Agecroft in Steam

Total Page:16

File Type:pdf, Size:1020Kb

Agecroft in Steam ( ?I ~- - - ~"~ _., -- ........... / -- . , ·--....., __ t) \ ,-- The 1960's saw a dramatic change m the use of The 'A' station system was abandoned early m steam locomotion in the North West of 1947 as construction of 'B' station cooling to Cl!Jton Junc1:c'n ) England. Within the short space of 8 years the towers severed the line. Between then and its QI✓ . familiar sight of a steam-hauled train closure the 'A' station received coal by road. {not all 1he rm,ways shown exi~ad al the some time vanished completely from British Rail. For a A Stallon .,:· :·, ,: ' _::' .·. ·-~ ·.. while steam continued to be used at some ·'..,·.'. _. 1, · ,_ c · ·n... c····. ~:·y···,--·· Reception Sidings industrial sites in Lancashire but now only II AG hopper Agecroft Power Station, near Manchester, .if •i•>,c': fp , ' . ,. Ill ·• continues the tradition. Three power stations (A, B and C ) have been A completely ne w coal handling system using developed on the Agecroft site smce 1925 and steam locomotives, was built on a separate each has used a rrnl system in its coal site· to se rve···•· both 'B ' and 'C' stations. A senes of handling. lines, approximately I mile lung, was coalslockmg construc ted running from the original gmundwilh ,:···. ~ ~ -c·,.' .-:B.ft. .,. ....:;: y ·:·:· conveyor to Agecroft Junc tion. The line passed crone lrack (standard gmrgel -.. ~~:: .. ·~&--... 2 loco sheds and fanned into wagon sidings ,,,. .-n:v ...' ... which converged lo pass through the tippler. .. .. A new conveyor was built to take the coal over . .. ... the British Rail line and the canal to the power The original 'A' statio,n used a 2' 6" gauge station. The section between Agecroft Road electrified railway to carry coal from the qnd Agecroft Junction provided a loop with delivery tippler to the power station. The line connections to British Rail. began in a loop at the tippler and ran over approximately ½ mile of track lo either a Two standard design outside cylinder 0-4-0 bucket/elevato r conveyor system feeding the saddle tanks were bought from Robert power station boilers or to the coal stocking Stephenson and Hawthorns in l 948 to operate yard. the system. The locos had brass nameplates • Agecroft I (7416) and Agecroft 2 (7485). They The locomotives were supplied by the Preston were stored al Magnesium Elektron Limited, Works of the English Electric Company Clifton Junction, sidings until the new sidmgs Limited. They had a strong outside boJJ: frame and conveyor we re brought into action in loaded with weights (needed to provide rail September 1950. The locos were transferred adhesion), a smallcab at the rear with a trolley 'dead' to Agecroft by goods train and were pole mounted on top and an open work lower turned to face north at the Agecroft LMS shed. at the front carrying a second pole . They were Ho wever the tippler arrangements made it fitted with dumb buffers and centre link desirable to increase driver VJsibility by couplings and normally pulled a load ol four turning one loco to face south, so Agecroft No.2 wagons, each containing 2½ tons of coal. again visited Agecroft Shed m May 195 l. ;t/'Station locomotives yi.,rds 0 Works numbers 691 'lt.1 694 200 400 Weigh• 4 t n..· Wheelbase 3 4 Wheel diameter l 4· Master c0n~roller Traction M tor,; n"' on e<rh axle Jnvu:g eSidings thr · n"' s n 11@ mri· ic-t· nn worm gear ~ Ut:i .:~Ll: ·. V ■ 1: -ffG .SH::i:.,. w1, n · p n, r ·1:er .·· Tt • • .. 1w Tracuve effnrt . 3~ ll-. r; ~t ,;1Jf !.1. 3 <1!".d ~rrp• HS N . c 1s n- ; r 1.. ~ .r,ly : ;.in in· t•, • • · ymi (at l hr. wtmg uil •r,.., r ·nr ·1 q 1 IJ a•: 1,s :ilw:iys ii: ; •re. • :.i,x1!'-: ~B.:\ 1 ITJ(t 1nd~,..- rt and 220 V'Jlts rlc ::•,• r..1ryw ::i ; • r; rir. s iu ,,.-N). ". r · i:. : tn,., s•a•. :. ui: p: .1. 1 J·r'. J Speed 5-6rr.ph r _1 u,;t8'i :is a :-:rr,,e r )O,; x• wh . l,'., !€'f.-n!ll • s· ','{ J ; ns IP br , ,! ' v:.:. , n:: r '1t..1r .r.;r r p(Lr.• Jre 2 .un· d tl :.