Muskrat Falls Probable Maximum Flood And

Total Page:16

File Type:pdf, Size:1020Kb

Muskrat Falls Probable Maximum Flood And Newfoundland and Labrador Hydro - Lower Churchill Project GI1140 - PMF Study Final Report - December 2007 Table of Contents Glossary of Abbreviations List of Tables List of Figures Executive Summary 1. Introduction ......................................................................................................................................... 1-1 1.1 Background................................................................................................................................. 1-1 1.2 Probable Maximum Flood Definition .......................................................................................... 1-1 1.3 Approach .................................................................................................................................... 1-2 1.3.1 Review of Previous Studies................................................................................................ 1-2 1.3.2 Analysis of Meteorological Data........................................................................................ 1-3 1.3.3 Development of the Hydrological Model of the Churchill River ........................................ 1-3 1.3.4 Review of Flood Handling Procedures for Upper Churchill ............................................... 1-3 1.3.5 Flood Routing to Establish the PMF for Gull Island and Muskrat Falls ................................ 1-4 2. Review of Previous Studies................................................................................................................... 2-1 2.1 Churchill Falls Power Project: Snowmelt and Frequency Studies for Design Floods, 1969........... 2-1 2.2 Gull Island Maximum Probable Flood Study, 1975 ..................................................................... 2-2 2.3 Flood Handling Study of the Churchill Falls Complex, 1989 ....................................................... 2-2 2.4 Churchill River Complex, PMF Review and Development Study, 1999....................................... 2-3 2.5 Summary..................................................................................................................................... 2-4 3. Lower Churchill Basin .......................................................................................................................... 3-1 3.1 Basin Description........................................................................................................................ 3-1 3.2 Climate ....................................................................................................................................... 3-1 3.3 Flow Regime............................................................................................................................... 3-2 4. Upper Churchill Basin.......................................................................................................................... 4-1 4.1 Basin Description........................................................................................................................ 4-1 4.2 Climate ....................................................................................................................................... 4-1 4.3 Flow Regime............................................................................................................................... 4-2 4.4 Flood Operation.......................................................................................................................... 4-2 5. Meteorology......................................................................................................................................... 5-1 5.1 General....................................................................................................................................... 5-1 5.2 Precipitation................................................................................................................................ 5-1 5.2.1 Spring PMP ....................................................................................................................... 5-2 5.2.2 All-Season PMP................................................................................................................. 5-3 5.2.3 Spring 100-year Rainfall .................................................................................................... 5-3 5.2.4 All-Season 100-year Rainfall.............................................................................................. 5-4 5.3 Temperatures .............................................................................................................................. 5-4 5.4 Snowpack ................................................................................................................................... 5-5 5.5 Climate Change .......................................................................................................................... 5-6 5.6 Comparison with Previous Studies .............................................................................................. 5-7 PRH-325967.10049 Rev. 0, Page i Newfoundland and Labrador Hydro - Lower Churchill Project GI1140 - PMF Study Final Report - December 2007 6. Churchill River Basin Watershed Model............................................................................................... 6-1 6.1 The SSARR Model....................................................................................................................... 6-1 6.2 Model Configuration................................................................................................................... 6-1 6.2.1 The Smallwood Reservoir Basin ........................................................................................ 6-2 6.2.2 The Ossokmanuan/Gabbro Lake Basin .............................................................................. 6-3 6.2.3 The Lower Churchill Basin ................................................................................................ 6-4 6.3 Calibration .................................................................................................................................. 6-6 6.3.1 Calibration Criteria............................................................................................................6-6 6.3.2 Calibration Data................................................................................................................6-6 6.3.3 Calibration Adjustments .................................................................................................. 6-10 6.3.4 The Smallwood Reservoir Basin ...................................................................................... 6-10 6.3.5 The Ossokmanuan/Gabbro Lake Basin ............................................................................ 6-11 6.3.6 The Lower Churchill Basin .............................................................................................. 6-11 6.3.7 Commentary ................................................................................................................... 6-12 6.3.7.1 The Smallwood Reservoir Basin............................................................................. 6-12 6.3.7.2 The Ossokmanuan/Gabbro Lake Basin .................................................................. 6-13 6.3.7.3 The Lower Churchill Basin .................................................................................... 6-14 6.4 Verification ............................................................................................................................... 6-14 7. PMF Simulations................................................................................................................................... 7-1 7.1 General....................................................................................................................................... 7-1 7.2 Meteorological Input................................................................................................................... 7-2 7.2.1 Rainfall.............................................................................................................................. 7-2 7.2.2 Temperatures ....................................................................................................................7-2 7.2.3 Snowpack ......................................................................................................................... 7-3 7.3 PMF Cases .................................................................................................................................. 7-3 7.3.1 100-year Snowpack and Spring PMP ................................................................................. 7-4 7.3.2 PMSA and 100-year Spring Rainfall ................................................................................... 7-4 7.3.3 Summer/Autumn PMP Preceded by 100-year Rainfall ....................................................... 7-4 7.4 Results Summary......................................................................................................................... 7-5 7.5 Sensitivity Checks and Analysis................................................................................................... 7-5 7.6 Comparison with Previous Studies .............................................................................................. 7-8 7.7 Comparison with Historic Events.................................................................................................7-9 8. Churchill Falls Flood Routing ..............................................................................................................
