DAILY PERFORMANCE REVIEW Monday, 31st December 2012

SENIOR OPERATING OFFICER’S SUMMARY An uneventful start-up save for 3 cancellations on the for the 06.00 snapshot owing to trains with flat batteries in . There was then little to report until a PIOT on the and a signal failure which disrupted the eastbound line at King’s Cross St Pancras, technical staff identified a discarded umbrella trackside to be the root cause. Crowds associated with New Year’s Eve celebrations filled the viewing areas earlier than in recent years, however the network coped well with the forward traffic. The return traffic was the usual mix of low value PEA operations and requests for ambulances associated with slips and falls; however a ‘bottling’ incident at Sudbury Hill was more serious and required both Police and Ambulance and stopped the Piccadilly line for 30 minutes. All lines met their excess PWT targets with the Victoria and Waterloo and City recording 100% headway proxy. (MRT)

Jubilee Northern Piccadilly Bakerloo Central Waterloo & City Victoria H&C Circle District Metropolitan

EXCESS PLATFORM WAIT TIME / HEADWAY / ADVERTISED GOOD SERVICE Actual excess 9 9 21 9 6 2 3 26 34 22 20 Platform Wait Time (Trains in Service) Target excess

9 13 26 14 15 15 18 40 48 22 24 % Platform Wait Time Headway proxy (%) 98 99.6 94.7 98.8 99.5 100 100 97.8 98.7 97 96.4 Advertised good 100 99.1 74.9 97.8 100 100 100 100 100 87 100 service (%)

UNSCHEDULED TRAIN CANCELLATIONS – SNAPSHOTS Totals Network Network 06:00 1 / 14 4 / 38 5 / 241 98.0 09:00 0 / 359 100 12:00 0 / 324 100 15:00 1 / 26 1 / 323 99.7 18:00 0 / 356 100 21:00 7 / 57 1 / 27 8 / 321 97.5 00:00 2 / 58 1 / 16 3 / 321 99 % trains across 100 99.5 98 100 100 100 99.4 100 98.7 98.5 snapshots (per line) 99.2 TOTAL UNSCHEDULED TRIP CANCELLATIONS TOTAL 674 940 634 538 648 306 684 330 778 SCHEDULED Complete Trips 52 77 94 46 45 4 47 14 60 No Data CANCELLED Part Trips 2 14 4 4 0 0 2 0 2 No Data CANCELLED % Complete 92 90.3 84.5 90.7 93.1 98.7 92.8 95.8 88.2 No Data

A trip is defined as a journey between scheduled termination points in one direction. Notes:

District line (06.00) - 3 cancellations owing to train battery issues at Lillie Bridge Depot Piccadilly line (21.00) – 7 cancellations owing to earlier signal failure at King’s Cross

TOP FIVE INCIDENTS Time Line Location Reason Delay I- NACH Owner SoT District Lillie Bridge Trains unavailable 7 38 APD 19.29 Piccadilly King’s Cross Signal failure 17 26 TLL 18.19 Victoria Warren Street PIOT 15 8 COO 01.22 Piccadilly Sudbury Hill Customer incident 28 <1 COO

Page 1 of 5

JUBILEE - Nil

NORTHERN 18.19 – Warren Street – PIOT – part suspension Owner – COO Summary Male customer taken ill with a suspect heart attack Impact Initial service alert issued and then service suspended from 18.31 Kennington to Camden Northbound only I-NACH 8 Stalled trains Nil Response 18.23 – LAS and PMO dispatched to site. 18.30 – Medical staff on site confirm heart attack. 18.31 – LAS on site. 18.32 – NIRM on site. 18.34 – Customer removed from train to platform. 18.36 – Incident train departed from the platform. 18.39 – Customer removed by medical staff. Recovery 18.41 – Good service restored to all destinations. Immediate Male customer having a suspected heart attack train service suspended in consequence. (PC) cause & resolution Debrief None Actions

PICCADILLY 19.29 – King’s Cross – signal failure – severe delays Owner - TLL Summary Signal track circuit ‘BT’ failure, leading to signals L10B and ‘station starting’ signal L9 failing to clear. Impact Initial seven-minute delay. Minor delays between Kings Cross and (EB) I-NACH 26 Stalled trains Nil Response Technical Officer despatched ex Caledonian Road, DRM attended from . Trains continued under ‘Route Secure’ procedures. 19.38- Technical Officer arrived on site. 19.42 – DRM arrived on site. 20.05 – Service status severe delays between Kings Cross and Cockfosters (both) 20.08 – Defect identified at track level – track access organised. 20.25 – Service status, severe delays between and Cockfosters (both) with minor delays the remainder of the line. 20.34 – Normal signalling restored after discarded umbrella removed and track fuse replaced. Recovery 22.10 – Severe delays on western branches & King’s Cross to Arnos Grove, minor delays to the rest. 22.59 – Acton Town to Cockfosters, good service, minor to the rest of the line. 23.41 – Minor delays, whole line. 00.09 – Good service. Immediate Signal failure - discarded umbrella removed and track fuse replaced. cause & resolution

01.22 – Sudbury Hill – customer incident – part suspension Owner - COO Summary Report of a customer assault on board train 304. Impact Piccadilly line suspended Acton Town – . I-NACH <1 Stalled trains Nil Response 01.30 – BTP & Ambulance requested to attend.

