North Eastern V/Line T&C Supervisor or their delegate. V/Line TON.0019/2021 ______

Page 29 of 30 Weekly Operational Notice No. 02/2021

TANDARRA UP END POINTS RECORD OF RAIL INFRASTRUCTURE – BOOKED OUT OF SERVICE Effective 11:57 hours on Monday 4th January 2021, the Up End Main Line Points at Tandarra have been Booked Out of Service by V/Line Network Maintenance due to Condition of Point Timbers, until further notice. The Up End Points have been secured Normal for Main Line movements only, the keys to which is held by the Northern V/Line S&C Supervisor or their delegate. Tandarra Down End Main Line Points remains unavailable for use vide TON-0107/2015. The Down End Main Line Points remain secured Normal for Main Line movements only. Tandarra Siding remains unavailable for use vide SW.0244/2014. V/Line TON.0020/2021 ______

Page 30 of 30 Weekly Operational Notice No. 02/2021