Urban Corridor Study

Total Page:16

File Type:pdf, Size:1020Kb

Urban Corridor Study Appendices South I-25 Urban Corridor Study Prepared for: Denver South Transportation Management Association (TMA) Prepared by: Economic & Planning Systems, Inc. Felsburg Holt & Ullevig Goodbee and Associates Sky to Ground Steer Davies Gleave May 4, 2016 EPS # 133068 Appendices Contents 1. SOUTH I-25 URBAN CORRI DOR STUDY ECONOMIC AND DEMOGRAPHI C DATA APPENDI X 2. SOUTH I-25 URBAN CORRI DOR STUDY – TRANSPORTATION AUDIT 3. BUSINESS PARK EVOLUTION WHITE PAPER 4. EMPLOYEE TRANSPORTATI ON SURVEY REPORT OF RESULTS 5. I-25 SOUTH STAKEHOLDER OUTREACH 6. UTILITY INFRASTRUCTURE EVALUATION – SOUTH I-25 URBAN CORRI DOR STUDY TECHNI CAL MEMORANDUM South I -25 Urban Corridor Study Economic and Demographic Data Appendix Denver LosAngeles Oakland Sacramento May 6, 2016 Outline • Employment Data • Housing Data • Demand vs. Capacity Analysis South I-25 Urban Corridor Study 1 EMPLOYMENT DATA South I-25 Urban Corridor Study 2 Study Corridor Boundaries South I-25 Urban Corridor Study 3 Historic Employment Trends 2005-2013 2013 Industry 2005 2013 Total Ann. # Ann. % % of Total Agriculture, Forestry, Fishing and Hunting 19 6 -13 -2 -13.6% 0.0% Mining, Quarrying, and Oil and Gas Extraction 421 1,102 681 85 12.8% 0.8% Utilities 86 6 -80 -10 -27.9% 0.0% Construction 5,840 3,855 -1,985 -248 -5.1% 2.9% Manufacturing 1,719 1,308 -411 -51 -3.4% 1.0% Wholesale Trade 8,249 8,527 278 35 0.4% 6.4% Retail Trade 8,646 9,150 504 63 0.7% 6.9% Transportation and Warehousing 1,190 913 -277 -35 -3.3% 0.7% Information 15,982 15,575 -407 -51 -0.3% 11.7% Finance and Insurance 23,433 24,836 1,404 175 0.7% 18.7% Real Estate and Rental and Leasing 2,945 3,011 66 8 0.3% 2.3% Professional, Scientific and Technical Services 16,150 21,265 5,116 639 3.5% 16.0% Management of Companies and Enterprises 5,711 8,691 2,980 372 5.4% 6.5% Administrative and Support and Waste Management and Remediation Services 7,491 11,041 3,550 444 5.0% 8.3% Educational Services 1,062 1,888 826 103 7.5% 1.4% Health Care and Social Assistance 4,408 7,358 2,950 369 6.6% 5.5% Arts, Entertainment, and Recreation 916 1,094 178 22 2.2% 0.8% Accommodation and Food Services 8,707 9,764 1,057 132 1.4% 7.3% Other Services, except Public Administration 1,600 2,349 750 94 4.9% 1.8% Public Administration 831 1,170 339 42 4.4% 0.9% Unclassified 18 10 -7 -1 -6.5% 0.0% Total Wage and Salary Employment 115,425 132,921 17,496 2,187 1.8% 100.0% Source: BLS QCEW; Economic & Planning Systems South I-25 Urban Corridor Study 4 Top 10 Largest Corridor Industries South I-25 Urban Corridor Study 5 Corridor Location Quotients by Industry 2013 Industry LQ Finance and Insurance 3.4 Management of Companies and Enterprises 3.3 Information 3.1 Professional, Scientific and Technical Services 1.9 Admin and Supp. and Waste Mang. and Rem. Serv. 1.2 Real Estate and Rental and Leasing 1.1 Wholesale Trade 1.1 Mining, Quarrying, and Oil and Gas Extraction 1.0 Accommodation and Food Services 0.8 Unclassified 0.7 Retail Trade 0.6 Other Services, except Public Administration 0.6 Construction 0.5 Health Care and Social Assistance 0.5 Arts, Entertainment, and Recreation 0.3 Educational Services 0.2 Manufacturing 0.2 Public Administration 0.1 Transportation and Warehousing 0.1 Agriculture, Forestry, Fishing and Hunting 0.0 Utilities 0.0 Source: