THE LONDON GAZETTE, 26Ra FEBRUARY 1993 3629

Total Page:16

File Type:pdf, Size:1020Kb

THE LONDON GAZETTE, 26Ra FEBRUARY 1993 3629 THE LONDON GAZETTE, 26ra FEBRUARY 1993 3629 Traffic will be diverted through Stratford St. Mary via the Ipswich Order made in 1981 which imposed a 24 hour clearway on the A3 slip Road, Lower Street, Upper Street, and vice versa. road at Cannonball Corner would be revoked. Any vehicle being used in connection with the said works or for Copies of the draft Order, of plans illustrating the proposal, of the police, fire or ambulance purposes will be exempt from the Orders to be amended and revoked and a statement of the reasons restriction contained in the Order. for making the Order may be inspected during office hours at the T. Nash, a Higher Executive Officer in the Department of offices of Hampshire County Council, The Castle, Winchester and Transport, Eastern Regional Office, Heron House, 49-53 East Hampshire District Council, Penns Place, Petersfield; during Goldington Road, Bedford MK40 3LL. (795) opening hours at those of Bramshott and Liphook Parish Council, Bohunt Centre, Longmoor Road, Liphook and at the Horndean Post Office, Portsmouth Road, Horndean. ROAD TRAFFIC REGULATION ACT 1984-SECTION 6 Any person desiring to object to the Secretary of State's proposal should send, not later than 19th March 1993, a written statement of The A23 Trunk Road (Streatham High Road. Lambeth) (Box his or her objection and of the grounds thereof to the Director, South Junction) Order 1993 East Network Management Division, Department of Transport, Senet House, Station Road, Dorking, Surrey RH41HJ, quoting the The Secretary of State for Transport hereby gives notice that on ref. MSB 5057/A3/0/41/2/1. 22nd February 1993 he made the above-named Order, the effect of which will be to prohibit the driving of any vehicle into the boxed S. D. Norton, a Senior Executive Officer, South East Network area to be placed on the carriageway at the junction of Streatham Management Division, Department of Transport, Dorking, High Road (A23), Mitcham Lane (A216), Tooting Bee Gardens and Surrey. (798) Gleneldon Road, unless (subject to certain exceptions) the vehicle can be driven out of the area immediately. The Order will come into force on 8th March 1993. A copy of the Order and a plan which illustrates its provisions ROAD TRAFFIC REGULATION ACT 1984 have been deposited at the offices of the Department of Transport, The Trunk Road (A41) (Tring Road, Northchurch) (40 m.p.h. Room C8/17,2 Marsham Street, London SW1P 3EB, at the offices Speed Limit) Order 1993 of Parkman Consulting Engineers, 19 Queen Anne's Gate, London SW1H 9BU and at Streatham Library, 63 Streatham High Road, The Secretary of State for Transport hereby gives notice that he has London SW16 1PL, where they may be inspected between 9.30 a.m. made an Order under section 84(1) and (2) of the Road Traffic and 4 p.m. Mondays to Fridays inclusive until 2nd April 1993. Regulation Act 1984, the effect of the Order which comes into force Any person wishing to question the validity of the Order or of any on 28th February 1993, will be that no person shall drive any motor of its provisions on the ground that it is not within the relevant vehicle at a speed exceeding 40 m.p.h. on that length of the Trunk powers of the Road Traffic Regulation Act 1984 or that a Road (A41) known as Tring Road in Northchurch, Hertfordshire, requirement of that Act or of any relevant regulations made from a point 36 metres north-west of its junction with Hamberlins thereunder has not been complied with may, within 6 weeks of the Lane, to a point 26 metres north-west of its junction with Lyme date on which the Order was made, make application for the purpose Avenue (a distance of approximately 443 metres). to the High Court. Any person who desires to question the validity of or of any provision contained in, the Order, on the ground that it is not within A. M. Robertson, a Senior Executive Officer, London Regional the powers with respect to the Order conferred by the above Act, or Office, 2 Marsham Street, London SW1P 3EB. (796) on the ground that any