The M1 Motorway (Junctions 5 – 6A

Total Page:16

File Type:pdf, Size:1020Kb

The M1 Motorway (Junctions 5 – 6A THE M1 MOTORWAY(JUNCTIONS 5–6A) TEMPORARYOVERNIGHT CLOSURES Notice is hereby given that Highways England Company Limited(a) intends to make an Order on the M1 Motorway,inthe County of Hertfordshire, under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works areproposed to be executed on the road. The effect of the Order would be to authorise the overnight closureofthe following – (a) the slip roads leading to and from both carriageways of the M1 at Junction 5(A41, A4008); (b) the slip roads leading to and from both carriageways of the M1 at Junction 6(A405); and (c) the link road leading from the southbound carriageway of the M1 at Junction 6A to both carriageways of the M25 at Junction 21. These measures would be in the interest of road safety to enable contractors to undertake cyclical maintenance work. It is expected that the work would take place for approximately 1-2nights for each closureat(a) –(c) above every two months at the following times: Monday-Thursday nights 22:00 –05:30 Friday nights 23:00 –06:00 Saturday nights 22:00 –06:00 Sunday nights 22:30 –05:30 The Order would come into force on 1August2017 and have amaximum duration of twelve months. During the closures outlined above, traffic affected would be diverted using other junctions of the M1, the A41, the A405 and the A410. The slip road closures, link road closureand diversion routes would be clearly indicated by traffic signs throughout the works periods. MTaylor, an official of Highways England Company Limited Ref: HA/M1/35/3/1894 (a)Registered in England and Wales under company no. 9346363. Registered office Bridge House, Walnut Tree Close, Guildford, Surrey, GU1 4LZ. General Enquiries relating to this notice may be made by contacting Highways England’sCustomer Contact Centreon0300123 5000 or by email at [email protected] https://www.highways.gov.uk THE M25 MOTORWAYJUNCTIONS 17 -25 TEMPORARYOVERNIGHT CLOSURES Notice is hereby given that the Highways England Company Limited(a) intends to make an Order on the M25 Motorway,inthe County of Hertfordshireand theLondon Borough of Enfield, under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works areproposed to be executed on the road. The effect of the Order would be to authorise the overnight closureof– (a) the slip and link roads leading to and from both carriageways of the M25 between Junctions 17 (A412) and 25 (A10) inclusive; (b) the clockwise carriageway of the M25 between the entry link road at Junction 21 (M1), and the exit slip road at Junction 21A (A405); and (c) the anti-clockwise carriageway of the M25 between the exit and entry slip roads at Junction 21A (A405). These measures would be in the interests of road safety to enable contractors to undertake cyclic maintenance and/or urgent repair work. It is expected that the work would take place for approximately 1-2nights for each slip road/link road/carriageway every 2months between: 22:00 and 05:30 on Monday –Thursday nights, 23:00 and 06:00 on Friday nights, 22:00 and 06:00 on Saturday nights, and 22:30 and 05:30 on Sunday nights. The Order would come into force on 1August2017 and have amaximum duration of twelve months. During the closures outlined above traffic would be diverted via other junctions of the M25, the M40 or the A405. The diversion route would vary depending on the closureinplace. The slip road, link road and carriageway closures, and diversion routes would be clearly indicated by traffic signs throughout the works periods. MTaylor, an official of Highways England Company Limited Ref: HA/M25/35/3/1903 (a)Registered in England and Wales under company no. 9346363. Registered office Bridge House, Walnut Tree Close, Guildford, Surrey, GU1 4LZ. General Enquiries relating to this notice may be made by contacting Highways England’sCustomer Contact Centreon0300123 5000 or by email at [email protected] https://www.highways.gov.uk.