BLS QCEW; Economic & Planning Systems South I-25 Urban Corridor Study 6 Employment by Subarea Description % Amount 2014 2014 Total Employment Belleview Station Area 15.5% 21,344 Orchard Station Area 17.0% 23,409 Arapahoe Station Area 24.0% 33,048 Dry Creek Station Area 21.0% 28,917 County Line Station Area 8.0% 11,016 Lincoln Station Area 12.5% 17,213 RidgeGate West Station Area 2.0% 2,754 RidgeGate East Station Area 0.0% 0 Subtotal 100.0% 137,701 Source: Economic & Planning Systems H:\133068-Denver SE I-25 Corridor Growth Study\Models\[133068- Employment and Space Forecast-06-26-2015.xlsm]SUM-EMP BY AREA South I-25 Urban Corridor Study 7 Forecast by Industry Growth Rates Total Employment 2013-2035 Description 2005-2013 2014-2035 2013 2035 Total Historical Forecast Finance and Insurance 0.7% 2.0% 24,836 38,193 13,356 Professional, Scientific and Technical Services 3.2% 2.1% 21,265 35,258 13,993 Information 0.8% 1.6% 15,575 19,334 3,760 Admin and Supp. and Waste Mang. and Rem. Serv. 4.6% 1.7% 11,041 16,008 4,967 Accommodation and Food Services 1.4% 1.7% 9,764 14,046 4,282 Management of Companies and Enterprises 5.2% 2.5% 8,691 15,279 6,588 Retail Trade 0.7% 2.0% 9,150 14,121 4,971 Health Care and Social Assistance 7.6% 4.5% 7,358 17,487 10,129 Wholesale Trade 0.2% 1.2% 8,527 11,398 2,870 Construction -5.0% 0.7% 3,855 4,465 611 Others 3.5% 3.2% 12,859 21,336 8,476 Total Employment 1.8% 2.0% 132,921 206,924 74,003 % of Metro Area 10.6% 11.5% Source: Bureau of Labor Statistics, QCEW; Economic & Planning Systems South I-25 Urban Corridor Study 8 Development Typologies • R&D/Low Rise Office • Office Campus/Mid Rise • High Rise Office South I-25 Urban Corridor Study 9 Existing Development by Type Description 2014 (CoStar) New: Total Space Office 29,877,352 R&D/Low -Rise Office 9,459,718 Campus/Mid-Rise Office 12,630,277 High-Rise Office 7,787,357 Industrial/Flex 3,410,171 Retail 6,804,869 Hotel 4,039,653 Total Space 44,132,045 Source: Economic & Planning Systems H:\133068-Denver SE I-25 Corridor Growth Study\Models\[133068- Employment and Space Forecast-06-26-2015.xlsm]SUM-SPACE BY TYPE South I-25 Urban Corridor Study 10 Forecast Jobs by Development Type Description 2014-2020 2020-2025 2025-2030 2030-2035 Total % of Total Employment by Type R&D/Low-Rise Office 7,315 4,054 2,876 2,680 16,925 24.0% Campus/Mid-Rise Office 7,478 4,151 2,940 2,740 17,309 24.6% High-Rise Office 7,072 3,827 2,644 2,429 15,972 22.7% Industrial/Flex 3,132 1,631 1,098 978 6,839 9.7% Retail 5,318 2,838 1,937 1,747 11,839 16.8% Hotel 691 364 251 227 1,533 2.2% Total 31,006 16,865 11,747 10,800 70,417 100.0% Average 5,168 3,373 2,349 2,160 3,353 Source: US Census Bureau, QCEW; Economic & Planning Systems South I-25 Urban Corridor Study 11 Building and Employee Density FAR Sq. Ft./ Description Existing Forecast Description Employee R&D/Low-Rise Office 0.54 0.60 R&D/Low-Rise Office 300 Campus/Mid-Rise Office 0.54 0.55 Campus/Mid-Rise Office 250 High-Rise Office 250 High-Rise Office 1.04 1.00 Industrial/Flex 600 Industrial/Flex 0.25 0.50 Retail 500 Retail 0.19 0.25 Hotel 1,000 Hotel 0.62 1.00 Source: Economic & Planning Systems [Note] Accounts for space built after 2000 Source: Economic & Planning Systems Building Space Demand Factors Land Demand Factors • Definition: • Definition: – Square feet of building space – FAR = Floor Area Ratio, which is