Gotthard Base Tunnel Dino Alfaré Head of Railway Systems Execution

Total Page:16

File Type:pdf, Size:1020Kb

Gotthard Base Tunnel Dino Alfaré Head of Railway Systems Execution Gotthard Base Tunnel Dino Alfaré Head of Railway Systems Execution AlpTransit Gotthard AG 559751 - LZ01 1 Gotthard Base Tunnel June 1st, 2016 559751 - LZ01 2 Gotthard Base Tunnel Contents 1. The Project 2. Project Management 3. Geology 4. Costs and Financing Requirements 5. Railway Infrastructure 6. Telecommunication and tunnel control systems 559751 - LZ01 3 1. TheProject 4 LZ01-559751 Gotthard Base Tunnel Rail Freight Corridor 1 Rotterdam - Genoa 559751 - LZ01 5 Gotthard Base Tunnel Connections to the European high-speed rail network 559751 - LZ01 6 Gotthard Base Tunnel Overview Zurich-Lugano 559751 - LZ01 7 Gotthard Base Tunnel A flat railway route through the Alps 559751 - LZ01 8 Gotthard Base Tunnel Key features of the only flat railway route through the Alps • Newly constructed twin-track route • Mixed operation • Maximum speed passenger trains: 250 km/h • Maximum speed goods trains: 160 km/h • 50 – 80 passenger trains per day • 220 – 260 goods trains per day • Loaded vehicles: max. height 4.2 m • Max. Gradient: ≤ 12.5 ‰ • Min. Radius: ≥ 5,000 metres • Useful life: 100 years 559751 • Max. temperature: 40° C - LZ01 9 Gotthard Base Tunnel Journey times Zurich - Lugano / Zurich - Milan 559751 - LZ01 10 Gotthard Base Tunnel Safety concept in the Gotthard Base Tunnel 559751 - LZ01 11 2. Project Management 12 LZ01-559751 Gotthard Base Tunnel Challenge – implementation organization • Direct management, simple control • Transparency through direct parliamentary control • Clear allocation of responsibilities, best governance • Efficiency thanks to lean organization (short paths, simple decision processes) 559751 - LZ01 13 Gotthard Base Tunnel Interest partners 559751 - LZ01 14 3. The Geology 559751 - LZ01 15 Gotthard Base Tunnel Longitudinal Geological Profile 559751 - LZ01 16 Gotthard Base Tunnel Challenge – for example the Piora Syncline 559751 - LZ01 17 Gotthard Base Tunnel October 15, 2010 - final breakthrough 559751 - LZ01 18 4. Cost Development and Financing Requirements 19 LZ01-559751 Gotthard Base Tunnel Allocation of Public Transport Financial Fund (FinöV) NRLA (45%) Heavy road vehicle New Rail Link through the Alps tax (64%) Rail 2000 Phase 1 and ZEB (44%) ZEB: Future Development of the Railway Infrastructure Fund for the Oil tax financing of (23%) public transport HSR (4%) European High-Speed Rail Network Value added tax Noise mitigation (VAT) (13%) (7%) 559751 - LZ01 20 Gotthard Base Tunnel Development of cost and risk potential 559751 - LZ01 21 5. Railway 5. Railway Infrastructure 22 LZ01-559751 Gotthard Base Tunnel Permanent and temporary railway infrastructure systems Permanent systems Temporary systems • Railway track • Infrastructure for installation • Power supply infrastructure and logistics and cable systems • Construction power supply • 16.7 Hz power supply to • Construction catenary and trains communications 559751 • Telecomms • Construction ventilation and - LZ01 • Safety systems cooling 23 Gotthard Base Tunnel Railway infrastructure contract Scope of railway infrastructure systems • LP10 project management, overall coordination • LP2x logistics and temporary systems • LP3x railway track • LP4x electrical system (50Hz + cabling) • LP5x traction power supply (16,7Hz) • LP60/61 telecommunication (control system, data network , telephone) Principal Builder Principal • LP70 tunnel radio system • LP8x railway control systems and signaling Contractor 559751 - General LZ01 24 Gotthard Base Tunnel Nokia's contribution in the project • Nokia member of Transtec Gotthard consortium • Transtec Gotthard is the general contractor for railway infrastructure system – contract value CHF 2 Billion – contract signed in April 2008 – successful commissioning and handover in June 2016 • Nokia (Alcatel-Lucent Switzerland) responsible for 3 main work package – Tunnel control system – Data network and communication – Tunnel radio system 559751 - LZ01 25 5. Telecommunication and tunnel control systems Scope of supply Nokia (Alcatel-Lucent Switzerland) 559751 - LZ01 26 Gotthard Base Tunnel LP60 tunnel control systems 559751 - LZ01 27 Gotthard Base Tunnel LP60 tunnel control systems Operator level: • Railway control system • Tunnel control system Operation center Pollegio: • Tunnel control center for the Gotthard base tunnel and Ceneri base tunnel • Railway operation from Chiasso to 559751 Art-Goldau - LZ01 28 Gotthard Base Tunnel LP61 data network BTG Erstfeld MFS Sedrun MFS Faido BTG Bodio CEP/BEZP Tunnel Controll Center (Pollegio) North Tunnel Controll Center South OST TCC-LAN MFSS MFSF WEST E1: Switch E2: Switch E3: Switch E4: Switch KD31: IP/MPLS data network for the Gotthard- Basetunnel (fiber optics) Hyrarchial 4-layer concept: 559751 • High availability IP Network . Layers E1 and E2: Backbone - • Availability 99.999 % . Layers E3 und E4: Distribution und Access LZ01 • Without cooling in the tunnel 29 Gotthard Base Tunnel LP61 communication systems Public announcement Erstfeld Bodio system landline telephony 559751 - LZ01 30 Gotthard Base Tunnel LP61 CCTV Erstfeld Bodio Quelle: TTG 559751 Quelle: TTG - LZ01 31 Gotthard Base Tunnel Tunnel radio system Tunnelröhre Leckkabel ... Funkdienste GSM-R Kopfstation POLYCOM KS TS TS TS Tunnelstation Public Glasfasern (GSM, UMTS, LTE,...) Basisstationen 559751 - LZ01 32 Gotthard Base Tunnel GSM-R Zugangsstollen Nordportal OstEast- TubeRöhre Südportal Sedrun Erstfeld Biasca 31 radio communication units MFS Sedrun MFS Faido Gustizia • 17 main systems • 14 parallel systems Zugangsstollen Zugangsstollen Biasca Amsteg WestWest -TubeRöhre Faido Ost-Röhre East Tube Strahlungskabelsegmenteleaky cable segment vonof 1 ca. km 1km Tunnelstation HS + PS Querschlag intersection Tunnelstation radio supply principle HS WestWest-Röhre Tube Signalstärke SBB CFF FFS Tunnel radio system 559751 - tunnel services main systems GSM-R + POLYCOM • Feed in for GSM-R / PMR • Feed in for public GSM/UMTS/LTE LZ01 parallel systems GSM-R + Public • Availability 99.999 % Koppelfeld • 136 km leaking cable 33 Gotthard Base Tunnel GSM-R 559751 - LZ01 34 Gotthard Base Tunnel Polycom (TETRA) 559751 - LZ01 35 Gotthard Base Tunnel Mobile Communication – GSM UMTS LTE • Mobile communication generations in use in both tubes each 57km in length • 2G, GSM • 3G, UMTS • 4G, LTE • With all Swiss public mobile operators on air • Salt • Sunrise • Swisscom 559751 - LZ01 36 Gotthard Base Tunnel Through the Gotthard Base Tunnel within 57 seconds 559751 - LZ01 37.