<.11r.;1s by :p • tt.e> · lliery ~ u: • M1mmum Radi ,s Curv>:> ne ~ tl 1bl~ l"' ::. th<> pa : Wl ! •n,,, nv y r ) J ..: L In 1961, to cope with the mcreased coal Today locos collect full wagons from the south demand of 'C' station a direct conveyor link sidings and propel them to the two tipplers. was opened between the re-opened Agecrof; The tipplers are designed to deal with two Colliery and the power station taking the rakes of wagons simultaneously but in pressure off the rail system. Later that year, in practice wagons are pushed through one side anticipation of a reduced workload, a diesel only and emptied singly. Wagons are then locomotive (a Stephenson & Hawthorns 0-6-0, pushed to the north sidings and subsequently 7746 of 1954) was brought by low loader from hauled back to the south sidings to await Brom.borough Power Station. The locomotive collection by the BR loco brmging the next was fitted with a Crossley direct reversing six train of fulls. cylinder scavenge pump diesel engine, better suited to trip working locomotives than In 1977 the three locos were renumbered shunters. Operations involving shunting AG-I, AG-2 and AG-3 (by this time Nos. l and backwards and forwards were very time 2 had lost their nameplates). All three have consuming with this type of engine. At each recently been repainted and can look forward change of direction the engine had to be shut to a secure working future. off involving laborious starting and direction changing procedures. Having been found t/-~v:_·,.·/~R-·• u·-, ...: : --·u·:. 'JI . unsuitable for the work at Agecroft the diesel ~..,._.. _: 5 ;,_, . : ...........- .. ~ was transferred to Whitebirk Power Station at Basic maintenance and overhaul of the -AG-1- Blackbum in July 1963. Agecroft locos 1s carried out at the shed. Larger jobs are undertaken by outside A third Robert Stephenson & Hawthorns 14'' x With the re-opening of Agecroft Colliery, the contractors, as when No.3 had a new firebox 22" 0-4-0 saddle tank (7681 of 1951) was rail system south of Agecroft Road bridge was fitted in 1961 and when No.2 had some saddle obtained to give increased cover. 7681 was altered. The CEGB lines were connected and tank plates renewed at Houghs of Wigan and originally ordered for Bolton Power Station. incorporated into the new colliery sidings as a her wheels retyred elsewhere. However, the capstan system at Bolton was back-up delivery system in the event of still operating sahsfactonly so the loco was conveyor breakdo wn or maintenance. An Towards the end of 1972, Agecroft No.2 was transferred to Chadderton Power Station, experiment in 1971 to make Agecroft Colliery given a major overhaul mcluding the fitting of Oldham, in 1952. Bolton No . 1 arrived at the sole coal supply and to make all deliveries new piston rings, rebushing the piston rod Agecroft by goods tram in September 1954. It by conveyor was unsuccessful and the Board neck and glands, facing up the valves and was repainted unlined blue in November and reverted to the rail system to make up the fitting new metallic packmg to the valve rods. subsequently became known as Agecroft Agecroft shortfall from collieries in Yorkshire Jn addition the axle boxes were replated, the No.3. and Leigh. axle brasses built up, the reversing shaft refitted at the bearings and the brake linkage and hangers rebushed. 1J& 'C'Station locomotives A1ecr At Nos. i, 2 anJ 3 vi rks N)S. 7416 ~435 ard 7681 Cylinders ,4 x22' Wher,! diameter 3 G' Wheelbase :, 6" Heatings lrlace 621 sq.ft. Grate area 8.87sq.ft. Water capuc1ty 700g~lbns Coal capao!)' 17 cwt Work Pressure :65 lb sq.m.::h Weight 28t:,ns Tractive effort a! 85°'o workmg pressure ~4,400 :.b Co;o'.lr Green with black lnimg edged m re cl and yellow -AG-2- -AG-3- Typical winter day demand curve and how CEGB which carry electricity at 400,000 and been flowing mto our na tional gnd smce the CEGB might meet the demand 275,000 volts), its mid-voltage Imes are its Calder Hall was opened m 1956. ELIC·TRICl·rv A-roads and its low-voltage lines are its mmor roads (these are the lines operated by the Area In fact there are a lready eight CEGB 'magnox' IN ENGLAND Electricity Boards which serve industry. towns nuclear powe r stations in England and Wales and villages, and the home). and another four of a more advanced design ANDWAL!S (the' AGR') nearing = mp!etion. Soon nuclear The Central Electricity Generating Board 4 The National Grid is a lso used to even out power w ill supply one-fifth of all our electricity {CEGB) is the 'wholesaler' of the electricity supply; for example by send.mg surplus requu ements. supply industry. It makes, distributes and sells electricity from one part of the UK to another electricity in bulk to twelve independent Arna 3 part where there 1s exceptional demand. The North West Region of the CEGB has been Electricity Boards - the 'retailers· such as in the forefront of this nuclear power MANWEB and NORWEB - which supply 50 The demand for electricity varies widely p rogramme. The Region's first 'magnox' m illion customers. during any 24-ho ur period.
