Premier Inn Bishop’S Stortford Station Road, Herts

Total Page:16

File Type:pdf, Size:1020Kb

Premier Inn Bishop’S Stortford Station Road, Herts PREMIER INN BISHOP’S STORTFORD STATION ROAD, HERTS Prime Hotel Forward Funding Investment Opportunity PREMIER INN BISHOP’S STORTFORD STATION ROAD, HERTS INVESTMENT SUMMARY • Forward funding opportunity to acquire a new 85-bedroom Premier Inn Hotel with a 839 sq. ft. ground floor retail unit • Located in the centre of Bishop’s Stortford, an affluent market town with excellent transport links to central London • Situated within a six hectare mixed-use regeneration area located adjacent to Bishop’s Stortford train station • The hotel will be let to Premier Inn Hotels Ltd for a term of 25 years from practical completion with a tenant break in year 20 • The hotel’s initial rent will be £378,250 (£4,450 per bed) per annum and is subject to 5 yearly CPI linked rent reviews • We anticipate the retail unit being let for £16,780 per annum during the construction period. The developer will provide a two year rent guarantee from PC if required • Freehold • PC due September 2020. Planning permission granted & Agreement for Lease signed We are seeking offers in excess of £8,690,000 (Eight Million Six Hundred and Ninety Thousand Pounds) on a traditional forward funding basis subject to contract and exclusive of VAT. A purchase at this level would reflect a Net Initial Yield of 4.42% assuming purchasers costs of 2.77% and a low capital value per bed of only £99,500. North-east corner of the hotel PREMIER INN BISHOP’S STORTFORD STATION ROAD, HERTS BISHOP’S STORTFORD MUSEUM TOWN CENTRE/ JACKSON SQUARE SHOPPING RIVER STORT 5 MIN WALK ANCHOR STREET LEISURE PARK GOODS YARD DEVELOPMENT SITE NEW BUS STATION PREMIER INN SITE STATION ROAD BISHOP’S STORTFORD TRAIN STATION ALDI WARWICK ROAD LONDON CAMBRIDGE LIVERPOOL STREET 45 MIN DRIVE 35 MIN TRAIN 40 MIN TRAIN JOURNEY JOURNEY STANSTED AIRPORT 12 MIN DRIVE 12 MIN TRAIN JOURNEY Cambridge A423 Bedford A1 A5 A43 Banbury A6 Milton Keynes Saffron Walden PREMIER INN BISHOP’S STORTFORD A131 A421 A10 STATION ROAD, HERTS M1 A44 Leighton Buzzard Stevenage BISHOP’S Bicester Luton STORTFORD Braintree A120 A41 A1(M) A414 A40 Aylesbury Harlow Oxford St Albans LOCATION A41 Chelmsford SITUATION A4010 M11 A414 Bishop’s Stortford is an affluent and historic market town located in Situated at the northern edge of the A420 A12 High Wycombe Watford Enfield M25 Hertfordshire, halfway between Cambridge and London, within the commuter M25 Goods Yard development scheme, the A34 belt close to the M11. The town has a resident population of 35,000, with 78,000 A10 Premier Inn hotel is approximately M40 living within 6 miles and 322,000 within 12 miles. The population has shown Romford Basildon 50m from the entrance of Bishop’s strong growth in recent years, much of which has been stimulated by the Henley-on-Thames A40 Leytonstone Stortford Train Station. The site fronts continuing development at Stanstead Airport. Slough A13 onto Station Road to the north and onto M4 LONDON Anchor Street to the west. This is a Dartford Bishop’s Stortford is 45 km (28 miles) south of Cambridge and 56 km (35 miles) prominent part of the site that is visible Bracknell A20 north of Central London, and benefits from excellent transportNewbur connections,y from the train station and fronts the Croydon making it a desirable commuter town. M3 M2 A33 primary route to the town centre which A23 is approximately a 5 minute walk from Woking M20 ROAD the hotel. A34 M25 Maidstone Junction 8 of the M11 motorway is approximately 2 miles from Reigate The northern edge of the hotel runs Andover Guildford Bishop’s Stortford Town Centre and provides access to the M25 parallel to a bus station and the A120 A24 M23 Tonbridge motorway and London to the south. It is also located on the A120, western side faces the Anchor Street M11 providing access to Braintree and Colchester to the east. A31 A3 Leisure Park which includes a cinema, A22 fast food retailers, a bar and a Nuffield RAIL Salisbury B1383 A120 Winchester STANSTEAD Health Club. The eastern façade of the AIRPORT 6 Bishops Stortford train station provides regular rail services to BISHOP’S building is opposite a proposed London Liverpool Street station, with the quickest journey time STORTFORD multi-storey car park and will open out of 35 minutes. The station also links directly into Tottenham Hale A1250 onto the new station square which is Underground Station on the Victoria Line with a fastest journey A1250 J8 A120 the approach to the new development. time of 24 minutes, providing direct access to the West End and A1184 A1250 M27 In addition to the retail offering the wider London Underground network. B1004 PREMIER INN proposed as part of the Goods Yard