The SRII Istanbul Libraries & Archives Guide
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Logistics Note Istanbul
LOGISTICS NOTE Inception and Training Workshop of the Project Minamata Initial Assessment Istanbul – Turkey, 26th - 27th March 2019 Venue Venue: Istanbul Marriott Hotel Sisli Abide-i Hurriyet Caddesi No.142 , Sisli Istanbul, 34381 Turkey ACCOMODATION OPTIONS Accomodation options: 1. Marriott Sisli Hotel (Venue of the workshop) Single room rate of 90 EUR/double room rate 100 EUR + 8 % VAT includes breakfast Contact: Ms. Kerim Bahtigul at [email protected] [email protected] Note: Please inicate that you are a participant of the Global MIA workshop on 26 and 27 March 2019 so that you can benefit from the special rate. 2. Radisson Blu Sisli (5 minutes walking distance): 90 € - room rates are per night, inclusive of breakfast, excluding %8 VAT Contacts: Kubra Colakel [email protected] Begum Bayram [email protected] 3. Hilton Bomonti (10-15 minutes walking distance): 90 € - room rates are per night, inclusive of breakfast, excluding %8 VAT. Contact: Nursu Ozgenc [email protected] LUNCHES, RECEPTION, COFFEE BREAKS AND RESTAURANTS The coffee breaks for the workshop will be offered by the organizers and served at the countries representatives next to the meeting room. Lunches will be at the expense and discretion of the participants. The express lunch menu at the Marriott hotel (workshop venue) is 45 TRY. Airport transfer and way to the meeting venue Please note that Istanbul has 2 airports. TAV Istanbul Ataturk Airport is located on the European side where the event will take place, while Sabiha Gokcen International Airport (SAW) is located in the Asian side of the city. -
Chapter 3 Road Network and Traffic Volume
The Study on Integrated Urban Transportation Master Plan for Istanbul Metropolitan Area in the Republic of Turkey Final Report Chapter 3 Chapter 3 Road Network and Traffic Volume 3.1 Road Network 3.1.1 Inter-regional Road Network 1) Existing Road Turkey is situated at the transit corridor between South-east Europe and the Middle East. Since “The Declaration for The Construction of International Arteries” (AGR) prepared by the United Nations Economic Commission for Europe (UN/ECE) in 1950 in Geneva, Turkey has developed international corridors connecting it to Southern Europe, because the international road network of AGR included an extension to Turkey. According to the provisions of AGR, two arteries should reach Turkey as E-Road. These are E-80 entering from the Bulgarian border (Kapikule) and E-90 entering from the Greek border (Ipsala). These two main routes link the International Road Network of Europe with the Middle East and Asia at southern and eastern borders of Turkey via Anatolia. Source: KGM, Ministry of Transportation Figure 3.1.1 International Road Network through Turkey, 2007 In addition to the E-Roads, the Trans-European Motorway (TEM) project is ongoing and it covers the whole country as an expressway network. The TEM highway network in Turkey starts from Edirne at the Bulgarian border and passes through Istanbul via the Fatih Sultan Mehmet Bridge and parts into two branches in Ankara going eastward and southward. Its eastern branch again parts into two branches in Askale. One of them reaches Trabzon in the Black Sea Region, and the other ends in Gurbulak at the Iranian border. -
T1 Tramvay Zaman Çizelgesi Ve Hat Güzergah Haritası
T1 tramvay saatleri ve hat haritası Bağcılar →Kabataş Web Sitesi Modunda Görüntüle T1 tramvay hattı (Bağcılar →Kabataş) arası 4 güzergah içeriyor. Hafta içi günlerde çalışma saatleri: (1) Bağcılar →Kabataş: 00:00 - 23:45 (2) Cevizlibağ →Eminönü: 07:02 - 19:02 (3) Eminönü →Cevizlibağ: 07:32 - 19:32 (4) Kabataş →Bağcılar: 00:00 - 23:45 Size en yakın T1 tramvay durağınıbulmak ve sonraki T1 tramvay varış saatini öğrenmek için Moovit Uygulamasını kullanın. Varış yeri: Bağcılar →Kabataş T1 tramvay Saatleri 31 durak Bağcılar →Kabataş Güzergahı Saatleri: HAT SAATLERİNİ GÖRÜNTÜLE Pazartesi 00:00 - 23:45 Salı 00:00 - 23:45 Bağcılar 3. Sokak, Turkey Çarşamba 00:00 - 23:45 Güneştepe Perşembe 00:00 - 23:45 Yavuz Selim Cuma 00:00 - 23:45 Cumartesi 00:00 - 23:48 Soğanlı Gönül Sokak, Turkey Pazar 00:00 - 23:48 Akıncılar Abdi İpekçi Caddesi, A. Nafiz Gurman Güngören T1 tramvay Bilgi Yön: Bağcılar →Kabataş Merter Tekstil Merkezi Duraklar: 31 Yolculuk Süresi: 63 dk Mehmet Akif Hat Özeti: Bağcılar, Güneştepe, Yavuz Selim, Soğanlı, Akıncılar, Güngören, Merter Tekstil Zeytinburnu Merkezi, Mehmet Akif, Zeytinburnu, Mithatpaşa, Seyitnizam-Akşemsettin, Merkez Mithatpaşa Efendi, Cevizlibağ - A.