M25 London Orbital with Astucia Studs Layout 1

Total Page:16

File Type:pdf, Size:1020Kb

M25 London Orbital with Astucia Studs Layout 1 CASE STUDY M25 LONDON ORBITAL WITH ASTUCIA STUDS Case Study Guiding the way on the M25 London Orbital PROJECT DETAILS Motorway DATE OF INSTALLATION 2009 Astucia is helping to improve driving conditions on the M25 LOCATION Motorway in Surrey, with the installation of approximately M25, Surrey, United Kingdom 4,500 Astucia SolarLite Road Studs. APPLICATION Astucia SolarLite Flush Road Studs BACKGROUND The M25 Motorway around London is one of the world’s longest orbital routes, covering 117 miles. The M25 is also one KEY BENEFITS of the busiest motorways in Europe being used by approximately 250,000 vehicles each day. Much of the 10x greater visibility for drivers motorway utilises street lighting to enhance driver visibility, than traditional reflective road however a number of junctions do not currently have lighting studs which increases driver safety risk due to restricted night time visibility. Excellent visibility in adverse Installing additional street lighting sites is an expensive exercise, with ever increasing weather e.g. fog, rain or surface costs of ongoing energy provision and environmental impact. It has been reported spray that electricity costs to power street lighting on motorways and ‘A’ roads in the UK Highlights sharp bends, dips in 1 was estimated at £15 million a year in 2009 . the road and other hazardous approaches Effective additional driver safety SOLUTION when used in conjunction with street light reduction schemes A recent project by Mouchel, a leading infrastructure and business services group has been designed to help improve driver visibility on a 6 mile unlit stretch of the M25 motorway between Junction 6 and the Clacket Lane Services. This has resulted in the TESTIMONIAL installation of around 4,500 Astucia SolarLite Road Studs. Graham Muspratt, Product Manager Astucia SolarLite Road Studs contain a Light Emitting Diode (LED) which automatically from Clearview Traffic commented, illuminate during the hours of darkness to provide up to 1,000 metres visibility – 10 “Installing further street lighting times greater than that of the traditional retro-reflective “cats eye” road stud. columns on the motorway would This installation is in addition to a section of Astucia Solarlite Road Studs already have incurred significant cost in both installation and ongoing energy bills, situated between the M2 and M20 motorway near the port of Dover, Kent which has whilst the use of Astucia SolarLite successfully guided motorists from an area containing street lighting into an unlit road studs presents just the fraction area. of this cost and does not require The M25 project is providing enhanced driver guidance without incurring ongoing ongoing funding due to the use of energy costs and carbon emissions as seen by the use of traditional street lighting. free solar energy. We are very pleased with the effect of the Astucia studs and are confident that this 1 The Times Online March 13 2009. enhanced delineation will have a positive effect on the safety and night time road environment on the M25”. Astucia T +44 (0)1869 362800 Astucia reserves the right to change or modify product specifications. A4 Telford Road, F +44 (0)1869 246858 ‘Astucia’, the ‘A’ Symbol and ‘SolarLite’ are trade marks. Bicester, E [email protected] Worldwide Patents Coverage. All values Oxfordshire OX26 4LD www.astucia.co.uk are nominal. Moving traffic, saving lives For more information visit www.astucia.co.uk.
Recommended publications
  • Operation Stack
    House of Commons Transport Committee Operation Stack First Report of Session 2016–17 HC 65 House of Commons Transport Committee Operation Stack First Report of Session 2016–17 Report, together with formal minutes relating to the report Ordered by the House of Commons to be printed 23 May 2016 HC 65 Published on 1 June 2016 by authority of the House of Commons Transport Committee The Transport Committee is appointed by the House of Commons to examine the expenditure, administration, and policy of the Department for Transport and its associated public bodies. Current membership Mrs Louise Ellman MP (Labour (Co-op), Liverpool, Riverside) (Chair) Robert Flello MP (Labour, Stoke-on-Trent South) Mary Glindon MP (Labour, North Tyneside) Karl McCartney MP (Conservative, Lincoln) Stewart Malcolm McDonald MP (Scottish National Party, Glasgow South) Mark Menzies MP (Conservative, Fylde) Huw Merriman MP (Conservative, Bexhill and Battle) Will Quince MP (Conservative, Colchester) Iain Stewart MP (Conservative, Milton Keynes South) Graham Stringer MP (Labour, Blackley and Broughton) Martin Vickers MP (Conservative, Cleethorpes) Powers The Committee is one of the departmental select committees, the powers of which are set out in House of Commons Standing Orders, principally in SO No 152. These are available on the internet via www.parliament.uk. Publication Committee reports are published on the Committee’s website at www.parliament.uk/transcom and in print by Order of the House. Evidence relating to this report is published on the inquiry publications page of the Committee’s website. Committee staff The current staff of the Committee are Gordon Clarke (Committee Clerk), Gail Bartlett (Second Clerk), James Clarke (Committee Specialist), Andrew Haylen (Committee Specialist), Adrian Hitchins (Committee Specialist), Daniel Moeller (Senior Committee Assistant), Michelle Owens (Committee Assistant) and Estelle Currie (Media Officer).
