Traffic Regulation Act 1984, S

Total Page:16

File Type:pdf, Size:1020Kb

Traffic Regulation Act 1984, S 1012 THE LONDON GAZETTE FRIDAY 17 JANUARY 2014 SUPPLEMENT No. 1 The M180 Motorway (Junction 2 to Junction 3) The M25 Motorway (Junctions 27 to 30) (Variable (Temporary Restriction and Prohibition of Traffic) Speed Limits) Regulations 2013 No. 2013/3166. - Order 2013 No. 2013/3255. - Enabling power: Road Enabling power: Road Traffic Regulation Act 1984, s. 17 Traffic Regulation Act 1984, s. 14 (1) (a) & S.I. (2) (3). - Issued: 18.12.2013. Made: 11.12.2013. Laid: 1982/1163, reg. 16 (2). - Issued: 27.12.2013. Made: 16.12.2013. Coming into force: 20.01.2014. Effect: None. 19.12.2013. Coming into force: 05.01.2014. Effect: None. Territorial extent & classification: E. Local. - 8p.: 30 cm. - Territorial extent & classification: E. Local. - Available at 978-0-11-110733-1 £4.00 http://www.legislation.gov.uk/uksi/2013/3255/contents/ma de Non-print Road traffic, Wales: Traffic regulation The M180 Motorway (Junction 3) (Temporary Prohibition of Traffic) Order 2013 No. 2013/3069. - The A40 Trunk Road (Chapel Farm Over-Bridge, Near Enabling power: Road Traffic Regulation Act 1984, s. 14 Monmouth, Monmouthshire) (Temporary Prohibition (1) (a). - Issued: 09.12.2013. Made: 28.11.2013. Coming of Vehicles) Order 2013 No. 2013/2899 (W.278). - into force: 07.12.2013. Effect: None. Territorial extent & Enabling power: Road Traffic Regulation Act 1984, s. 14 classification: E. Local. - Available at (1) (4). - Issued: 19.12.2013. Made: 12.11.2013. Coming http://www.legislation.gov.uk/uksi/2013/3069/contents/ma into force: 18.11.2013. Effect: None. Territorial extent & de Non-print classification: W. Local. - This appeared on daily list 227, The M180 Motorway (Midmoor to Broughton) and the with an issue date of 14.11.2013 in error. - Available at M181 Motorway (Frodingham Grange Roundabout to http://www.legislation.gov.uk/wsi/2013/2899/contents/mad Midmoor) (Temporary Prohibition of Traffic) Order e. - In English and Welsh. Welsh title: Gorchymyn 2013 No. 2013/3098. - Enabling power: Road Traffic Cefnffordd yr A40 (Trosbont Chapel Farm, Ger Trefynwy, Regulation Act 1984, s. 14 (1) (a). - Issued: 10.12.2013. Sir Fynwy) (Gwahardd Cerbydau Dros Dro) 2013 Made: 02.12.2013. Coming into force: 03.12.2013. Effect: Non-print None. Territorial extent & classification: E. Local. - The A55 Trunk Road (Conwy Tunnel, Conwy) Available at (Temporary Traffic Prohibitions and Restrictions) (No http://www.legislation.gov.uk/uksi/2013/3098/contents/ma 2) Order 2013 No. 2013/3238 (W.318). - Enabling power: de Non-print Road Traffic Regulation Act 1984, s. 14 (1) (4) (7). - The M180 Motorway (North Ings Interchange to Issued: 24.12.2013. Made: 20.12.2013. Coming into force: Junction 1) (Temporary Restriction and Prohibition of 03.01.2014. Effect: None. Territorial extent & Traffic) (No.2) Order 2013 No. 2013/3082. - Enabling classification: W. Local. - Available at power: Road Traffic Regulation Act 1984, s. 14 (1) (a) & http://www.legislation.gov.uk/wsi/2013/3238/contents/mad S.I. 1982/1163, reg. 16 (2). - Issued: 09.12.2013. Made: e. - In English and Welsh. Welsh title: Gorchymyn 28.11.2013. Coming into force: 08.12.2013. Effect: None. Cefnffordd yr A55 (Twnnel Conwy, Conwy) Territorial extent & classification: E. Local. - Available at (Gwaharddiadau a Chyfyngiadau Traffig Dros Dro) (Rhif http://www.legislation.gov.uk/uksi/2013/3082/contents/ma 2) 2013 Non-print de Non-print The A55 Trunk Road (Penmaenbach Tunnel, Conwy The M602 Motorway (Junction 1 - 3 