Ö.Y., Topkapı, Pazartekke, Çapa-Şehremini, Fındıkzade, Haseki, Yusufpaşa, Aksaray, İstanbul Seyitnizam-Akşemsettin Üniversitesi - Laleli, Beyazıt-Kapalıçarşı, Çemberlitaş, Sultanahmet, Gülhane, Sirkeci, Merkez Efendi Eminönü, Karaköy, Tophane, Fındıklı - Mimar Sinan Üniversitesi, Kabataş Cevizlibağ - A.Ö.Y. Topkapı Pazartekke Çapa-Şehremini 125/B Turgut Özal Millet Caddesi, -
01 TEMMUZ 2017 TARİHİNDEN İTİBAREN GEÇERLİ İSTANBULKART (Elektronik Bilet) / JETON / ABONMAN (Mavi Kart) ÜCRET TARİFELERİ
01 TEMMUZ 2017 TARİHİNDEN İTİBAREN GEÇERLİ İSTANBULKART (Elektronik Bilet) / JETON / ABONMAN (Mavi Kart) ÜCRET TARİFELERİ 25.05.2017 Tarih ve 2017/4-10.B Sayılı UKOME Kararı İSTANBULKART; o İETT OTOBÜSLERİ (İETT Genel Müdürlüğü), o TÜNEL (İETT Genel Müdürlüğü), o NOSTALJİK TRAMVAY (İETT Genel Müdürlüğü), o ÖHO OTOBÜSLERİ (Özel Halk Otobüsleri A.Ş), o İOAŞ OTOBÜSLERİ (İstanbul Otobüs A.Ş), o METRO (Metro İstanbul A.Ş), o TRAMVAY (Metro İstanbul A.Ş), o FÜNİKÜLER (Metro İstanbul A.Ş), o TELEFERİK (Metro İstanbul A.Ş), (Bu hatlarda abonman (mavi kart) ve sınırlı kullanım bilet için 1 düşüş yapılacaktır.) İSTANBULKART (Elektronik Bilet) Tam Öğrenci İndirimli 2 İlk Biniş 2,60 TL 1,25 TL 1,85 TL 1. Aktarma 1,85 TL 0,55 TL 1,10 TL 2. Aktarma 1,40 TL 0,50 TL 0,85 TL 3. Aktarma 0,90 TL 0,45 TL 0,55 TL 4. Aktarma 0,90 TL 0,45 TL 0,55 TL 5. Aktarma 0,90 TL 0,45 TL 0,55 TL MARMARAY (TCDD); (Bu hatlarda abonman (mavi kart) ve sınırlı kullanım bilet için 1 düşüş yapılacaktır.) İSTANBULKART (Elektronik Bilet) Tam Öğrenci İlk Biniş 2,60 TL 1,25 TL 1. Aktarma 1,95 TL 0,55 TL 2. Aktarma 1,70 TL 0,50 TL 3. Aktarma 1,50 TL 0,45 TL 4. Aktarma 1,50 TL 0,45 TL 5. Aktarma 1,50 TL 0,45 TL İDO (Sirkeci – Harem Arabalı Vapuru); (Bu hatlarda abonman (mavi kart) ve sınırlı kullanım bilet için 1 düşüş yapılacaktır.) TAŞIMACILIK TÜRÜ Jeton İstanbulkart Yolcu (Tam) 2,60 TL Yolcu (Öğrenci) 5,00 TL 1,25 TL Yolcu Yolcu (Sosyal, İndirimli 2) 1,85 TL Bisiklet Ücretsiz (Yalnızca Yolcu Ücreti) Motosiklet 5,00 TL Otomobil 10,00 TL Arazi Aracı (SUV, Off Road, Cip vb.) 14,00 TL Yolcu Taşıtları Yolcu Minibüs, Küçük Otobüs 15,00 TL Otobüs* 30,00 TL Azami Yüklü Ağırlığı 3.500 Kilogramı Geçmeyen ve Yük Taşımak İçin İmal 25,00 TL Yük Edilmiş N1 Kategorisindeki Motorlu Taşıt Taşıtları *İBB TUHİM’den Alınmış; Güncel Güzergâh Kullanım İzin Belgesi’ne Sahip Olmak Şartıyla Geçiş Yapılabilecektir. -
Discussion Paper Nr
discussion paper Nr. 41/2018 Juni/2018 discussion paper Houshmand E. Masoumi1, Amr Ah. Gouda1,7, Lucia Layritz1, Pia Stendera1, Cynthia Matta2, Haya Tabbakh3, Sima Razavi4, Houshiar Masoumi4, Betül Mannasoğlu5, Özlem Kılınç5, Ashraf M. Sharara6, Mahmoud Elnably7, Ahmad Alhakeem1, Sherzad Ismail1, Erik Fruth1 Urban Travel Behavior in Large Cities of MENA Region: Survey Results of Cairo, Istanbul, and Tehran 1 Technische Universität Berlin, Zentrum Technik und Gesellschaft, Germany 2 Notre Dame University, Louaize, Lebanon 3 American University of Beirut, Lebanon 4 Independent surveyor, Tehran, Iran 5 Istanbul Technical University, Turkey 6 Independent Surveyor, Cairo, Egypt 7 Ain Shams University, Cairo, Egypt Impressum Zentrum Technik und Gesellschaft Sekretariat HBS 1 Hardenbergstraße 16.18 10623 Berlin www.ztg.tu-berlin.de Die Discussion Paper werden von Martina Schäfer, Leon Hempel und Dorothee Keppler herausgegeben. Sie sind als pdf-Datei abrufbar unter: http://www.tu-berlin.de/ztg/menue/publikationen/discussion_papers/ 2 Abstract The present discussion paper summarizes an urban mobility survey as a part of the project “Urban Travel Behavior in Large Cities of MENA Region” (UTB-MENA) funded by the German Research Foundation (DFG) undertaken in summer and autumn 2017 in Tehran, Istanbul, and Cairo. This data collection was conducted in 18 neighborhoods located in different urban forms related to three different eras: traditional urban form, in-between (transitional) urban form, and new developments. The survey instrument included 31 questions organized in six different sections. As a result of face- to-face interviews with residents as well as quantification of several land use indicators, a database of 8284 validated subjects (Cairo: 2786 , Istanbul: 2781 , Tehran: 2717) was created by the research team based in Berlin, Tehran, Istanbul, and Cairo. -