requirement, of, or of any Instrument made under, any provision of that Act has not been complied with in relation to the Order, may, before 11th April 1993 or within 6 weeks ROAD TRAFFIC REGULATION ACT 1984 of the date of publication of this Order, whichever is the later, apply to the High Court for the suspension or quashing of the Order or of The A483 Trunk Road (Wrexham Road, Eccleston, Chester) any provision contained therein. (Prohibition of Use of Gap in Central Reservation) Order 1993 A copy of the Order, may be inspected during office hours at the Notice is hereby given that the Secretary of State for Transport offices of Hertfordshire County Council, Goldings, North Road, proposes to make an Order under sections 1 and 2 of the Road Hertford SG14 2PY; Dacorum Borough Council, Civic Centre, Traffic Regulation Act 1984 on the A483 Trunk Road, Wrexham Marlowes, Hemel Hempstead, Hertfordshire HP11HH; or obtained Road at Eccleston, in the City of Chester, in the county of Cheshire. by application to the Director, Network Management Division, The effect of the Order will be to close the gap in the central Department of Transport, Eastern Regional Office, Heron House, reservation of the A483 Trunk Road, Wrexham Road, opposite its 49-53 Goldington Road, Bedford MK40 3LL, quoting ref. junction with Rough Hill (Balderton Lane) (C208). 505928/1/A41/03. A copy of the draft Order with a plan illustrating the proposal and G. Kidd, a Higher Executive Officer in the Department of a statement of reasons may be inspected during normal working Transport. (788) hours at the offices of the Cheshire County Council, County Legal and Member Services, Room 273, County Hall, Chester. Anyone wishing to object to the proposals should write to the HIGHWAYS ACT 1980 Department of Transport, North West Network Management Division, Sunley Tower, Piccadilly Plaza, Manchester Ml 4BE, The M25 Motorway (Brickfield Lane Bridge, Sevenoaks) Side quoting the ref. TNW 5046/41/7/A483(T)/01 by 19th March 1993. Roads Order 1993 /. Maker, Deputy Director, North West Network Management The Secretary of State for Transport hereby gives notice that he has Division, Department of Transport. made an Order under sections 18 and 125 of the Highways Act 1980, 3rd February 1993. (797) in relation to the M25 Motorway at Sevenoaks in the county of Kent. The Order is entitled The M25 Motorway (Brickfield Lane Bridge, Sevenoaks) Side Roads Order 1993 and it: ROAD TRAFFIC REGULATION ACT 1984 (1) authorises him to: (a) stop-up a highway, The A3 Trunk Road (Bramshott to Homdean and Sheet Link) (24 (b) construct a new highway, and Hours Clearway) Order 199 (c) provide a new means of access to premises, The Secretary of State hereby gives notice that he proposes to make all in the vicinity of the route of the Motorway mentioned an Order under sections 1(1), 2(1) and (2) and 4(1) of the Road above; and Traffic Regulation Act 1984 on the A3 Trunk Road in the county of Hampshire (2) provides for the transfer of the new highway to the Kent The effect of the Order would be to impose a 24 hours clearway on County Council as highway authority from the date on which the A3 in Hampshire from its junction with the county boundary of he notifies them that it is open for use. Surrey to its junction with the A3(M) in Horndean and including the Copies of the Order and the plan referred to in it have been section known as the A3 Spur (Sheet Link). Ths 24 hours clearway deposited and are available for inspection, free of charge, at all would also apply to all the slip roads leading to and from the A3 in reasonable hours at the Department of Transport, Room S3/04, Hampshire. An Order made in 1968, and amended in 1969 and 1980, 2 Marsham Street, London SW1P 3EB; and at the Department's imposed a 24 hours clearway on lengths of the A3 in Surrey, South East Network Management Division, Senet House, Station Hampshire and West Sussex. That Order would be amended to Road, Dorking, Surrey RH4 1HJ; and at the offices of Kent County exclude the lengths of the A3 in Hampshire and West Sussex, and the Council, Highways and Transportation Department, Springfield,.