Recommended publications
  • SWISS REVIEW the Magazine for the Swiss Abroad August 2016
    SWISS REVIEW The magazine for the Swiss Abroad August 2016 History at the Gotthard – the opening of the base tunnel A cotton and plastic sandwich – the new CHF 50 banknote Keeping an eye on the surveillance – the Davos-born photographer Jules Spinatsch Switzerland is mobile and Swiss Abroad may be found everywhere on Earth. And you, where are you situated around the globe? And since when? Share your experience and get to know Swiss citizens living nearby… and everywhere else! connects Swiss people across the world > You can also take part in the discussions at SwissCommunity.org > Register now for free and connect with the world SwissCommunity.org is a network set up by the Organisation of the Swiss Abroad (OSA) SwissCommunity-Partner: Contents Editorial 3 Casting your vote – even if it is sometimes a chore 5 Mailbag Hand on heart, did you vote in June? If you did, on how many of the five federal proposals? I tried to form an 6 Focus opinion on all of the initiatives and referenda. I stu­ The tunnel­building nation died the voting documents, read newspapers, watched “Arena” on Swiss television and discussed the issues 10 Economy with family and friends. The new banknotes Admittedly, it was arduous at times: Just the doc­ uments themselves, which included two hefty book­ 12 Politics lets, various information sheets and the ballot papers, namely for the five fed­ Referendum results from 5 June eral proposals – pro public service, unconditional basic income, the milch Proposals for 25 September cow initiative, the amendment to the law on reproductive medicine and an Parmelin’s first few months on the amendment to the Asylum Act – plus, because I live in Baselland, six cantonal Federal Council proposals ranging from supplementary childcare to the “Cantonal parlia­ ment resolution on the implementation of the pension fund law reform for 17 Culture the pension scheme of the University of Basel under the pension fund of the The alphorn in the modern age canton of Basel­Stadt – a partnership­based enterprise”.
    [Show full text]
  • Case Study Elasticity for the Slab Track in the Gotthard Base Tunnel, (CH)
    Case Study Elasticity for the Slab Track in the Gotthard Base Tunnel, (CH) The project of the century: With 57 kilometres the world's longest railway tunnel Highest requirements: Outstanding material properties over the entire service life Optimised solution, comprehensive project support and just-in-time logistics Elastic Sylodyn® Insertion Pads for Sleeper Boots in the World's longest Railway Tunnel Description of the project Prestigious project with highest Gotthard Base Tunnel requirements in terms of railway Altdorf Overall length 57 km technology Altdorf/Rynächt Length 4.4 km t 57 kilometres in length, the A Gotthard Base Tunnel is cur rently Erstfeld the longest railway tunnel in the world. Erstfeld Length 7.8 km It links the Swiss communities of Erst- feld and Bodio. The tunnel forms part Amsteg of the New Railway Link through the Alps (NRLA), which is at present the Amsteg largest construction project in Swit- Length 11.3 km zerland. With the construction of this "project of the century", north/south railway transit trafic will be further Sedrun improved, meaning that transit trafic Sedrun can be moved off the roads and onto Length 9.2 km the railways. More over, travel time for public transport services will be sig- Andermatt niicantly reduced – in conjunction with the Ceneri Base Tunnel which is currently being constructed – (the Faido travel time from Zurich to Milan will be Length 12.9 km cut by one hour), thereby considerably increasing the attractiveness of rail- way travel compared with taking the Ariolo car or plane. In future, passenger and freight trains will pass through the Faido tunnel at speeds of up to 250 km/h.
