Relief Line and Yonge Subway Extension

Total Page:16

File Type:pdf, Size:1020Kb

Relief Line and Yonge Subway Extension Relief Line and Yonge Subway Extension Leslie Woo Chief Planning Officer JUNE-26-17 RELIEF LINE AND YONGE SUBWAY EXTENSION OVERVIEWS • Both the Relief Line and the Yonge Subway Extension are priority projects included in The Big Move and will be included in the next Regional Transportation Plan • Each project makes a significant contribution to the regional transit network by: • Enhancing our ability to connect people to where they need to be • Adding capacity so that transit trips are more comfortable • Enabling more residents to choose transit for their trips • Spurring on local transit oriented development 2 A REGIONAL SYSTEM • The Relief Line and the Yonge Subway Extension are part of the regional transportation network needed to meet the GTHA’s growth to 2031 and beyond • The 7.4 km northern extension of the Yonge Subway (Line 1) from Finch Avenue into Richmond Hill will connect two provincial urban growth centres, North York Centre and Richmond Hill Centre, and significantly reduce the 2,500 daily bus trips along the busy Yonge corridor • The Relief Line is a critical infrastructure investment required to create capacity for new riders on the Yonge subway and provide a new connection into Toronto’s downtown • The Yonge Subway Extension would generate more access • The Relief Line would create more capacity • Both projects need to advance in an integrated way 3 PARTNERSHIPS Much progress is being made in bringing the parties together to work as a team to advance both projects Yonge Subway Extension • Metrolinx, City of Toronto, Toronto Transit Commission (TTC) and York Region staff have established an Executive Working Group, which is advancing a project management approach to design and engineering • TTC will be leading the design and engineering work packages, in close partnership with York Region and Metrolinx Relief Line • Metrolinx, City of Toronto, and TTC staff have established a joint Relief Line Working Group, which will coordinate governance of Relief Line planning in two segments: • Relief Line South, between Danforth Avenue and downtown Toronto; and • Relief Line North, between Sheppard Avenue and Danforth Avenue • The Relief Line South will advance to TPAP and further design and engineering work. Led by the City of Toronto • The Relief Line North Project Assessment will launch this summer, led by Metrolinx, in close partnership with the City of Toronto and TTC 4 CURRENT FUNDING • Through Metrolinx, the provincial government has provided: • $55 million in funding for Yonge Subway Extension project development to be used for advancing design and engineering • $155 million in funding for Relief Line project development to be used for planning, business case, environmental assessment, and design and engineering • York Region has an additional $36.3 million in federal funding through the Public Transit Infrastructure Fund (PTIF) for Yonge Subway Extension work • The City of Toronto has an additional $55.52 million in funding for Relief Line project development, 50% of which is through the federal Public Transit Infrastructure Fund (PTIF) 5 CITY OF TORONTO COUNCIL AND TTC BOARD UPDATE Toronto City Council (May 24th, 2017) adopted a staff report on the following: Yonge Subway Extension • Authority has been given to the City of Toronto and TTC to enter into a Memorandum of Understanding (MOU) with Metrolinx and York Region • Define roles and responsibilities • Ensure the TTC recovers from Metrolinx and York Region the full costs of undertaking work required to develop a Class 3 cost estimate (15-30% design) 6 CITY OF TORONTO COUNCIL AND TTC BOARD UPDATE Toronto City Council (May 24th, 2017) adopted a staff report on the following: Relief Line • Authority has been given to the City of Toronto and TTC to negotiate and enter into a Memorandum of Understanding with Metrolinx • Define roles and responsibilities • Establish a cost-sharing agreement between Metrolinx, the City of Toronto, and TTC to complete the planning and design work required to develop a Class 3 cost estimate (15-30% design) • Plan a Community Benefits program for Relief Line South and North • Requests that the City Manager’s office work with Metrolinx and TTC on developing a business case for Relief Line North 7 YORK REGION UPDATE • York Region Committee of the Whole (June 22nd, 2017) recommended that Council adopt a staff report at their next meeting (June 29th, 2017) on the following: Yonge Subway Extension • Authorization given to negotiate and execute a Memorandum of Understanding among Toronto, TTC, York Region, York Region Rapid Transit Corporation (YRRTC) and Metrolinx in support of planning and design for the Yonge Subway Extension • The York Report to Council also discusses project governance, financial considerations, further analysis of Line 1 capacity, and local municipal impact 8 ADVANCING THE PROJECTS Yonge Subway Extension • TTC, Metrolinx, and York Region are finalizing a work plan to commence field investigations along with tunnel, station and systems design work. • An MOU is being finalized amongst the three parties (TTC, Metrolinx, and York Region) based on the following principles • TTC will be responsible for project management of project planning and design • York Region and/or Metrolinx will be responsible for the costs associated with planning and design of the project and provide funding to the TTC • A procurement options analysis will be undertaken to assess the best delivery model for the project • The MOU will also define the project administration responsibilities 9 ADVANCING THE PROJECTS Relief Line • Relief Line South • City of Toronto and TTC will be commencing the Transit Project Assessment Process, as well as advancing design and engineering, with a report back to City Council in Q4 2019 • City of Toronto and TTC will continue to lead work on Relief Line South • Relief Line North • Metrolinx, in partnership with Toronto and TTC, is initiating a planning study and initial business case in Summer 2017 with public consultation planned for later 2017/early 2018 • Metrolinx will lead work on Relief Line North, in close partnership with Toronto and TTC 10 NEXT STEPS • Metrolinx to finalize MOUs on the Yonge Subway Extension and Relief Line projects • A joint Modelling Working Group will continue to coordinate ridership forecasting for both projects • Progress update to Board in Fall 2017 11 .