Recommended publications
  • The M25 Motorway (Junctions 19, 22 and 23) and the A40
    THE M25 MOTORWAY (JUNCTIONS 19, 22 AND 23) AND THE A40 TRUNK ROAD (DENHAM ROUNDABOUT) TEMPORARY OVERNIGHT LINK/SLIP ROAD CLOSURES Notice is hereby given that Highways England Company Limited(a) intends to make an Order on the M25 Motorway and the A40 Trunk Road, in the Counties of Buckinghamshire and Hertfordshire, under section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order would be to authorise the overnight closure of the following: (a) the link roads leading to and from the M25 at Junction 19 (A41/A411); (b)the slip road leading to the clockwise carriageway of the M25 at Junction 22 (A1081); (c) the slip roads leading from the clockwise carriageway and to the anti-clockwise carriageway of the M25 at Junction 23 (A1/A1(M) Junction 1); (d)the slip road leading from the westbound carriageway of the A40 to Denham roundabout (A4020/A412) at M40 Junction 1. These measures would be in the interests of road safety while contractors undertake cyclic maintenance and/or urgent repair work. It is expected that the work would take place for approximately 1 - 2 nights for each closure every 2 months between 22:00 and 05:30 on Monday – Thursday nights, 23:00 and 06:00 on Friday nights, 22:00 and 06:00 on Saturday nights and 22:30 and 05:30 on Sunday nights. The Order would come into force on 16 April 2017 and have a maximum duration of twelve months.
    [Show full text]
  • Greater London Fund for the Blind Annual
    Company number: 03693002 Charity number: 1074958 Greater London Fund for the Blind Report and financial statements For the year ended 31 March 2018 *A7KMSSOS* A18 12/12/2018 ¹301 COMPANIES HOUSE SAYER V I NC ENT OOOOO OOOOOOO 0 0 0 0 0 0 0 0 0 0 0 0 Greater London Fund for the Blind Contents For the year ended 31 March 2018 Reference and administrative information . Trustees' annual report . Independent auditor's report . 11 Consolidated statement of financial activities (incorporating income and expenditure account) ... 15 Balance sheets ......................................................""""""." . 16 Consolidated statement of cash flows . 17 Notes to the financial statements . 18 Greater London Fund for the Blind Reference and administrative information For the year ended 31 March 2018 Company number 03693002 Charity number 1074958 Registered office and operational address Sir John Mills House 12 Whitehorse Mews 37 Westminster Bridge Road London SE1 7QD Country of registration England & Wales Country of incorporation United Kingdom Trustees The Trustees, who are also directors under company law, who served during the year and up to the date of this report were as follows: Anna Tylor* —Chair Charles Colquhoun* (Resigned 5 December 2018) Keith Felton* Harry Harris Bob Hughes (Appointed 29 October 2018) James Matthews (Appointed 12 July 2017) Raj Mehta* Sharon Petrie (Appointed 12 May 2017) Frans Pettinga (Resigned 6 July 2017) Daniel Stewart-Smith (Resigned 29 July 2018) *Members of Finance, Audit and Risk Committee Key management
    [Show full text]
  • Units to Let/For Sale from 3,175-46,393 Sq Ft
    EDGINGTON WAY | SIDCUP | KENT | DA14 5NH UNITS TO LET/FOR SALE www.klingerindustrialpark.co.uk FROM 3,175-46,393 SQ FT A NEW DEVELOPMENT OF WAREHOUSE/INDUSTRIAL/TRADE COUNTER UNITS A20 SIDCUP BYPASS ROAD A20 B&Q PROPOSED CAR DEALERSHIP JAGUAR A 2 2 COSTA 3 TESCO E D G I N BOOKER G www.klingerindustrialpark.co.uk T O N W COCA COLA A Y EDMUNDSON ELECTRICAL HOWDENS A 2 2 3 SELCO SCREWFIX ALSFORD TIMBER BP TOYOTA LEXUS Minimum clear height of 8 metres TO LET/ EDGINGTON WAY Generous yard and car parking provisions FOR SALE 1 full height loading door per unit AVAILABLE Q3 2017 Floor loading of 37.5 kN/sq m 2b 2a Ability to combine units 1 First floor mezzanine - can be fitted as offices or used as storage UNDER OFFER 3 Excellent access to A20, M25 and Central London 4 5 Images of similar Chancerygate schemes 6 Warehouse 1st Floor Total sq ft (sq m) Car parking 17 .6m Unit 1 UNDER OFFER Unit 2a 3,175 - 3,175 (295) 7 Unit 2b 3,175 - 3,175 (295) 7 16 m Unit 3 11,248 2,174 13,423 (1,247) 14 Unit 4 9,795 1,916 11,711 (1,088) 12 10 9 Unit 5 8,719 1,701 10,420 (968) 12 8 Unit 6 9,203 1,636 10,839 (1,007) 12 7 Unit 7 5,328 1,485 6,813 (633) 8 11 Unit 8 4,575 1,270 5,845 (543) 7 12 Unit 9 4,844 1,346 6,190 (575) 8 Planning use 13 Unit 10 4,844 1,335 6,179 (574) 8 B1 (c), B2, B8 and Unit 11 7,912 2,099 10,011 (930) 12 Trade Counter.