Recommended publications
  • Nalcor Energy
    2018 ANNUAL REPORT 2018 We are committed to developing and managing Newfoundland and Labrador’s energy resources safely and responsibly. CONTENTS 01 2018 Achievements 27 Community 04 Corporate Profile 29 People 05 Message from the Chair 31 Environment 07 Message from the CEO 33 Operating Statistics 09 Safety 34 Financial Statistics 35 Executive, Directors and Officers Business Excellence 37 Corporate Governance 1 1 Muskrat Falls Project 17 Newfoundland and Labrador Hydro \\Appendix 1 21 Churchill Falls Management’s Discussion and Analysis 23 Oil and Gas \\Appendix 2 25 Bull Arm Fabrication Consolidated Financial Statements – December 31, 2018 26 Energy Marketing 1 2018 ACHIEVEMENTS 3.4 B 3.3 B DEBT TO CAPITAL 1.4 B 2018 2017 2016 % % % 2018 2017 2016 64 67 61 FINANCIAL CAPITAL EXPENDITURE 1.0 B TOTAL ASSETS 913 M 824 M 2018 18.8 B 2017 18.0 B 2018 2017 2016 REVENUE 2016 14.1 B 191 M 157 M * Previously reported as $930 million, adjusted 136 M following the application of IFRS 15 effective 2018 January 1, 2018. 96% ** Previously reported as $169 million, completE adjusted following the application of IFRS 15 effective January 1, 2018. 2017 2018 2017 2016 *** Previously reported as 66%, adjusted 89% OPERATING following the application of IFRS 9 completE effective January 1, 2018. PROFIT TRANSMISSION ASSETS ENERGIZED across Newfoundland and Labrador MUSKRAT 2016 66% FALLS completE HISTORY MADE with the flow COMPLETION of power from Churchill Falls to the island ASSEMBLY AND INSTALLATION of turbines and generators started Since January 2013,
    [Show full text]
  • North American Megadam Resistance Alliance
    North American Megadam Resistance Alliance May 18, 2020 Christopher Lawrence U.S. Department of Energy Management and Program Analyst Transmission Permitting and Technical Assistance Office of Electricity Christopher.Lawrence.hq.doe.gov Re: Comments on DOE Docket No. PP-362-1: Champlain Hudson Power Express, Inc. and CHPE, LLC: Application to Rescind Presidential Permit and Application for Presidential Permit Dear Mr. Lawrence, The Sierra Club Atlantic Chapter and North American Megadam Resistance Alliance submit these comments on the above-referenced application of Champlain Hudson Power Express, Inc. (CHPEI) and CHPE, LLC (together, the Applicants) to transfer to CHPE, LLC ownership of the facilities owned by CHPEI and authorized for cross-border electric power transmission via a high voltage direct current line (the Project) by Presidential Permit No. PP- 362, dated October 6, 2014 (PP-362 or the Permit) .1 The Project is being developed by TDI, a Blackstone portfolio company. www.transmissiondevelopers.com Blackstone is a private investment firm with about $500 billion under management. www.blackstone.com The Sierra Club Atlantic Chapter, headquartered Albany New York, is responsible for the Sierra Club’s membership and activities in New York State and works on a variety of environmental issues. The Sierra Club is a national environmental organization founded in 1892. 1 On April 6, 2020, the Applicants requested that the Department of Energy (DOE) amend, or in the alternative, rescind and reissue PP-362 to enable the transfer of the Permit from CHPEI to its affiliate CHPE, LLC (the Application). On April 16, 2020, the Department of Energy (DOE) issued a Notice of “Application to Rescind Presidential Permit; Application for Presidential Permit; Champlain Hudson Power Express, Inc.