per job/employee the ratio of building space (sq. ft.) to land area (sq. ft.) • Purpose: • Purpose: – Translate jobs into building space demand (sq. ft.) – Translate building space demand into land demand (acres) South I-25 Urban Corridor Study 12 Forecast Square Feet Change 2014-2035 Description Total Ann. # % of Total Cumulative Demand for Space by Type R&D/Low-Rise Office 4,954,391 235,923 22% Campus/Mid-Rise Office 4,831,095 230,052 21% High-Rise Office 4,579,399 218,067 20% Industrial/Flex 2,419,701 115,224 11% Retail 4,857,724 231,320 22% Hotel 867,812 41,324 4% Total 22,510,122 1,071,911 100% Source: Economic & Planning Systems South I-25 Urban Corridor Study 13 Office Space Growth, 1975 to 2035 Forecast South I-25 Urban Corridor Study 14 New Office Space per 10 year period Forecast South I-25 Urban Corridor Study 15 HOUSI NG DATA South I-25 Urban Corridor Study 16 Population and Households, 2014 Change 2000-2014 2000 2010 2014 Total # Ann # Ann. % Population 10,637 21,158 23,397 12,760 911 5.8% Households 5,029 11,332 12,511 7,482 534 6.7% Persons per HH 2.12 1.87 1.87 Housing Units 5,712 13,072 14,369 8,657 618 6.8% Source: ESRI; US Census Bureau; Economic & Planning Systems South I-25 Urban Corridor Study 17 Age of Corridor Residents, 2014 Description Total % of Total Age Range 0 - 4 1,183 4.7% 5 - 9 1,233 4.9% 10 - 14 1,208 4.8% 15 - 24 2,995 11.9% 25 - 34 6,316 25.1% 35 - 44 3,624 14.4% 45 - 54 3,196 12.7% 55 - 64 2,894 11.5% 65 - 74 1,661 6.6% 75 - 84 579 2.3% 85 + 327 1.3% Source: US Census Bureau; US Census Bureau ACS; Economic & Planning Systems H:\ 133068-Denver SE I-25 Corridor Growt h St udy\ Dat a\ ESRI\ [ Demographics_Corridor.xlsx] Sheet 1 South I-25 Urban Corridor Study 18 Units by Type, 2014 Units In Structure # Units % Units 1 (Detached) 2,825 23.5% 1 (Attached) 376 3.1% 2-4 380 3.2% 5-9 1,113 9.3% 10-19 1,586 13.2% 20+ 5,708 47.5% Other 42 0.3% Source: ESRI; US Census ACS; Economic & Planning Systems C:\Users\mprosser.EPSDEN\ Desktop\ Denver south\[ 133068-Demog.xlsx]Unit Type South I-25 Urban Corridor Study 19 Housing Tenure South I-25 Urban Corridor Study 20 Households by Income, 2014 Income # Households % Households <$15,000 688 5.5% $15,000 - $24,999 513 4.1% $25,000 - $34,999 901 7.2% $35,000 - $49,999 1,564 12.5% $50,000 - $74,999 2,052 16.4% $75,000 - $99,999 1,689 13.5% $100,000 - $149,999 2,315 18.5% $150,000 - $199,999 988 7.9% $200,000+ 1,789 14.3% Average Household Income $114,364 --- Median Household Income $81,380 --- Source: ESRI; US Census; Economic & Planning Systems C:\ Users\mprosser.EPSDEN\ Deskt op\ Denver sout h\ [ 133068-Demog.xlsx] Income South I-25 Urban Corridor Study 21 People per Household, 2014 # People in Household # Households % Households 1-Person 5,086 44.9% 2-Person 3,771 33.3% 3-Person 1,202 10.6% 4-Person 862 7.6% 5-Person 309 2.7% 6-Person 72 0.6% 7+ Person 30 0.3% Source: ESRI; US Census; Economic & Planning Systems H:\ 133068-Denver SE I-25 Corridor Growt h St udy\ Dat a\ [ 133068-Demog.xlsx] HH Size South I-25 Urban Corridor Study 22 Housing Units by Decade Built South I-25 Urban Corridor Study 23 Jobs to Housing Ratio South I-25 Downtown Corridor Denver 130,000 120,000 Workers Workers 12,500 12,000 Households Households South I-25 Urban Corridor Study 24 Housing Forecast Forecast Change 2014-2035 Description 2000 2014 2020 2025 2035 Total # Ann.