Recommended publications
  • The M25 Motorway (Junctions 19, 22 and 23) and the A40
    THE M25 MOTORWAY (JUNCTIONS 19, 22 AND 23) AND THE A40 TRUNK ROAD (DENHAM ROUNDABOUT) TEMPORARY OVERNIGHT LINK/SLIP ROAD CLOSURES Notice is hereby given that Highways England Company Limited(a) intends to make an Order on the M25 Motorway and the A40 Trunk Road, in the Counties of Buckinghamshire and Hertfordshire, under section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order would be to authorise the overnight closure of the following: (a) the link roads leading to and from the M25 at Junction 19 (A41/A411); (b)the slip road leading to the clockwise carriageway of the M25 at Junction 22 (A1081); (c) the slip roads leading from the clockwise carriageway and to the anti-clockwise carriageway of the M25 at Junction 23 (A1/A1(M) Junction 1); (d)the slip road leading from the westbound carriageway of the A40 to Denham roundabout (A4020/A412) at M40 Junction 1. These measures would be in the interests of road safety while contractors undertake cyclic maintenance and/or urgent repair work. It is expected that the work would take place for approximately 1 - 2 nights for each closure every 2 months between 22:00 and 05:30 on Monday – Thursday nights, 23:00 and 06:00 on Friday nights, 22:00 and 06:00 on Saturday nights and 22:30 and 05:30 on Sunday nights. The Order would come into force on 16 April 2017 and have a maximum duration of twelve months.
    [Show full text]
  • Call for Sites 2021 Justification Statement V3
    Planning Justification Statement Representation to Hertsmere Local Plan Process Commercial Redevelopment Land and Buildings at the Mercure Hotel Watford, A41 Bypass WD25 8JH March 2021 Contents 1. Introduction 2 2. The Site 4 3. The Proposal 7 4. Exceptional Circumstances 12 5. Economic Need 16 6. Green Belt and Landscape 25 7. Transport and Accessibility 31 8. Flood Risk 34 9. Ecology and Trees 37 10. Heritage 40 11. Other Technical Matters 41 12. Case of Exceptional Circumstances 43 13. Conclusion 51 Appendix A: Site Planning History 1 1. Introduction This Planning Justification Statement is submitted by Warner Planning on behalf of Regen Properties LLP. This submission is made to the Hertsmere Borough Council 'Employment Land Call for Sites' 2021. We promote land and buildings at the Mercure Hotel Watford, A41 Bypass WD25 8JH for allocation for B8 with ancillary B1 commercial development. The hotel has been struggling for several years, which has been further compounded by the Covid-19 Pandemic, and the hotel is due to close in late 2021/early 2022. This statement, therefore, provides representations in respect of the whole site, including the hotel buildings and the land to the south-east of the building, which is part of the same plot. Through this statement, we will demonstrate that this is a credible and deliverable opportunity with no technical issues. This submission is supported by a wealth of technical reports, including: • Masterplans – UMC • Economic Benefits Assessment - Lichfields • Landscape Visual Overview – CSA Environmental • Ecology Overview- CSA Environmental • Aboricultural Assessment – DCCLA • Flood Risk and Drainage Apprisal – EAS • Transport Review – EAS • Desk Based Phase 1 Environmental Site Assessment – TRC • This Statement – Warner Planning • Market Report – Knight Frank • Employment Call for Sites Submission Form There are limited alternatives to this proposal.
    [Show full text]
  • Greater London Fund for the Blind Annual
    Company number: 03693002 Charity number: 1074958 Greater London Fund for the Blind Report and financial statements For the year ended 31 March 2018 *A7KMSSOS* A18 12/12/2018 ¹301 COMPANIES HOUSE SAYER V I NC ENT OOOOO OOOOOOO 0 0 0 0 0 0 0 0 0 0 0 0 Greater London Fund for the Blind Contents For the year ended 31 March 2018 Reference and administrative information . Trustees' annual report . Independent auditor's report . 11 Consolidated statement of financial activities (incorporating income and expenditure account) ... 15 Balance sheets ......................................................""""""." . 16 Consolidated statement of cash flows . 17 Notes to the financial statements . 