    [Show full text]
  • 17A MAESTRIA PAC Faido Torre
    2019 17 a MAESTRIA PAC Leventinese – Bleniese Faido Torre 8 linee elettroniche 8 linee elettroniche 6 – 8.12.2019 Fabbrica di sistemi Fabbrica di rubinetteria d’espansione, sicurezza e sistemi sanitari / e taratura riscaldamento e gas Fabbrica di circolatori e pompe Fabbrica di pompe fecali/drenaggio e sollevamento d’acqua Bärtschi SA Via Baragge 1 c - 6512 Giubiasco Tel. 091 857 73 27 - Fax 091 857 63 78 Fabbrica di corpi riscaldanti e www.impiantistica.ch Fabbrica di bollitori, cavo riscaldante, impianti di ventilazione e-mail: [email protected] caldaie, serbatoi per nafta, controllata impianti solari e termopompe Fabbrica di scambiatori di calore Fabbrica di diffusori per l’immissione a piastre, saldobrasati e a e l’aspirazione dell’aria, clappe fascio tubiero tagliafuoco e regolatori di portata DISPOSIZIONI GENERALI Organizzazione: Tiratori Aria Compressa Blenio (TACB) – Torre Carabinieri Faidesi, Sezione AC – Faido Poligoni: Torre vedi piantina 8 linee elettroniche Faido vedi piantina 8 linee elettroniche Date e Orari: 29.11.19 aperto solo se richiesto 30.11.19 dalle ore 14.00 – 19.00 1.12.19 6.12.19 dalle 20.00 alle 22.00 7.12.19 dalle 14.00 alle 19.00 8.12.19 dalle 14.00 alle 18.00 Un invito ai tiratori ticinesi e del Moesano, ma anche ad amici provenienti da fuori cantone, a voler sfruttare la possibilità di fissare un appuntamento, per telefono ai numeri sotto indicati. L’appuntamento nei giorni 29–30–01 è possibile solo negli orari indicati. Appuntamenti: Contattare i numeri telefonici sotto indicati. Iscrizioni: Mediante formulari ufficiali, entro il 19.11.2019 Maestria – TORRE: Barbara Solari Via Ponte vecchio 3 6742 Pollegio 076 399 75 16 [email protected] Maestria – FAIDO: Alidi Davide Via Mairengo 29 6763 Mairengo 079 543 78 75 [email protected] Formulari e www.tacb.ch piano di tiro: www.carabinierifaidesi.ch Regole di tiro: Fanno stato il regolamento ISSF e le regole per il tiro sportivo (RTSp) della FST.
    [Show full text]
  • Uri in Zahlen
    Uri in Zahlen Ausgabe 2015/2016 A63945_Umschlag_A63945_Umschlag 11.07.13 14:26 Seite 2 Ingenbohl Wirtschaftskontaktstellen im Kanton Morschach Seelisberg Muotathal Riemenstalden Volkswirtschaftsdirektion Uri Emmetten Beckenried Abteilung Wirtschaft Uri Altdorf Andermatt Attinghausen Sisikon Bauen Klausenstrasse 4 Flüelen CH-6460 Altdorf Bürglen Tel. +41 (0)41 875 24 01 ÄUSSERE Altdorf Fax +41 (0)41 875 24 12 Isenthal Seedorf Spiringen Spiringen Wolfenschiessen SEEGEMEINDEN [email protected] HINTERES www.ur.ch/wirtschaft Attinghausen Schattdorf Bauen Bürglen Erstfeld Flüelen SCHÄCHENTAL Linthal Unterschächen Die Wirtschaftsförderung Uri ist die Informations- und Anlaufstelle der Verwaltung für die Urner Wirtschaft. Sie liefert Dienstleistungen, Informationen und Kontakte. Auch für Engelberg Erstfeld neuzuziehende Unternehmerinnen und Unternehmer, Jungunternehmerinnen und Jung- NTERES REUSSTAL unternehmer ist die Wirtschaftsförderung Uri die erste Adresse. Der Kontakt erfolgt di- U rekt, persönlich, unkompliziert und rasch. Silenen Göschenen Gurtnellen Hospental Isenthal SILENEN Kontaktpersonen Gurtnellen Disentis/Muster Bestandesentwicklung Wassen Gadmen Christoph Müller Klausenstrasse 4 Volkswirtschaftsdirektion Uri CH-6460 Altdorf Abteilung Wirtschaft Tel. +41 (0)41 875 24 01 Fax +41 (0)41 875 24 12 Realp Schattdorf Seedorf OBERESGöschenen REUSSTAL [email protected] Tujetsch Promotion, Neuansiedlungen, Jungunternehmerförderung Andermatt Anita Canonica Klausenstrasse 4 Volkswirtschaftsdirektion Uri CH-6460 Altdorf URSERNHospental