    [Show full text]
  • Bibliothèque Et Archives Canada
    Library and Archives Bibliotheque et Canada Archives Canada Published Heritage Direction du Branch Patrimoine de I'edition 395 Wellington Street 395, rue Wellington Ottawa ON K1A0N4 Ottawa ON K1A 0N4 Canada Canada Your file Votre reference ISBN: 978-0-494-88023-4 Our file Notre reference ISBN: 978-0-494-88023-4 NOTICE: AVIS: The author has granted a non­ L'auteur a accorde une licence non exclusive exclusive license allowing Library and permettant a la Bibliotheque et Archives Archives Canada to reproduce, Canada de reproduire, publier, archiver, publish, archive, preserve, conserve, sauvegarder, conserver, transmettre au public communicate to the public by par telecommunication ou par I'lnternet, preter, telecommunication or on the Internet, distribuer et vendre des theses partout dans le loan, distrbute and sell theses monde, a des fins commerciales ou autres, sur worldwide, for commercial or non­ support microforme, papier, electronique et/ou commercial purposes, in microform, autres formats. paper, electronic and/or any other formats. The author retains copyright L'auteur conserve la propriete du droit d'auteur ownership and moral rights in this et des droits moraux qui protege cette these. Ni thesis. Neither the thesis nor la these ni des extraits substantiels de celle-ci substantial extracts from it may be ne doivent etre imprimes ou autrement printed or otherwise reproduced reproduits sans son autorisation. without the author's permission. In compliance with the Canadian Conformement a la loi canadienne sur la Privacy Act some supporting forms protection de la vie privee, quelques may have been removed from this formulaires secondaires ont ete enleves de thesis.
    [Show full text]
  • Death and Life for Inuit and Innu
    skin for skin Narrating Native Histories Series editors: K. Tsianina Lomawaima Alcida Rita Ramos Florencia E. Mallon Joanne Rappaport Editorial Advisory Board: Denise Y. Arnold Noenoe K. Silva Charles R. Hale David Wilkins Roberta Hill Juan de Dios Yapita Narrating Native Histories aims to foster a rethinking of the ethical, methodological, and conceptual frameworks within which we locate our work on Native histories and cultures. We seek to create a space for effective and ongoing conversations between North and South, Natives and non- Natives, academics and activists, throughout the Americas and the Pacific region. This series encourages analyses that contribute to an understanding of Native peoples’ relationships with nation- states, including histo- ries of expropriation and exclusion as well as projects for autonomy and sovereignty. We encourage collaborative work that recognizes Native intellectuals, cultural inter- preters, and alternative knowledge producers, as well as projects that question the relationship between orality and literacy. skin for skin DEATH AND LIFE FOR INUIT AND INNU GERALD M. SIDER Duke University Press Durham and London 2014 © 2014 Duke University Press All rights reserved Printed in the United States of America on acid- free paper ∞ Designed by Heather Hensley Typeset in Arno Pro by Copperline Book Services, Inc. Library of Congress Cataloging- in- Publication Data Sider, Gerald M. Skin for skin : death and life for Inuit and Innu / Gerald M. Sider. pages cm—(Narrating Native histories) Includes bibliographical references and index. isbn 978- 0- 8223- 5521- 2 (cloth : alk. paper) isbn 978- 0- 8223- 5536- 6 (pbk. : alk. paper) 1. Naskapi Indians—Newfoundland and Labrador—Labrador— Social conditions.