Recommended publications
  • Toward City Charters in Canada
    Journal of Law and Social Policy Volume 34 Toronto v Ontario: Implications for Canadian Local Democracy Guest Editors: Alexandra Flynn & Mariana Article 8 Valverde 2021 Toward City Charters in Canada John Sewell Chartercitytoronto.ca Follow this and additional works at: https://digitalcommons.osgoode.yorku.ca/jlsp Part of the Law Commons Citation Information Sewell, John. "Toward City Charters in Canada." Journal of Law and Social Policy 34. (2021): 134-164. https://digitalcommons.osgoode.yorku.ca/jlsp/vol34/iss1/8 This Voices and Perspectives is brought to you for free and open access by the Journals at Osgoode Digital Commons. It has been accepted for inclusion in Journal of Law and Social Policy by an authorized editor of Osgoode Digital Commons. Sewell: Toward City Charters in Canada Toward City Charters in Canada JOHN SEWELL FOR MORE THAN 30 YEARS, there has been discussion about how cities in Canada can gain more authority and the freedom, powers, and resources necessary to govern their own affairs. The problem goes back to the time of Confederation in 1867, when eighty per cent of Canadians lived in rural areas. Powerful provinces were needed to unite the large, sparsely populated countryside, to pool resources, and to provide good government. Toronto had already become a city in 1834 with a democratically elected government, but its 50,000 people were only around three per cent of Ontario’s 1.6 million. Confederation negotiations did not even consider the idea of conferring governmental power to Toronto or other municipalities, dividing it instead solely between the soon-to-be provinces and the new central government.
    [Show full text]
  • Renaming to the Toronto Zoo Road
    Councillor Paul Ainslie Constituency Office, Toronto City Hall Toronto City Council Scarborough Civic Centre 100 Queen Street West Scarborough East - Ward 43 150 Borough Drive Suite C52 Scarborough, Ontario M1P 4N7 Toronto, Ontario M5H 2N2 Chair, Government Management Committee Tel: 416-396-7222 Tel: 416-392-4008 Fax: 416-392-4006 Website: www.paulainslie.com Email: [email protected] Date: October 27, 2016 To: Chair, Councillor Chin Lee and Scarborough Community Council Members Re: Meadowvale Road Renaming between Highway 401 and Old Finch Road Avenue Recommendation: 1. Scarborough Community Council request the Director, Engineering Support Services & Construction Services and the Technical Services Division begin the process to review options for the renaming of Meadowvale Road between Highway 401 and Old Finch Avenue including those of a "honourary" nature. 2. Staff to report back to the February 2017 meeting The Toronto Zoo is the largest zoo in Canada attracting thousands of visitors annually becoming a landmark location in our City. Home to over 5,000 animals it is situated in a beautiful natural habitat in one of Canada's largest urban parks. Opening its doors on August 15, 1974 the Toronto Zoo has been able to adapt throughout the years developing a vision to "educate visitors on current conservation issues and help preserve the incredible biodiversity on the planet", through their work with endangered species, plans for a wildlife health centre and through their Research & Veterinary Programs. I believe it would be appropriate to introduce a honourary street name for the section of Meadowvale Road between Highway 401 and Old Finch Avenue to recognize the only public entrance to the Toronto Zoo.