    [Show full text]
  • Gotthard Bergstrecke’
    University of Lugano, Switzerland Faculty of Economics The touristic future on and along the ‘Gotthard Bergstrecke’ Exploring the associations people have with the region, the motivations of prospective visitors, their requirements to a ‘Gottardo Express’ train offer and the potential of regional attractions. Master’s dissertation Author: Fabio Flepp Supervisor: Prof. Rico Maggi Second Reader: Stefano Scagnolari Academic year: 2014/2015 Submission date: December 2014 ! Contact Author: Fabio Flepp - Linkedin: https://ch.linkedin.com/in/fabio-flepp-a2567043 - Email: [email protected] Table of Contents LIST OF FIGURES IV LIST OF TABLES V LIST OF ABBREVIATIONS VI 1. INTRODUCTION 1 1.1 CHOICE OF TOPIC 1 1.1.1 ALPTRANSIT AND “BERGSTRECKE” 2 1.1.2 CONSEQUENCES, FEARS AND SIMILAR PLACES 3 1.1.3 DISCUSSIONS ABOUT THE FUTURE TOURISM DEVELOPMENT 4 1.2 RESEARCH AIM 5 1.3 OUTLINE 7 2. TRANSPORT AND TOURISM 8 2.1 GENERAL 8 2.2 TRANSPORTATION FOR TOURISM 9 2.3 (TOURISM-) IMPACTS OF NEW TRAFFIC INFRASTRUCTURE 9 2.4 TRANSPORT AS TOURISM & SLOW TRAVEL 10 2.5 RAIL TOURISM 12 2.5.1 MOTIVATION FOR TRAIN TRAVEL 12 2.5.2 HERITAGE RAILWAYS 13 3. GOTTHARD 14 3.1 HISTORY OF THE TRANSPORTATION LANDSCAPE 14 3.2 TOURISM HISTORY IN THE GOTTHARD REGION 15 3.3 TOURISM TODAY 17 3.3.1 TOURISM NUMBERS OF THE GOTTHARD REGION 18 3.3.2 TOURISM MONITOR 2013 18 3.3.3 PRESENT TOURISM PRODUCTS AND TOURISM CARD OFFERS 19 4. TOURISM PRODUCTS (+ DESTINATIONS) 23 4.1 GENERAL 23 4.2 CO-CREATION OF THE TOURISM EXPERIENCE 24 4.3 TOURISM PRODUCT DEVELOPMENT 25 I 5.
    [Show full text]
  • Jahresbericht 2020 SPENDERINNEN UND SPENDER PERSONELLES ––– –––
    Jahresbericht 2020 SPENDERINNEN UND SPENDER PERSONELLES ––– ––– Die nachfolgenden Personen und Institutionen haben uns Vereinsmitglieder zwischen 01.09.2020 und 31.01.2021 mit einer Spende geholfen: 154 Einzelmitglieder 70 Paarmitglieder Arnold Trudi & Josef, Schattdorf | Arnold Gertrud, Flüelen | Arnold Hans, Flüelen | Arnold Martha & Gustav, Altdorf | Arnold Thomas & Mirjam, 50 Kollektivmitglieder Bürglen | Arnold Antoinette & Max, Altdorf | Aschwanden Margrit, St. Gal- len | Arnold Richard, Flüelen | Arnold Julia & Raphael, Attinghausen | Alb- Vorstand recht Huber Zita & Toni, Altdorf | Arnold Rosi & Josef, Attinghausen | -Ar Hans Gnos-Baumgartner, Bristen, Präsident nold Eva & Josef, Bürglen | Arnold Rosmarie, Altdorf | Arnold Karl & Heiri Arnold, Altdorf Neue MitarbeiterinSimon Gnos, Bürglen Elsbeth, Schattdorf | Arnold Lisbeth & Bruno, Erstfeld | Arnold & Co. AG, Erika Florin, Schattdorf beim Hilfswerk der Kirchen Uri Flüelen | Aschwanden Felix, Altdorf | Arnold Hans & Anna, Schattdorf | Simon Gnos, Bürglen Aschwanden Beat & Cécile, Altdorf | etschart Elisabeth, Seedorf | Bucher B Ursula Muheim-Tresch, Altdorf Per 1. März 2021 hat Marina Regli die Nachfolge von Freddy Amend Josef, Zug | Betschart Ingrid, Altdorf | Brunner Peter, Altdorf | Burch Vreny, Bruno Tresch, Seedorf angetreten. Die gebürtige Urnerin verfügt über ein Studium in sozialer Bürglen | Burkart Franz, Erstfeld | Bissig Gabriela & Bruno, Altdorf | Bo- matter Alois & Margrit, Schattdorf | Balli Roman & Marian, Altdorf | Büsser Esther Zgraggen Bossert, Altdorf Arbeit
    [Show full text]
  • RURBANCE Project Territorial System Factsheet