    [Show full text]
  • The M25 Motorway (Junctions 19, 22 and 23) and the A40
    THE M25 MOTORWAY (JUNCTIONS 19, 22 AND 23) AND THE A40 TRUNK ROAD (DENHAM ROUNDABOUT) TEMPORARY OVERNIGHT LINK/SLIP ROAD CLOSURES Notice is hereby given that Highways England Company Limited(a) intends to make an Order on the M25 Motorway and the A40 Trunk Road, in the Counties of Buckinghamshire and Hertfordshire, under section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order would be to authorise the overnight closure of the following: (a) the link roads leading to and from the M25 at Junction 19 (A41/A411); (b)the slip road leading to the clockwise carriageway of the M25 at Junction 22 (A1081); (c) the slip roads leading from the clockwise carriageway and to the anti-clockwise carriageway of the M25 at Junction 23 (A1/A1(M) Junction 1); (d)the slip road leading from the westbound carriageway of the A40 to Denham roundabout (A4020/A412) at M40 Junction 1. These measures would be in the interests of road safety while contractors undertake cyclic maintenance and/or urgent repair work. It is expected that the work would take place for approximately 1 - 2 nights for each closure every 2 months between 22:00 and 05:30 on Monday – Thursday nights, 23:00 and 06:00 on Friday nights, 22:00 and 06:00 on Saturday nights and 22:30 and 05:30 on Sunday nights. The Order would come into force on 16 April 2017 and have a maximum duration of twelve months.
    [Show full text]
  • Infrastructure Delivery Plan
    Tunbridge Wells Borough Council Infrastructure Delivery Plan March 2021 1.0 Introduction .................................................................................................................... 1 2.0 Background and Policy Context ..................................................................................... 2 National Policy ...................................................................................................................... 2 Local Policy .......................................................................................................................... 3 Local Plan policy context and strategy for growth ................................................................ 4 Policy STR 1 - The Development Strategy .............................................................................. 6 What is infrastructure? ......................................................................................................... 8 Engagement ....................................................................................................................... 10 Prioritisation of infrastructure .............................................................................................. 11 Identified risks .................................................................................................................... 12 Timing ................................................................................................................................ 12 Costs .................................................................................................................................
    [Show full text]
  • Greater London Fund for the Blind Annual
    Company number: 03693002 Charity number: 1074958 Greater London Fund for the Blind Report and financial statements For the year ended 31 March 2018 *A7KMSSOS* A18 12/12/2018 ¹301 COMPANIES HOUSE SAYER V I NC ENT OOOOO OOOOOOO 0 0 0 0 0 0 0 0 0 0 0 0 Greater London Fund for the Blind Contents For the year ended 31 March 2018 Reference and administrative information . Trustees' annual report . Independent auditor's report . 11 Consolidated statement of financial activities (incorporating income and expenditure account) ... 15 Balance sheets ......................................................""""""." . 16 Consolidated statement of cash flows . 17 Notes to the financial statements . 