    [Show full text]
  • Update on Metrolinx Transit Expansion Projects –
    June 8th, 2021 Sent via E-mail Derrick Toigo Executive Director, Transit Expansion Division Toronto City Hall 24th fl. E., 100 Queen St. W. Toronto, ON M5H 2N2 Dear Derrick, Thank you for your ongoing support and close collaboration in advancing Metrolinx transit expansion projects across the City of Toronto. The purpose of this letter is to respond to your letter dated May 13, 2021 which transmitted City Council’s decisions of April 7th and 8th, 2021, where Toronto City Council adopted the recommendations in agenda item MM31.12: Ontario Line - Getting Transit Right: Federal Environmental Assessment and Hybrid Option Review – moved by Councillor Paula Fletcher, seconded by Councilor Joe Cressy with amendments, we provide the following information. Request for Federal Environmental Assessment In response to the request made by Save Jimmie Simpson! and the Lakeshore East Community Advisory Committee in March 2021 to conduct an environmental assessment of the above- ground section of Ontario Line (the “Project”) through Riverside and Leslieville, on April 16, 2021, the Honourable Jonathan Wilkinson, Federal Minister of Environment and Climate Change (the “Minister”), announced the Project does not warrant designation under the Impact Assessment Act. The Minister’s response is available at the Impact Assessment Agency of Canada website, Reference Number 81350. In making his decision, the Minister considered the potential for the Project to cause adverse effects within federal jurisdiction, adverse direct or incidental effects, public concern related to these effects, as well as adverse impacts on the Aboriginal and Treaty rights of the Indigenous peoples of Canada. The Minister also considered the analysis of the Impact Assessment Agency of Canada.
    [Show full text]
  • Toronto Transit Commission Relief Line South Toronto Transit Commission
    Toronto Transit Commission Relief Line South Toronto Transit Commission The engineering support services provided by GZ included Location: Toronto, Canada preliminary design of the temporary and permanent support measures for the SEM caverns in the swelling conditions as well Date: 2017 - 2019 design of the waterproofing system. In addition, GZ provided constructability reviews and value engineering studies for the stations, as well as for the alignment. Structure: 2 large diameter underground Station caverns Length: 4.66 mi (7.5 km) Geology: Georgian Bay Shale, glacial tills Cost: - Client: HDR Owner: Toronto Transit Commission Preliminary SEM Station Design: n 2017, the Toronto Transit Commission approved the I Preliminary Engineering Design of the Relief Line South Project, which was a planned new 7.5 km long subway line that was intended to run through the center of downtown Toronto. The project was to connect the Yonge-University-Spadina Subway (Line 1) to the Bloor-Danforth Subway (Line 2) in the downtown area. The goal of the Relief Line South was to help relieve Figure 1. Proposed Relief Line South arrangement with stations. crowding on Line 1 south of Bloor, at the Bloor-Yonge Station, and on the surface transit routes coming in and out of downtown. Construction planning of the Relief Line South included construction of twin running tunnels by means of tunnel boring machines, five new stations, and modifications to three existing stations, which will be converted to interchange stations. Design of the Relief Line South progressed to the preliminary engineering stage, and was consequently re-envisioned as the southern section of the Ontario Line Project.
    [Show full text]
  • THE FALSE PANACEA of CITY CHARTERS? a POLITICAL PERSPECTIVE on the CASE of TORONTO Andrew Sancton
    Volume 9 • Issue 3 • January 2016 THE FALSE PANACEA OF CITY CHARTERS? A POLITICAL PERSPECTIVE ON THE CASE OF TORONTO Andrew Sancton SUMMARY Toronto is unlike any other city, as its local boosters will not hesitate to point out. That was the basis, after all, of the “charter movement” that demanded special rights for a mega-city that the movement’s backers insisted was so vital that it even warranted a status similar to that of an entire province. Their efforts culminated in the province’s passage in 2006 of the City of Toronto Act, which appeared on its face to grant the metropolis the power it believed it required and merited. In reality, the Ontario government may have actually set Toronto back, leaving it more at the mercy of provincial power than other smaller municipalities. The few additional taxation powers that were granted by the ostensible Toronto “charter” — the City of Toronto Act — are, in reality, still overseen by the province, which retains the right to limit those revenue tools if it considers it “desirable in the provincial interest to do so.” But while Toronto may have been given just a small number of revenue tools, which it has used only sparingly, and the use of those tools is ultimately decided by Queen’s Park, their very existence has given the province licence to sidestep the city’s calls for more funding. The provincial Liberals have, in the past, insisted that Toronto make use of its own taxes before it demands more provincial funds. Meanwhile, the City of Toronto Act did nothing to curtail the power of the Ontario Municipal Board (OMB).
