2021-2024 Stip
Total Page:16
File Type:pdf, Size:1020Kb
2021-2024 STIP Appendix 3: Carry Forward List Page 83 Ohio 2018-2021 STIP FHWA Individual Carry Forward List into 2021-2024 STIP MPO/ Air STIP RTPO/ Project Name (ie Sponsoring Length STIP Phase Line Dist PID/PH Cnty Descript / Category / Termini Quality SFY SAC Fund Group Project Total* STIP Reference ID Agency Large CRS) Agency (SLM) Estimate Status City Description: Resurface with asphalt concrete. HAN Findlay Project also includes widening, drainage and Air FHWA 1 100184-CO Findlay HAN FY2020 bike path work. Work Type: Resurfacing, Findlay, City of Quality 1.27 20204TA7 MPO STBG$ 940,000.00 $ 1,232,035.00 2018stipID0001FDCO Resurfacing Undivided System Termini: On CR 236 from SR Exempt 568 to US 224 Description: Resurface with asphalt concrete. HAN Findlay Project also includes widening, drainage and Air FHWA 1 100184-CO Findlay HAN FY2020 bike path work. Work Type: Resurfacing, Findlay, City of Quality 1.27 2020LNTP Local$ 235,000.00 $ 1,232,035.00 2018stipID0001FDCO Resurfacing Undivided System Termini: On CR 236 from SR Exempt 568 to US 224 Description: Resurface with asphalt concrete. HAN Findlay Project also includes widening, drainage and Air FHWA 1 100184-CO Findlay HAN FY2020 bike path work. Work Type: Resurfacing, Findlay, City of Quality 1.27 20204TA7 MPO STBG$ 28,200.00 $ 1,232,035.00 2018stipID0001FDCO Resurfacing Undivided System Termini: On CR 236 from SR Exempt 568 to US 224 Description: Resurface with asphalt concrete. HAN Findlay Project also includes widening, drainage and Air FHWA 1 100184-CO Findlay HAN FY2020 bike path work. Work Type: Resurfacing, Findlay, City of Quality 1.27 2020LNTP Local$ 7,050.00 $ 1,232,035.00 2018stipID0001FDCO Resurfacing Undivided System Termini: On CR 236 from SR Exempt 568 to US 224 Description: Replace the concrete pavement in the I-480/SR-176 interchange in Cleveland and Brooklyn Heights; create new access points for ODOT Air SR 176 SB to enter I-480 EB quicker; modify legs FHWA 12 101941-CO NOACA CUY CUY SR 176 10.13 SPONSORING Quality 0.75 20214RA7 State$ 2,850,000.00 $ 16,024,810.00 2018AM14ID0487FDCO entering SR 176 NB such that one full lane AGENCY Exempt enters from Brookpark Road, I-480 EB, Work Type: Roadway Major Rehab Termini: Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Description: Replace the concrete pavement in the I-480/SR-176 interchange in Cleveland and Brooklyn Heights; create new access points for ODOT Air SR 176 SB to enter I-480 EB quicker; modify legs FHWA 12 101941-CO NOACA CUY CUY SR 176 10.13 SPONSORING Quality 0.75 2021 4RC7 Major Programs$ 11,400,000.00 $ 16,024,810.00 2018AM14ID0487FDCO entering SR 176 NB such that one full lane AGENCY Exempt enters from Brookpark Road, I-480 EB, Work Type: Roadway Major Rehab Termini: Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Description: Replace the concrete pavement in the I-480/SR-176 interchange in Cleveland and Brooklyn Heights; create new access points for ODOT Air SR 176 SB to enter I-480 EB quicker; modify legs FHWA 12 101941-CO NOACA CUY CUY SR 176 10.13 SPONSORING Quality 0.75 20204RA7 State$ 1,000.00 $ 16,024,810.00 2018AM14ID0487FDCO entering SR 176 NB such that one full lane AGENCY Exempt enters from Brookpark Road, I-480 EB, Work Type: Roadway Major Rehab Termini: Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Description: Replace the concrete pavement in the I-480/SR-176 interchange in Cleveland and Brooklyn Heights; create new access points for ODOT Air SR 176 SB to enter I-480 EB quicker; modify legs FHWA 12 101941-CO NOACA CUY CUY SR 176 10.13 SPONSORING Quality 0.75 20204RC7 Major Programs$ 4,000.00 $ 16,024,810.00 2018AM14ID0487FDCO entering SR 176 NB such that one full lane AGENCY Exempt enters from Brookpark Road, I-480 EB, Work Type: Roadway Major Rehab Termini: Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Description: Replace the concrete pavement in the I-480/SR-176 interchange in Cleveland and Brooklyn Heights; create new access points for ODOT Air SR 176 SB to enter I-480 EB quicker; modify legs FHWA 12 101941-CO NOACA CUY CUY SR 176 10.13 SPONSORING Quality 0.75 20214RA7 State$ 1,000.00 $ 16,024,810.00 2018AM14ID0487FDCO entering SR 176 NB such that one full lane AGENCY Exempt enters from Brookpark Road, I-480 EB, Work Type: Roadway Major Rehab Termini: Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Description: Replace the concrete pavement in the I-480/SR-176 interchange in Cleveland and Brooklyn Heights; create new access points for ODOT Air SR 176 SB to enter I-480 EB quicker; modify legs FHWA 12 101941-CO NOACA CUY CUY SR 176 10.13 SPONSORING Quality 0.75 20214RC7 Major Programs$ 4,000.00 $ 16,024,810.00 