    [Show full text]
  • 4.2.2 Wildlife 4.2.2.1 Caribou Labrador's Caribou (Rangifer Tarandus) Can Be Classified Into Two Main Groups, the Migratory An
    REVISED ENVIRONMENTAL IMPACT STATEMENT 4.2.2 Wildlife 4.2.2.1 Caribou Labrador’s caribou (Rangifer tarandus) can be classified into two main groups, the migratory and sedentary (also known as woodland) ecotypes, which are distinguished by their use of calving grounds or fidelity to specific calving sites. Migratory caribou travel large distances, occupy large home ranges, and aggregate during calving periods. Conversely, sedentary caribou display limited movements, occupy smaller home ranges, and tend to disperse during the calving period (Schaefer et al. 2000; Bergerud et al. 2008). The Project occupies a portion of Western Labrador which overlaps with the range of the George River (GR) Herd. Straddling the Québec-Labrador peninsula, the GR Herd is one of the world’s largest Rangifer populations, with population estimates peaking at almost 800,000 individuals in the 1980’s (Couturier et al. 1996; Russell et al. 1996, Rivest et al. 1998). This area of western Labrador overlaps the GR Herd as a portion of their winter range (Jacobs 1996). In addition to the GR Herd, there is another migratory ecotype that is recognized on the Ungava Peninsula and known as the Rivière-aux-Feuilles (‘Leaf River’) (RAF) Herd. Existing and recognized sedentary populations include the Lac Joseph (LJ) Herd located south of the Assessment Area, and the Red Wine Mountains (RWM), the Joir River (JR), and the Mealy Mountains (MM) Herds all much further to the east. The Mealy Mountains act as a geographic barrier separating this herd from the other herds of Labrador, but the lack of a geographic barrier between the other three sedentary herds results in an overlap of herd ranges (Schmelzer et al.
    [Show full text]
  • Revised Draft Experiences with Inter Basin Water
    REVISED DRAFT EXPERIENCES WITH INTER BASIN WATER TRANSFERS FOR IRRIGATION, DRAINAGE AND FLOOD MANAGEMENT ICID TASK FORCE ON INTER BASIN WATER TRANSFERS Edited by Jancy Vijayan and Bart Schultz August 2007 International Commission on Irrigation and Drainage (ICID) 48 Nyaya Marg, Chanakyapuri New Delhi 110 021 INDIA Tel: (91-11) 26116837; 26115679; 24679532; Fax: (91-11) 26115962 E-mail: [email protected] Website: http://www.icid.org 1 Foreword FOREWORD Inter Basin Water Transfers (IBWT) are in operation at a quite substantial scale, especially in several developed and emerging countries. In these countries and to a certain extent in some least developed countries there is a substantial interest to develop new IBWTs. IBWTs are being applied or developed not only for irrigated agriculture and hydropower, but also for municipal and industrial water supply, flood management, flow augmentation (increasing flow within a certain river reach or canal for a certain purpose), and in a few cases for navigation, mining, recreation, drainage, wildlife, pollution control, log transport, or estuary improvement. Debates on the pros and cons of such transfers are on going at National and International level. New ideas and concepts on the viabilities and constraints of IBWTs are being presented and deliberated in various fora. In light of this the Central Office of the International Commission on Irrigation and Drainage (ICID) has attempted a compilation covering the existing and proposed IBWT schemes all over the world, to the extent of data availability. The first version of the compilation was presented on the occasion of the 54th International Executive Council Meeting of ICID in Montpellier, France, 14 - 19 September 2003.
