The Follo Line Project LONGEST

Total Page:16

File Type:pdf, Size:1020Kb

The Follo Line Project LONGEST The Follo Line Project LONGEST. URBAN. COMPLEX. FASTER. 2015/3 Norwegian National Rail Administration THE FOLLO LINE PROJECT | 1 2 | THE FOLLO LINE PROJECT The project The Follo Line Project is currently the largest infrastructure The project includes: new double track line between Oslo Central project in Norway and will include the longest railway tunnel Station and the public transport hub at Ski in the Nordic countries. The new double track rail line forms 20 km long twin rail tunnel extensive work at Oslo Central Station the core part of the InterCity development southwards construction of a new station at Ski and from the capital. surface alignment necessary realignment of the existing Østfold Line, both on the approach to Oslo Central Station (with a new tunnel), and between the The Follo Line tunnel will be Norway’s first long twin new Ski Station and the future tunnel for the tube rail tunnel and one of the first to be constructed Follo Line using tunnel boring machines. The main construction work started in 2015, with completion in December 2021. Important preparatory work with the alignment of the new line and the construction sites was finalized in 2014/2015. THE FOLLO LINE PROJECT | 3 4 | THE FOLLO LINE PROJECT Overview Efficient and forward-looking at Ski. In tandem with the Østfold Line, which possible. Groundwater and properties that might be The Follo Line Project in total will comprise around currently runs between Oslo and Ski, the Follo Line affected are closely monitored Thorough planning is 64 km of new railway tracks. The new double track will give improved service to passengers. essential in order to restrict the negative impact on line from Oslo to Ski will be 22 km long, and designed the surroundings. Furthermore progress and costs for speeds up to 250 km/h. The line will make it Growth and the environment must be closely monitored. possible to reduce the journey time between Oslo The Østfold Line has reached its capacity limit. and Ski by 50 % (from 22 to 11 minutes). The double Simultaneously, a population growth of at least From road to rail track line will be an efficient, safe and environmen- 30 % is anticipated in this region by 2025. The The Follo Line will provide capacity for more freight tally-friendly transport system. Follo Line will link residential and working areas trains. Around 80 % of land-based transport of heavy together effectively and contribute to development goods in and out of the country passes through the From a railway engineering perspective, constructing in the region. county of Østfold. The bulk of this traffic is currently new lines in the densely trafficked metropolitan handled by freight vehicles. One freight train can area around Oslo Central Station is a major challenge. A large scale project transport the same volume as approximately 24 Much of the work will be undertaken without The Follo Line Project is comprehensive. Several heavy goods vehicles. disruption to the daily flow of traffic to and from different operations will be undertaken simultane- this busy station. ously, deadlines will need to be met and the project faces exciting challenges in terms of logistics and An urban challenge management. The Follo Line Project comprises four tracks to Oslo Central Station, which is Norway’s largest public During the construction phase, a large scale project transport hub. Trains on the new Follo Line will run of this nature will affect people, nature and the en- directly between Oslo and the public transport hub vironment. It is required to cause as little impact as THE FOLLO LINE PROJECT | 5 Challenges and requirements Oslo Central Station: Between Oslo Central Station and the tunnel, con- struction of the Follo Line must accommodate other rail traffic in and out of Oslo Central Station. The line will be constructed with connections to several platforms. In addition restrictions concerning the Medieval Park in Oslo must be taken into account, as this is of great archaeological and historical significance. The Directorate for Cultural Heritage in Norway, Oslo Municipality and the Norwegian National Rail Administration have reached a joint solution for con- servation measures regarding both the introduction of the new Follo Line and the new tracks for the Østfold Line through an area known as ‘Klypen’. This will provide the opportunity to establish a park area The line will be constructed almost twice the current size. with connections to several The tunnel: The tunnel, which will pass beneath the Ekeberg Hill platforms. in Oslo, is about to become the longest railway tunnel (20 km) to date in the Nordic countries. Excavation is performed by means of four hard rock shielded tunnel boring machines (TBM). 