2021-2024 Stip

2021-2024 Stip

2021-2024 STIP Appendix 3: Carry Forward List Page 83 Ohio 2018-2021 STIP FHWA Individual Carry Forward List into 2021-2024 STIP MPO/ Air STIP RTPO/ Project Name (ie Sponsoring Length STIP Phase Line Dist PID/PH Cnty Descript / Category / Termini Quality SFY SAC Fund Group Project Total* STIP Reference ID Agency Large CRS) Agency (SLM) Estimate Status City Description: Resurface with asphalt concrete. HAN Findlay Project also includes widening, drainage and Air FHWA 1 100184-CO Findlay HAN FY2020 bike path work. Work Type: Resurfacing, Findlay, City of Quality 1.27 20204TA7 MPO STBG$ 940,000.00 $ 1,232,035.00 2018stipID0001FDCO Resurfacing Undivided System Termini: On CR 236 from SR Exempt 568 to US 224 Description: Resurface with asphalt concrete. HAN Findlay Project also includes widening, drainage and Air FHWA 1 100184-CO Findlay HAN FY2020 bike path work. Work Type: Resurfacing, Findlay, City of Quality 1.27 2020LNTP Local$ 235,000.00 $ 1,232,035.00 2018stipID0001FDCO Resurfacing Undivided System Termini: On CR 236 from SR Exempt 568 to US 224 Description: Resurface with asphalt concrete. HAN Findlay Project also includes widening, drainage and Air FHWA 1 100184-CO Findlay HAN FY2020 bike path work. Work Type: Resurfacing, Findlay, City of Quality 1.27 20204TA7 MPO STBG$ 28,200.00 $ 1,232,035.00 2018stipID0001FDCO Resurfacing Undivided System Termini: On CR 236 from SR Exempt 568 to US 224 Description: Resurface with asphalt concrete. HAN Findlay Project also includes widening, drainage and Air FHWA 1 100184-CO Findlay HAN FY2020 bike path work. Work Type: Resurfacing, Findlay, City of Quality 1.27 2020LNTP Local$ 7,050.00 $ 1,232,035.00 2018stipID0001FDCO Resurfacing Undivided System Termini: On CR 236 from SR Exempt 568 to US 224 Description: Replace the concrete pavement in the I-480/SR-176 interchange in Cleveland and Brooklyn Heights; create new access points for ODOT Air SR 176 SB to enter I-480 EB quicker; modify legs FHWA 12 101941-CO NOACA CUY CUY SR 176 10.13 SPONSORING Quality 0.75 20214RA7 State$ 2,850,000.00 $ 16,024,810.00 2018AM14ID0487FDCO entering SR 176 NB such that one full lane AGENCY Exempt enters from Brookpark Road, I-480 EB, Work Type: Roadway Major Rehab Termini: Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Description: Replace the concrete pavement in the I-480/SR-176 interchange in Cleveland and Brooklyn Heights; create new access points for ODOT Air SR 176 SB to enter I-480 EB quicker; modify legs FHWA 12 101941-CO NOACA CUY CUY SR 176 10.13 SPONSORING Quality 0.75 2021 4RC7 Major Programs$ 11,400,000.00 $ 16,024,810.00 2018AM14ID0487FDCO entering SR 176 NB such that one full lane AGENCY Exempt enters from Brookpark Road, I-480 EB, Work Type: Roadway Major Rehab Termini: Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Description: Replace the concrete pavement in the I-480/SR-176 interchange in Cleveland and Brooklyn Heights; create new access points for ODOT Air SR 176 SB to enter I-480 EB quicker; modify legs FHWA 12 101941-CO NOACA CUY CUY SR 176 10.13 SPONSORING Quality 0.75 20204RA7 State$ 1,000.00 $ 16,024,810.00 2018AM14ID0487FDCO entering SR 176 NB such that one full lane AGENCY Exempt enters from Brookpark Road, I-480 EB, Work Type: Roadway Major Rehab Termini: Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Description: Replace the concrete pavement in the I-480/SR-176 interchange in Cleveland and Brooklyn Heights; create new access points for ODOT Air SR 176 SB to enter I-480 EB quicker; modify legs FHWA 12 101941-CO NOACA CUY CUY SR 176 10.13 SPONSORING Quality 0.75 20204RC7 Major Programs$ 4,000.00 $ 16,024,810.00 2018AM14ID0487FDCO entering SR 176 NB such that one full lane AGENCY Exempt enters from Brookpark Road, I-480 EB, Work Type: Roadway Major Rehab Termini: Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Description: Replace the concrete pavement in the I-480/SR-176 interchange in Cleveland and Brooklyn Heights; create new access points for ODOT Air SR 176 SB to enter I-480 EB quicker; modify legs FHWA 12 101941-CO NOACA CUY CUY SR 176 10.13 SPONSORING Quality 0.75 20214RA7 State$ 1,000.00 $ 16,024,810.00 2018AM14ID0487FDCO entering SR 176 NB such that one full lane AGENCY Exempt enters from Brookpark Road, I-480 EB, Work Type: Roadway Major Rehab Termini: Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Description: Replace the concrete pavement in the I-480/SR-176 interchange in Cleveland and Brooklyn Heights; create new access points for ODOT Air SR 176 SB to enter I-480 EB quicker; modify legs FHWA 12 101941-CO NOACA CUY CUY SR 176 10.13 SPONSORING Quality 0.75 20214RC7 Major Programs$ 4,000.00 $ 16,024,810.00 2018AM14ID0487FDCO entering SR 176 NB such that one full lane AGENCY