Recommended publications
  • May 2019 Proposed Service Changes
    May 2019 Proposed Service Changes BUS Route 0 – South Broadway Running time analysis resulting in schedule adjustments. Route 1 – 1st Avenue Move east terminal from Birch/Virginia to Virginia/Cherry, immediately behind King Soopers at Leetsdale/Cherry for operator restroom and customer convenience. Route 15 – East Colfax This proposal is an effort to relieve passenger overloads east of Monaco to VA Hospital by adding selected trips between 9:00am and 1:00pm. Move short turn recovery location from Oneida/Colfax to Leyden/Colfax, for operator restroom access. Close to Walgreens, McDonalds, 7-11. Add weekday bus for recovery and on-time performance. 16/16L – West Colfax Running time analyses on weekend services. Route 33 – Platte Valley Due to low ridership performance, it proposed that this route service be discontinued. Current ridership performance stands at 10.3 passenger per hour, which falls below the Urban Local ridership standard. This proposal would impact approximately 55 weekday passengers. Alternative service to the Route 33 can be found in using combinations of Central and West Light Rail corridors, Routes 4, 9, 30 and 30Limited. Route 36L – Fort Logan Limited Running time analysis, for operator recovery and on-time performance. No cost impacts are anticipated. Route 44 – 44th Avenue Reroute eastbound buses via Larimer Street instead of Lawrence, between Broadway and Downing. This change consolidates service onto the historic transit corridor, instead of being split between two streets. Bus stop improvement along northbound Larimer are currently underway in support of this reroute. No cost impacts are anticipated. Route 51 – Sheridan Boulevard This proposal would, formalize the current 4-block route detour in Englewood, which was put into effect due to the City having converted a part of Elati Street into a one-way operation.
    [Show full text]
  • City of Littleton 2255 West Berry Avenue Littleton, CO 80120 Meeting Agenda
    Littleton Center City of Littleton 2255 West Berry Avenue Littleton, CO 80120 Meeting Agenda Planning Commission Monday, January 9, 2017 6:30 PM Community Room Study Session 1. RTD and Southwest Rail Extension Updates a. ID# 17-10 Kent Bagley, Regional Transportation District, Board of Directors, District H Attachments: RTD Directors Map - District H 2. Board and Staff Updates The public is invited to attend all regular meetings or study sessions of the City Council or any City Board or Commission. Please call 303-795-3780 at least forty-eight (48) hours prior to the meeting if you believe you will need special assistance or any reasonable accommodation in order to be in attendance at or participate in any such meeting. For any additional information concerning City meetings, please call the above referenced number. City of Littleton Page 1 Printed on 1/5/2017 Littleton Center City of Littleton 2255 West Berry Avenue Littleton, CO 80120 Staff Communication File #: ID# 17-10, Version: 1 City of Littleton Page 1 of 1 Printed on 1/5/2017 powered by Legistar™ College View / South Platte Englewood Station Nine Mile Station 95 391 UV Harvey Park South FLOYD AV Wellshire 2 University Hills Hampden UV LAKEWOOD Bear Valley UV88 UV Nine Mile Station ZUNI ST HAMPDEN AV 285 30 Kennedy AURORA UV391 9E Wadsworth / Hampden UV95 Englewood Station ¤£285 ¤£285 E HAPPY CANYON RD¤£ UV I Southmoor Station S LOWELLS BLVD 225 0 0.5 1 KENYON AV AURORA ¨¦§ 83 ELATI ST ELATI UV Southmoor Station YOSEMITES ST Miles CLARKSONST Southmoor Park SHERIDAN DENVER Dayton
    [Show full text]
  • AGENCY PROFILE and FACTS RTD Services at a Glance
    AGENCY PROFILE AND FACTS RTD Services at a Glance Buses & Rail SeniorRide SportsRides Buses and trains connect SeniorRide buses provide Take RTD to a local the metro area and offer an essential service to our sporting event, Eldora an easy RTDway to Denver services senior citizen at community. a glanceMountain Resort, or the International Airport. BolderBoulder. Buses and trains connect and the metro trainsarea and offer an easy way to Denver International Airport. Access-a-Ride Free MallRide Access-a-RideAccess-a-Ride helps meet the Freetravel MallRideneeds of passengers buses with disabilities.Park-n-Rides Access-a-RideFlexRide helps connect the entire length Make connections with meet theFlexRide travel needsbuses travel of within selectof downtown’s RTD service areas.16th Catch FlexRideour to connect buses toand other trains RTD at bus or passengerstrain with servies disabilities. or get direct accessStreet to shopping Mall. malls, schools, and more.89 Park-n-Rides. SeniorRide SeniorRide buses serve our senior community. Free MallRide FlexRideFree MallRide buses stop everyFree block onMetroRide downtown’s 16th Street Mall.Bike-n-Ride FlexRideFree buses MetroRide travel within Free MetroRide buses Bring your bike with you select RTDFree service MetroRide areas. buses offer convenientoffer convenient connections rush-hour for downtown commuterson the bus along and 18th train. and 19th Connectstreets. to other RTD connections for downtown SportsRides buses or trains or get direct commuters along 18th and Take RTD to a local sporting event, Eldora Mountain Resort, or the BolderBoulder. access toPark-n-Rides shopping malls, 19th streets. schools, Makeand more.connections with our buses and trains at more than 89 Park-n-Rides.