Page 2 of 5

01.48 – DSM on site, confirmed 2 persons were injured in an assault, with a bottle used as a weapon. Both injured persons were moved to the platform. Agreement reached to allow train to move and stable at pending SOCO attendance. 01.50 – Train on move to , train service resumes. Recovery 01.50 – Severe delays on the Uxbridge branch. 02.50 – Minor delays. Immediate Report of 2 customers seriously hurt after assault on board the train. BTP, MetPol and Ambulance cause & all in attendance. Upon arrival of DSM, the train was able to move to South Harrow siding. 1 resolution casualty was treated by ambulance staff, with the other person leaving of their own volition. (PD) Debrief N/A Actions

BAKERLOO - Nil

CENTRAL / WATERLOO & CITY - Nil

VICTORIA - Nil

CIRCLE / HAMMERSMITH & CITY - Nil

DISTRICT SoT – Lillie Bridge depot – trains unavailable – minor delays Owner – APD Summary Three trains in depot with flat batteries. Impact Minor delays on Edgware Road – Wimbledon. I-NACH 38 Stalled trains Nil Response Trains in depot with flat batteries attended to by technical staff and brought into service as available. Recovery 08.38 – Good service. Immediate Lights left on stabled trains, batteries re-charged. (CMK) cause & resolution Debrief None. Actions

METROPOLITAN

OTHER NOTEWORTHY BUSINESS ISSUES Upgrades Nil Power Nil TAC Nil Connect Nil Ticketing Nil ORR injury There were four instances of passenger injury notified to the Office of Rail Regulation. notifications

CUSTOMER SERVICE CENTRE GENERAL / FORTHCOMING ISSUES / WEATHER OUTLOOK Comments at: 01:40 Tuesday will be mainly dry with some sunny periods in the morning, and just the Bakerloo Piccadilly low risk of a light shower during the afternoon. Overnight, breaks in the cloud will

Central C&H allow temperatures to fall away with a small risk of frost in more rural locations.

Victoria District Winds will become light overnight and remain westerly throughout.

W&C Metropolitan A cold and dry start on Wednesday, it will become increasingly cloudy through the

Jubilee 1 Unspecified morning with some patchy light rain or drizzle affecting the area for a time during in Northern the afternoon and evening. Becoming dry but remaining cloudy overnight. Temperatures will also gradually increase throughout the day. Another cloudy, but mostly dry day with perhaps a few spots of light rain or drizzle. Staying mostly cloudy and dry overnight. Winds generally light. Mild.

Page 3 of 5

ERU BLUE LIGHT DEPLOYMENT - Nil POLICE MEDIC DEPLOYMENT Ambulance Time Line Location Reason for Deployment Time On Site Resumption Time arrival time (Wheels turning) 18.19 Victoria Warren Street Suspect heart attack 18.32 18.29 18.41

LIFTS & Lifts* Escalators Jubilee Northern Piccadilly Elephant & Castle (1), defective, 19.45 – 21.17 Bakerloo Elephant & Castle (1), defective, 21.40 – 22.50 Central Queensway (2), defective, 05.30 – 13.15 Victoria Brixton (2), defective, 12.10 – 14.12 C&H Kings Cross (3), defective, SoT – 0615 District Metropolitan *lifts in bold are on Step Free Routes

FORTHCOMING EVENTS EXPECTED EVENT LOCATION DAY / TIME NEAREST STATIONS CAT ATTENDANCE Piccadilly to 11.30–15.00 500,000+ Charing Cross, Hyde Park New Year’s Parliament Square Corner, , , Day Parade Westminster

Winter Wonderland Hyde Park 10.00-22.00 Up to Hyde Park Corner,

100,000 , Marble Arch Football: Vicarage Road 13.00 Ground Overground to Watford v Charlton Capacity Watford High Street 22,000 Football: White Hart Lane 15.00 Ground Seven Sisters, take Greater v Reading Capacity Anglia to White Hart Lane 36,000 Football: Boleyn Ground 15.00 Ground Upton Park, Plaistow West Ham v Norwich Capacity 35,500 Football: The Den 15.00 Ground London Bridge, take Millwall v Bristol Capacity Southern to South

20,000 Bermondsey or New Cross Gate Football: Underhill 15.00 Ground High Barnet Barnet v Aldershot Capacity 6,000

Town

Football: Griffin Park 15.00 Ground South , Gunnersbury, Brentford v Capacity Northfields (or) Brentford

Bournemouth 12,500 (SWT)

Football: Selhurst Park 15.00 Ground Victoria, take Southern to Crystal Palace v Capacity Selhurst

Wolverton 26,000

Concert: Chiro Loco O2 Academy 21.00-05.00 4,000 Brixton New Years Day Party

Note. Platform Wait Time – EJT Proxy measures the average time (secs) customers wait for a train over and above the timetabled wait time. Headway – % of trains that pass through a defined measuring point within two scheduled headways of the previous train. Train Cancellations – Number of trains not in service at the time of the snapshots

Page 4 of 5

Percentage Good Service – % of core traffic hours (defined as 05.30-00.45, Monday – Saturday and 07.00-00.15, Sunday) that a line is advertised to customers as operating a good service. (Note Waterloo & City core hours are 06.15-21.45 Monday – Saturday). Disclaimer - Indicative NACH (I-NACH) scores are an initial calculation made by the NOC immediately after an incident and may differ from the final figure which is calculated by the Service Performance Information team.

Page 5 of 5