Davutpaşa Campus
DAVUTPAŞA CAMPUS AIRPORTS Atatürk Airport Atatürk International Airport (IST) at Yeşilköy, 14 miles west of Sultanahmet Square, is the busiest one of Turkey's major airports. You can travel between Atatürk Airport and the city center by (M1: Yenikapı-Atatürk Airport) metro, city bus, taxi, shuttle van (Havabus Shuttle) or private transfer. For Davutpaşa Campus, take the M1 metro line to the ‘Davutpaşa-Yıldız Teknik Üniversitesi’ stop. Cross the avenue, you will see the entrance of the university. http://www.ataturkairport.com/en-EN/Pages/Main.aspx Sabiha Gökçen Airport https://www.sabihagokcen.aero/homepage Sabiha Gökçen International Airport (SAW) is on the Asian shore of the Bosphorus about 30 km (19 miles) southeast of Haydarpaşa Station, the Kadıköy ferry dock. You can travel between Sabiha Gökçen Airport and the center of Istanbul by city bus (E-10), shuttle van (Havabus Shuttle), taxi, private transfer or car rental. You can take E-10 city bus, it departs from Sabiha Gökçen Airport about every 15-20 minutes throughout the day. The bus stops at several bus stations in the town nearby, then goes on the E-5 highway to Kadıköy. You can get off Vergi Dairesi stop and take 500T city bus. Then you can get off Edirnekapı Kaleboyu stop and take 41AT going to Davutpaşa Campus directly. This route may take long time, so you can go for other possible route options as below. You can obtain the full schedule from the IETT website. (http://www.iett.istanbul/en) Havabus Shuttle (Airport Buses) in the direction of Sabiha Gökçen Airport departs from Taksim Square in Beyoğlu on the European side. -
An Ottoman Global Moment
AN OTTOMAN GLOBAL MOMENT: WAR OF SECOND COALITION IN THE LEVANT A Dissertation submitted to the Faculty of the Graduate School of Arts and Sciences of Georgetown University in partial fulfillment of the requirements for the Degree of Doctor of Philosophy In History By Kahraman Sakul, M.A Washington, DC November, 18, 2009 Copyright 2009 by Kahraman Sakul All Rights Reserved ii AN OTTOMAN GLOBAL MOMENT: WAR OF SECOND COALITION IN THE LEVANT Kahraman Sakul, M.A. Dissertation Advisor: Gabor Agoston, Ph.D. ABSTRACT This dissertation aims to place the Ottoman Empire within its proper context in the Napoleonic Age and calls for a recognition of the crucial role of the Sublime Porte in the War of Second Coalition (1798-1802). The Ottoman-Russian joint naval expedition (1798-1800) to the Ionian Islands under the French occupation provides the framework for an examination of the Ottoman willingness to join the European system of alliance in the Napoleonic age which brought the victory against France in the Levant in the War of Second Coalition (1798-1802). Collections of the Ottoman Archives and Topkapı Palace Archives in Istanbul as well as various chronicles and treatises in Turkish supply most of the primary sources for this dissertation. Appendices, charts and maps are provided to make the findings on the expedition, finance and logistics more readable. The body of the dissertation is divided into nine chapters discussing in order the global setting and domestic situation prior to the forming of the second coalition, the Adriatic expedition, its financial and logistical aspects with the ensuing socio-economic problems in the Morea, the Sublime Porte’s relations with its protectorate – The Republic of Seven United Islands, and finally the post-war diplomacy. -
Professional Ethics and the Denial of Armenian Genocide