RAILWAY AIR STATION development scheme, Jackson Square Located 5 km (3 miles), 12 minute drive, to the east of Bishops shopping centre is approximately a Stortford is London Stanstead Airport which handles circa 24.3 5 minute walk from the hotel. A1060 million passengers annually and is the UK’s fourth biggest airport. M11 The airport is London’s third busiest airport and predominately provides domestic and European flights. A1184 PREMIER INN BISHOP’S STORTFORD STATION ROAD, HERTS BISHOP’S STORTFORD GOODS YARD The 6 hectare site will be developed over the next 10 years and will comprise of approximately 586 new homes, 3,000 sqm of office space, 1,500 sqm of retail space, a 55 bed care home, two multi-storey car parks and the subject hotel. In addition, the scheme will also create a high quality public square at Bishop’s Stortford station with hard and soft landscaping and new vehicle, pedestrian and cycle routes that connect the site with the wider community. KEY: Premier Inn Residential Offices Multi-storey Car Park Carehome Retail & Residential Train Station PREMIER INN BISHOP’S STORTFORD STATION ROAD, HERTS DESCRIPTION Retail Unit The property will be arranged over ground and three upper floors comprising of four bedrooms on the ground floor and 27 bedrooms on each of the upper GROUND FLOOR SECOND & THIRD FLOOR floors, with 85 bedrooms in total. All rooms will be fitted to the latest Premier Inn specifications and will include a range of double and family rooms. On the ground floor there will be a reception, a restaurant and a 600 sq. ft. retail unit with corner frontage and separate access on Station Road and Anchor street that is well positioned to be used as a shop or café. Hotel guests will be able to (subject to a charge) use the parking facilities in the proposed multi-storey car park adjacent to the subject property. FIRST FLOOR STATION ROAD ELEVATION SITE JACKSON SQUARE SHOPPING CENTRE The site for the self-contained hotel is configured in a broadly rectangular shape. Adjacent to the hotel will be a multi-story car park and the first phase of TOWN CENTRE residential development. PLANNING The vision for The Goods Yard is established in the revised Masterplan which was adopted in September 2017. PREMIER INN SITE Planning submissions for the current version of the scheme outlined in the SOUTH ST (MAIN TOWN Masterplan were formally submitted in November 2017, and granted formal HIGH ST) approval, in May 2018 The application reference is 3/17/2588/OUT. BISHOP’S STORTFORD TRAIN STATION Full planning details and documents can be found in the Data Room. View over River Stort towards development PREMIER INN BISHOP’S STORTFORD STATION ROAD, HERTS TENURE The property is sold freehold. TENANCY The property will be let on full repairing and insuring terms to Premier Inn Hotels Ltd from practical completion for a term of 25 years with a tenant only break in year 20. The tenant has the option to renew for a further 25 years on expiry. The agreed rent is £378,250 per annum, reflecting £4,450 per bed, which will be subject to five yearly upward only rent reviews linked to the Consumer Price Index (CPI), compounded annually with a collar and cap of 0% & 4%. The developer will provide a two year rental guarantee of £12,000 per year from PC on the retail unit if it remains vacant. COVENANT Premier Inn Hotels Limited operates over 70,000 rooms, having increased by over 4,000 rooms per year since 2010 and continues to target new hotels. As of December 2017, Premier Inn had a total of 771 hotels and just over 10% of the entire UK hotel market. In recent brand surveys, Premier Inn has extended its Typical Reception lead over other hotel brands in both quality and value. As a result, Premier Inn has continued to grow its market share alongside an increase in RevPAR. Typical Room Premier Inn Hotels Limited is rated 5A1 100% Minimum Risk by Dun & Bradstreet. 02/03/2017 03/03/2016 26/02/2015 Turnover £812,000,000 £743,195,000 £374,540,000 Pre-Tax Profit (Loss) £268,397,000 £255,471,000 £148,523,000 Tangible Net Worth £1,143,116,000 £923,100,000 £744,335,000 Artist impression of new high street PREMIER INN BISHOP’S STORTFORD STATION ROAD, HERTS DEVELOPER DEVELOPMENT TIMETABLE SOLUM Conditional exchange of land December 2018 Established in July 2008, Solum is a partnership & funding contract between Network Rail and Kier Property formed to attract private investment into the rail network and build much needed new homes close to transport hubs. March 2019 Site purchased for £1.9m To date Solum have completed schemes at Epsom, Kingswood, Christchurch and Haywards Heath. Construction of the scheme at Walthamstow has completed and Solum are on the last phase June 2019 1st drawdown/Construction start of construction at Twickenham.