    [Show full text]
  • Denver Market Report – Office Q1 2021
    OFFICE MARKET REPORT Q1 2021 Denver, CO OUR NETWORK IS YOUR EDGE. PREPARED BY: All information is from sources deemed reliable and is subject to errors,omissions, change of price, rental, prior sale, and withdrawal without notice. Prospect should Brandon Langiewicz carefully verify each item of information contained herein. Partner Hoff & Leigh | 3141 S Broadway, Suite A | Denver, CO 80113 | 720.572.5187 office www.hoffleigh.com/denver DenverDenver Office Office OFFICE MARKET REPORT Market Key Statistics 1 Leasing 3 Rent 8 Construction 11 Under Construction Properties 13 Sales 15 Sales Past 12 Months 17 Economy 19 Market Submarkets 24 Supply & Demand Trends 28 Rent & Vacancy 30 Sale Trends 32 4/5/2021 Copyrighted report licensed to Hoff & Leigh Colorado Springs, LLC - 1031464 OVERVIEWOverview DenverDenver Office Office 12 Mo Deliveries in SF 12 Mo Net Absorption in SF Vacancy Rate 12 Mo Rent Growth 1.3 M (5 M) 13.6% -1.7% The Denver office market entered the pandemic on solid currently available, an all-time high in Denver. footing. The market has benefitted from the in-migration Sublease availabilities are mainly concentrated in and relocation of companies to the area, particularly from Downtown, where oil and gas tenants occupy roughly technology companies fleeing expensive office space in 15% of office space. Prior to the pandemic, merger and the coastal markets. Job and population growth have acquisition activity in the oil industry meant that large been robust in the past decade, driving strong absorption blocks of space were already being placed on the gains, rent growth, and development activity in the office market, but energy tenants began listing their space in market.
    [Show full text]
  • Broncosride Pickup Schedule for December 22, 2019
    BroncosRide and Light Rail Service page 1 of 2 BroncosRide Schedule for: Sunday, December 22, 2019 Route: Park-n-Ride / Stop / Station Times are approximate Post game bus location** BR26: Dry Creek & University 11:35 AM 11:40 AM 11:45 AM every 5-10 minutes until 12:55 PM Row 22 Arapahoe High School BR24: Alameda Havana 12:25 PM 12:40 PM 12:55 PM Row 21 BR10: Boulder High School 11:35 AM 11:55 AM 12:15 PM Row15-16 Arapahoe & 17th BR32: El Rancho 12:00 PM 12:15 PM 12:35 PM Row 4 BR32: Evergreen 11:45 AM 12:00 PM 12:20 PM Row 4 BR38: Federal Shuttle: Lincoln HS (Hazel Ct & Iliff) and bus stops on Federal Blvd 11:35 AM 11:40 AM 11:45 AM every 5 - 10 minutes until 1:50 PM Row 28 between Evans and 8th Ave BR20: Longmont Park-n-Ride 11:30 AM 11:35 AM 11:45 AM 11:50 AM 12:00 PM 12:10 PM 12:20 PM 12:30 PM Rows 17-18 815 South Main Street BR44: Nine Mile (Ga te F) 11:35 AM 11:40 AM 11:45 AM every 5-10 minutes until 1:00 PM Rows 23-24 BR8: Olde Town Arvada Discontinued Discontinued: Ride G-Line to DUS and Transfer to C, E or W-Lines to Broncos Stadium BR48: Parker 11:35 AM 11:45 AM 11:50 AM 12:00 PM 12:15 PM 12:30 PM Row 19 BR48: Pinery 11:35 AM 11:40 AM 11:50 AM 12:05 PM 12:20 PM Row 19 BR56: South High School 11:40 AM 11:50 AM 12:00 PM 12:10 PM 12:20 PM 12:35 PM 12:50 PM Row 26 Louisiana & Gilpin BR4: Thornton (Gate C) 11:40 AM 11:45 AM 11:45 AM every 5-10 minutes until 1:35 PM Rows 9-12 BR10: US 36 & Broomfield Station (Gate 11:35 AM 11:45 AM 11:55 AM 12:05 PM 12:15 PM 12:25 PM 12:45 PM Rows 15-16 K) BR10: US 36 & McCaslin Stn (Gate A) 11:45
    [Show full text]
  • 2013 Transit-Oriented Development Status Report RTD and Fastracks Overview