18 Greater London Fund for the Blind Reference and administrative information For the year ended 31 March 2018 Company number 03693002 Charity number 1074958 Registered office and operational address Sir John Mills House 12 Whitehorse Mews 37 Westminster Bridge Road London SE1 7QD Country of registration England & Wales Country of incorporation United Kingdom Trustees The Trustees, who are also directors under company law, who served during the year and up to the date of this report were as follows: Anna Tylor* —Chair Charles Colquhoun* (Resigned 5 December 2018) Keith Felton* Harry Harris Bob Hughes (Appointed 29 October 2018) James Matthews (Appointed 12 July 2017) Raj Mehta* Sharon Petrie (Appointed 12 May 2017) Frans Pettinga (Resigned 6 July 2017) Daniel Stewart-Smith (Resigned 29 July 2018) *Members of Finance, Audit and Risk Committee Key management
    [Show full text]
  • Units to Let/For Sale from 3,175-46,393 Sq Ft
    EDGINGTON WAY | SIDCUP | KENT | DA14 5NH UNITS TO LET/FOR SALE www.klingerindustrialpark.co.uk FROM 3,175-46,393 SQ FT A NEW DEVELOPMENT OF WAREHOUSE/INDUSTRIAL/TRADE COUNTER UNITS A20 SIDCUP BYPASS ROAD A20 B&Q PROPOSED CAR DEALERSHIP JAGUAR A 2 2 COSTA 3 TESCO E D G I N BOOKER G www.klingerindustrialpark.co.uk T O N W COCA COLA A Y EDMUNDSON ELECTRICAL HOWDENS A 2 2 3 SELCO SCREWFIX ALSFORD TIMBER BP TOYOTA LEXUS Minimum clear height of 8 metres TO LET/ EDGINGTON WAY Generous yard and car parking provisions FOR SALE 1 full height loading door per unit AVAILABLE Q3 2017 Floor loading of 37.5 kN/sq m 2b 2a Ability to combine units 1 First floor mezzanine - can be fitted as offices or used as storage UNDER OFFER 3 Excellent access to A20, M25 and Central London 4 5 Images of similar Chancerygate schemes 6 Warehouse 1st Floor Total sq ft (sq m) Car parking 17 .6m Unit 1 UNDER OFFER Unit 2a 3,175 - 3,175 (295) 7 Unit 2b 3,175 - 3,175 (295) 7 16 m Unit 3 11,248 2,174 13,423 (1,247) 14 Unit 4 9,795 1,916 11,711 (1,088) 12 10 9 Unit 5 8,719 1,701 10,420 (968) 12 8 Unit 6 9,203 1,636 10,839 (1,007) 12 7 Unit 7 5,328 1,485 6,813 (633) 8 11 Unit 8 4,575 1,270 5,845 (543) 7 12 Unit 9 4,844 1,346 6,190 (575) 8 Planning use 13 Unit 10 4,844 1,335 6,179 (574) 8 B1 (c), B2, B8 and Unit 11 7,912 2,099 10,011 (930) 12 Trade Counter.
    [Show full text]
  • 160 Great Britain for Updates, Visit Wigan 27 28
    160 Great Britain For Updates, visit www.routex.com Wigan 27 28 Birkenhead Liverpool M62 36 Manchester Stockport M56 Mold Chester 35 Congleton Wrexham 59 M6 Shrewsbury 64 65 07 Wolverhampton Walsall West Bromwich Llandrindod Birmingham Wells Solihull M6 03 Coventry Warwick02 Carmarthen Hereford 01 51 60 Neath M5 Swansea 06 Pontypridd Bridgend Caerphilly Newport Cardiff M4 13 Barry Swindon M5 Bristol 61 14 Weston-super-Mare Kingswood 31 Bath 32 M4 05 Trowbridge 62 Newbury Taunton M5 20 Yeovil Winchester Exeter Southampton 55 Exmouth M27 Poole Lymington Bournemouth Plymouth Torbay Newport GB_Landkarte.indd 160 05.11.12 12:44 Great Britain 161 Wakefield 16 Huddersfield Hull Barnsley Doncaster Scunthorpe Grimsby Rotherham Sheffield M1 Louth 47M1 Heanor Derby Nottingham 48 24 Grantham 15 Loughborough 42 King's Leicester Lynn 39 40 Aylsham Peterborough Coventry Norwich GB 46 01 Warwick Huntingdon Thetford Lowestoft 45 M1 Northampton 02 43 44 Cambridge Milton Bedford Keynes Biggleswade Sawston 18 M40 19 Ipswich Luton Aylesbury Oxford Felixstowe Hertford 21 50 M25 M11 Chelmsford 61 30 53 52 Slough London Bracknell Southend-on-Sea Newbury Grays 54 Wokingham 29 Rochester Basingstoke 22 M3 Guildford M2 M25 Maidstone Winchester 23 M20 17 M27 Portsmouth Chichester Brighton La Manche Calais Newport A16 A26 Boulogne-sur-Mer GB_Landkarte.indd 161 05.11.12 12:44 162 Great Britain Forfar Perth Dundee 58 Stirling Alloa 34 Greenock M90 Dumbarton Kirkintilloch Dunfermline 57 Falkirk Glasgow Paisley Livingston Edinburgh Newton M8 Haddington Mearns 04 56 Dalkeith 26 Irvine Kilmarnock Ayr Hawick A74(M) 41 Dumfries 25 Morpeth Newcastle Carlisle Upon Whitley Bay 12Tyne 08 South Shields Gateshead 09 11 Durham 49 Redcar 33 Stockton-on-Tees M6 Middlesbrough 10 38 M6 A1(M) 37 Harrogate York 63 M65 Bradford Leeds Beverley M6 28 M62 Wakefield Wigan 16 27 Huddersfield Birkenhead Liverpool Manchester Barnsley M62 Scunthorpe 35 36Stockport Doncaster Rotherham Sheffield GB_Landkarte.indd 162 05.11.12 12:44 Great Britain 163 GPS Nr.