Recommended publications
  • SSA341 Agecroft Bro 14/1/10 11:43 Am Page 2 LAND DEVELOPMENT SERVICED of PLOTS FOUR for SALE from 1.43 - 11.40 Acres for SALE PARK COMMERCE AGECROFT
    SSA341 Agecroft Bro 14/1/10 11:43 am Page 2 AGECROFT AGECROFT ROAD | SALFORD COMMERCE PHASE PARK T L A A LLY S N H G E M L A E A R Y N E WA R R O W A Y A D Y 3 FORFOR SALESALE FOUR PLOTS OF SERVICED DEVELOPMENT LAND From 1.43 - 11.40 Acres (0.58 - 4.61 Hectares) SSA341 Agecroft Bro 14/1/10 11:43 am Page 3 AGECROFT AGECROFT COMMERCE COMMERCE PARK Agecroft Commerce Park is situated on the PARK site of the former Agecroft Colliery and is one of North West England’s success stories. The site which has been reclaimed by the North West Regional Development Agency A580 (NWDA) in association with English A666 Partnerships (National Coalfields Programme) is now the home to a large number of companies including Bunzl, Securicor, Nimans, Worthington Nicholls, The Juice Corporation and most recently PZ Cussons. AGECROFT RD Developers including Langtree, Priority Sites, Network Space and Scarborough have Plot 4 Plot 5 carried out successful schemes on previous Plot 2 Plot 3 phases of Agecroft Commerce Park. Plot 1 SOLD TO LAMPLIGHT PZ CUSSONS WAY BUNZL TALLYMAN WAY Description NIMANS NETWORK SECURICOR Phase 3 of Agecroft Commerce Park SPACE SQUIRREL comprises the last parcels of land of this STORAGE exciting Regeneration Project. The site infrastructure and services have all been installed. The site has been masterplanned to give a great deal of flexibility with individual plots ranging from 0.76 hectares (1.88 acres) to 4.44 hectares (10.98 acres).
    [Show full text]
  • Agecroft Power Stations Generated Together the Original Boiler Plant Had Reached 30 Years for 10 Years
    AGECROl?T POWER STATIONS 1924-1993 - About the author PETER HOOTON joined the electricity supply industry in 1950 at Agecroft A as a trainee. He stayed there until his retirement as maintenance service manager in 1991. Peter approached the brochure project in the same way that he approached work - with dedication and enthusiasm. The publication reflects his efforts. Acknowledgements MA1'/Y. members and ex members of staff have contributed to this history by providing technical information and their memories of past events In the long life of the station. Many of the tales provided much laughter but could not possibly be printed. To everyone who has provided informati.on and stories, my thanks. Thanks also to:. Tony Frankland, Salford Local History Library; Andrew Cross, Archivist; Alan Davies, Salford Mining Museum; Tony Glynn, journalist with Swinton & Pendlebury Journal; Bob Brooks, former station manager at Bold Power Station; Joan Jolly, secretary, Agecroft Power Station; Dick Coleman from WordPOWER; and - by no means least! - my wife Margaret for secretarial help and personal encouragement. Finally can I thank Mike Stanton for giving me lhe opportunity to spend many interesting hours talkin11 to coUcagues about a place that gave us years of employment. Peter Hooton 1 September 1993 References Brochure of the Official Opening of Agecroft Power Station, 25 September 1925; Salford Local History Library. Brochure for Agecroft B and C Stations, published by Central Electricity Generating Board; Salford Local Published by NationaJ Power, History Library. I September, 1993. Photographic albums of the construction of B and (' Edited and designed by WordPOWER, Stations; Salford Local Histo1y Libraty.