    [Show full text]
  • The M1 Motorway (Junctions 5 – 6A
    THE M1 MOTORWAY(JUNCTIONS 5–6A) TEMPORARYOVERNIGHT CLOSURES Notice is hereby given that Highways England Company Limited(a) intends to make an Order on the M1 Motorway,inthe County of Hertfordshire, under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works areproposed to be executed on the road. The effect of the Order would be to authorise the overnight closureofthe following – (a) the slip roads leading to and from both carriageways of the M1 at Junction 5(A41, A4008); (b) the slip roads leading to and from both carriageways of the M1 at Junction 6(A405); and (c) the link road leading from the southbound carriageway of the M1 at Junction 6A to both carriageways of the M25 at Junction 21. These measures would be in the interest of road safety to enable contractors to undertake cyclical maintenance work. It is expected that the work would take place for approximately 1-2nights for each closureat(a) –(c) above every two months at the following times: Monday-Thursday nights 22:00 –05:30 Friday nights 23:00 –06:00 Saturday nights 22:00 –06:00 Sunday nights 22:30 –05:30 The Order would come into force on 1August2017 and have amaximum duration of twelve months. During the closures outlined above, traffic affected would be diverted using other junctions of the M1, the A41, the A405 and the A410. The slip road closures, link road closureand diversion routes would be clearly indicated by traffic signs throughout the works periods. MTaylor, an official of Highways England Company Limited Ref: HA/M1/35/3/1894 (a)Registered in England and Wales under company no.
    [Show full text]
  • Road Investment Strategy M25 Junction 25 Improvements
    Road Investment Strategy M25 Junction 25 Improvements Environmental Study Report October 2016 v2.1, 25 October 2016 Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ Highways England Company Limited registered in England and Wales number 09346363 M25 Junction 25 Improvements: Environmental Study Report Notice This document and its contents have been prepared and are intended solely for Highway England’s information and use in relation to the M25 Junction 25 Improvements Environmental Study Report. Atkins Ltd assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. Document control The Project Manager is responsible for production of this document, based on the contributions made by his/her team existing at each Stage. Document Title M25 Junction 25 Improvements: Environmental Study Report Author Sarah Wallis Owner Piotr Grabowiecki Distribution Highways England Reviewers, Atkins Team Document Status Draft Revision History This document is updated at least every stage. Version Date Description Author 1.0 08/08/16 First Draft Sarah Wallis / Neil Watson 2.0 03/10/16 Second Draft Sarah Wallis / Neil Watson 2.1 25/10/16 Final Draft Sarah Wallis / Neil Watson Reviewer List Name Role Alison Braham Technical Review - Environmental Nicole Pulici Atkins Project Manager Henry Penner Highways England PTS Environmental Advisor Piotr Grabowiecki, Eze Onah, Highways England Integrated Project Team Andrew Salmon Approvals The Project SRO is accountable for the content of this document Name Signature Title Date of Issue Version Andrew Salmon Highways England Project SRO Working on behalf of i M25 Junction 25 Improvements: Environmental Study Report Table of contents Glossary ...................................................................................................................