2018AM14ID0487FDCO entering SR 176 NB such that one full lane AGENCY Exempt enters from Brookpark Road, I-480 EB, Work Type: Roadway Major Rehab Termini: Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Description: Replace the concrete pavement in the I-480/SR-176 interchange in Cleveland and Brooklyn Heights; create new access points for ODOT Air SR 176 SB to enter I-480 EB quicker; modify legs FHWA 12 101941-CO NOACA CUY CUY SR 176 10.13 SPONSORING Quality 0.75 2021LABR Labor$ 362,400.00 $ 16,024,810.00 2018AM14ID0487FDCO entering SR 176 NB such that one full lane AGENCY Exempt enters from Brookpark Road, I-480 EB, Work Type: Roadway Major Rehab Termini: Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Description: Replace the concrete pavement in the I-480/SR-176 interchange in Cleveland and Brooklyn Heights; create new access points for ODOT Air SR 176 SB to enter I-480 EB quicker; modify legs FHWA 12 101941-CO NOACA CUY CUY SR 176 10.13 SPONSORING Quality 0.75 2021LABR Labor$ 90,600.00 $ 16,024,810.00 2018AM14ID0487FDCO entering SR 176 NB such that one full lane AGENCY Exempt enters from Brookpark Road, I-480 EB, Work Type: Roadway Major Rehab Termini: Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Appendix 3: Carry Forward List Page 84 Ohio 2018-2021 STIP FHWA Individual Carry Forward List into 2021-2024 STIP MPO/ Air STIP RTPO/ Project Name (ie Sponsoring Length STIP Phase Line Dist PID/PH Cnty Descript / Category / Termini Quality SFY SAC Fund Group Project Total* STIP Reference ID Agency Large CRS) Agency (SLM) Estimate Status City Description: Conversion of three signalized intersections to multi-lane modern roundabouts. Air HAM Plainfield Rd Work Type: Intersection Improvement Termini: FHWA 8 103416-RW OKI HAM BLUE ASH Quality 0.47 20204TA7 MPO STBG$ 2,014,470.00 $ 13,860,906.53 2018MODID0467FDRW Roundabouts Intersections of Plainfield Road with (1) EB SR- Exempt 126 ramps (2) Hunt Road, and (3) Peppermill Ln/Reed Hartman Hwy Description: Conversion of three signalized intersections to multi-lane modern roundabouts. Air HAM Plainfield Rd Work Type: Intersection Improvement Termini: FHWA 8 103416-RW OKI HAM BLUE ASH Quality 0.47 2020LNTP Local$ 863,344.29 $ 13,860,906.53 2018MODID0467FDRW Roundabouts Intersections of Plainfield Road with (1) EB SR- Exempt 126 ramps (2) Hunt Road, and (3) Peppermill Ln/Reed Hartman Hwy Description: Conversion of three signalized intersections to multi-lane modern roundabouts. Air HAM Plainfield Rd Work Type: Intersection Improvement Termini: FHWA 8 103416-RW OKI HAM BLUE ASH Quality 0.47 2018LABR Labor$ 3,799.00 $ 13,860,906.53 2018MODID0467FDRW Roundabouts Intersections of Plainfield Road with (1) EB SR- Exempt 126 ramps (2) Hunt Road, and (3) Peppermill Ln/Reed Hartman Hwy Description: Rehabilitate the Whitehouse Crossing bridge (SR-14) over NS RR in Garfield ODOT Air Hts. Part 1 is to prepare a life cycle cost FHWA 12 104132-DD NOACA CUY CUY SR 014 06.93 SPONSORING Quality 20204BT7 State$ 300,000.00 $ 34,080,086.00 2018AM06ID0214FDDD analysis between rehabilitating the existing AGENCY Exempt structure and replacing it. Work Type: Bridge Repair Termini: Garfield Hts; Over NS Railroad Description: Rehabilitate the Whitehouse Crossing bridge (SR-14) over NS RR in Garfield ODOT Air Hts. Part 1 is to prepare a life cycle cost FHWA 12 104132-DD NOACA CUY CUY SR 014 06.93 SPONSORING Quality 2020 4BU7 Major Programs$ 1,200,000.00 $ 34,080,086.00 2018AM06ID0214FDDD analysis between rehabilitating the existing AGENCY Exempt structure and replacing it. Work Type: Bridge Repair Termini: Garfield Hts; Over NS Railroad Description: This project consists of 2" of pavement planning, 1.5" of Intermediate course and 1.5" of Surface course. A 5' stone berm and Air WOO CR 107 1.73 all appropriate pavement markings and casting WOOD COUNTY FHWA 2 104428-DD TMACOG WOO Quality 2.9 20204HJ7 Safety$ 50,000.00 $ 2,785,408.12 2018AM11ID0319FDDD Oregon Rd adjustments will also be included. When ENGINEER Exempt completed, the stretch of Oregon Road from Work Type: Mill and Fill Termini: from Ohio Turnpike to Binker Rd Description: This project consists of 2" of pavement planning, 1.5" of Intermediate course and 1.5" of Surface course. A 5' stone berm and Air WOO CR 107 1.73 all appropriate pavement markings and casting WOOD COUNTY FHWA 2 104428-DD TMACOG WOO Quality 2.9 2020LABR Labor$ 12,000.00 $ 2,785,408.12 2018AM11ID0319FDDD Oregon Rd adjustments will also be included. When ENGINEER Exempt completed, the stretch of Oregon Road from Work Type: Mill and Fill Termini: from Ohio Turnpike to Binker Rd Description: This project consists of 2" of pavement planning, 1.5" of Intermediate course and 1.5" of Surface course.