    [Show full text]
  • 01 STA Cover 2007
    15-28 STA Listings 2007 21/2/07 2:37 PM Page 15 THE SOURCE TESTING ASSOCIATION THE STA MEMBERSHIP 3M UK Aerosol Industrial Station Road, Coleshill ALcontrol On-Site Services Ian Clarkson Research Group Birmingham B46 1JY Trevor Worrall 3M Centre, Cain Road, Bracknell Cristina Gutiérrez-Cañas T: 0800 917 1313 Templeborough House, Mill Close Berkshire RG12 8HT Maria Diaz de Haro 68 F: 01675 467022 Rotherham, South Yorkshire T: 01344 857801 Bajo Pab 3-4-5, Portugalete [email protected] S60 1BZ [email protected] Bizakaia 48920, Spain www.uk.airliquide.com T: 01709 841028 www.mmm.com T: (+34) 944 723597 F: 01709 841079 F: (+34) 944 723604 Air Monitors [email protected] A-Plus Consulting [email protected] James Mills www.alcontrol.co.uk Graham Clarke www.aerosolirg.com Unit 2, The Hawthorns 35 Holmesdale Road, Dronfield Pillows Green Road, Staunton Derbyshire S18 2FA AES Gloucestershire GL19 3NY T: 01246 410256 Mark Elliott T: 01452 849111 [email protected] Northumberland Dock Road F: 01452 849112 Wallsend, Tyne & Wear NE28 0QD [email protected] T: 0191 2968500 www.airmonitors.co.uk Anchem Laboratories F: 0191 2968560 Gethyn Jones [email protected] Air Products Unit 5a, Darcy Business Park www.aes-labs.co.uk Dr Gary Yates Darcy Way, Llandarcy, Neath 2 Millennium Gate, Westmere Drive SA10 6EJ ABB AES Kilroot Power Crewe, Cheshire CW1 6AP T: 01792 323223 John Kelly Stephen Fleming T: 01270 614227 F: 01792 323236 Hortonwood 37, Telford, Shropshire Larne Road, Carrickfergus F: 01932 258622 [email protected]
    [Show full text]
  • Exploring Greater Manchester
    Exploring Greater Manchester a fieldwork guide Web edition edited by Paul Hindle Original printed edition (1998) edited by Ann Gardiner, Paul Hindle, John McKendrick and Chris Perkins Exploring Greater Manchester 5 5. Urban floodplains and slopes: the human impact on the environment in the built-up area Ian Douglas University of Manchester [email protected] A. The River Mersey STOP 1: Millgate Lane, Didsbury The urban development of Manchester has modified From East Didsbury station and the junction of the A34 runoff to rivers (see Figure 1), producing changes in and A5145, proceed south along Parrs Wood Road and into flood behaviour, which have required expensive remedial Millgate Lane, Stop at the bridge over the floodbasin inlet measures, particularly, the embankment of the Mersey from channel at Grid Reference (GR) 844896 (a car can be turned Stockport to Ashton weir near Urmston. In this embanked round at the playing fields car park further on). Looking reach, runoff from the urban areas includes natural channels, south from here the inlet channel from the banks of the storm drains and overflows from combined sewers. Mersey can be seen. At flood times the gates of the weir on Alternative temporary storages for floodwaters involve the Mersey embankment can be opened to release water into release of waters to floodplain areas as in the Didsbury flood the Didsbury flood basin that lies to the north. Here, and at basin and flood storage of water in Sale and Chorlton water other sites along the Mersey, evidence of multi-purpose use parks. This excursion examines the reach of the Mersey from of the floodplain, for recreation and wildlife conservation as Didsbury to Urmston.