    [Show full text]
  • The One Toronto Transit Plan the One Toronto Transit Plan
    THE ONE TORONTO TRANSIT PLAN THE ONE TORONTO TRANSIT PLAN As Mayor, John Tory will make Toronto more liveable, affordable and functional. Public transit is at the heart of what it takes to improve Toronto in each of these areas. John Tory’s One Toronto Transit Plan is a collection of initiatives and public transit investments that will get our city moving in seven years, and provide relief to the Yonge-University-Spadina subway line. THE ONE TORONTO PLAN WILL: • Start construction of the Scarborough subway extension immediately. • Engage the City with the Government of Ontario’s and Metrolinx’s plans for Regional Express Rail (RER) – all-day, two-way surface subway service on existing GO track lines with new higher-speed vehicles . • Start with the SmartTrack line as the first RER project, providing 53 km of relief. The SmartTrack line will run from the Airport Corporate Centre in the west, down to Union Station and back up to Markham in the east, with 22 new station stops and four interchanges with the TTC rapid transit network. • Finance the City’s one third of the capital cost of the SmartTrack line without raising property taxes, using tax increment financing. • Provide new express bus services for a segment of travelers that can be moved much quicker if fewer stops are made en route. Examples, which have been discussed, include, Don Mills Road, Dufferin Street and Front Street/Liberty Village. THE ONE TORONTO TRANSIT PLAN BENEFITS ASSOCIATED WITH TORY’S ONE TORONTO TRANSIT RELIEF PLAN INCLUDE: • Bringing relief sooner, to more Torontonians, rather than just the downtown- concentrated proposals of other candidates.
    [Show full text]
  • Peer Review EA Study Design Billy Bishop Toronto City Airport BBTCA
    Imagine the result Peer Review – EA Study Design Billy Bishop Toronto City Airport (BBTCA) Runway Expansion and Introduction of Jet Aircraft Final Report August 2015 BBTCA Peer Review of EA Study Design Report ACRONYMS AND ABBREVIATIONS ii 1.0 INTRODUCTION 1-1 1.1 Background 1-1 1.2 Current Assignment 1-3 2.0 PEER REVIEW APPROACH 2-1 2.1 Methodology 2-1 3.0 FINDINGS OF PEER REVIEW OF AECOM’S DRAFT STUDY DESIGN REPORT 3-1 3.1 EA Process and Legislation 3-1 3.2 Public Consultation & Stakeholder Engagement 3-1 3.3 Air Quality 3-2 3.4 Public Health 3-5 3.5 Noise 3-6 3.6 Natural Environment 3-10 3.7 Socio-Economic Conditions 3-11 3.8 Land Use & Built Form 3-14 3.9 Marine Physical Conditions and Water Quality 3-15 3.10 Transportation 3-15 3.11 Archaeology & Cultural Heritage 3-18 4.0 SUMMARY RECOMMENDATIONS 4-1 APPENDIX A Presentation Given to the Working Group (22 June 2015) B Presentation of Draft Phase I Peer Review Report Results (13 July 2015) i BBTCA Peer Review of EA Study Design Report ACRONYMS AND ABBREVIATIONS AERMOD Atmospheric Dispersion Modelling System ARCADIS ARCADIS Canada Inc. BBTCA Billy Bishop Toronto City Airport CALPUFF Meteorological and Air Quality Monitoring System CCG Canadian Coast Guard CEAA Canadian Environmental Assessment Act CO Carbon Monoxide COPA Canadian Owners and Pilots Association dBA Decibel Values of Sounds EA Environmental Assessment EC Environment Canada GBE Government Business Enterprise GWC Greater Waterfront Coalition HEAT Habitat and Environmental Assessment Tool INM Integrated Noise Model Ldn Day-Night
    [Show full text]
  • For Information City Council Transmittals – Executive