Eastbound and County Borough) (Temporary Traffic Restrictions & Westbound Carriageway and Slip Roads) and the M60 Prohibitions) (No.2) Order 2013 No. 2013/3257 Motorway (Junction 12 Anticlockwise Links to the M62 (W.319). - Enabling power: Road Traffic Regulation Act Westbound and M602 Eastbound) (Temporary 1984, s. 14 (1) (4) (7). - Issued: 27.12.2013. Made: Prohibition of Traffic) Order 2013 No. 2013/3099. - 23.12.2013. Coming into force: 03.01.2014. Effect: None. Enabling power: Road Traffic Regulation Act 1984, s. 14 Territorial extent & classification: W. Local. - Available at (1) (a). - Issued: 10.12.2013. Made: 04.12.2013. Coming http://www.legislation.gov.uk/wsi/2013/3257/contents/mad into force: 08.12.2013. Effect: None. Territorial extent & e. - In English and Welsh. Welsh title:Gorchymyn classification: E. Local. - Available at Cefnffordd yr A55 (Twnnel Penmaen-bach, Bwrdeistref http://www.legislation.gov.uk/uksi/2013/3099/contents/ma Sirol Conwy) (Cyfyngiadau a Gwaharddiadau Traffig Dros de Non-print Dro) (Rhif 2) 2013 Non-print The A458 Trunk Road (Buttington River Bridge, Nr. Road traffic, England: Special roads Welshpool, Powys) (Temporary Prohibition of Vehicles) Order 2013 No. 2013/2900 (W.279). - Enabling The M25 Motorway (Junctions 16 to 23) (Variable power: Road Traffic Regulation Act 1984, s. 14 (1) (4). - Speed Limits) Regulations 2013 No. 2013/3167. - Issued: 19.11.2013. Made: 11.11.2013. Coming into force: Enabling power: Road Traffic Regulation Act 1984, s. 17 16.11.2013. Effect: None. Territorial extent & (2) (3). - Issued: 18.12.2013. Made: 11.12.2013. Laid: classification: W. Local. - This appeared on daily list 227, 16.12.2013. Coming into force: 20.01.2014. Effect: None. with an issue date of 14.11.2013 in error. - Available at Territorial extent & classification: E. Local. - 8p.: 30 cm. - http://www.legislation.gov.uk/wsi/2013/2900/contents/mad 978-0-11-110734-8 £4.00 e. - In English and Welsh. Welsh title: Gorchymyn Cefnffordd yr A458 (Pont Afon Tal-y-bont, Ger Y Trallwng, Powys) (Gwahardd Cerbydau Dros Dro) 2013 Non-print Road traffic, England: Special roads.
Recommended publications
  • The M25 Motorway (Junctions 19, 22 and 23) and the A40
    THE M25 MOTORWAY (JUNCTIONS 19, 22 AND 23) AND THE A40 TRUNK ROAD (DENHAM ROUNDABOUT) TEMPORARY OVERNIGHT LINK/SLIP ROAD CLOSURES Notice is hereby given that Highways England Company Limited(a) intends to make an Order on the M25 Motorway and the A40 Trunk Road, in the Counties of Buckinghamshire and Hertfordshire, under section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order would be to authorise the overnight closure of the following: (a) the link roads leading to and from the M25 at Junction 19 (A41/A411); (b)the slip road leading to the clockwise carriageway of the M25 at Junction 22 (A1081); (c) the slip roads leading from the clockwise carriageway and to the anti-clockwise carriageway of the M25 at Junction 23 (A1/A1(M) Junction 1); (d)the slip road leading from the westbound carriageway of the A40 to Denham roundabout (A4020/A412) at M40 Junction 1. These measures would be in the interests of road safety while contractors undertake cyclic maintenance and/or urgent repair work. It is expected that the work would take place for approximately 1 - 2 nights for each closure every 2 months between 22:00 and 05:30 on Monday – Thursday nights, 23:00 and 06:00 on Friday nights, 22:00 and 06:00 on Saturday nights and 22:30 and 05:30 on Sunday nights. The Order would come into force on 16 April 2017 and have a maximum duration of twelve months.