    [Show full text]
  • Chapter 2 the Historical Background
    CHAPTER 2 THE HISTORICAL BACKGROUND 1 5 I GEOGRAPHICAL AND CLIMATIC FOUNDATIONS As an area of historical study the Greater milder climate, by comparison both with the Manchester County has the disadvantage of being moors and with other westerly facing parts of without an history of its own. Created by Act Britain. Opening as they do on to what is, of Parliament a little over ten years ago, it climatically speaking, an inland sea, they joins together many areas with distinct avoid much of the torrential downpours brought histories arising from the underlying by Atlantic winds to the South West of England. geographical variations within its boundaries. At the same time the hills give protection from the snow bearing easterlies. The lowland areas The Greater Manchester County is the are fertile, and consist largely of glacial administrative counterpart of 20th century deposits. urban development which has masked the diversity of old pre-industrial southeast In the northwest of the Greater Manchester Lancashire and northeast Cheshire. County the plain rises around Wigan and Standish. For centuries the broad terraced The area has three dominant geographic valley of the Rivers Mersey and Irwell, which characteristics: the moorlands; the plains; and drains the plain, has been an important barrier the rivers, most notably the Mersey/Irwell to travel because of its mosses. Now the system. region's richest farmland, these areas of moss were largely waste until the early 19th century, when they were drained and reclaimed. The central area of Greater Manchester County, which includes the major part of the The barrier of the Mersey meant that for conurbation, is an eastward extension of the centuries northeast Cheshire developed .quite Lancashire Plain, known as the 'Manchester separately from southeast Lancashire, and it Embayment1 because it lies, like a bay, between was not until the twenties and thirties that high land to the north and east.
    [Show full text]
  • 2008 Corporate Responsibility Report Centrica Plc Corporate Responsibility Report 2008
    2008 Corporate responsibility report Centrica plc Corporate responsibility report 2008 www.centrica.com/cr08 Contents 3 Chief Executive’s introduction 4 Assurance and scope 5 Excerpt from Corporate Citizenship’s Assurance Statement 6 2008 Highlights 7 Business overview 8 Our approach 14 CR Committee and Governance 17 Business principles 22 Key Performance Indicators 25 Key impact areas 26 Climate change and the environment 44 Customer service 56 Securing future energy supplies 64 Health and safety 72 Employees 83 Supply chain 87 Local impact 92 Our stakeholders 94 Customers 97 Investors 99 Employees 101 Suppliers and business partners 103 Governments and regulators 105 Communities 107 NGOs and consumer organisations 109 Media 110 Trade unions 111 Appendix – Memberships 2 Centrica plc Corporate responsibility report 2008 www.centrica.com/cr08 Chief Executive’s introduction Introduction from Sam Laidlaw 2008 was my first full year as a member of the Corporate Responsibility Committee. Throughout the year, the Committee challenged our current performance and debated areas of future activity across a range of critical business issues. Through this continual process of improvement, I have confidence that we are making good progress in developing the necessary structures and processes, allied to a management commitment that will build a sustainable and environmentally aware business for the future. In this report, you can read about our initiatives and performance over the year, as well as our forward- looking plans for 2009 and beyond. As our CR programmes mature, there is an increasing amount of available information to present to our internal and external audiences. As in previous years, we have chosen to use the online environment to report.
    [Show full text]
  • Walk 3 in Between
    The Salford Trail is a new, long distance walk of about 50 public transport miles/80 kilometres and entirely within the boundaries The new way to find direct bus services to where you of the City of Salford. The route is varied, going through want to go is the Route Explorer. rural areas and green spaces, with a little road walking walk 3 in between. Starting from the cityscape of Salford Quays, tfgm.com/route-explorer the Trail passes beside rivers and canals, through country Access it wherever you are. parks, fields, woods and moss lands. It uses footpaths, tracks and disused railway lines known as ‘loop lines’. Start of walk The Trail circles around to pass through Kersal, Agecroft, Bus Number 92, 93, 95 Walkden, Boothstown and Worsley before heading off to Bus stop location Littleton Road Post Office Chat Moss. The Trail returns to Salford Quays from the historic Barton swing bridge and aqueduct. During the walk Bus Number 484 Blackleach Country Park Bus stop location Agecroft Road 5 3 Clifton Country Park End of walk 4 Walkden Roe Green Bus Number 8, 22 5 miles/8 km, about 2.5 hours Kersal Bus stop location Manchester Road, St Annes’s church 2 Vale 6 Worsley 7 Eccles Chat 1 more information Moss 8 Barton For information on any changes in the route please Swing Salford 9 Bridge Quays go to visitsalford.info/thesalfordtrail kersal to clifton Little Woolden 10 For background on the local history that you will This walk follows the River Irwell upstream Moss as it meanders through woodland and Irlam come across on the trail or for information on wildlife please go to thesalfordtrail.btck.co.uk open spaces to a large country park.