6 | THE FOLLO LINE PROJECT This is one of the first railway tunnels in Norway being excavated by TBM, a technology that is other- wise common in the excavation of long tunnels in Europe. The bored section of the tunnel represents 18,5 km. In addition, drill & blast techniques will be utilised for some of the tunnel work. In the northern part of the tunnel section, both the Follo Line and the relocated Østfold Line are located quite close to existing tunnels, caverns and sensitive installa- tions. The excavation will be done partly by careful drill and blast and by drill and split methodology without blasting. Important criteria for the tunnel: impermeable and safe long service life minimum maintenance requirements optimal train handling (to ensure reliable traffic) minimum impact on the local environment during the construction and in operation skills upgrading and development THE FOLLO LINE PROJECT | 7 8 | THE FOLLO LINE PROJECT The tunnel will comply with inter-European safety these were less complex and mainly used to exca- requirements for long tunnels with cross passages vate hydro-electric power tunnels. The decision to use TBMs approximately every 500 meters to be used as paves the way for alliance- escape routes. The life expectancy of the tunnel will The decision to use TBM paves the way for alliance be at least 100 years. building, skills upgrading and innovation as both building, skills upgrading national and international participation take part in TBMs are well suited for the construction of this this project. and innovation. tunnel due to: the tunnel’s length Quality and rock conditions the rock characteristics Tunnel boring is a system comprising precast imper- generally adequate cover/overburden meable concrete elements installed in a closed ring access to a large rigging area suitably to ensure protection from rock fall, as well as water located in relation to the tunnel and to the and frost. The space behind the concrete elements main road system is filled with cement grout to seal the gap between limits the number of cross cut tunnels in the rock face and the ring. populated areas Production and installation of concrete elements The tunnel will become the first long rail tunnel in will form part of an industrialised process. This will Norway with twin tubes to facilitate: help ensure a high and consistent quality of compo- access to future operation and maintenance nents, as well as the actual installation process. From optimal train/traffic handling a life cycle perspective, precast concrete elements in safety-evacuation a closed ring will require less maintenance than the more traditional form of rock support using bolts TBM technology and shotcrete. Drill & blast is the most common method used in tunnel construction in Norway. In the 70s and 80s, Choosing machinery that is suited to the ground tunnel boring machines were also utilised although conditions and a crew experienced in operating THE FOLLO LINE PROJECT | 9 under similar rock conditions is essential. Extensive The TBM assembly chambers and the access tunnels The new Ski station will knowledge of ground conditions is an important will be constructed utilizing drill & blast techniques. criteria for success. be built with six tracks Open section and the and three central platforms, One major construction site new Ski Station: The rig area at Åsland, a rural site on the outskirts The Follo Line will run along a 1.5 km open section a new pedestrian under- of Oslo, includes facilities for production of precast south of the tunnel before reaching the public pass, a new road bridge, concrete segments. From the rig area two TBMs transport hub at Ski. Retaining walls and culverts will be working towards Oslo Central Station to be (concrete tunnels) will be built along this section, bus terminal and enlarged connected to conventionally blasted tunnels in the and it will be necessary to realign the Østfold Line in Ekeberg Hill. A further two TBMs will be working in a order to achieve efficient train operation. car park. southerly direction toward Ski to be connected to a future cut and cover section. Within the station area itself, the new Ski Station is built with six tracks and three central platforms, The entire TBM tunnel constructions is accessed and a new pedestrian underpass, a new road bridge, supplied via two access tunnels at the rig area. All bus terminal and enlarged car park. Accessibility, four TBMs will be launched from assembly caverns efficient transport and integration into the urban now under construction at the bottom of these landscape are important factors to the Norwegian access tunnels. National Rail Administration. Together, the access tunnels cater for traffic to and from the main tunnel, as well as removal of excavated material by belt conveyors to the rig area. The tunnels are also important to secure air supply to the main tunnel. The assembly chambers for the TBMs will be reused as future rescue and evacuation facilities. 10 | THE FOLLO LINE PROJECT THE FOLLO LINE PROJECT | 11 Excavated materials – a resource During construction of the Follo Line, around 10-11 The main requirements are aimed at transport of So far the Rail Administration has signed one million tons of rock spoil will be removed within a the excavated material, noise protection during the contract with Società Italiana per Condotte d’ Acqua period of around 3-3.5 years.