Professional Ethics and the Denial of Armenian Genocide Roger W. Smith College of William and Mary, Williamsburg, Virginia Eric Markusen Southwest State University, Marshall, Minnesota Robert Jay Lifton The City University of New York This article examines Turkish efforts to deny the Armenian genocide of 1915-17. Specifically, it exposes an arrangement by which the government of Turkey has channeled funds into a supposedly objective research insti- tute in the United States, which in turn paid the salary of a historian who served that government in its campaign to discredit scholarship on the Armenian genocide. After a short review of the Armenian genocide and a range of Turkish denial efforts, three documents are reproduced in full. They include a letter that Robert Jay Lifton received from the Turkish Am- bassador to the United States, and two documents that were inadvertently included with the Lifton letter—a memorandum to the Turkish Ambassa- dor and a draft letter to Lifton for the Ambassador's signature. After a critical analysis of each document, we discuss the harmful ness of genocide denial and explore why intellectuals might engage in the denial of known genocides. The article concludes with reflections on the relationship be- tween scholars and truth. The will to truth is cowed by pressure of numerous kinds, reasons of state on the one hand, economic necessities on the other, and, not least, the pure careerism of intellectu- als who put their expertise in the service of power as a matter of course When govern- ments and professional elites find reward in the sophistries of might makes right, truth is bound to suffer.1 Terrence Des Pres It has been said that gentlemen do not read other gentlemen's mail. -
Was There an Armenian Genocide? Geoffrey Robertson
University of St. Thomas Journal of Law and Public Policy Volume 4 Article 6 Issue 2 Spring 2010 Was There an Armenian Genocide? Geoffrey Robertson Follow this and additional works at: http://ir.stthomas.edu/ustjlpp Part of the Human Rights Law Commons Bluebook Citation Geoffrey Robertson, Was There an Armenian Genocide?, 4 U. St. Thomas J.L. & Pub. Pol'y 83 (2010). This Article is brought to you for free and open access by UST Research Online and the University of St. Thomas Journal of Law and Public Policy. For more information, please contact Editor-in-Chief Patrick O'Neill. WAS THERE AN ARMENIAN GENOCIDE? THE OPINION OF GEOFFREY ROBERTSON, QC. THE ISSUE There is no doubt that in 1915, the Ottoman government ordered the deportation of up to two million Armenians from Anatolia and other provinces: they were marched towards Syria and hundreds of thousands died en route from disease, starvation, and armed attack. There were other atrocities committed against Armenians in that year because of their race and their Christian religion, beginning with the rounding up of several hundred intellectuals in Constantinople on April 24th. The "Young Turk" government was accused of responsibility for what the governments of Britain, France, and Russia, jointly and formally declared to be a "crime against humanity." These allies solemnly promised to punish the perpetrators, and after the war, special provisions were made to do so in the Treaty of S~vres. The United Kingdom rounded up sixty-seven Turkish officials suspected of ordering atrocities and held them for trial in Malta, but for reasons of diplomatic expediency, they were eventually released. -
The Making of Sultan Süleyman: a Study of Process/Es of Image-Making and Reputation Management
THE MAKING OF SULTAN SÜLEYMAN: A STUDY OF PROCESS/ES OF IMAGE-MAKING AND REPUTATION MANAGEMENT by NEV ĐN ZEYNEP YELÇE Submitted to the Institute of Social Sciences in partial fulfillment of the requirements for the degree of Doctor of Philosophy in History Sabancı University June, 2009 © Nevin Zeynep Yelçe 2009 All Rights Reserved To My Dear Parents Ay şegül and Özer Yelçe ABSTRACT THE MAKING OF SULTAN SÜLEYMAN: A STUDY OF PROCESS/ES OF IMAGE-MAKING AND REPUTATION MANAGEMENT Yelçe, Nevin Zeynep Ph.D., History Supervisor: Metin Kunt June 2009, xv+558 pages This dissertation is a study of the processes involved in the making of Sultan Süleyman’s image and reputation within the two decades preceding and following his accession, delineating the various phases and aspects involved in the making of the multi-layered image of the Sultan. Handling these processes within the framework of Sultan Süleyman’s deeds and choices, the main argument of this study is that the reputation of Sultan Süleyman in the 1520s was the result of the convergence of his actions and his projected image. In the course of this study, main events of the first ten years of Sultan Süleyman’s reign are conceptualized in order to understand the elements employed first in making a Sultan out of a Prince, then in maintaining and enhancing the sultanic image and authority. As such, this dissertation examines the rhetorical, ceremonial, and symbolic devices which came together to build up a public image for the Sultan. Contextualized within a larger framework in terms of both time and space, not only the meaning and role of each device but the way they are combined to create an image becomes clearer. -