    2013 Transit-Oriented Development Status Report RTD and FasTracks Overview RTD oversees a 47-mile rail transit system that services 46 stations on five corridors including: • The 5.3-mile Central Corridor and 1.8-mile Central Platte Valley (CPV) Spur in central Denver • The 8.7-mile Southwest Line to Englewood, Sheridan, and Littleton • The 19.2-mile Southeast Line to Lone Tree and Aurora • The 12.1-mile West Line to Lakewood and Golden The FasTracks program, approved by district voters in a 2004 ballot initiative will: • add 122 miles of rail service • 18 miles of Bus Rapid Transit (BRT) • approximately 60 new stations along six new corridors • extend three existing light rail lines image courtesy Gensler Grand Opening / image courtesy RTD Construction cranes dominated the skyline in RTD and TOD STAMPs Underway STAMPs Kicking Off 2013, as the result of an apartment boom in in 2014 the metro area. Development in 2013 centered Transit-oriented development is typically on the hub of the FasTracks program: Denver higher density and incorporates a mixture C-470/Lucent Station I-25/Broadway Station Area Master Plan Area Master Plan Union Station which is scheduled to open in of different uses that generate transit rider- spring 2014. Significant development has also ship. Multiple TODs contribute to creating 104th Ave. Station TOD Fitzsimons Parkway occurred around other existing and future transit-oriented communities where people Master Planning Study Station Area Master Plan stations as construction of FasTracks corridors can live, work, reduce transportation costs, continues at a rapid pace. and improve overall health through increased 88th Avenue Station Civic Center Station muli-modal activity.
    [Show full text]
  • RIDGEGATE, 6Th Amendment Coventry Development Corp
    Master Developer RIDGEGATE, 6th Amendment Coventry Development Corp. – Colorado 10270 Commonwealth Street, Suite B (an amendment to the PDD formerly known as RidgeGate, 5th Amendment, approved by the City of Lone Tree, and recorded at 201818230 on March 28, 2018) Lone Tree, Colorado 80124 Sections 13, 14, 15, 22, 23, 24 and a portion of Section 21, Township 6 South, Range 67 West of the 6th Principal Meridian City of Lone Tree, State of Colorado (3,515 Acres) Planned Development District LEGAL DESCRIPTION PARCEL 1:] ] A TRACT OF LAND SITUATED IN SECTIONS 13, 14, 15, 22, 23, AND 24, SAID SECTION 14; ] THENCE NORTH 00 DEGREES 23 MINUTES 27 SECONDS WEST 19 MINUTES 21 SECONDS EAST ALONG SAID SOUTH LINE 1,298.21 FEET ; ] THENCE WEST ALONG SAID WEST LINE 134.42 FEET ; ] THENCE SOUTH 21 DEGREES 49 MINUTES RIGHT OF WAY LINE OF LINCOLN AVENUE (SEPTEMBER 1988);] ] 3. THENCE NORTH 68 TOWNSHIP 6 SOUTH, RANGE 67 WEST OF THE 6TH PRINCIPAL MERIDIAN, MORE ALONG SAID WEST LINE AND ALONG THE EAST LINE OF SAID INTERSTATE HIGHWAY NO. SOUTH 00 DEGREES 09 MINUTES 28 SECONDS WEST ALONG THE WEST LINE OF A 20 SECONDS WEST ALONG SAID WEST LINE 199.84 FEET ; ] THENCE SOUTH 16 DEGREES DEGREES 41 MINUTES 15 SECONDS EAST, ALONG SAID SOUTHERLY RIGHT OF WAY LINE PARTICULARLY DESCRIBED AS FOLLOWS:] ] BEGINNING AT THE NORTHEAST CORNER OF 25 RIGHT OF WAY 333.4 FEET ; ] THENCE NORTH 22 DEGREES 41 MINUTES 20 SECONDS COUNTY ROAD 2,626.6 FEET TO THE SOUTH LINE OF THE NORTHEAST QUARTER OF SAID 50 MINUTES 20 SECONDS EAST ALONG SAID WEST LINE 63.98 FEET ; ] THENCE SOUTH OF LINCOLN AVENUE (SEPTEMBER 1988), A DISTANCE OF 24.46 FEET (27.50 FEET DEED) SAID SECTION 24 ; ] THENCE SOUTH 00 DEGREES 09 MINUTES 28 SECONDS WEST EAST ALONG SAID EAST RIGHT OF WAY LINE 66.37 FEET ; ] THENCE NORTH 03 DEGREES SECTION 13 ; ] THENCE NORTH 89 DEGREES 25 MINUTES 49 SECONDS EAST ALONG 21 DEGREES 49 MINUTES 20 SECONDS WEST ALONG SAID WEST LINE 747.39 FEET TO TO THE WEST LINE OF SAID SECTION 14;] ]4.