    [Show full text]
  • Proposed Response to the North West Coast Connections Route Corridor Consultation – Appendix 1
    PROPOSED RESPONSE TO THE NORTH WEST COAST CONNECTIONS ROUTE CORRIDOR CONSULTATION – APPENDIX 1 PURPOSE OF APPENDIX The purpose of this Appendix is to set out the proposed response of SLDC to the National Grid North West Coast Connections Route Corridor Consultation 1 General comments 1.1 SLDC broadly supports the preferred option – Onshore South with Tunnel. 1.2 The preferred option includes a tunnel under Morecambe Bay from close to Heysham to the Rampside area and then broadly follows the existing 132kV Electricity North West power line northwards through the Furness peninsula to Broughton in Furness and then up the West Coast of Cumbria, much of which will be removed and replaced by a smaller number of larger 400kV pylons. 1.3 The preferred option, in the main, avoids the significant impacts to South Lakeland communities that would be incurred if other alternative options, such as Onshore South, were implemented. 1.4 However, SLDC’s support for the preferred option is subject to consideration of the remaining concerns and needs for mitigation detailed below. 2 Section H1 (South eastern Furness) 2.1 The preferred tunnel route is proposed to surface slightly inland in the area between Roosebeck and Rampside. SLDC considers that locating the convertor stations at the points where the cable surfaces as close to the existing energy infrastructure at Roosecote Power Station as possible (as indicated by the larger blue hatched polygon in the consultation material) would indeed be preferable. It would have the least impact on social, environmental and economic factors, including landscape, impacts on local communities and tourism.
    [Show full text]
  • Roosecote (Barrow)
    DEVELOPMENT CONTROL AND REGULATIONS COMMITTEE 02 October 2012 A Report by the Assistant Director Planning and Sustainability _____________________________________________________________________________ Reference No: EN010044 Applicant: Centrica RPS Limited, Maidenhead Road, Windsor, Berkshire, SL4 5GB District: Barrow Borough Council ______________________________________________________________________ Proposal: To consider a joint Cumbria County Council/Barrow Borough Council Local Impact Report relating to an application for a Development Consent Order (DCO) to enable the applicant to construct and operate a new Biomass electricity generating station with a nominal capacity of 90MW, together with a number of associated developments Location: Land at Roosecote, Barrow-in-Furness ______________________________________________________________________ 1.0 RECOMMENDATION 1.1 To approve the joint Cumbria County Council/Barrow Borough Council prepared Local Impact Report, as set out in Annex A, and to refer it to Cabinet and for Cabinet to make representation about whether the Council supports the proposal or not, taking account the Local Impact Report agreed by DC&R. 2.0 BACKGROUND 2.1 On the 3 rd July 2012, Centrica RPS Limited submitted an application for a Development Consent Order (DCO) to the National Infrastructure Directorate (Planning Inspectorate) to build and operate a 90MW (gross)/80MW (Net) biomass electricity generating power station on land at Roosecote, Barrow-in-Furness. 2.2 As the biomass facility is an on-shore electricity generating station having a capacity of more than 50MW, it is deemed a Nationally Significant Infrastructure Project (NSIP) within the definition contained in Sections 14 & 15 of the Planning Act 2008, as amended. The application for the DCO will therefore be determined by the Secretary of State, via the National Infrastructure Directorate (Planning Inspectorate).