    [Show full text]
  • Road Investment Strategy M25 Junction 25 Improvements
    Road Investment Strategy M25 Junction 25 Improvements Environmental Study Report October 2016 v2.1, 25 October 2016 Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ Highways England Company Limited registered in England and Wales number 09346363 M25 Junction 25 Improvements: Environmental Study Report Notice This document and its contents have been prepared and are intended solely for Highway England’s information and use in relation to the M25 Junction 25 Improvements Environmental Study Report. Atkins Ltd assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. Document control The Project Manager is responsible for production of this document, based on the contributions made by his/her team existing at each Stage. Document Title M25 Junction 25 Improvements: Environmental Study Report Author Sarah Wallis Owner Piotr Grabowiecki Distribution Highways England Reviewers, Atkins Team Document Status Draft Revision History This document is updated at least every stage. Version Date Description Author 1.0 08/08/16 First Draft Sarah Wallis / Neil Watson 2.0 03/10/16 Second Draft Sarah Wallis / Neil Watson 2.1 25/10/16 Final Draft Sarah Wallis / Neil Watson Reviewer List Name Role Alison Braham Technical Review - Environmental Nicole Pulici Atkins Project Manager Henry Penner Highways England PTS Environmental Advisor Piotr Grabowiecki, Eze Onah, Highways England Integrated Project Team Andrew Salmon Approvals The Project SRO is accountable for the content of this document Name Signature Title Date of Issue Version Andrew Salmon Highways England Project SRO Working on behalf of i M25 Junction 25 Improvements: Environmental Study Report Table of contents Glossary ...................................................................................................................
    [Show full text]
  • The Regional Impact of the Channel Tunnel Throughout the Community
    -©fine Channel Tunnel s throughpdrth^Çpmmunity European Commission European Union Regional Policy and Cohesion Regional development studies The regional impact of the Channel Tunnel throughout the Community European Commission Already published in the series Regional development studies 01 — Demographic evolution in European regions (Demeter 2015) 02 — Socioeconomic situation and development of the regions in the neighbouring countries of the Community in Central and Eastern Europe 03 — Les politiques régionales dans l'opinion publique 04 — Urbanization and the functions of cities in the European Community 05 — The economic and social impact of reductions in defence spending and military forces on the regions of the Community 06 — New location factors for mobile investment in Europe 07 — Trade and foreign investment in the Community regions: the impact of economic reform in Central and Eastern Europe 08 — Estudio prospectivo de las regiones atlánticas — Europa 2000 Study of prospects in the Atlantic regions — Europe 2000 Étude prospective des régions atlantiques — Europe 2000 09 — Financial engineering techniques applying to regions eligible under Objectives 1, 2 and 5b 10 — Interregional and cross-border cooperation in Europe 11 — Estudio prospectivo de las regiones del Mediterráneo Oeste Évolution prospective des régions de la Méditerranée - Ouest Evoluzione delle prospettive delle regioni del Mediterraneo occidentale 12 — Valeur ajoutée et ingénierie du développement local 13 — The Nordic countries — what impact on planning and development