Recommended publications
  • Upcoming Projects Infrastructure Construction Division About Bane NOR Bane NOR Is a State-Owned Company Respon- Sible for the National Railway Infrastructure
    1 Upcoming projects Infrastructure Construction Division About Bane NOR Bane NOR is a state-owned company respon- sible for the national railway infrastructure. Our mission is to ensure accessible railway infra- structure and efficient and user-friendly ser- vices, including the development of hubs and goods terminals. The company’s main responsible are: • Planning, development, administration, operation and maintenance of the national railway network • Traffic management • Administration and development of railway property Bane NOR has approximately 4,500 employees and the head office is based in Oslo, Norway. All plans and figures in this folder are preliminary and may be subject for change. 3 Never has more money been invested in Norwegian railway infrastructure. The InterCity rollout as described in this folder consists of several projects. These investments create great value for all travelers. In the coming years, departures will be more frequent, with reduced travel time within the InterCity operating area. We are living in an exciting and changing infrastructure environment, with a high activity level. Over the next three years Bane NOR plans to introduce contracts relating to a large number of mega projects to the market. Investment will continue until the InterCity rollout is completed as planned in 2034. Additionally, Bane NOR plans together with The Norwegian Public Roads Administration, to build a safer and faster rail and road system between Arna and Stanghelle on the Bergen Line (western part of Norway). We rely on close
    [Show full text]
  • Sydhavna (Sjursøya) – an Area with Increased Risk
    REPORT Sydhavna (Sjursøya) – an area with increased risk February 2014 Published by: Norwegian Directorate for Civil Protection (DSB) 2015 ISBN: 978-82-7768-350-8 (PDF) Graphic production: Erik Tanche Nilssen AS, Skien Sydhavna (Sjursøya) – an area with increased risk February 2014 CONTENTS Preface ............................................................................................................................................................................................................................................ 7 Summary ...................................................................................................................................................................................................................................... 8 01 Introduction ........................................................................................................................................................................................ 11 1.1 Mandat .............................................................................................................................................................................................. 12 1.2 Questions and scope ............................................................................................................................................................... 13 1.3 Organisation of the project ................................................................................................................................................. 13 1.4
    [Show full text]
  • Jernbaneverket
    On track in 2008 A brief look at the activities of Jernbaneverket Director General Elisabeth Enger is preparing for record railway investments and recruiting more and more young people to Jernbaneverket, the Norwegian National Rail Administration ALL ABoard! 155 years of Norwegian Contents railway history All aboard! 155 years of Norwegian railway history 2 1854 Norway’s first railway line opens, linking Kristiania As Jernbaneverket’s new Director General, I see a high level of commitment to Key figures 2 (now Oslo) with Eidsvoll. the railways – both among our employees and others. Many people would like 1890-1910 Railway lines totalling 1 419 km are built in Norway. All aboard! 3 to see increased investment in the railway, which is why the strong political will 1909 The Bergen line is completed at a cost equivalent to This is Jernbaneverket 4 the entire national budget. to achieve a more robust railway system is both gratifying and inspirational. 2008 in brief 6 1938 The Sørland line to Kristiansand opens. Increased demand for both passenger and freight transport is extremely positive Working for Jernbaneverket 8 1940-1945 The German occupation forces take control of NSB, because it is happening despite the fact that we have been unable to offer our Norwegian State Railways. Restrictions on fuel Construction 14 loyal customers the product they deserve. Higher funding levels are now providing consumption give the railway a near-monopoly on Secure wireless communication 18 transport. The railway network is extended by grounds for new optimism and – slowly but surely – we will improve quality, cut Think green – think train 20 450 km using prisoners of war as forced labour.