    For Information City Council Transmittals – Executive Committee Item 3.1 Engagement with the Province on Toronto’s Transit System - Q1 2019 Status Report, Executive Committee Item 3.12 Save Our Subway – Ensuring Torontonians Know the Facts Date: April 11, 2019 To: TTC Board Summary Transmittal letters from the City Clerk confirming that City Council on March 27 and 28, 2019, considered Items EX3.1 and EX3.12 together and has forwarded a copy of City Council’s decisions to the Toronto Transit Commission Board for information. Contact Kevin Lee Head of Commission Services 416-393-3744 [email protected] City Council Transmittals – Toronto’s Transit System, Save Our Subway Page 1 of 1 2019-03-27 Committee Report - Executive Committee Page 1 of 5 Committee Report Considered by City Council on March 27, 2019 Report Item March 28, 2019 Executive Committee EX3.1 Amended Ward: All Engagement with the Province on Toronto's Transit System - First Quarter 2019 Status Report City Council Decision City Council on March 27 and 28, 2019, adopted the following: 1. City Council allocate $2,000,000 from the Capital Financing Reserve Fund XQ0011 to provide funding for additional staff and third-party advice and services required to support engagement with the Province, including one Solicitor 3 Full-Time Equivalent staff position ($134,395.81) on a one-year contract basis. 2. City Council direct the City Manager to seek full cost-recovery from the Province for third- party services, City/Toronto Transit Commission staff-time, and any other resources employed arising from the City's participation in this engagement with the Province.
    [Show full text]
  • Attachment 4 – Assessment of Ontario Line
    EX9.1 Attachment 4 – Assessment of Ontario Line As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed Ontario Line. The details of this assessment are provided in this attachment. 1. Project Summary 1.1. Project Description The Ontario Line was included as part of the 2019 Ontario Budget1 as a transit project that will cover similar study areas as the Relief Line South and North, as well as a western extension. The proposed project is a 15.5-kilometre higher-order transit line with 15 stations, connecting from Exhibition GO station to Line 5 at Don Mills Road and Eglinton Avenue East, near the Science Centre station, as shown in Figure 1. Figure 1. Ontario Line Proposal (source: Metrolinx IBC) Since April 2019, technical working groups comprising staff from the City, TTC, Metrolinx, Infrastructure Ontario and the Ministry of Transportation met regularly to understand alignment and station location options being considered for the Ontario 1 http://budget.ontario.ca/2019/contents.html Attachment 4 - Assessment of Ontario Line Page 1 of 20 Line. Discussions also considered fleet requirements, infrastructure design criteria, and travel demand modelling. Metrolinx prepared an Initial Business Case (IBC) that was publicly posted on July 25, 2019.2 The IBC compared the Ontario Line and Relief Line South projects against a Business As Usual scenario. The general findings by Metrolinx were that "both Relief Line South and Ontario Line offer significant improvements compared to a Business As Usual scenario, generating $3.4 billion and $7.4 billion worth of economic benefits, respectively.
    [Show full text]
  • Country BIA Business - Name Address Website/Social Media Argentina York Eglington Rincon De La Boca 1710 Eglinton Ave
    Country BIA Business - Name Address Website/Social Media Argentina York Eglington Rincon de la Boca 1710 Eglinton Ave. W http://www.yorkbia.ca/item/rincon-de-la-boca-bar-restaurant/ York Eglington Toronto Latino 1786 Eglinton Ave. W http://www.torontolatino.com/toronto/ Harbord Tik Talk Bistro Cafe’ 96 Harbord Street www.tiktalkcafeTO.com Bahamas Harbord The Harbord Room 97 Harbord Street, www.theharbordroom.com Barbados Harbord RASA By The Food Dudes 196 Robert/Harbord Street www.rasarestaurant.com Bermuda St.Lawrencemarket Goldstein Eyewear Boutique 225 King Street East www.goldsteinboutique.com harbord Harbord House 150 Harbord Street www.harbordhouse.ca Bolivia York Eglington Toronto Latino 1786 Eglinton Ave. West http://www.torontolatino.com/toronto/ Harbord Dessert Trends & Bistro 154 Harbord Street www.DTBristro.com Brazil York Eglington Book Café 1790 Eglinton Avenue West http://www.yorkbia.ca/item/bookafe/ Riverside MacFAB Sews http://www.macfabfabrics.com/macfab-sews/ York Eglington Toronto Latino 1786 Eglinton Ave. West Toronto, ON http://www.torontolatino.com/toronto/ St.Lawrencemarket St. Lawrence Pet Valu 184 Front Street East www.petvalu.com The Beach Village Gongton Design 2116-C Queen Street East www.gongtondesign.com Copacabana Brazilian Steakhouse 230 Adelaide St. West www.thecopa.ca Copa by Sea 230 Adelaide St. West | Lower Venue www.copabysea.com Harbord THR & Co. 97 Harbord Street – M5S-1G6 www.thrrestaurant.com British Virgin Islands Waterfront Gone Sailing Adventures 415 Queens Quay West www.gosailto.com Canada