    RURBANCE Project Territorial System Factsheet Territorial System Identification data Name: Zurich Main urban center: Zurich Country: Switzerland State / Region: Canton of Zurich Map 1: A Zurich – Metropolitan Area Zurich (Zurich and greater surroundings) RURBANCE Project Territorial System Factsheet Pilot Area for Rurbance-Project Line Zurich (A) - Gottardo – Milano (B) (planned «Gottardo»-study) Rural and urban regions on the «Gottardo»-route: City of Zurich, Cantons of Zurich, Zug (City of Zug), Schwyz (only inner part of the Canton, City of Schwyz), Uri (capital Altdorf), Ticino (Cities of Bellinzona, Lugano, Mendrisio/Chiasso) and City of Milano RURBANCE Project Territorial System Factsheet Territorial System Reference data City of Zurich (end 2011) Population City of Zurich 390’000 Area (km2): 92 Density: 4’240 p / km2 Cantons of Zurich, Uri, Schwyz, Zug and Ticino (pilot study-area «Gottardo»; end 2011) Population Area Density Number of km2 p / km2 Municipalities Canton Schwyz SZ 148’000 908 151 30 Canton Ticino TI 337’000 2’812 119 147 Canton Uri UR 35’000 1’077 32 20 Canton Zug ZG 115’000 239 481 11 Canton Zurich ZH 1’392’000 1’729 805 171 Pilot study-area «Gottardo» Population pilot area 2’027’000 6’764 296 379 % of Switzerland 25.5% 16.38 % Switzerland 7’953’000 41’285 193 *2‘408 * 1.1.2013 Spoken languages ZH, UR, SZ, ZG German TI Italian RURBANCE Project Territorial System Factsheet Land use (% in the TS, as for the CORINE Land Cover level 2 data 2006, in km2) SZ TI UR ZG ZH pilot area CH Urban fabric (1.1) 41.55 137.70 11.89
    [Show full text]
  • Bericht Über Die Exkursion Zum Scheidnössli Bei Erstfeld, in Die Urserenmulde Vom Rhonegletscher Bis Andermatt Und Ins Westliche Tavetscher Zwischenmassiv
    Bericht über die Exkursion zum Scheidnössli bei Erstfeld, in die Urserenmulde vom Rhonegletscher bis Andermatt und ins westliche Tavetscher Zwischenmassiv Autor(en): Brückner, Werner / Niggli, Ernst Objekttyp: Article Zeitschrift: Eclogae Geologicae Helvetiae Band (Jahr): 47 (1954) Heft 2 PDF erstellt am: 04.10.2021 Persistenter Link: http://doi.org/10.5169/seals-161839 Nutzungsbedingungen Die ETH-Bibliothek ist Anbieterin der digitalisierten Zeitschriften. Sie besitzt keine Urheberrechte an den Inhalten der Zeitschriften. Die Rechte liegen in der Regel bei den Herausgebern. Die auf der Plattform e-periodica veröffentlichten Dokumente stehen für nicht-kommerzielle Zwecke in Lehre und Forschung sowie für die private Nutzung frei zur Verfügung. Einzelne Dateien oder Ausdrucke aus diesem Angebot können zusammen mit diesen Nutzungsbedingungen und den korrekten Herkunftsbezeichnungen weitergegeben werden. Das Veröffentlichen von Bildern in Print- und Online-Publikationen ist nur mit vorheriger Genehmigung der Rechteinhaber erlaubt. Die systematische Speicherung von Teilen des elektronischen Angebots auf anderen Servern bedarf ebenfalls des schriftlichen Einverständnisses der Rechteinhaber. Haftungsausschluss Alle Angaben erfolgen ohne Gewähr für Vollständigkeit oder Richtigkeit. Es wird keine Haftung übernommen für Schäden durch die Verwendung von Informationen aus diesem Online-Angebot oder durch das Fehlen von Informationen. Dies gilt auch für Inhalte Dritter, die über dieses Angebot zugänglich sind. Ein Dienst der ETH-Bibliothek ETH Zürich, Rämistrasse 101, 8092 Zürich, Schweiz, www.library.ethz.ch http://www.e-periodica.ch Bericht über die Exkursion zum Scheidnössli bei Erstfeld, in die Urserenmulde vom Rhonegletscher bis Andermatt und ins westliche Tavetscher Zwischenmassiv gemeinsam durchgeführt von der Schweizerischen Mineralogischen und Petrographischen Gesellschaft, dem Verband Schweizerischer Geographischer Gesellschaften und der Schweizerischen Geologischen Gesellschaft vom 27.