    [Show full text]
  • M1 Motorway (Junctions 1-3), M25
    M1 MOTORWAY(JUNCTIONS 1-3), M25 MOTORWAYJUNCTION 23, AND A1 TRUNK ROAD TEMPORARYTRAFFIC RESTRICTIONS Notice is hereby given that Highways England Company Limited intends to make an Order on the M25 Motorway in the County of Hertfordshire and the London Boroughs of Barnet and Hendon, under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order would be to authorise the overnight closure, in phases, of:- a) the entirecirculatory carriageway of the roundabout at M25 Junction 23 (A1(M)/A1); b) the roads leading to and from both carriageways of the M25 at Junction 23 (A1(M) Junction 1/A1); c) the roads leading to and from both carriageways of the A1(M)/A1 at Junction 23 (A1(M) Junction 1/A1); d) the southbound carriageway of the A1 between Bignell’sCorner (M25 Junction 23) and Borehamwood Interchange (A5135); e) the road leading from the southbound carriageway of the A1 at Borehamwood Interchange (A5135); f) the northbound carriageway of the M1 between Junction 1(A406) and the tip of the nosing of the entry slip road at Junction 3 (London Gateway Services); g) the road leading to the northbound carriageway of the M1 at Junction 1(A406); h) the road connecting to the M1 northbound entry slip road from the eastbound road connecting the EdgwareRoad roundabout to Staples Corner roundabout at Junction 1 (A406); i) theroads connecting to and from both carriageways of the M1 at Junction 2(A1); and j) all of the roads leading to and from both carriageways of the M1 at London Gateway Services.
    [Show full text]
  • Predicting Accident Frequency at Their Severity Levels and Its Application in Site Ranking Using a Two-Stage Mixed Multivariate Model
    Loughborough University Institutional Repository Predicting accident frequency at their severity levels and its application in site ranking using a two-stage mixed multivariate model This item was submitted to Loughborough University's Institutional Repository by the/an author. Citation: WANG, C., QUDDUS, M.A. and ISON, S.G., Predicting accident frequency at their severity levels and its application in site ranking using a two-stage mixed multivariate model. Accident Analysis and Prevention, 43(6), pp.1979-1990 Metadata Record: https://dspace.lboro.ac.uk/2134/8702 Version: Accepted for publication Publisher: c Elsevier Please cite the published version. This item was submitted to Loughborough’s Institutional Repository (https://dspace.lboro.ac.uk/) by the author and is made available under the following Creative Commons Licence conditions. For the full text of this licence, please go to: http://creativecommons.org/licenses/by-nc-nd/2.5/ 1 Predicting accident frequency at their severity levels and its application in site ranking using a two-stage mixed multivariate model Chao Wang*, Mohammed A Quddus, Stephen G Ison Transport Studies Group Department of Civil and Building Engineering Loughborough University Loughborough, Leicestershire LE11 3TU United Kingdom * Corresponding author – Tel: +44 (0)1509 564682; Fax: +44 (0)1509 223981. Email addresses: [email protected] (Chao Wang); [email protected] (Mohammed A Quddus); [email protected] (Stephen G Ison). Abstract Accident prediction models (APMs) have been extensively used in site ranking with the objective of identifying accident hotspots. Previously this has been achieved by using a univariate count data or a multivariate count data model (e.g.