    [Show full text]
  • 2016 Business and Financial REPORT 2016 Business and Financial REPORT
    2016 Business and Financial REPORT 2016 Business and Financial REPORT TABLE OF CONTENTS 02 2016 ACHIEVEMENTS 04 CORPORATE PROFILE 07 MESSAGE FROM THE CHAIR 08 MESSAGE FROM THE CEO 10 SAFETY 12 ENVIRONMENT BUSINESS EXCELLENCE 14 MUSKRAT FALLS PROJECT 18 HYDRO 22 OIL AND GAS 24 BULL ARM 25 ENERGY MARKETING 26 CHURCHILL FALLS 28 PEOPLE 29 COMMUNITY 30 OPERATING STATISTICS 31 FINANCIAL STATISTICS 32 EXECUTIVE, DIRECTORS AND OFFICERS 34 CORPORATE GOVERNANCE APPENDIX 1 MANAGEMENT’S DISCUSSION & ANALYSIS APPENDIX 2 CONSOLIDATED FINANCIAL STATEMENTS – DECEMBER 31, 2016 Nalcor Energy is a proud, diverse energy company focused on the sustainable development of Newfoundland and Labrador’s energy resources. 2016 ACHIEVEMENTS FINANCIAL HIGHLIGHTS DEBT-TO-CAPITAL TOTAL ASSETS ($) 2016 60.7% 2016 14.1B 2015 64.5% 2015 12.3B 2014 69.2% 2014 10.6B 3.2B 136.3M 810.5M 824.1M 2.8B 798M 115.6M 2.0B 45.7M 2014 2015 2016 2014 2015 2016 2014 2015 2016 CAPITAL EXPENDITURE ($) REVENUE ($) OPERATING PROFIT ($) SAFETY ENVIRONMENT Achieved all corporate safety metrics of environmental targets achieved • All-injury frequency rate • Lost-time injury frequency rate • Lead / lag ratio Hydro’s activities in the takeCHARGE 15% ZERO programs helped its customers 1,976 MWh reduction in lost-time injuries reduce electricity use by recordable injuries maintained in over previous year several areas COMMUNITY Nalcor supported more than 40 organizations throughout Newfoundland and Labrador. 2 Nalcor Energy Business and Financial Report 2016 HYDRO OIL & GAS 25.5 BILLION BARRELS COMPLETED of OIL and 20.6 TRILLION MORE THAN CUBIC FEET of GAS Since 2011, over potential identified in an 145,000 line kilometres independent study covering PROJECTS of NEW 2-D multi-client blocks on offer in the AND data acquired.
    [Show full text]
  • Isciences Global Water Monitor & Forecast February 14, 2020
    Global Water Monitor & Forecast Watch List February 14, 2020 For more information, contact: Thomas M. Parris, President, 802-864-2999, [email protected] Table of Contents Introduction .................................................................................................................................................. 2 Worldwide Water Watch List ........................................................................................................................ 4 Watch List: Regional Synopsis ....................................................................................................................... 4 Watch List: Regional Details .......................................................................................................................... 6 United States ............................................................................................................................................. 6 Canada ...................................................................................................................................................... 9 Mexico, Central America, and the Caribbean ......................................................................................... 11 South America ......................................................................................................................................... 13 Europe ..................................................................................................................................................... 16
    [Show full text]
  • Outlet Winter 2013
    Winter 2013 6 Keeping the public safe around dams 10 Churchill Falls prepares 16 President’s Awards for its next generation celebrates five-years of employee recognition 20 Employees join the Red Shoe Crew to support Ronald McDonald House Newfoundland and Labrador Outlet - Summer 2012 1 Plugged In 2 Leadership Message Safety 3 Safety 7 Environment 9 Business Excellence 14 People 20 Community 23 Highlights Environment Please visit us at: Excellence Facebook: facebook.com/nalcorenergy facebook.com/nlhydro Twitter: twitter.com/nalcorenergy twitter.com/nlhydro Business YouTube: youtube.com/nalcorenergy youtube.com/nlhydro Outlet is Nalcor Energy’s corporate magazine, published semi-annually by Corporate Communication & Shareholder Relations. People For more information, to provide feedback or to submit articles or ideas, contact us at 709.737.1446 or [email protected] Front Cover The 2012 President’s Award Winners. Community Nalcor Energy Plugged In – July to December 2012 • In November, a power outage safety contest on Hydro’s Facebook page saw users participate with more than 1,480 tips, “likes” and shares of information on the page. Users shared their own tips and advice on how to prepare for an unplanned power outage. • By the end of November 2012, Nalcor EnergySafety employees submitted more 6,800 safety-related SWOPs in the database. • Nalcor’s Environmental Services department completed a waste audit study in Bay d’Espoir in September. The type and quantity of waste leaving the site was examined. The report will look at opportunities to enhance reduction of non-hazardous waste being sent to the landfill. • In November, takeCHARGEEnvironment gave away 500 block heater timers in Labrador City and Happy Valley-Goose Bay.