    [Show full text]
  • Groups & Incentives in Ticino
    Groups & Incentives in Ticino. meetings.ticino.ch/incentives Come for business, stay for lifestyle. Collina d’Oro, Lake Lugano Region Collina d’Oro, | 1 Ticino Turismo Index: Via C.Ghiringhelli 7 CH - 6501 Bellinzona Introduction. 4 Tel. +41 (0)91 825 70 56 Excursions & Nature. 6 [email protected] Culinary & Delights. 9 www.meetings.ticino.ch Sport & Fun. 11 Culture & Events. 15 Technical visits. 17 Contact: Webcode. Monica Reggiani The webcode is the number to be found in the blue box of each activity. XY Product Manager Meetings For further information, visit www.meetings.ticino.ch and click the search [email protected] botton in the upper right corner of the page, then type the webcode in the search box. Please contact us if you need more information, it would be a pleasure for us to help you organizing your great Ticino-experience! Ticino Turismo, in cooperation with various partners operating throughout the area, is able to offer professional and free assistance for the planning of meetings, incentives, conventions and events. See: www.meetings.ticino.ch/contact 2 | Did you know that in Ticino… • you can soak up 2,302 hours of sun every year? • you can find AlpTransit, the world’s largest construction site? It’s one of Switzerland’s sunniest regions! Here you can receive all the information on the new Gotthard tunnel at the Pollegio Information Centre: this is the longest tunnel in the world • clouds are not welcome? and is 57 km long! The maximum cloud formation in Lugano is 43%, compared to 65% in Milan! • you can suffer from
    [Show full text]
  • Qualità Del Paesaggio Agricolo Della Valle Leventina
    Cantone Ticino Sezione dell’agricoltura Qualità del paesaggio agricolo della valle Leventina Rapporto di progetto Faido, 31 marzo 2016 Progetto qualità paesaggio valle Leventina Società Agricola di Leventina Impressum Contatto Cantone: ing. Daniela Linder Basso, Ufficio della consulenza agricola, Viale S. Franscini 17, 6500 Bellinzona Tel. 091/814 35 47, e-mail [email protected] Contatto ente promotore: Società agricola di Leventina, c/o Omar Pedrini, 6763 Osco Tel. 079/436 18 25, e-mail [email protected] Autori/redazione: Lucchini Mariotta Associati SA, 6715 Dongio, Fabrizio Conceprio e Nilde Dazzi [email protected] Progetto qualità paesaggio valle Leventina Società Agricola di Leventina Indice 1 Dati generali sul progetto .......................................................................................................................... 1 1.1 Iniziativa ............................................................................................................................................... 1 1.2 Organizzazione del progetto ................................................................................................................ 1 1.3 Comprensorio del progetto .................................................................................................................. 2 2 Andamento del progetto e procedura partecipativa ............................................................................... 8 3 Analisi del paesaggio..............................................................................................................................