    [Show full text]
  • Project Portfolio Infrastructure Construction Division
    1 Project portfolio Infrastructure Construction Division www.banenor.no | 2019 3 We rely on close cooperation In the upcoming years there will be a large increase in About Bane NOR rail investments in Norway. As described in this folder the investments will be spread out on several projects. Bane NOR is a state-owned company respon- These investments create great value for all travelers. In the coming sible for the national railway infrastructure. Our years, departures will be more frequent, with reduced travel time mission is to ensure accessible railway infra- within the InterCity operating area. We are living in an exciting and Photo: Anne-Mette Storvik structure and efficient and user-friendly ser- changing infrastructure environment, with a high activity level. Over Einar Kilde vices, including the development of hubs and the next three years Bane NOR plans to introduce contracts relating goods terminals. to a large number of mega projects to the market. Investment will Executive Vice President continue until the InterCity rollout is completed as planned in 2034. Infrastructure Construction Division As of today, the Follo Line and Venjar-Langset are in production, The company’s main responsible are: and Sandvika-Moss-Såstad, Drammen-Kobbervikdalen and Ny- • Planning, development, administration, operation and kirke-Barkåker are out for tender. In 2019 and 2020 our plan is to maintenance of the national railway network • Traffic management start the pre-qualification process for Kleverud-Sørli-Åkersvika and • Administration and development of railway property The Ringerike Line and E16 highway. Additionally, Bane NOR plans together with The Norwegian Bane NOR has approximately 4,500 employees and the head office is Public Roads Administration, to build a safer and faster rail and road based in Oslo, Norway.
    [Show full text]
  • 3 the Follo Line Brussels Nov 19Th 2018 PD Borenstein Fin.Pdf
    Norwegian rail development: The Follo Line Project constructing the longest railway tunnel to date in the Nordic countries Project Director Per David Borenstein Brussels 19 November 2018 Lillehammer Moelv InterCity development 2018/2019 Brumunddal Hamar Stange Tangen • Planning • Completed sections Eidsvoll InterCity project background Oslo Lufthavn Hønefoss • Population growth in the eastern part of Norway Sundvollen • Increased demand for rail transport and Lillestrøm Sandvika Oslo S Lysaker more congestion in urban areas Asker Drammen • Good transport solutions needed to Ski help organize a well functioning housing & job market Sande • InterCity development will provide Holmestrand general development in the region Moss Horten Rygge Råde Sarpsborg Tønsberg Skien Stokke Fredrikstad Torp Porsgrunn Sandefjord Halden Larvik 22 km Åsland rig area Connection to Oslo D&B / D&S TBM: 18,5 km Open section and Central station 20 km tunnel Ski station The Follo Line Project – production from five rig areas Two large EPC contracts and several smaller contracts Oslo 11 min Ski The Follo Line: High speed line Oslo-Ski. 70 % of the project is executed (November 2018) Venjar-Langset Dovrebanen – en del av SectionInterCity Oslo Central Station • Kortere reisetid • 600 m tunnel under Oslo Medieval• Økt kapasitet Park for gods- og persontog • Archaeological excavations • ChallengingPlanlagt åpning ground 2023 conditions • Traffic to be considered to and from the busy central rail station Constructing a 600 meter culvert/tunnel to be extended under Oslo
    [Show full text]
  • Again and Again and Again Music As Site, Situation and Repetition
    Eivind Buene Again and Again and Again music as site, situation and repetition NordART The Arne Nordheim Centre for Artistic Research Eivind Buene Again and Again and Again music as site, situation and repetition Publications from The Arne Nordheim Centre for Artistic Research, vol. 2 NMH Publications 2017:7 Published by Norwegian Academy of Music NMH Publications 2017:7 © Norwegian Academy of Music and Eivind Buene Cover photo: Box Seats, RKO Hamilton Theatre. ISSNCopyright 0333-3760 2017 Matt Lambros. www.afterthefinalcurtain.net ISSN 2535-373X (elektroniske utgaver) ISBN 978-82-7853-216-4 ISBN 978-82-7853-231-7 (pdf) ISBN 978-82-7853-232-4 (ebok) Norwegian Academy of Music P.O. Box 5190 Majorstua 0302 OSLO Tel.: +47 23 36 70 00 E-mail: [email protected] nmh.no Print: 07 Media, www.07.no, 2018 Contents Introduction 5 Excavation, Exhumation, Autopsy 11 The Symphony Orchestra as Site Body and Site 29 Reading Kwon, thinking of Gould Brief Note on Repetition 46 Critical Music? 53 A spanner in the works Brief Note o n Infinite Endings 68 Delirious Brahms 71 Investigating the music chamber Brief note on Hacktivism 85 Posthumous Passions 89 A different perspective Brief Note on Transcription 98 ‘Smart critiques. Stupid creates’, Part 1 105 ‘Smart critiques. Stupid creates’, Part 2 114 ‘Smart critiques. Stupid creates’, Part3 123 Brief Note instead of a Conclusion 128 APPENDIX Works 133 Notes 134 Introduction Writing reflections Writing is not so much an activity that is ‘about’ or pursed alongside music, as it is a way of critically thinking, reinventing and experimenting with music.