The Ottoman Documents and the Genocidal Policies of the Committee for Union and Progress (İttihat Ve Terakki) Toward the Armenians in 1915
Genocide Studies and Prevention: An International Journal Volume 1 Issue 2 Article 5 September 2006 The Ottoman Documents and the Genocidal Policies of the Committee for Union and Progress (İttihat ve Terakki) toward the Armenians in 1915 Taner Akçam Follow this and additional works at: https://scholarcommons.usf.edu/gsp Recommended Citation Akçam, Taner (2006) "The Ottoman Documents and the Genocidal Policies of the Committee for Union and Progress (İttihat ve Terakki) toward the Armenians in 1915," Genocide Studies and Prevention: An International Journal: Vol. 1: Iss. 2: Article 5. Available at: https://scholarcommons.usf.edu/gsp/vol1/iss2/5 This Article is brought to you for free and open access by the Open Access Journals at Scholar Commons. It has been accepted for inclusion in Genocide Studies and Prevention: An International Journal by an authorized editor of Scholar Commons. For more information, please contact [email protected]. The Ottoman Documents and the Genocidal Policies of the Committee for Union and Progress (_Ittihat ve Terakki) toward the Armenians in 1915 Taner Akc¸am University of Minnesota The author analyzes the Ottoman Archives as a source of information on the Armenian Genocide of 1915. He discusses the contradictory positions of two broad groups of scholars on the reliability of these archives, concluding that the Ottoman Archives agree with the information found in the archives of the United States, Britain, Germany, and Austria. He discusses the various categories of Ottoman documents, which mostly came out during the trials related to the Armenian Genocide, which took place from 1919 to 1921, and makes clear that there was a wide-ranging cleansing operation of the archives after the armistice in 1918. -
The New Anatolian Metro of Istanbul G
Zurich, 10/12/2009 Tunnelling in urban area The new Anatolian Metro of Istanbul G. Astore ([email protected]), G. Quaglio ([email protected]) and G. Pradella ([email protected]) Geodata SpA, Torino, Italy The new metro line of Istanbul from Kadikoy to Kartal is 21.7km long with 16 stations, crossing the densely-populated Anatolian side of the city and a significant part of the line is located beneath the E5/D100 motorway. The line is designed to be completely underground, with a variable cover of 25-35m, such that all the stations, the turn-out tunnels and more than 50% of the running tunnels are excavated with conventional methods. Tunnelling in this densely-populated urban area is associated with a number of problems such as lack of space for stations and access shafts (more than 20 access shafts are required), interference with valuable buildings and the need to maintain traffic on critical roads during construction. Moreover, the complex contractual constraints, the heterogeneous geological conditions comprising mainly of sedimentary rocks with volcanic intrusions, and the high level of seismicity of the region, presents a great challenge for the Designers and Contractors. In this article a number of examples are presented where an appropriate and agreed management of risks has allowed to face and to solve a number of critical design and construction issues during excavation works. At the time of writing of this article, in a little more than a year and a half after the start of the construction, more than 60 excavation fronts are opened and a large part of the excavations have been successfully completed, allowing to meet contractual deadlines.