18 Greater London Fund for the Blind Reference and administrative information For the year ended 31 March 2018 Company number 03693002 Charity number 1074958 Registered office and operational address Sir John Mills House 12 Whitehorse Mews 37 Westminster Bridge Road London SE1 7QD Country of registration England & Wales Country of incorporation United Kingdom Trustees The Trustees, who are also directors under company law, who served during the year and up to the date of this report were as follows: Anna Tylor* —Chair Charles Colquhoun* (Resigned 5 December 2018) Keith Felton* Harry Harris Bob Hughes (Appointed 29 October 2018) James Matthews (Appointed 12 July 2017) Raj Mehta* Sharon Petrie (Appointed 12 May 2017) Frans Pettinga (Resigned 6 July 2017) Daniel Stewart-Smith (Resigned 29 July 2018) *Members of Finance, Audit and Risk Committee Key management
    [Show full text]
  • Units to Let/For Sale from 3,175-46,393 Sq Ft
    EDGINGTON WAY | SIDCUP | KENT | DA14 5NH UNITS TO LET/FOR SALE www.klingerindustrialpark.co.uk FROM 3,175-46,393 SQ FT A NEW DEVELOPMENT OF WAREHOUSE/INDUSTRIAL/TRADE COUNTER UNITS A20 SIDCUP BYPASS ROAD A20 B&Q PROPOSED CAR DEALERSHIP JAGUAR A 2 2 COSTA 3 TESCO E D G I N BOOKER G www.klingerindustrialpark.co.uk T O N W COCA COLA A Y EDMUNDSON ELECTRICAL HOWDENS A 2 2 3 SELCO SCREWFIX ALSFORD TIMBER BP TOYOTA LEXUS Minimum clear height of 8 metres TO LET/ EDGINGTON WAY Generous yard and car parking provisions FOR SALE 1 full height loading door per unit AVAILABLE Q3 2017 Floor loading of 37.5 kN/sq m 2b 2a Ability to combine units 1 First floor mezzanine - can be fitted as offices or used as storage UNDER OFFER 3 Excellent access to A20, M25 and Central London 4 5 Images of similar Chancerygate schemes 6 Warehouse 1st Floor Total sq ft (sq m) Car parking 17 .6m Unit 1 UNDER OFFER Unit 2a 3,175 - 3,175 (295) 7 Unit 2b 3,175 - 3,175 (295) 7 16 m Unit 3 11,248 2,174 13,423 (1,247) 14 Unit 4 9,795 1,916 11,711 (1,088) 12 10 9 Unit 5 8,719 1,701 10,420 (968) 12 8 Unit 6 9,203 1,636 10,839 (1,007) 12 7 Unit 7 5,328 1,485 6,813 (633) 8 11 Unit 8 4,575 1,270 5,845 (543) 7 12 Unit 9 4,844 1,346 6,190 (575) 8 Planning use 13 Unit 10 4,844 1,335 6,179 (574) 8 B1 (c), B2, B8 and Unit 11 7,912 2,099 10,011 (930) 12 Trade Counter.
    [Show full text]
  • 15-19 North Street Ashford, Kent, Tn24 8Lf 15-19 North Street, Ashford, Kent, Tn24 8Lf 2
    FREEHOLD TOWN CENTRE OFFICE INVESTMENT OPPORTUNITY WITH REDEVELOPMENT POTENTIAL 15-19 NORTH STREET ASHFORD, KENT, TN24 8LF 15-19 NORTH STREET, ASHFORD, KENT, TN24 8LF 2 INVESTMENT SUMMARY Located in Ashford town centre, close to the High Street and within walking distance of Ashford International train station. Three self contained office buildings comprising 9,461 sq ft in total, with 10 car parking spaces Freehold Multi-let to three tenants on three separate leases AWULT of approximately 0.73 years to break options and 3.55 years to lease expiries Barclays in occupation of no. 17 have exercised their break in September 2016, leaving 5,340 sq ft (NIA) vacant and prime for alternative use or re-letting Current rent of £104,415 per annum, equating to an average rent of £11.04 per sq ft Asset Management Initiatives • Explore change of use on vacant space • Let vacant space • Settle dilapidations with Barclays Offers are invited in excess of £800,000 (Eight Hundred Thousand Pounds), reflecting a Capital Value of £85 per sq ft (assuming purchaser’s costs at 5.49%) A10 M1 M50 15-19 NORTH STREET, ASHFORD, KENT, TN24 8LF M40 3 A44 Colchester . Gloucester T S HA RDIN GE H ROA D T KEY R A40 W N E O M1 O Y M5 R W E LOCATION N M11 R L L A IL Oxford B H S D A1(M) S 11 E Chelmsford A T A D L O O R S L A40 E T R Bus route OM ER M25 E SE SET E R The property is located in Ashford, Kent, a historic market town T ER GH ROAD RO N M R A W A12 O O BU D M25 R S DIN W E H approximately 55 miles to the South East of London and 15 T A420 Watford O Knoll LanePARK MALL .