Recommended publications
  • Welcome to This A14 Cambridge to Huntingdon Improvement Scheme Public Exhibition. This Exhibition Is About the Work We Are Doing
    A14 Cambridge to Huntingdon improvement scheme A1 Welcome Alconbury D3 Woolley A141 S2 Huntingdon St Ives A14 Town centre improvements including removal of A14 viaduct Ellington D3 The Hemingfords Brampton D2 Existing A14 Godmanchester Fenstanton Fen Drayton Proposed A14 Swavesey Buckden D3 D3 D2 The Offords A1 Northstowe Hilton Conington New development S2 A1198 D3 Boxworth Lolworth Histon Bar Hill D4 Milton Girton A14 D3 M11 Routes for construction traffic East Coast Mainline railway Cambridge River Great Ouse A428 Huntingdon Southern Bypass S2 Single 2 lane carriageway A1 widening D2 Dual 2 lane carriageway A14 on-line improvements D3 Dual 3 lane carriageway Cambridge Northern Bypass D4 Dual 4 lane carriageway Local access roads © Crown copyright and database rights 2016 Ordnance Survey 100030649 Highways England, creative S160069 Welcome to this A14 Cambridge to Huntingdon improvement scheme public exhibition. This exhibition is about the work we are doing in Huntingdon as part of the A14 Cambridge to Huntingdon improvement scheme. Members of the project team are here to answer any questions you might have. Thank you Highways England – Creative BED19_0157 A14 Cambridge to Huntingdon improvement scheme Why is the scheme necessary? The A14 provides an east- west route linking the Midlands with East Anglia. It begins at Catthorpe near Rugby, where it connects with the M1 and M6 motorway, and continues east for approximately 130 miles to the port town of Felixstowe. It forms one of the UK’s strategic routes and is part of the Trans-European Transport Network. The A14 between Cambridge and Huntingdon serves an additional purpose, connecting the A1(M) motorway to the North The scheme will: of England with the M11 motorway � combat congestion, making the to London and the South East.
    [Show full text]
  • Queens' College Back
    PUBLIC TRANSPORT M11 NORTH- Cambridge A1307 London HUNTINGDON, A1, A14 DIRECTIONS By Rail, Cambridge Station. Newmarket M11 Situated on the south side of the city, has N Felixstowe A14 Leave the M11 motorway at Junction 12 and follow the signs for Cambridge A603; regular services to London (Kings Cross GET IN LANE Harwich * Follow this road, including a forced left-turn at traffic lights (at Grantchester Street) Ely (A10) and Liverpool Street) with a non stop N'market C'bridge until you reach a roundabout; journey time of approximately 55 minutes. M1 A14 A1307 * From 06:00 to 10:00 only, go straight across (first exit) into Newnham Road; For information on train times and * At traffic lights, turn right into Silver Street and pass through bollards: Queens' 1 31 operators call National Rail Enquiries on College entrances are on the left. 0845 7484950. * At other times, turn right (second exit) onto Fen Causeway, part of the Ring Road Cambridge Newmarket A1134; By Bus, Felixstowe A1307 Coach services run regularly from Stansted, A14 Harwich * At a mini-roundabout by the Royal Cambridge Hotel, turn left and keep in the left Heathrow and Gatwick Airports. A A14 lane; 13 Ely 0 * Go straight across an immediate second mini-roundabout (at Lensfield Road), to 7 (A10) By Air, Stansted Airport. 428 head north up Trumpington Street; A Is approximately a 40 minute journey by * Go straight past the Mill Lane/Pembroke Street junction; M11 car. Train services run from Stansted Airport * At Silver Street, take a forced left turn (King's Parade is closed to motor traffic); Junction 14 Ring road Ring road and run hourly (journey time 30 minutes).