    [Show full text]
  • Greater London Fund for the Blind Annual
    Company number: 03693002 Charity number: 1074958 Greater London Fund for the Blind Report and financial statements For the year ended 31 March 2018 *A7KMSSOS* A18 12/12/2018 ¹301 COMPANIES HOUSE SAYER V I NC ENT OOOOO OOOOOOO 0 0 0 0 0 0 0 0 0 0 0 0 Greater London Fund for the Blind Contents For the year ended 31 March 2018 Reference and administrative information . Trustees' annual report . Independent auditor's report . 11 Consolidated statement of financial activities (incorporating income and expenditure account) ... 15 Balance sheets ......................................................""""""." . 16 Consolidated statement of cash flows . 17 Notes to the financial statements . 18 Greater London Fund for the Blind Reference and administrative information For the year ended 31 March 2018 Company number 03693002 Charity number 1074958 Registered office and operational address Sir John Mills House 12 Whitehorse Mews 37 Westminster Bridge Road London SE1 7QD Country of registration England & Wales Country of incorporation United Kingdom Trustees The Trustees, who are also directors under company law, who served during the year and up to the date of this report were as follows: Anna Tylor* —Chair Charles Colquhoun* (Resigned 5 December 2018) Keith Felton* Harry Harris Bob Hughes (Appointed 29 October 2018) James Matthews (Appointed 12 July 2017) Raj Mehta* Sharon Petrie (Appointed 12 May 2017) Frans Pettinga (Resigned 6 July 2017) Daniel Stewart-Smith (Resigned 29 July 2018) *Members of Finance, Audit and Risk Committee Key management
    [Show full text]
  • Former British Sugar Factory Site, Scawby Road, Brigg
    FORMER BRITISH SUGAR FACTORY SITE, SCAWBY ROAD, BRIGG, NORTH LINCOLNSHIRE, DN20 9LT LAND FOR SALE 42.06 Ha (103.93 ACRES) PICTURE FOR INDENIFICATION PURPOSES ONLY Chartered Surveyors & Commercial Property Consultants LOCATION SUMMARY Located off the A18 Scawby Road Strategic development opportunity approximately one mile west of Brigg town Total approx. 42.06 Ha (103.93 Acres) centre in the County of North Lincolnshire. Available as a whole or in part The property occupies a strategic location Approx. 5.26 Ha (13 Acres) already sold close to Junction 4 of the M180 motorway for a new Biomass Power Station which is located approximately four miles to Centrica Power Station adjacent the west and provides access to Grimsby and Would suit a variety of uses (STP) Immingham Docks to the east, with Hull to the north, Scunthorpe to the west and Lincoln to ACCOMMODATION the south via the A15. Available as a whole or in part. Ha Acres TOTAL APPROX. 42.06 103.93 TERMS £5,000,000 for the Freehold plus VAT, if applicable for the whole. Please speak to the agents regarding smaller parcels. RATES The property will need to be assessed for business rates purposes. Interested parties are advised to seek advice FOR IDENTIFICATION PURPOSES ONLY from the Valuation Office. CONTACTS DESCRIPTION The subject land comprises the former British Duncan Willey Sugar Factory Site. Approx 5.26 ha (13 acres) 01724 294946 has already been sold to Eco2 for a new 07710 344602 [email protected] Biomass Power Station which has recently been constructed. The Centrica Power Station is also situated adjacent.
    [Show full text]
  • Units, Roxby Road Industrial Estate, Winterton, Scunthorpe, North
    UNITS, ROXBY ROAD INDUSTRIAL ESTATE, WINTERTON, SCUNTHORPE, NORTH LINCOLNSHIRE, DN15 9SX INDUSTRIAL TO LET FROM 48.03 SQ M (517 SQ FT) Chartered Surveyors & Commercial Property Consultants LOCATION SUMMARY LEASE TERM Winterton is located midway between the Humber Bridge and Modern industrial units from approx. 48.03 sq m (517 sq The units are available on new effective full repairing and the town of Scunthorpe along the A1077 trunk road. The site ft) on established industrial estate. insuring leases for a term to be agreed by negotiation. is situated approximately 6 miles North of the junction with Popular location with easy access to Scunthorpe and the Humber Bridge. the M181 motorway which links directly onto Junction 3 of Available for immediate occupation and suitable for a REPAIRS AND INSURANCE the M180 motorway and the rest of the motorway network. wide range of uses. The Tenant will be responsible for all repairs and decorations to the demised premises together with the reimbursement of The site is situated adjacent to the A1077 located to the West See Schedule of Availability. the property insurance premium applicable thereto of the village centre in a predominantly residential location. ACCOMMODATION The property provides the following approximate accommodation SERVICE CHARGE which has been measured on a gross internal area basis in The tenants will be responsible for a proportion of landlord’s accordance with the RICS Code of Measuring Practice. costs incurred in the repair, maintenance and cleaning of all common areas of the development including management of Sq m Sq ft the same. Further details on the service charge are available Unit 1A 70 753 from the agents.