    [Show full text]
  • The M1 Motorway (Junctions 5 – 6A
    THE M1 MOTORWAY(JUNCTIONS 5–6A) TEMPORARYOVERNIGHT CLOSURES Notice is hereby given that Highways England Company Limited(a) intends to make an Order on the M1 Motorway,inthe County of Hertfordshire, under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works areproposed to be executed on the road. The effect of the Order would be to authorise the overnight closureofthe following – (a) the slip roads leading to and from both carriageways of the M1 at Junction 5(A41, A4008); (b) the slip roads leading to and from both carriageways of the M1 at Junction 6(A405); and (c) the link road leading from the southbound carriageway of the M1 at Junction 6A to both carriageways of the M25 at Junction 21. These measures would be in the interest of road safety to enable contractors to undertake cyclical maintenance work. It is expected that the work would take place for approximately 1-2nights for each closureat(a) –(c) above every two months at the following times: Monday-Thursday nights 22:00 –05:30 Friday nights 23:00 –06:00 Saturday nights 22:00 –06:00 Sunday nights 22:30 –05:30 The Order would come into force on 1August2017 and have amaximum duration of twelve months. During the closures outlined above, traffic affected would be diverted using other junctions of the M1, the A41, the A405 and the A410. The slip road closures, link road closureand diversion routes would be clearly indicated by traffic signs throughout the works periods. MTaylor, an official of Highways England Company Limited Ref: HA/M1/35/3/1894 (a)Registered in England and Wales under company no.
    [Show full text]
  • Road Investment Strategy M25 Junction 25 Improvements
    Road Investment Strategy M25 Junction 25 Improvements Environmental Study Report October 2016 v2.1, 25 October 2016 Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ Highways England Company Limited registered in England and Wales number 09346363 M25 Junction 25 Improvements: Environmental Study Report Notice This document and its contents have been prepared and are intended solely for Highway England’s information and use in relation to the M25 Junction 25 Improvements Environmental Study Report. Atkins Ltd assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. Document control The Project Manager is responsible for production of this document, based on the contributions made by his/her team existing at each Stage. Document Title M25 Junction 25 Improvements: Environmental Study Report Author Sarah Wallis Owner Piotr Grabowiecki Distribution Highways England Reviewers, Atkins Team Document Status Draft Revision History This document is updated at least every stage. Version Date Description Author 1.0 08/08/16 First Draft Sarah Wallis / Neil Watson 2.0 03/10/16 Second Draft Sarah Wallis / Neil Watson 2.1 25/10/16 Final Draft Sarah Wallis / Neil Watson Reviewer List Name Role Alison Braham Technical Review - Environmental Nicole Pulici Atkins Project Manager Henry Penner Highways England PTS Environmental Advisor Piotr Grabowiecki, Eze Onah, Highways England Integrated Project Team Andrew Salmon Approvals The Project SRO is accountable for the content of this document Name Signature Title Date of Issue Version Andrew Salmon Highways England Project SRO Working on behalf of i M25 Junction 25 Improvements: Environmental Study Report Table of contents Glossary ...................................................................................................................
    [Show full text]
  • The Regional Impact of the Channel Tunnel Throughout the Community
    -©fine Channel Tunnel s throughpdrth^Çpmmunity European Commission European Union Regional Policy and Cohesion Regional development studies The regional impact of the Channel Tunnel throughout the Community European Commission Already published in the series Regional development studies 01 — Demographic evolution in European regions (Demeter 2015) 02 — Socioeconomic situation and development of the regions in the neighbouring countries of the Community in Central and Eastern Europe 03 — Les politiques régionales dans l'opinion publique 04 — Urbanization and the functions of cities in the European Community 05 — The economic and social impact of reductions in defence spending and military forces on the regions of the Community 06 — New location factors for mobile investment in Europe 07 — Trade and foreign investment in the Community regions: the impact of economic reform in Central and Eastern Europe 08 — Estudio prospectivo de las regiones atlánticas — Europa 2000 Study of prospects in the Atlantic regions — Europe 2000 Étude prospective des régions atlantiques — Europe 2000 09 — Financial engineering techniques applying to regions eligible under Objectives 1, 2 and 5b 10 — Interregional and cross-border cooperation in Europe 11 — Estudio prospectivo de las regiones del Mediterráneo Oeste Évolution prospective des régions de la Méditerranée - Ouest Evoluzione delle prospettive delle regioni del Mediterraneo occidentale 12 — Valeur ajoutée et ingénierie du développement local 13 — The Nordic countries — what impact on planning and development