    [Show full text]
  • The Regional Impact of the Channel Tunnel Throughout the Community
    -©fine Channel Tunnel s throughpdrth^Çpmmunity European Commission European Union Regional Policy and Cohesion Regional development studies The regional impact of the Channel Tunnel throughout the Community European Commission Already published in the series Regional development studies 01 — Demographic evolution in European regions (Demeter 2015) 02 — Socioeconomic situation and development of the regions in the neighbouring countries of the Community in Central and Eastern Europe 03 — Les politiques régionales dans l'opinion publique 04 — Urbanization and the functions of cities in the European Community 05 — The economic and social impact of reductions in defence spending and military forces on the regions of the Community 06 — New location factors for mobile investment in Europe 07 — Trade and foreign investment in the Community regions: the impact of economic reform in Central and Eastern Europe 08 — Estudio prospectivo de las regiones atlánticas — Europa 2000 Study of prospects in the Atlantic regions — Europe 2000 Étude prospective des régions atlantiques — Europe 2000 09 — Financial engineering techniques applying to regions eligible under Objectives 1, 2 and 5b 10 — Interregional and cross-border cooperation in Europe 11 — Estudio prospectivo de las regiones del Mediterráneo Oeste Évolution prospective des régions de la Méditerranée - Ouest Evoluzione delle prospettive delle regioni del Mediterraneo occidentale 12 — Valeur ajoutée et ingénierie du développement local 13 — The Nordic countries — what impact on planning and development
    [Show full text]
  • M1 Motorway (Junctions 1-3), M25
    M1 MOTORWAY(JUNCTIONS 1-3), M25 MOTORWAYJUNCTION 23, AND A1 TRUNK ROAD TEMPORARYTRAFFIC RESTRICTIONS Notice is hereby given that Highways England Company Limited intends to make an Order on the M25 Motorway in the County of Hertfordshire and the London Boroughs of Barnet and Hendon, under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order would be to authorise the overnight closure, in phases, of:- a) the entirecirculatory carriageway of the roundabout at M25 Junction 23 (A1(M)/A1); b) the roads leading to and from both carriageways of the M25 at Junction 23 (A1(M) Junction 1/A1); c) the roads leading to and from both carriageways of the A1(M)/A1 at Junction 23 (A1(M) Junction 1/A1); d) the southbound carriageway of the A1 between Bignell’sCorner (M25 Junction 23) and Borehamwood Interchange (A5135); e) the road leading from the southbound carriageway of the A1 at Borehamwood Interchange (A5135); f) the northbound carriageway of the M1 between Junction 1(A406) and the tip of the nosing of the entry slip road at Junction 3 (London Gateway Services); g) the road leading to the northbound carriageway of the M1 at Junction 1(A406); h) the road connecting to the M1 northbound entry slip road from the eastbound road connecting the EdgwareRoad roundabout to Staples Corner roundabout at Junction 1 (A406); i) theroads connecting to and from both carriageways of the M1 at Junction 2(A1); and j) all of the roads leading to and from both carriageways of the M1 at London Gateway Services.