    [Show full text]
  • 2019 Annual Report Annual 2019
    a force for good. 2019 ANNUAL REPORT ANNUAL 2019 1, cours Ferdinand de Lesseps 92851 Rueil Malmaison Cedex – France Tel.: +33 1 47 16 35 00 Fax: +33 1 47 51 91 02 www.vinci.com VINCI.Group 2019 ANNUAL REPORT VINCI @VINCI CONTENTS 1 P r o l e 2 Album 10 Interview with the Chairman and CEO 12 Corporate governance 14 Direction and strategy 18 Stock market and shareholder base 22 Sustainable development 32 CONCESSIONS 34 VINCI Autoroutes 48 VINCI Airports 62 Other concessions 64 – VINCI Highways 68 – VINCI Railways 70 – VINCI Stadium 72 CONTRACTING 74 VINCI Energies 88 Eurovia 102 VINCI Construction 118 VINCI Immobilier 121 GENERAL & FINANCIAL ELEMENTS 122 Report of the Board of Directors 270 Report of the Lead Director and the Vice-Chairman of the Board of Directors 272 Consolidated nancial statements This universal registration document was filed on 2 March 2020 with the Autorité des Marchés Financiers (AMF, the French securities regulator), as competent authority 349 Parent company nancial statements under Regulation (EU) 2017/1129, without prior approval pursuant to Article 9 of the 367 Special report of the Statutory Auditors on said regulation. The universal registration document may be used for the purposes of an offer to the regulated agreements public of securities or the admission of securities to trading on a regulated market if accompanied by a prospectus or securities note as well as a summary of all 368 Persons responsible for the universal registration document amendments, if any, made to the universal registration document. The set of documents thus formed is approved by the AMF in accordance with Regulation (EU) 2017/1129.
    [Show full text]
  • A428 Black Cat to Caxton Gibbet Improvements
    A428 Black Cat to Caxton Gibbet improvements TR010044 Volume 6 6.8 First Iteration Environmental Management Plan Planning Act 2008 Regulation 5(2)(a) Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 26 February 2021 A428 Black Cat to Caxton Gibbet improvements First Iteration Environmental Management Plan Infrastructure Planning Planning Act 2008 The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 A428 Black Cat to Caxton Gibbet improvements Development Consent Order 202[ ] First Iteration Environmental Management Plan Regulation Reference: Regulation 5(2)(a) Planning Inspectorate Scheme TR010044 Reference Application Document Reference TR010044/APP/) 6.8 Author A428 Black Cat to Caxton Gibbet improvements Project Team, Highways England Version Date Status of Version Rev 1 26 February 2021 DCO Application Planning Inspectorate Scheme Ref: TR010044 Application Document Ref: TR010044/APP/6.8 A428 Black Cat to Caxton Gibbet improvements Environmental Statement – First Iteration Environmental Management Plan Table of contents Chapter Pages 1 Introduction and background to the Scheme 1 1.1 Purpose of the Environmental Management Plan 1 1.2 The Scheme 4 1.3 Scheme Objectives 7 2 Project team roles and responsibilities 9 2.1 Site roles and responsibilities 9 3 Environmental actions and commitments 15 3.1 Introduction 15 3.2 Guide to the REAC tables 15 4 Consents and permissions 35 4.1 Consents and Agreements Position Statement 35 5 Environmental asset data and as
    [Show full text]
  • Impact of Improvements in the Road Network on the Accessibility & Economic Potential of Counties, Urban Areas, Gateways &
    Transport Research & Information Note Impact of Improvements in the Road Network on the Accessibility & Economic Potential of Counties, Urban Areas, Gateways & Hubs March 2012 Transportation Research & Information Notes Impact of Improvements in the Road Network on the Accessibility & Economic Potential of Counties, Urban Areas, Gateways & Hubs March 2012 This document is available to download at www.nra.ie/publications/trin For further queries please contact: Strategic Planning Unit National Roads Authority St Martin’s House Waterloo Road Dublin 4 Tel: (01) 660-2511 Email: [email protected] Web: www.nra.ie Prepared on behalf of the National Roads Authority by The AECOM Consortium Impact of Improvements in the Road Network on the Accessibility & Economic Potential of Counties, Urban Areas, Gateways & Hubs Contents 1. Introduction ........................................................................................................ 