    [Show full text]
  • CE 54 (R1) (Public)
    Muskrat Falls Project - CE-54 Rev. 1 (Public) Page 1 of 66 Muskrat Falls Project - CE-54 Rev. 1 (Public) Page 2 of 66 Nalcor Energy - Lower Churchill Project GI1141 - Upper Churchill PMF and Flood Handling Procedures Update Final Report - August 28, 2009 Table of Contents List of Tables List of Figures Executive Summary 1. Introduction ......................................................................................................................................... 1-1 1.1 Background................................................................................................................................. 1-1 1.1.1 Project Location ................................................................................................................1-1 1.1.2 Summary of GI1140 Study ................................................................................................ 1-1 1.1.3 Rationale for Smaller PMF Estimate ................................................................................... 1-2 1.2 Probable Maximum Flood Definition .......................................................................................... 1-2 1.3 Approach .................................................................................................................................... 1-3 1.3.1 Review of Previous Studies................................................................................................ 1-3 1.3.2 Update of PMF Estimate ...................................................................................................
    [Show full text]
  • C S a S S C C S
    C S A S S C C S Canadian Science Advisory Secretariat Secrétariat canadien de consultation scientifique Research Document 2005/051 Document de recherche 2005/051 Not to be cited without Ne pas citer sans permission of the authors * autorisation des auteurs * A Comprehensive Framework for Un protocole d'évaluation des Assessing Changes in Fish Habitat changements de capacité de Productive Capacity Resulting From production de l'habitat du poisson Large Hydroelectric Projects lors de grands projets hydroélectriques Michel Bérubé, Richard Verdon, Gabriel Durocher, Jean-Christophe Guay Hydro-Québec Équipement Direction développement de projet et environnement 855 Sainte-Catherine est, 9ième étage Montréal, Québec H2L 4P5 * This series documents the scientific basis for the * La présente série documente les bases evaluation of fisheries resources in Canada. As scientifiques des évaluations des ressources such, it addresses the issues of the day in the halieutiques du Canada. Elle traite des time frames required and the documents it problèmes courants selon les échéanciers contains are not intended as definitive statements dictés. Les documents qu’elle contient ne on the subjects addressed but rather as progress doivent pas être considérés comme des énoncés reports on ongoing investigations. définitifs sur les sujets traités, mais plutôt comme des rapports d’étape sur les études en cours. Research documents are produced in the official Les documents de recherche sont publiés dans language in which they are provided to the la langue officielle utilisée dans le manuscrit Secretariat. envoyé au Secrétariat. This document is available on the Internet at: Ce document est disponible sur l’Internet à: http://www.dfo-mpo.gc.ca/csas/ ISSN 1499-3848 (Printed / Imprimé) © Her Majesty the Queen in Right of Canada, 2005 © Sa majesté la Reine, Chef du Canada, 2005 ABSTRACT The Policy for the management of fish habitat and its No net Loss of habitat productive capacity by the Department of Fisheries and Oceans (DFO) represents a challenge for the hydroelectric industry in general.
    [Show full text]
  • Hydro-Québec TRIENNIAL REVIEW of RESOURCE ADEQUACY
    Hydro-Québec TRIENNIAL REVIEW OF RESOURCE ADEQUACY Prepared by Direction principale Approvisionnements énergétiques et Marchés de gros Groupe Services énergétiques Hydro-Québec May 1999 EXECUTIVE SUMMARY This Report, Hydro-Québec Triennal Review of Resource Adequacy is submitted to the Northeast Power Coordinating Council (NPCC) and prepared in accordance with the “Guidelines for Area Review of Resource Adequacy”, document B-8 revised 2/14/96. It shows that Hydro-Québec has the ability to meet the NPCC reliability criterion as stated below for the planning period 1998 through 2008. NPCC reliability criterion : “ Each Area's resources will be planned in such a manner that, after due allowance for scheduled outages and deratings, forced outages and deratings, assistance over interconnections with neighboring Areas and regions, and capacity and/or load relief from available operating procedures, the probability of disconnecting non-interruptible customers due to resource deficiencies, on the average, will be no more than once in ten years”. This report is based on the 1998 load forecast and considers the potential of available and committed resources within the planning period. The in-service dates of new projects other than those that are committed are not shown in this report. Only the potential of uncommitted resources post 2000 is discussed. The highlights of the report are as follow Québec load is expected to grow at a lower rate than anticipated in 1995 (1,4% instead of 1,9%). Consequently, no new resources are required for the Québec load and current firm export obligations before the winter 2004-05. The margin over reserve requirement allows Hydro-Québec to increase short term exports.
    [Show full text]