    [Show full text]
  • Predicting Accident Frequency at Their Severity Levels and Its Application in Site Ranking Using a Two-Stage Mixed Multivariate Model
    Loughborough University Institutional Repository Predicting accident frequency at their severity levels and its application in site ranking using a two-stage mixed multivariate model This item was submitted to Loughborough University's Institutional Repository by the/an author. Citation: WANG, C., QUDDUS, M.A. and ISON, S.G., Predicting accident frequency at their severity levels and its application in site ranking using a two-stage mixed multivariate model. Accident Analysis and Prevention, 43(6), pp.1979-1990 Metadata Record: https://dspace.lboro.ac.uk/2134/8702 Version: Accepted for publication Publisher: c Elsevier Please cite the published version. This item was submitted to Loughborough’s Institutional Repository (https://dspace.lboro.ac.uk/) by the author and is made available under the following Creative Commons Licence conditions. For the full text of this licence, please go to: http://creativecommons.org/licenses/by-nc-nd/2.5/ 1 Predicting accident frequency at their severity levels and its application in site ranking using a two-stage mixed multivariate model Chao Wang*, Mohammed A Quddus, Stephen G Ison Transport Studies Group Department of Civil and Building Engineering Loughborough University Loughborough, Leicestershire LE11 3TU United Kingdom * Corresponding author – Tel: +44 (0)1509 564682; Fax: +44 (0)1509 223981. Email addresses: [email protected] (Chao Wang); [email protected] (Mohammed A Quddus); [email protected] (Stephen G Ison). Abstract Accident prediction models (APMs) have been extensively used in site ranking with the objective of identifying accident hotspots. Previously this has been achieved by using a univariate count data or a multivariate count data model (e.g.
    [Show full text]
  • M25 London Orbital with Astucia Studs Layout 1
    CASE STUDY M25 LONDON ORBITAL WITH ASTUCIA STUDS Case Study Guiding the way on the M25 London Orbital PROJECT DETAILS Motorway DATE OF INSTALLATION 2009 Astucia is helping to improve driving conditions on the M25 LOCATION Motorway in Surrey, with the installation of approximately M25, Surrey, United Kingdom 4,500 Astucia SolarLite Road Studs. APPLICATION Astucia SolarLite Flush Road Studs BACKGROUND The M25 Motorway around London is one of the world’s longest orbital routes, covering 117 miles. The M25 is also one KEY BENEFITS of the busiest motorways in Europe being used by approximately 250,000 vehicles each day. Much of the 10x greater visibility for drivers motorway utilises street lighting to enhance driver visibility, than traditional reflective road however a number of junctions do not currently have lighting studs which increases driver safety risk due to restricted night time visibility. Excellent visibility in adverse Installing additional street lighting sites is an expensive exercise, with ever increasing weather e.g. fog, rain or surface costs of ongoing energy provision and environmental impact. It has been reported spray that electricity costs to power street lighting on motorways and ‘A’ roads in the UK Highlights sharp bends, dips in 1 was estimated at £15 million a year in 2009 . the road and other hazardous approaches Effective additional driver safety SOLUTION when used in conjunction with street light reduction schemes A recent project by Mouchel, a leading infrastructure and business services group has been designed to help improve driver visibility on a 6 mile unlit stretch of the M25 motorway between Junction 6 and the Clacket Lane Services.
    [Show full text]
  • Stephen Ison and Jon Shaw
    PARKING ISSUES AND POLICIES TRANSPORT AND SUSTAINABILITY Series Editors: Stephen Ison and Jon Shaw Recent Volumes: Volume 1: Cycling and Sustainability Volume 2: Transport and Climate Change Volume 3: Sustainable Transport for Chinese Cities Volume 4: Sustainable Aviation Futures TRANSPORT AND SUSTAINABILITY VOLUME 5 PARKING ISSUES AND POLICIES EDITED BY STEPHEN ISON Transport Studies Group, Loughborough University, UK CORINNE MULLEY Institute of Transport and Logistics Studies, The University of Sydney Business School, Sydney, Australia United Kingdom À North America À Japan India À Malaysia À China Emerald Group Publishing Limited Howard House, Wagon Lane, Bingley BD16 1WA, UK First edition 2014 Copyright r 2014 Emerald Group Publishing Limited Reprints and permission service Contact: [email protected] No part of this book may be reproduced, stored in a retrieval system, transmitted in any form or by any means electronic, mechanical, photocopying, recording or otherwise without either the prior written permission of the publisher or a licence permitting restricted copying issued in the UK by The Copyright Licensing Agency and in the USA by The Copyright Clearance Center. Any opinions expressed in the chapters are those of the authors. Whilst Emerald makes every effort to ensure the quality and accuracy of its content, Emerald makes no representation implied or otherwise, as to the chapters’ suitability and application and disclaims any warranties, express or implied, to their use. British Library Cataloguing in Publication Data A catalogue record for this book is available from the British Library ISBN: 978-1-78350-919-5 ISSN: 2044-9941 (Series) ISOQAR certified Management System, awarded to Emerald for adherence to Environmental standard ISO 14001:2004.
