M1 MOTORWAY(JUNCTIONS 1-3), M25 MOTORWAYJUNCTION 23, AND A1 TRUNK ROAD TEMPORARYTRAFFIC RESTRICTIONS Notice is hereby given that Highways Company Limited intends to make an Order on the in the County of and the Boroughs of Barnet and , under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order would be to authorise the overnight closure, in phases, of:- a) the entirecirculatory carriageway of the at M25 Junction 23 (A1(M)/A1); b) the roads leading to and from both carriageways of the M25 at Junction 23 (A1(M) Junction 1/A1); c) the roads leading to and from both carriageways of the A1(M)/A1 at Junction 23 (A1(M) Junction 1/A1); d) the southbound carriageway of the A1 between Bignell’sCorner (M25 Junction 23) and (A5135); e) the road leading from the southbound carriageway of the A1 at Borehamwood Interchange (A5135); f) the northbound carriageway of the M1 between Junction 1(A406) and the tip of the nosing of the entry slip road at Junction 3 ( Services); g) the road leading to the northbound carriageway of the M1 at Junction 1(A406); h) the road connecting to the M1 northbound entry slip road from the eastbound road connecting the EdgwareRoad roundabout to roundabout at Junction 1 (A406); i) theroads connecting to and from both carriageways of the M1 at Junction 2(A1); and j) all of the roads leading to and from both carriageways of the M1 at London Gateway Services. These measures would be in the interests of road safety while contractors undertake resurfacing and lighting works including road marking, stud and loop replacement, column, cable, ducting, cabinet and pillar replacement and all associated works. The work is part of aproject which is expected to last for 18 months starting on or after Tuesday 5th November 2019. Precise location timing to be advised by advanced roadside and gantry signing. The overnight closures would vary according to the contracted working hours for the road affected and would not exceed 2100 – 0600 hours. The Order would come into force on 3November 2019 and continue until completion of the works or until 3May 2021 whichever is sooner. Traffic affected by the closures would be diverted using other junctions on the M25 and M1, and by using the A1(M), A1, A41, and A406, A411, A1081, and A5183. The diversion in operation would vary according to the closureinforce. The temporary closures and diversion routes would be clearly indicated by traffic signs when they areinoperation during the works period. JDownham, an Official of Co Ltd. Ref: HE/SE/2019/M25/220 Highways England Company Limited, (Company No. 9346363). Registered Office: Bridge House, Walnut Tree Close, , ,GU1 4LZ. Acompany registered in England and Wales. For enquiries, please contact the Customer Contact Centreon0300123 5000 or [email protected]. https://www.highwaysengland.co.uk