    [Show full text]
  • Subsurface Exploration Methods for Soft Ground Rapid Transit Tunnels
    fft ATS 3H5 JUI 8 197S ORT NO. UMTA-MA-06-0025-76- Library /A SUBSURFACE EXPLORATION METHODS FOR SOFT GROUND RAP I D TRANSIT TUNNELS Volume I: Sections 1-6 and References Parsons, Bri nckerhof f , Qu'ade and Douglas 250 West 34th Street, New York NY 10001 Soil and Rock Instrumentation, Inc. 30 Tower Road, Newton Upper Falls MA 02164 it APRIL 1976 FINAL REPORT DOCUMENT IS AVAILABLE TO THE PUBLIC THROUGH THE NATIONAL TECHNICAL INFORMATION SERVICE, SPRINGFIELD, VIRGINIA 22161 Prepared for U.S. DEPARTMENT OF TRANSPORTATION URBAN MASS TRANSPORTATION ADMINISTRATION Office of Research and Development Washington DC 20590 . / NOTICE This document is disseminated under the sponsorship of the Department of Transportation in the interest of information exchange. The United States Govern- ment assumes no liability for its contents or use thereof NOTICE The United States Government does not endorse pro- ducts or manufacturers. Trade or manufacturers' names appear herein solely because they are con- sidered essential to the object of this report. I 1I.5 .A37 T5c -ttiUr/9 - no . Oo r- Technical Report Documentation Pag 76-3 1 . Report No. 2. Government Accession No. 3. Recipient s Catalog No. V. / UMTA-MA- 06-0025-76-1 4. Title and Subtitle 5. Report Date SUBSURFACE EXPLORATION METHODS FOR April 1976 SOFT GROUND RAPID TRANSIT TUNNELS 6. Performing Organization Code Volume I: Sections 1-6 and References 8. Performing Organization Report No. 7 . Autior's) Birger Schmidt,* Bruno Matarazzi,* Dunnicliff ** and Stephen Alsup** ’ DOT - TSC -UMTA- 7 6-3. C. John , 9. Per'orming Orgomzation Name and Address 10.
    [Show full text]
  • Norwegian Bergen Hosts World Cycling Championships American Story on Page 8 Volume 128, #19 • October 6, 2017 Est
    the Inside this issue: NORWEGIAN Bergen hosts World Cycling Championships american story on page 8 Volume 128, #19 • October 6, 2017 Est. May 17, 1889 • Formerly Norwegian American Weekly, Western Viking & Nordisk Tidende $3 USD Who were the Vikings? As science proves that some ancient warriors assumed to be men were actually women, Ted Birkedal provides an overview of historical evidence for real-life Lagerthas WHAT’S INSIDE? « Den sanne oppdagelsesreise Nyheter / News 2-3 TERJE BIRKEDAL består ikke i å finne nye Business 4-5 Anchorage, Alaska landskaper, men å se med Opinion 6-7 In the late 19th century a high-status Viking-era were buried with a sword, an axe, a spear, arrows, and nye øyne. » Sports 8-9 grave was excavated at Birka, Sweden. The grave goods a shield. The woman from Solør was also buried with a – Marcel Proust Research & Science 10 included a sword, an axe, a spear, a battle knife, several horse with a fine bridle. Another grave from Kaupang, armor-piercing arrows, and the remains of two shields. Norway, contained a woman seated in a small boat with Norwegian Heritage 11 Two horses were also buried with the grave’s inhabitant. an axe and a shield boss. Still another high-status grave Taste of Norway 12-13 Until 2014 the grave was thought to belong to a in Rogaland, Norway, turned up a woman with a sword Norway near you 14-15 man, but a forensic study of the skeleton in 2014 sug- at her side. Many other graves throughout Scandinavia Travel 16-17 gested that the buried person was a woman.