1 2. Accessibility, Effective Density & Productivity ................................................... 1 3. Methodology ...................................................................................................... 6 4. Accessibility to Employment & Population 2006 ................................................ 9 5. The Impact on Accessibility to Employment & Economic Productivity............. 15 6. Implications for Roads Policy, Planning and Research ................................... 23 Impact of Improvements in the Road Network on the Accessibility & Economic Potential of Counties, Urban Areas, Gateways
    [Show full text]
  • Hard Shoulder Running E40 and Weaving Segments E314
    Arc Atlantique Traffic Management Corridor Annex 1 Evaluation reports www.easyway-its.eu TABLE OF CONTENTS 1. FL-01: Hard shoulder running E40 and weaving segments E314 2. FL-02: Hard shoulder running E19 Kleine Bareel – St.-Job-in-‘t-Goor 3. WL-03: Management and transit traffic on Walloon motorways 4. FR-05: Intelligent Truck Parking 5. FR-16: Traffic Management Plans 6. IE-01: MIU ITS Deployment 7. NL-01: Field test Amsterdam 8. PT-..: Monitoring Enhancement on critical segments – to be delivered 9. PT-03: System Enhancements 10. E01: AG-64 Traffic Control and Traffic Management ITS deployment 11. E02: AG-55 Traffic Control and Traffic Management ITS deployment 12. ES-20: Floating Car Data use 13. ES-21: Analysis and evaluation of different traffic management strategies in order to reduce the congestions in Bilbao peri-urban area 14. UK 02: M25 J 5 – 7 Variable Speed Limit, All lane Running / Hard Shoulder Running 15. UK 03: M25 J 23 – 27 Variable Speed Limit, All lane Running / Hard Shoulder Running 16. UK ..: Welsh National Traffic Data System – to be delivered Arc Atlantique Evaluation report – Annex 1 2/2 Hard Shoulder Running and Weaving Segments Belgium –E40/E314 – Brussel - Aken Project Reference: FL-01 Project Name: Hard shoulder running E40 and weaving segments E314 ITS Corridor: E40/E314 Brussel - Aken Project Location: Belgium – E40/E314 Leuven Area 1. DESCRIPTION OF THE PROBLEM ADDRESSED BY THE PROJECT 1.1 Nature of the Site The R0, E40 and E314 in this report are part of a highway connection between the cities of Brussels-Lummen (E314), and Brussels-Luik (E40).
    [Show full text]
  • Chigwell Lane M11 M11 Off-Slip
    Site Report Essex Highways Casualty ReductionDate Site April Report 201 8/19 Date April 2007 Locat ion: CHIGWELL LANE A1168 M11 MOTORWAY M11 District: EPPING Collision Investigation Period: 01/01/2014 – 30/06/2017 Site Ranking: 8 1.0 Site Plan with Collision Plot Chigwell Lane M11 Off-slip M11 Page 1 of 9 2.0 Site Description & Observations Details Description/Observations Road Name (s) Chigwell Lane A1168 jw M11 Northbound Off-slip Grid Reference 544308 - 195621 Speed Limit 40 Street Lit Yes Carriageway type Dual Gradient None Traffic Management / Advanced directional sign and ‘End of Motorway‘ signs on off-slip, Give Existing Traffic Way signs and carriageway markings at junction. Calming Utilities Present Unknown Existing TRO’s 40mph speed restriction. No U-turn Road Surface SCRIM Data (WIP): Good Condition Signing 40 roundel signs, No Entry signing at end of Off-slip Road Markings Clear and appropriate Visibility Good forward visibility to junction with off-slip Vegetation Vegetation within Off-slip embankment Highway Is the scheme within Yes Boundary / Land Highway boundary or (*if the land is not highway the No scheme should only proceed to & Ownership on land owned by feasibility design & land Check ? ECC(*) acquisition/dedication stage) Does the scheme require change to an existing No TRO or Speed Limit Other 3.0 Pers onal Injury Collision Analysis Cluster Site Collision COLLISIONS CASUALTIES Information FATAL SERIOUS SLIGHT FATAL SERIOUS SLIGHT 1 2 3 1 2 5 Identified Collision COLLISIONS CASUALTIES Pattern(s) at Cluster Site FATAL SERIOUS SLIGHT FATAL SERIOUS SLIGHT Vehicles exiting the Off-slip 0 2 2 0 2 4 failing to give way at the junctions and colliding with northbound road users on Chigwell Lane.