    [Show full text]
  • Housing and Employment Land Allocations Development Plan Document | 1 Contents
    Contents CONTENTS 1 INTRODUCTION ..................................................................................................................................................................................................................................3 Examining Local Plans ..................................................................................................................................................3 The wider context and background to the document .......................................................................................................4 Key principles in the planning system .............................................................................................................................5 2 PRESUMPTION IN FAVOUR OF SUSTAINABLE DEVELOPMENT .........................................................................................................................................................7 3 HOUSING LAND ALLOCATIONS ..........................................................................................................................................................................................................9 Housing Site Selection Methodology ...........................................................................................................................10 Policy H1 Phasing of Housing Land .............................................................................................................................13 SCUH-1 Land at Phoenix Parkway Phase 1 (36-40) .......................................................................................................16
    [Show full text]
  • Units to Let/For Sale from 3,175-46,393 Sq Ft
    EDGINGTON WAY | SIDCUP | KENT | DA14 5NH UNITS TO LET/FOR SALE www.klingerindustrialpark.co.uk FROM 3,175-46,393 SQ FT A NEW DEVELOPMENT OF WAREHOUSE/INDUSTRIAL/TRADE COUNTER UNITS A20 SIDCUP BYPASS ROAD A20 B&Q PROPOSED CAR DEALERSHIP JAGUAR A 2 2 COSTA 3 TESCO E D G I N BOOKER G www.klingerindustrialpark.co.uk T O N W COCA COLA A Y EDMUNDSON ELECTRICAL HOWDENS A 2 2 3 SELCO SCREWFIX ALSFORD TIMBER BP TOYOTA LEXUS Minimum clear height of 8 metres TO LET/ EDGINGTON WAY Generous yard and car parking provisions FOR SALE 1 full height loading door per unit AVAILABLE Q3 2017 Floor loading of 37.5 kN/sq m 2b 2a Ability to combine units 1 First floor mezzanine - can be fitted as offices or used as storage UNDER OFFER 3 Excellent access to A20, M25 and Central London 4 5 Images of similar Chancerygate schemes 6 Warehouse 1st Floor Total sq ft (sq m) Car parking 17 .6m Unit 1 UNDER OFFER Unit 2a 3,175 - 3,175 (295) 7 Unit 2b 3,175 - 3,175 (295) 7 16 m Unit 3 11,248 2,174 13,423 (1,247) 14 Unit 4 9,795 1,916 11,711 (1,088) 12 10 9 Unit 5 8,719 1,701 10,420 (968) 12 8 Unit 6 9,203 1,636 10,839 (1,007) 12 7 Unit 7 5,328 1,485 6,813 (633) 8 11 Unit 8 4,575 1,270 5,845 (543) 7 12 Unit 9 4,844 1,346 6,190 (575) 8 Planning use 13 Unit 10 4,844 1,335 6,179 (574) 8 B1 (c), B2, B8 and Unit 11 7,912 2,099 10,011 (930) 12 Trade Counter.
    [Show full text]
  • The M1 Motorway (Junctions 5 – 6A
    THE M1 MOTORWAY(JUNCTIONS 5–6A) TEMPORARYOVERNIGHT CLOSURES Notice is hereby given that Highways England Company Limited(a) intends to make an Order on the M1 Motorway,inthe County of Hertfordshire, under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works areproposed to be executed on the road. The effect of the Order would be to authorise the overnight closureofthe following – (a) the slip roads leading to and from both carriageways of the M1 at Junction 5(A41, A4008); (b) the slip roads leading to and from both carriageways of the M1 at Junction 6(A405); and (c) the link road leading from the southbound carriageway of the M1 at Junction 6A to both carriageways of the M25 at Junction 21. These measures would be in the interest of road safety to enable contractors to undertake cyclical maintenance work. It is expected that the work would take place for approximately 1-2nights for each closureat(a) –(c) above every two months at the following times: Monday-Thursday nights 22:00 –05:30 Friday nights 23:00 –06:00 Saturday nights 22:00 –06:00 Sunday nights 22:30 –05:30 The Order would come into force on 1August2017 and have amaximum duration of twelve months. During the closures outlined above, traffic affected would be diverted using other junctions of the M1, the A41, the A405 and the A410. The slip road closures, link road closureand diversion routes would be clearly indicated by traffic signs throughout the works periods. MTaylor, an official of Highways England Company Limited Ref: HA/M1/35/3/1894 (a)Registered in England and Wales under company no.