    [Show full text]
  • Cotton Mills for the Continent
    cotton mills_klartext.qxd 30.05.2005 9:11 Uhr Seite 1 Cotton mills for the continent Sidney Stott und der englische Spinnereibau in Münsterland und Twente Sidney Stott en de Engelse spinnerijen in Munsterland en Twente 1 cotton mills_klartext.qxd 30.05.2005 9:11 Uhr Seite 2 Cotton mills for the continent Bildnachweis/Verantwoording Sidney Stott und der englische Spinnereibau in afbeldingen Münsterland und Twente – Sidney Stott en de Engelse spinnerijen in Munsterland en Twente Andreas Oehlke, Rheine: 6, 47, 110, 138 Archiv Manz, Stuttgard: 130, 131, 132l Herausgegeben von/Uitgegeven door Axel Föhl, Rheinisches Amt für Denkmalpflege, Arnold Lassotta, Andreas Oehlke, Siebe Rossel, Brauweiler: 7, 8, 9 Axel Föhl und Manfred Hamm: Industriegeschichte Hermann Josef Stenkamp und Ronald Stenvert des Textils: 119 Westfälisches Industriemuseum, Beltman Architekten en Ingenieurs BV, Enschede: Dortmund 2005 111, 112, 127oben, 128 Fischer: Besteming Semarang: 23u, 25lo Redaktion/Redactie Duncan Gurr and Julian Hunt: The cotton mills of Oldham: 37, 81r Hermann Josef Stenkamp Eduard Westerhoff: 56, 57 Hans-Joachim Isecke, TECCON Ingenieurtechnik, Zugleich Begleitpublikation zur Ausstel- Stuhr: 86 lung/Tevens publicatie bij de tentoonstelling John A. Ledeboer: Spinnerij Oosterveld: 100 des Westfälischen Industriemuseums John Lang: Who was Sir Philip Stott?: 40 Museum Jannink, Enschede: 19, 98 – Textilmuseum Bocholt, Museum voor Industriële Acheologie en Textiel, des Museums Jannink in Enschede Gent: 16oben und des Textilmuseums Rheine Ortschronik (Stadtarchiv) Rüti: 110 Peter Heckhuis, Rheine: 67u, 137 Publikation und Ausstellung ermöglichten/ Privatbesitz: 15, 25u, 26u, 30, 31, 46, 65, 66, 67oben, 83oben, 87oben, 88u, 88r, 90, 92, 125l Publicatie en tentoonstelling werden Rheinisches Industriemuseum, Schauplatz Ratingen: mogelijk gemaakt door 11, 17 Europäische Union Ronald Stenvert: 26r, 39r, 97, 113oben, 113r, 114, 125r, Westfälisches Industriemuseum 126 Kulturforum Rheine Roger N.
    [Show full text]
  • Distribution Network Review
    A DISTRIBUTION NETWORK REVIEW ETSU K/EL/00188/REP Contractor P B Power Merz & McLellan Division PREPARED BY R J Fairbairn D Maunder P Kenyon The work described in this report was carried out under contract as part of the New and Renewable Energy Programme, managed by the Energy Technology Support Unit (ETSU) on behalf of the Department of Trade and Industry. The views and judgements expressed in this report are those of the contractor and do not necessarily reflect those of ETSU or the Department of Trade and Industry.__________ First published 1999 © Crown copyright 1999 Page iii 1. EXECUTIVE SUMMARY.........................................................................................................................1.1 2. INTRODUCTION.......................................................................................................................................2.1 3. BACKGROUND.........................................................................................................................................3.1 3.1 Description of the existing electricity supply system in England , Scotland and Wales ...3.1 3.2 Summary of PES Licence conditions relating to the connection of embedded generation 3.5 3.3 Summary of conditions required to be met by an embedded generator .................................3.10 3.4 The effect of the Review of Electricity Trading Arrangements (RETA)..............................3.11 4. THE ABILITY OF THE UK DISTRIBUTION NETWORKS TO ACCEPT EMBEDDED GENERATION...................................................................................................................................................4.1
    [Show full text]
  • Industry Background
    Appendix 2.2: Industry background Contents Page Introduction ................................................................................................................ 1 Evolution of major market participants ....................................................................... 1 The Six Large Energy Firms ....................................................................................... 3 Gas producers other than Centrica .......................................................................... 35 Mid-tier independent generator company profiles .................................................... 35 The mid-tier energy suppliers ................................................................................... 40 Introduction 1. This appendix contains information about the following participants in the energy market in Great Britain (GB): (a) The Six Large Energy Firms – Centrica, EDF Energy, E.ON, RWE, Scottish Power (Iberdrola), and SSE. (b) The mid-tier electricity generators – Drax, ENGIE (formerly GDF Suez), Intergen and ESB International. (c) The mid-tier energy suppliers – Co-operative (Co-op) Energy, First Utility, Ovo Energy and Utility Warehouse. Evolution of major market participants 2. Below is a chart showing the development of retail supply businesses of the Six Large Energy Firms: A2.2-1 Figure 1: Development of the UK retail supply businesses of the Six Large Energy Firms Pre-liberalisation Liberalisation 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
    [Show full text]