    [Show full text]
  • Theale’S Premier Business Park 1 Minute from M4 Junction 12
    THEALE I READING I M4 JUNCTION 12 3,966 SQ FT OF FULLY FITTED GRADE A OFFICES TO LET EXCELLENT PARKING RATIO www.watersidedrive.co.uk THEALE’S PREMIER BUSINESS PARK 1 MINUTE FROM M4 JUNCTION 12 02 03 Bristol 18 5 min Theale High Street min walk walk 1 min drive M4 Junction 12 A4 Newbury A4 Reading London 10 min walk Arlington Business Park Theale Station Walk to: Theale High Street 5 minutes Theale Rail Station 10 minutes Calcot Retail Park 18 minutes Drive to: M4 junction 12 1 minute The Park Waterside Drive offers your staff the perfect blend of environment, location, and access to amenities. Current office layout GROUND FLOOR LANDSCAPED EXCELLENT UNPARALLELED Waterside Drive is set within landscaped grounds OFFICES ENVIRONMENT COMMUNICATIONS WORKFORCE with a stunning lake backdrop and is at the forefront Waterside Drive is a collection of three Waterside Drive stands at the front of From Waterside Drive it is only a few Reading has one of the most productive of Arlington Business Park. Waterside Drive is highly refurbished office buildings providing a 200 acre business park and benefits minutes walk to Theale station which workforces in the country. Combined prominent to the A4 and situated at Junction 12 contemporary Grade A accommodation from inspiring landscaped grounds all has direct trains to London Paddington with exceptional living standards, it’s of the M4, providing exceptional road transport at the front of Arlington Business Park. centred around a striking lake. Whether in 43 minutes. With bus services on not surprising that 13 of the world’s top The ground floor suite of THREE is the it’s for a lunchtime stroll, a park run or its doorstep and a prime position just 30 companies have headquarters in links across the country.
    [Show full text]
  • Celebrating 30 Years of Serving the Uk's Drivers
    CELEBRATING 30 YEARS OF SERVING THE UK’S DRIVERS PROJECT: M25 Motorway CITY/REGION: London COUNTRY: United Kingdom Above: The start of the M25 I woul KEY FACTS Application: Asphalt surfacing Product Family: Shell Cariphalte Contractor: Reigate Hill Benefits: Durable Reliability Capable of handling heavy traffic 1 CELEBRATING 30 YEARS OF David recalls this exciting project and SERVING THE UK’S DRIVERS shares some insight around its design The M25, a highly recognisable feature of with us England’s capital as Wembley’s arch, the London Eye or Tower Bridge are, has “The M25 is carrying far, far more celebrated 30 years of operation in 2016. vehicles than it was initially designed to cope with. While that’s the case for most Officially opened by Prime Minister Margaret roads in the UK, it’s especially true of the Thatcher on October 29, 1986, the 117-mile M25. And, because of this increased stretch of road has catered to the needs of demand, Shell is constantly seeking to millions of commuters, holiday-goers and create advanced products to help keep hauliers for over three decades, allowing them the road in good condition. to avoid the narrow streets of London. “I remember one project that we carried out on the M25 with particular clarity. It Spanning five counties – Kent, Surrey, was during the late ‘90s, and there was Buckinghamshire, Hertfordshire and Essex – and encircling all of Greater London (with the some maintenance work being carried exception of North Ockendon), it is Europe's out on Reigate Hill, which is a relatively second longest orbital road.
    [Show full text]