    [Show full text]
  • Road Investment Strategy M25 Junction 25 Improvements
    Road Investment Strategy M25 Junction 25 Improvements Environmental Study Report October 2016 v2.1, 25 October 2016 Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ Highways England Company Limited registered in England and Wales number 09346363 M25 Junction 25 Improvements: Environmental Study Report Notice This document and its contents have been prepared and are intended solely for Highway England’s information and use in relation to the M25 Junction 25 Improvements Environmental Study Report. Atkins Ltd assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. Document control The Project Manager is responsible for production of this document, based on the contributions made by his/her team existing at each Stage. Document Title M25 Junction 25 Improvements: Environmental Study Report Author Sarah Wallis Owner Piotr Grabowiecki Distribution Highways England Reviewers, Atkins Team Document Status Draft Revision History This document is updated at least every stage. Version Date Description Author 1.0 08/08/16 First Draft Sarah Wallis / Neil Watson 2.0 03/10/16 Second Draft Sarah Wallis / Neil Watson 2.1 25/10/16 Final Draft Sarah Wallis / Neil Watson Reviewer List Name Role Alison Braham Technical Review - Environmental Nicole Pulici Atkins Project Manager Henry Penner Highways England PTS Environmental Advisor Piotr Grabowiecki, Eze Onah, Highways England Integrated Project Team Andrew Salmon Approvals The Project SRO is accountable for the content of this document Name Signature Title Date of Issue Version Andrew Salmon Highways England Project SRO Working on behalf of i M25 Junction 25 Improvements: Environmental Study Report Table of contents Glossary ...................................................................................................................
    [Show full text]
  • The Regional Impact of the Channel Tunnel Throughout the Community
    -©fine Channel Tunnel s throughpdrth^Çpmmunity European Commission European Union Regional Policy and Cohesion Regional development studies The regional impact of the Channel Tunnel throughout the Community European Commission Already published in the series Regional development studies 01 — Demographic evolution in European regions (Demeter 2015) 02 — Socioeconomic situation and development of the regions in the neighbouring countries of the Community in Central and Eastern Europe 03 — Les politiques régionales dans l'opinion publique 04 — Urbanization and the functions of cities in the European Community 05 — The economic and social impact of reductions in defence spending and military forces on the regions of the Community 06 — New location factors for mobile investment in Europe 07 — Trade and foreign investment in the Community regions: the impact of economic reform in Central and Eastern Europe 08 — Estudio prospectivo de las regiones atlánticas — Europa 2000 Study of prospects in the Atlantic regions — Europe 2000 Étude prospective des régions atlantiques — Europe 2000 09 — Financial engineering techniques applying to regions eligible under Objectives 1, 2 and 5b 10 — Interregional and cross-border cooperation in Europe 11 — Estudio prospectivo de las regiones del Mediterráneo Oeste Évolution prospective des régions de la Méditerranée - Ouest Evoluzione delle prospettive delle regioni del Mediterraneo occidentale 12 — Valeur ajoutée et ingénierie du développement local 13 — The Nordic countries — what impact on planning and development
    [Show full text]
  • The M48 Motorway (Junctions 1-2)
    ROAD TRAFFIC: TRAFFIC REGULATION The M48 Motorway (Junctions 1-2) (Severn Bridge High Winds) The M62 Motorway (Junction 8 Westbound Entry Slip Road) (Temporary Restriction and Prohibition of Traffic) Order 2015 No. (Temporary Prohibition of Traffic) Order 2015 No. 2015/1256. - 2015/1228. - Enabling power: Road Traffic Regulation Act 1984, s. 14 Enabling power: Road Traffic Regulation Act 1984, s. 14 (1) (a). - (1) (b). - Issued: 26.03.2015. Made: 24.03.2015. Coming into force: Issued: 01.04.2015. Made: 25.03.2015. Coming into force: 12.04.2015. 28.03.2015. Effect: None. Territorial extent & classification: E. Local. - Effect: None. Territorial extent & classification: E. Local. - Available at Available at http://www.legislation.gov.uk/uksi/2015/1256/contents/made http://www.legislation.gov.uk/uksi/2015/1228/contents/made Non-print Non-print The M62 Motorway (Junction 23 to Junction 24) (Temporary The M50 Motorway (Junction 1 - Junction 4) (Temporary Prohibition of Traffic) Order 2015 No. 2015/1068. - Enabling power: Restriction and Prohibition of Traffic) Order 2015 No. 2015/1237. - Road Traffic Regulation Act 1984, s. 14 (1) (a). - Issued: 18.02.2015. Enabling power: Road Traffic Regulation Act 1984, s. 14 (1) (a). - Made: 05.02.2015. Coming into force: 16.02.2015. Effect: None. Issued: 20.04.2015. Made: 23.03.2015. Coming into force: 30.03.2015. Territorial extent & classification: E. Local. - Available at Effect: None. Territorial extent & classification: E. Local. - Available at http://www.legislation.gov.uk/uksi/2015/1068/contents/made http://www.legislation.gov.uk/uksi/2015/1237/contents/made Non-print Non-print The M62 Motorway (Junction 25 to Junction 26) (Temporary The M53 Motorway (Junctions 4-3 Northbound Carriageway and Prohibition of Traffic) Order 2015 No.