    [Show full text]
  • The A1(M) Motorway (Junction 42 to Junction 43 and Junction 44) and the A64 Trunk Road (Temporary Prohibition of Traffic) Order 2011
    STATUTORY INSTRUMENTS 2011 No. 89 ROAD TRAFFIC The A1(M) Motorway (Junction 42 to Junction 43 and Junction 44) and the A64 Trunk Road (Temporary Prohibition of Traffic) Order 2011 Made - - - - 11 January 2011 Coming into force - - 16 January 2011 WHEREAS, the Secretary of State for Transport, being the traffic authority for the A1(M) Motorway, the A64 Trunk Road and connecting roads, in the Districts of Leeds and Selby in the Counties of West Yorkshire and North Yorkshire, is satisfied that traffic on that motorway and some of those connecting roads should be prohibited because survey, investigation and general maintenance works are proposed to be executed thereon: NOW, THEREFORE, the Secretary of State, in exercise of the powers conferred by section 14(1)(a) of the Road Traffic Regulation Act 1984(a), makes the following Order: - 1. This Order may be cited as the A1(M) Motorway (Junction 42 to Junction 43 and Junction 44) and the A64 Trunk Road (Temporary Prohibition of Traffic) Order 2011 and shall come into force on 16 January 2011. 2. In this Order; – “the A1(M)” means the A1(M) Motorway; “the M1” means the M1 Motorway at Junction 48 (Hook Moor); “the A64” means the A64 Trunk Road “the northbound carriageway” means the A1(M) northbound carriageway from the nose of the northbound exit slip road at Junction 42 (Selby Fork) to its junction with the M1 northbound carriageway at Hook Moor (the A1(M) Junction 43), a distance of 4800 metres; “the southbound carriageway” means the A1(M) southbound carriageway from its junction with the M1
    [Show full text]
  • Prominent Car Dealership Premises
    TO LET. Unit 24, Whitby Avenue, Park Royal, London NW10 7SF. Warehouse / Industrial Unit –4,826 sq f t (448.4 sq m) including Covered Loading. Property Features. • To be fully refurbished • Fitted first floor offices • End of terrace unit • 5.63m clear height • Trade counter potential • Covered loading • Undercroft for flexible future fit out • 5 car parking spaces Location. Terms. EPC. Located within the heart of Park Royal, on the Whitby Unit 24 is available by way of a new full repairing and D:87 Avenue Industrial Estate, Whitby Avenue. Accessed insuring lease at a annual rent of £87,000 per annum from Abbey Road, within the established and sought exclusive. after Park Royal industrial area. Legal Costs. The property is conveniently located for quick and easy Business Rates. Each party to bear their own legal costs. access to the North Circular Road (A406), providing access to the M1 motorway and Western Avenue (A40) The property has a rateable value of £40,250 and is eastbound providing access to Central London and described as “warehouse & premises”. All interested VAT. westbound for the A40 / M40, M25 and M4 motorways. parties should make enquires at Brent Local Authority. Ref: 55480024000001. Rent is subject to VAT. Park Royal station (Piccadilly line), Hanger lane (Central line) and Stonebridge Park (Bakerloo line) are all within walking distance. Description. An end of terrace unit comprising 5.63m clear height rising to 7.5 at the apex, warehouse lighting, undercroft for low height storage, trade counter or welfare accommodation and fully fitted first floor offices. Goods access is via a covered loading area and single level loading door measuring 4.82m wide by 5.0 high.
    [Show full text]
  • M25 London Orbital with Astucia Studs Layout 1
    CASE STUDY M25 LONDON ORBITAL WITH ASTUCIA STUDS Case Study Guiding the way on the M25 London Orbital PROJECT DETAILS Motorway DATE OF INSTALLATION 2009 Astucia is helping to improve driving conditions on the M25 LOCATION Motorway in Surrey, with the installation of approximately M25, Surrey, United Kingdom 4,500 Astucia SolarLite Road Studs. APPLICATION Astucia SolarLite Flush Road Studs BACKGROUND The M25 Motorway around London is one of the world’s longest orbital routes, covering 117 miles. The M25 is also one KEY BENEFITS of the busiest motorways in Europe being used by approximately 250,000 vehicles each day. Much of the 10x greater visibility for drivers motorway utilises street lighting to enhance driver visibility, than traditional reflective road however a number of junctions do not currently have lighting studs which increases driver safety risk due to restricted night time visibility. Excellent visibility in adverse Installing additional street lighting sites is an expensive exercise, with ever increasing weather e.g. fog, rain or surface costs of ongoing energy provision and environmental impact. It has been reported spray that electricity costs to power street lighting on motorways and ‘A’ roads in the UK Highlights sharp bends, dips in 1 was estimated at £15 million a year in 2009 . the road and other hazardous approaches Effective additional driver safety SOLUTION when used in conjunction with street light reduction schemes A recent project by Mouchel, a leading infrastructure and business services group has been designed to help improve driver visibility on a 6 mile unlit stretch of the M25 motorway between Junction 6 and the Clacket Lane Services.
    [Show full text]