Exempt enters from Brookpark Road, I-480 EB, Work Type: Roadway Major Rehab Termini: Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Description: Replace the concrete pavement in the I-480/SR-176 interchange in Cleveland and Brooklyn Heights; create new access points for ODOT Air SR 176 SB to enter I-480 EB quicker; modify legs FHWA 12 101941-CO NOACA CUY CUY SR 176 10.13 SPONSORING Quality 0.75 2021LABR Labor$ 362,400.00 $ 16,024,810.00 2018AM14ID0487FDCO entering SR 176 NB such that one full lane AGENCY Exempt enters from Brookpark Road, I-480 EB, Work Type: Roadway Major Rehab Termini: Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Description: Replace the concrete pavement in the I-480/SR-176 interchange in Cleveland and Brooklyn Heights; create new access points for ODOT Air SR 176 SB to enter I-480 EB quicker; modify legs FHWA 12 101941-CO NOACA CUY CUY SR 176 10.13 SPONSORING Quality 0.75 2021LABR Labor$ 90,600.00 $ 16,024,810.00 2018AM14ID0487FDCO entering SR 176 NB such that one full lane AGENCY Exempt enters from Brookpark Road, I-480 EB, Work Type: Roadway Major Rehab Termini: Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Appendix 3: Carry Forward List Page 84 Ohio 2018-2021 STIP FHWA Individual Carry Forward List into 2021-2024 STIP MPO/ Air STIP RTPO/ Project Name (ie Sponsoring Length STIP Phase Line Dist PID/PH Cnty Descript / Category / Termini Quality SFY SAC Fund Group Project Total* STIP Reference ID Agency Large CRS) Agency (SLM) Estimate Status City Description: Conversion of three signalized intersections to multi-lane modern roundabouts. Air HAM Plainfield Rd Work Type: Intersection Improvement Termini: FHWA 8 103416-RW OKI HAM BLUE ASH Quality 0.47 20204TA7 MPO STBG$ 2,014,470.00 $ 13,860,906.53 2018MODID0467FDRW Roundabouts Intersections of Plainfield Road with (1) EB SR- Exempt 126 ramps (2) Hunt Road, and (3) Peppermill Ln/Reed Hartman Hwy Description: Conversion of three signalized intersections to multi-lane modern roundabouts. Air HAM Plainfield Rd Work Type: Intersection Improvement Termini: FHWA 8 103416-RW OKI HAM BLUE ASH Quality 0.47 2020LNTP Local$ 863,344.29 $ 13,860,906.53 2018MODID0467FDRW Roundabouts Intersections of Plainfield Road with (1) EB SR- Exempt 126 ramps (2) Hunt Road, and (3) Peppermill Ln/Reed Hartman Hwy Description: Conversion of three signalized intersections to multi-lane modern roundabouts. Air HAM Plainfield Rd Work Type: Intersection Improvement Termini: FHWA 8 103416-RW OKI HAM BLUE ASH Quality 0.47 2018LABR Labor$ 3,799.00 $ 13,860,906.53 2018MODID0467FDRW Roundabouts Intersections of Plainfield Road with (1) EB SR- Exempt 126 ramps (2) Hunt Road, and (3) Peppermill Ln/Reed Hartman Hwy Description: Rehabilitate the Whitehouse Crossing bridge (SR-14) over NS RR in Garfield ODOT Air Hts. Part 1 is to prepare a life cycle cost FHWA 12 104132-DD NOACA CUY CUY SR 014 06.93 SPONSORING Quality 20204BT7 State$ 300,000.00 $ 34,080,086.00 2018AM06ID0214FDDD analysis between rehabilitating the existing AGENCY Exempt structure and replacing it. Work Type: Bridge Repair Termini: Garfield Hts; Over NS Railroad Description: Rehabilitate the Whitehouse Crossing bridge (SR-14) over NS RR in Garfield ODOT Air Hts. Part 1 is to prepare a life cycle cost FHWA 12 104132-DD NOACA CUY CUY SR 014 06.93 SPONSORING Quality 2020 4BU7 Major Programs$ 1,200,000.00 $ 34,080,086.00 2018AM06ID0214FDDD analysis between rehabilitating the existing AGENCY Exempt structure and replacing it. Work Type: Bridge Repair Termini: Garfield Hts; Over NS Railroad Description: This project consists of 2" of pavement planning, 1.5" of Intermediate course and 1.5" of Surface course. A 5' stone berm and Air WOO CR 107 1.73 all appropriate pavement markings and casting WOOD COUNTY FHWA 2 104428-DD TMACOG WOO Quality 2.9 20204HJ7 Safety$ 50,000.00 $ 2,785,408.12 2018AM11ID0319FDDD Oregon Rd adjustments will also be included. When ENGINEER Exempt completed, the stretch of Oregon Road from Work Type: Mill and Fill Termini: from Ohio Turnpike to Binker Rd Description: This project consists of 2" of pavement planning, 1.5" of Intermediate course and 1.5" of Surface course. A 5' stone berm and Air WOO CR 107 1.73 all appropriate pavement markings and casting WOOD COUNTY FHWA 2 104428-DD TMACOG WOO Quality 2.9 2020LABR Labor$ 12,000.00 $ 2,785,408.12 2018AM11ID0319FDDD Oregon Rd adjustments will also be included. When ENGINEER Exempt completed, the stretch of Oregon Road from Work Type: Mill and Fill Termini: from Ohio Turnpike to Binker Rd Description: This project consists of 2" of pavement planning, 1.5" of Intermediate course and 1.5" of Surface course.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    32 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us