    [Show full text]
  • 14B Morten Sigvartsen Bane NOR Contract Strategy And
    Bane NOR contract strategy and future projects Morten Sigvardsen Head of Supplier Relations Oslo 13.11.18. Bane NOR SF – A state-owned enterprise 2 We create the railway of the future Strategic Direction for Bane NOR VISION NORWAY ON RAILS Europe’s safest railway More value for Customer first Future oriented money contributor to society Values Openminded, Respectful, Dedicated, Inovative Åpen Nytenkende Respektfull Engasjert 3 Five divisions with responsibility for each of their business line Infrastructure Infrastructure Traffic Operations Property Digitalisation Construction Management and Customer Management and Technology Services Planning and execution Operation, maintenance Operational traffic Management and Development and delivery of projects related to and investment projects management, operational development of the within digitalisation and construction of new related to improvement route planning, train properties of the technology for the whole infrastructure of the existing contractor agreements company company infrastructure and information to travellers 475 employees 850 employees 200 employees 600 employees 2.200 employees Unique growth in infrastructure development in Scandinavia NTP - Norway NTP - Sweden 100 100% 100 100% 90 90% 90 90% 80 80% 80 80% 70 70% 70 70% SEK NOK Bn Bn 60 60% 60 60% 50 50% 50 50% average average 40 40% 40 40% Relativ vekst Relativ vekst Relativ 30 30% 30 30% Yearly Yearly 20 20% 20 20% 10 10% 10 10% 0 0% 0 0% 2010-2019 2014-2023 2018-2029 2010-2021 2014-2025 2018-2029 ~Yearly spend Relative change from previous NTP ~Yearly spend Relative change from previous NTP 5 Source: National Transport plan in Norway, Proposal to national transport plan in Sweden.
    [Show full text]
  • Kleverud-Sørli-Åkersvika
    The Dovre Line: Kleverud-Sørli-Åkersvika Stine Ilebrekke Undrum Project Director Bane NOR Tender Conference June 5. 2019 Important HSE principles for Bane NOR • Safety always has first priority • Our safety culture shall ensure that we work systematically with safety to avoid human injury and environmental or material damages. − we adhere to the highest safety standards. − we understand and consider risk. − we have zero tolerance for breach of safety regulations • The Working Environment Act applies to EVERYONE working in Norway, both Norwegian and foreign nationals. − http://www.arbeidstilsynet.no/working-conditions-in- norway.html Everybody safely home 4 Infrastructure Construction Division Infrastrucure Construction Einar Kilde Project 2020 Plan & Portfolio Brede Nermoen Elsebeth A Bakke Finance & Communication projectcontrol Cecilie Melland Birger Steffensen Contract & Market Safety & Quality Henning Scheel Vigdis Bjørlo Technique & Concept HR Trude Anke Gry Jødestøl Folloline Ringerikeline/ E16 East (Østfoldline & West/Mid Vestfoldline New Oslo-tunnel Per David Morten Dovreline) Hans-Egil Larsen Lars A Tangerås Anne Siri Haugen Borenstein Klokkersveen Stine I Undrum 5 East – Østfold Line & Dovre Line Project director Stine Ilebrekke Undrum Dep. Projectcontrol Project director Tor-A Holst Larsen Per B Vilnes Communication HR TBN Arild Sæthre Contract & Safety & Quality strategy Bente Gamst Karin Kaasen Hornnæs Venjar – Langset Kleverud – Sørli – Planprojects Sandbukta – Moss Planprojects Rønnaug-Ingeborg Åkersvika Dovreline – Såstad
    [Show full text]
  • Activity Report 2019 Activity Reports 2019 ITA Is the Leading International Organization for 4 Albania Tunnelling and Underground Space