    [Show full text]
  • Relief Line Update
    Relief Line Update Mathieu Goetzke, Vice-President, Planning David Phalp, Manager, Rapid Transit Planning FEBRUARY 7, 2019 EXECUTIVE SUMMARY • The Relief Line South alignment identified by the City of Toronto as preferred, has a Benefit Cost Ratio (BCR) above 1.0, demonstrating the project’s value; however, since it is close to 1.0, it is highly sensitive to costs, so more detailed design work and procurement method choice will be of importance to maintain or improve this initial BCR. • Forecasts suggest that Relief Line South will attract ridership to unequivocally justify subway-level service; transit-oriented development opportunities can further boost ridership. • Transit network forecasts show that Relief Line South needs to be in operation before the Yonge North Subway Extension. Relief Line North provides further crowding relief for Line 1. RELIEF LINE UPDATE 2 SUBWAY EXPANSION - PROJECT STATUS Both Relief Line North and South and the Yonge North Subway Extension are priority projects included in the 2041 Regional Transportation Plan. RELIEF LINE UPDATE 3 RELIEF LINE SOUTH: Initial Business Case Alignments Evaluated • Metrolinx is developing an Initial Business Case on Relief Line South, evaluating six alignments according to the Metrolinx Business Case Guidance and the Auditor General’s 2018 recommendations • Toronto City Council approved the advancement of alignment “A” (Pape- Queen via Carlaw & Eastern) • Statement of Completion of the Transit Project Assessment Process (TPAP) received October 24, 2018. RELIEF LINE UPDATE 4 RELIEF
    [Show full text]
  • View Transactions
    2020 LAND SPECIALISTS TRANSACTIONS LAND SPECIALISTS TABLE OF CONTENTS MEET THE Specialists 6 ABOUT CBRE 8 TRANSACTIONS Map 10 RESIDENTIAL TRANSACTIONS 211 POWERLINE ROAD, Brantford 13 JENNINGS CREEK PHASE I & II, Lindsay 14 6480, 6482 & 6484 KINGSTON ROAD, Toronto 14 3431 OLD SCHOOL ROAD, Caledon 15 197, 199, 201 GALLOWAY ROAD 16 & 4097 LAWRENCE AVENUE EAST, Toronto I.C.I. TRANSACTIONS 3650 DANFORTH AVENUE, Toronto 18 2 ROYAL AVENUE, Nobleton 19 9361 & 9371 HIGHWAY 11, Severn 19 455 MAGNA DRIVE, Aurora 20 60 MAIN STREET NORTH, Brampton 21 36-40 MAIN STREET NORTH, Brampton 22 2829 MCKINSTRY ROAD, Bradford 23 2156 QUEENSVILLE SIDEROAD, East Gwillimbury 23 LAND Industrial Commercial Institutional “I.C.I.” SPECIALISTS JASON CHILD OUR TEAM SENIOR VICE PRESIDENT Jason Child is a Senior Vice President at CBRE Limited. Since joining CBRE, Jason has become a leading expert in the disposition of residential land throughout the Greater Toronto Area and Greater Golden Horseshoe Area. Throughout his career, Jason has been involved in more than 350 land deals. Over his 20-year career, he has SPECIALIZES IN been consistently recognized as a top performer in the acquisition and disposition of residential land throughout the Greater Golden Horseshoe Area. Jason earned his Bachelor of Commerce, majoring in Housing and Real Estate Management from the University of Guelph. A MESSAGE FROM LAND THE PARTNERS IAN HUNT SENIOR VICE PRESIDENT Ian Hunt is a Senior Vice President at CBRE Limited. He is recognized as a leading advisory expert in land dispositions 2020 was an interesting year, throughout the ‘416’ and ‘905’ regions and is ranked within the Top 10 Sales Professionals in CBRE’s Toronto North Our team specializes in Land Advisory & Transaction impacting each of us and all of those Office.
    [Show full text]