    [Show full text]
  • Examination Into the Soundness of the Cambridge Local Plan
    CC1/CCC Examination into the Soundness of the Cambridge Local Plan Matter CC1 – Protecting and Enhancing the Character of Cambridge Matter Statement by Cambridge City Council May 2016 Contents Page List of Abbreviations Introduction 1 CC1A – Design and the Historic Environment 1 1A.1 Policy 7: The River Cam 1 i. In addition to criterion (b), should the policy specifically require new 1 development to preserve or enhance the setting of the river within the historic core having regard to paragraph 2.71 of the policy and the findings of the Cambridge Historic Core Appraisal (2006)? ii. Should the policy make specific reference to ‘The Cam Too Project’ given its 2 close association with the river? 1A.2 Policy 8: Setting of the City 3 i. Should the footnote 7 refer specifically to the most up to date Green Belt 3 review document? ii. Does criterion (a) accord with the provisions of Policy 4 of the Plan in terms 3 of the requirements for development in the Green Belt? In this regard, should the policy draw a distinction between proposals for development in the countryside and proposals within the Green Belt given the substantial weight that the National Planning Policy Framework (the Framework) accords to harm to the Green Belt? iii. Is the wording of criterion (a) too prescriptive in terms of development on the 4 urban edge? Is the criterion out of step with paragraph 58 of the Framework which requires that whilst development should respond to the character, identity and history of the local surroundings this should not prevent appropriate innovation? iv.
    [Show full text]
  • 100 Pall Mall, St James ,London, SW1Y NQ Tel:0207 664
    100 Pall Mall, St James ,London, SW1Y NQ Tel:0207 664 8699 Fax: 0207 321 3738 Email: [email protected] www.theaskingprice.co.uk REFERENCE: 16038-Vacant Warehouse, Peterborough ADDRESS: Jtf Wholesale Ltd, Padholme Road East Peterborough PE1 5XL • Prominent location with 275 ft frontage to Padholme Road • Site area 2.08 acres and 364 ft on Vicarage Farm Road • 58 Car parking spaces • 37427 sq. ft • B8 Wholesale Warehouse and A1 Retail warehouse club use LOCATION Peterborough is a historic cathedral city in the east of England. The city lies on the River Nene and is situated about 40 miles north west of Cambridge, 40 miles north east of Northampton, 40 miles east of Leicester and 90 miles north of Central London. Peterborough is located around 3.5 miles north east of Junction 17 of the A1(M) Motorway. After Junction 17 the A1(M) becomes the A1 which serves as the main access route to the Midlands and the North from East Anglia. The A1(M) converges with the A14 around 13.5 miles to the south proving access to Huntingdon and Cambridge. At Cambridge the A14 meets the M11 Motorway at Junction 14 which provides access to the M25 (London Orbital) Motorway at Junction 6/27 a further 38 miles to the south. The A1(M) also provides direct access to Junction 23 of the M25 around 58 miles to the south of Peterborough. Peterborough Railway station provides a direct service to London Kings Cross with a fastest journey time of approximately 45 minutes. SITUATION Padholme Road East runs for approximately two thirds of a mile on an east to west axis from its junction with Fengate to the east, to its junction with Carr Road to the west.