    [Show full text]
  • TOD 2007V1-Kr.Indd
    Transit Oriented Development 2007 Status Report Transit-Oriented Development Status Report 2007 December 2007 This is a controlled document; please do not dupli- cate. If additional copies are required, please request them from the FasTracks Document Control. This will assure that all recipients of the document receive revisions and additions. Approved By: Liz Rao, Assistant General Manager Planning and Development December 2007 Transit-Oriented Development Status Report 2007 TABLE OF CONTENTS 1.0 SUMMARY ....................................................................... 1-1 1.1 Development Activity ............................................................................1-1 1.1.1 Existing Corridors .........................................................................1-1 1.1.1.1 Central Corridor/Central Platte Valley Spur ....................................1-1 1.1.1.2 Southwest Corridor ...................................................................1-3 1.1.1.3 Southeast Corridor ....................................................................1-3 1.1.2 Planned Corridors and Extensions ...................................................1-3 1.1.3 Systemwide Development Summary ...............................................1-3 1.2 Planning and Zoning Activity ................................................................ 1-10 1.2.1 Station Area Planning ................................................................. 1-10 1.2.2 Rezoning Activity .......................................................................1-12
    [Show full text]
  • Colorado Public Works Journal, Winter 2017
    CPWJ_09-Winter 2017_V3:CPWJ 1/24/17 6:06 PM Page 1 WINTER 2017 : Vol.13, No.1 TRANSPORTATION SPECIAL ISSUE FEATURE: THE ROBOTS ARE COMING INDUSTRY NEWS ACEC AWARDS 2017 CPWJ 2017 MEDIA KIT CPWJ_09-Winter 2017_V3:CPWJ 1/24/17 6:06 PM Page 2 Serving Colorado Since 1970. Call 303-922-7815 www.coloradobarricade.com Trac Street/Highway Pavement Sign Manufacturing Control Sign Installation Marking & sales Serving Colorado Since 1970 Colorado Barricade knows our employees are our greatest asset and our expertise and service are what distinguish us apart from our competition. We provide traffic control, road markings and signs to keep contractors and the traveling publc safe. Products and services include traffic safety and management, event planning, providing equipment rental and safety supplies, pavement marking and permanent sign installation. We have the experience to help you get the job done right, the first time. CPWJ_09-Winter 2017_V3:CPWJ 1/25/17 10:01 AM Page 3 Editor 970. e.com Jo Taylor, Managing Editor ill 2017 really be the year that we start seeing driverless cars on the road in Colorado? Can you imagine yourself being chauffeur driven by a computer whilst sitting back relaxing and enjoying your coffee – or will you, like me, be constantly looking in the mirrors, slapping your foot down hard? Just like I am when my teenage daughter is driving me. In three states already laws have been passed to allow the testing of Wdriverless cars on public roads. However, much work needs to still to be done for every junction, sign and signal to be accurate and precise in order for the autonomous vehicle to travel the road.