    [Show full text]
  • The Truth Behind Op Stack.Pdf
    THE TRUTH BEHIND OPERATION STACK 1. What is Operation Stack? Operation Stack is an emergency procedure implemented by Kent Police to ‘stack’ coast-bound cross-Channel freight traffic on parts of the M20 motorway. History Although originally operated on the A2 by Kent Police before the M20 was completed, once the Channel Tunnel was built and the trunk road from the M20 through to Dover was completed, the M20 became the primary route for cross-Channel freight vehicles. A new version of Operation Stack was subsequently devised for the M20, initially comprising of a coast-bound closure between Junction 11 and Junction 13 as Phase 1 and, if required, a closure of the London-bound carriage way for Phase 2. Purpose Stack is activated when there is a significant blockage to the flow of cross-Channel freight traffic beyond the control of the Port that results in demand for space at either the Channel Tunnel or Port of Dover Ferry Terminal outstripping their parking capacity, resulting in traffic backing up onto the surrounding road network. It has been needed during times of stress such as:- Strike action in Calais Extreme weather conditions Channel Tunnel problems (e.g. migrant incursions, line failure etc) 1 2. Stack Today Implementation Operation Stack is activated by Kent Police based on information received from several sources including the Port of Dover and the Channel Tunnel. Good communication with Kent Police is essential in notifying of any problems that may lead to the need for Stack as it takes approximately two hours from the time of notification to actually closing the motorway and takes a considerable amount of police resource.
    [Show full text]
  • M20 Junction
    M20 Junction 10a TR010006 5.1 Consultation Report APFP Regulation 5(2)(q) Revision A Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Volume 5 July 2016 M20 Junction 10a TR010006 5.1 Consultation Report Volume 5 This document is issued for the party which commissioned it We accept no responsibility for the consequences of this and for specific purposes connected with the above-captioned document being relied upon by any other party, or being used project only. It should not be relied upon by any other party or for any other purpose, or containing any error or omission used for any other purpose. which is due to an error or omission in data supplied to us by other parties This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it. Date: July 2016 M20 Junction 10a Consultation Report TR010006 Foreword Highways England has undertaken a fully managed programme of consultation with the local community and wider stakeholders. The consultation process has facilitated feedback which has been carefully considered throughout the development of the M20 junction 10a Scheme (the 'Scheme'). Pre-application consultation is an important element of any Nationally Significant Infrastructure Project. Highways England has taken careful consideration to relevant legislation, guidance and notes when designing the pre-application strategy. Early consultation addressed the main strategic and audience interaction needs to deliver a meaningful and progressive engagement programme. A number of different model groups were supported throughout the non-statutory engagement period.
    [Show full text]
  • M1 Motorway (Junctions 1-3), M25
    M1 MOTORWAY(JUNCTIONS 1-3), M25 MOTORWAYJUNCTION 23, AND A1 TRUNK ROAD TEMPORARYTRAFFIC RESTRICTIONS Notice is hereby given that Highways England Company Limited intends to make an Order on the M25 Motorway in the County of Hertfordshire and the London Boroughs of Barnet and Hendon, under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order would be to authorise the overnight closure, in phases, of:- a) the entirecirculatory carriageway of the roundabout at M25 Junction 23 (A1(M)/A1); b) the roads leading to and from both carriageways of the M25 at Junction 23 (A1(M) Junction 1/A1); c) the roads leading to and from both carriageways of the A1(M)/A1 at Junction 23 (A1(M) Junction 1/A1); d) the southbound carriageway of the A1 between Bignell’sCorner (M25 Junction 23) and Borehamwood Interchange (A5135); e) the road leading from the southbound carriageway of the A1 at Borehamwood Interchange (A5135); f) the northbound carriageway of the M1 between Junction 1(A406) and the tip of the nosing of the entry slip road at Junction 3 (London Gateway Services); g) the road leading to the northbound carriageway of the M1 at Junction 1(A406); h) the road connecting to the M1 northbound entry slip road from the eastbound road connecting the EdgwareRoad roundabout to Staples Corner roundabout at Junction 1 (A406); i) theroads connecting to and from both carriageways of the M1 at Junction 2(A1); and j) all of the roads leading to and from both carriageways of the M1 at London Gateway Services.
    [Show full text]