    [Show full text]
  • HE/A14/EX/32 TR010018 A14 June 2015
    2 A14 3 Cambridge to Huntingdon improvement scheme Development Consent Order Application HE/A14/EX/ Response to the First Written Questions TR010018 HE/A14/EX/32 Development Consent Order Application Response to the First Written Questions Report 5: Design and Engineering standards June 2015 The Infrastructure Planning (Examination Procedure) Rules 2010 A14 Cambridge to Huntingdon improvement scheme Development Consent Order Application Response to the First Written Questions (Report 5: Design and Engineering Standards ) HE/A14/EX/ 32 June 2015 A14 Cambridge to Huntingdon improvement Development Consent Order Application scheme Response to the First Written Questions (Report 5, Design and Engineering Standards) Contents 1 Category 5: Design and Engineering Standards ....................................... 4 Question 1.5.1 .................................................................................................. 4 Response ......................................................................................................... 4 Question 1.5.2 .................................................................................................. 5 Response ......................................................................................................... 5 Question 1.5.3 .................................................................................................. 6 Response ......................................................................................................... 6 Question 1.5.4 .................................................................................................
    [Show full text]
  • New Units for SALE/TO
    New units FOR SALE/TO LET 6,243 to 39,558 sq ft (580 to 3,675 sq m) A new development of industrial warehouse units situated in a prime location on the Brimsdown Industrial Area in Enfield, North London. www.enfieldthegrid.com UNITS AVAILABLE Q3 2017 LOCKFIELD AVENUE | ENFIELD | EN3 7PX A range of flexible units ideally suited for serving the North and Central London markets and the wider South East Enfield’s strategic location with easy access to the M25 and A406, plus central London, London airports and public transport network has attracted a diverse industrial and distribution base. It is home to over 10,000 logistics and industrial businesses employing nearly 90,000 people. Images of other speculative developments carried out by Chancerygate Accommodation Planning use Unit Ground Floor First Floor TOTAL* B1 (c), B2 and B8 (industrial and warehouse) uses. (sq ft) (sq ft) (sq ft) Unit 1 21,743 2,799 24,542 (2,280 sq m) Unit 2 12,540 2,476 15,016 (1,395 sq m) Unit 3 5,070 1,173 6,243 (580 sq m) Green credentials Unit 4 5,404 1,259 6,663 (619 sq m) Chancerygate employ the latest environmentally friendly technologies Unit 5 UNDER OFFER Sliding Gate to reduce the costs of occupation. The scheme will ensure a minimum *Areas are approximate on a GEA basis 35% decrease in CO2 emissions over 2010 Buildings Regulations and achieve a BREEAM rating of “Very Good”. As a result occupation costs 36m General specification to the end user will be reduced.
    [Show full text]
  • Raynham Road Industrial Estate | Bishop’S Stortford | Cm23 5Pb Stansted Airport
    RAYNHAM ROAD BISHOP’S STORTFORD, INDUSTRIAL ESTATE CM23 5PB REVERSIONARY SOUTH EAST MULTI LET ESTATE WITH DEVELOPMENT & ASSET MANAGEMENT OPPORTUNITIES INVESTMENT SUMMARY • Unique opportunity to acquire an established multi – let industrial estate in a core South East market 1 MILE FROM M11 MOTORWAY • Situated off the A1250 Dunmow Road being 1 mile from Junction 8 of the M11 • Multi let estate comprising of 26 industrial and trade counter units totalling 101,374 sq ft (GIA), with unit FULLY LET INDUSTRIAL AND sizes ranging from 1,626 sq ft to 13,996 sq ft TRADE COUNTER ESTATE • 29% of the estate (by floor area) was constructed since 2010 • Fully let to 18 tenants with a headline rent of£794,225 per annum, reflecting a low average rent of £7.83 per sq ft 37% OF THE ESTATE • The estate has an average weighted unexpired lease CONSTRUCTED SINCE 2010 term of approximately 6.7 years to expiry and 3.3 to tenant break options • Strong tenant line up to include a number of trade FUTURE REPOSITIONING occupiers, including Edmundson Electrical, Screwfix AND REDEVELOPMENT and ITAB Prolight UK Ltd OPPORTUNITY • Prominent site totalling approximately 9.43 acres, reflecting a low site density of 31.8% • Immediate asset management opportunities and LOW HEADLINE RENT longer term development OF £7.83 PSF • Freehold Offers are sought in excess of £12,400,000 (Twelve Million, Four Hundred Thousand Pounds), subject to contract and exclusive of VAT, which reflects a Net Initial Yield of 6.00%, assuming purchaser’s costs of 6.71%, and a capital value of £122 per sq ft.
    [Show full text]