    [Show full text]
  • Strategic Plan for Transit Oriented Development Strategic Plan for Transit Oriented Development
    Strategic Plan for Transit Oriented Development Strategic Plan for Transit Oriented Development Revision 0, June 2006 This is a controlled document; please do not dupli- cate. If additional copies are required, please request them from the FasTracks Document Control. This will assure that all recipients of the document receive revisions and additions. Approved By: Liz Rao, Assistant General Manager Planning and Development June 20, 2006 Strategic Plan for Transit Oriented Development TABLE OF CONTENTS 1.0 INTRODUCTION ............................................................. 1-1 1.1 Regional Context ......................................................................................1-1 1.2 Plan Organization .....................................................................................1-3 2.0 TRANSIT ORIENTED DEVELOPMENT POLICY ..................... 2-1 2.1 Policy Adoption........................................................................................2-1 2.2 Definition of TOD .....................................................................................2-1 2.3 Basis for TOD Policy .................................................................................2-2 2.4 TOD Vision .............................................................................................2-2 2.5 Goals and Strategies .................................................................................2-3 3.0 TOD PROCESS GUIDANCE ............................................... 3-1 3.1 Roles in TOD Implementation .....................................................................3-1
    [Show full text]
  • RTD Director Map District E
    SABLEBD Five Points 15TH ST City Park South Park Hill NMONACO STREET PKWY 225 E 18TH AVE E 17TH AVE 17TH AV 18thNLINCOLN ST St - California Station E 17TH AVE ¨¦§ North Capitol Hill City Park West YORKN ST E 17TH AVENUE PKWY E 16TH AVE YOSEMITEST CBD NLOGAN ST East Colfax MOLINEST UV32 §70 ¤£40 ¤£40 ¨¦ I E 14TH AVE Colfax Station NSTEELE ST HAVANA ST HAVANA 0 0.5 1 E 13TH AVE NQUEBEC ST Capitol Hill NCLARKSON ST Miles NCORONA ST E HALE PKWY LAREDO ST Civic CenterNBROADWAY Cheesman Park E 11TH AVE 11TH AV NGRANT ST Congress Park Hale Montclair 13th Avenue Station DELMAR PY AIRPORTBD PEORIA ST PEORIA E 8TH AVE ST DAYTON HOFFMAN BD Lincoln Park POTOMAC ST RTD Director 30 E 6TH AVE E 6TH AVENUE PKWY 6TH AV UV30 UV Districts N HOLLY ST E SPEER BLVD RDPICADILLY 4TH AV Country Club E 3RD AVE GUNCLUB RD 2ND AV Speer Hilltop Lowry Field Cherry Creek E 1ST AVE 1ST AV 2ND AV W 1ST AVE E 1ST AVE E 1ST AVE Abilene Station E BAYAUD AVE Alameda / Havana Legend Baker E ALAMEDA AVE E ALAMEDA AVE ALAMEDA AV Alameda Station " LightRail Stations Broadway Marketplace X SMONACO STREET PKWY S DAYTON ST SDAYTON E VIRGINIA AVE Windsor MOLINEST Aurora City Center Station ParkNRides Alameda Station Belcaro EXPOSITION AV E EXPOSITION AVE GLENDALE COUNTIES I-25 / BroadwaySEMERSON ST Station Washington Park West QUEBECS ST Washington Park Washington Virginia Vale Current Director Dist SSTEELE ST S QUEBEC ST TROY ST I-25¨¦§25 - Broadway StationGILPINS ST MISSISSIPPI AV MISSISSIPPI AV Other Director Dist E MISSISSIPPI AVE 85 E MISSISSIPPI AVE ¤£ FASTRACKS Ruby Hill
    [Show full text]
  • Citycenter Redevelopment Planning Progress with SKB
    STUDY SESSION TO: Mayor and Council FROM: Dan Poremba, John Voboril DEPARTMENT: Community Development DATE: May 4, 2020 SUBJECT: CityCenter Redevelopment Planning Progress with SKB DESCRIPTION: CityCenter Redevelopment Planning Progress with SKB RECOMMENDATION: This informational update to Council is provided in anticipation of a Predevelopment Agreement (PDA) between the same parties which is scheduled to be presented for Council consideration at the May 18, 2020 Regular City Council Meeting. PREVIOUS COUNCIL ACTION: On February 18, 2020, City Council approved by motion the execution of an Exclusive Negotiation Agreement (ENA) between the City/EEF and SKB of Portland, Oregon (also referred to as Scanlan Kemper Bard). Following a year-long, multi-step procurement process, the ENA reflected the selection of SKB as the preferred master developer partner with the City to redevelop the “City Property” at Englewood City Center. This is the property owned or controlled by the City and EEF, shown in blue on the attached site plan. The City initiated exploration of the redevelopment of the City Property in connection with the August 2018 foreclosure of the three-square block former Weingarten Realty property at CityCenter, shown in red on the attached site plan. This led to the implementation of a master developer procurement process. Council has been briefed at key points throughout the process. As previously noted, the ENA is the first of three anticipated agreements between the City/EEF and SKB, each requiring Council review and approval. SUMMARY: Council’s recent considerations regarding CityCenter redevelopment have included the following key points. • CityCenter currently presents a dated and fading image and the need for redevelopment has been documented in multiple City-sponsored planning studies, and in two recent independent studies of the Urban Land Institute.
    [Show full text]