    [Show full text]
  • M1 Motorway (Junctions 1-3), M25
    M1 MOTORWAY(JUNCTIONS 1-3), M25 MOTORWAYJUNCTION 23, AND A1 TRUNK ROAD TEMPORARYTRAFFIC RESTRICTIONS Notice is hereby given that Highways England Company Limited intends to make an Order on the M25 Motorway in the County of Hertfordshire and the London Boroughs of Barnet and Hendon, under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order would be to authorise the overnight closure, in phases, of:- a) the entirecirculatory carriageway of the roundabout at M25 Junction 23 (A1(M)/A1); b) the roads leading to and from both carriageways of the M25 at Junction 23 (A1(M) Junction 1/A1); c) the roads leading to and from both carriageways of the A1(M)/A1 at Junction 23 (A1(M) Junction 1/A1); d) the southbound carriageway of the A1 between Bignell’sCorner (M25 Junction 23) and Borehamwood Interchange (A5135); e) the road leading from the southbound carriageway of the A1 at Borehamwood Interchange (A5135); f) the northbound carriageway of the M1 between Junction 1(A406) and the tip of the nosing of the entry slip road at Junction 3 (London Gateway Services); g) the road leading to the northbound carriageway of the M1 at Junction 1(A406); h) the road connecting to the M1 northbound entry slip road from the eastbound road connecting the EdgwareRoad roundabout to Staples Corner roundabout at Junction 1 (A406); i) theroads connecting to and from both carriageways of the M1 at Junction 2(A1); and j) all of the roads leading to and from both carriageways of the M1 at London Gateway Services.
    [Show full text]
  • Predicting Accident Frequency at Their Severity Levels and Its Application in Site Ranking Using a Two-Stage Mixed Multivariate Model
    Loughborough University Institutional Repository Predicting accident frequency at their severity levels and its application in site ranking using a two-stage mixed multivariate model This item was submitted to Loughborough University's Institutional Repository by the/an author. Citation: WANG, C., QUDDUS, M.A. and ISON, S.G., Predicting accident frequency at their severity levels and its application in site ranking using a two-stage mixed multivariate model. Accident Analysis and Prevention, 43(6), pp.1979-1990 Metadata Record: https://dspace.lboro.ac.uk/2134/8702 Version: Accepted for publication Publisher: c Elsevier Please cite the published version. This item was submitted to Loughborough’s Institutional Repository (https://dspace.lboro.ac.uk/) by the author and is made available under the following Creative Commons Licence conditions. For the full text of this licence, please go to: http://creativecommons.org/licenses/by-nc-nd/2.5/ 1 Predicting accident frequency at their severity levels and its application in site ranking using a two-stage mixed multivariate model Chao Wang*, Mohammed A Quddus, Stephen G Ison Transport Studies Group Department of Civil and Building Engineering Loughborough University Loughborough, Leicestershire LE11 3TU United Kingdom * Corresponding author – Tel: +44 (0)1509 564682; Fax: +44 (0)1509 223981. Email addresses: [email protected] (Chao Wang); [email protected] (Mohammed A Quddus); [email protected] (Stephen G Ison). Abstract Accident prediction models (APMs) have been extensively used in site ranking with the objective of identifying accident hotspots. Previously this has been achieved by using a univariate count data or a multivariate count data model (e.g.
    [Show full text]