    ITA MEMBER NATION ACTIVITY REPORTS 2019 ITA MEMBER NATION MEMBER NATION ITA September 2020 ACTIVITY REPORTS 2019 ITA Member Nation Activity Reports 2019 1 20-08-18_011_ID20081_eAz_Brenner_ITA Activity Report_210x297_RZgp ITA MEMBER NATION ACTIVITY REPORTS 2019 BRENNER BASE TUNNEL, AUSTRIA – ITALY PUSHING LIMITS WITH VIGOROUS ENGINEERING The new brenner base tunnel represents a next level of trail blazing hard-rock-tunnelling. With a total length of 64 km and maximum overburdenHERRENKNECHT of 1,300 meters this high-impact project AD sets new records. Six project specific engineered Herrenknecht hard-rock-machines are involved in the hardest mission worldwide. Empowering our customers to push the limits. herrenknecht.com/bbt/ Contractors: 1 x Gripper TBM: Consortium H33 Tulfes-Pfons 3 x Double Shield TBM: Consortium Mules 2-3 2 x Single Shield TBM: Consortium H51 Pfons-Brenner 2 20-08-18_011_ID20081_eAz_Brenner_ITA Activity Report_210x297_RZgp.indd 1 18.08.20 10:34 ITA MEMBER NATION ACTIVITY REPORTS 2019 Contents Jinxiu (Jenny) Yan ITA President ITA President’s message for the ITA ITA MEMBER NATION Member Nations Activity Report 2019 Activity Reports 2019 ITA is the leading international organization for 4 Albania tunnelling and underground space. This position is dependent not only on the intensive worldwide 5 Argentina activities of the ITA itself, but also of its Member 6 Australia Nations with their leading positions in their respective countries. Over the past year, this has 9 Belarus been further consolidated via stronger communication and closer cooperation 10 Brazil between the ITA and its Member Nations, and also among the Member Nations 13 Bulgaria themselves. Issuing this print version of the yearly ITA Member Nations Activity report is one 13 Canada of the most effective ways to promote better communications within the ITA HERRENKNECHT AD 16 Chile family.
    [Show full text]
  • Analytical Model for Assessing Collapse Risk During Mountain Tunnel Construction Guo-Hua Zhang, Yu-Yong Jiao, Li-Biao Chen, Hao Wang, and Shu-Cai Li
    326 ARTICLE Analytical model for assessing collapse risk during mountain tunnel construction Guo-Hua Zhang, Yu-Yong Jiao, Li-Biao Chen, Hao Wang, and Shu-Cai Li Abstract: Risk management for safety in mountain tunnel construction is of great significance. However, existing research lags behind engineering applications. In this paper, the risk of mountain tunnel collapse is used as an example to illustrate a new assessment method based on case-based reasoning, advanced geological prediction, and rough set theory. First, the risk sur- roundings and risk factors involved in tunnel collapse are integrated and summarized, and a risk assessment index system is established for tunnel collapse. At the same time, because the dynamic response parameters obtained by the advanced geological prediction usually indicate a typical geological structure, sensitive response parameters are introduced in the assessment index system. Advanced risk assessment can be performed for tunnel sections at a certain distance ahead of the tunnel face. Second, the major risk surroundings and the advanced geological prediction results are analyzed for the tunnel under assessment. Cases with similar attribute characteristics are selected via comparison with previous cases. Attribute reduction and calculation of weights are subsequently performed for the risk surroundings and risk factors of similar cases based on the attribute signifi- cance theory of rough sets. Finally, index screening and objective weights are applied in the fuzzy comprehensive assessment model. The results of this paper can be used to improve the theoretical level and reliability of risk assessment in tunnel safety and serve as a reference for tunnel construction. Key words: mountain tunnel, case-based reasoning, advanced geological prediction, rough set, risk assessment.
    [Show full text]