    [Show full text]
  • Tabella Di Marcia 2 GP Ticino Cat. Elite, U23, Amateur Lodrino 2021
    2° GRAN PREMIO TICINO BANCA STATO GARA NAZIONALE SU STRADA 2021 domenica, 11.07.2021 Tabella di marcia categoria Elite, U23, Amateur e Master Lodrino-Osogna-Claro-Preonzo-Lodrino-Biasca-Osogna-2 giri piccoli Riviera - Pollegio-Giornico-Chiggiogna-Nivo-Giornico-Biasca-Osogna-Lodrino, 2 giri grandi con Leventina Distanza Orario Orario Altezza Distanza Luogo percorso passaggio 40 passaggio 45 m/sM intermedia progressiva km/h km/h 262 Lodrino, aeroporto partenza 0.00 0.00 12:45 12:45 274 Osogna-Cresciano, stazione FFS 2.00 2.00 12:48 12:48 260 Cresciano 2.60 4.60 12:52 12:51 270 Claro rotonda, deviazione a destra 3.30 7.90 12:57 12:56 255 Bivio Preonzo-Claro 0.90 8.80 12:58 12:57 250 Preonzo 1.00 9.80 12:59 12:58 262 Lodrino rotonda 4.30 14.10 13:06 13:04 295 Iragna 3.70 17.80 13:11 13:09 295 Iragna, bivio per Biasca via Iragna 3.00 20.80 13:15 13:13 295 Biasca, strada Industriale 301 Biasca, via Industrie 1.70 22.50 13:18 13:15 1° GIRO PICCOLO RIVIERA 301 Biasca, via Traversa 22.50 301 Biasca, strada cantonale via Chiasso 1.00 23.50 13:20 13:17 274 Osogna, stazione FFS 4.60 28.10 13:26 13:23 260 Cresciano 2.60 30.70 13:30 13:26 270 Claro rotonda, deviazione a destra 3.30 34.00 13:35 13:30 255 Bivio Preonzo-Claro 0.90 34.90 13:36 13:31 250 Preonzo 1.00 35.90 13:38 13:32 262 Lodrino rotonda 4.30 40.20 13:44 13:38 295 Iragna 3.70 43.90 13:50 13:43 295 Iragna, bivio per Biasca via Iragna 3.00 46.90 13:54 13:48 2° GIRO PICCOLO RIVIERA 296 Pollegio rotonda Pasquerio 1.20 48.10 13:56 13:49 298 Pollegio 1.20 49.30 13:58 13:51 322 Bodio 2.80 52.10
    [Show full text]
  • Selection of the Optimum Tunnel System for Long Railway Tunnels with Regard to the Entire Lifecycle
    SELECTION OF THE OPTIMUM TUNNEL SYSTEM FOR LONG RAILWAY TUNNELS WITH REGARD TO THE ENTIRE LIFECYCLE H. Ehrbar & C. Tannò ETH Zurich, Switzerland H.-P. Vetsch Vetsch Rail Consult, Bützberg, Switzerland ABSTRACT: Since more than 30 years long tunnels with a total length of more than 50 kilometres exist. Many of them show a different tunnel system: double track tunnels with service tunnel, two single track tunnels and two single track tunnels with a service tunnel are the existing systems. The decision on the tunnel system of this long tunnels had to be taken at a time when only few information on operation and maintenance costs were available. Today more information on oration a maintenance is available. The paper shows, how the decision-making process should be made today considering the criteria construction, operation and safety with regard to the entire lifecycle. Recommendations on the selection of the tunnel system will be given for different boundary conditions, based on the operation experience of the long tunnel railway tunnels under operation. 1. PROJECT REQUIREMENTS OF LONG RAILWAY TUNNELS Railway tunnel constructions have the purpose of connecting cities, economic regions (Gotthard-Base Tunnel), countries (Eurotunnel, Cross Border Base Tunnel under the Ore Mountains) or even continents (Gibraltar Strait Tunnel) in order to ensure a rapid and environmentally friendly transport of people and goods. Mountains or straits are the typical topographical obstacles that must be overcome with a tunnel. Such tunnels become quickly very long (> 20 km length) due to special topographic boundary conditions for mountain base tunnels and strait tunnels. Figure 1: Longitudinal profile of a subsea tunnel (Eurotunnel) and a mountain base tunnel (Gotthard Base Tunnel) (source Wikipedia and AlpTransit Gotthard) Very long tunnels have to fulfil many project requirements, as each other civil work also.
    [Show full text]